We appreciate everyone being on the line, and we’re glad to have you join the September Quarter Report for 29Metals Limited. Everyone attending is currently muted and can only listen. After a presentation, we’ll hold a question-and-answer session. Should you want to pose a question, press the star key and then the number one on your phone’s keypad. At this point, I’ll pass the conference to Michael Slifirski, Group Manager, Investor Relations. Over to you.

Michael Slifirski

executive
#2

Thank you, Betsy. Good morning, everyone. I’m Michael Slifirski. Welcome to the 29Metals September Quarter 2022 Production Report Conference Call. This call is being recorded and will be available for replay through the 29Metals website as well as the Open Briefing website. Peter Albert, Managing Director and CEO of 29Metals, will start the discussion, then hand over to Chief Operating Officer Ed Cooney, who will take you through the operating performance. Ed will pass to our CFO, Peter Herbert, to talk about financial performance, and then pass on to Group Geology Manager, Mark van Heerden. Mark will then hand back to Peter, who will facilitate Q&A. I’ll now hand over to Peter to begin the discussion. Thanks, Peter.

Peter Albert

executive
#3

Thanks, Mike, and I appreciate the introduction. Welcome, everyone, and thanks for being with us this morning. Mike has already handled the introductions. I'd like to begin by acknowledging the two tragic deaths at Western Australian mines last week, and also the loss of Peter Bradford, one of the Australian mining industry's best-known and most respected people. It was a sad week for mining and for all of us. On 29Metals' own safety results, we had a very pleasing quarter, with our TRIFR coming down meaningfully. What the quarterly data points don't capture is how much our site teams have focused on leading indicators, like hazard identification and leadership interactions. They've been doing a great job. COVID effects have been fairly minor, and while absenteeism remains an issue overall, it dropped significantly over the quarter. Labor pressures continue across the industry, particularly in certain technical discipline areas, but we've largely held our own. Our mining contractor, Byrnecut, has recruited and trained additional personnel successfully. One thing we keep focusing on is bringing women into every part of the business. Gender diversity is a central factor in our recruitment and retention efforts. Speaking of Byrnecut, we were delighted to sign a new five-year contract with Byrnecut for Golden Grove, starting on the first of October, just past.

Peter Albert

executive
#4

Byrnecut has proven to be a solid partner, and the fresh agreement is essentially on equivalent terms to the earlier one, with extra shared commitments around sustainability and ESG that will be delivered across the contract's duration. All in all, output throughout the company has been encouraging, hitting or beating every one of the targets we set. Copper and zinc output came in at 12,300 tons and twelve thousand five hundred tons respectively — the strongest quarterly figures this year for both metals. At Capricorn Copper, copper output of almost 7,700 tons made for a very robust quarter, with solid melt, tons, grade, and recovery. Golden Grove's copper output of 4,600 tons was a steady result, and zinc at 12,500 tons points to a rising zinc production profile that ought to build in the fourth quarter, as we previously told the market. Group copper equivalent output for the quarter reached 19,800 tons — the best quarter this year so far and the second-best across the last seven quarters. Ed will go into production results in greater depth. Commodity prices stayed broadly steady during the quarter, with copper ranging from roughly $3.40 a pound U.S. to $3.60 a pound U.S. Even though commentators foresee prices easing in 2023, 29Metals holds a bullish longer-term view, underpinned by the unavoidable demand needs for copper tied to the decarbonization thematic.

Peter Albert

executive
#5

Even so, whatever the price backdrop, what we concentrate on is getting production out and keeping costs in check. On costs: absolute costs did rise versus the prior quarter, but that mostly reflects more activity plus somewhat higher input costs, diesel among them. For certain commodity inputs, the momentum of cost increases is easing, and for some it is actually falling. Group C1 and AISC unit costs came down quarter-over-quarter even though absolute costs were higher, because production results improved. We keep committing spending to sustainability projects for the business's long-term operational security and growth. As I mentioned earlier, labor pressures continue industry-wide, though after our first-half review of remuneration, attraction, and retention strategies, turnover rates have flattened out, and we have managed to fill some of the tougher technical roles. Turning to my earlier point about investing for the future, several key projects moved forward in the September quarter, including the paste fill plant at Golden Grove, which is now delivering paste to an underground stope at Gossan Hill. Optimization of that facility is ongoing, and we are happy with how it has performed so far. The chilling plant and booster fans at Gossan Hill are still on schedule to be delivered by the end of the year, which will further improve operating conditions at the Xantho Extended ore body.

Peter Albert

executive
#6

By the close of the quarter, the newest TSF extension at Golden Grove had reached near completion. Both the Cervantes and Gossan Valley studies wrapped up in that period, and final review is underway as we get ready to share a market update before long. Exploration results across all three 29Metals assets that we reported this quarter were highly encouraging. Additional drilling at Cervantes keeps bolstering the potential of this ore body, and an infill drilling program is now being advanced. Over at Capricorn, drilling at depth at Esperanza South showed at minimum sustained grades across wider widths, reaffirming our thesis of possible increased tons per vertical meter as we go deeper at ESS, Esperanza South. At Red Hill, we released the remaining results from the exploration program conducted earlier in the year, which showed extensions to vein systems along with some very encouraging copper and gold results from the rock and chip samples collected. On financial outcomes, Peter Herbert will go into more detail, but a few highlights. Revenue was strong at close to AUD 200 million even with commodity prices falling quarter-over-quarter. Our first debt repayment has been made, and copper hedges are now fully closed off as of early October. And of course, our first dividend was paid during the quarter, which should have landed in bank accounts sometime in the last few days.

Peter Albert

executive
#7

I'll pass things along now to Ed Cooney, our COO and Chief Operating Officer, who will cover what's happening on the production side at both operating mines. After that, Ed will pass the floor to Peter Herbert for a rundown of the financial and commercial results. And last, Mark van Heerden will go through a few of the exploration results. Ed, over to you.

Ed Cooney

executive
#8

Thanks, Peter, and good morning to everyone. So, during the September quarter we saw an improvement compared with how both the March and June quarters performed, with group metal production overall coming in higher. Copper, zinc, and lead all rose, whereas precious metals declined. At Golden Grove, both mining volumes and development advance were up relative to the June quarter, mainly because absenteeism levels were lower. Extraction of zinc sources from underground rose in line with the mining schedule. At the close of the quarter, roughly 100,000 tons of ROM stocks sat ahead of the mill, made up predominantly of zinc ore. The mining plan for the December quarter will keep focusing on extracting zinc ore sources, and zinc production is expected to be materially higher than in the September quarter. At Xantho Extended, production from the first was successfully completed, and the stope is currently being backfilled. Good progress was achieved installing the additional surface cooling plant, which remains on track for commissioning during the December quarter. That will deliver further chilled air capacity to improve operating conditions at Xantho Extended over the upcoming summer months. Procurement of underground booster fans has unfortunately been delayed, with expected delivery now moving into the March quarter. Installation and energization of the paste fill plant were completed, with fill delivered into the first stope, and commissioning will continue through the December quarter to ensure the performance criteria tied to both the plant and the fill are achieved.

Ed Cooney

executive
#9

On the mill side, throughput came in lower because we finished a planned ten-day maintenance shutdown, and we also had a mill rate limitation in place while building the TSF lift, which rainfall delays affected. The TSF lift is set to be finished in the December quarter, and the milling rate limitation had been removed by the end of the quarter. Because of this, mine tons came in above mill tons, which built up surface ROM stockpiles. The zinc regrind mill, which had a failure in the March quarter, was brought back online, and that, together with higher feed grades and lower pyrite levels in the zinc feed, helped lift recoveries. Unit costs at Golden Grove in the quarter were affected by higher mining activity levels, the maintenance spend tied to the planned shutdown, lower by-product credits, higher sustaining capital costs that coincided with the TSF lift and the cooling plant installation, and lower copper sales. Turning to Capricorn Copper, which had a particularly strong quarter with over 7,600 tons of copper produced, supported by significantly higher tons milled, improved feed grades, and better recoveries. Mining volumes were lower because of reduced draw point availability at the sublevel cave, Esperanza South ore body, which also saw some interruption from the ongoing commissioning of the recently installed surface fans.

Ed Cooney

executive
#10

Commissioning of the fans should be completed successfully in the December quarter. Ore grades came in higher across all three ore bodies. Greater tonnage was milled thanks to a push by the processing and maintenance teams earlier in the year to increase runtime, made possible by healthy opening ROM stockpiles at the start of the quarter. Unit costs at Capricorn Copper reflected broadly unchanged site costs along with robust copper sales. Beyond the continuing commissioning of the surface ventilation fans, project work also featured buying new high-efficiency evaporators to cut the site water inventory further, set for commissioning later in the December quarter. At the same time, preparations got underway for the approaching wet season. We lodged the application for the next lift of the tailings storage facility during the quarter, and construction is anticipated to begin in the December quarter. We likewise began preliminary studies into cobalt present in the resource, mainly in the Esperanza South ore body, aiming to gain a clearer picture of the cobalt mineralization and potential future by-product recovery routes. I'll now pass things to Peter Herbert, who will cover the quarter's financial results.

Peter Herbert

executive
#11

Thanks, Ed, and good morning, everyone. I'll begin with how revenue turned out. 29Metals posted revenue of AUD 193 million for the September quarter, which was up 17% versus the June quarter result. That quarter-on-quarter revenue lift came mainly from materially better operating performance at Capricorn Copper, which drove higher copper sales and positive QP adjustments during the quarter, and those more than offset reduced sales volumes at Golden Grove. In line with Capricorn's stronger contribution, copper revenue for the quarter, excluding QPs, came in at roughly 68%, compared with 62% in the June quarter. Turning to costs, group site costs for the September quarter were about AUD 8 million, or 6%, above the prior quarter, driven mainly by higher site costs at Golden Grove, reflecting the higher activity levels Ed covered, including mine tonnes, operating development and rehabilitation, cost escalation, including diesel prices, and the effect of a planned shutdown during the quarter. On the whole, site costs at Capricorn Copper were flat, as higher mining costs were offset by lower G&A costs. Group concentrate transport costs came in roughly AUD 1 million higher, in line with greater sales volumes at Capricorn, and TCRC costs were about AUD 4 million lower, as higher TCRC costs at Capricorn and increased sales volumes were more than offset by reduced sales volumes at Golden Grove and lower prevailing zinc prices during the quarter, which brought down the cost of TCs linked to the zinc price.

Peter Herbert

executive
#12

On a quarter-over-quarter basis, the higher absolute C1 costs for the group mostly come down to increased site costs at Golden Grove, as we discussed, along with reduced by-product credits. Unit C1 costs did fall, though, by 4% in USD terms during the September quarter, thanks to greater stockpile credits at Golden Grove, which came from a build-up in raw material stockpiles. We also saw flat site costs at Capricorn Copper paired with significantly higher production and a decline in the Australian dollar exchange rate. Absolute AISC costs reflected increased sustaining capital expenditure in the September quarter, which stemmed from TSF and ventilation projects at Golden Grove. After the result on C1 unit costs, AISC unit costs came in at $3.37 a pound U.S., down roughly 6% versus the June quarter. Unaudited cash as of 30 September stood at AUD 189 million, a decrease from the AUD 228 million balance at 3 June, reflecting the effect of realized QPs on reported sales in the prior period, which cut final cash receipts in the September quarter by about AUD 21 million. Roughly AUD 8 million settled out of the mining hedges during the quarter, along with debt service payments of AUD 14 million, including the first scheduled amortization of 29Metals' term loan facility. With that scheduled amortization underway, drawn debt dropped to $144 million.

Peter Herbert

executive
#13

29Metals is going to keep amortizing its term loan facility each quarter. Every pre-IPO copper hedge has now been settled, and the last cash payment on those out-of-the-money hedges takes place in early October. In the September quarter, 29Metals declared its first dividend — an interim dividend of AUD 0.02 per share, fully franked. That dividend was paid after the quarter closed, so it isn't reflected in the unaudited cash balance at 30 September. And lastly, the stamp duty owed on the Golden Grove acquisition is still outstanding. 29Metals carries an AUD 26 million provision for that stamp duty. Thank you very much. I'll now pass things to Mark to talk about exploration.

Mark van Heerden

executive
#14

Thanks, Peter. Over the quarter, we kept up drill testing of priority zones at Capricorn Copper and Golden Grove, and we also began initial drilling at two regional prospects located on the Capricorn Copper exploration leases. Beyond that, 29Metals reported drilling results from Esperanza South and Cervantes, plus exploration results from the Red Hill field campaign. At Capricorn Copper, on August first we put out the surface drilling results. That drilling targeted the deeper portions of the Esperanza South ore body and cut broad zones of copper, silver and cobalt mineralization, with results coming in above what is modeled in the current mineral resources estimates. A few notable highlights are downhole intercepts of 72.9 meters at 2.9% copper, 37 grams silver, 672 PPM cobalt; 86 meters at 2.8% copper, 32 grams silver, 822 PPM cobalt; and 104 meters at 2% copper, 22 grams silver, 714 PPM cobalt. Esperanza South is still open down plunge, and there is plenty more work for us to do there. The success of this drilling justified committing an additional AUD 2 million in 2022. This settlement has let us keep drilling this area through the September quarter and on into the December quarter. Every result reported in the August 1 release will be folded into the annual mineral resources and ore reserves update.

Mark van Heerden

executive
#15

Extensional and resource-conversion underground drilling also took place throughout every active mining area. Regionally, the quarter saw only limited drilling, with 350 meters completed at the Eagle's Nest and Fortsky East prospects. Planned regional work for the December quarter covers an induced polarization geophysical survey campaign across a number of historic copper occurrences, plus initial testing at the Merlot prospect using 2 short RC holes. At Golden Grove, Cervantes and Xantho Extended were the priority targets for conversion and extension. The Cervantes drilling results came out as part of the August first exploration release. That drilling cut local zinc, silver, gold, lead and copper mineralization beyond the existing mineral resource estimates, above the known mineralization. Results are also in for the first extensional hole to the north, which intersected zinc, silver and gold mineralization. Cervantes and Xantho Extended drilling will carry on into the December quarter. Drilling at Oizon and at Xantho Extended north, both originally planned for the September quarter, has been pushed back to the December quarter and early 2023 respectively. The reason is to permit development of appropriate underground drill locations that keep interactions with planned mining activities to a minimum.

Mark van Heerden

executive
#16

Regarding Red Hill, we got assay results back from the portable small drill and rock chip samples that were collected during the 2022 field season. Those results came out on August 1 and September 26. Every modeled vein outcrops at surface, and the current mineral resource estimates are mostly modeled down to 100 meters below surface, with a maximum depth of 200 meters. According to the new results, all the mineralized veins that make up the current estimation remain open along strike and at depth. In addition, we identified and sampled several veins that have not yet been drilled, and results from those came back as high as 11.9% copper and 164 grams per ton silver. What we learned from this year's campaign is being used to inform planning for future exploration activity at Red Hill. Now I'll hand it back to Peter Albert for any further remarks from Q&A.

Peter Albert

executive
#17

Appreciate that update, Mark. Betsy, let’s move on to the Q&A now, please.

Operator

operator
#18

Thank you. Should you want to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, press star two instead. Should you be using a speakerphone, please lift your handset before asking the question. Our first question comes from Adam Baker at Macquarie. Please proceed.

Adam Baker

analyst
#19

Good day, everyone. Perhaps I’ll begin with Capricorn, where mill throughput was quite strong this quarter at 493,000 tons. I’m just wondering whether that is a level that can be sustained going forward, or what you expect it to fall back to if that level cannot be sustained. Thanks.

Peter Albert

executive
#20

Appreciate that, Adam. Ed, I'll have you take that one.

Ed Cooney

executive
#21

Yeah, thanks. We had no scheduled mill shutdowns during the quarter, so in that respect we benefited from extra runtime compared with the prior quarter. There's a lot of focus on, you know, throughput rates and keeping those rates high. If you recall, in 2021 during the second half of the year, we sustained a throughput rate of circa 2 million tonnes for that second half. You know, we're always trying to optimize and maximize mill runtime. We do have some fairly healthy surface stocks, albeit of lower grade, to support, you know, continued high runtime. I probably won't put a number on it, but yeah, obviously we're trying to maximize it as best we can for as long as possible.

Adam Baker

analyst
#22

What's the size of your surface stocks? Sorry, I guess I should be looking at the reserves and resources, but yeah, it's quite significant, isn't it?

Ed Cooney

executive
#23

In terms of magnitude, it's comparable to what we've disclosed for the Golden Grove stockpile, though at Capricorn Copper the material is of lower grade.

Adam Baker

analyst
#24

Sure, no problem. Perhaps looking at Golden Grove, then, and just running some quick rough figures. In order for you to hit the zinc output guidance in Q4, you'd need to turn out roughly 19,500 tons of zinc. Do you believe that can be done?

Ed Cooney

executive
#25

As you’re aware, right now we’re extracting zinc from a large number of underground sources. Through the end of the year, the remaining quarter contains plenty of zinc sources. At present we have 100,000 tons—mostly zinc ore—stockpiled ahead of the mill while zinc campaigns are being run, so the mine plan and the processing schedule both back that up.

Adam Baker

analyst
#26

That's great to hear. Appreciate it, everyone. I'll make sure that gets shared.

Peter Albert

executive
#27

Appreciate that, Adam.

Operator

operator
#28

Our following question is from Alexander Papageorgiou at Citi. You have the floor.

Alexander Papageorgiou

analyst
#29

Hey Peter, and everyone on the team. With the copper hedge now closed out, what's your approach to hedging from here on? Do you plan to stay unhedged? Would you consider hedging certain byproducts, such as zinc?

Peter Albert

executive
#30

Broadly, my view is that we want to give investors the greatest possible exposure to commodity prices. That's a stance we revisit periodically. It will remain an open question, but as things stand right now, our position is that we won't put on any additional hedges.

Alexander Papageorgiou

analyst
#31

Yeah. So, the underground mining contracts at Golden Grove were just renewed with Byrnecut — how does this new contract stack up against the old one when it comes to labor rates?

Peter Albert

executive
#32

Was that all, Ed?

Ed Cooney

executive
#33

Yes. I mean, the arrangement is basically on the same commercial terms and conditions. As you know, we’ve taken on labor cost escalation as we went through the term of the previous contract, and we don’t expect any material jump as of October 1. For us, it’s very much business as usual.

Alexander Papageorgiou

analyst
#34

All right, thank you — I'll make sure that gets shared.

Operator

operator
#35

Our following question is from Daniel Morgan at Barrenjoey. You have the floor.

Dan Morgan

analyst
#36

Hi, Peter and Tim. My question is about Golden Grove. As you point out, development rates have come in somewhat under plan so far this year. I was just wondering, you know, whether you could give us an update on when you expect to reach Xantho in a material sense, so that it's providing material feed for the mill, and, you know, when you expect a big lift in zinc grades, which I imagine comes along with that? Thank you.

Ed Cooney

executive
#37

Yeah, I’ll take that question. We’re now in Xantho Extended. Our first stope has been mined. The next stope is scheduled for mining this quarter. Beyond that, we’re obviously also advancing the decline and developing the ore body. The amount of material coming from Xantho Extended will rise progressively year on year as we keep moving further into the core of the ore body.

Dan Morgan

analyst
#38

At what point do you anticipate reaching the main portion of the ore body? Is that going to come along gradually over the course of 2023, you know, and then begin to carry more and more weight in 2024? Or is there — you know, I'm just trying to work through how that plays out. Thanks.

Ed Cooney

executive
#39

Yeah. Yes, it's going to ramp up gradually across the years ahead. I probably won't attach, you know, particular figures to that, but the prospectus documents also showed an increase in ore tons as output from that orebody grew.

Dan Morgan

analyst
#40

Yes. Many thanks.

Peter Albert

executive
#41

To pick up on something Mark said earlier, we're going to keep drilling deep at Xantho Extended and keep growing that ore body. It keeps looking extremely positive.

Dan Morgan

analyst
#42

Alright, thanks so much.

Operator

operator
#43

Our following question is from Tim Hoff at Canaccord. Go right ahead.

Tim Hoff

analyst
#44

Hey there, thanks for asking. We’re taking a look at Golden Grove right now. Mining unit costs appear to have run higher over the last couple of quarters. Your dollar million cost has risen too. I was wondering whether there’s extra activity happening at the mine, or development work there, that’s being folded into that figure and, you know, somewhat obscuring how the cost increase is being perceived—or is that increase in cost genuine?

Ed Cooney

executive
#45

During the latest quarter, activity picked up as we outlined — ore and waste movements, development work, and rehabilitation all increased, and on top of that we saw some cost escalation during the period. Beyond those items, there really wasn't anything else material. One additional point: naturally, we always aim to keep Tonne-kilometre as low as possible. We did experience some interruption to Scuddles hoist availability. Once that is back up and running, we ought to see a reduction in TKM coming from the Scuddles mine, though nothing particularly significant.

Tim Hoff

analyst
#46

Yes. As we look ahead on that, do we take it that activity levels of this kind are going to carry on?

Ed Cooney

executive
#47

Could you repeat that, please?

Tim Hoff

analyst
#48

As we look ahead regarding that rehabilitation waste movement and development, should we expect those levels to stay at the current quarter? In other words, is this not merely activity, or is this—

Ed Cooney

executive
#49

Honestly, those figures do tend to move in cycles, depending on the location of our mining operations and the kind of work being carried out, and also on the amount of waste development involved. So rather than taking a single quarter as representative, I'd suggest averaging them across a span of time.

Tim Hoff

analyst
#50

All right, sounds good. Great. Thanks a lot.

Operator

operator
#51

If you'd like to ask something, just hit star one on your phone again and hang tight until your name is called. Our next question is from Matt Greene at Credit Suisse. Go right ahead.

Matt Greene

analyst
#52

Morning, gentlemen. Trust everyone’s doing well. First off, congratulations on how Capricorn Copper has performed. Yeah, in the latest quarters it really appears to be getting everything right. I suppose, then, what difficulties—if there are any—do you anticipate from that operation in the near term?

Peter Albert

executive
#53

I didn't catch that. Which challenges were you referring to? Apologies, Matt, I didn't hear that.

Matt Greene

analyst
#54

So what kind of challenges, if any, are you anticipating from the operation in the near term — or is it mostly about labor and consumable costs, or any other issues we ought to know about short term?

Peter Albert

executive
#55

Okay, the difficulties we ran into during the first six months of the year, which affect the entire sector — we got through those, I mean the absenteeism and COVID, that was a major hurdle. We have definitely watched that ease off, so to speak, during this quarter, and hopefully that keeps going and we see nothing other than that kind of result. Even so, we still face difficulties when it comes to labor pressures and the unemployment rate sitting as low as it is — historically low — that will always be a hurdle for the entire sector. As I mentioned in my earlier remarks, we are more or less holding our ground there and are fairly happy, in relative terms, with how we stack up against others when it comes to recruiting and retaining our good people. It is always a hurdle, and you have to stay very alert to what is going on in the marketplace. On the physical side, naturally, Ed has discussed some of the operational matters that we have been handling and getting past and in fact improving — when it comes to tailings dams, when it comes to ventilation systems, and getting ahead of things. We have always, as 29Metals, always been putting money in for the longer-term sustainability of the business, and we have kept doing so.

Peter Albert

executive
#56

So that takes some risk out of the business, and it helps us hit the guidance we anticipate and expect to meet over the coming quarter. Provided we have the people resources and the physical resources — meaning the equipment — that ought to leave us well positioned. Barminco, as I mentioned earlier, has been a very good partner. Ed has referred to the very good production coming out of the Capricorn Processing Plant. The team there is doing a marvelous job when it comes to the availability of that facility. Capricorn and Golden Grove have always been in a good place on that front. You know, it's a mining business, Matt, so you have to be able to respond to challenges on an ongoing basis. As for what we can manage day to day, we think we're in pretty good shape.

Matt Greene

analyst
#57

Thanks, Peter. I appreciate the context you provided. Moving on to Golden Grove and the Zinc Ridge stockpiles: did this accumulation happen simply because of the regrind — the zinc regrind that was unavailable — or are you now, and I mean you mentioned that during this current quarter you'll be heading into the Zinc Ridge areas, but also in the September quarter — was that the situation?

Ed Cooney

executive
#58

Right, so, you know, we were mining, and during the quarter we began moving mining toward sources that are more dominant in zinc. The buildup, really, was probably more a result of the lower mill throughput lining up with the planned mill outage along with some limitations on the throughput rate. That's, you know, those constraints aren't there for this quarter, so we'll begin chewing through all that material, and it's also supported by additional zinc feed from underground.

Matt Greene

analyst
#59

All right, thanks—that helps. Now, on the mine plan: during the last quarter you moved operations toward shallower zones. The material there was expected to be copper, mainly copper-rich, and you noted that those stopes had been pulled forward in the schedule and that this would carry on through the remainder of the calendar year. So are you now returning to deeper levels that are richer in zinc? In other words, has the mine plan been altered over the past few months?

Ed Cooney

executive
#60

Just a few remarks. We had consistently indicated that zinc would be weighted toward the second half of the year. At this point we have much lower absenteeism levels, which means we can run all of the equipment at full capacity. We have always been mining certain ore sources at depth, but likely in the later portion of the year there will be a greater number of ore sources at depth, mainly zinc. Those lower absenteeism levels along with higher mining activity genuinely underpin that capability.

Matt Greene

analyst
#61

All right. We should begin seeing additional ore out of the deeper levels, and I imagine you'd anticipate that to build through the December quarter and then carry on into 2023. Would that be a reasonable read?

Ed Cooney

executive
#62

So for that particular December quarter, given where the zinc ore sources sit, there's probably a good chance the tonne-kilometre figure will rise. As for life of mine, I suppose my answer would be that the mine certainly isn't becoming any shallower. Trucking remains a major area of focus for us at all times.

Matt Greene

analyst
#63

Yeah, got it. Okay, thank you. Regarding the main growth projects at Golden Grove, it seems that most of the spending on those will wrap up during this quarter. You noted that the fans have moved into the March quarter. I suppose, looking ahead to 2023, if we set aside Cervantes and Gossan Valley, are there any other significant projects in the pipeline that we ought to know about?

Ed Cooney

executive
#64

Expect us to give more detail and clarity on that, I'd think, when we put out the December quarter results — regarding, you know, what's in store for 2023.

Matt Greene

analyst
#65

All right, that's excellent. Thank you so much.

Operator

operator
#66

That brings us to the end of the Q&A. I'll turn things over to Peter Albert now for some closing comments.

Peter Albert

executive
#67

Thanks, Betsy, and thanks to everyone for the great questions. Thanks Ed, Mark, and Peter Herbert for walking us through your respective areas of expertise. Just a few closing comments, Betsy. As was just mentioned, the opening two quarters of 2022 were difficult as the borders in Queensland and then Western Australia reopened, and during that stretch COVID turned into a major man-management hurdle. That was then made worse by higher absenteeism and pressures in the labor market. As I noted a moment ago, this past third quarter has seen those difficulties ease, and that has contributed to the strong production we delivered in the quarter. There's been plenty of discussion of that just now. On top of that, we're beginning to see certain input prices level off and, in some instances, retreat from their peaks. We don't claim to be forecasters of commodity prices, but we do recognize the strategic worth of our portfolio, since global decarbonization commitments will require substantially more output of the metals we produce than, from where we sit, seems attainable on the supply side of the equation, so to speak. As miners, our perspective has to span the medium to long term, while also managing to the short term. Over the long term, we hold a very positive view on copper and other critical minerals.

Peter Albert

executive
#68

Absolutely, I consider copper to be a critical mineral. In the near term, our priority is ensuring the business remains robust across every cycle. We're especially enthusiastic about the exploration results from Esperanza South at Capricorn Copper that Mark mentioned. Capricorn Copper's performance in the September quarter showed how this operation leverages grade and throughput. The Esperanza South exploration results point to the potential for the operation to deliver more tons at high grade in future years while also extending mine life. We do anticipate additional news coming through this quarter, with updates on the Cervantes and Gossan Valley studies to be released in the near term. Thanks, everyone, for listening and for the good questions we've had. That's all from us, Betsy. Thank you very much for hosting the call.

Operator

operator
#69

That brings today's conference to a close. We appreciate your participation. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete 29Metals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to 29Metals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in 29Metals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.