5E Advanced Materials, Inc. (FEAM) Earnings Call Transcript & Summary

November 17, 2026

NASDAQ US Materials Metals and Mining earnings 35 min

Earnings Call Speaker Segments

Paul Weibel

executive
#1

Good afternoon, and thank you for being with us today. For 5E Advanced Materials, the first quarter of fiscal year 2027 represents a pivotal point. On October 1, the day following quarter end, we completed our acquisition of Searles Valley Minerals' assets, taking them free and clear of the previous owner's legacy liabilities and historical claims. That closing moved 5E from a development-stage company to an operating producer of borates and industrial minerals that generates revenue. It deserves a moment to consider what we now hold. Searles Valley encompasses three processing sites, 54 megawatts of on-site cogeneration capacity, the Trona Railway short line railroad, a water utility, roughly 25,000 acres spread over three California counties, and mineral tenure covering more than 9,000 acres at Searles Lake, run by a skilled workforce of about 250 people. The operation turns out 5E Bor, which is borate pentahydrate, along with sodium sulfate and salt, and it has boric acid production capacity that sits idle at present. Alongside our Fort Cady project, 5E now owns two boron assets in Southern California at a moment when boron has earned a place on the U.S. Department of the Interior's critical minerals list. In our view, that makes 5E a strategically important domestic supplier of critical minerals. Since the acquisition closed only after quarter end, I want to concentrate today on our first 5 weeks of ownership and on our plan to build the value of this platform going forward; that plan rests on the three levers we described on our acquisition call: price, cost, and volume. Operational excellence and execution are the focus now. Work on each is already underway, and I will take you through our progress. First, a look at our first month of operations. During October, we produced 6,200 tons of 5E Bor, on top of roughly 3,000 tons of 5E Bor inventory that we brought into the month, and we sold about 2,500 tons; in October we gave priority to our domestic customers as we build out export logistics through the Port of Long Beach; that network is now in place, opening container shipments into Asia, and the inventory built during October is positioned to move into that channel in November; with logistics established and product on hand, we expect 5E Bor sales volumes to ramp as we progress through November and into December. Now to the levers, beginning with price. Through the bankruptcy process, the legacy below-market sales contracts were rejected. That leaves us a clean slate on commercial terms, and we have moved customers onto new take-or-pays and fixed-price 5E Bor offtake agreements. In our first month, we achieved a 5E Bor netback of approximately $767 per ton. Importantly, many of our November 5E Bor orders have been prepaid, which reflects the demand we are seeing for our product. Turning to cost, power stands as one of our largest opportunities, and the answer is already on site. We intend to cut the Westend plant's reliance on purchased power by making greater use of our existing 54 megawatts of on-site cogeneration capacity. To make that possible, we’ve brought in a third-party engineering firm to complete the specifications for a capacitor, and our aim is to have that capacitor ordered by January, with the goal of cutting our dependence on the grid by next summer. We expect this effort to call for capital of roughly $0.5 million, and it would save about $38,000 each day on grid electricity purchases, or around $40 million gross annualized, which we expect to lower operating expenditures by roughly $8 million to $9 million. Beyond power, we’re resetting the cost structure through organizational and procurement efficiencies and by eliminating duplicative corporate costs; turning to volume, current 5E Bor production is about 82,000 short tons annualized. Our goal is to bring production back toward roughly 100,000 short tons a year through two initiatives: restarting the SAC plant and an engineering-led wellfield development program, along with incremental byproduct production, including sodium bicarbonate and additional boric acid. We also intend to restart idled boric acid production at our Trona facility, adding another product line from assets already in place. Reliability is the foundation for that growth. On November 1, we began our first planned 5-day maintenance turnaround at the Westend plant. The team finished the work and restarted production on Friday, November 6th. That planned downtime let us address equipment reliability and maintenance items that matter for sustaining higher operating rates, and it was one part of a wider effort to cut unplanned downtime and strengthen operating performance. During our last update call, we stressed the restart of the SAC plant, and it remains our most immediate volume catalyst; for those new to the story, SAC stands for soda ash consolidation. It is a small existing facility that was idled as part of the soda ash exit last February, and it can run independently of the legacy soda ash operation. The SAC plant is designed to capture natural gas emissions into the brine and lower brine pH, improving brine chemistry and 5E Bor output. Bringing it back online is a capital-light way to add volume. I’m pleased to report that our team has started the necessary prep work, including maintenance, readiness activities, and the steps required for a safe startup. Our target is to have the SAC plant operational in January. Sustained volume growth starts with the resource, and we’re also focused on the brine and wellfield system that underpins production. October brine grade matched our modeled expectations, consistent with the assumptions behind our production plan. Today, we kicked off a drilling and workover program covering 205 wells, with new and reworked wells targeting fresh tincal ore, aiming to recover brine grade toward historical levels. We also improved heat delivery on the lake by bypassing an underperforming heat exchanger, which produced more consistent heat. Along with the SAC restart, these initiatives are meant to support stronger brine grades and higher 5E Bor production. Past borates, our industrial salt and sodium sulfate operations provide a diversified revenue foundation, serving long-established industrial customers. The industrial salt side made the transition without a hitch, moving roughly 28 trucks daily that deliver industrial salt to major oil and gas buyers in Bakersfield, California; on the sodium sulfate side, October was spent putting rail and export logistics in place for our customers in Mexico; that effort is complete, and product now travels by rail to the Union Pacific line and on into Mexico, positioning volumes to grow from here. The Searles Valley platform additionally offers us chances outside our present operating plan. Two separate workstreams are now underway, one on lithium and one on tungsten, each with the potential to turn into significant byproducts that strengthen our economics. Brine samples have gone to reputable third parties, who will carry out initial testing, analytical procedures, and process recovery work. These opportunities remain early stage, yet we view them as meaningful optionality layered on our core borates business. We likewise see longer-term potential in borates expansion and sulfate of potash. At Fort Cady, we keep advancing our advanced boron materials strategy. $8 million to $9 million. September 30, 2026.

Paul Weibel

executive
#2

In August, an independent X-ray diffraction study confirmed iron boride had developed within our ferroboron samples. We've since begun trials at 1,400 degrees Celsius, and as the following steps toward making samples for prospective customers, we intend to produce a batch of about 500 grams together with a third-party metallurgical processing partner. Meanwhile, the Searles Valley organization is being folded into 5E. We've held our inaugural employee town hall, we're collaborating closely with our staff as they transition onto 5E systems, and we've pinpointed critical positions we plan to fill. I'd like to personally acknowledge the Searles Valley team. The fact that they’ve operated this asset before is a real plus for 5E, and I appreciate what they’ve accomplished during this first phase of transition. Turning to financing: we ended the quarter with $15.6 million in cash and cash equivalents, and at closing we drew $7 million from our bridge facility; we are working carefully through the remaining CPs in order to access the last $3 million. Prepayments from customers on November orders are helping fund our working capital, and our plan going forward calls for a working capital debt facility secured by our contracted offtake structure, which we are trying to finalize at present; we continue to concentrate on solutions that give 5E the best possible cost of capital. In summary, during our initial 5 weeks we focused on building a dependable operating platform and a base for raising output, and our progress has been solid. We wrapped up a successful first month, simplified logistics to boost sales, started reworking our commercial terms, finished a scheduled maintenance turnaround, and moved the SAC restart forward, which could free up extra production and sales volumes. As we look forward, the milestones we need to hit are well defined: increasing 5E Bor sales across November and December, moving customers over to fresh take-or-pay and fixed-price offtake contracts, bringing the SAC plant back online in January, resuming boric acid output that has been idled at Trona, getting the capacitor order placed by January, cutting how much we depend on the grid by next summer, and lifting 5E Bor output back toward roughly 100,000 short tons per year. Our attention stays fixed on raising volumes safely, making reliability and cost better, and sharpening how we execute commercially. We think that pairing Searles Valley's current operating platform with Fort Cady's long-term resource opportunity puts 5E in position for its next stage of growth, and we're eager about what lies ahead. With that said, we're ready to take questions on the call.

Dmitry Silverstein

executive
#3

Hi, Paul. Thanks for taking my question. I just wanted to get some clarity on your figures regarding the sale of 5E Bor and the production of 5E Bor. You mentioned 6,200 tons produced in November, and I believe you said there were 1,300 tons in inventory, which comes to roughly 7,500 tons, and you sold 2,500. When you refer to the ramp-up in November compared with October, are you essentially looking at selling the remainder of that? I'm just trying to get a handle on what the run rate will be in November and December, given the 2,500-ton sale in October.

Paul Weibel

executive
#4

Inventory was a little over 3,000 tons when we obtained?.

Dmitry Silverstein

executive
#5

3,000, sorry.

Paul Weibel

executive
#6

Yeah, 3,000. No, targeted production sits at roughly 8,200, I believe we came in, sat down with the team, and sort of came out of the gates, then planned for that first downtime. A power outage hit us and took us down for a day during that month, and after that we gradually built the rates back up. I think the goal and target for November right now is around 8,300 tons, and I think doing 6,200 in month one, we didn't really know how it would look once we arrived, and we were pleasantly surprised to find about 3,000 tons in inventory, and I think we're aiming at sort of reaching those rates.

Dmitry Silverstein

executive
#7

Understood. All right, so I just want to make sure I have this right about the savings you get from turning off the power grid and moving to your cogeneration plant. You mentioned $14 million in gross savings, and then you also mentioned $8 to $9 million in savings. Are those both annual figures?

Paul Weibel

executive
#8

No. What happens in this case is — and it's worth digging into those specifics. Roughly, the amount we purchase from the grid at Westend comes to around $38 grand per day, correct? So 38 multiplied by 365 gets you, more or less, the gross figure that goes to SoCal Edison. The lines plus the infrastructure are built so we can fully decouple from the grid, yet a voltage sag occurs, which means we need a capacitor to ultimately stand that up. After we've done that, there will be an incremental MMBtu of natural gas that we'll procure, but at $6 to $6.20 all-in MMBtu throughout the day, purchasing that makes sense every day of the week. The net savings, meaning the OpEx reduction on a net basis, is targeted at $8 to $9 million.

Dmitry Silverstein

executive
#9

Got it. Alright, so that figure is the savings after subtracting gas purchases and plant operating costs. Understood. Okay. And regarding your 5-day maintenance outage, you mentioned things largely went as planned. Was there anything—maybe not a surprise exactly, but something you discovered while servicing that equipment that shifted your plans in either direction?

Paul Weibel

executive
#10

No, that’s a fair question. I’d say there were a number of safety fixes and get-right items that had to be handled immediately. One tank had not been cleaned out and emptied for roughly 10 years and had not had its bottom seen; it was essentially drained and then cleaned, and the rakes were more or less maintained and operating properly. There are plenty of leaks, and from our concentrations we can measure where we stand in the solution. A leak of 10 gallons a minute, if it contains 2% to 5% borax or whatever the level is, means money going onto the ground. Much of the attention went there and simply repairing many of the leaks and beginning to add redundancies that are really aimed at uptime reliability. I think the main point and takeaway was, look, it needs TLC. That was a major focus from the start, and we more or less did that, and I think it was well planned, which is why I believe we began November 1st or 2nd and came out of it right on the 6th.

Dmitry Silverstein

executive
#11

Excellent. It sounds like, at least across the first 5 weeks, you're getting your hands around this asset and really beginning to understand which levers need pulling, so that's good to see. I'll get back into the queue. Thank you.

Paul Weibel

executive
#12

No problem.

Adam Kelsey

analyst
#13

Great. Thank you. Paul, I just want one clarification. Of the current 5E Bor output, what share falls under those new take-or-pay contracts, and how soon do you expect to deal with any legacy contracts that remain?

Paul Weibel

executive
#14

We're probably around 90% all-in. When I look at the take-or-pays, there's a minimum of 62,000 tons under contract, but they also come with maximums. I believe we're not obliged to sell the maximum, though they're truly great customers and we want to serve them. There's a small percentage that are kind of spot, or kind of smaller contracts of 1,000 tons a year to 1,500 tons done via a simple one-page doc, but right now there are five customers, and that makes up the majority of our volumes.

Adam Kelsey

analyst
#15

Great, thanks. Regarding those customer prepayments in November, will that become a regular, standard part of how business is done, or is it more of a one-off exception?

Paul Weibel

executive
#16

No, I think it's funny. Demand is very real, and I think some customers have figured out that, hey, they're happy to prepay if it lets them go higher in line and get their allocation. All these offtakes come with roughly 60 days of documentary letters of credit, so the goal here is to actually transition them away from prepays; we're working with a financial institution that will basically stand up a working capital facility at essentially SOFR plus 4%, and so all these customers have been vetted, and once we're in the process of transitioning them over to the documentary LCs, which give us the working capital, that's for probably three out of the five. For one of the other offtakes, actually the customer negotiated that they're prepaying for the first 6 months. You have a bit of a mix, and it is quite helpful on the working capital draw.

Adam Kelsey

analyst
#17

Understood. Clearly we're only around 6 weeks in since the asset was acquired, so it's still early. That said, I'd welcome hearing about any initial takeaways or anything that caught you off guard over those last 6 weeks.

Paul Weibel

executive
#18

No, that's a good question. Look, I'd like to credit the team heavily for getting those supply chains opened up for all the exports. Most of the sodium sulfate is heading down into Mexico, and four of our five contracted boric customers are based out of Asia. A new union contract is being negotiated in Long Beach, it's been progressing, but everybody is watching that closely. I think inspections have been required, and bills of lading simply need to match, and we set up a new entity. The actual contracting entity was set up probably around September 15th, 5E SVM was the buyer, but beneath 5E SVM sit three stand-alone entities. All of that, there's a great deal involved in the basic execution of taking product up in Trona, packaging it, getting it onto a truck with a container, making sure it reaches the correct loading dock in Long Beach that gets on the correct container bound for Malaysia, arriving then in Malaysia and then to customers. We knew it wouldn't be so straightforward, and perhaps a bit of turbulence there, but I think plenty of lessons learned, and we're stood up and we're going. I believe we're at 15 trucks a day picking up all that product staged in the warehouse, and it's moving.

Adam Kelsey

analyst
#19

Great. I have one final question, and after that I’ll rejoin the queue. You mentioned certain positions still need to be filled. I’d just like clarity: are those pre-existing legacy roles, or are they positions that have been newly created? Is there any common thread in what you need to tackle?

Paul Weibel

executive
#20

I believe when we got there, some employees were still sort of handling the tail end of certain soda ash contracts. And then there were employees located in Overland Park who were not given offers. We tried to avoid making big changes to the org charts right away, and there were certainly open positions already listed there, but our approach was basically to come in, evaluate things, and decide from that point. HR has a role posted, there’s a mechanic, and utilities needs to fill three operator positions. We're getting ready to begin posting those positions, and for the utilities team they matter a great deal, since the SAC plant is located directly beside our utilities control room and those staff have the capacity to oversee the SAC plant as well; we want those positions filled and the people trained, and we're not discussing a large number of positions, but roughly 5, 6, 7 positions should be filled over the coming 4 to 6 weeks. Assuming SAC starts up in January as we anticipate, we'll run a 30-day drilling program targeting fresh tincal ore. If that raises brine grade, it lifts primary borax output and allows us to bring Trona online, restart boric acid, and get Westend running at full capacity sooner. My model is fairly conservative, I believe, but we'll see how things actually go.

Heiko Ihle

analyst
#21

Hey, Paul. I ended up joining the queue a bit later than I'd expected, so thanks for your patience. Just to follow on from the previous question a little, could you take us through the mood at site as you see it at the moment? How are employees handling the transition? I'd assume everybody is getting along well. It sounds like you're bringing on more staff, at least to some degree. Maybe just take us through what you're seeing on the ground and perhaps give a little more color than what we got in the press release.

Paul Weibel

executive
#22

Heiko, good to have you here. I appreciate the question as well. Look, the culture and that integration is probably among the bigger challenges in this acquisition. I believe it took roughly a week and a half or so, and since then I've been up there twice a week with the team, really getting to know our people. We held a town hall. We're planning our next town hall. We'll do one after each quarter. Plenty of questions. For many of the employees, we went from 25 people to 250 people as of October 1, approximately. We had 5E benefits. Now we're a smaller company, and our benefits weren't as good as what they had before, but we were able to at least offer benefits and enroll everyone. Now we'll go back to market here in the new year. I think right from the start, there was definitely skepticism received, as I think would be fairly normal. I think there's a rational reason behind why we've done something or made a decision. Similar to how I need to answer to shareholders, the leadership team here at 5E needs to answer to our employees, and it's not just an arbitrary decision. I think what we've seen is a positive inflection in culture as we simply talk to people and get to know them; it's really that boots-on-the-ground implementation and letting people know and explaining to them why we've done what we've done. Candidly, right out of the gate, probably saw some resistance, but I think once we began talking to people and really explaining to them, and I've been able to make turnover shifts at 6:00 a.m. or 6:00 p.m; and I've gotten to talk to the Westend teams and utilities, but not every team within the organization. There are four shifts. I'm trying to catch people at turnovers and just talk things through with them. We're holding leadership meetings on a weekly basis that basically can ensure everyone is across the details of the organization, because it really is an integrated facility and platform where power drives heat to the lake, lake drives brine and borates to Westend, Westend puts out tons, and they need power and good brine to run; it's very much an integrated organization, and just making sure people are informed and there's a rhyme and a reason for decisions has been critical.

Heiko Ihle

analyst
#23

Fair enough. And as a follow-up, I suppose, take me through how those client conversations have been going. Clearly the economy and the geopolitical picture around the world have shifted a fair amount over the last, say, 9 months, 6 months, whatever. Capital markets are far more volatile than they used to be. My assumption is they want product sourced from jurisdictions that are geopolitically safe. My assumption is also that the discussion about paying extra for that is actually landing reasonably well. Along the same lines, what are you hearing in those conversations that you might be able to share here on the public call?

Paul Weibel

executive
#24

Great question. I'd say buying domestically from a U.S. entity matters. We have one of the best jurisdictions in the world. I'd say customers value that third supplier in an oligopoly market, which is really what we're able to offer. Honestly, I've seen it come through website inbound, and also through our commercial team — Mark's been in the borate business for 25-plus years, and boy, if we could produce 200,000 tons of 5E Bor, we could sell the 5E Bor. That market is very tight. I'd say USGS got it right in November last year when boron was added as a critical mineral, and it's genuinely a supply-and-demand story. I think customers see that. A lot of these customers — Mark was able to be in Asia the first week out of the acquisition, and that definitely helped lay the groundwork for the prepays. I'd say customers are quite uncomfortable, given that this is an oligopoly structure, and they do like that it's an American-owned company they're able to buy from.

Heiko Ihle

analyst
#25

That's fair. Thanks, everyone. I'll rejoin the queue.

Paul Weibel

executive
#26

Thanks to all of you for being on the call today. As we work hard toward reaching the next phase of milestones, we look forward to keeping you updated. Have a great day.

Operator

operator
#27

Thanks to all of you. That brings today's event to a close. At this point you're welcome to disconnect, and I hope you have a wonderful day. We appreciate your participation.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete 5E Advanced Materials, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to 5E Advanced Materials, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in 5E Advanced Materials, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.