5N Plus Inc. (VNP) Earnings Call Transcript & Summary
February 22, 2023
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone. Thanks for being on the line, and welcome to the conference call covering 5N Plus Inc.'s results for the fourth quarter of 2022. <<operator_script>>. At this point I'll hand things over to today's speaker, Richard Perron, our Chief Financial Officer. Sir, the floor is yours.
Richard Perron
executive<<foreign_lang>> Morning, everyone, and thanks for being with us on the conference call and webcast covering our Q4 and full year 2022 results. A brief presentation comes first, and after that we'll take questions from the financial analysts. With me this morning is Gervais Jacques, our President and CEO. We released our financial results yesterday and put a short presentation up in the Investors section of our website. Please turn your attention to Slide 2 of that presentation. The information on this slide, along with what the speakers say today, includes statements regarding expected future events and financial results that are forward-looking and, as such, carry risks and uncertainties. You can find a detailed discussion of the risk factors that could affect future results in our management's discussion and analysis of 2022, dated February 21, 2023, which is available on our website and in our public filings. When reviewing our quarterly results, you'll see that we use and discuss certain non-IFRS measures, and their definitions may differ from those other companies use. For more information, please refer to our management discussion and analysis. I'll now hand the conference over to Gervais.
Gervais Jacques
executive<<foreign_lang>> and good morning to all of you. Our fourth quarter and full-year results for the year that ended December 31, 2022, were issued yesterday. Fourth-quarter revenue declined somewhat because of the divestiture of our Tilly, Belgium operations, yet annual revenue climbed 26%, and adjusted EBITDA reached $30 million, landing at the top of the guidance range we had set for the year. The AZUR acquisition, now completely integrated, contributed substantially to the year's revenue growth. Further support for our performance came from stronger demand in renewable energy across specialty semiconductors and pharma and health and performance materials. These results please us greatly, particularly given the difficult year and the headwinds created by inflation and geopolitical events. They show that we are succeeding in carrying out our strategy of concentrating on value-added end markets and client partnerships. Another factor behind our success was our capacity to lock in strategic agreements, including those with first order, Sierra Space and Rio Tinto, in high-growth sectors. We likewise moved quickly to put in place the first wave of our commercial excellence program, which helped counter inflation's negative effect on product margins, producing a sequential gain in consolidated adjusted gross margin from 21.9% in Q1 2022 to 26.7% in Q4 2022.
Gervais Jacques
executiveIn our Specialty Semiconductors segment, we remain the sole viable worldwide supplier outside China of ultra-high purity semiconductor compounds that are used across a broad range of critical technologies essential to people's lives. Growth in the space power market is running ahead of even our most optimistic forecast. And in the fourth quarter, we concentrated heavily on putting 24/7 production schedules in place at critical back-end production areas at AZUR, and on making sure our overall capacity received a comprehensive review so we can address near-term demand. As a market leader, we are investing in our operations to meet exceptional customer demand over the years ahead across our key markets. We also hold a unique position to play a significant part in the new photon counting detector technology for CT scan, which is set to revolutionize medical imaging over the medium term. Beyond that, we are exploring further potential market opportunities for our specialty semiconductor products in the defense and security sectors. Within Performance Materials, we expect our health and pharmaceutical products to keep delivering high profitability and consistent cash flows, and we remain focused on the right sectors for expanding the segment's product mix in attractive end markets. Before the end of 2022, we completed the strategic review of our operations.
Gervais Jacques
executiveWithin that review, we finished selling off our Tilly, Belgium business, which makes our product lineup simpler, betters our operational footprint, and represents our departure from the low-margin extractive and catalytic sector. During 2022, we likewise wrapped up our Saint-Laurent project located in Montreal, which broadens development and manufacturing of critical minerals used in advanced 2/6 based semiconductor compounds. At this facility, byproducts obtained through our strategic agreement with the Rio Tinto Kennecott Utah Copper operation began arriving in late December 2022. Throughout our manufacturing sites, we'll keep putting money into building capacity to match the ramp-up of our commercial agreements. Given high value-added products and strategic contracts already signed, we're enthusiastic about what lies ahead for us. Throughout our business, we stay at the leading edge of our field—a critical supplier to critical industries worldwide and a true differentiator and partner of choice in specialty semiconductors—and as 2023 begins, we'll keep building on this strong momentum. On strategy, we keep carrying out operational optimization initiatives wherever appropriate, delivering incremental benefits that support organic growth, while staying disciplined about acquisition and strategic partnership opportunities. Lastly, to our employees, we want to express thanks for their dedication and hard work, and to our stakeholders and shareholders, the company wishes to thank them for their continued confidence and support.
Gervais Jacques
executiveI'll now pass things over to Richard, who will walk us through the results in greater detail, and after that we'll take questions from analysts. Richard?
Richard Perron
executiveYes. Thanks, Gervais, and good morning, everyone. As Gervais noted, fiscal 2022 was a significant chapter for 5N Plus. Looking purely at financial performance, the company demonstrated an ability to react swiftly to challenging conditions. Despite sanctions affecting Russia-based customers, which weighed on our Q1 results, cost pressures stayed intense all year because of global inflation and energy prices. Our answer was to roll out the first wave of our commercial excellence program quickly, designed to rapidly lessen the negative effect of inflation on product margins, and that lifted consolidated adjusted gross margins from 21.9% in the first quarter to 26.7% in the last quarter. By year-end, we finished the strategic review of our operations to support our long-term positioning in value-added markets. That ultimately resulted in the divestment of our nonstrategic manufacturing operations in Tilly, Belgium, sold in late December to a third party. This transaction is expected to add incremental adjusted EBITDA to consolidated results of roughly $2 million annually. Furthermore, it supports more favorable net working capital levels and better resource allocation. Since the impairment charges and loss on divestiture booked in Q3 and Q4 were noncash in nature, we were able to realize most of our affiliate net working capital, repatriating the excess liquidity before the transaction.
Richard Perron
executiveAs Gervais mentioned, AZUR SPACE was brought into the fold successfully this year, and that has improved how much growth we can expect from our space solar power offerings, going past what we had originally anticipated. Right now, the business holds a backlog that comes to roughly 2x AZUR's historical level — bearing in mind that what we call backlog in these reports covers shipments only over the next 12 months. Moving on to revenue, gross margin and adjusted EBITDA for Q4 and the full year: revenue dipped a little in Q4, coming in at $61 million versus $64.6 million in Q4 of last year. That decline is mainly -- is attributable to the phaseout we began earlier in the year of our extractive and catalytic products made in Belgium, along with our divestiture of that facility in late December. Even so, revenue for the full year of 2022 rose by 26%, hitting $264.2 million against $210 million in full year of 2021, helped by the November 2021 acquisition of AZUR and stronger demand from both segments. Adjusted gross margin in Q4 benefited from product mix and our commercial excellence program. Adjusted gross margin came to $16.3 million, or 26.7%, versus $15 million, or 23.2%, in Q4 of last year. Across the full year, adjusted gross margin also got a favorable lift from our volumes and the acquisition of AZUR.
Richard Perron
executiveFor the fourth quarter of 2022, adjusted EBITDA came in at $6.7 million, which was $3.4 million lower than the $10.1 million posted in the same period a year earlier. Within specialty semiconductors, adjusted EBITDA fell by $2.6 million, largely because AZUR's quarterly adjusted EBITDA contribution was more evenly spread across 2022 than in 2021, when the bulk of it landed in Q4 after the November acquisition of AZUR. In Performance Materials, adjusted EBITDA was down $1.2 million, with the main pressures coming from inflation and the phasing out of divestitures involving our low-margin products made in Belgium. For the whole year, adjusted EBITDA came to $30 million, which is the top end of our guidance. The $1.8 million gain versus 2021 came primarily from growth in specialty semiconductors, even with the adverse effect of the Russia-Ukraine conflict that started in Q1, whereas Performance Materials, of the two operating segments, felt the greatest hit from global inflation as well as extra corporate costs tied to integrating AZUR and other corporate projects. Full-year 2022 EBITDA was $4.6 million versus $25 million in 2021, and although adjusted EBITDA rose by $1.8 million, that gain did not offset the $5.4 million impairment of noncurrent assets booked earlier in the year.
Richard Perron
executiveBeyond the divestiture loss booked in Q4 and the $7.1 million impairment of noncurrent assets taken in Q3 after we confirmed our plan to leave low-margin manufacturing in Belgium, these various charges are noncash in nature. Turning now to annualized backlog. As of December 31, '22, backlog equaled 253 days of annualized revenue — 61 days, or 30%, above the Q3 backlog. Versus Q4 of last year, specialty semiconductors backlog rose 77 days, mostly thanks to favorable long-term contract negotiations, which confirms near-term growth potential in renewable energy and space applications. On the other hand, Performance Materials backlog fell 36 days relative to December of last year, hitting 124 days versus 160 days. That decline is primarily tied to the divestiture of our Belgium operations. As I mentioned earlier, we define backlog as shipments across the next 12 months, even though we do hold orders and commitments beyond 2023 in renewable energy and space. Moving to expenses. SG&A came in at $7.2 million in Q4 and $28.6 million for the full year, respectively, versus $7 million and $21.9 million. Those increases are chiefly explained by the AZUR acquisition, inflation, and the easing of COVID-related restrictions.
Richard Perron
executiveLitigation and restructuring costs came to $3.2 million in Q4 and $3.8 million for the full year 2022. Within those figures were $2.6 million tied to the divestiture of our subsidiary, $0.4 million for the site closure in Asia, and $0.4 million recorded in Q1 for settling a contract by mutual agreement. During Q4 we divested our 100% interest in 5N Belgium SA, recognizing a loss on that divestiture of $7.8 million. Financial expense for Q4 was $0.2 million, versus $2.2 million in Q4 of last year. That favorable swing stems mainly from interest income earned after the recent resolution of an international tax arbitration involving two jurisdictions where we operate. Also on foreign exchange and derivatives mitigating our interest on long-term debt, plus imputed interest following the AZUR acquisition, financial expenses for the full year totaled $5.2 million, compared with $4.1 million last year. Turning to liquidity: in 2022, cash generated by operating activities reached $23.8 million, up from $10.3 million last year, with the gain driven by positive changes in nonworking capital, particularly under Tilly, Belgium. For the full year 2022, cash used in investing activities was $19 million, compared with $49.9 million last year, of which $42.2 million went to the acquisition of AZUR and $2 million to acquiring a minority equity stake in Microbion Corporation.
Richard Perron
executiveA significant share of the PPE we obtained through investing shows up as growth, leaving out the cash contribution from clients, which is recorded as deferred revenue within operating activities. Measured across the full year, financing activities released $2.4 million in cash versus $36.2 million, largely due to how the net drawdown of the credit facility differed over the period and to last year's acquisition of AZUR. Turning now to gross and net debt: total debt came to $121 million at year-end, while net debt, after accounting for cash and cash equivalents, fell by $1.8 million to $78.3 million at the close of December '22. Moving on to guidance: given unprecedented demand for our renewable energy and space solar power products, together with investments in high-growth opportunities and a streamlined product mix, 5N Plus heads into 2023 with strong momentum and a business that is more streamlined and predictable. Our ability to offer guidance for the next 2 fiscal years for the first time illustrates this. Thus, for fiscal 2023, we anticipate adjusted EBITDA in the range of USD 35 million to USD 40 million, with a larger contribution in the second half of the year thanks to planned order releases, and for fiscal 2024, between USD 45 million and USD 50 million.
Richard Perron
executiveTo wrap up, we're in a stronger place going forward to establish and sustain our leading position in the market across the promising sectors where we perform best. We see promise ahead and anticipate steady growth over the coming years. So, thank you all at this point. I'll hand the call back to the operator now for questions from the analysts.
Operator
operator<<operator_script>> Our initial question comes from David Ocampo of Cormark Securities.
David Ocampo
analystI suppose the first question is for Richard. Regarding your 2023 and 2024 guidance, I was just wondering: does any revenue or profitability in there come from the CT scanner market, or from any of the other new verticals you're pursuing, like security and defense?
Richard Perron
executiveOkay. There is a small amount, clearly, that has come in. But I won’t call it significant, because our view remains that this opportunity sits more on a 3- to 5-year horizon, and over the next 2 years, only some modest improvement is built in. Yes.
David Ocampo
analystAll right, that's clear. Then, Gervais, I was hoping you might go into more depth regarding the opportunities you're seeing in space, and whether any significant CapEx would be needed to meet and serve that demand?
Gervais Jacques
executiveWell, thank you for giving me the chance to speak to this. I believe the first step we've taken is bringing in round-the-clock operation, seven days a week. At the time we bought AZUR, it was largely running two shifts over 5 days. After that we brought in a sixth phase to a limited degree, and at this point it's a continuous operation. So that was our initial move. Clearly, that alone won't be sufficient to satisfy all the demand we're up against, and we're looking at targeted growth, though it always has to be supported by a firm order, so that we know precisely what the payback on these investments will be.
Richard Perron
executivePerhaps I could just add something, and I touched on this briefly in my introduction. There are indeed customers of ours who are supplying us with equipment to help with expanding capacity.
Gervais Jacques
executiveThis fits within how we work as partners. If additional capacity is truly required, then we have to look for ways to collaborate with them and close that gap, since a gap in this market plainly exists and must be tackled. In my view, the opportunity sits up there, and together with them we need to come up with a creative solution.
David Ocampo
analystAppreciate that. And with the 2024 guidance now out, you likely have solid confidence and visibility into the order backlog past the 12 months. I'm just wondering whether your capacity is sold out as well for '24 and '25 — beyond that 12-month backlog you provided?
Richard Perron
executiveYes, by that point we’re definitely going to be floating with the high, high end of that — of our capacity.
Gervais Jacques
executiveAbsolutely.
Operator
operatorUp next, we have a question from Michael Glen with Raymond James.
Michael Glen
analystI'd like to focus on EBITDA for your specialty semiconductor business. And if you can, compare it with 3Q, since revenue in that business was essentially flat, yet the margin declined and the EBITDA contribution fell on a sequential basis. So what I'm trying to get at is this: between the third quarter of '22 and the fourth quarter of '22, what was the variance in product mix, or in some of the profitability factors, that affected the specialty semiconductor segment?
Richard Perron
executiveWith the AZUR changes, we follow our standard rule of thumb, though the second half definitely contained somewhat more renewable energy than the first. Our review isn't done by Q3 and Q4 separately — renewable energy in particular is now assessed on a semester basis. For instance, we already know this year's second semester will be materially stronger than the first half, and last year followed the same pattern. From a mix standpoint — client and product wise — AZUR is a tougher beast to forecast between one quarter and the next. So to answer properly, I'd likely need to dig a bit deeper into AZUR's client and product mix across Q3 and Q4.
Gervais Jacques
executiveAnd if I could just add something — when we bought AZUR, we had to fulfill a contract that had already been signed. Now, beginning this year, the new contracts we've been signing will take effect. And I think that's — we'll start seeing that now, but increasingly toward the back end of the year and then next year. Then — in line with the higher demand, we'll see the impact later this year and next year. And right now — because of how it works with that kind of program, programs typically run between 12 to 18 months, sometimes 24 months, so at this point we're delivering orders that were signed under the previous ownership.
Richard Perron
executiveThat gives you the big picture. Still, looking at it quarter by quarter, it's dynamic as well.
Gervais Jacques
executiveAbsolutely.
Michael Glen
analystAll right. Could you also briefly address, regarding your guidance, how we ought to view capital expenditures and free cash conversion in both '23 and '24?
Richard Perron
executiveAll right. For '23, the standard guideline holds — typically CapEx lands around our net cash outlay for CapEx, since, as you'll recall, certain clients take part, it will track roughly with our PPE — the depreciation charges on PPE. As for 2024, we're still refining those figures. It's possible we'll see somewhat above the customary depreciation level, though we're actively working through the present CapEx program right now.
Michael Glen
analystSo if I look at that $16 million of PPE in '22 — I believe that was the full-year figure — would it be consistent with that?
Richard Perron
executiveWe saw net cash out of roughly $12 million. A portion of what the client put in gets recorded under deferred revenue, along with some other items.
Michael Glen
analystOkay, and one last question from me. When we consider a couple of your commodities at the moment — specifically tellurium and bismuth — how is market pricing for those two materials? What effect do you expect those two commodities to have on results in '23?
Richard Perron
executiveHonestly, from an inflation standpoint, we have no basis for expecting either a meaningful increase or a meaningful decrease. So at this point, we're assuming things stay stable.
Michael Glen
analystAt the moment, there isn't anything out there in the market that would...
Richard Perron
executiveRight, so it stays flat at where we are now.
Operator
operatorWe'll take our next question from Rupert Merer at National Bank.
Rupert Merer
analystIt looks like your R&D costs climbed somewhat during the quarter, and that might have been putting pressure on EBITDA. You mentioned certain moving pieces tied to subsidies and grants in your disclosures. Could you walk us through what we saw in Q4 on the R&D side? Give us a bit more detail there. And beyond that, what ought we to expect going forward? It appears to be largely connected to AZUR.
Richard Perron
executiveYes. When it comes to how our R&D charges are split across the businesses today, AZUR is going to take on a bigger share compared with what 5N normally carries. That said, given where it sits strategically in European health, it does receive a decent amount of grants—though how those grants land from one quarter to the next is going to move around. We have a fairly solid view of the full-year picture, but the actual recognition as it is realized quarter by quarter is going to be somewhat more uneven.
Rupert Merer
analystSo would I be correct that this quarter it rose by roughly $2 million compared with what we've been seeing in...
Richard Perron
executiveThat extra $2 million comes from two things: the grant level, and as we integrate AZUR into 5N Plus, we're still aligning the bookkeeping, the accounting, and how AZUR defines things with the rest of the group. So part of that is simply reclassifying items properly going forward, consistent with the group's other units — which is normal during that first full year of integration into 5N Plus.
Rupert Merer
analystAll right, so is it fair to say the run rate from here on out might come in somewhat below what you'd expect?
Richard Perron
executiveOur expectation is that it will be, yes, a bit lower.
Rupert Merer
analystTurning to the guidance, could you share a bit more detail on that bridge? Specifically, what assumptions underlie the baseline business compared with 2022? Also, perhaps you could shed some light on what the biggest risks to the guide are? And are there any opportunities to find new business that would be incremental to the guide?
Richard Perron
executiveAll right. The guidance is basically a bottom-up exercise in which every one of our subsidiaries and all our people took part. It's essentially founded on contracts we've already committed to, with a slight amount of growth in medical imaging and the remainder of our business holding steady. So it's built mainly around renewable energy and our space business. Elsewhere there's a small amount of upside, but we're being very prudent.
Rupert Merer
analystAll right, then — in your view, what would be the largest risks and the biggest opportunities when it comes to that guidance?
Richard Perron
executiveOpportunities in sectors such as medical imaging are arriving sooner than we anticipated. There's always some modest effect that could work in our favor. There's always some modest notation that could work in our favor. As I mentioned, the current assumptions reflect a reasonable degree of conservatism. So those are the factors. But we should be candid: renewable energy and space — well, we hold long-term contracts there. In space, as we've noted, we carry 2 years of backlog, and that business previously carried roughly a year of backlog. So over the coming couple of years — I mean, in the range we're giving, I believe we have, as I said, a fairly solid amount of conservatism baked in. The upside will come, as I said, from items less within our control — notations, effects. And perhaps, as I said, medical imaging, where we know we'll be playing a role. The difficulty lies in judging when that market will improve in a material way.
Gervais Jacques
executiveYeah, and I’d also mention that, from a geopolitical standpoint, the Inflation Reduction Act taking place in the U.S. might be an upside too. I believe we’re seeing an initial wave, and as that keeps happening more and more, I think it could become another possible upside.
Rupert Merer
analystThanks. One last item from me. Is it possible that notations could act as a drag on the outlook? What do you consider the possible...
Richard Perron
executiveThat is the reason we are giving a range. There are factors affecting our business that I do not fully control at 100%. So a range is what we're offering.
Rupert Merer
analystThat headwind is manageable then, any potential risk from...
Richard Perron
executiveYes. Yes. Yes. Absolutely — I mean, now that Tilly has been divested, our product lineup has an actual metal content that is lower and keeps getting lower than anything that existed a few years ago. So our exposure to metal keeps shrinking. But look, the products we make are constructed from minerals.
Operator
operatorThe following question comes from Nick Agostino of Laurentian Bank Securities.
Nick Agostino
analystI just want to touch on a few, I suppose, housekeeping matters — specifically the problems that hurt the company previously. On shortages, was there any — when you look at how the shortage situation played out through 2022, how did — did you see any effect in Q4? Or is that largely behind us now?
Richard Perron
executiveI want to make sure I've got your question right. When you say shortages, could you be a bit...
Nick Agostino
analystSo it's really any supply chain problem, whether that involves chips or not? Basically anything at all tied to the supply chain?
Richard Perron
executiveNo, I wouldn’t say the worldwide shortage issue had any effect on us in ’22. Not at all. We managed to secure carriers. We were able to obtain our main chemicals and consumables. Sure, it took somewhat more effort, but our business wasn’t affected.
Nick Agostino
analystAll right. Now to the second question: as you work through the Q4 contract renewal process, in the past you discussed the value pricing strategy and driving through higher pricing — is that conversation still taking place? Are there contracts where you're putting that topic on the table? And if so, how is it landing as you speak with customers about their contract renewal and try to push pricing through? And further, can you achieve pricing increases well above — simply the rate of inflation?
Gervais Jacques
executiveOkay, so you've observed how our margin has climbed from Q1 through Q4. And indeed, we're tackling that in a systematic way across all customers. Sure, at times it goes more smoothly than at others. But at present, what we're doing is manufacturing highly complex, high-technology products. And I believe we must ensure those products get valued at the proper level. Our assumption is that this wasn't happening, and that's what we're working toward every single day — making certain our key differentiating attributes are valorized, making certain we partner with our customers not just on what we produce today but on the next generation of products, and also tackling where R&D opportunities with them might exist. So it's a whole basket of opportunities, but commercial excellence really means partnering with customers and making certain our products are valorized at the right level. And we think there's still room for improvement, and that is baked into our guidance for the next 2 years.
Nick Agostino
analystAll right, that helps. Then just a few — two additional questions. I simply want to confirm I heard it right, Richard: did you mention that for AZUR, the backlog stands at twice the historical level? I just want to be certain I caught that accurately.
Richard Perron
executiveCorrect. That is indeed the situation. However, as I noted earlier, the KPI shown in our documents—per our definition, which you can find in the back—specifies the upcoming 12 months. The reality is that renewable energy and space extend past 12 months, and space, as I said, used to hold roughly a year; at present it holds approximately 2 years of backlog.
Nick Agostino
analystOkay, that leads into my second question. I understand that the backlog figure you're giving covers the next 12 months, but why not reveal what the backlog looks like past 12 months, especially since you're giving a 2-year EBITDA guidance number?
Richard Perron
executiveNick, that's a fair question. Here's what we intend to do: our goal was to finish 2022 on the same footing as 2021. As for '23, we might have more to add that will give you a fuller sense of what we're only touching on at this point.
Operator
operator<<operator_script>> Our following question comes from Frederic Tremblay of Desjardins.
Frederic Tremblay
analystActually, let me return to the Saint-Laurent project for a moment. Could you talk about how the equipment ramp-up is going there, and also the first deliveries from Rio Tinto? I'd just like your early impressions of how that project and partnership are progressing so far?
Gervais Jacques
executiveWell, we handled the start-up commissioning back in December, and then — at this point we're running at a normal rate, the way...
Richard Perron
executiveWhile there is certainly still room to improve on the performance side, the project has now been commissioned.
Gervais Jacques
executiveYes. So at the moment, what we’re doing is we have been checking each piece of equipment individually. We’ve been running things continuously. And as part of the ramp-up right now, we’re trying out various materials, since I believe we have more than one source. We’re working to diversify where we source from. Rio Tinto is among them — that’s a new one — but other sources are also being pursued. And I think that’s part of commissioning: making sure every different product gets tested and then optimized. So we’re quite happy with how it’s performing at present.
Frederic Tremblay
analystAll right, moving on to AZUR. Historically, I realize the outcomes have tended to lean toward the latter portion of the year. Maybe that didn't quite hold true in 2022. Still, I'm curious whether, looking ahead, given the visibility into their backlog and possibly the deliveries, there's anything worth noting regarding a quarterly revenue cadence for them. Will it revert to being <<inaudible>> quarter to quarter as well as toward the back half of 2023?
Richard Perron
executiveAs far as I can tell right now from a release standpoint, right? The strongest quarters will be Q2 and Q3, and my suspicion is that Q2 will be stronger than Q2. That's what we can see at this point, but there's -- I mean, changes to the release date are always possible. Even though, again, we've got a commitment for the full year, release dates could shift from 1 quarter to another. But what I can see so far is that Q2 and Q3 will potentially be their strongest quarter, with Q3 a little better.
Frederic Tremblay
analystAll right, that helps. Then one final question from me, and it concerns where capital allocation ranks in priority. You brought up CapEx before, but perhaps you could address a few additional items there. Do you have anything to say about paying down debt? And I realize you touched on M&A briefly too. Your thinking on those 2 areas would be useful.
Richard Perron
executiveWell, as — as most people know, we're extremely diligent on how we manage the balance sheet. So we'll make sure we make the best use of our cash and our cash flow be used primarily towards making sure we can meet the customer demand. So that's what you see from allocation of capital in the next couple of years, but at the same time, within parameters that are diligent.
Operator
operatorMoving on, our next question comes from Michael Glen at Raymond James.
Michael Glen
analystCould you give a little color on how you see the growth trajectory for the First Solar business beyond 23%? I realize the figure is 35% for the year, but how should we be thinking about that as the year unfolds?
Richard Perron
executiveRegarding the current — and I'll say it again, as with the AZUR launch — our scheduled launches this year are much heavier in the back half than the front half, all right? Q1 is the weakest of all 4 quarters, Q2 picks up slightly on the release side, but most of the volume — and consequently the gain versus '22 — lands in this year's second half.
Michael Glen
analystAnd on that — regarding the material you sell for solar, is all of it now produced in Montreal? Or does some material still come from other locations?
Richard Perron
executiveAs for First Solar, right now it’s supplied through a mix of Montreal and one of our German facilities. That’s always been how it works, and it will stay that way through the rest of ’23. In ’24, though, a bigger share of the actual sell — the renewable energy — is going to come from Montreal. So this year we’re focused on ramping up the capacity Canada will need for ’24, in Montreal.
Operator
operatorThe following question comes from Nick Agostino at Laurentian Bank Securities.
Nick Agostino
analystI wanted to revisit that risk conversation, since you’re issuing guidance covering 2 years and, as you’ve mentioned before, space contracts tend to be lumpy. What kinds of terms do those contracts include that let you feel confident enough to provide the 2-year guidance? More specifically, is there a chance contracts might be pulled during the next 2 years in a way that would affect your guidance? Or do those contracts contain take-or-pay-type provisions, and is the guidance you’re giving based on that being taken into account? I’m really just trying to get a handle on the stability, particularly for those solar — sorry, space contracts.
Richard Perron
executiveThe majority of those contracts are committed in full. And yes, two things need to be kept in mind. Across this entire industry, just 3 players exist outside China, all right? So there is no alternative place to turn. And this reflects where things stood as of December. The reality is that we keep submitting bids. As a result, predictability is quite strong for '23 and '24.
Operator
operatorAnd with that, gentlemen, that's all the questions we have at this point. Go ahead with your closing remarks.
Richard Perron
executiveWell, we appreciate everyone taking the time to be with us today, and we hope the rest of your day goes well.
Gervais Jacques
executiveYes. Many thanks, and we’ll be seeing you shortly.
Operator
operatorThank you. Ladies and gentlemen, that brings today's conference call to a close. Thank you once more for joining us. And right now, we'd ask that you disconnect your lines, please.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete 5N Plus Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to 5N Plus Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in 5N Plus Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.