AB Ignitis grupe (IGN1L) Earnings Call Transcript & Summary
February 28, 2024
Earnings Call Speaker Segments
Aine Riffel-Grinkeviciene
executiveGood afternoon, ladies and gentlemen, and welcome to Ignitis Group's earnings call for 2023. I'm Aine Riffel-Grinkeviciene, Head of Investor Relations, and today, I will moderate the call. During this annual results presentation, Ignitis Group's CEO will review the strategic highlights; and CFO, financial performance. Afterwards, a Q&A session will be held. Before we begin, I would like to remind that today's presentation contains forward-looking statements that are subject to risks and uncertainties. These statements are based on the management's current views, expectations and assumptions and actual results may differ materially from those expressed or implied. With that, I would like to hand over to Darius Maikštenas, CEO of Ignitis Group.
Darius Maikštenas
executiveGood afternoon all, and welcome to our 2023 results call. In 2023, we have delivered a strong strategic and financial performance. On strategy delivery, we witnessed accelerated growth of our Green Generation business segment, which -- with renewables portfolio increase, which now stands at 7.1 gigawatt and secured capacity growth to 2.9 gigawatts. We also achieved a number of significant milestones on the project development front, including entering the offshore wind market by winning 3 offshore wind auctions in the Baltic states. Next, on the sustainability front, we are consistently continuing our decarbonization efforts, which are also reflected in our strong ESG ratings. Finally, our growth is also reflected in our financial results as we exceeded the top range of our adjusted EBITDA guidance, again made a strong record high investments and continued to fund these investments at attractive terms as the result of our strong balance sheet supported by our BBB+ credit rating. Let me now take you through each of highlights in more detail. First, on our strategy execution. In 2023, we increased our portfolio by 2.0 gigawatts by -- from 5.1 gigawatts to 7.1 gigawatts. This is a result of acquisition of onshore wind development projects, Kelme wind farms I and II in Lithuania with the total capacity of 300 megawatts, the secured seabed sites for the expected capacity of -- from 1 to 1.5 gigawatts in Estonia offshore wind tender, and the greenfield capacity additions of around 0.7 gigawatts. Our secured capacity grew by 1.4 gigawatts from 1.6 gigawatts to 2.9 gigawatts as number of projects with total capacity of around 670 megawatts reached the construction phase and the 700-megawatt Lithuanian offshore wind farm project reached the awarded contract stage. In terms of split of our renewables portfolio, it continues to be dominated by onshore wind and solar projects with the share of 4.2 gigawatts. Most projects are being developed in Lithuania and Latvia. However, we have significantly increased our portfolio in Estonia, which now stands at 1 gigawatt. On the project-by-project basis, despite significant milestones achieved across all portfolio development phases, the most significant achievement, we believe, is the offshore market entry with 3 auction wins with a total potential capacity of 1.7 gigawatts to 2.2 gigawatts. For those who did not dial into our previous earning calls, I would like to remind you that we won the 700 megawatts Lithuania offshore wind tender together with our partner, Ocean Winds, in Q3 2023. On top of that, in December of 2023 and January of this year, we won another 2 offshore wind tenders in Estonia, with our partner, Copenhagen Infrastructure Funds. We have secured 2 seabed sites in Liivi 1 and 2 areas and plan to develop these sites as a single offshore wind project. The capacity of offshore wind farm is expected to be between 1 and 1.2 gigawatts. And it is expected to become operational around 2023. By securing an offshore project in Lithuania with COD until 2030 and another one in our home markets with COD post 2030, we have achieved the group strategic goal and made a significant step towards increasing our Green Generation stored capacity 4x from 1.2 gigawatts in 2022 to 4 to 5 gigawatts by the end of 2030. Moving on to the remaining technologies on the onshore wind front. Our 50-megawatt Silesia I wind farm in Poland supplied electricity to the grid. For the first time, we expect to reach COD in March of this year. And finally, Vilnius CHP biomass unit achieved partial COD for the capacity of 50 megawatts energy and the 149 megawatts in thermal capacities. Next, I would like to highlight the progress we made in continuing our decarbonization initiatives to minimize our environmental impact. In 2023, we have reduced our Scope 1 and Scope 2 emissions, although the total emissions increased by 2.5% as the result of Vilnius CHP biomass unit COD. Also, 85% of our electricity generation was green. On the health and safety front, which is our top priority, total recordable injury rates for both employees and contractors, they are well below the target level. Finally, we are proud to share that we have maintained leadership in sustainability as evidenced by high ESG ratings such as AA from MSCI and B from CDP, placing group among the top utility peers globally. With that, I conclude strategic overview for now, and we'll hand over to Jonas to continue with the financial performance.
Jonas Rimavicius
executiveThank you, Darius, and hello to you all. Let me start with a follow-up on our 2023 guidance. Our adjusted EBITDA in 2023 reached EUR 484.7 million and exceeded the top range of our guidance, which was between EUR 430 million and EUR 480 million. It was driven by outperformance across all business segments, with the biggest effect coming from reserve capacities, which exceeded the expectations the most due to better market conditions in Q4 2023. Next, the financial highlights for the year. Adjusted EBITDA grew by 3.3% year-over-year with growth across all business segments except Green Generation, as expected, due to lower captured electricity prices. However, Green Generation remains the largest contributor to the group's adjusted EBITDA, representing 46% of the total. Adjusted net profit increased by 12% to EUR 287 million. In 2023, we have substantially increased our investments, reflecting our progress in the Green Generation portfolio, where we currently have 1 gigawatt of projects under construction. Compared to last year, investments increased by almost 80% and reached a record high level of EUR 937 million. Return on capital employed decreased by 0.9 percentage points to 9.8%, mainly due to the time lag between the deployment of capital in investments and subsequent realization of returns. In other words, it takes a few years until capital invested starts generating EBITDA. Our leverage metrics remain strong with FFO to net debt at 29.4% and net debt to adjusted EBITDA at 2.7x. The group's balance sheet strength is also underpinned by S&P's affirmation of BBB+ credit rating with stable outlook, which is in line with our commitment to maintain a solid investment-grade credit rating of BBB or above over the 4-year strategic period. Finally, in line with our dividend policy, for 2023, we intend to distribute a dividend of EUR 1.29 per share, which is 3% higher than last year and results in a dividend yield of around 7%. Now let's take a closer look at our KPIs. Starting with adjusted EBITDA, the growth from EUR 469 million last year to almost EUR 485 million this year was driven by, firstly, EUR 15.5 million EBITDA increase in networks, mainly due to higher regulated asset base, which results from our substantial investment program in electricity network; and secondly, a EUR 15.3 million EBITDA increase in the Reserve Capacities segment, where we successfully utilized the option to earn an additional return in the market on top of the regulated return. Third largest growth of EUR 14.8 million came from Customers & Solutions segment due to better results in electricity B2B and natural gas businesses. The growth in the 3 mentioned segments was partly offset by the decline in Green Generation, which was expected due to historically high power prices in 2022. Now let's deep dive into the EBITDA of each segment. Starting with Green Generation. It remains the largest contributor to the group's adjusted EBITDA, accounting for 46% of the total, despite an 11.8% year-over-year decline from EUR 252 million last year to EUR 223 million this year. The main drivers behind that were lower captured electricity prices due to 2 main reasons: first, a decrease in overall electricity market prices, which have declined more than 2x in the Baltics and by 35% in Poland; and second, the sale of 100% of electricity generated by the Pomerania wind farm in Poland under CfD subsidy scheme, which is lower than the market price. As a reminder, last year, we sold only 20% under the CfD and 80% was sold at high market prices. Another reason for EBITDA decline in this segment was the increase in OpEx, which is natural as we continue our intensive expansion work. Moving on to the Networks segment. Adjusted EBITDA grew by 9.4% and amounted to EUR 180 million. The increase was mainly due to the higher value of the electricity regulated asset base. And the overall asset base increased by 6.2% from EUR 1.3 billion to EUR 1.4 billion due to investments made. It is worth highlighting that values for RAB and WACC are already known for the year 2024. The RAB will grow by 11% to EUR 1.6 billion, and WACC will grow from 4.2% to 5.1%. Next, in Reserve Capacities segment, adjusted EBITDA increased by EUR 15.3 million and reached EUR 49.9 million, mainly as a result of utilized optionality to earn an additional return in the market on top of the regulated return. As a reminder, the assets in this segment are providing system reserve services. Therefore, they stand still most of the time. In both 2022 and 2023, the load factor of these assets was only around 3%. For these services, the regulator essentially covers all the costs associated with these assets, including the depreciation. However, the regulator does not pay return on capital but allows us to earn it ourselves by operating these units in the market when the price balance between electricity, gas and emission allowances is right, also known as clean spark spread. And this is precisely the optionality that we successfully utilized in 2022. Lastly, our Customers & Solutions segment adjusted EBITDA increased by EUR 14.8 million and reached EUR 30.4 million. We saw an increase in both electricity and natural gas supply businesses. In 2023, the electricity B2B segment turned positive, mainly due to the result in effective hedging, while natural gas business recorded a positive effect from adjusted methodology for calculation of income related to customer over-declaration. Next, as already mentioned in the beginning, our investments increased by almost 80% year-over-year, reaching a record high level of EUR 937 million in 2023. The main drivers for this increase were the following: firstly, more than two-fold increase in Green Generation investments, which exceeded EUR 0.5 billion and were mainly made in new wind farm projects in Lithuania and Poland as well as Vilnius CHP biomass unit and Kruonis pump storage expansion project; and secondly, higher investments in electricity network expansion driven by new connections and smart meter rollout. It is worth highlighting that investments made in Green Generation accounted for 58% of the group's total investments. Turning to our net working capital numbers. Lower energy market prices led to a significant reduction in net working capital. It has decreased by 60% since the end of 2022, down to EUR 175 million at the end of 2023. The main drivers for lower net working capital, both caused by lower energy prices, were decrease in inventory value and decrease in trade receivables. Adding it all together, our free cash flow metric was negative in 2023 at EUR 212 million, driven by investments made. Regarding the leverage metrics. Our net debt increased by 33% and stood at EUR 1.3 billion at the end of 2023, mainly due to negative free cash flow influenced by high investments. Despite the increase, the group's FFO to net debt remained at solid level of 29.4%, remaining well above the 23% threshold required by S&P for BBB+ credit rating. Net debt to adjusted EBITDA also remains very healthy at 2.7x and continues to be well below the 5x threshold of our 4-year strategic plan. Finally, our guidance for 2024. For 2024, we expect our adjusted EBITDA to be in the range of EUR 440 million to EUR 470 million driven by our 2 largest segments, Green Generation and Networks. In Green Generation, we expect our Silesia I and II wind farms in Poland with a total capacity of 187 megawatts to reach COD this year. While in Networks, the result is expected to be driven mainly by higher WACC approved by the regulator. In terms of Reserve Capacities and Customers & Solutions segments, we expect lower EBITDA in 2024 due to better-than-usual results in 2023. On top of the adjusted EBITDA guidance, we are also providing a full year investment guidance. And for 2024, we expect investments to be in the range of EUR 850 million to EUR 1 billion, mainly driven by Green Generation and Networks. In Green Generation, the main investments will be related to construction works of Kelme wind farms with total capacity of 300 megawatts in Lithuania, Latvian solar portfolio I with a capacity of 239 megawatts and Kruonis pump storage expansion projects with a capacity of 110 megawatts. And in Networks, as usual, we will continue to invest in the electricity grid expansion and maintenance. With that, I will hand back to Darius to conclude our earnings call.
Darius Maikštenas
executiveThank you, Jonas. Let me summarize Ignitis Group's performance in 2023. We again delivered strong strategic performance, evidenced by our Green Generation portfolio increase from 5.1 to 7.1 gigawatts and secured capacity growth from 1.6 to 2.9 gigawatts. Also, we secured the largest renewable energy projects in Baltics. We won 3 offshore wind auctions with total potential capacity between 1.7 to 2.2 gigawatts. And lastly, our projects under construction as of now stands at 1 gigawatt. Next, on the sustainability front, we decreased our Scope 1 and Scope 2 emissions and maintained the vast majority of our electricity generation to be green, improved operational health and safety metrics, also retained employee satisfaction reflected in Top Employer certificate for the third consecutive year; and in turn, maintained leadership in sustainability as evidenced by high ESG ratings, placing the group among the top utility peers globally. Finally, our financial highlights, we again exceeded full year guidance of EUR 484.7 million in adjusted EBITDA, made the record high investments amounting to EUR 937.1 million, maintained strong balance sheet with a BBB+ credit rating with stable outlook referred by S&P. And for 2024, expect our adjusted EBITDA to be in the range of EUR 440 million-EUR 470 million, and investments in the range of EUR 850 million to EUR 1 billion. With that, I would like to thank you for listening, and we are now open for your questions.
Aine Riffel-Grinkeviciene
executiveThis concludes Ignitis Group's annual results presentation and opens the floor for questions. We will start with the ones we have received in advance. The first question is Kruonis hydro unit's major repair was delayed to the end of March. What are the reasons? Would that date be final?
Jonas Rimavicius
executiveYes. So regarding Kruonis, it's business as usual. When we did the detailed evaluation for the planned maintenance work, we found some additional work -- that some additional work needed to be done. Hence, the maintenance was extended. Regarding the date, yes, it is the current estimate of the final date.
Aine Riffel-Grinkeviciene
executiveNext question. Ignitis has a EUR 37.7 million treasury shares reserve. Are there plans to launch share buyback in foreseen future? If not, why this reserve is still held?
Jonas Rimavicius
executiveYes. So there are currently no plans to launch a buyback program. And this reserve will be canceled this year, and it's actually one of the questions in the general shareholders' meeting.
Aine Riffel-Grinkeviciene
executiveThe following question, Saare 1 Estonian offshore wind auction ends tomorrow. Ignitis Renewables Projektai 6 is also participating. Are you planning to place bids, participate actively? Do Ignitis see possibilities to expand its offshore wind portfolio even more than already announced winnings?
Jonas Rimavicius
executiveYes. So regarding the first one, so since the auction is still ongoing, we will not comment. But I will say that our Liivi 1 and Liivi 2 plots are preferred ones to this one. In terms of the second part of the question, again, we are constantly evaluating the opportunities. But currently, there is no new information regarding that.
Aine Riffel-Grinkeviciene
executiveNext question, would Ignitis participate in second offshore wind auction in Lithuania?
Darius Maikštenas
executiveAs we already achieved our strategic targets, at the current moment, we do not have such plans.
Aine Riffel-Grinkeviciene
executiveOne more question. What are the reasons that Vilnius biomass units still have not reached a full COD? When it is planned to reach it?
Jonas Rimavicius
executiveYes. So the reasons -- first of all, the Vilnius CHP has reached a partial COD at the end of the year for the majority of the plant's capacity to be precise for around 85% of that capacity. The delay is related to the ongoing testing procedures and -- yes, and that's the current status. So we are expecting to finalize the project as soon as possible, but it is already operating over the large share of potential capacity and providing heat to the -- to Vilnius city.
Aine Riffel-Grinkeviciene
executiveNext question. All the turbines in Silesia second project are already installed. When should we expect the first energy production there?
Jonas Rimavicius
executiveSo we expect the COD in Silesia II to take place in the second half of the year. Regarding the first power, currently, we are working with the Polish network operator because now the outstanding works are on their side. So as soon as they are done, we will be able to generate the first power. On our part, all the works in Silesia II are done.
Aine Riffel-Grinkeviciene
executiveFollowing question. Solar PV prices went down sharply. Are you making steps to speed up or expand solar installations using this opportunity?
Jonas Rimavicius
executiveYes. So in short, we are working on our solar projects, which we have in the pipeline. And yes, we will -- we have already locked in those favorable rates for our Latvian solar portfolio I, and we plan to do more of that in the nearest future.
Aine Riffel-Grinkeviciene
executiveNext question. H2 project starts in Lithuania. Are you also planning to start your own or partnered projects in the foreseen future in this direction? Are there already flexible electrolysis units available?
Darius Maikštenas
executiveYou are right, H2 and green hydrogen investment direction has a real significant part in our further growth strategy. While saying so, we cannot announce any particular separate projects at the moment, and we will announce them later on when we will be ready.
Aine Riffel-Grinkeviciene
executiveNext question. Congrats on stellar results. Could you please share your power prices expectation for 2024 behind the guidance and long term?
Jonas Rimavicius
executiveYes. So regarding -- thank you for good words. And regarding the price expectation for 2024, so our Green Generation portfolio is 74% hedged at roughly EUR 130 per megawatt hour. The remaining bit will be sold on the market prices, which we currently see similar, maybe slightly lower than 2023, meaning between EUR 80 and EUR 90. Regarding the long-term power price forecast, this is, as usual, not an easy exercise. But as a general trend, we think prices will normalize around current levels and will slowly increase towards EUR 100 plus in the longer term.
Aine Riffel-Grinkeviciene
executiveThe following question, could you please indicate if EBITDA in hydro assets Kruonis and Kaunas was comparable to the level of 2022 or provide any kind of granularity?
Jonas Rimavicius
executiveSo currently, we don't split our Green Generation results by assets, so unfortunately, I cannot comment on this one.
Aine Riffel-Grinkeviciene
executiveNext question. Any thoughts about share buyback?
Jonas Rimavicius
executiveAgain, as already mentioned, no plans currently.
Aine Riffel-Grinkeviciene
executiveOne more question. Could you please remind the CfD price for Pomerania wind farm?
Jonas Rimavicius
executiveOut of the top of my head, it's around EUR 62 and it gets inflated annually. But this is disclosed in our annual report. So the more precise figure could be found there.
Aine Riffel-Grinkeviciene
executiveThe next question, what is total wind and solar power installed gigawatts working already?
Jonas Rimavicius
executiveSo in total, we have around 240 megawatts of wind in operation and around 1 gig of wind and solar under construction, meaning that they will be launched this or next year.
Aine Riffel-Grinkeviciene
executiveThe next question, do you see a risk that rising costs will stop or delay your plans for new offshore wind farms in the Baltic region?
Jonas Rimavicius
executiveYes. So I mean, regarding the rising costs for the offshore, in general, we have -- we are now at the peak of the prices. So we even expect to see some normalization. Right now, we are going ahead with our offshore plans. And when the time comes to fix those CapEx contracts, then we will do that only if we see the economic sense. So currently, we are progressing as planned, and no changes there.
Aine Riffel-Grinkeviciene
executiveThe following question, should the power bidding zones of the 3 Baltic countries be merged to facilitate a larger market for hedging future production and consumption?
Darius Maikštenas
executiveYou're right. There are plans of merging bidding -- power bidding zones across 3 Baltic states. We are looking positively towards that development. Most likely, it will be implemented after synchronization to European continental networks.
Aine Riffel-Grinkeviciene
executiveThe following question, given your guide, Reserve Capacities adjusted EBITDA to be lower this year, are you expecting clean spark spreads to be less favorable over the course of the year? Or how do you view the performance since current natural gas and emission allowances pricing should be rather favorable?
Jonas Rimavicius
executiveYes. So the reason why we expect it to be lower is that it's not that much the average clean spark spread for the year, which is important. It's those periods with a very favorable clean spark spread. And we had last year a few windows where it was very favorable. And this year, we don't expect it to be so. So even though the average clean spark spread might be better throughout the year, but the volatility, which we've seen in clean spark spread last year was, in our view, a bit exceptional. So this year, we don't expect that to happen. That being said, it could be the case. That's the beauty of our optionality in this segment. So if it will be the case and if there will be those opportunities, we will be able to capture them.
Aine Riffel-Grinkeviciene
executiveThe next question, Estonian wind offshore options. Are there penalties if not constructed, if conditions would be not favorable at time of FID?
Jonas Rimavicius
executiveNo, there's no penalty. So currently, it's also the optionality which we have. And the only fund costs at the moment is the bid in the auction, which was 1 and 2 million for projects which we currently won. So that's the only exposure.
Aine Riffel-Grinkeviciene
executiveAs we have no further questions, this concludes today's earnings call. Thank you all for joining us. If you have any further questions, please do not hesitate to reach out to our Investor Relations team. Thank you again for your participation, and have a great day.
This call discussed
For developers and AI pipelines
Programmatic access to AB Ignitis grupe earnings transcripts and 32,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.