Aditya Birla Real Estate Limited (500040) Earnings Call Transcript & Summary
May 15, 2025
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the earnings conference call for Aditya Birla Real Estate, brought to you by MK Global Financial Services Limited. Just a reminder that every participant line will be in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. If you require any help during this call, please signal an operator by pressing star and then zero on your touchtone phone. Kindly note that this conference is being recorded. I'll now turn the conference over to Mr. Harsh Pathak with Emkay Global Financial Services Limited. Thank you, and the floor is yours, sir.
Harsh Pathak
analystThank you, Alarik, and good morning to everyone. Speaking for Emkay Global Financial Services, I'm pleased to welcome all of you to the Q4 and full year FY 2025 earnings conference call of Aditya Birla Real Estate. I'd like to extend a welcome to the management and express our thanks for this opportunity. Joining us today are Mr. R.K. Dalmia, Managing Director; Mr. K. T. Jithendran, Managing Director and Chief Executive Officer, Birla Estates; and Mr. Snehal Shah, Chief Financial Officer. I'll now turn the call over to the management for the opening remarks. Over to you, gentlemen.
R.K. Dalmia
executiveThis is R.K. Dalmia. Good morning, everyone, and welcome to the earnings conference call covering the fourth quarter and the financial year ending 2025. As all of you are aware, here at Aditya Birla Real Estate, we have been pursuing a process of streamlining our company with the aim of building one of India's largest real estate players. Against that backdrop, financial 2025 has been a landmark year. During this year, the company has taken additional steps to reorganize its businesses, delivering superlative growth in its core real estate segment. The board has also approved the divestment of its pulp and paper business, which further sharpens the balance sheet and management focus towards real estate, and will lead to long-term value creation. I'm sure you must have gone through the financial performance, so I can directly move to highlight our real estate business. The Indian real estate market continues to demonstrate resilience and steady growth, supported by stable macroeconomic environment, rising urbanization, and evolving lifestyle aspirations. Projects with right products, right location, and trusted brand names are continuing to witness healthy traction. In parallel, there is a growing emphasis on sustainability and innovation. Green building practices, energy-efficient designs, and smart infrastructure are increasingly influencing both buyer preference and regulatory framework.
R.K. Dalmia
executiveEvery one of these is a parameter we’ve incorporated into our business model and portfolio, while also being steered by robust return guardrails. During Q4 2025 — that is, financial 2025 — the real estate business did exceptionally well, posting stellar sales at our three new projects and two new phases that were launched across the NCR, Bengaluru, and Pune regions. Booking value doubled compared with the prior year, reaching INR 5,738 crores. Collections also rose by more than 100%, hitting INR 1,073 crores. Across the full year, financial year 2025, booking value more than doubled to INR 8,087 crore, supported by our seven project phase launches. Our collections climbed 100% year on year, to INR 2,706 crore. Both the number of units sold and the area sold per square foot increased threefold versus financial year 2024. Revenue for the year was up 11% year on year, at INR 1,157 crore. Projects we’ve added carry a GDV exceeding INR 25,000 crore, which brings the company’s total GDV to nearly INR 70,000 crore. What these figures reflect is solid business momentum along with the confidence our customers, partners, and stakeholders have shown in us. Crucially, the Birla brand has served as a major success driver on our accelerated journey.
R.K. Dalmia
executiveWe've also lifted how visible our brand is this year to a degree we never had before. Being the lead sponsor of Royal Challengers Bengaluru in IPL 2025 carried the Birla Estates name into millions of households. That effect was emotional as well as strategic, widening our reach and strengthening the connection we have with our brand. On other fronts, together with Mitsubishi Estate Company we have brought in $33 million to develop Birla Aurora, Bengaluru. This joint venture amounts to a powerful endorsement from one of the biggest and most admired real estate investors anywhere in the world. We intend to pursue similar opportunities down the road. Leaning on all of these levers, we are also working toward surpassing INR 15,000 crore of annual pre-sales within the coming few years. Against the background of such robust business execution, we take equal pride in having received the prestigious Golden Peacock National Quality Award for the year 2025, which makes us the first real estate company to be honored in the last six years. Looking forward, we are preparing ourselves for the next phase of growth. We are investigating the redevelopment segment in a serious way, which we think could unlock asset-like deals for us. We are likewise looking into growing our commercial real estate portfolio, which creates new annuity income streams and moves us nearer to our vision of becoming a holistic real estate platform.
R.K. Dalmia
executiveTaking into account everything I have just outlined, I think our real estate business is positioned very well for growth that is both sustained and of high quality going forward. Now let me turn to the paper segment. As I said earlier, the board of directors of Aditya Birla Real Estate gave its approval to the divestment of the paper business by way of a business transfer agreement, envisaging a slump sale to ITC, subject to consideration of INR 3,498 crore, subject to the achievement of certain conditions and precedents. We expect the divestment process to conclude by Q2 financial year 2026. That brings me to the end of our opening remarks, and we can now begin the question-and-answer session. Thank you, gentlemen.
Operator
operatorThank you, sir. We'll now start the question-and-answer portion. Anyone who wants to ask something can press star and one on their touchstone phone. Should you want to take yourself out of the question queue, press star and two. We ask participants to use handsets when asking a question. Ladies and gentlemen, we'll pause for a moment while the question queue is put together. Our first question is from the line of Karan Khanna at Ambit Capital. Please go ahead.
Karan Khanna
analystHi there, thanks for giving me the chance to speak, and congratulations to the team on the strong sales growth, the launches, and the collection.
Operator
operatorGo ahead with your question, and if you've muted yourself, please unmute.
Karan Khanna
analystHello. Can you hear me? Hello?
Operator
operatorKaran, can you hear us?
Karan Khanna
analystHi there. Yes, you can hear me. Good morning.
Operator
operatorBecause the participant isn't responding, we'll go to the following participant. Our next question is from Akash Gupta of Nomura. Please proceed.
Akash Gupta
analystHello there. Hi, can everyone hear me?
Operator
operatorAkash, please go ahead with your question.
Akash Gupta
analystYeah. Hi there. Congrats on the fantastic quarter. Sir, I actually had a few questions.
Operator
operatorWe're going to hand things over to the following participant. So the following question will be coming from Amit Srivastava at BNK Securities. Please proceed.
Amit Srivastava
analystHello there. Can everyone hear me okay?
R.K. Dalmia
executiveThere seems to be an issue on your line, boss.
Amit Srivastava
analystCorrect.
Operator
operatorAll right, everyone, please remain connected. We’ll check whether there’s a problem and then return to you. Thanks.
R.K. Dalmia
executiveHand me a notebook.
Operator
operatorOkay, I turned the music line on since we need to verify the process while the participants aren't all switched over. I'm announcing that the music line is on. Our next question is from Amit Srivastava. Please go ahead.
Amit Srivastava
analystYeah, hi. Congrats on a solid set of results. Can you hear me?
Operator
operatorYes, please go ahead.
Amit Srivastava
analystHello, and congratulations on the strong results you delivered across the pieces in 2025. I'd like to look ahead to next year now. How are you viewing the pieces figure? With that context in mind, our plan is to launch roughly INR 14,000 crore of GDV through eight-time projects in FY 2026. Could you also walk through the sequencing — how those launches will be spread across the coming fiscal year — and share guidance on pieces as well as project additions for FY 2026?
R.K. Dalmia
executiveYes. Amit, thanks for that question. As we said, we intend to bring roughly INR 14,000 crore of new launch phases or new projects to market. For the most part, that is lined up for Q3 and Q4. There could be one or two launches that we're attempting to pull into Q2. Because the weighting is so heavily toward the back half of the year, I'm reluctant to offer a guess at a guidance figure for this year. What we're really focused on is a plan over three years, under which we're targeting roughly INR 15,000 crore within about three years' time. I think I can speak with more confidence over a longer horizon than by giving you annual guidance over such a short term, since there are so many variables at play and the launches are concentrated toward the later portion of the year. I'd put it this way: we'll keep growing in a phased manner, though it may move up and down. My main focus is a three-year plan under which, by the close of the third year, we ought to be posting annual sales above INR 15,000 crore per annum.
R.K. Dalmia
executiveI mean, that's roughly twice the figure we posted a year ago.
Amit Srivastava
analystAbsolutely, sir. Regarding the launches we did, we had 2 major projects in Q4 — one at Birla Aurora and the other in Bangalore. Gurgaon saw a really strong reaction, and we managed to sell out completely. As for Bangalore, the response was a bit weaker — could you help us understand what mainly drove the difference in how the two markets reacted? Is it that the market itself is weaker? Or that one location is superior? If you could expand on that, please.
R.K. Dalmia
executiveThe NCR result was genuinely extraordinary. No one expected that within just 15 days we could somehow get past 3,000+ bookings in that short a window. That really was remarkable. In my opinion, what took place in Bengaluru, in Sarjapur, is likewise a very impressive showing, since it ranks as our biggest launch in Bengaluru. Never before have we recorded INR 850+ crore in so brief a span. In all our earlier launches, the numbers were modest, so we achieved INR 500 crore or INR 550 crore, and so on. This launch has been enormous. We recorded INR 850+ crore. From where we sit, I believe this launch has been extremely, extremely successful. We were given only about a week there. That explains it. I mean, if you want to put it that way, it could not get to something like INR 3,000 crore or thereabouts. I think the response was also very, very strong. We launched almost at the tail end of the quarter. Sorry, yes, Amit, did I cut you off?
Amit Srivastava
analystNo, no — I wasn’t asking about that. I was just checking whether demand itself is fine, or whether demand is slowing, or whether it’s the market that’s the issue.
R.K. Dalmia
executiveAmit, demand is still very strong. I've consistently said that when you get the pricing right, the location right, and the mix of the right brand, right design, and right sizing, the market keeps showing enormous appetite, or demand, for products of that kind.
Amit Srivastava
analystAlright. Sir, another question on our cash flows. What would cash flow look like for the coming year, given that we've completed a deal to exit the paper business? Taking that cash flow into account, along with project collection and the planned CapEx on a construction scheme, could you shed some light on the cash flow position?
R.K. Dalmia
executiveHey Amit, I'm still on the line.
Amit Srivastava
analystYes, sir.
R.K. Dalmia
executiveAmit, look, our consolidated debt right now is at INR 3,575 crore, and our net worth is roughly around INR 3,900 crore. Debt-to-net equity comes to about 0.92. Now, once the cash flow from the paper business divestment comes in, we'll actually need to repay close to around INR 2,000 crore of debt, which is tied in one way or another to that business's assets. Whatever balance comes will sit in treasury, earmarked for future growth capital in our business. After that, we'll of course have cash flows from collections, but I assume those would also be consumed against construction costs. The main requirement is only growth capital, and so this remaining amount from the paper business will be used. If it gets exhausted, we'll probably go for fresh borrowing, because our leverage would have improved a lot by then.
Amit Srivastava
analystJust to clarify that point, sir — it's INR 3,500 crore.
Operator
operatorAmit, in case anything else comes up that you'd like to ask, would you mind getting back in the queue?
Amit Srivastava
analystNo, I was just hoping you could clarify something about this cash flow specifically — just this performance.
R.K. Dalmia
executiveNo, that's fine — I figure most of the other folks probably have this same question too. So Amit, go right ahead.
Amit Srivastava
analystOkay, so quick question, sir — that INR 2,000 crore paper debt, does it sit inside the INR 3,500 crore net debt figure, or not?
R.K. Dalmia
executiveYes, yes, it’s in there. That’s exactly what I’m saying. So from INR 3,500, INR 2,000 is going to go.
Amit Srivastava
analystAlright.
R.K. Dalmia
executiveSo <<foreign_lang>>, once you factor in capital gains and all of that, it comes to roughly INR 3,500 crore from the paper sale. INR 2,000 goes out, INR 300 goes out, so about INR 1,200 crore will land in our treasury, which we can use to fund any growth in the real estate business. Should that not be enough, we'll take on fresh borrowings.
Amit Srivastava
analystAlright. Regarding the money going toward collection as opposed to construction, sir, for this year — FY 2026 — if you have that?
R.K. Dalmia
executiveAmit, sorry — could you repeat the question?
Amit Srivastava
analystWhat's the projected collection for FY 2026 compared with what we'll spend on construction?
R.K. Dalmia
executiveConstruction spend, yes. We brought in a really solid collection of close to INR 2,706 crore. What did construction spend come to? Was it INR 500 crore or more? Construction was around INR 1,600 crore.
Amit Srivastava
analystAnd if you could also share it for FY 2026, sir — what would the projection be, if you have one?
R.K. Dalmia
executiveAs I said, you're all aware this depends mostly on sales. Because I'm not providing a sales figure, I'd rather not speculate, but I can assure you collections will also see very, very healthy and strong growth, driven mainly by our bookings to date and the progress we're making on construction.
Amit Srivastava
analystAlright, thank you very much, sir. I do have another question, and then we’ll return to the queue.
Operator
operatorThanks. Our next question is from Karan Khanna of Ambit Capital. You have the floor.
Karan Khanna
analystYes, hello. I appreciate the chance to speak. Can you hear me okay?
R.K. Dalmia
executiveYes, Karan, we can hear you fine. Thanks for the question. And thanks for joining and asking.
Karan Khanna
analystAbsolutely, Katie. First off, could you share a few qualitative observations regarding the foot traffic, conversion rates, and bookings we're seeing this quarter? In particular, on Nyara, would you mind telling us how many units were sold in the previous quarter? And as a follow-up, what's the outlook as we head into FY 2026? Do you still expect the phase III launch at year-end, or might you shift it to the third quarter?
K. T. Jithendran
executiveOkay, so where Nyara is concerned, everybody knows we've launched two towers. Of the 414 apartments in the first tower, 401 have been sold. It's basically a situation where there's barely any inventory remaining. In Tower B, we sold 96 of 148. The last quarter was very strong for us. We did roughly 9 or 10 apartments in that quarter. We're sitting at 96. I'd say demand is holding steady. Even so, most of our really prime inventory has been sold. Demand continues to be steady. We're quite excited and are looking forward to launching the third tower. In all likelihood, that will take place at the end of Q3 or in early Q4.
Karan Khanna
analystSure. On one of the slides, K. T., you noted that Birla Aurora is the sole project slated for delivery during this financial year. Considering the growth and business development you've achieved over the past few years, will FY 2026 be oriented more toward additional BD and launches, or will you change course and concentrate on executing the projects already underway?
K. T. Jithendran
executiveThank you, Karan, for raising that question. I want to make clear that execution has always been our priority and will remain so going forward. In my view, solid business development and sales are built on a foundation of really strong execution. To date, we have handed over three projects. The first is Birla Aurora in Kalyan, the second is Birla Alokya in Bengaluru, and the third is the initial phase of Birla Navya in NCR. Every one of these phases was completed comfortably ahead of the RERA deadline and drew very positive feedback, with very strong NPS scores. It is simply that the timing has not lined up right now. What I mean is that Alokya and Navya — both in NCR and separate developments — are finished, largely handed over, and their profits recorded. We still have certain flats left to sell in one year, and income recognition on that remaining portion will therefore come through during this year. A number of our customers have not yet paid in full. More than 80% is paid, with more than 20% still outstanding. That should come in during this year. We have not planned any handovers for this year. There will be a modest number of handovers from Birla to SIA, and a new phase of Navya will arrive in the following financial year.
K. T. Jithendran
executiveI'd say the main handover is going to be Nyara Tower One in FY 2028. The fact that nothing is being delivered in a given year doesn't mean our attention isn't on it. As Mr. Dalmia mentioned in his remarks, we received the Golden Peacock Award for Quality Systems — the only real estate company to get it in the last several years. It was conferred on us as a company. That says a lot about how we execute, our quality, our timelines — all of it is something we're extremely focused on. We're also very proud to say that we've stayed within all of our budget costs over this period. I don't believe there's been any lack of focus. Actually, execution has been an extreme focus for us. Execution and design are what we've focused on.
Karan Khanna
analystYeah. It has been 100%.
R.K. Dalmia
executiveMy apologies for cutting you off. Yes.
Karan Khanna
analystRight, that helps. Thanks for clearing that up. On Bengaluru, since you've used up nearly all the launches there apart from Trimaya phase IV, which should come this fiscal year, what should we expect for business development in that market in FY 2026, and is there any overall FY 2026 business development guidance you'd like to give?
K. T. Jithendran
executiveYes. So I think our entire attention is on continuing to expand our GDV bank, since sales, as you said, have been extremely robust, and we have a really solid lineup of launches planned for this year. I believe our emphasis will remain on BD. In the last year, we added GDV amounting to roughly INR 25,000 crore. For this year, we're targeting at minimum around INR 15,000 to 20,000 crore of fresh GDVs, fresh BD to be brought in. That will center on every market where we find the right deals, whether it's Bengaluru, NCR, Mumbai, or Pune. All four of these markets are where we're focused, yeah, equally.
Karan Khanna
analystAnd sir, my final question concerns Noida Sector 150 — has anything moved forward since the regulatory authorities stepped in? Given all the complications tied to it, do you expect this project to join your portfolio within the next 4 or 5 years?
K. T. Jithendran
executiveThe situation appears somewhat uncertain, since things haven’t advanced much beyond where they stood when we signed. It remains unresolved. So I’d call it 50/50. I’m not especially confident that we’ll close this deal. The agreement runs out later this month. So we’ll need to reassess it from scratch.
Karan Khanna
analystAlright, that’s useful, K. T. Jithendran. I’ll rejoin the queue if I have any follow-ups. Thanks, and best of luck.
Operator
operatorThanks. Our next question is from Akash Gupta at Nomura. Go ahead, please.
Akash Gupta
analystHello there. Can you hear me okay?
R.K. Dalmia
executiveYes, Akash. That's right — you are.
Akash Gupta
analystGreat. Sir, my first question was about the Niyara Tower launch. So Godrej is coming up, and then Prestige is there as well. I just wanted to get a sense of your plans for the Niyara third phase. In what ways will this tower differ from the first two phases? Do you intend to change dimensions or anything like that? That's my first question, sir.
R.K. Dalmia
executiveAlright, Akash — yes, competition in this region has definitely intensified. Quite a few very high-end apartments are cropping up around this micro market. Still, as I said a bit earlier, our pull has remained very strong for Tower B. It always helps to introduce something fresh. We aren't yet able to reveal that, though for Tower C we are introducing a changed format.
Akash Gupta
analystAlright, alright. My next question concerns the Mathura Road project as well — where does that stand right now? And my third question is about Sarjapur. We launched it during the second quarter. Should we expect the remaining Sarjapur sales to come through in this quarter of the financial year?
R.K. Dalmia
executiveRegarding the India Hume Pipes project — the Mathura Road project in Delhi — regrettably, it remains stalled at the approval stage. Little headway has been possible on that front. A standing committee needs to be appointed, and the project must be cleared by it. We had hoped that with the new government taking shape, things would move faster. Regrettably, that has not materialized. We have not included it in this year's launch calendar either. We are making every possible effort to get it moving. The positive aspect is that, since it is a JV, very little capital is tied up in it — hardly anything at all. Even so, our efforts are in full swing, because we regard it as a highly attractive and very strong market. Every effort is underway to work around the challenge we are confronting. That covers the India Hume Pipes project. On Sarjapur — yes, it was launched at the very end, and we expect sales to keep occurring. The only thing is that the new phase, the team, the challenge, the channel partners, the recoup is taking place at the start of the new quarter. I believe sales will keep happening, and we anticipate a reasonable level of traction carrying on in this project.
Akash Gupta
analystGot it, sir. Wishing you the very best in the new financial year, sir. Many thanks.
R.K. Dalmia
executiveThanks, Akash.
Operator
operatorThanks. Our next question is from Pritesh Sheth at Axis Capital. Pritesh, the floor is yours.
Pritesh Sheth
analystYeah, thanks for the chance. First question, carrying on with this Sarjapur — it says we've launched it fully, but it looks like we didn't open much inventory. I just wanted to get a sense of how much we opened to generate that INR 860-odd crore kind of sales there. Yeah, I mean, you can take that one, and then probably I'll move on to my second question.
R.K. Dalmia
executiveYeah. I think, aside from three towers, we launched four towers. At the start, we concentrated on those simply because the timeframe was quite brief. At the moment, we're putting our attention there. Once we see decent volumes at those, we'll move into the remaining ones and bring the other towers online as well.
Pritesh Sheth
analystWould those four towers carry a GDV worth INR 4,000 crore, or possibly an amount above that?
R.K. Dalmia
executiveYeah. I don't think I've got that figure on me. We can look into it. I believe roughly 1,500 is the usual figure. Yeah. I think it's nearer to 15, but I'll need to get back to you on that. Perhaps we can provide those figures to you offline. The first 4 towers in Sarjapur.
Pritesh Sheth
analystAll right, I just want to make sure I follow the cash flow information you provided on slide 34. Our project development cost came to roughly INR 6,000+ crore. Earlier you said INR 1,600 crore was what we spent on construction. The remainder is the FSI purchase we made. Is that the correct understanding?
R.K. Dalmia
executiveThat figure covers BD as well as another significant item. Beyond construction finance, it takes in BD costs on the projects we've acquired. A large chunk of it — roughly INR 1,300 crore — relates to the Worli acquisitions, the 10 acres we picked up in Worli. We can walk you through a breakdown of the remaining costs. K. T., do we have those other costs, the ones aside from project or something?
K. T. Jithendran
executiveYeah. Other costs. Yeah.
Pritesh Sheth
analystSo, that's approximately where the remainder sits — INR 2,000 or more, what would you call it?
R.K. Dalmia
executive1,600.
Pritesh Sheth
analystOn construction—what was our construction spend? You meant 1,600.
R.K. Dalmia
executiveWe laid out INR 1,600. That's INR 1,600 plus INR 300. So that comes to roughly INR 3,000 crores, correct? The remaining INR 3,000 covers the other projects we've acquired.
Pritesh Sheth
analystRight. So essentially, that figure also takes in the BD cost we've taken on.
R.K. Dalmia
executiveYeah.
Pritesh Sheth
analystThat's the clarification I was after. Okay. Alright. And then finally, regarding the launches slide, you've provided a GDV estimate of 26. I take it that this figure also takes into account the inventory already sitting in the project, or is the INR 14,000 crore entirely made up of new projects we intend to launch?
R.K. Dalmia
executiveFourteen is the new launches plus the sustenance inventory is also there. This is just the new ones we are bringing to the market.
Pritesh Sheth
analystAll right, all right, that's fair enough. All right, thanks. That's everything from me, and the rest as well. Thank you.
R.K. Dalmia
executiveThanks.
Operator
operatorThanks. Our next question is from Hitesh Doshi at Nirzar Securities. Go right ahead.
Hitesh Doshi
analystMorning, everyone, and nice work on those strong sales figures.
R.K. Dalmia
executiveYeah. Thanks.
Hitesh Doshi
analystHere's my question. Yeah, so I'd like to ask, what's the sustenance inventory, the way K. T. Jithendran proposed it?
R.K. Dalmia
executiveIt's approximately INR 6,000 crore, sir.
Hitesh Doshi
analystSix thousand?
R.K. Dalmia
executive6,700 crores.
Hitesh Doshi
analystSo in a sense, over the whole of the next 12 months, you'll be bringing projects worth INR 20,000 crore to market.
R.K. Dalmia
executiveCorrect. Yes.
Hitesh Doshi
analystSo how close are we to getting the money from the ITC deal, or could there be some negative surprise there if some approval comes through?
R.K. Dalmia
executiveAs of today, Hitesh Bhai, we aren’t anticipating any negative surprise. We expect the closing to take place around the end of July. At most, perhaps a month or so—if it closes in July, then roughly a month or so to get the funds. Hopefully, we should be closed in August. Apart from a possible minor delay in completing the transaction, no negative surprises are likely.
Hitesh Doshi
analystAll right, so this year we've got INR 20,000 crore of goods slated for sale, and that covers both the launch and inventory. We should be hopeful that we at least exceed what we achieved last year.
R.K. Dalmia
executiveThere's nothing to say about that, Hitesh Bhai.
Hitesh Doshi
analystAll right, I wish each of you the very best.
R.K. Dalmia
executiveAppreciate it.
Hitesh Doshi
analystI really appreciate it.
Operator
operatorThanks. Our next question is from Dixit Doshi at Whitestone Financial Advisors. Go ahead, please.
Dixit Doshi
analystHi there. Yeah, thanks for the chance to ask. My first question is this: in our prior conversations, on a few of the calls, you've said that for the Worli project, construction cost comes to roughly INR 20,000 per square foot. Broadly speaking, I just wanted to confirm whether that figure refers to saleable area, as you mentioned, or whether it's based on carpet area?
R.K. Dalmia
executiveI've consistently referred to costs on saleable areas. Yeah. I haven't mentioned — what I said was in the region of about 25,000. It starts at 20, then it may rise, with the finished projects that include it, to about 25,000.
Dixit Doshi
analystAll right, so it's 25,000 — roughly twenty-five thousand rupees on the saleable side — while the realization comes in at about eighty thousand.
R.K. Dalmia
executiveNo. What I’ve consistently said is that once we finish this construction over the next 6, 7, 8 years, we’d reach an average price of roughly INR 50,000 and a cost of approximately INR 25,000 each year, including all inflation. So we should get close to about 50, maybe 45%–50% margin. That’s what I’ve maintained.
Dixit Doshi
analystWhen we refer to that INR 25,000 cost, the full cost, it's going to include marketing and all of it. That whole cost will be recognized when revenue recognition occurs, or some portion of it is actually being recorded right now, since we're posting losses in the current quarters.
R.K. Dalmia
executiveDixit, what occurs is that there's a particular cost — of course, a significant cost always gets tied up in work in progress — but there are also certain launch costs, advertising costs and so on that we bear during the year across all the launches. Those expenses are written off in the P&L account. You'll notice a large portion, since we had many launches this year, especially in the last quarter. So we ended up with a significant amount of expenses that had to be charged to the P&L account. That's one reason our EBITDA margin is a little softer. All of these recurring items — launch costs and the like — get written off in the P&L.
Dixit Doshi
analystAll right, and a final question here. For FY 2026, we've got nine projects lined up for planned launches. Could you break those down by GDV for each project?
R.K. Dalmia
executiveI believe I can list those projects for you. Breaking it down project by project in terms of GDV would take quite a while, so we can handle that offline. We're coming out with a new phase at Birla Thirumaya — a fourth phase. For Mumbai, the first phase of our Thane project, which we signed with Hindalco, is on the way. At Birla Niyara we're planning to launch a new tower. We signed a sizable plotted development project in Boisar, close to Mumbai, and that's another one we intend to launch. In Pune we're looking at launching two phases at Birla Punya, where the first phase came out in March — we're hoping to bring two additional phases there. Then there's the other Pune project, situated in Manjari, which we also plan to launch. That makes three launches in Pune. Over in NCR, Birla Arika phase I is essentially sold out, and now we're getting ready to launch the next phase of Arika. The new project we signed last year in Gurgaon, in Sector 71, is another one we're planning to launch.
Dixit Doshi
analystAll right. So there's been some regulation lately concerning NGT approval. They said that in the area around Vikroli Thane, the NGT will require — I mean, environmental clearance will have to come from the central government. Could that have any effect on our Thane project?
R.K. Dalmia
executiveYeah. Yeah. So for our projects, we've submitted applications to the central government. Our project falls under that, which is why there's been a relatively small impact. Even though we intended to launch during the last financial year, we've filed with Delhi for our clearance.
Dixit Doshi
analystAlright. Alright. I've got nothing further to add.
Operator
operatorThanks. Our next question is from Siddhant Chabra at Mainvera Asset Advisors. Go ahead, please. Siddhant Chabra. Siddhant, please proceed with your question.
Siddhant Chhabra
analystHello there. Hi. Good day.
Operator
operatorYeah. Yeah.
Siddhant Chhabra
analystThanks a lot. Appreciate the chance to ask. My question is — I realize we’ve sold off the pulp and paper business, but I just have a small question about a few details there. First, it’s about the wood price. In the presentation, I saw a drop of 6% quarter over quarter and also YOI. So what’s the expectation? I know we’ve divested it, but what sort of expectation is there for this price going forward, maybe over the next 6 to 12 months?
R.K. Dalmia
executiveAt the moment, especially for the pulp and paper business, when it comes to input prices and the price of imported pulp, our expectation is that things will stabilize — though we don't anticipate any drastic decline.
Siddhant Chhabra
analystIs there a range you might be able to give us, maybe what you'd expect looking forward from this point?
R.K. Dalmia
executiveGiving you a range right now would be tough, since as you can see, the markets are all over the place. Predicting at this point is really hard. All we can do is watch things closely. Should something significant shift, we can consider a market correction to our realization.
Siddhant Chhabra
analystSo we anticipate additional declines ahead when it comes to input costs, things such as food and pulp?
R.K. Dalmia
executiveYeah.
Siddhant Chhabra
analystAlright. Then, second, I wanted to ask about the market outlook you put in the investor presentation. Competitive intensity has gone up from Indonesia and Thailand. Would that apply to board and tissue, or might it also be the case in uncoated paper?
R.K. Dalmia
executiveMostly in board.
Siddhant Chhabra
analystAll right. That's largely reflected in the board at this point. From what you understand, do you expect this to keep being a factor for the rest of the year, or might it be more of a short-term headwind?
R.K. Dalmia
executiveThat's expected to keep going. Discussions are underway — the association is in talks with the government about establishing some kind of minimum import price and, what's the term, even anti-dumping measures and so on. We'll see how that moves forward.
Siddhant Chhabra
analystOkay, there's just one small item. It's a data point I'd need. Perhaps I could get in touch with you after this call. I was just hoping to learn, regarding input price by area, what the wood price would roughly be by area. In other words, if you don't have it at the moment, I could potentially contact you once the call has wrapped up.
R.K. Dalmia
executiveYes. Please get in touch.
Siddhant Chhabra
analystAlright, thanks.
R.K. Dalmia
executiveI appreciate that.
Operator
operatorThanks. Our next question is from Amit Srivastava at BNK Securities. Go ahead, please.
Amit Srivastava
analystYeah. Good morning, sir. Can you hear me?
R.K. Dalmia
executiveThat's right, you are.
Amit Srivastava
analystWell done, sir, on those blockbuster sales.
R.K. Dalmia
executiveThanks, man.
Amit Srivastava
analystMy question is about the Mitsubishi tie-up. You've raised INR 275 crore. Is that a JV, or is it a loan taken from them?
R.K. Dalmia
executiveNope, that isn’t a loan — what they’re doing is taking an equity stake.
Amit Srivastava
analystWhat can we ask here?
R.K. Dalmia
executiveIt's an even split—51/49. Ours is the 51, theirs is 49. Think of it as a platform—well, actually it isn't a platform. What it is, is an equity participation at the project level. The structuring follows a particular approach, but in reality it comes down to 51 and 49. We receive 6% DMV. 8% DMV, right. Plus a bit of promotion.
Amit Srivastava
analystThere's one more question about whether you can share some outlook on EBITDA margins for the FY 2026.
R.K. Dalmia
executiveIn FY 2026, no handover is taking place yet. So EBITDA isn't getting too much emphasis. Collections will be strong. Sales are what we're concentrating on. The bulk of the EBITDA will come about in future years. We don't anticipate much EBITDA, given how the project completion method, booking, and accounting work. We don't expect a great deal of EBITDA to arrive in FY 2026.
Amit Srivastava
analystAppreciate the response, sir. Wishing you all the best going forward. Thanks.
R.K. Dalmia
executiveThanks, Amit.
Operator
operatorThanks. Just a reminder for everyone: to ask a question, press star and one. Our next question is from Biplab Debbarma at Antique Stock Broking. Please go ahead.
Biplab Debbarma
analystMorning, everyone. Morning, KT sir and Snehal sir. My first question has to do with the projects in Pune. Pune is a market that's new for us. From what I understand, they've launched the first phase there of roughly INR 400 crore. What's the response like, and how does the Pune market compare with, say, Bengaluru, Mumbai and the NCR market, where you've done exceedingly well? Next to those, how is Pune? How has the response been for the first phase of the Pune launch?
R.K. Dalmia
executiveThanks, Biplab. Once again, what defined the last quarter is that most launches ended up bunched near the close of that year. Out of the 400 limited inventory units we brought to market, since some approval changes took place in the Pune development rules, only 400 could be launched, yet 75% of that inventory was sold by us. The response for us has been extremely strong. We keep expecting that same kind of response for our upcoming launches in Pune.
Biplab Debbarma
analystRegarding the market, sir?
R.K. Dalmia
executiveThe market is really strong and holding up really well. I'd say it's a resilient market with very strong demand, a lot like Bengaluru. It's India's third largest market. We're quite bullish on this market.
Biplab Debbarma
analystQuestion number two concerns the deals. I'm certain you're seeing plenty of them, getting them done, and doing an amazing job on all of them. Could you share some insight regarding deals over the coming few quarters — should we expect a handful of large ones, or something that can be closed?
R.K. Dalmia
executiveYeah. I mean, at any given moment, we've got a certain number of term sheets signed, and we're focused on converting them. We're also trying to convert something this quarter. There are plenty of them coming in future quarters. We're also now mostly focused on securing redevelopment deals in Mumbai. We're making solid progress there. Hopefully, either this quarter or perhaps the next one, we might be able to announce our first successful one. I'm hoping to do that. Yeah. I expect that maybe we'll do something this quarter, or it could spill over into the next quarter. I think our pipeline is healthy, and we expect to close some good deals very soon.
Biplab Debbarma
analystSir, third and last question. Since you brought up redevelopment, look — most Mumbai developers, all the well-known ones, most of them are concentrating, they're concentrating on redevelopment projects too. Do you see a lot of supply coming from redevelopment projects themselves, or will there be tough competition among the bigger developers in redevelopment? How is the redevelopment market doing? Is it truly moving at a quicker pace?
R.K. Dalmia
executiveI believe South Mumbai is genuinely opening up thanks to infrastructure work and better connectivity, which have improved quite a lot in that direction. Competition has grown in that market. All the leading developers are targeting it. Still, I feel there is ample room, since these projects are relatively far smaller in size. The inventory each one of them brings out is going to be limited. I think a player can operate there and build a strong market share position. Trust matters a great deal. I think we certainly hold an edge in that respect. That is also what we are observing. We are seeing it happen. Our brand performs very well. Brand equity performs very well in that segment.
Biplab Debbarma
analystThank you. Congratulations, and I wish you all the best, sir.
R.K. Dalmia
executiveAlright.
Operator
operatorThank you. Just a quick note for everyone on the line: press star and one if you'd like to pose a question. Once again, to ask a question, hit star and one. Our next question is from Amit Srivastava at BNK Securities. The floor is yours.
Amit Srivastava
analystYes. Thanks for asking that follow-up. We just want one point clarified. You said the cost per square foot at Birla Niyara would be roughly INR 20,000 to INR 25,000. I'd like to understand which costs are being counted within that INR 20,000-INR 25,000 figure.
R.K. Dalmia
executiveEvery cost is in there. We've factored in nearly all of them. Development cost, land cost, premium FSI cost, overheads, marketing and sales costs. And naturally, construction cost, approval cost, design costs, overheads, inflation, material inflation — all of that.
Amit Srivastava
analystAlright, that’s clear. Now, one clarification about the provision we made of roughly INR 114 crore for our JV at the Birla Niyara Advanced Needs site. Given that our city investment in that business is just INR 25 crore, and we commissioned that project only recently, what exactly does this liability—larger than that amount—relate to? Is it operational liabilities, or is it some other item that has been booked?
R.K. Dalmia
executiveI'm here to push things a bit further. The figure will come to roughly INR 114 crore. Yeah. Essentially, the joint venture we had relied heavily on our existing textile business, which supplied yarn to it, and some utilities were also shared. After our textile divisions were closed, it became unviable for that JV to keep going as well. So we've now had to decide to shut it down — meaning sell the JV off. As things stand, we estimate its liabilities at close to about INR 228 crore, and so on. Both partners will contribute equally toward that liability. We also already have INR 50 crore of capital in place. Another INR 89 crore each will need to be invested by us into the JV. That INR 89 crore is the amount we're treating as a provision. We've already booked a loss of roughly INR 8 to 9 crores in the first quarter. The net amount we still need to provide comes to about INR 81 crores. If you look at the INR 124 crores figure, INR 81 crores is this piece, and the remaining INR 43 crores relates to the carrying cost we had on the property — the Worli lease land — which, as per the Supreme Court, we have now handed over to the BMC.
R.K. Dalmia
executiveWe need to write off the carrying cost tied to that specific property. Those are the two big exceptional items. INR 81 plus INR 43 comes to INR 124 crores, and that's the amount we've provided. Hope that helps.
Amit Srivastava
analystYes. Yes. Of course. Of course. I appreciate you clearing that up. That's all I have.
R.K. Dalmia
executiveThanks.
Operator
operatorThe following question is from Akash Gupta of Nomura. Please proceed.
Akash Gupta
analystHello, sir. Thanks for taking my follow-up question. Regarding our launch guidance of INR 140 billion, sir, do you see any downside risk to that launch guidance? For instance, we are awaiting central government approval for that Thane project. My first question is, how confident are we in this INR 140 billion launch guidance?
R.K. Dalmia
executiveAkash, look, at this moment we feel very confident and quite positive. Everything is going to unfold the way we've planned. With approvals, issues do arise, and it could get more intense as we approach the final quarter. In theory, some of them might slip into Q1. As of today, there's been no indication of that. When it comes to approvals, you can't be entirely, entirely certain it will happen on schedule. As of today, everything is moving forward as planned. We expect all of them, and we're fairly confident. It's possible that one or two of them could spill into the next quarter of next year. That said, Akash, I wanted to clarify one thing. Akash and Pratish, the two of you had asked about Sarjapur, how much we launched, and so on. I said four towers, but in fact it's four blocks that we've launched. Four blocks, and each block consists of two towers. We've launched roughly seven towers. What we've held back for a later launch is six towers. In total it's 13 towers split into four or five blocks.
R.K. Dalmia
executiveI wanted to provide that clarification.
Akash Gupta
analystRight, got it. Since the Sarjapur deck showed, I believe, the whole project being launched — that's what the presentation indicated for Sarjapur.
R.K. Dalmia
executiveAkash, that's correct. For this entire 13, there's a single RERA number—just one RERA. Our plan has been to launch the whole thing. Given the situation, we chose to concentrate more on maximizing our revenue and so on with the first seven towers, since time was short because the RERA arrived at a very late stage.
Akash Gupta
analystAll right, all right. Sir, I have one last question. For the revenue we recorded in the fourth quarter, what were the EBITDA margins at the project level?
R.K. Dalmia
executiveYeah, roughly 25%. It falls somewhere between 25% and 30%, or 33%, depending on the project. I'd say our NCC projects carried a really strong margin. With Kalyan located where it is and given the pricing, Kalyan's margin came in lower. So that gives you the range.
Akash Gupta
analystGot it, sir. Great. Thanks a lot, sir.
R.K. Dalmia
executiveMany thanks to you, sir.
Operator
operatorThanks. Our next question is from Ronald Siyoni of ICICI Securities. Ronald, please go ahead.
Ronald Siyoni
analystThank you, sir, for the opportunity, and congratulations on a great set of numbers. I actually had a question about the business development guidance you gave of about INR 15,000-INR 20,000 crore. Does that include redevelopment projects? Because redevelopment projects won't need much of the capital. Another related question would be, are you being a little bit conservative considering generally around 10% of land cost is there, and you will have about INR 1,200 crore to invest in the coming financial year? This BD guidance, is it conservative?
R.K. Dalmia
executiveYeah. I mean, I think that's realistic. Like I said, I'd point out that when it comes to new deals, our approach is somewhat conservative — what I've always said is that we take on no risk beyond market risk. We're very particular about location, title, access, zoning, and all of that. And even on land prices, the micro markets we pick, the type of competition present there. From that standpoint, we're a bit more selective about our BD deals. That also takes in the new segment we intend to enter, namely the redevelopment sector. That said, I think, yeah, I mean, funding has never been a constraint. We're reasonably confident, I think, that we should be able to achieve this.
Ronald Siyoni
analystYes, thanks. My final question concerns your 3-year goal of hitting INR 15,000 crore on an annual basis. Since your broader vision is to belong to the top tier of developers — what we're seeing right now is that local unlisted yet organized players are also advancing very quickly and attempting to get past INR 10,000 crore on that basis. How do you compare against both organized and unorganized large players, given your overall ambition to be in that top league?
R.K. Dalmia
executiveYeah. What we're really discussing is essentially doubling the bookings we hold today within a brief span of 3 years. That looks quite solid, in my view. Our growth has been fairly vigorous. At the same time, the cycle has to be factored in. The cycle we've been moving through has been extremely robust. Our assumption must be that this cycle keeps going along the same trajectory. The market is clearly shifting toward more organized, branded corporate participants, who show greater dedication to execution and to the quality of delivery, to delivering on time. I believe our positioning is very strong. Our positioning is very strong, I think, for capitalizing on this. I've said consistently that our aim is to scale proportionately while being the most customer-centric as well as the most reputed developer. We won't pursue new deal signings too aggressively. We are quite selective when it comes to deals, since real estate is a business with a multi-year cycle. That requires care from us. Growth requires prudence from us. Growing will take time on our part. We feel very confident, with the opportunity before us, with the brand, with the skills our team is developing, and so on. I think our growth path will be very robust.
Ronald Siyoni
analystMuch appreciated, sir, for taking the question, and I wish you the best of luck.
Operator
operatorThanks. Attendees, kindly limit yourselves to 2 questions. Should you have further questions, please get back in the queue. Our next question is from Sagar Shah at FIN Research. Go ahead, please. Sagar, please proceed with your question. As the participant isn't responding, we'll go on to the following participant. The next question is from Isha Shah of Nirzar Enterprise. Please go ahead.
Analyst
analystGood afternoon. Nice work on the solid results in NCR and Bangalore. Can you hear me, sir? Hello?
Operator
operatorSure, go ahead and ask your question.
Analyst
analystCan everyone hear me okay?
R.K. Dalmia
executiveIt's all yours.
Analyst
analystAlright, so I’ve got two questions. The first: during financial year 2025 to 2026 and 2026 to 2027, which projects are going to be finished and handed over, and how many will there be? My second question: in financial 2025, for the projects we’ve added but haven’t launched, how much have we put in on our own projects and in JDA — meaning the upfront investment and the advance? Those are my two questions.
R.K. Dalmia
executiveAlright, Isha Sohb, I believe I told you earlier about those projects that are nearing completion. My sense is that very little is going on in 2026. It's just the remaining inventory that still needs selling, plus some carryover from last year — units that are finished but where buyers haven't taken possession and haven't paid the 80% threshold. Those are the ones from which we'll book EBITDA this year, and that amount isn't very substantial. Next year, I think we'll be working on recognizing revenue from our Bengaluru projects, Birla Tissia, and a new phase of Birla Navya as well. That falls in the year after this one — the coming financial year.
Analyst
analystSo they’re going to be finished and handed over?
R.K. Dalmia
executiveThat's correct.
Analyst
analystAll right. All right. Moving on to the second question, sir?
R.K. Dalmia
executiveMy apologies — the second question concerned the launch, right. There's a list we maintain regarding the project — sorry, regarding the projects that we've added. We've added the.
Analyst
analystRight, but not launched. What I'm after, essentially, is this: we've got projects added that haven't launched yet. How much money have we put in on our own projects and in JDA — I mean the upfront investment and the advance we've invested?
R.K. Dalmia
executiveBirla Arika, definitely, that one we've launched. I won't get into the details on it. It was a project that got launched, acquired within this financial year itself, and we turned it around in under nine months. Manjari is the other one we brought to market last year — that was an outright deferred, outright, well, not even outright. Deferred means a long payment schedule. I believe we've paid roughly, what, INR 200 crore, something like that?
K. T. Jithendran
executiveYeah, that's roughly around INR 200 crore. Boisar is an outright project. We've put in about INR 72 crore there over one and a half years. What's the figure? One and a half. Perhaps we can get those numbers to you offline. Sector 71 was also there, which is another outright one. Then there's Worli, the new land — 10 acres we acquired — where we invested roughly INR 1,200 crore. Yeah. Yeah.
Analyst
analystSo that's roughly INR 1,500 crore, is that right — the amount we'd have put in upfront?
R.K. Dalmia
executivePretty much, yes. That's accurate.
Analyst
analystAlright. We’ve put the investment in, and the launch hasn’t happened yet. Okay. Okay. Thanks, sir.
R.K. Dalmia
executiveYeah.
Operator
operatorThanks. Our following question is from Sagar Shah at FIN Research. Go ahead, please.
Analyst
analystOkay, hello. Sir, can you hear me?
Operator
operatorYes, go right ahead.
Analyst
analystHi there.
R.K. Dalmia
executiveYes, Sagar. We’re able to hear you.
Analyst
analystOkay, so, two things, sir. I mean, regarding major deliveries — would it be reasonable to assume those get booked starting in FY 2028 and after, sir?
R.K. Dalmia
executiveYes, I mean, Tower A of Birla Arika will begin in FY 2028.
Analyst
analystTower 8 as well as Tower.
R.K. Dalmia
executiveThat's going to be a major completion for us — a significant delivery milestone.
Analyst
analystFI 2029, sir?
R.K. Dalmia
executiveFor 2028, that’s what I mentioned, correct?
Analyst
analystNo, Tower A is the one I meant. That puts both of them at FI 2028.
R.K. Dalmia
executiveA year separates them.
Analyst
analystI picked up on what you said regarding redevelopment. So, from your remarks, is it fair to assume — I mean, to understand — that you're quite unconcerned about redevelopment prospects in South Mumbai, where peers have been very aggressive, sir? I mean, the Walkeshwar, South Mumbai area.
R.K. Dalmia
executiveThat's one of the markets we're targeting. South Mumbai, Bandra, Juhu, Santa Cruz — these are a few of the markets we're aiming at.
Analyst
analystSince I see Valkeshwar as a single project, and that covers Malabar Hill as well. I mean, on top of that, you're being pretty aggressive too, aren't you, sir?
R.K. Dalmia
executiveCorrect.
Analyst
analystCould you, um, give us the outlook on that redevelopment — and that? I mean, what's your view there, sir?
R.K. Dalmia
executiveI'm really excited about this. I believe we'll manage to lock in a few deals.
Operator
operatorIs that what you were asking, Sagar?
Sagar Shah
analystThanks. Yeah.
Operator
operatorThanks. Our next question is from Ankit Bajaj at Care Ratings. Go ahead, Ankit — please ask your question.
Ankit Bajaj
analystYeah. Hi there. Can you hear me okay?
R.K. Dalmia
executiveYes, that's correct — it's you.
Ankit Bajaj
analystYeah. Good afternoon, sir. First off, congratulations on that strong set of sales and collection. Sir, I was just hoping for your guidance on debt going forward and on net debt to equity, sir.
R.K. Dalmia
executiveLike I said at the start, I believe I noted that at present it stands at roughly 0.92.
Ankit Bajaj
analystThat's right.
R.K. Dalmia
executiveMy view is that any projection of net debt to equity down the road hinges on the timing of the payment I receive from selling the paper business's real estate. As I said, at roughly that point we'd retire debt of about INR 2,000 crore out of the proceeds we got. With luck, by then borrowings would fall to somewhere around INR 1,500 crore. Relative to our equity, that's nearly under 50%. On top of that, naturally, we'd be holding a cash balance. At that moment, in technical terms, we'd be at virtually no debt at all.
Ankit Bajaj
analystRight, sir, I just wanted to get a clearer picture, since you'll be launching a number of substantial projects during this financial year. You'll also be taking on some new debt to fund those launches. Does that come into play as a factor?
R.K. Dalmia
executiveSo as I mentioned, out of the INR 3,500 crore of outstanding debt we have, we'll repay INR 2,000 crore using the INR 3,500 crore we got from the paper business. Even after accounting for things like some capital gain tax payment and so on, we'd still be left with roughly INR 1,200 to INR 1,300 crore sitting in our treasury. That money will likely go toward any acquisitions we're planning in the near future. Should we need a larger amount at that point, we'll go in for fresh borrowings. It all hinges on how much we need for acquisitions in the near future, beyond what's already in our treasury from the proceeds of the paper business sale.
Ankit Bajaj
analystAll right. All right. Thanks, sir.
R.K. Dalmia
executiveI appreciate that.
Operator
operatorThank you. Ladies and gentlemen, we will take that as the last question for today. I would now like to hand the conference over to the management for the closing comments.
R.K. Dalmia
executiveThanks to each of you for joining tonight’s call. Should you have any additional questions or want further details about the company, please contact our IR manager at Alvoraum Advisor. We appreciate all the interest you’ve shown in our company. Thank you.
Operator
operatorThank you, sir. Ladies and gentlemen, this conference has now come to a close on behalf of Emkay Global Financial Services. We appreciate your participation, and you are free to disconnect your lines at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aditya Birla Real Estate Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Aditya Birla Real Estate Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aditya Birla Real Estate Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.