AerSale Corporation (ASLE) Earnings Call Transcript & Summary
November 8, 2022
Earnings Call Speaker Segments
Kristen Gallagher
executiveGood afternoon, and thanks to each of you for joining us for AerSale's earnings call covering the third quarter of 2022. Leading today's discussion are Nick Finazzo, our Chief Executive Officer, and Martin Garmendia, our Chief Financial Officer. Before we get into the results for this quarter, we should remind you that any statements on this call that aren't about historical fact are to be treated as forward-looking statements under the federal securities laws, and that includes statements about what we currently expect for the business and for our financial performance. Such statements aren't promises or guarantees; they carry known and unknown risks, uncertainties, and other significant factors that could make our actual results, performance, or achievements materially different from any future results. The important factors that could make actual results differ materially from forward-looking statements are covered in the Risk Factors section of the company's annual report on Form 10-K for the year ended December 31, 2021, which was filed with the Securities and Exchange Commission on March 15, 2022, along with its other filings with the SEC. In those filings, other important risks and uncertainties are identified and addressed that could cause actual events and results to differ materially from what the forward-looking statements on this call indicate. We'll also refer to non-GAAP measures that we consider important when assessing how our business is performing. A reconciliation of those non-GAAP metrics to the closest GAAP metric is available in the earnings presentation materials posted on the Investors section of the AerSale website at ir.aersale.com. With that, I'll hand the call over to Nick Finazzo.
Nicolas Finazzo
executiveKristen, thanks. Good afternoon, everyone, and I appreciate you being on the call with us today. I'll start by giving a quick look at the quarter, covering how operations went, and after that I'll hand things over to Martin, who will walk through the figures in more depth. Just like we do each quarter, we feel it's important to remind investors that our financial results are usually uneven from one quarter to the next, and we suggest looking at our performance on a full year basis. That's because of how our flight equipment sales programs work, since they tend to happen at irregular points during the year. The way our revenue was paced in 2022 fits that same pattern, since the timing of flight equipment sales produced record first and second quarters, then a weaker third quarter, with what we expect to be a strong finish to the year. The underlying growth and volume of our business stayed robust throughout this stretch, and I'm happy to say that every one of our flight equipment sales contemplated when we issued our initial 2022 guidance earlier in the year has now closed, except for two. I'll speak about those two remaining planned flight equipment sales shortly. Now for the details: in the third quarter, consolidated sales came in at $51 million, versus $73.3 million in the same period a year earlier. Our Adjusted EBITDA for the period was a loss of $500,000, compared with a gain of $13.9 million in the third quarter of 2021. As I mentioned, the weaker sales in the period came entirely from the timing of flight equipment sales, which were either pulled forward into the second quarter or pushed back into the fourth quarter. Year-to-date, sales are up 40.1% to $313.4 million, and Adjusted EBITDA is up 16.2% to $70.5 million. Also, if you exclude the impact on Adjusted EBITDA from CARES Act support in the prior year, our Adjusted EBITDA rose 53.6% year-over-year. These results make us proud, and we're positioned to close out the year the way we expected. Now to segment performance, starting with Asset Management Solutions: third quarter sales were $20.6 million, compared with $48.9 million in the same period a year earlier. Flight equipment sales during the quarter totaled only $2.7 million, which included two engines, versus $27.4 million in the prior year period, which included three aircraft and one engine. Looking ahead, we've contracted for 12 more Boeing 757 P2F conversions from multiple providers, which takes the P2F program through the end of 2023. Those 12 include the two aircraft I referenced earlier that were part of flight equipment sales in our original 2022 guidance. We removed those two aircraft from sale as passenger aircraft in 2022 in favor of higher margin opportunities to sell or lease them as P2F converted aircraft in 2023. In our USM Parts business, airframe and engine part sales came in below the prior year period, largely because of extended turnaround times for overhauled parts. Looking past the upcoming two quarters, we expect USM sales to rise as we capitalize on greater asset availability throughout the market. Within our leasing segment, revenue came in level with the same period last year, since a larger number of engines under lease almost fully compensated for reduced aircraft leasing revenue; over in Tech Ops, sales climbed sharply, up 24.5%, fueled by better results at our landing gear and component MROs, along with robust MRO performance at our Goodyear location during that time. On AerAware, our progress toward certification remains steady and consistent. We have now asked the FAA to set up our final certification flights, and we anticipate those will get underway in the next few weeks. Though we're eager to start final flight testing, we want to remind investors that carrying out the flight test depends on particular weather conditions in order to demonstrate the system. Despite possible weather-related hold-ups and FAA scheduling constraints, we expect to obtain our Supplemental Type Certificate, or STC, soon after testing wraps up. With AerAware certified, AerSale would become the first company to certify a head-wearable display as a primary flight display on a commercial transport aircraft. Since we're approaching the commercialization stage for AerAware, we've kept ramping up our marketing push with airline operators. Right now we're collaborating with a number of potential launch customers to model the system's cost savings and efficiency gains. AerAware's capabilities are obvious and persuasive. A plane fitted with AerAware improves safety and reliability, should generate lower greenhouse emissions, and is capable of delivering meaningful cost savings for operators by reducing weather-related congestion and delays. Significantly, the timing of AerAware's availability could hardly be better for airline operators and other commercial air travel stakeholders, given that the worldwide airline industry is straining to handle greater passenger volume amid airport congestion and growing weather-related delays. AerAware tackles these critical issues head-on and helps ease them. To wrap up, with only two months remaining in the year, we're on track to hit our full year financial guidance and are set to deliver a solid fourth quarter. We will shortly introduce AerAware to the market with several potential launch customers. Our backlog of Boeing 757 P2F conversions stays strong, and we're positioned extremely well to carry our momentum forward into 2023. At this point, I'll hand the call to Martin for a closer look at the numbers. Martin?
Martin Garmendia
executiveThank you. Appreciate it, Nick. I'll begin by walking through how we did financially in the third quarter, then finish with the 2022 guidance. Third quarter revenue came in at $51 million, and that figure included $2.7 million from selling flight equipment, specifically two engines. Back in the third quarter of 2021, revenue stood at $73.3 million, with $27.4 million coming from flight equipment sales made up of three aircraft plus one engine. Strip out flight equipment sales, and our third quarter revenue would land at $48.3 million, versus $45.9 million for the same period in 2021. A reminder for investors: during the second quarter we handed over a B747 freighter that had initially been scheduled for the third quarter. We also delivered the last internally converted B757 passenger to freighter, or P2F, aircraft early in the fourth quarter, which likewise had originally been planned for the third quarter. As we've pointed out on several earnings calls, our business can and frequently does swing quarter to quarter depending on when flight equipment sales occur; that makes it essential to track our progress through asset purchases and sales across the long term. Asset Management Solutions, or AMS, revenue for the third quarter fell 57.9% to $20.6 million in Q3 2022, driven mainly by reduced flight equipment sales. USM parts sales also came in lower during the third quarter of 2022, reflecting longer turnaround times for overhauled parts in that period. Leasing revenue reached $7.8 million in the third quarter of 2022, roughly in line with the $8 million of leasing revenue in the third quarter of 2021, since engine demand from wide-body freighter operators partly made up for weaker aircraft leasing revenue, with just one aircraft on lease this quarter. Excluding flight equipment sales, third quarter AMS revenue would have been $17.9 million, compared with $21.5 million in the third quarter of 2021. In our USM Parts business, the market for feedstock availability keeps looking more favorable, set against rising demand for airframe and engine parts as airline consumption of USM parts grows. Beyond that, demand for B757 P2F converted aircraft should stay elevated, and we're well positioned to monetize an additional 12 B757 aircraft in 2023. TechOps third quarter revenue was $30.4 million, up 24.5% from the third quarter of 2021, thanks to strong results at our landing gear and component MROs. Early in the fourth quarter, we moved the P2F conversion program away from our heavy MRO facility in Goodyear to several third-party providers who will handle the additional 12 P2F conversions; this shift comes after we finished our last internal P2F conversion, which was sold at the start of the fourth quarter; we anticipate this transition will boost our capacity for third-party work, letting us bring in more revenue going forward while preserving the economics of our P2F conversion program. Counteracting the gains we mentioned earlier, MRO work performed on-airport at Roswell slipped because we had fewer customer planes sitting in storage than during the earlier period. Gross margin for the third quarter came in at 30.4% versus 33.6% in the same quarter of 2021, mainly driven by an unfavorable product mix tied to reduced flight equipment sales, which normally carry better margins. SG&A expenses totaled $24 million this third quarter, and that figure included $4.4 million in non-cash equity-based compensation. In the third quarter of 2021, SG&A expenses stood at $22.8 million, with $8.7 million of that amount being non-cash equity-based compensation. Our operating loss reached $8.5 million in the third quarter, whereas the third quarter of 2021 produced operating income of $1.8 million. Net loss for the third quarter was $9 million, against a net loss of $1.6 million in the third quarter of 2021. After adjusting for non-cash equity-based compensation, mark-to-market adjustments tied to our private warrants, secondary offering costs, and relocation costs, adjusted net loss came to $1.9 million in the third quarter, compared with adjusted net income of $9.2 million in the third quarter of 2021. Diluted loss per share for the third quarter was $0.17, versus diluted loss per share of $0.04 in the third quarter of 2021. Once adjusted for non-cash equity-based compensation, mark-to-market adjustments tied to our private warrants, secondary offering costs, and relocation costs, diluted loss per share was $0.03 in the third quarter, against diluted earnings per share of $0.22 in the third quarter of 2021. Third quarter Adjusted EBITDA came to -$5 million, while the matching period a year earlier had Adjusted EBITDA of $13.9 million. The reduced volume of flight equipment sales this quarter, which typically carry better margins, weighed negatively on Adjusted EBITDA. AerSale received no Payroll Support Program proceeds in either the third quarter of 2021 or 2022. Cash used in operating activities year-to-date reached $2.4 million through the third quarter, compared with cash flow provided of $26.4 million in the third quarter of 2021. The main reason cash generation fell was a rise in inventory purchases, advance payments to vendors supporting our P2F conversion program, plus the reversal of $12.5 million in previously collected deposits tied to a completed flight equipment sale that shows up in cash flows from investing activities. At the close of the quarter, AerSale held roughly $151.4 million in cash on its balance sheet along with undrawn revolver capacity of $150 million. Last, turning to our 2022 guidance and summary. Given our strong performance across the first three quarters of the year and having closed all remaining flight equipment sales that our full year guidance had contemplated, we are reaffirming 2022 guidance for revenue of $420 million-$450 million and adjusted EBITDA of $80 million-$90 million. As we peer past 2022, we anticipate that deliveries of flight equipment under our 757 P2F initiative will pick up speed during 2023, and that AerAware will add substantially once we expect product deliveries to begin. All told, the fundamental results of our operations leave us both pleased and encouraged, even with the timing tied to flight equipment sales. Our conviction is unchanged that the power of the model we built for a specific purpose, together with our outstanding ability to execute, will keep surpassing what we expect across the coming few quarters; with that said, operator, we are prepared to open the line for questions.
Gautam Khanna
analystHey there, hope your day's going well, everyone. There are two things I wanted to ask about. To start with—
Martin Garmendia
executiveHey, good afternoon.
Gautam Khanna
analystGood afternoon. First off, I wanted to ask about that Q4 equipment sale — how significant a revenue item is it, to begin with?
Martin Garmendia
executiveWe don't provide precise figures for flight equipment sales as a whole, but as Nick mentioned, that will leave us positioned to hit the full-year guidance we gave.
Gautam Khanna
analystUnderstood. That's quite substantial. Another item I wanted to ask about, specifically on AerAware, if you could give us an update like you referenced, contingent on weather and FAA scheduling and so forth — but from what you understand, is the software now completely finalized? What kind of duration do you expect the flight hours from this point to require? And what would be a realistic timeline for a first order coming from your launch customer?
Nicolas Finazzo
executiveAll right. On that — let me attempt to address all three of your questions. On the weather side and what conditions we need when we operate this aircraft and show it to the FAA: the reason specific weather came up is that the FAA has been shown video by us covering various weather situations — fog, sleet, snow, hail, smog, sand, since Goodyear has sandstorms — and they've viewed all of that. However, the single thing they were adamant about is that although they'll accept much of that footage from the test flying already completed, they must observe the airplane in foggy conditions. They need to see the. We need to cha. Once the FAA is aboard the airplane, we have to locate an area with morning fog or fog at whatever time, and we have to show them how the system operates. This time of year works well for that. Fog appears in, you know, lots of regions of the country during the morning. Once the FAA is on the airplane, we're going to have to fly to wherever that fog is and demonstrate it for them. There's no way to know exactly when or where we'll find fog, but that is. You know, we specifically are gonna have to demonstrate the operation of the system in foggy conditions. We're nearing the conclusion of the year. As the FAA has told us repeatedly, when they get close to year-end, many FAA staff members forfeit unused vacation time if they don't take it. I'm somewhat concerned; we're ready. The airplane's ready. The crew's ready. The system has been checked. The software has been validated. No technical obstacles exist that would prevent us from performing our demonstration flights. Everything required for the FAA to permit us to demonstrate the airplane has been completed; at this point we're waiting; we've requested dates from the FAA. You know, I've said that it could happen in as soon as weeks. When might it happen? I mean, literally, it could happen in as soon as weeks. Are we likely gonna start it next week? No. Could we start after Thanksgiving? Why not? It's really up to the FAA to give us a slot in their flight schedule and to make sure that we have all the required FAA personnel on board. You know, it won't be AerSale holding up the start of those flight testing. It's simply going to be a matter of when the FAA is able to give us a slot to fly the airplane, provided we can follow the weather, and provided we keep every FAA person that's required on board for the whole time the flight testing runs. So, how long is that flight testing going to take? Our view is no more than a week, and likely just a few days of actual flying. Again, it depends on whether personnel are available and on chasing the weather; it could stretch to a week, but it doesn't mean a full week of flying. As for when we anticipate receiving a launch order from one of several possible launch customers, some of them very large, others less so — at this stage we're discussing 737. We're also talking with prospective customers about several other aircraft types, and with OEMs about putting this system, or something similar, into brand-new aircraft as they leave the factory, as they come off the assembly line. Let's set that to one side; that's for the future. Regarding the 737, our expectation is that after we're certified, an order will likely come in 90 days. Yeah, I can't see any reason it ought to take more than 90 days, particularly given the customer we've been displaying the airplane to, you know, throughout the last year, who has joined a number of our flights. I don't know why getting an order would take more than 90 days. We're already making kits so installation can begin next year, so we expect demand for kits next year that we can start putting into aircraft; so, you know, I realize that's not a brief answer, but my expectation is that within 90 days we'll receive our first order once we're certified; now, that isn't a promise.
Gautam Khanna
analystOkay, that's-
Nicolas Finazzo
executiveThat's my best guess.
Gautam Khanna
analystYep. That's fair. No, thank you. I was also going to ask about the USM turnaround time — you brought up some constraints there. Could you elaborate on what the bottlenecks were and whether they've been resolved, or is it more of an ongoing issue? If you could just expand on that.
Nicolas Finazzo
executiveYeah. You know, that's — I think internally there's been a great deal of discussion about that, about what we can do to secure greater availability of USM, and the frustrating answer is that turnaround times for everything — whether it's getting aircraft torn down in foreign locations or even locations in the U.S., because of labor constraints — things that normally would take 30 days, 45 days to tear down an airplane, we have to get in line. If we're not doing it ourselves, it could take three, four, five months to get an airplane torn down so that we get access to the USM that we can then get refurbished, whether we do it internally or whether we do it externally. When we send out parts externally to get refurbished, what would normally be a 45 to 60 day turnaround time is in some cases taking six months to get a part back. We have more inventory sitting at vendors in process being overhauled, mostly engine parts, than we've ever had in the history of the company; that's because there's just the lead times or the turnaround times are so extended. Now, how's that gonna get fixed? I don't think that's gonna get fixed anytime soon. I think that's a multiple year problem. How do we fix it? We just keep feeding the system; we're not buying just because there's extended turnaround times. We're buying, we're tearing down, we're getting the products out to the vendors to get them overhauled, we're putting them in the queue, and when we get them out, you know, we'll have had enough pre-sale time probably to sell them when we get them out. Other than what we're suffering through right now, the feed into the system will eventually, you know, be consistent and then the output will be consistent. It's just not there today because you know, as we're just acquiring equipment and putting it in, we're still in the wait mode. You know, we expect a steady flow of materials starting to come out, but with extended turn times. I think it's unavoidable. I can't call or predict when that's gonna abate, but my expectation is, it's potentially years before that's gonna abate.
Gautam Khanna
analystThanks, guys.
Nicolas Finazzo
executiveYou're welcome.
Bert Subin
analystHi there. Good afternoon. Perhaps we can continue discussing AerAware. I realize the timeline for this has shifted to the right on a few occasions, which was outside your control, simply because of the challenges involved in securing the STC and wrapping that up. Nick, could you share with us what your optimistic scenario is regarding approval and the sales that would follow, and perhaps also what the pessimistic scenario looks like? Is there any chance at all that this slips into 2024, or do you feel fairly confident it lands in 2023, and based on what you're hearing from prospective customers, it seems like you believe there might be appetite to begin shipping those kits?
Nicolas Finazzo
executiveAll right. Oh, yes. Thank you. That's a solid question, Bert. I appreciate you bringing it up. Regarding the bull and bear scenarios — the optimistic one, which honestly doesn't feel all that optimistic, comes across more like our standard expectation — the certification flight testing is about to happen. It could, quite literally, be just weeks away. Might it be months? I doubt it. If my belief were that it would take months, I'd have said that within the coming several months, certification would be achieved. My sense is it's a matter of the next several weeks. Usually, once flight testing or flight test certification wraps up, that tends to be the final stage in the certification effort. After it concludes satisfactorily — and we anticipate that outcome since we've already flown the airplane and shown it meets what the regulations demand — at that stage, you're essentially confirming what you already know. You show it to the FAA. Once that's done, they complete all their due diligence and verify everything on their checklist. An STC arrives within 30 days. That's the norm. Consider the best case, the bull scenario; it won't occur next week because that's too soon. Suppose — and remember Thanksgiving is approaching, arriving shortly after — well, suppose we receive it after Thanksgiving, perhaps in early December; we conduct our week of flight testing. We wrap up with no problems. We don't anticipate any problems; now the Christmas break is approaching, and with luck, by that point the FAA will have finished everything required on the documentation side to complete the STC issuance process. Christmas factors in, so I don't anticipate having it during December, yet I would anticipate that if our flight testing happens in late November — late this month — or early December, the STC will come in January. Honestly, I consider that the base case as well. I don't even view that as the bull scenario. The bear scenario might be that we can't get the FAA to commit to flight testing during this year. It carries over into early January, and from there everything moves; the situation is identical. We get flight testing in early January once everyone returns from vacation; it's a week of flight testing, 30 days of waiting for STC issuance — so in my view the bear scenario is mid to late first quarter. I don't have a bear scenario suggesting this would stretch out significantly. There's simply no justification. There's simply no justification for it to stretch out. The FAA bears a responsibility to conduct the flight certification testing on our behalf and to grant the STC once all requirements have been satisfied. Just so you're aware, the FAA's disposition is quite favorable. They — this is novel technology. This will be the first system featuring a head-wearable display to receive certification with this kind of advanced technology. This was imagined as one of the initiatives tied to the Next Generation Air Transportation System, you know. The FAA, you know, is looking to see this system get certified. I believe everyone involved wants to be included in that. Keep in mind, given what happened with the MAX, the FAA is acting extremely carefully, so many people are reviewing this, and that's a positive thing. Setting aside the fact that we've had to endure the lengthy timeline, what we'll end up with is a solid, thoroughly validated system that the FAA feels at ease with, and we will secure certification for this system.
Martin Garmendia
executiveMost recently, I believe, the first quarter. Most recently through the conclusion of Q1. There's no reason for me to say that it would — I can't come up with any reason it would go beyond when the first quarter ends.
Bert Subin
analystSuppose the worst-case scenario unfolds, and imagine March is the point when everything wraps up, and you mentioned you'd anticipate receiving an order within 90 days. That likely lands you in the second quarter. When I consider that, I'm aware there's that rule requiring at least 50% of the planes to be fitted with this. So if we're discussing a sizable 737 fleet—say an airline with 300 aircraft—could you explain how that procedure would unfold, given that 150 of these kits must be installed before that carrier can use it, how much time that requires, and how things would progress?
Martin Garmendia
executiveYes. This breaks down into a couple of aspects. The first involves production and supply of the Elbit parts — the Elbit Universal parts — meaning the camera, the head-worn displays, the eye tracker, and the flight computer linking those to the aircraft's main system. That equipment must be sourced through Elbit/Universal. We've gotten things moving on that front, you know, by putting in an order for hardware so that Elbit will have units ready for us to begin installs right away. I mean, a certain quantity of kits is already on hand, and more kits keep becoming available to us continually in order to satisfy the $33 million order we placed earlier in the year. We're also working on expanding our own capability to produce the install kits. Several kits have already been built every month. That keeps getting better month-over-month. You know, we expect that by 2024 we'll have the capacity to turn out as many as 20 to 25 kits per month, so we're scaling toward that. Kits will be available for 2023. If we get the hardware in 2023 and an order in 2023, you know, we anticipate making substantial kit deliveries in 2023.
Bert Subin
analystAlright. Perhaps shifting topics a bit, I simply want to confirm I've got this right; this is likely a question for Martin. Could you assist us in grasping the rhythm of P2F sales in 4Q of 2023, and how many aircraft out of that 12 — which I believe totals 13 — do you presently possess, and what's your outlook regarding that selling process? Then finally, perhaps, what approach should we take when considering engine sales? I'm just attempting to understand the pattern for total asset sales.
Martin Garmendia
executiveAll right. Regarding those 12 P2F converted assets we're working on, the very first one is, in fact, already underway at a facility owned by a third party. To handle that work, we're deploying 3 facilities, which means those assets will be delivered more evenly across 2023 compared to how things went in 2022. I realize that will likely simplify things for all of you when it comes to modeling the whole picture. Out of those 12 assets, seven belong to us. As Nick mentioned, we made a strategic decision to defer a pair of assets that were slated to be sold as passenger to freighter, redirecting them into the P2F conversion program so we could generate greater returns overall. Negotiations are already in progress, and we're hunting for the remaining five; talks are underway to acquire three or four of those assets already. When it comes to having all the feedstock required to satisfy that total demand of 12 aircraft, we're sitting in a solid spot. Looking at engines broadly, once again, we keep buying engines out in the broader market, and clearly we've got inventory on hand too, with respect to timing overall; that timing was, clearly, as opportunistic as these things get. Just to remind everyone, these aren't new engines. They're used engines, which means every one is sold on a spec basis, so identifying buyers is necessary. When it comes to quarterly projections on that front, it's hard to say with any precision, but we certainly have a healthy amount of inventory at our disposal that will support engine sales in 2023, you know, along with leasing and USM sales throughout 2023.
Bert Subin
analystLet me make sure I've got that rhythm right — of the 12, is it 1 in Q4 with 11 coming next year, or does that mean 1 plus 12?
Martin Garmendia
executiveNot at all, no. That plane is in the middle of its conversion right now. Delivery won't happen until 2023. By 2023, all 12 of those aircraft should be ready to be sold or leased.
Bert Subin
analystAlright, that's useful. And I've got one final question. So, when we consider the main part of the business, specifically MRO, and I realize you already covered the USM piece before. In this environment, what sort of performance do you anticipate from that unit? Demand for air travel has remained resilient and capacity continues to recover. Planes are getting older, and cargo has decelerated, though it's still holding up well. Given that you're now directing additional capacity there, should we expect MRO to keep expanding? Also, are you seeing any variation in the patterns for component MRO versus aircraft MRO and engine MRO?
Martin Garmendia
executiveCorrect, like you mentioned, there's been quite a bit of favorable momentum across that broader segment. So we made the deliberate choice to hand off the P2F conversions to a pair of outside companies. It gives us the advantages of both approaches. We keep holding onto the margins we've managed to generate within that wider program, while also gaining extra capacity from third parties. That applies to the heavy MROs. When it comes to our component MROs at our landing gear shop, we've certainly witnessed demand climbing from passenger, plus freighter demand that remains robust overall. We've got plenty of room to keep expanding. We expect that same kind of outlook to carry through the rest of 2022 and on into 2023.
Bert Subin
analystAppreciate you making room for us.
Ken Herbert
analystSure thing. How's your evening going?
Nicolas Finazzo
executiveYeah, we're good. Good, Ken. Good to hear from you.
Ken Herbert
analystHi Nick, yeah, so first, regarding those 12 aircraft we expect to convert in the coming year, how many do you think will actually be sold during 2023, and how many do you think will simply be placed on lease, perhaps for sale at some later point?
Nicolas Finazzo
executiveI can't say with certainty what the exact figure is. We've had discussions with quite a few customers regarding buying the planes outright once the conversions are done. There are also several customers who want to take the planes on lease after we finish converting them. As you've seen before, when we place a plane under a long-term lease, there are lots of financial buyers willing to acquire that plane with the lease in place. It's difficult for me to give you a precise number like we'll sell X planes and lease Y planes. Either way, we anticipate placing every one of those planes in the coming year in one form or another, whether through a sale or through a lease. Should it be a lease, we might retain a few of those planes under lease, depending on the situation, but more likely, if we lease the plane out, we'll locate a financial buyer to assume the lease, and at that point it turns into a sale.
Ken Herbert
analystAll right. When you consider these planes entering the conversion program, could there be any danger that due to supply chain limitations, workforce issues, or other factors, you anticipate hold-ups with these aircraft exiting those conversions?
Nicolas Finazzo
executiveNot really. The good news is that kit supply hasn't caused problems, and nothing major in the way of holdups has shown up. That said, I won't claim there have been zero holdups. Take the second aircraft we intended to send into conversion — that one is behind schedule, because the outfit doing the job is sorting out contractual matters, and those matters involve the kit provider rather than us. A few items will create a small effect and possibly small slippage in when that equipment is delivered, yet nothing big stands out in our view. Regarding those kits — deposits get paid on the kits we've ordered, while we're locating the outfit to handle installation, and deposits also go down on the conversions being handled by Precision, our partner; after that, Precision goes and purchases that material from its own suppliers. So far, nothing meaningful has reached us about kit deliveries slipping for the conversions. Conversion work sits in a very constrained window. Only so many crews are out there capable of performing conversions. They've got workers for the conversions, they've got open windows for the conversions, and plenty of other jobs are on their plate too. Your kit has to be ready, your aircraft has to be ready, and it has to be there when a window opens, and once it starts, things move fast. It's quite efficient.
Ken Herbert
analystAll right, that's useful. Given that cargo markets have been expanding more slowly — though they're still quite strong, particularly where the 757s are concerned — is there any push at all on lease rates in that segment?
Nicolas Finazzo
executiveSo, looking at the market as a whole—and I'm not talking about 757s here, since the supply of those airframes is pretty tight. My guess is we'll end up with the final 12 out of 13 planes that get converted, and after that Precision will stop working on 757s altogether. That said, there are A321s being converted right now, plus A320s and 737 NGs. Plenty of outfits are dealing with book value issues and are converting planes essentially to push the problem into the future and, you know, reset the depreciation over—I don't know—another 15 to 30 years, it just depends on how aggressive the lessees get with that equipment. Word we're getting is that a lot of 737 NGs are showing up for sale, and that market's getting softer. That's partly why you don't see us taking on any 737 NG conversions—the economics just aren't attractive at the moment; it amounts to nothing more than stretching out depreciation by sinking money into a conversion. Yeah, I do think there's downward pressure on the cargo market, though it varies by aircraft type. Take the 737 NG—I'd call that a case of serious downward pressure, given how much equipment is available. Not seeing that with the 757. As for the 767, everything out there—like I've mentioned before—is already spoken for by the big cargo operators running large fleets of that model. There's hardly any of that plane available. That's pushing folks to consider converting A330s. Some players are now exploring A330 conversions. It's likely not as attractive as a 767, but A330s will get converted, no question. Like I said, there are A321s out there too. It doesn't perform quite the way a 737 NG does—I mean the way a 757 does—and it's going to be somewhat comparable to a 737 NG; however, not that many are being converted right now, so you can't say there's an oversupply of A321s. I don't see downward pressure in that market yet until... unless and until there's, you know, a flood of those planes hitting the market post-conversion, sitting there unavailable and unleased. I haven't heard that about the A321 yet. That doesn't mean it couldn't happen. I'm just not hearing it. Yeah, each aircraft type faces different pressures, both positive and negative; on the narrow body side, I'd say overall there's a bit of negative pressure. You know, there's been a headwind on narrow bodies for some time. Supply outweighs demand. Not seeing that with the hybrid or middle-of-the-road plane, the 757. On the wide-body side, demand is strong—the 767 and larger.
Ken Herbert
analystSure. All right. Thanks for all the detail. If I could, just one last question. Nick, you've said a few things about the USM market, and it sounds like the problems you're dealing with involve getting material out of shops so it can be resold. What are you observing when it comes to feedstock? It sounds like you're seeing more feedstock, but when it comes to your ability to locate engines or other assets to place into the USM pool, is that still supply constrained, or how is that trending?
Nicolas Finazzo
executiveIt's a complex question, and I'll do my best to address it. What we observe now, and what we've experienced over the past several years, is a sizable supply of older planes entering our market as anticipated, serving as feedstock for our USM. We keep purchasing airframes in situations where lessors or airlines remove the usable engines and sell a frame possibly containing one unusable engine, or simply the frame by itself. On the airframe side, we're performing quite well, and we're now acquiring more frames for teardown than at any point in our company's history involving newer planes. We're not referring to DC-8s here; we mean 737s, A330s, A320s. Mid-generation assets—we're purchasing more frames than we ever have. A shortage of airframes is certainly not the situation. Frames have traditionally made up around one-third of our USM revenue. The components derived from frames account for approximately one-third of USM revenue. Engine parts would make up about two-thirds of USM revenue. But we aren't seeing sufficient engines emerging that ultimately get disassembled. When we obtain an engine for teardown, here's what happens with many of those engines we purchase: we might acquire them at teardown pricing, yet we don't even dismantle them ourselves. We restore those engines and return them to operation, since we think there's greater worth in them—those types of quality 737 engines, A320 engines, CFM56 to 5B 2,500, CFM56 to 7s. We continue to find quality engines. If we possess USM material obtainable from other engines we've chosen to dismantle, rather than selling the excellent components to someone else to reduce their overhaul expense, we retain them and install them in our own engines for overhaul. We aren't necessarily extracting that material and directing it into our USM operation to sell to outside parties. A great deal of it gets consumed internally; that also reduces the quantity of USM that has usually accounted for two-thirds of our USM parts sales. We consume it, and it takes a different form. Now it becomes part of a complete engine that will either go out on lease or be installed on a plane, meaning that value won't be realized until we sell the aircraft carrying that engine; it's not that we're forfeiting that value, it's just that we aren't selling it through the USM side of the business. That's one aspect of the engine situation. The other aspect involves the engine difficulties on the A320neo, the lengthy 737 MAX recertification, and the duration required to return all those grounded, completed 737 MAXes to service. The FAA mandating recertification or issuance of original certification for each 787 produced. The entire supply chain — simply because of those elements by themselves — is stopping new equipment from entering the market quickly enough to push out the equipment that'll eventually be headed our way. I've spoken with quite a few aircraft lessors, and in their opinion, it'll take several years before that issue is resolved. Because of that, there's going to be pressure on how available USM material is, and that's before you even bring in all the other outside elements — possibly heading into recession, the situation with Russia. All sorts of things are influencing how much feedstock is available to supply the engine side of the business. Yet on the airframe side, that doesn't appear to be nearly as widespread. Difficult. It's going to be difficult. We need to hunt. We need to work out how to pull value from each and every piece of whatever we can get. We need to work out whether we should part something out and sell those parts to third parties, or part it out and use those parts ourselves to bring aircraft or engines back into service; we really need to rely on our multidimensional model to work out where the greatest value lies. Sure, it's simple to say, "Well, we're going to have plenty of USM to sell," but I don't want to sell plenty of USM when there's greater value for us in placing it into, integrating it into a larger component — that is, an aircraft engine. Sorry for such a lengthy response, but this is a complicated matter, and the response is complicated.
Ken Herbert
analystNo, I appreciate all the detail. Thanks, Nick.
Nicolas Finazzo
executiveNo problem at all, Ken.
Nicolas Finazzo
executiveOkay then. So, we appreciate everyone tuning in to this session. Here's the thing — we're going to keep putting in effort and working intelligently so we can hit and surpass what's expected of us. There's nothing about Q3 that says anything about what lies ahead for us. AerSale is in good shape, and we've got a great road ahead. Enjoy the rest of your day, everybody.
Operator
operatorThat brings today's conference call to a close. We appreciate everyone for joining us. You're welcome to hang up your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AerSale Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to AerSale Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AerSale Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.