executiveThanks, operator. Morning, everybody, and thanks for being on the call for Agnico Eagle's Fourth Quarter and Year-end 2025 Conference Call. Just a reminder that a number of forward-looking statements will be made, so please bear that in mind and look at the disclaimers at the start of this presentation. Today we're happy to report yet another strong quarter, which wraps up a remarkable year. During 2025, with gold prices reaching new highs all year long, Agnico Eagle met our production targets, we met our costs, and we did so responsibly and reliably. Although gold's price rose by $1,700 compared with the prior year, our cash costs rose by $76 per ounce. So more than 95% of that rise in the gold price went straight to the benefit of our shareholders, which is exactly what our core mandate calls for — giving our owners leverage to gold's upside. Through 2025, we retired close to $1 billion in debt, built up nearly $3 billion in cash, and sent over $1.4 billion directly back to our owners through dividends along with share buybacks, and we did all of that while continuing to invest heavily in what lies ahead, funding the largest exploration budget in our history and keeping up strong spending on our 5 key growth projects. It was an outstanding year for gold, and Agnico Eagle came through on what we promised our owners, our employees and our communities. That momentum is continuing as we move into 2026 and past that, and it rests on a steady yearly output range of 3.3 million to 3.5 million ounces across the coming 3 years, with costs that lead our peers, alongside record reserves, record resources, record inferred ounces, and a dividend increase. Even though cash costs for 2026 are projected to rise a bit more than $100 per ounce compared with last year, over half of that gain reflects assumed higher royalties plus a stronger Canadian dollar. Strip out those assumptions and the cost rise works out to roughly 4% to 5%, which lands at or just under the industry inflation we experienced last year. We did well on managing expenses for the things within our control. On reserves, we hit an all-time high of 55.4 million ounces, which is a 2% increase. Resources reached a record 47.1 million ounces, climbing nearly 10%, while inferred ounces set a record at 41.8 million ounces, marking an impressive 15.5% gain. This past year, 2025, was outstanding, and what lies just ahead appears even stronger; however, what truly matters this morning, the genuine thrill, isn't found in revisiting the past or even in the coming 3 years. What's really got us energized today is that Agnico Eagle has never been stronger than it is right now, and we're already moving hard on the next wave of growth — and growth on a per-share basis. Our focus this morning is the roadmap we have for lifting output by as much as 20% to 30% across the coming decade, which puts us on a trajectory toward exceeding 4 million ounces produced each year by the early 2030s. That expansion will come from the finest projects anywhere, situated in the world's most favorable jurisdictions. What's driving this growth are properties we already own, in areas we know inside and out, run by crews that are already assembled, and typically constructed on infrastructure that's already there. That matters, since our mission isn't merely to get bigger — it's to increase value for our shareholders on a per-share basis. Within this sector, expanding in stable regions while making use of infrastructure already built delivers not just the strongest return on capital for our owners, but the strongest return on capital once risk is factored in as well. Let's move to the next slide. These assets have absorbed considerable time, effort, and capital from us over recent years, and that spending is now speeding up; we've reached a moment where we anticipate a step change in production per share beginning in 2030, and we're excited to walk you through our progress this morning. At Detour Lake, Canada's biggest gold mine, we're carrying out a plan that could yield an extra 300,000 to 350,000 ounces annually by developing an underground operation, and over the last 12 months we've grown resources by 4.3 million ounces within the high-grade mineralized corridor suited to underground extraction. We're also boosting our investment threefold, from $100 million up to $300 million, as we push ahead toward a go-ahead decision in mid-2027 and the possibility of beginning underground production as soon as 2028. At the Canadian Malartic complex, Canada's second biggest gold mine, we see room to add an impressive 400,000 to 500,000 ounces annually through our fill-the-mill strategy. Reserves have grown by 9 million ounces since our previous technical update. The ramp is ahead of schedule, first production from East Gouldie should arrive this quarter, and the first shaft is also ahead of schedule with commissioning expected in 2027. We're making strong headway assessing ways to fill-the-mill further through the Marban open pit, through Wasamac underground, and through a second shaft, with all 3 targeting first production by 2033. At Upper Beaver, projected to yield more than 200,000 ounces annually, we're once again ahead of schedule on the ramp and the shaft alike. We're raising our investment from $200 million to $300 million to speed up project development, aiming to bring production forward to 2030. We've got a study in the works at Hope Bay that would back an operation producing between 400,000 and 425,000 ounces annually, and inferred mineral resources there climbed 46%, with Patch 7 being the primary driver. A study update, and potentially project approval, could come as soon as May of this year. Over at San Nicholas, progress continues to be solid, and we're hoping to get the permits we need to move ahead before too long. If you look at these projects individually, they could add 1.3 million to 1.5 million ounces of very profitable yearly output. Across the board, we've made strong strides and we're pursuing everything aggressively. With that foundation in place, I'll turn things over to Jamie Porter, our CFO, who will take you through the third quarter and full year results.
Jamie Porter
executiveAppreciate that, Ammar. According to what Ammar shared, our 2025 results were the strongest we've ever posted financially, powered by solid operations, disciplined spending, and supportive gold pricing. Q4 closed out the year well, producing roughly 841,000 ounces of gold, with total cash costs at $1,089 per ounce and all-in sustaining costs at $1,517 per ounce. Costs climbed compared to the prior quarter, mostly because of higher royalties, lower output, and bigger expenses at Meadowbank tied to extending the mine's life. Even with those higher costs, we hit a number of financial highs in Q4. Adjusted earnings came in around $1.4 billion—a record—working out to $2.70 per share, and free cash flow topped $1.3 billion, another record, equal to $2.62 per share. Across the entire 2025 year, gold production reached 3.45 million ounces, surpassing the midpoint of our guidance and highlighting how consistently we execute. For total cash costs, we recorded $979 per ounce, while all-in sustaining costs were $1,339 per ounce. Each figure finished a bit higher than the upper bound of our guidance ranges, which happened because royalty costs rose, a result of an average realized gold price of $3,454—roughly $1,000 per ounce more than what we had assumed in guidance. When you take out the effect of increased royalties, our all-in cash cost would have come to $937 per ounce—$42 per ounce less and under the midpoint of our guidance—which again shows how well our operating teams controlled costs and executed. Thanks to that performance, we gained significant leverage to the gold price, realizing roughly 95% of the rise in gold price and margin growth, and posted record financial results in every respect, among them about $4.4 billion in free cash flow for the year. Let's move to the following slide. Thanks to our best-ever financial results and ongoing margin growth, shareholders came out ahead — both from bigger direct payouts and from a much healthier balance sheet. In 2025 we reduced our debt by about $950 million, and at the same time our cash position grew by $1.9 billion, so we ended the year holding $2.9 billion in cash. Shareholder returns through buybacks and dividends hit a record — roughly $500 million during Q4, and a record $1.4 billion for the full year 2025. As a company, our financial position has never been stronger, and with gold prices where they are today, we believe we're in an excellent spot. Our plan is to continue increasing what we give back to shareholders. The quarterly dividend rose 12.5% to $0.45 per share. And with gold prices at their current level, we expect to be more active on share buybacks. To help with that, we plan to renew our normal course issuer bid in May and raise the purchase limit to as much as $2 billion. During 2025, roughly 1/3 of our free cash flow went back to shareholders, and this year we think there's room to lift that figure to 40% or higher, with the flexibility to adjust based on the gold price and what the business requires. Meanwhile, we're still concentrated on making our financial position even stronger. As a reminder, since our profitability has been so strong, a significantly larger cash tax payment tied to fiscal 2025 will come due when February arrives — approximately $1.3 billion — and we have the cash on hand to cover it. Before we wrap up, one last thing worth stressing: our approach to deploying funds stays disciplined, which lets us advance the internal expansion projects delivering the strongest payback. Despite the fact that bullion prices at present are generating strong cash flow, we remain committed to spending wisely, keeping our focus fixed on creating long-term value for shareholders. Let's turn to the next slide. We've revised our guidance, and we continue to expect consistent production over the next three years. We're especially proud of what the team has delivered, because we were able to present a 2028 outlook that beats consensus, supported by extending the mine life at Meadowbank along with higher output from Canadian Malartic, Fosterville and Kittila. Moving on to costs now. For 2026, our guidance midpoints are $1,070 an ounce for cash costs and $1,475 an ounce for all-in sustaining costs. Higher royalties account for about 60% of the cash cost increase relative to 2025, driven by a budgeted gold price of $4,500 per ounce and a stronger Canadian dollar. The remaining 40% of that increase reflects expected inflation of roughly 4% to 5%, plus the impact of mining sequences with lower grades. Starting in 2026, we changed how total cash costs and all-in sustaining costs are calculated, taking out certain Amaruq payments to the NTI — an organization representing Nunavut's Inuit — to improve consistency and comparability across our Nunavut operations. Those payments carry traits much like the mining duties we owe under Nunavut mining regulations, and those duties are already left out whenever total cash costs and all-in sustaining costs get calculated. Our cash costs and all-in sustaining costs remain several hundred dollars per ounce beneath what our peers report, a reflection of how strong our asset base is and how consistently we manage costs. When you look at what we're planning for capex, it really reflects how committed we are to putting money back into the company so we're positioned for the growth that comes next. Between now and the middle of 2027, we're ramping up spending at Detour Underground and Upper Beaver. Beyond those, Hope Bay stands out as a promising chance to grow. If we greenlight it, that would mean roughly $300 million more than what's baked into the 2026 guidance as it stands today. Dom, Natasha and Guy are going to walk through these projects in more depth later in the call. All together, these are strong opportunities that generate solid returns, come with considerable upside, and could build value for many decades ahead. Taking everything into account, what we've laid out in our revised outlook points to a steady, dependable operation with costs that lead our peer group, even as we continue moving our slate of expansion projects forward and remain set up to give investors substantial exposure should gold prices climb. On that note, I'll pass things along to Dom.
Dominique Girard
executiveThanks, Jimmy. Good morning, everybody. During my portion, I'll go over operations plus the main project highlights across Quebec, Nunavut and Finland. Once again, Q4 proved to be a highly steady quarter, consistent in nature, and it helped make 2025 a solid year on both production and costs. I want to thank every employee and all management teams for their dedication and involvement, and in particular for the way they collaborate to keep making the business better; a strong illustration of that collaboration involves the improved way we use our data, and you can see it reflected in the outlook. Over at LaRonde, during the past 6 months, the team has been working with telemetry to examine the data, how the equipment behaves and how the operator behaves, so they could better grasp what was happening. As a result, they've managed to raise the number of hours on the transmissions and motors from 3,000 hours to 6,000, 7,000, 8,000 hours now. Achieving that meant developing internal know-how in data analysis and trend identification, then feeding that back to the operator and back to the trainers so they could move in that direction; it's a really effective route to greater efficiency, and it's also something that can be applied to other operations and other projects we're building right now; so because of that collaboration, we're now moving it over to Goldex, and from there it will reach other divisions as well. The fleet management system is the same story. We're running a pilot at LZ5 as we speak. More precisely, we'll have a dispatch system in our ramps — for those of you who've already been underground in a ramp, you know it can sometimes be chaotic; so we're taking that to a higher level now. And all of that knowledge will also be rolled out at Odyssey and Amaruq later in the year. Another piece of good news in the outlook is that Meadowbank's mine life now extends through 2030. By adding those extra ounces, Meadowbank has been very important in smoothing out our production profile for 2026 and 2030. I thank the Meadowbank team for that key contribution. Those ounces do carry higher risk — well, not higher risk exactly. I mean higher costs, but the risk is low given, let's say, the existing — the current infrastructure. So that's quite positive. And I also thank the team for continuing to search for further options that might stretch it past 2030. That remains under review. Next page. The Malartic fill-the-mill strategy. So back in 2023, when we put out our first study, or rather the updated one, on that, we had 9 million ounces. Mine life was heading to 2042. Thanks to the good drilling that's been done, we've potentially been able to extend that mine life by double. So with the first shaft, shown on the first line at the bottom here, along with the ramp, we remain in a very good position to deliver on time and on budget; but because we're adding more ounces, that could take us as far as 2056, 2057. That's the reason the second shaft is being brought into the picture now. How do we get those ounces out sooner? The team is therefore focused on possibly having shaft number two running by 2033. That forms one piece of the 1 million ounce vision. Going back again to 2023, at that point we laid out a vision — alright, how do we reach 1 million ounces while using only one third of the mill? Shaft number two is a solid illustration of that. And over the past 3 years, we've also been working to add the Marban and Wasamac satellite ore bodies, which would be hauled to Malartic, and that too could deliver additional ounces. When you combine it all and run the numbers, we land at 1 million ounces; studies are moving along nicely, and we aim to share further details potentially at the end of Q3 or early Q4 next year, at which point you'll get a clearer picture of all of them; so very encouraging news. The fill-the-mill strategy is underway, and there's still capacity available at the mill. Add everything up and you arrive at 46,000 ounces per year. There are still more than 25 drills active in the area surrounding Canadian Malartic, and who knows where things will stand 3 years from now. Moving to the next slide. At Hope Bay, back in 2021 following the TMA acquisition, we moved quickly to set a goal of getting it above, shall we say, 350,000 ounces per year in order to make the project economical. The good news is that we're hitting that level now, and we intend to publish and provide you with additional details about it in May this year. The study points to 6,000 tonnes per day and more than 400,000 ounces per year. So our target is being met. We'll be in a position to, shall we say, initially launch a 10-year life of mine. That's what we're after. And should this move ahead, we'll be able to spend — we're fully prepared to spend an extra $300 million beyond what we're currently guiding; so it's very encouraging; and the study rests on a strong foundation, drawing on benchmarks from the Meliadine and Amaruq mines. So we understand what the cost will be. We understand how we'll run it. It's supported by historical background, historical information regarding OpEx, regarding CapEx, what construction will cost. Second, we are beyond — we're going to be beyond 50% of engineering. That was a firm target. We're achieving it. And when it comes to execution, this isn't our first barbecue in Nunavut. So we understand how to get it done. It'll be the same team working with the same contractors, or partly the same contractors, and we're confident it will succeed. With that, I'll hand things over to my wonderful colleague, Natasha.
Natasha Vaz
executiveThank you, Dom, and good morning to all of you. I'll walk through the operational highlights for Ontario, Australia and Mexico. The regions hit their full year production targets as planned and showed consistent execution right across the portfolio. At the same time, they keep pushing forward on initiatives aimed at further optimizing how we perform. Over at Macassa, the team makes us extremely proud, since we've set a record for gold production. And in 2025, with reserve grades expected to fall over the years ahead, the team took the initiative and got work underway to raise mill throughput. And now in 2026, we're carrying those initiatives further, with a goal of lifting throughput to 2,150 tonnes per day by the end of 2027. At Fosterville, our approach to handling declining reserve grades looks much the same. We now have a plan in place to raise the milling and mining rate to 3,300 tonnes per day by 2028 via a range of optimization efforts. And that plan should support yearly production of roughly 160,000 to 190,000 ounces beginning in 2028 and continuing into the early 2030s; and through exploration, we keep seeing meaningful upside at Fosterville that supports extending mine life. At Detour, even with the pit delays experienced this year, the mill set a record for annual throughput at 28 million tonnes. That works out to a 35% gain since the mill expansion got started 6 years ago. I'd like to pause for a moment and commend the site team for what they've achieved. Reaching that point took an enormous amount of hard work. So I simply wanted to offer a quick thank you to the team. The team's attention now is on further optimization, with a revised time line supporting a more measured ramp-up to 29 million tonnes, which gives the team a bit more flexibility and allows for optimizing processes and embedding sustainable operating practices. Now on to the next slide. The mill optimization I just mentioned, taking it to 29 million tonnes, forms part of Detour's next phase of growth, which also takes in the development of an underground operation. We're moving ahead on both fronts, and we have a clear line of sight to reaching 1 million ounces of annual gold production in the early 2030. In 2025, we made solid progress on advancing permitting and exploration, on high-intensity drilling, on establishing the key infrastructure on surface and, of course, on developing the exploration ramp. So with our confidence in the underground project growing, we've chosen to accelerate approximately $200 million of capital through to mid-2027; this acceleration of capital should derisk project construction and ramp-up and could also speed up development towards the main ore zone. At the same time, we're also evaluating starting incremental underground production from a shallower Western extension zone as early as 2028; so since our last project update in June 2024, the mineral resources have gone up significantly. Just to remind everyone, the June 2024 underground study update only covered 4 million ounces, whereas our mineral resources at year-end now stand at approximately 6 million ounces in measured and indicated, plus an additional 6 million ounces in inferred. And with the exploration success continuing, we believe there's a chance to build a bigger underground mine than what we originally had in mind. Exploration wins combined with this stronger gold price setting have handed us considerable optionality at Detour, and we're only in the early days of assessing it. That might mean greater milling capacity, an expanded underground scenario, or a bigger open pit. When that study wrapped up in 2024, we described it as merely a snapshot in time, and our view on that hasn't changed. So stay tuned. We believe more opportunity still lies ahead at Detour. Turning now to Upper Beaver. Progress on that project remains very strong. The exploration ramp is running ahead of schedule. And during the fourth quarter, we started shaft sinking, and by year-end, the shaft had gotten down to a depth of 155 meters. The team has performed exceptionally well. And because of their strong execution, we now intend to invest an extra $100 million between now and project sanction, which is anticipated in mid-2027. Once again, as with the Detour underground project, this accelerated capital spending should derisk construction and ramp-up, and also bring forward initial production to 2030. I've mentioned this previously, but the Upper Beaver project has the potential to unlock significant long-term value throughout the company's broader Kirkland Lake camp. Beyond the possible extension of mineralization at depth at Upper Beaver, the project might also enable a centralized mill strategy for nearby satellite deposits, such as Upper Canada or Anoki-McBean. Overall, the Upper Beaver project is advancing very well. I'd like to close simply by thanking the teams for their passion, their persistence, and their incredible efforts in 2025. It's greatly appreciated, and I look forward to continuing to push the optimization efforts forward with you and the key projects. With that, I'll hand the call over to Guy.
Guy Gosselin
executiveThank you, Natasha, and good morning to all of you. To begin, I want to pause and express my appreciation to the entire exploration group — at each of our mine sites and at the regional exploration offices throughout the organization — for a fantastic year when it came to safety, productivity and keeping costs under control. During 2025, we had over 120 drill rigs operating, and we safely finished close to 1.4 million meters of core drilling, all while keeping our unit costs a bit below what they had been the year before. The dedication to innovation shown by our drilling excellence team keeps delivering results and will remain a key element of our success going forward, since we are entering 2026 aiming to surpass 1.5 million meters of drilling. Turning to Slide 14, the 2025 exploration drilling campaign at our operations and key pipeline project, together with the purchase of the Marban project located beside the Canadian Malartic complex, produced a very robust mineral reserve and mineral resource total as of the end of 2025. Compared with the prior year, our mineral reserves rose 2.1% to 55.4 million ounces. Our measured and indicated mineral resources increased by nearly 10% to 47 million ounces. And our inferred mineral resources grew by an impressive 15.5% to 42 million ounces, which shows the considerable exploration upside of our assets. As the graph on the right side of that slide illustrates, looking at things globally from the merger in early 2022 onward, even though we have mined roughly 15 million ounces during that stretch, we still succeeded in substantially expanding our mineral reserves on a net-of-depletion basis, reaching a record 55.4 million ounces, thanks to successful exploration, conversion, delivery of studies and smart acquisitions over those last 4 years. From a results perspective, I'd like to discuss 3 projects. On Slide 15, at Malartic, the outstanding results generated throughout the year at East Gouldie, Odyssey and the parallel Eclipse zone added, year-over-year, roughly 470,000 ounces to underground proven and probable reserves and 2.9 million ounces to inferred mineral resources, which includes 600,000 ounces from the newly discovered Eclipse zone that runs parallel to East Gouldie near our planned mining infrastructure. At the adjacent Marban project, 128 drill holes were completed, amounting to more than 39 kilometers of drilling during 2025. An initial mineral reserve declaration of 1.58 million ounces came from 52 million tonnes at 0.95 gram per tonne as part of our fill-the-mill strategy. That initial mineral reserve was estimated using the drill hole database that existed when the acquisition took place and did not include any of the 2025 drilling. We intend to bring out a refreshed Marban project study toward the close of '26, folding in fresh drilling plus further chances to work in tandem with the Canadian Malartic complex around people, machinery and installations, so that Marban can be fine-tuned under our fill-the-mill approach; moving to Slide 16 now, over at Detour the drill program has kept performing very strongly this year, with 215 kilometers finished, largely aimed at infilling and growing the mineral resources westward so the underground project can move ahead. Two zones received particular attention, the first sitting beneath and around the midpoint of the reserve open pit now in operation, shown in orange on the graphic. Findings there keep backing the 2 mining concept, with multiple broad intervals whose combined width goes past 200 meter in places, grading between 1 and 2 gram per tonne, among them a slimmer high-grade hit of as much as 10 grams across 10 meters that might be extracted earlier from underground, while preserving the choice to mine a far wider, lower grade mineralized shell in a bigger open pit down the road. The second zone sits 3 kilometers west, beyond the western edge of the ultimate open pit scenario in play today, near the underground exploration ramp now under construction; it too delivered robust results of up to 10 grams across 10 meters and stays open at depth heading west. As of year-end 2025, resources suitable for the underground mine project total 5.5 million ounces measured and indicated along with 5.8 million ounces inferred. That gives a substantially bigger mineral resource base for the coming Detour underground project update, versus the 2024 initial study, which brought in just 4.6 million ounces for the mine plan's first iteration; and finally, at O3, 6 drill rigs ran all year, turning in a superb 131,000 meters of drilling across 2025. Strong results keep coming from Patch 7, at depth and in its southern extension. Those excellent figures recorded during the year drove a 1 million ounce year-over-year gain in inferred resources, chiefly from Patch 7; given how much mineral resource has been added since the project was acquired in 2021, our resource base is now far larger, underpinning the development — redevelopment plan Dominique covered earlier. During 2026, exploration will stay centered on expanding resources and converting them into reserves to back the project's development, along with issuing a refreshed reserve estimate at the close of 2026. Taking everything into account, it was a really strong year for exploration, and that turned into a meaningful boost to reserves that backs up what we're aiming for in production growth over the near and medium term. But what matters even more is the very substantial 15% rise in our inferred resources, which gives us confidence that the future looks bright. This outcome keeps showing just how remarkable the exploration potential is across our project portfolio, and it highlights the exceptional efforts of our excellent exploration, technical services and operation team at our various operations and our key value driver project. With that said, I'll hand the microphone back to Ammar so he can offer a few closing remarks.
Ammar Al-Joundi
executiveThanks, Guy. Here at Agnico Eagle, we take pride in our decades-long track record of increasing value per share for our owners — not just by giving full leverage to gold prices, but also, and importantly, by expanding gold production per share. Looking ahead, we're excited that even as the world's second largest gold producer, we can see a clear path toward a decade of continued, meaningful gains in production per share, at costs that lead our peers, with exceptional risk-adjusted returns. And we're already at work on further projects that could deliver even more growth, such as early-stage efforts at Hammond Reef, Timmins East and Northern Territory. Let's go to the next slide. As you can see, we continue to put in serious effort on behalf of every stakeholder group, and we will carry on developing from those same core strategic pillars that have supported us effectively over the last 68 years. Our attention is going to stay fixed on the finest mining jurisdictions, as determined by geology's potential alongside political stability. We will continue being careful with our owners' capital, basing investment choices on technical and regional expertise, generating value via the drill bit and via intelligent acquisitions in the right places at the right moments; our position is uniquely strong thanks to a high-quality project pipeline, making use of current assets located in the world's best regions and in areas where we think our competitive advantage is substantial. Our priority remains generating per-share value and staying at the front of our industry when it comes to giving capital back to shareholders — something shown by more than 42 straight years of dividends that keep rising, along with growing share repurchases. All told, 2025 proved to be an excellent year for the gold market. The start of 2026 has been even stronger, though it has come with volatility. We can't foresee what prices will do next week or next month, but looking further out, we continue to hold a constructive, positive view on gold because of structural financial and political forces around the world that won't shift easily. We want to provide our shareholders not just with complete exposure to gains in the gold price, but also with a growing amount of gold for every share they hold. That's something we've delivered on for many decades, and we have a strong strategy to keep delivering it throughout the coming ten years — all while holding assets of the finest quality, located in the world's most favorable jurisdictions, at costs that lead our peers. Here at Agnico Eagle, things are going well, and we've never been stronger in our nearly 70 years of operation. Thanks once more for being with us today. Operator, please go ahead and open the line for questions.
Lawson Winder
analystIf we could begin by addressing the topic of M&A, I realize this is likely somewhat delicate at the moment, but whatever detail you can offer would be useful. Has Agnico made up its mind about whether to tender its shares into the offer that's presently outstanding on Foran?
Ammar Al-Joundi
executiveWell, thank you, Lawson. Look, as with any M&A activity, those choices rest with the individual shareholders, and there are far more shareholders besides us. So that isn't really a matter I'd feel at ease talking about.
Lawson Winder
analystAll right. I figured it was worth a shot, but I fully get it. And then, perhaps building on that same idea, M&A activity in the gold sector has picked up pace over the past few years, and even in the last several quarters. So what's Agnico's take right now when it comes to M&A? And obviously, I recognize that your existing portfolio offers enormous growth potential; but still, chances do come up now and then. What's the thinking there, especially regarding jurisdiction, and also just your views on whether there's any urgency around M&A.
Ammar Al-Joundi
executiveWell, that's a great question; and I'd say M&A, much like exploration, much like project investment, is a decision about capital allocation. And that money belongs to our owners, and we treat it that way; and every investment we make is meant to generate value for our owners on a per share basis. What does that mean when it comes to M&A? It means a few things. First, are you in a position where you can spot and evaluate solid opportunities to put your owners' money to work, M&A included. And I believe our position is very strong. You're familiar with us. We're familiar with everyone in the communities and regions where we operate. Our relationships are good. In many instances, we have a very solid grasp of the different assets that exist out there. So our position is strong, and this matters, because buying things is simple. what's difficult is buying things that earn money for your owners. So the first point is, are you positioned to hold a knowledge advantage. And I believe our position there is strong. But what I'd tell you, Lawson, is that we're prepared to act and we have acted when we spot an opportunity on the M&A front that truly generates value per share. Simply growing larger doesn't interest us. The truly difficult part is generating value per share. And so that will always be what drives us, not just for M&A, but for every one of our capital allocation decisions.
Fahad Tariq
analystJust to be clear, this presentation brought up several cost productivity efforts. I recall quite a few additional ones being discussed during the prior quarter's presentation as well. Have those already been factored into the 2026 ASIC guidance? Or do they represent additional upside beyond what the guidance shows?
Dominique Girard
executiveThis is Dominique. My answer would be that some of it is captured, though not the entirety. It falls to Natasha and me to set the bar appropriately for both budget and guidance, but we do retain a degree of flexibility there.
Fahad Tariq
analystAll right. Then, regarding the underlying inflation — I believe a remark was made about it, and it appeared in the press release, at roughly 4% underlying cost inflation. Could you remind us, or give any additional detail on consumables compared with labor? Fuel is likely a tailwind right now; and are there any significant labor agreements due for renewal in 2026?
Jamie Porter
executiveYeah, Fahad, this is Jamie. I can address that. I'd say that apart from taxes, labor is now our largest cost; it represents roughly 45% of our total cost structure. And labor inflation has been running at about 4%. Among the other consumables — chemicals, reagents, equipment, parts and supplies — there is some variation. But on the whole, I think industry-wide last year, inflation — cost inflation was around 5%. So 4% for labor, 5.5%, 6% for everything else.
Ammar Al-Joundi
executiveI'll add my thoughts here. Looking back, what has truly driven expenses upward hasn't really been a case of labor costs rising 6% rather than 4%. The real trigger has been situations where labor simply isn't available and parts can't be sourced. With gold at $5,000, we expect additional strain on workforces. Yet one advantage we genuinely believe Agnico holds is having the industry's lowest turnover. For decades, we've ranked as the #1 employer in the regions where we operate. Our relationships with our people are truly strong. And beyond whether it's 5% or 6%, the question becomes whether you can maintain low turnover. Will you achieve the productivity you rely on from genuinely the best workers? We believe our market position for that is very strong.
Josh Wolfson
analystAssuming the project portfolio performs as intended, should we anticipate a rise in CapEx down the road? Or is it better to view the present run rate as essentially flat from here?
Jamie Porter
executiveYeah, Josh — Jamie speaking. That's a fair question. And I'd say, well, given the 20% to 30% production growth that begins in 2030 and builds across the decade, what you're witnessing are the returns on that capital investment. If we move forward with Hope Bay and give the green light to build that project in May of this year, that would bring roughly $300 million to perhaps $350 million in capital; so when you take what we've guided, the $2.1 billion we guided plus the $300 million for Hope Bay, we land at about $2.5 billion — $2.4 billion, $2.5 billion of capital for this year, along with a further $400 million of capitalized exploration. In my view, that's a suitable range across the coming few years. Capital will, more or less, remain at that higher level. And after we begin to observe that stair step gain in production in 2030, you would anticipate capital beginning to decline.
Ammar Al-Joundi
executiveAnd I want to stress that we're speeding up these investments by choice. They aren't cost overruns. We're not voluntarily accelerating them for no reason — at these prices, these projects genuinely produce outstanding returns, somewhere in the 30% to 60% IRR range. And once more, our task is to generate money for our owners, and if we can deliver them an IRR of 30% to 60%, that's a positive. So — to reiterate, these are choices we made willingly to move faster on what we believe are the finest projects anywhere in the world.
Josh Wolfson
analystUnderstood. I'm really looking forward to hearing about those projects and seeing the IRRs calculated at $5,000 gold. Turning to how you're allocating capital — with gold where it trades today, even once you account for the fresh dividend and assume the $2 billion NCIB that's coming gets fully completed, our own modeling suggests you'll still be piling up a pretty meaningful amount of cash at these price levels. So given that our projections point to potentially more than $5 billion in net cash during this year's second half, how are you thinking about putting that money to work if gold either holds around here or climbs even higher?
Jamie Porter
executiveYep. Appreciate it, Josh. Obviously, our goal is to be as financially strong and flexible as possible, because that's what gives us choices about the best ways to build value in the business. As Ammar mentioned, we've identified the 5 main value drivers and how we think we can grow them. But because of the success we've had through the drill bit, the projects continue to change, and there may be room for additional growth and further acceleration in capital spending. So we want to make sure our balance sheet can back that up. Keeping cash on the balance sheet equal to somewhere in the range of 3% to 5% of our market cap strikes me as a perfectly reasonable position. Once more, what that does is provide the financial underpinning that lets us retain the ability to put money into additional expansion of the business.
Josh Wolfson
analystUnderstood. And perhaps, just to connect that line of thinking and Lawson's M&A questions as well. On the M&A front, Ammar, you laid out the chance to build value per share, yet the company holds many projects that appear exceptional at today's gold prices. So in weighing outside opportunities against what you already own internally, what would make an acquisition target truly stand out, past simply per-share upside?
Ammar Al-Joundi
executiveGreat question, and I'm pleased you framed it as competing with our own projects, since you always want to — as with anything, you want to choose the finest investment for your owners. I think regarding — so on one hand, with internal projects, your knowledge is always greater. That's simply true. And so that tends to — that sort of tilts toward — if something internal offered the same return as something external, your instinct would favor the one you feel more certain about, and that's always the internal option. Having said that, what would genuinely attract us, and what has genuinely propelled us on outside M&A, has really been exploration potential. That — every asset we purchase, you know this business, if you acquire a top-tier asset, you wind up paying what looks like a complete price, but the true worth lies in whether you hold a very strong conviction about the exploration potential. And honestly, that has been the operating approach behind everything we've pursued on the M&A front. The actual return for our owners has come from growing what was — growing far past the original perception of what existed there.
Daniel Major
analystCan you hear me okay?
Ammar Al-Joundi
executiveYes.
Daniel Major
analystGreat. A few questions. First, could you provide a rough estimate of the cost per ounce from the life extension at Meadowbank through 2030?
Ammar Al-Joundi
executiveWell, I should probably have turned to Dom, since his figures are more current. As I recall, the most recent figure I came across was around $2,200 to $2,300.
Dominique Girard
executiveYeah, over there.
Ammar Al-Joundi
executiveAll right. Great. What I wanted to highlight is that this involves extra ounces. Therefore, it isn't a case of expenses having risen. These simply represent further ounces generating a tremendous amount of profit at today's spot prices. Here's something intriguing that I'll mention. As I recall, Meadowbank carries a value of $866 million on our books; during 2025, Meadowbank generated $870 million in cash flow. So this asset has truly been quite extraordinary.
Daniel Major
analystAll right. Yeah, and I apologize — I just want to make sure we're on the same page here. That figure of 2,200 to 2,300, that's referring to an ASIC rather than a total cash cost, right?
Dominique Girard
executiveThat's right.
Daniel Major
analystYeah. Okay. Yeah, regarding the second item, maybe to build on what was asked about capital allocation, specifically the part about giving excess cash back, which ties into Josh's question — yeah, I mean, would you think about doing buybacks together with special dividends if prices stay high? Or would you simply keep the EUR 2 billion buyback facility going?
Jamie Porter
executiveYeah. Thanks. I believe either approach is genuinely possible for us. I don't see any reason we'd shut the door on paying a special dividend at some point; in an environment where the gold price keeps climbing, like you mentioned, that would definitely be something we'd weigh. Should we hit that $2 billion cap and still be producing surplus cash past what we require or expect to require for operations, then that would absolutely be something we'd look at.
Daniel Major
analystAll right. Then one additional item, if I may, and it kind of folds in your present project pipeline plus other possibilities. Clearly you're speeding up capital expenditure and putting additional projects into the pipeline. Do you sense that anywhere in the organization a ceiling is being hit when it comes to technical and, well, human capital? And should that be true, regarding other possibilities such as Hammond Reef, Taylor, Holt, and so on, what might those be worth to another party? And might recycling those projects ever be something you'd consider?
Ammar Al-Joundi
executiveOnce more, a great question. So we constantly ask ourselves how to secure the greatest amount of money for anything on behalf of our owners. So I'd put it this way: with what we currently have before us, we're quite at ease, yet we're drawing heavily on our people. And therefore, if we were to consider, let's say, Hammond Reef or certain of the others, the scheduling would factor in that manpower availability; and many of these jobs demand very high skill levels and are highly specialized; but your observation is a valid one. Should it make sense for another party to hold one of those assets, and should they believe they can deliver more money to our owners than what we perceive in it, we'd always remain open to that.
Daniel Major
analystAll right, that's excellent. Congratulations on a strong year.
Anita Soni
analystWe've discussed how capital gets allocated quite a bit already, I know. Still, I was hoping to dig into how you approach the risk side of the dividend. My understanding is that you folks take a cautious stance and have stated that reducing the dividend is never something you'd want to do. So how exactly did you arrive at 12.5% rather than 25%? Do you rely on some sort of pricing assumption to set the dividend, and is that the base case you work from?
Jamie Porter
executiveAnita, hi, this is Jamie. We don't apply any particular gold price assumption or a specific adverse case when setting that dividend. The truth is, gold prices could essentially be halved and we would still be fine keeping the dividend at that level. So I have a lot of confidence in raising it, and that raise amounts to $100 million, taking it from $800 million up to $900 million annually. Relative to our total free cash flow, that's a fairly small share. So I'm quite at ease lifting the dividend to that amount, and honestly, the share buyback is what we'll treat as the lever — we'll scale it up or down based on how profitable we are and how much cash we generate.
Anita Soni
analystThen moving on to my second point, I'd like to spend a moment discussing the projects. So I appreciate the thorough information about them — it gives us material we can use to animate some of those reserves and resources, along with that organic pipeline, inside our models. So on Hope Bay specifically, I believe an updated study is coming out from you in May. Could you provide — I mean, is it possible to offer us somewhat of a preview regarding the CapEx and the figures we might potentially expect to see?
Dominique Girard
executiveYes, Anita, this is Dominique. Yes, CapEx will come in at roughly $2 billion. Once again, work is still ongoing on it, but that's the figure we're aiming toward. Things are progressing quite well on this project in terms of — similar to Meliadine, we're getting the site ready so that we'll have more than 400 rooms, new rooms prepared for construction. We're getting the landfill ready. Right now we have roughly 100 people engaged full time on engineering to ensure we'll be at 50, 60; and that's what's required so you can have the CapEx that will be spent. Once you possess a great deal of detail, a solid level of detail, it becomes simple — you can move into tender, you collaborate with the contractor, the supplier, to lock down your figure. That's exactly what we did at Meliadine. We finished 6 months ahead of schedule and on budget back then. So our aim is to repeat that.
Ammar Al-Joundi
executiveAs Dominique mentioned—and I believe this was the phrase he used—this isn't our first barbecue up in Nunavut. That said, when you're working in Nunavut, a mistake costs far more because of the logistics involved. So the team has performed excellently on the engineering side and excellently in getting the site ready. I would also mention improvements to the port facility and improvements to the laydown facility. We've already cleared out the previous no building. I brought up the camp—essentially everything spanning preparation and engineering, all aimed at ensuring you're positioned as well as possible for execution. That matters on any project, and it matters especially on projects that carry those sorts of logistical challenges.
Anita Soni
analystI simply wanted to congratulate you on the expansion. For the senior group, that really is an exceptional result. And regarding Hope Bay as well, I believe I recall that you caught some criticism over that purchase 4 or 5 years back, and it appears it will end up being — well, based only on my rough calculations, your total acquisition plus build costs come in at under $300. So congratulations for that.
Tanya Jakusconek
analystIs my voice coming through?
Ammar Al-Joundi
executiveYes, Tanya, we can hear you.
Tanya Jakusconek
analystAlright, excellent. If possible, I'd like to pick up on Hope Bay, following on from what Anita asked. Dominique, could you take me back through it — you mentioned that we'd get the green light in May; and incidentally, Dominique, should a mine tour happen, it had better fall in May, otherwise we'll be at a barbecue instead. Would — could you just run through precisely what has been approved up there for that $300 million slated to be used during 2026? And precisely what would be covered by that $300 million?
Dominique Girard
executiveYes. Every permit needed for us to use that $300 million is in hand. That isn't a problem. A few things must be handled beforehand, so to speak, prior to entering production, yet nothing there raises a warning. What we'll be using it for is mostly procurement. Mostly it's about placing steel, concrete and all the materials required. Once again, our operations follow barge season. What we must use always runs from the middle of — or rather, the initial barge in September '26, through to September '27, we have to load everything aboard the boat; so roughly 8 boats need to be filled and shipped to site so that further work can begin. That accounts for one portion of the outlay. Another portion involves ramp development. So we keep getting the field ready to be set for full production in 2030. That's the remaining portion where money will be used.
Tanya Jakusconek
analystAll right. All right. We're eager to see that May study. Then, moving on, my next question circles back once more to how capital is being allocated. Ammar, I'd like to hear your perspective. To start, when I consider each of these initiatives and factor in that some are slated to arrive around 2031, plus '23, is it fair to assume roughly $5 billion in capital will be needed to fund this expansion? Should that be my framework? Or perhaps Jamie could also weigh in on this for me.
Jamie Porter
executiveYeah, absolutely. At a very broad level, going through every one of these initiatives—the Detour underground, possibly rounding to $1 billion if we go up; Upper Beaver at $1 billion; Hope Bay at $2 billion. After that, an update on San Nicholas will probably come later in this year. That said, somewhere between $5 billion and $6 billion in growth expenditure across '26 to 2030 strikes me as roughly the correct figure, Tanya.
Ammar Al-Joundi
executiveOne thing worth noting here, though it's a bit understated: the team has really excelled at holding sustaining CapEx essentially flat.
Tanya Jakusconek
analystAll right. Let me try to fit in one more question, I realize. But perhaps this one's for you, Ammar — when you're weighing capital allocation, thinking about M&A, and clearly considering what gets returned to shareholders, how much does it matter to hold 100% of your assets? My reason for asking: suppose Teck decided to divest its 50% stake in San Nicholas — would that be a candidate for your capital allocation?
Ammar Al-Joundi
executiveIf it generated profit for our owners on a per-share basis, then without question, we'd look at it.
John Tumazos
analystAt Malartic, we grew the underground resources this year — 7.5 million ounces. In the year ahead, should we be looking for another 7.5 million? Or is that work mostly behind us already? And then, on the topic of eventually turning the inferred resources into reserves, does it make more sense to hold off until after 2030, once the first and second shafts are potentially finished, once significant development is complete, and once the zones can be visually inspected, channel sampled, or close-space drilled from underground, rather than paying the substantial cost of 0.5 mile or 1 mile holes from surface?
Guy Gosselin
executiveJohn, it's Guy here. On your first question: this year we made a big push to convert the outskirt — when you look at that pale green mineral inventory on the outskirt of East Gouldie — to bring it to the inferred category. That's where the big addition you saw came from. Some mineral inventory remains in the outskirt, but far less than we used to have. That was by design, since we wanted to tight fill that mineralized envelope to bring it to infer. As for your second question, we're already doing some of that with the current infrastructure, using the ramp in the upper part of East Gouldie. More and more of that conversion to reserve is going to happen, because you're right — hitting the drill spacing needed to classify it as indicated or reserve is far more cost efficient from underground. So we're going to be doing that, having access from the current linkage ramp that reaches all the way to East Gouldie and from the upper part of East Gouldie, attempting to do as much of the reserve conversion from underground as we can. There will also be a continuation of drilling from surface, though. But as we've seen across the total number of drill rigs that Dominique was mentioning, there's a progressive shift towards much more drilling from underground versus drilling from surface. So our real aim was bringing it to infer from surface, and a lot more of the conversion towards reserve is going to be done from underground. That's for the reason you mentioned — the fact that to achieve the drill spacing at 30- to 40-meter drill spacing, it's much easier to achieve that and less — and more cost effective to do that from underground.
John Tumazos
analystIs that roughly the ceiling for adding 2.5 million ounces annually to the reserve? Or might it happen more quickly?
Guy Gosselin
executiveYou're referring to resources, since when it comes to reserves.
John Tumazos
analystNo, no — going from inferred into reserve.
Guy Gosselin
executiveInferred into reserve — take this year as an illustration: 470,000 ounces got added, and going forward our rate runs at roughly that level, converting around 0.5 million ounces out of resources into reserves. That, I believe, is the pace we can achieve and the one we're aiming for.
John Tumazos
analystSo you have 20 years of that ahead of you? Just teasing, Guy.
Bennett Moore
analystNice work on a record year. Could you go into more detail about the mill ramp slowing down and the sequencing change at Detour Lake, and what that means for cost and CapEx over the next few years before that growth path in the next decade?
Natasha Vaz
executiveAbsolutely. Bennett, you mean the schedule for the mill ramp-up at Detour?
Analyst
analystRight. And what might that mean, I suppose, for things such as incremental stripping as well?
Natasha Vaz
executiveOkay. That sounds fine. Let me begin with the mill. Regarding the mill, we hit 28 million tonnes during this year. That's a tremendous accomplishment for the team. Over the past 6 years, Bennett, the mill has been expanding, so the team simply wanted to take some time to stabilize throughput and make sure sustainable operating practices are in place. This gives the team a bit of flexibility. As for timing, we still expect to bring the mill up to 29 million tonnes by 2030. And when we reran our life of mine plan, we also expect to hit 1 million ounces in the early 2030s. So on that front, there isn't much change yet.
Ammar Al-Joundi
executiveRight. One aspect of this — and perhaps I'm splitting hairs a bit here — is that throughput alone isn't what matters. You also have to ensure there aren't any recovery problems and no reliability problems. So that's what Natasha was getting at — they've performed excellently. In my view, we've got some of the finest individuals globally working on this, and we invariably follow their guidance regarding the optimal approach.
Analyst
analystMoving on to Meadowbank — it's good to see the mine life stretched out to 2030, though those are slightly more expensive ounces. Still, I'm curious whether you can paint a clearer picture of what might lie ahead of 2030, given that this would be an underground-only operation. In other words, might it end up comparable in size and scale to what we've witnessed in recent years?
Dominique Girard
executiveYeah. The team is exploring, aiming for — and I'll stress this is highly conceptual — 250. Could that be achievable by — we understand it means going deeper underground. That way, we'd simply continue mining. They're likewise hunting for the smallest pushback in various spots; they're examining beneath what we've already mined at Goose at that point, beneath what we've already mined at Vault at that point, and combining those to determine whether Meadowbank could be extended. Naturally, a gold price of USD 5,000 per ounce is extremely welcome for Nunavut, for Meadowbank. It's also extremely welcome since we keep drilling — the drills keep turning. And who can say? All it takes is a single hole, and the whole picture might shift. So that's quite encouraging. True, the cost is higher. Yet as Ammar noted, it builds on top of existing infrastructure, requiring minimal CapEx to make it happen. So we're continuing to work on it. Perhaps 20 — I'd say no earlier than 2027, we'll give you — we might be able to share more about that. We'll see how well the team can progress on it.
Ammar Al-Joundi
executiveAppreciate it, operator, and thanks to all of you for being here. For anybody who has the extended break coming up, make sure to spend it enjoying time with your loved ones. Thanks.
Operator
operatorThat wraps up the conference call for today—many thanks to all of you, and we're glad you could be with us. As for the timing, perhaps 2020, though I'll say not before 2027, and we might be able to share more on that later. Feel free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Agnico Eagle Mines Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Agnico Eagle Mines Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Agnico Eagle Mines Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.