Airbus SE (AIR) Earnings Call Transcript & Summary

February 20, 2025

Euronext Paris FR Industrials Aerospace and Defense earnings 78 min

Earnings Call Speaker Segments

Operator

operator
#1

Good afternoon, ladies and gentlemen, and thank you for holding. This is Airbus's Full Year 2024 Results Release Conference Call, and you're welcome to it. Sandra here, serving as operator for today's conference. Please be aware that throughout the presentation, everyone joining will be in listen-only mode, and this conference is being recorded. Once the presentation wraps up, there will be a chance for you to ask questions. Right now, I'd like to hand the conference to your hosts, Guillaume Faury, Thomas Toepfer, and Hélène Le Gorgeu. Please go ahead.

Hélène Le Gorgeu

executive
#2

Thank you, Sandra. Good morning, ladies and gentlemen. You're joining the Airbus conference call covering the release of our Full Year 2024 results. Guillaume Faury, our CEO, and Thomas Toepfer, our CFO, will present the results and take your questions. We expect this call to run for approximately one hour and 15 minutes. That figure covers the Q&A, which we'll hold following the presentation. A webcast of this call is also available. You can reach it through our homepage by clicking the dedicated banner. A playback of this call will be accessible on our website, though no dedicated phone replay service exists. The supporting information package was published on our website earlier today. It contains the slides, which we will now take you through, as well as the financial statements. During this call, we will be making forward-looking statements. I invite you to refer to our Safe Harbor Statement that appears in the presentation slide, which applies to this call as well. Please read it carefully. And now, over to you, Guillaume.

Guillaume Faury

executive
#3

Thank you, Hélène. Good morning, everyone, and thanks for being with us this morning for the call on our full year 2024 results. It's a pleasure to be here in Toulouse alongside Thomas and Hélène and to take you through what we delivered. During 2024, we saw yet another very strong order intake right across all businesses, which confirms the demand and the positive outlook for our industry and also for products and services. At the same time, we adapted to the environment in which we operate, concentrating on what matters most. We refocused our efforts so we could make progress on our priorities and secure our trajectory. On Defence and Space, we took further steps to transform the business and the organization. The extensive technical reviews of our space programs have now been completed. On Space Systems, we progressed on our three-step approach. We have fixed what I would call our foundation. We are executing our turnaround plan. Third, finally, we are evaluating strategic options. In that sense, we have started exploratory discussions with Thales and Leonardo, and I will comment on it later. On commercial aircraft ramp-up, we prioritized activities and allocated our resources accordingly. We are upskilling our teams, collaborating closely with our suppliers, while keeping a laser focus on quality and safety.

Guillaume Faury

executive
#4

Basically, we're making headway in a setting that's still complicated and, as you can see for yourselves, shifting quickly. Against that backdrop, we handed over 766 Commercial Aircraft in 2024, 269 of them in the final quarter, which is an annual rise of +4% versus last year. That figure takes in the very first XLR deliveries, the A321XLR deliveries, opening up fresh opportunities for our customers. We met our updated guidance, and I see that as a genuine accomplishment given the conditions I just described. The teams' work makes me truly proud, and I also want to highlight how committed all our partners were in reaching that outcome. Turning now to how we performed financially in 2024, our EBIT adjusted came in at EUR 5.4 billion, which mirrors our Commercial Aircraft handovers and a solid showing at Helicopters. It likewise mirrors EUR 1.3 billion of charges across our space programs for the whole year, among them a EUR 0.3 billion charge booked in Q4, stemming from finishing the technical review, and Thomas will revisit that point afterward. Our free cash flow before customer financing reached EUR 4.5 billion, mirroring the robust performance across every business. These financial results, together with a net income of EUR 4.2 billion and our confidence in how we'll perform financially going forward, underpin our 2024 dividend proposal of EUR 2 per share plus a special dividend of EUR 1 per share.

Guillaume Faury

executive
#5

Keeping all of that in view, let's examine 2024 more closely, beginning with where we stand commercially. So we'll turn now to the commercial landscape, starting with Commercial Aircraft. Travel demand stayed strong throughout 2024, and it kept surpassing prior records. Following the record-setting 2023, this year proved a successful one on the commercial side. Customers placed repeat orders for the same aircraft family, and a few of our product lines brought in new customers. During 2024 we booked 878 gross orders, 211 of which came in Q4. For the A220, we booked 17 gross orders and added four new operators. Turning to the A320 family, 637 gross orders were booked, including 180 in the fourth quarter, which lifted our backlog to 7,210 aircraft, of which more than 2/3 are for the A321. On the wide body side, we recorded 224 gross orders, which underlines the ongoing momentum behind our wide body family. Net orders came to 826 aircraft, including 52 cancellations, and our backlog in units rose to 8,658 aircraft at the end of December, reflecting a book-to-bill above one. At group level, our backlog in value grew to EUR 629 billion in 2024, chiefly reflecting the book-to-bill above one that I mentioned earlier across all divisions, along with the strengthening of the U.S.

Guillaume Faury

executive
#6

Turning to Helicopters, 2024 stands out as a remarkable year for Airbus Helicopters. Net orders came in at 450, versus 393 in 2023, and our book-to-bill was above one in both units and value, which shows how strong demand is for these platforms. We also landed a solid order intake on services. That includes the standout performance of what we call the Super Puma family, or the H225 family — in the fourth quarter we signed a contract with the Dutch Ministry of Defence covering 12 H225Ms. Momentum remains positive in the civil market and the military market alike, and our focus stays on locking in new business opportunities both in our home countries and in export markets. Moving to Defence and Space, order intake for 2024 was EUR 16.7 billion, 6% higher year-on-year, equivalent to a book-to-bill of roughly 1.4. That is a record order intake, and we have achieved it for the second year running, even as we became more selective in our biddings and more prudent on risk profiles. I am clearly very pleased about this. To my mind, it proves we hold the right products and services for the current environment and for our customers. The key orders booked in Q4 mirror strong momentum across every business line, and especially on what we refer to as the Air Power side.

Guillaume Faury

executive
#7

When it comes to Eurofighter, we're pleased to point out that the Spanish government has signed the Halcon contract, covering the purchase of 25 Eurofighter aircraft that will be assembled, tested, and delivered at the Airbus Getafe site. Beyond that, Italy has also ordered as many as 24 Eurofighters. Through this contract, both nations will further grow the fleets they already operate. Turning to the A400M, Airbus Defence and Space concluded two strategic contracts with the Organisation for Joint Armament Co-operation, OCCAR. One is the Global Support Services contract, known as GSS3, delivering a complete set of services tailored to requirements, while the other is the Block Upgrade 0 contract, representing the first enhancement of the A400M's operational capabilities beyond what the original launch contract covered. In space, Eutelsat awarded us a contract in December to build the extension of its OneWeb Low Earth Orbit LEO constellation. Let me restate our plan here. As I mentioned earlier, we have now finished the technical reviews. We keep carrying out our turnaround plan, particularly through the organization and the workforce adaptation. In addition, we have begun what I would describe as exploratory discussions with Thales and Leonardo. These talks, preliminary and non-binding at this point, are meant to evaluate various scenarios for consolidating and reinforcing the European space sector and delivering value to this industry's main stakeholders.

Guillaume Faury

executive
#8

And at this point, Thomas is going to walk you through the financials. Thomas.

Thomas Toepfer

executive
#9

Thanks, Guillaume. Good morning, everyone, and thank you for being on the call. I'm on page six of the presentation now, and I'll walk you through how we performed financially. As you can see, revenues for full year 2024 rose to EUR 69.2 billion, an increase of 6% year-on-year, mainly reflecting the number of deliveries of Commercial Aircraft and Helicopters, along with higher volume in our Air Power business. On R&D, as you can see on the right-hand side of the page, expenses stood at EUR 3.3 billion in 2024, stable compared to 2023. Indeed, two factors offset the slight increase we had initially anticipated. First, the LEAD initiative — which, I repeat, is not a cost-cutting program, but which aims at prioritizing activities and projects to focus on what matters — that also resulted in a slightly lower R&D expense for the year. Secondly, the earlier capitalization of our development costs in our Commercial Aircraft business, which we initiated in the third quarter in order to align with accounting standards, also resulted in lower R&D expenses, with, of course, the opposite effect on our CapEx. And you remember that I mentioned that effect already in Q3.

Thomas Toepfer

executive
#10

Looking ahead now, R&D spending should rise only slightly in 2025, in line with the LEAD prioritization initiative, as you already saw in Q4. Turning to EBIT adjusted, our full year 2024 EBIT adjusted fell to EUR 5.4 billion from EUR 5.8 billion in 2023. So let's begin by looking at 2023. As you may recall, 2023 gained from the progress we achieved on our compliance topics, which then enabled us to release provisions totaling EUR 0.1 billion in Commercial Aircraft. However, 2023 figures also included revised assumptions on certain long-term contracts in our space business, which produced a charge of EUR 0.6 billion. Then, in 2024, the positive effect of higher Commercial Aircraft deliveries was partly offset by investments made to prepare for the future, particularly the excess workforce, along with a somewhat less favorable hedge rate. Underlying performance also drew support from the solid results of our Helicopters division. In Q4, as planned, we finished the in-depth technical review of our space programs, notably one major program that still needed to be fully assessed. That led to a charge of EUR 0.3 billion in the last quarter, coming mainly from updated key assumptions.

Thomas Toepfer

executive
#11

That takes the total charges for the full year up to EUR 1.3 billion, and that clearly is the main factor behind the drop in our EBIT adjusted versus the prior year. This charge mirrors the broad, deep effort the team has put in, program by program, which produced revised assumptions and, as a result, reduced our risk profile going forward in a business that stays inherently complex and faces greater competition. Let me remind you here that this charge covers past, present, and future profitability as well, so only part of it actually pertains to the current period. So 2/3 is probably the right order of magnitude to normalize in your models. I'll turn now to delivering on our plan within a simpler organization, with end-to-end accountability and by leveraging technology reuse. Turning to Defence and Space, we are making headway in talks with our social partners regarding the division reorganization and workforce adaptation, and a restructuring provision is expected to be recognized once the necessary conditions are met, with the amount expected to be around EUR 0.2 billion. Now to the EBIT adjustments, which were slightly negative in the full year 2024, they included, as you can see on the page, a EUR +101 million impact from the dollar working capital mismatch and balance sheet revaluation, of which EUR 247 million came in Q4.

Thomas Toepfer

executive
#12

Within that figure was a EUR -121 million item tied to the A400M, and EUR -118 million of it landed in Q4. There was also a EUR +51 million gain on Airbus OneWeb Satellites, connected to buying out the remaining 50% of the joint venture, which we had already booked in the first quarter. On top of that, a EUR -40 million charge came from the recently announced shutdown of the Airbus Beluga Transport business. And lastly, EUR -41 million in other costs, covering compliance and M&A, with EUR -31 million of that in Q4. All of this brings our full year EBIT reported for 2024 to EUR 5.3 billion. As the page also shows, over on the right-hand side, the financial result came in at a EUR +121 million, mainly reflecting revaluation of certain equity investments and movements in the U.S. dollar, partly offset by the interest result and revaluation of financial instruments. Turning to tax, the rate on our core business remains at roughly 27%. Regarding the French surtax, we stand by our earlier estimate of an impact of approximately EUR 300 million, though we now anticipate it will hit in 2025, on both the P&L and the cash flow.

Thomas Toepfer

executive
#13

For 2024, our effective tax rate comes in at 25%, and that figure reflects the tax impact from revaluing certain equity investments, along with updates on deferred tax positions and tax risks. As a result, net income works out to EUR 4.2 billion, and reported earnings per share were EUR 5.36. Full-year 2024 adjusted EPS was EUR 5.05, calculated on an average of 790 million shares. Given this outcome and our confidence in future financial performance, we will propose a 2024 dividend of EUR 2 per share along with a special dividend of EUR 1 per share, which we see as the most suitable way to strengthen our commitment at this moment. Turning to U.S. dollar exposure coverage — I'm on page eight of the presentation — during 2024, $ 23.2 billion of forwards matured, with the related EBIT impact and euro conversions realized at a blended rate of $1.21, versus $1.20 in 2023. In financial year 2024, we also put in place $14.3 billion of new coverage at a blended rate of $1.11. Consequently, our total U.S. dollar coverage portfolio in U.S. dollars is $82.8 billion, at an average blended rate of $1.21, compared with $91.7 billion at $1.23 at the close of 2023.

Thomas Toepfer

executive
#14

And so, as you can see, given the market conditions, we chose to reduce our U.S. dollar coverage by approximately $9 billion during 2024. I should also mention that our portfolio is being adjusted right now through some rollovers to reflect the 2025 delivery target as well as the delivery profile, which we expect to be back-loaded. Now let's take a closer look at free cash flow — I'm on page nine of the presentation. Free cash flow before customer financing came in at EUR 4.5 billion in 2024, mainly reflecting the delivery level and the commercial momentum across all our businesses, which produced a healthy PDP inflow, while the planned inventory build-up reflects the ramp-up across the programs. The A400M continued to weigh negatively on our free cash flow, and full year 2024 CapEx was EUR -3.7 billion, which obviously reflects investments in enhancing and upgrading our industrial system as well as the change in development cost capitalization that I mentioned earlier. To support our ramp-up, we expect CapEx to increase slightly in 2025. Free cash flow was EUR 4.5 billion as well, with a very minor impact from customer financing, and in that context, the aircraft financing environment, in our view, remains strong and competitive, and we currently expect sufficient liquidity from diverse sources to finance the 2025 deliveries. To round it up, our net cash position stood at EUR 11.8 billion as of the end of December, also supported by the dollar's strengthening towards year-end, and our total liquidity is now at around EUR 35 billion.

Thomas Toepfer

executive
#15

Having said that, I'd like to turn things back over to Guillaume.

Guillaume Faury

executive
#16

Thanks, Thomas. That was a great shot of the H225M, by the way. So let's begin with Commercial Aircraft on page 11. In 2024, as we've mentioned, we handed over 766 aircraft to 86 customers. Now, looking at how things stand by aircraft family, on the so-called narrow-body side, we delivered 75 A220s along with 602 A320 aircraft, and of those, 361 were A321s, which works out to 60% of deliveries for the family — so 60% of the family's deliveries were A321s. On the A320, we're still ramping up toward a rate of 75 A320 family aircraft per month in 2027, no change there. We're very pleased that our newest aircraft, the A321XLR, has entered into service. The first A321XLR went to Iberia in October, followed by two more to Aer Lingus. The A321XLR delivers unique capabilities when it comes to range, economics, and environmental efficiency. Great product. We delivered 89 wide bodies, consisting of 32 A330s and 57 A350s, including first deliveries to new operators. On the A330, we are now stabilizing at a monthly production rate of around four per month. Specific supply chain challenges, notably with Spirit AeroSystems, are currently putting pressure on the ramp-up of both the A350 and the A220. On the A350, we continue to target the rate 12 in 2028, so again, no change here, and we are adjusting the entry into service of the freighter variant, which is now expected in the second half of 2027, and here, it's a change, and on the freighter, the first flight test aircraft will enter the final assembly line this year.

Guillaume Faury

executive
#17

Regarding the A220, we're still on track to reach a monthly production rate of 14 aircraft in 2026 — so essentially, our ramp-up path is moving forward. Some particular supply chain problems remain, though. Engine pressures for narrow-bodies continue, especially with CFM, and that's already hitting us as we start to see the so-called gliders — planes that are fully assembled but sitting there waiting for their engines. The upshot will be a low delivery figure for Q1. We saw this coming back in 2023, and Q1 will come in below last year's level. We anticipate the situation lasting through the summer, then normalizing during the second half of the year. Turning to cabin and equipment, the issue is structural, driven by the recovery in air traffic and demand from customers for upgrades. On Aerostructures, as mentioned before, supply chain difficulties are likewise weighing on our activities. As for Spirit AeroSystems, we'll share more detail on the acquisition currently underway later. Let's now turn to the financials for our Commercial Aircraft business. Revenues rose 6% year on year, largely reflecting a higher delivery count. EBIT adjusted climbed to EUR 5.1 billion from EUR 4.8 in 2023, as the gain from more deliveries was partly offset by investments aimed at preparing for the future, including some specialized workforce.

Guillaume Faury

executive
#18

Turning to Helicopters: during 2024 we handed over 361 rotorcraft — a figure 15 higher than 2023's total. Revenue rose 8% to EUR 7.9 billion, driven by those greater deliveries, strong results across the programs and expansion in services. Consequently, EBIT adjusted climbed to EUR 818 million, with profit margins at 10.3%, matching our target of durable profitability even as we stay dedicated to disciplined execution and ongoing enhancements. Now let's wrap up the review with Defence and Space. Revenues there grew 5% year on year during 2024, reaching EUR 12.1 billion, chiefly powered by the Air Power business. EBIT adjusted mirrors the EUR 1.3 billion in space charges that Thomas outlined. At this point I want to remind everyone that 2023 likewise carried EUR 4.6 billion of charges. Both sets of impacts stemmed primarily from revising our estimates at completion — the EAC assumptions — for the space programs. I'd like to reinforce Thomas's earlier remarks. Now that the thorough technical review is finished, our attention shifts to meeting our commitments within the space business, a business that stays intricate. On A400M, seven aircraft were delivered by us in 2024, among them the first unit for Kazakhstan — an export customer and the ninth nation to fly the aircraft.

Guillaume Faury

executive
#19

During 2024, we carried out one more revision to the contract estimate at completion, and we booked a net charge of EUR 121 million. That mainly reflects updated assumptions about the new contract amendment with the launch nations as well as risks in production planning. Given the uncertainty around the level of aircraft orders, the company keeps evaluating what the potential impact could be on the program's manufacturing activities, and risks concerning qualification of technical capabilities and the related costs remain stable, with no major variation versus 2023, and yes, before we move to the 2025 guidance, Thomas will give you more color on Spirit AeroSystems.

Thomas Toepfer

executive
#20

Yes, glad to address that. I'm looking at page 14 of the deck, so regarding Spirit AeroSystems — as we discussed on our H1 call, we signed a binding term sheet agreement. What I'd describe as a defensive step, taken to protect both immediate operations and the long-term future of major Airbus work packages, and it gave greater certainty as well to employees and to the supply chain that supports Airbus activities. Since signing that term sheet, we've moved forward with due diligence while evaluating the best ways of integrating every production site into our operating model. Given how many stakeholders are involved, finalizing the transaction needs more time, so consequently — and as our understanding of the operational situation grows deeper — the financial outlook is tougher than we originally expected. Indeed, supporting the A350 and the A220 ramp-up will require investment to boost production capabilities and drive operational efficiency. So with that, let me say a few words on the expected financial impact, based on preliminary assumptions. If we assume a closing date around mid-year, the 2025 impact on EBIT adjusted should be approximately neutral.

Thomas Toepfer

executive
#21

On the reported EBIT side, the effect will probably be a positive one in the mid-triple digits, largely because of the deal compensation we're set to receive from Spirit AeroSystems. Then, the net cash effect should come out roughly neutral as well, since that compensation will offset the negative free cash flow impact before customer financing. Moving to 2026 and 2027, we're expecting a negative impact on adjusted EBIT in the low triple digits, and on free cash flow before customer financing a negative impact of up to the mid-triple digits each year. Our teams are putting in hard work to deliver this project, which is plainly one of our key priorities for 2025. With that, Guillaume will now walk you through our guidance.

Guillaume Faury

executive
#22

Thanks, Thomas. Moving to page 16 — for the 2025 guidance to hold, the company is assuming there will be no further disruptions affecting global trade or the world economy, air traffic, the supply chain, the company's internal operations, or its capacity to deliver products and services. To be specific, potential new tariffs on the company's business are not factored into this guidance. As Thomas just explained, the 2025 guidance incorporates the integration of certain Spirit AeroSystems work packages, based on preliminary estimates and closing assumptions as of 1 July. On that basis, the company is targeting roughly 820 Commercial Aircraft deliveries in 2025, EBIT adjusted of approximately EUR 7 billion, and free cash flow before customer financing of about EUR 4.5 billion. Our key priorities on slide 17 will wrap things up. We are committed to serving customers in 2025 while keeping our strong commercial position across all businesses, which is a source of strength and stability. In doing so, we'll stay focused on the Commercial Aircraft ramp-up and the Defence and Space transformation. On the ramp-up, our aim is to improve our ability to deliver on time and with quality. We will keep shaping our industrial systems, notably through the integration of Spirit AeroSystems, and managing a deep and interdependent supply chain in a complex and ever-fast-changing environment.

Guillaume Faury

executive
#23

To put it plainly, in 2025 we'll need to perform at our very best. Regarding the Defence and Space transformation, we'll continue carrying out our turnaround plan and pursue workforce adaptation in close cooperation with our social partners, while examining various scenarios to create scale in the space business. These priorities serve as enablers for profitable growth and for our ambition to lead the development of sustainable aerospace. Climate change is one critical challenge facing humanity, and globally, 2024 was the warmest year on record. At Airbus, our aim is to decarbonize aviation over the long term. So we will keep enhancing the environmental performance of our products and operations, and also act as a catalyst in developing sustainable aviation fuels. On hydrogen, we hold the ambition of bringing a commercially viable, fully electric, hydrogen-powered Commercial Aircraft into service. That is not changing. We consider fuel cell technology the most promising way to fulfill this ambition. Scaling up the hydrogen ecosystem is challenging and, unfortunately, is moving at a slower pace than we previously anticipated. Bringing fuel cell technologies to a commercially viable product at scale will likewise take more time.

Guillaume Faury

executive
#24

Here's what we've picked up from our work over the past years. A product that's commercially viable is now anticipated to arrive after 2035 rather than sooner, and we'll put that extra time toward advancing how the fuel cell propulsion performs along with the liquid hydrogen system technologies. With all of that considered, we're heading into 2025 with focus, determination, and plenty of positive energy. We're ready now to take your questions.

Hélène Le Gorgeu

executive
#25

We're going to begin the question-and-answer portion now. When you ask a question, kindly state your name and your company. Keep it to 2 questions per turn, sub-questions included. And as always, please speak distinctly and at a slower pace so that everyone on the call, especially you yourself, can follow what's being asked. So, Sandra, please go ahead and walk the participants through the procedure.

Operator

operator
#26

We’re moving into the Q&A portion now. If you’d like to pose a question, just press star one one on your phone’s keypad. Our first question comes from Benjamin Heelan at Bank of America. Go right ahead, sir.

Benjamin Heelan

analyst
#27

Morning, everyone. Hope you’re all doing well. Thanks for asking. Could you share a bit more about Spirit and the difficulties in the second half of the year, and maybe sketch out what’s actually going on? What are the issues? What are they having trouble with? Is it labor? Is it capacity? Just a little more detail on that. Thank you.

Thomas Toepfer

executive
#28

What are the challenges? I see two things. Let me begin with Spirit's operations. As you know well, Boeing experienced a major strike, and that clearly impacted Spirit too, since Boeing is one of its biggest customers. This caused further disruption to the company's work, which doesn't help with the work packages we're looking to acquire. So additional support became necessary to keep Spirit on a stable footing, operationally as well as financially. Second, as we dig deeper into those work packages, we now have a clearer view of the investment required to bring Spirit up to a level where it can fully back the ramp-up we're planning for the A350 and the A220, and our assumptions now incorporate that updated knowledge. Finally, as you can see, reaching a final signature and then closing the contract does take some time. I'd say we're making good progress. But naturally, with more than two parties at the table and a transaction that's quite complex by nature, it simply took a while.

Thomas Toepfer

executive
#29

That said, I'd repeat that we're on a solid path and making solid headway here, and so we've built into our guidance an assumption—one I consider quite realistic—that we'll reach a closing by the middle of the year.

Benjamin Heelan

analyst
#30

Alright, thanks. And I suppose I have another question for Guillaume. Guillaume, you’ve mentioned space and the talks you’re having right now with Thales and Leonardo. What actually — what would a good outcome look like for you from these negotiations? What are you hoping to get done? Is it about building a European champion that Airbus can be part of? Or is it about you consolidating the other assets? Could you give us a bit of color? In a good scenario, what do you see coming out of these negotiations? Thank you.

Guillaume Faury

executive
#31

Morning, Ben. Quite an early start for you. What we're looking to do is gain scale and speed by consolidating the business. The businesses we're in are ones where scale matters. These are businesses where technologies move very quickly, so you need to invest. And in order to invest, you need the scale to have a reasonable impact on the recurring cost. You also need scale on the production side. So we're in a situation where some U.S. players are disrupting the ecosystem, are going at scale on new technologies on constellation. In Europe we have Airbus, but also looking at Thales Alenia Space and Telespazio, we have technologies, in some cases even better ones, but we're missing the scale that we need to be competitive in this new environment. So we want to create the scale. We want Airbus to have a stake in a large company. We would be happy if the end result looks like something along the lines of the MBDA model, where we have a significant share with others in a business that can prosper, that can grow, that can invest, and that can be successful on a global scale. Now we're looking at different scenarios, and we're not at a point where we can fully answer the questions of what it will look like.

Guillaume Faury

executive
#32

So again, what are we after? We're after scale and speed in this business. We want to take advantage of the technologies and the competencies that we have. And to do that, we have to be able to compete globally, and global competition right now truly involves far more dollars and far more speed than at any time before.

Benjamin Heelan

analyst
#33

I'll keep this really brief. Could Ariane potentially play a role in that?

Guillaume Faury

executive
#34

Could you repeat that?

Benjamin Heelan

analyst
#35

Could Ariane potentially also be involved in those discussions?

Guillaume Faury

executive
#36

What we're continuing to pursue in order to reach a different outcome centers on satellites and satellite services. This is extremely urgent.

Benjamin Heelan

analyst
#37

Thanks.

Operator

operator
#38

Thanks. Our following question comes from Tristan Sanson at BNP Paribas. You have the floor.

Tristan Sanson

analyst
#39

Yes, good morning to all of you, and thanks for taking my question. My first question concerns raw materials. Guillaume, could you give us a brief perspective on how you view the raw material supply situation in 2025, and how you believe that will support the ramp-up plan in the years ahead? The second question is a quick one, but can you confirm that on Spirit, regarding the financial side of the Spirit deal, the revision of the cash cost tied to integrating the assets comes to roughly EUR 1 billion across a period of three years? Is that the right magnitude? Thank you very much.

Guillaume Faury

executive
#40

Thomas will take the second question — honestly, I’m not certain I grasped it completely myself. As for the first one, raw materials: that has certainly been a source of concern and difficulty over recent years, particularly following COVID and the conflict in Ukraine. By now, though, things have settled down, and raw materials don’t appear among the critical bottlenecks I’d flag for 2025.

Thomas Toepfer

executive
#41

Yeah. So regarding Spirit, I realize the financial effect might be a bit tricky to convey. The way things stand, we'll get compensation for taking on the work packages, but that won't show up in our free cash flow—it will only appear in our net cash position. Still, it will offset the negative free cash flow in 2025. So if you look at our net cash position, the overall cash impact in 2025 will be neutral. But as we showed on the slide, we do expect additional cash needs in 2026 and 2027, with a negative impact of up to a mid-triple-digit amount per year in each of those two years. So I think, going back to your point, that could add up to something under a billion for the timeframe we indicated.

Tristan Sanson

analyst
#42

That's quite clear. Thanks, Thomas. Appreciate it.

Operator

operator
#43

Thanks. Our next question is from David Perry at JPMorgan. Go ahead.

David Perry

analyst
#44

Hello, yes. Good morning, Guillaume and Thomas. I was hoping you could give us some help on the delivery guidance. I understand you're saying roughly 820, but let's take 820 as the figure. That works out to 54 additional aircraft. Could you walk us through how that splits across the different models? I mean, A350 deliveries actually fell in 2024. So should we expect them to rise again in 2025? And what does that mean for growth on the A320 specifically? Thank you.

Guillaume Faury

executive
#45

Good morning, David. Splitting things out by model isn't something we favor, since that flexibility gets used throughout the year to hit the guidance, and there are always ups and downs plus challenges here and there, and we rely on the volume not being too far off when we issue a guidance at the start of the year. Now, the sole indication I can offer is that we're having difficulty with the ramp-up on the A350 and the A220 against the backdrop of one stronger bottleneck, which is Spirit AeroSystems, and that's the reason we're talking so much about Spirit AeroSystems, so our trajectory, our ramp-up trajectory on those two programs is significantly impacted in 2025 by these difficulties.

David Perry

analyst
#46

Okay, and do you expect those two models to actually see higher deliveries?

Guillaume Faury

executive
#47

David, I’m not going to address that question today, but the ramp-up is under pressure.

David Perry

analyst
#48

Alright. That's everything I had to ask about today. Thanks. I appreciate it.

Guillaume Faury

executive
#49

Appreciate it, David.

Operator

operator
#50

Thanks. Our next question comes from Ross Law at Morgan Stanley. Please go ahead.

Ross Law

analyst
#51

Good morning, everyone, and thanks for taking my questions. The first one concerns engines. What precisely is causing supply to be lower in each case? Is it purely a matter of allocation between OE and aftermarket, or is something else happening with the engine suppliers? Then, on the special dividend, it will cost you roughly EUR 800 million in total, yet net cash stood at EUR 11.8 billion, which is about EUR 1.8 billion above the EUR 10 billion threshold. So why wasn't the special dividend a bit larger? Are you in effect setting aside extra cash for something specific? Thanks.

Guillaume Faury

executive
#52

Thanks for those questions — I'll pass it over to Thomas now. On engines, yes, that's an important one as well. I'd say I have no particular comments regarding the wide bodies, and from Rolls-Royce we're getting what we need for 2025 and beyond. For our narrow bodies, there are challenges when it comes to engines. With Pratt & Whitney's GTF, we remain constrained by the fallout from the metal powder problems two years back, and by the path that was reset through two rounds of negotiation with them — in 2023, if I remember correctly. They are on that path, but we understood this would mean fewer engines for new aircraft, so that we can support the in-service fleet as well as reasonably possible, given that a large number of aircraft are on the ground due to their engines being in the recall campaign tied to this technical issue, or production issue. So this is low, but I'd describe it as more or less as planned — or perhaps even more unplanned. What's very different is CFM: at the back end of 2024, CFM ran into several issues — production issues, and one also connected to damage at one of its supplier's plants in Florida following the hurricane that occurred.

Guillaume Faury

executive
#53

They ended up facing a really critical supply situation with certain parts, and that hit both the aircraft for the aircraft manufacturer and support for the fleet. That was the cause of a great deal of arm twisting among the stakeholders at the end of last year over engine allocation. CFM helped us during the last month to deliver aircraft to our customers, but we knew some hardware would be missing in the beginning of this year, and that is affecting us as well as our customers. So we are in that situation, and a sort of normalization is planned for around mid-year. That is what we tried to explain on the call earlier. So we have different situations for different aircraft.

Thomas Toepfer

executive
#54

Regarding dividends, let me just bring back to mind that we stated once the 10 billion net cash threshold is reached, we would examine the possibility of additional shareholder returns, and that is precisely what we did last year, and it is also what we are doing this year. We also mentioned that it would not be a mechanical process when it comes to paying out exactly the amount above the threshold. We are examining the factors, clearly, that are relevant. One of those is the fact that a not-insignificant portion of the overshoot stems from a pure translation impact on our dollar cash reserves, which get translated into euro. As a result, we believed the appropriate balance would be the EUR 1 special dividend per share for 2024 as well.

Ross Law

analyst
#55

Got it. Thank you very much.

Operator

operator
#56

Thanks. Our following question comes from Chloé Lemarié at Jefferies. You have the floor.

Chloé Lemarié

analyst
#57

Yes. Thanks for taking my question. I actually have two, if I may. The first concerns the additional charge in Defence and Space. It appears this isn't tied to wrapping up the review on that single project which was still outstanding. So could you confirm what actually prompted that revision, and how confident you are that the space business is now fully de-risked? And my second question is about the EBIT bridge from 2024 to 2025. Specifically, I was wondering whether you could break out what you've factored in for potential ramp-up cost and inflation, please. Thank you.

Thomas Toepfer

executive
#58

Right, so let me address the charge first and be very clear about it. Our review of all the space programs is now finished. Last time we spoke on the call, we mentioned that one major program remained outstanding, where all we had was a top-down assumption; we still needed to examine that program closely, bottom-up, so as to fully assess what sits in our portfolio — and that work has now been carried out, meaning the review is done. It was extremely thorough, so I would genuinely say this exercise now lies behind us, and, as Guillaume mentioned, we can turn our full attention to what matters in the business: winning orders with a sound risk profile, concentrating on execution and delivery. So I would describe us as finished with a cleanup exercise — which, naturally, does not imply the business carries no risk at all. By its very nature, I think there will always be some ups and downs, yet the 2023 and 2024 exercise sits behind us. As for the inflation bridge from 2024 to 2025, yes, we continue to assume a modest amount of inflation. Keep in mind that previously we indicated it might reach as much as EUR 200 million.

Thomas Toepfer

executive
#59

My guess is that 2025 might come in a bit under that figure.

Chloé Lemarié

analyst
#60

And what about ramp-up costs — did you factor anything in for those?

Thomas Toepfer

executive
#61

What I mean is that we are including the usual cost of ramping up to reach our weights, but I don’t see this as a special item in the bridge. So it forms part of the inflation, and it forms part of the excess workforce we’re carrying in 2024. We’ll keep going — as you have seen, or may have seen, we brought on 9,000 people in 2024. That said, nearly 50% of that comes from scope changes. So the true like-for-like growth is probably closer to 5,000 FTEs, and we expect that we’ll keep hiring, though at a slower rate in 2025 compared with 2024. And if you choose to label that ramp-up cost, that’s likely what sits in our plan for the current year.

Chloé Lemarié

analyst
#62

That’s very clear—thank you.

Operator

operator
#63

Thanks. Our next question comes from Doug Harned at Bernstein. You’re up.

Douglas Harned

analyst
#64

Morning, and thanks. Regarding the A350, given the ramp that's slower at present, could you break down how much of that effect stems from problems at Spirit as opposed to interiors, which have been ongoing for a while? That's my first question. Then secondly, with U.S. tariffs, things are uncertain at the moment. Could you discuss how you're viewing the possible impact on Airbus? And are there any steps you're taking to mitigate any potential effect from possible tariffs?

Guillaume Faury

executive
#65

Yes, thanks for the questions. Regarding the A350, the effects from Spirit and from the interiors manufacturers are quite different in nature. On Spirit Section 15, we simply cannot build the plane. So that is genuinely holding back the ramp-up as such. As for interiors and what we have seen up to now, we are encountering delays in seats, in monuments, in items of that kind, and that postpones the point when we can hand over an aircraft that is fully completed and deliver it on schedule. But it is not holding back the ramp-up as such. So the constraint that is truly the major problem for the ramp-up as such at present on the A350 is Section 15 from Spirit, and that is genuinely a shame. That is why we are concentrating all our efforts there, because that is what we must de-bottleneck in order to do the ramp-up, which is fully prepared when we look at everything else, with plenty of partner suppliers eager to deliver and to help us in delivering on that ramp-up. So I hope that answers your question. On U.S. tariffs, well, we have all our sensors on. We are trying to fully understand and to reasonably anticipate what could happen, but it is obviously very difficult.

Guillaume Faury

executive
#66

When it comes to the tariffs—their character, which goods they'd hit, which countries would be hit harder based on their trade balance with the U.S., based on the VAT they apply, based on the currency and exchange rates—we're in the same boat as everyone else facing that uncertainty. Many factors have been raised, and in our view it's extremely hard to genuinely predict what's coming. So up to now we haven't made major moves—a few small ones here and there to adjust or to try to sensibly get ahead of things—but we haven't altered the production system or the sourcing, and we figure we have quite a few options for adapting once things arrive, if and when they do. Demand for our product is very strong. Our production system, thanks to supply, is oversized right now. So we have several reasons to think we could adjust to whatever comes. Demand from outside the U.S. is very strong, but we also have a production system inside the U.S. And over the past years we've tried to do what we believed was needed to be viewed as a major U.S.

Guillaume Faury

executive
#67

We’re a participant in the U.S. market, and we want to be respected for the work we do for U.S. customers, for sourcing from U.S. suppliers, and for having a U.S. workforce, and we hope that this will pay off. So that’s the situation right now, and we’re more in a wait-and-see stance. We also chose to issue guidance in this uncertain environment so we could share what we believe we can achieve absent tariffs, and then tariffs will be whatever they turn out to be, and we’ll need to adapt as appropriate.

Douglas Harned

analyst
#68

That's great, thank you.

Operator

operator
#69

Thanks. Our following question comes from Olivier Brochet at Redburn Atlantic. Your line is open.

Olivier Brochet

analyst
#70

Yes. Thanks a lot for taking my questions, Guillaume, Thomas, and good morning. I have two, if I may. The first one concerns cash flow for 2025 to 2027. Could you give us a sense of how the A400M outflow evolves over that period and the space cash outflow? That's the first one, and the second one, how do you assess the risk that the issues on the A350 at Spirit continue into 2026?

Guillaume Faury

executive
#71

Would you like to start with the first question?

Thomas Toepfer

executive
#72

Okay, I'll take the first question about cash flow. So with the A400M—let me begin with the A400M—it was still dragging on our cash flow in 2024. But in line with what we've previously stated, we do anticipate the A400M being roughly neutral in 2025 and then beginning to be somewhat accretive in 2026 and beyond. So that's what we've said before, and it remains our expectation going forward. Regarding space, we aren't anticipating a negative cash burden from our space business in 2025. Clearly, the charges we incurred were largely P&L-related and only burdened our space business to a minor degree. So it does hurt profitability, as you can also observe through the normalization. But we don't expect any significant cash charges in 2025 going forward, and so there's nothing specific you need to put into your models.

Guillaume Faury

executive
#73

On the A350, as my briefing made clear, we're still aiming for a rate of 12 in 2028, so apart from the Spirit bottleneck we regard ourselves as on track for that ramp-up. Being able to bring the A350 and A220 work packages in as soon as possible matters a great deal to us. Our assumption is that we'd be in a position to sign by the middle of this year and to have those Spirit work packages integrated by the middle of this year. With this work sitting at Airbus, handled by our own experts and capabilities, we think we can and we will pull off the ramp-up. There are uncertainties, of course, but as Thomas also pointed out, we see that Spirit's present condition as a company weighs heavily on its capacity to deliver to us. A great many distractions or challenges at Spirit stem from the company's situation, and those would clearly be resolved once we own those work packages and can fully deploy our workforce, our power, our engineers and our production specialists at the sites.

Guillaume Faury

executive
#74

We’ll be in a position to make the right investments at the right moment to carry out the ramp-up of those work packages and support us through the ramp-up. So it matters that we can keep progressing with integrating the work packages, and having that completed mid of the year would help the further ramp-ups and help us reach the rate 12 in 2028 for the A350.

Olivier Brochet

analyst
#75

Thanks for that response — I appreciate it.

Operator

operator
#76

Thanks. Our following question comes from Christophe Menard at Deutsche Bank. Your line is open.

Christophe Ménard

analyst
#77

Yes. Good morning, and thanks so much for taking my question. My first one concerns the free cash flow bridge between 2024 and 2025. Could you walk us through the moving parts? I understand the Spirit piece has to be left out — I mean, the compensation. Also, from the earlier question, I gather there's no space impact, as you just mentioned. So I'd just like to grasp the bridge in terms of free cash flow. And my other question also relates to the A400M. Can you comment on the commercial outlook? I mean, you said you were being more selective on contract quality. So what commercial outlook are you considering for the years ahead? I mean, I think the last delivery falls in 2029 as per the current backlog. So what do you have in mind for other contracts? Thank you.

Thomas Toepfer

executive
#78

I'll begin with cash flow, and I want to be very clear about it. Regarding Spirit, as I mentioned, our assumption is that the deal closes midway through the year, and we will get a compensation. We pointed to the $559 million that we have contractually, or that appears in the term sheet. That said, those amounts won't show up in free cash flow, so it weighs on our free cash flow in 2025. Of course, though, the compensation we receive will affect our net cash position. It's cash we'll have in our accounts, so Spirit will drag on free cash flow while having a neutral effect on the company's net cash position. I think that also explains the bridge fairly well. On one side, you get a lift in operating results from the higher deliveries and, clearly, from the space charges not repeating — though those were largely non-cash in nature. The positive contribution from operations will then be partly offset, or offset, by the negative contribution from Spirit, so you end up at roughly EUR 4.5 billion, which is quite close to what we saw in 2024.

Guillaume Faury

executive
#79

Now, regarding the A400M, as of the close of 2024, our backlog contains 48 aircraft that haven't been delivered yet. That's the situation we're facing going forward. We're also pursuing export campaigns, and those take longer to reach conclusions than I would prefer. That's a factor we have to bear in mind. We are, in fact, selective when it comes to orders. That remark was mainly about space, where we assumed considerable risk on development contracts involving many new technologies from 2018 through 2021. That has little to do with Air Power. And when it comes to the A400M, what we're proposing to export customers is quite similar to what we've already delivered for our home country customers. So it carries far less risk in any case.

Christophe Ménard

analyst
#80

Thanks a lot.

Operator

operator
#81

Thanks. Our following question comes from Robert Stallard at Vertical Research. You have the floor.

Robert Stallard

analyst
#82

Thank you very much, and good morning, everyone.

Hélène Le Gorgeu

executive
#83

Morning, Rob.

Robert Stallard

analyst
#84

I have a couple of questions. Good morning. Let me ask two things. To start with, Guillaume, on your forecast for deliveries of roughly 820 aircraft, how confident are you that Airbus can hit that number this year, given the supply chain difficulties and everything that has happened over the past two years? Then, second, a supply chain question on a specific point: is Airbus exposed in any way to the Precision Castparts facility in Pennsylvania that burned down? Thank you.

Guillaume Faury

executive
#85

Thank you, Rob. Now on the delivery side, you noted that the past two years suggest things didn't go well. With the benefit of hindsight, I'd like to revisit that: the target we set for 2023 was 720, and the target for 2024 was 800, as we saw things at the close of 2022 looking ahead. That totals 1,520 aircraft, and with the 735, that came in 15 above what we had targeted for 2023, and the 766 brings the total to roughly 1,500. If I'm counting right, we're at 1,501. So across two years we're 19 aircraft short of 1,520. That's approximately 1%. Given the backdrop of so many challenges and all the unforeseen difficulties — including the Pennsylvania situation you raised, which doesn't hit Airbus directly but does affect us indirectly via our supply chain and several of our major tier-one suppliers — what we've achieved on deliveries is probably not so bad. And in fact, as I mentioned earlier, I'm genuinely proud of how the team has found solutions to those numerous problems.

Guillaume Faury

executive
#86

The reason we're providing guidance of roughly 820 at this point in the year is that we consider it a sensible figure, and we have reasonable confidence in our ability to hand over approximately 820 aircraft during this year. We enter 2025 facing a somewhat particular set of circumstances, since we already know Q1 is going to be soft—softer than the same period a year earlier—given the challenges with CFM specifically, though those difficulties aren't limited to CFM alone. That makes for a rather distinctive hurdle in 2025. That said, we now enjoy somewhat greater visibility into our suppliers' lots. What we observe—the honest way to put it—is that the system's fundamental capacity to produce at rate is robust and sound. So once more, the pressure originates in the supply chain, and our suppliers will have to perform more or less in line with their commitments—including those dealing with their own difficulties, their already-known difficulties, in hitting those figures. We also chose, or rather took the freedom, to issue guidance that leaves out tariffs, simply because we have no idea how those tariffs will take shape. Should they arrive, they could affect us, and their effect on our financials could vary based on how they take shape.

Guillaume Faury

executive
#87

Yet it might also generate some extra difficulties for the supply chain. Those aren't positive in nature. They bring about fresh problems and challenges. Still, as I mentioned before, we also have quite a few levers available to adjust to these circumstances. So once again, this is a year marked by uncertainties. But looking back, 2023 and 2024 were extremely tough, yet not so bad considering the context.

Robert Stallard

analyst
#88

I really appreciate it.

Operator

operator
#89

Thanks. Our following question comes from Ken Herbert at RBC Capital Markets. Kindly proceed.

Ken Herbert

analyst
#90

Yes, hello and good morning. If I may, I have a couple of questions. First, the free cash flow assumptions for Spirit seem to suggest a meaningful lessening of cash burn across 2026 and 2027, assuming roughly mid-single-digit hundreds of millions for half of 2025 and a comparable figure in 2026. Can you highlight anything specific that supports confidence in that free cash flow gain at Spirit in 2026 versus 2025? And in your due diligence, how far have you been able to dig into operations there, particularly regarding the A350? Second, on the A220, keeping the production guidance as is implies more than a 2X ramp for that program over the coming two to three years. From my vantage point that looks like a stretch, but any comments that would bolster confidence in that ramp would be welcome. Thank you.

Guillaume Faury

executive
#91

Thomas, I believe you should clear up what your experience actually is. Yeah.

Thomas Toepfer

executive
#92

Okay, let me begin once more with Spirit and free cash flow. What we're aiming to do, I think, is give everyone a clear view of Spirit and how Spirit will affect the figures we report in 2025, and beyond that in 2026 and 2027 as well. So, as I mentioned, during 2025 it will be plainly neutral regarding overall cash, whereas in 2026 and 2027 we do anticipate having to invest and to turn the work packages around. As I said, we expect a negative cash impact of up to a mid-triple-digit amount in each of those 2 years, and we will factor that into our guidance for 2026 and 2027. That said, we'll address guidance for those 2 years once we reach them, and so I believe it's too early to discuss that today. Today we are issuing guidance for 2025, which sits at around EUR 4.5 billion, including, as I noted, a negative Spirit effect at the free cash flow level and then neutrality in terms of the total cash situation for 2025. How strong are we on due diligence? I think we now have a very, very clear picture, because we were, of course, in a position to keep examining what the situation is with the work packages.

Thomas Toepfer

executive
#93

We’ve got several dozens of people at the sites working shoulder to shoulder with Spirit on a joint improvement project. So because of that, I’d say our visibility into what the situation is and what needs to be done going forward to ensure we lay the groundwork for the ramp-up of the A220 and the A350 is, I would say, pretty good.

Guillaume Faury

executive
#94

Thanks, Thomas. I hope that's useful. On the A220, we truly have a very steep ramp-up ahead of us for 2025 and 2026. It's a success waiting to happen, as we feel we've invested a great deal and we're ready for it. Unfortunately, there are one or two challenges along the way, chiefly the wings from Spirit Belfast. That's why we're so focused on this. That's why we're so eager to bring the work package in at Airbus so we can fully control what's happening there. And the other one is the GTF situation I mentioned a bit earlier, which leads to some backloading in the year and in the ramp-ups. But that's part of the challenges we have to overcome this year and next year. It's a positive one. And yeah, we're looking forward to reporting on this moving forward.

Ken Herbert

analyst
#95

All right, thanks.

Operator

operator
#96

Thanks. We’re going to take the final question now from Ian Douglas-Pennant at UBS. Please go ahead.

Ian Douglas-Pennant

analyst
#97

Appreciate you fitting me in at the end—thank you. I’ve got another question on Spirit, but it won’t be about the free cash flow split again. This one’s a bit longer-term. My assumption is that the gap between the EBIT impact and the free cash flow impact over the next few years comes from CapEx requirements—please correct me if that’s wrong. Once that CapEx program appears to wrap up in 2027, does this business’s cash flow profile get back to something resembling normal, or should we think about continued weak cash flow, say, from 2028 onward? I’m not after exact guidance—just any loose commentary on what that program looks like and what comes out of it, please. Then my second question is about the supply chain. I’m just wondering whether it would be reasonable to view Spirit as a sort of case study for Aerostructure suppliers broadly. What I mean is, if you did the same work you’ve done at Spirit—if you were able to—at other Aerostructure suppliers, and the work you did at Spirit led you to believe much more investment is required to support that ramp-up, how confident can you be that you wouldn’t have that same experience if you looked at other Aerostructure suppliers?

Ian Douglas-Pennant

analyst
#98

Thanks, everyone.

Guillaume Faury

executive
#99

Perhaps I'll begin with that question and give you a moment to consider Spirit beyond 2028. No, it's a highly significant question, and in fact we tackled it at Airbus back in 2018 and 2019, when Mike Schoellhorn — who today serves as CEO of Airbus Defence and Space — was our chief operating officer, really pushing us to challenge ourselves on what the model of integration and make-or-buy, core versus non-core, should be for the big aerostructures. At that point, we had Stelia handling the more forward fuselage sections of our aircraft. We had Premium AEROTEC in Germany covering the rear portion of the fuselage, along with some of the central fuselage. These were subsidiaries assembled roughly 15 years ago in the wake of Boeing splitting out its activity into Spirit. The real question was whether we should divest and procure aerostructures, or instead integrate them more closely to our chest, on the view that this would be core. We reached that conclusion. We said, "Well, aerostructures are core. There's a great deal of the quality. There's a great deal of the speed of integrated changes in supply chain management." Probably even more than the situation as it stood at that time was the view that going forward, through digitalization — what we call DDMS at Airbus — of the design and the manufacturing, we really wanted the aerostructure companies to be part of our make so we could run that digitalization exercise.

Guillaume Faury

executive
#100

We also held the view that the fuselage aerostructure of tomorrow would resemble a car’s chassis, with many functions integrated into it. That meant it was really an airframer’s job rather than a supplier’s. So we made the decision to set up Airbus Atlantic, bringing together, in a way, the Stelia work scope along with certain Airbus sites in western France. Then in Germany we formed what we call Aerostructures by combining Premium AEROTEC with the portion of our Hamburg fuselage work. That now sits inside Airbus. We moved it from being bought internally to being made internally. These are genuinely core activities for Airbus. And early last year we observed that Boeing in fact chose to bring things back in-house — to verticalize the work that had been carved out to Spirit 20 years earlier, likely for comparable reasons. So I believe that provides a more strategic response to what you asked. Looking ahead, we regard aerostructures as core and something we make.

Thomas Toepfer

executive
#101

Yes. Perhaps regarding Spirit's future and how we view it. So let me begin by asking, what is Spirit's situation at present? I think two things define it. First, the work packages for Airbus are loss-making, since Spirit's efficiency needs improvement. There are processes in place that aren't optimal, and so on. And second, Spirit clearly constitutes a bottleneck, as they can't ramp up and raise output. That therefore weighs on the A350 ramp-up, and on the A220 as well. That said, over the next three years our focus is spending on CapEx to get them into a position where they can support the trajectory in our plans for the A220 and the A350. It's about integrating the company into our operations so that processes get improved, and finally, of course, turning around the work packages will take some time, so we must bear the operating loss we have acquired. That said, once the investments and the optimizations we want to make at Spirit are done, we expect to turn these work packages around to the same cost level we currently pay externally, and so the impact beyond 2028 should not be negative from Spirit once we've made the necessary improvements both in processes and in capital investment.

Ian Douglas-Pennant

analyst
#102

Thanks. That's really helpful. Appreciate it.

Hélène Le Gorgeu

executive
#103

Thanks, Guillaume, and thanks, Thomas. That brings today's conference call to an end. Should you have any additional questions, just send an email to Olivier, to Victoria — whom we're very glad to have joining us — or to me, and we'll respond as quickly as we can. Thanks, and we look forward to talking with you again very soon.

Guillaume Faury

executive
#104

Appreciate it, everybody. Take care.

Operator

operator
#105

Ladies and gentlemen, that brings the conference to a close, so you're free to hang up your phones now. Thanks for being with us, and we hope the rest of your day goes well. Take care.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Airbus SE transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Airbus SE earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Airbus SE or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.