Akobo Minerals AB (publ) (AKOBO) Earnings Call Transcript & Summary

December 7, 2023

Oslo Bors NO Materials Metals and Mining earnings 55 min

Earnings Call Speaker Segments

Jørgen Evjen

executive
#1

Good morning, everyone, and welcome to the third quarter presentation for Akobo Minerals, joining you from Addis Ababa, Oslo, and Trondheim. Today we'll walk you through the third quarter. Helge Rushfeldt, our new Head of Mining Operations, is here with me; he's in Trondheim. He'll take you through his area of expertise, mining and the processing plant. And as always, Dr. Matt Jackson, our Chief Operating Officer, is with us too. He has recently assumed overall responsibility for exploration and its development. Exploration is his field of expertise, so we'll say a bit more about how we view exploration going forward and how, over time, we can build value through it. But first, a brief introduction to the company. We'll cover some of the quarter's highlights and what has happened since the quarter ended, and at the close of the presentation we'll hold a Q&A session, and we'll also show a short video from site. For those who are interested, we'll wrap up with that. So I think we'll simply begin and turn to page number four. Okay. Akobo Minerals is a Scandinavian-based Ethiopian gold exploration company. We have been active in Ethiopia for the last 13 years.

Jørgen Evjen

executive
#2

At this point we're listed on the Oslo stock exchange. In the US, our shares trade on the OTC. Roughly 3,000 shareholders stand behind us, with Norwegian investors holding the majority, so the corporate foundation is solid. These days we have close to 200 employees, plus a solid management team in Ethiopia that works day and night to push this project forward. So we have the capacity to grow, and we have the capacity to expand in different directions. We'll talk more about that later. So again, we have a strong local foothold. We have been working closely with the local community. We are working hard to do it right. This is an important part of our business. We do have also developed a very cost-effective operation. It's a low overhead cost, and we do have a very flexible operation in Ethiopia. And we expect to fund continued exploration and then development with cash flow now from our Segele mine and the boutique mining that we are developing. So though Ethiopia, we only have one asset in Ethiopia so far, and we do have the ambition to become a leading player in the Ethiopian mining industry over time. Next slides, please. So looking more into the project and where we are, we do have significant exploration and high margin production here, gold production potential.

Jørgen Evjen

executive
#3

If you’re not acquainted with this project, the map is visible on the right-hand side. Our position is near the South Sudan border. Addis is roughly 700 km away. A tarmac road now runs the entire way, and we have our own airstrip. Access to the area and to the site is easy. It’s a really lovely, beautiful place in which to work. Very calm. During the last 13 years of working there, we have never had any incidents. Although there have been several conflicts in other parts of Ethiopia, we have so far had no issues, and we don’t expect any in the future either. So it’s a very nice place. We have what we need, and we have the most important thing, a mineral resource estimated by SRK, which is quite astonishing. It’s a small resource, but even so it’s a very high grade, as you can see here: 41,000 oz at 40.6 g per ton, which is the indicated part, and the total inferred and indicated is close to 69,000 oz, with an average of 22.7 g per ton. So for those familiar with the industry, and of course for those who aren’t, you know that you can run a mine at 1.5, 1, depending on up to 2, 3.

Jørgen Evjen

executive
#4

That's roughly what the industry typically delivers, so our figure sits well above it. And at that level the mine remains open, plus we hold plenty of near-term targets close to the mine for exploration. In fact, we received some highly encouraging results today. Helge will go into more detail on that. We've completed the first production from the Segele mine and the ore body. We hit the ore body last week, and from here on we'll be producing from it as we move forward. So the estimated free cash flow remains approximately $50 million from the Segele mine. It rests on the current resource estimate and the scoping study. The details show why we've been able to generate such strong cash flow from this small resource — it comes down to the high grade, which in turn gives us a very low all-in cost. Matt will cover the exploration side in more depth, but we do hold an ambition to establish a 1 million-ounce potential — a 1 million-ounce deposit. We've identified several targets, and we're also making some changes to our exploration philosophy and strategy. Let's move to the next slide. Thank you. For us, it's all about doing it right. It's part of our DNA and how we work, all the way from the board and our shareholders and investors, down to operations on site and camp.

Jørgen Evjen

executive
#5

These are only a handful of the initiatives we have underway, which are highlighted here, but our ESG team is also deeply engaged in the broader development of the company. They are collaborating closely with the processing plant team to ensure we have solid plans in place for managing the cyanide. We do have monitoring plans, so our ESG efforts reach into every part of the organization. So these are merely some of the projects that you can see here. We've launched a tree nursery. We've been constructing eco-brick houses. We are setting up a small solar grain mill for the Women's Association. We just received some results today. You can see a few bricks here. They're produced from the Hydraform equipment that we have on site. We now have people being trained there at site. This is a very interesting technology that we're developing with the local community. And what we're looking at here, actually, the three bricks in the picture, the bottom picture here is made from the tailings that we've had from the first production. So we intend to use a lot of the tailings in making bricks, which will be a good... It will be a good project, for the community and will be very good for us also to be able to reuse the tailings and not continue, piling up.

Jørgen Evjen

executive
#6

That's part of getting it right, and we take a lot of pride in it. In Indaba, we received the ESG Nature Award. At Mines and Money, we came in second place twice for ESG Explorer of the Year, so we're quite pleased to keep building on this program. Please move to the next slide, and thank you. Now, on the key events: Q3 isn't all that interesting at this point. Attention is mostly on what has happened since then. Still, I'll note that we had a solid site visit the other day together with MKS PAMP. So a solid plan is now in place for moving the gold out, selling it, refining it, and then selling it, and returning the money to the company. That trip we took was a really good one. So we're eager for the first trip with MKS and to see what comes of it. I've put in this little teaser image here, and Helge will say more about it. It came fresh from site today. It shows the latest production and some of the interesting things going on at site. As for what has happened since the third quarter, clearly the gold price is at an all-time high, which lines up nicely with first production from the Segele Mine.

Jørgen Evjen

executive
#7

Lately we've been putting a lot of effort into the mining side — not just taking over operations from IW Mining, which went really well, but also doing a great deal of work to rectify and fix the errors they made, unfortunately. So at the outset our strategy, of course, was to cut risk as much as possible on the mining front, and that's the reason we opted for the contract miner. Unfortunately, that landed us in a very — well, not the place we wanted to be, and they missed the trajectory entirely. So Helge will go into that a bit more, but it has been fixed, and last week we hit the ore body, and we're extremely happy about that. That, of course, cost us a lot of delays, which will have an impact on our funding strategy. As you can see here, I have, we have noted here that we have begun a funding dialogue. We potentially both see whether we need advisors or whether we, or whether we, do this on our own. But there is a funding need that we are looking to secure up to $5 million. I assume most of this will come from existing investors, but we will get back to that once we have more, more information.

Jørgen Evjen

executive
#8

We have indeed launched a cost reduction initiative, and given the circumstances we find ourselves in, that is simply to be expected. At this point we are putting substantial effort into a few of the biggest difficulties we have faced, and those are tied to procurement. Operating in Ethiopia is not simple at present. Inflation is running high, and obtaining ordinary consumables as well as spares there is difficult. That said, I believe that as we move ahead, following the recent deal Ethiopia reached with the IMF and a number of its partners, they have at least secured some breathing room on servicing their international debt over the coming two years. We are also seeing the new governor of the National Bank of Ethiopia putting in hard work to advance the economy, open it up further, draw in additional investors, and do the right things. So we hold a very positive view that this will bring about changes in the economy as we go forward. ... After that, I think we will hand over to Helge, who will walk us through more on the operational side and the mining side. So let's move to that section.

Helge Rushfeldt

executive
#9

Thanks, Jørgen. Yes, as was just mentioned, we've finally hit gold. The very first gold came out of the mine known as the Western Winze on November 27 — so roughly a week back. Over on the right you can see a photo of that very first gold we pulled from the mine. The ore was intersected precisely where we'd anticipated it would be, which confirms the resource sits where we thought, and that our calculations were right. That gold has since been hauled to what we call the ultra-small plant, a pilot plant for the initial test production. As Jørgen noted, we did hit a fairly significant setback in mining at this Western Winze. It actually took around two months to fully recover from what was essentially an angle error in the inclination of the shaft as it goes down. That meant plenty of extra excavation, securing, and ripping to get things back on track. But we're back on track now. And we've now shifted from contract mining to owner-operating mining, with a very fully functional and highly competent team. We're now running the entire mining operation ourselves, and it's going very well.

Helge Rushfeldt

executive
#10

Naturally, there are difficulties we face. Procurement is one item that came up. Simply obtaining standard consumable spare parts and similar items can prove rather difficult. That presents a problem for us. Still, I would say we are determined to resolve this particular difficulty, and our performance improves as we proceed. Operating in Ethiopia is not simple, yet were it simple, everyone would be doing it, and we did not enter this for what is simple; we entered to learn, to overcome, and to improve at it. The unstable nature of the surface rock has likewise been a considerable difficulty. Nearly to 15 m, 20 m, it is heavily eroded, which raises safety issues and may result in rock slides and so on. This means our safeguarding and securing must go well beyond what we had anticipated. Once more, though, we have that under control, and our grasp of the formations keeps improving. In addition, the quantity of water has been one of those matters that has run far above our expectations. The weather patterns have shifted as well, so typically November and December bring no rains, while this November and December we have experienced very heavy rains.

Helge Rushfeldt

executive
#11

Alright, this is out of the ordinary. When it rains here, it truly pours. Normally that kind of thing would cause flooding and similar issues. That said, we're taking lessons from our operations, and our pumping capacity and all of that will be increased so we can keep this in balance. Yes, we've now hit 55 m at the Incline Shaft — that's the main shaft, the one that will be producing in the future. The Western Winze has reached 46 m, and that's where we've hit gold, while the Eastern Winze — which will run roughly parallel to the Western Winze and assist us with production — is now at 31 m. Okay, next. This is merely a schematic picture of roughly what went wrong with the mine contractor we had before. The red lines show how it appeared from the moment we took over. Why it happened is a long and complicated tale, and I doubt we'll ever get a truly satisfactory explanation. Even so, it's a huge problem for us: where we ought to have had a normal 45-degree straight descent, it abruptly straightened out and became nearly horizontal.

Helge Rushfeldt

executive
#12

There was a great deal of fixing needed to get things back on course. Today we're completely back where we should be, and we've arrived at... What you're looking at is the initial section of this ore body — the orange-colored part there. Our shaft has reached the level shown there, so that's the upper portion of the gold ore. So at this point we're inside the ore, and we've begun mining within it. Next. This is day one for gold, so our mining crew is delighted. Tsholofelo, the woman at the center there, serves as our mine captain, and she led the team underground to bring out that first gold. So that's the genuine first gold ore rock they're holding there in their hands. And over on the right, we can see the initial gold ore getting loaded onto a truck and taken to the ultra small plant. Yes, next. And this — I'm nearly tearing up a little watching it, since this photo reached us only this morning, so it's completely fresh right now. And what you're seeing here is an image from the shaking table. That's why it isn't 100% clear, because it's moving all the time.

Helge Rushfeldt

executive
#13

What you're looking at is the gold-colored line running through the center, sitting between the black on one side and the gray on the other. That gold represents the first high-grade gold we've produced, and being able to show it and state today that we've now hit this level — that we can turn out proper gold from our own ore, from the resource model — is a milestone for us. So this marks a major step for us and for Akobo. It also proves the concept: not just that we've reached the resource and reached the ore, but that with that, we can mine it, we can extract it, and we can produce it in our plant. So this makes all of us very happy. Yeah, next. Back to the mine. Here we have a few pictures from the operation. I think it matters to show how we work. Up on the upper left, that's the morning meeting. Each day we begin with a safety meeting in the morning, going through incidents, going through what we'll be watching for in the mine, and making it a safe and good workday. As just one example, down on the lower left, this is actually taken when you stand at the bottom of the mine and look up — you can see a hole in the roof, and that hole wasn't made by us.

Helge Rushfeldt

executive
#14

What happened there was artisanal miners going down to a fairly significant depth. In other words, people whose only equipment is their hands and their tools managed to dig a hole deeper than 20 m, which is pretty remarkable. Of course, this creates certain problems for us. We never designed for them to be in those spots, yet they are definitely there. Still, those are exactly the kinds of situations we must anticipate and deal with once we encounter them. Over on the right, you can see the mine face immediately following blasting, and then geologists are examining that face searching for the ore and, well, also checking stability and so forth at the mine. Yeah. Ramp-up at the mine should come around May. That is the point when we have the usual route for ore established, with the incline shaft being worked on and properly installed. So up to that time, we will be producing gold in limited amounts from the western and eastern winzes while we develop those two sections. Thank you. Next. Turning to the processing plants, we have at this point all the major structures standing. As the pictures show, it is beginning to resemble a real plant, with connections, pipework, and all of that finished.

Helge Rushfeldt

executive
#15

A few tasks are still left. The primary ones involve the electricals, the generator installation along with diesel infrastructure, the water pipeline, and the tailings storage facility. Next. The electricals are moving along quickly at this point. Here you can see these container units — the MCC, the Motor Control Center. So each motor, each engine, all of it feeds into this unit and gets controlled from there. This is a fairly manual operation as far as control goes, and there's a solid reason behind it. Running a manually controlled plant of this kind is simpler when you're located very far from any sort of assistance and other infrastructure. That makes it easier to operate, and we'll have a solid crew at the plant to run it once it's operational. So at the moment we have several kilometers of cable being pulled each day. This is the point where it all gets connected, and once the generators are running, we'll move on to the commissioning phase. Next. Yeah, here's another image showing the crushing circuit. The plant's key metrics: it's a 10 tonne per hour plant, and it has been built in a way that makes upgrading to a 20 tonne per hour plant easy, should you wish to.

Helge Rushfeldt

executive
#16

When it comes to the main plant, recovery is going to be 97.2%, and peak production will reach 4,000 oz each month. By contrast, the pilot plant's capacity sits at roughly 1 tonne per hour. Our estimate — and this is really just a ballpark number — is that gold recovery there is about 50%. The tailings will be handled by us: we'll run the tailings coming from the pilot plant through the main plant afterward, so that the remaining gold gets recovered and nothing goes to waste. The chief cause of that lower recovery is that the pilot plant lacks — what it doesn't have is the chemical section of the plant. Only gravimetric separation happens there. Okay, next. Here are a few pictures of the ultra-small plant. And this is where we've now managed to extract the gold that appeared in the picture a moment ago. There are some options for us to scale up the capacity on this plant, or to make it somewhat larger, but we're still waiting to see whether that will be needed at this time. Next. Yes, lastly, I wanted to show you the tailings storage facility. We're constructing it at the moment, and it will be finished by the time we start up the plant for commissioning.

Helge Rushfeldt

executive
#17

This also shows nicely how our team collaborates with the ESG group and everyone on the Akobo team to secure this permit for this one in record time. Getting this permit took us just a few weeks, since it contained no errors. Everything was completed the way it should be, and all of it was in order. So we hold the full competence in-house, and we have everything necessary to run this safely and avoid any incidents of spillage or anything of that kind going forward. So this is an important part of keeping our promise to be green and to have no pollutions or anything of that kind near us. Yeah, so there you see our lead civil engineer, Faisal. He takes pride in the work he's doing with TSFs and all the other construction work around our area. I think that was it from me, Jørgen. Muted.

Matt Jackson

executive
#18

I believe it's my turn to speak now.

Jørgen Evjen

executive
#19

Matt, over to you.

Matt Jackson

executive
#20

Yeah.

Jørgen Evjen

executive
#21

Happy to do that.

Matt Jackson

executive
#22

Thank you, Jørgen, and many thanks to you too, Helge. Having Helge at the helm of the mining operations team is wonderful, since it has let me turn my attention back to expanding the company, which clearly stands as a very important pillar of our strategy. As a lot of our regular viewers are aware, we hold the ambition of turning into a leading player in the Ethiopian mining industry, and we are definitely on track for that at this point. Right now, I believe it makes sense to say a little about our exploration strategy and explain why we think we will turn into a leading player in the Ethiopian mining industry. Of course, plenty of exploration geologists are familiar with this, and for us it is standard knowledge. But I would like to expand slightly on the thinking behind this strategy. So, to grow the company, generate more mines, and build a larger resource base, there are three things we must do. We must be exploring in the right locations. We must be, as I would put it, tipping the table to success, which is entirely about having the right flow of projects, and we also must have the right technology along with the right logistics.

Matt Jackson

executive
#23

To start, we're doing exploration work in the Arabian-Nubian Shield, and that's a really exciting region for us to be operating in. I'll get into that a bit more shortly. It's a greenstone belt that hasn't been explored. On top of that, we're reviewing acquisitions for potential licenses across the whole country too. Our focus isn't limited to southwestern Ethiopia. We already hold a fairly sizable exploration license covering 182 sq km, and we've got a substantial pipeline of new targets. We're also pursuing additional licenses, both countrywide and further north within the Arabian-Nubian Shield. And when it comes to improving our odds of success, applying probability the right way, we're conducting a smart review of our projects to confirm our capital is going into the best spots. On the technology side, we own our own drill rig. A lot of exploration companies can't say that, but we run ours ourselves at under half the cost — the operating cost of running it. We also possess some of our own geophysical equipment. We've just taken delivery of our own lab as well, and I'll cover that later. And naturally, we have a camp and transportation system that's fully operational, all of it situated in the Arabian-Nubian Shield.

Matt Jackson

executive
#24

And since our team has spent 15 years working in this area, we possess geological knowledge and experience regarding the geology, structures, alteration, and mineralization present there. So in this portion of the Arabian-Nubian Shield, we are very, very well positioned. When it comes to tipping the table towards success, what we mean here is having the right flow of projects into the company. Now, on the left-hand side, you'll see sections for concept and desktop targets. A lot of our targets fall into the target generation and early stage drilling category. Of course, between the early-stage drilling category and having a mine, you need to do advanced drilling, resource definition, and feasibility studies. We've been through all this with the Segele mine, and now I'm very, very delighted to see that it's actually producing gold. So, we have many targets in the target generation and early drilling phase, and then we have a mine. So what we need to do is to... What we will be doing from now onwards is doing a very careful prioritization of our drilling targets, to analyze which ones are the most likely ones to take us towards the next mine.

Matt Jackson

executive
#25

So that's going to draw on expert knowledge and careful numerical analysis through a system called Resource Range Analysis — a system that major mining companies developed. I was involved in using it at BHP Billiton. And it will let us prioritize our targets and decide which ones we should focus on to move them toward advanced drilling and resource definition. What we'll also be doing is filling up the left-hand side of the funnel as well. That means developing more conceptual and desktop targets, and also claiming more licenses, as I mentioned earlier. Obviously, we've had some great success with gold. We're also looking at extending that to copper, nickel, cobalt, and lithium. Many of those are considered to be battery metals and critical metals. We believe that there's opportunities for those in the area, both nationwide and nearby where we're working now. So we have some exciting news, which we're hoping to bring out about that soon. With regards to the Arabian-Nubian Shield, this is considered to be one of the best regions of the world to explore for new gold deposits. There was 1,000 kg of gold extracted in the 18 months in a period of 18 months right above where we have recently produced gold.

Matt Jackson

executive
#26

And artisanal miners did that in an informal way. Four hundred kilometers east of our project sits the Lega Dembi Gold Mine — the sole other gold mine currently operating in Ethiopia. Segele is only the second commercial gold mine ever in Ethiopia. Four hundred kilometers north — well, 300 km to 400 km north — you'll find the Allied Gold project and the KEFI Minerals project, and both are very near to closing their financing at this point; they're large-scale gold mines, each with several million ounces. Between our project and KEFI Minerals' Tulu Kapi, exploration has been very, very sparse. In fact, essentially none. And as I mentioned on the earlier slides, we're in a position where we hold geological knowledge, all the equipment required, and all the logistics in place, ready to explore that region. I can say with confidence that very, very few companies are positioned with this logistics, this capability, and this knowledge in a Precambrian terrain that is prospective for large-scale deposits. We got a head start on this back in 2010. So now we're seeking to leverage our position so we can make new discoveries.

Matt Jackson

executive
#27

I’m really glad to say that during the next calendar year, I’ll be pushing very hard on this. Here’s a quick update on the targets we have within our current license area. Those are the dots on the funnel diagram you saw on earlier slides. Each of these coloured rectangles, of course, represents a different target. A number of them have been drilled, while others have not. We have high-grade results from grab samples and from drilling, and these are the targets that now need to be prioritized so we can decide which among them are most likely to advance toward actual mining... you know, we have indications of fantastic grades similar to the great, fantastic grades at the Segele mine, and we have some indications of possible large-scale resources that might be found in some of these. So it comes down to prioritization—analyzing where we are most likely to spend, where we can get the most bang for our buck, as they say. One target we haven’t discussed much lately is the West Segele target, and it has been the focus of intense exploration over the last couple of months. We did put out some news on social media that we’d found a 24 g gold nugget in a trench at West Segele.

Matt Jackson

executive
#28

Here's an image of it. West Segele is showing us something tempting. We've put in a fair number of trenches — 600 m of trenching — and what we're seeing is a sheared type of ultramafic rock carrying gold nuggets, which we recovered by panning those sheared ultramafics. Right beside the Segele mineralisation at the mine, we observe sheared ultramafics with gold that look very much the same. This project sits 1 km-1.5 km away from the Segele mine, and the task before us is to solve that puzzle so we can determine where to drill across this area, and thereby discover any mineralisation nearby, at depth, or somewhere in the vicinity. It's a thrilling puzzle and we're putting in hard work on it. I've spoken about Gingibil previously, of course. This one is clearly very exciting too. To recap, it's a 10-minute drive from Segele. We carried out some bulk sampling here earlier, and it gave us interesting results. Once we looked at those results — well, if you factor in dilution along with the recovery levels at the ultrasmall plant — we should be expecting open pit grades far, far below those of the Segele mine, yet interesting all the same.

Matt Jackson

executive
#29

Basically, at surface we’ve got loose quartz fragments containing those grades, and at depth we’ve also been able to match up some of the intersections encountered during drilling. That data is going to feed into how we prioritize and assess things, comparing all of our projects side by side so we can figure out the best way to allocate our resources. As for the surface mineralization, a complete trial mining plan is ready to go. In essence, we’re planning to extract 6,700 tonnes of the loose material sitting at surface. That only takes in the loose material visible in the picture on the left-hand side. And once we make the call to go ahead, we’ll extract it with excavators and carry out some assessments of the operating cost involved in pulling that from these gold-bearing quartz floats at surface. In essence, we can build a cost analysis for this project by producing and extracting gold from those 6,700 tonnes. So that’s clearly exciting, and, you know, once we have that underway, it could potentially generate a new ore feed for the processing plant at Segele. One more part of our strategy — and the final thing I’ll cover in this part of the presentation — is how we’re applying technology.

Matt Jackson

executive
#30

Of course, we possess our own magnetic equipment, and that has been employed at Gingibil lately. That is a big help, and we also own a drill rig. Plus, we have recently received a system known as the DetectORE system. A lot of our existing shareholders are aware that we must wait two or three months for the analysis — the assays of gold from the core and the samples we collect — because previously those samples had to be cut from the core and sent to various different countries around the world for specialist analysis. That takes two or three months. The DetectORE system we now have is a brand-new, award-winning technology, and it will be used first for process control at the mine itself, to make sure that we have rocks containing gold going into the process plant, but it will also be used for exploration. And instead of taking two or three months to get the results back, this takes as little as 24 hours. What that means is that instead of waiting two or three months to find out whether an exploration project is good, whether we have gold in the core, this means it takes days.

Matt Jackson

executive
#31

So here's an example that shows what this actually means in practice. In theory, we might collect samples on a Tuesday, get a handful of results by Wednesday, then return on Thursday for additional sampling. The effect of this is that you dramatically shorten how long an exploration project takes to develop. Now, this system isn't JORC-compliant at this point. That means we currently aren't able to publicly release these results, but it does allow us to rank targets fast, examine targets fast, and internally we'll identify which ones are good enough for mining far more quickly — though afterward we'll still need to carry out the JORC analysis, the JORC-compliant analysis. So, a lot of us are aware that it has taken a good number of years to go from first discovering the mineralization at Segele through to the mining site, and much of that period went into resource definition. There's potential for us to speed that process up considerably. So that means we've — we now have the capacity to move many exploration targets that sat in the early stage drilling area into resource definition far more quickly, and so I'm really looking forward to seeing what comes out of this.

Matt Jackson

executive
#32

Thanks so much for your time — and Jørgen, I'll hand it back to you now.

Jørgen Evjen

executive
#33

Thanks, Matt. That provides a really solid picture of where things stand on the exploration front at the moment. We are pulling back somewhat, taking a wider view, and looking further ahead than we have before. So I am quite pleased that Matt is now in charge of this area, and we will keep building sound strategies on that front. Turning to the financials, we will walk through a few of the main items. I won't cover every detail. If anything comes up, my suggestion is that you get in touch with me. As you can still see, we remain in the development phase. My expectation is that in the next reporting we will show revenues, given that we have now seen the gold. But thus far in Q3, we will have... We only have cost operation, and the movement there also mirrors the fact that all operating costs are now being placed in the profit and loss statement rather than on the balance sheet, the way we did before. There is movement in equity and debt. Our equity is negative as of Q3, though that does not concern me. We will work our way through it, so it is nothing to be too worried about.

Jørgen Evjen

executive
#34

We’ve got a solid foundation, strong shareholders, and a solid project, and I believe things will keep moving along as they are, and we’ll come up with solid answers down the road to resolve this. Next slide, please. And just a quick recap of the corporate structure and our largest shareholders. As we mentioned earlier, we’re listed on the Euronext Growth, and we also have a listing on the Frankfurt Stock Exchange. We’re now trading on the OTC Market. Just to comment on that, we gave our first investor presentation yesterday to the U.S. market. So that’s the first marketing push we’ve made toward the U.S. market. So, we’ll see how that goes. This isn’t something that will happen overnight with a huge increase in liquidity from the OTC market platform, but it’s a long-term investment into that market. And it fits well with where we are right now and the stage of the operations, and we’ll keep working with the OTC market to get our information out. And I can just give a... Just to mention that we’ll do Indaba Mining in February. That’s a big event, and we’ll also take part in the biggest mining conference on the mall, PDAC.

Jørgen Evjen

executive
#35

There will also be a booth for Toronto in March. So over the coming quarter, we'll be quite active out in the market. As you can see, the top shareholders remain the same — our shareholder base is very stable and supportive. Let's go to the next slide, please. Yes, I'll leave these key metrics up for you to read, and I think, given how much time we have here, that you can dig into the details, along with the financials that come on the following few pages. You can read more on that in our report — the Q3 report — which is available on our website, and also alongside today's release. So with that, I think we'll move into the Q&A section and take whatever questions have come in.

Matt Jackson

executive
#36

Could I go ahead and read the questions out loud?

Jørgen Evjen

executive
#37

Yes.

Matt Jackson

executive
#38

This question we've got here simply reads, "Size and value of first sale and practical logistics. Sold locally or internationally? Payment terms." So it's a big, wide-ranging question—really broad.

Jørgen Evjen

executive
#39

Sure, I can address that. Regarding the volume and scale, we’ll need to follow up with you on those details. On the logistics front, though, we now have a partnership in place with MKS and Brink’s — the largest security and logistics provider globally. We’ve completed test flights and made the trip. So essentially, we’re able to produce and have gold prepared by Friday. It gets shipped all the way to Switzerland, arrives at the refinery, undergoes refining, and we receive payment back, perhaps by Tuesday. That’s the cycle. It’s quite a fast cycle. This isn’t very complicated. Selling locally to the National Bank is, of course, an option. But the arrangement we currently have is to sell through MKS PAMP, an LBMA-approved refinery. That’s important to note, because without LBMA-approved gold, you can’t sell it on the spot market at the London stock exchange. If you sell to a refinery that isn’t LBMA-approved, or to someone else, you’ll lose a significant amount of money on the gold sale.

Jørgen Evjen

executive
#40

This matters a lot to us, and it aligns with the ESG profile and with doing things properly. It's a significant piece of our business, and, you know, even a discount of just 10%-15% on being unable to sell at spot makes an enormous difference for us. So this is a really solid setup that shouldn't pose any problem at all for us as we move ahead.

Matt Jackson

executive
#41

Okay, moving on to the next question: at present, what number of drill rigs are in operation? Well, clearly we have 1 rig that is operational and functioning, and that unit has in fact been halted for the time being, purely so we can concentrate on the mining operation. And as I mentioned, of course, during our presentation — in the presentation I gave — the priority at this point is ranking the targets so that the correct ones can be lined up for advanced drilling. Yes. So there's another question here, which asks: what is your view regarding other international miners and the potential of the Ethiopian mining sector overall? Jørgen, would you like to take that one, or should I?

Jørgen Evjen

executive
#42

Absolutely. No, no, I’m glad to address that. We enjoy a solid relationship with many of the other—well, there aren’t all that many, but those partnering with us in Ethiopia—we are certainly witnessing ongoing changes and improvements from the government and on the legislative front. This mining sector is a top priority. It’s one of the pillars in their ten-year plan that will help ease the difficulties they face with foreign currency exchange. So we receive full support, and everyone else now receives all the backing they require to advance their projects. So if you look at the map at present, if you look at us, we are now a producer, with Lega Dembi already producing. KEFI, Allied Gold—they just went public on the Toronto Stock Exchange here a month or two ago, $1 billion valuation. Their Ethiopian project is their number one priority on the exploration side. We still see major companies such as Newmont holding licenses in Ethiopia. So I think we are at the start of opening up the Ethiopian sector and increasingly so. Once someone begins, that’s how mining works, once someone begins, the rest will follow.

Jørgen Evjen

executive
#43

And given the position we hold, I think we'll be an appealing partner for prospective companies in the future that want to explore Ethiopia.

Matt Jackson

executive
#44

All right, that brings us to the final question.

Jørgen Evjen

executive
#45

All right, so let me give a quick recap. We have somewhat mixed emotions, naturally. Hitting the ore body and generating high-grade gold has us very pleased. From an operations standpoint, that truly matters most. It confirms the gold exists, confirms we can extract it, and we feel very, very confident about long-term output capability and the operation's results. On the other hand, as mentioned, we're running somewhat behind on extracting sufficient tonnage from the mine to genuinely kick off the main plant. So the main plant isn't really... I realize plenty of folks out there are wondering when it will be operational. Well, it's quite near completion, but what's actually holding things up is the mining-side delay and the reality that we must ramp up to a particular level before the main plant can start. So at present, every effort is going toward advancing the underground mine and pulling out tonnage that can support main plant startup. And as a final point, the upshot of all this is that a funding process has been initiated. We're having productive conversations with all shareholders on that matter.

Jørgen Evjen

executive
#46

We'll find a solid answer, just like we have before. This won't bring the project to a halt as such. We'll keep moving forward, and I'm quite sure and confident this gets sorted out very soon. We'll come back with more details on that. So I think with that, we had a very lengthy presentation today. It was also necessary in order to present Helge and to present some of our new thoughts and ideas around the exploration. But with that, I'd like to thank everyone for joining, and we'll wrap up with, yeah, with the recent movie or what film that Matt made, with his camera at site, not long ago, which will give you an impression of what it's like at site, and building the processing plant. So thank you all.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Akobo Minerals AB (publ) transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Akobo Minerals AB (publ) earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Akobo Minerals AB (publ) or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.