Good morning, and welcome to the Q1 operational update. This won't be the usual Q1 presentation. I believe everyone is keener to hear the newest operational updates, so that's where we'll put our attention today. Many things have taken place lately, and we're quite enthusiastic about the most recent development and the milestones we've reached. Joining me today are our COO, Dr. Matt Jackson, and Helge Rushfeldt, who leads Mining and Processing. We'll walk you through the presentation and then take some questions at the end. This time, I'll go directly to the operational highlights from lately. It's been an extremely busy stretch for us, and, as you can see here, we have in fact now finished building the processing plant. It's 100% done. As you also see, one important element we must mention is really the strong and solid backing and cooperation we've had with the Ministry of Mines and other governmental bodies in making this happen. It's been a joint effort, and all of us have worked very hard to get it done. As you can see here as well, we're actually aiming for the start of first low-grade ore production by July, at the end of July.

Jørgen Evjen

executive
#2

This marks a milestone for us — a huge one in this company's history — and we're genuinely excited to present it today and explain more about what we're doing and what comes next. Just to run through some highlights: we've spoken before about tailings, diesel, electrical work, and piping, and all of that is now complete. The team put in a big effort, working 24/7 to get it finished. We're truly proud of all the hard work done recently at site. It was tough, but they really delivered, and now it's all finished. We've also begun phased commissioning at site together with Universal Power and Solar Resources. They showed up a few days ago, and a lot has already happened since. We've successfully synchronized, tested, and operated every generator that will supply power to the processing plant. In fact, this morning we received the first video of the mill being commissioned and running. That's a really big deal for us, and we'll keep going with the conveyor belts and the crusher in — well, today, tomorrow, over the next couple of days. The ore body should now be reached in the eastern decline very, very soon — any day — and that will of course open up access to more gold, or rich gold.

Jørgen Evjen

executive
#3

And that, combined with hitting the gold in the western veins, gives us material to feed through the mill and processing plant in July. We've also brought on DRA Global, a contractor that leads the industry. They'll help us make the mining operation more efficient and lower operational risk, and we're very much looking forward to building that cooperation with them. They're truly one of the major players in mining. We've also put a lot of work into sourcing and logistics, and at this point we have a solid setup with multiple third-party procurement houses or enterprises along with Airland Logistics, and DRA Global is now working with us on the procurement side as well. We've worked hard with our local team, and we should also mention Prudent Logistics, who are a big help to us locally in getting things in and out of customs. So the setup there looks quite good these days. As you all know, we've had some difficulties with diesel supply over the last few months. We have now gotten the license from the Ethiopian Petroleum and Energy Authority for sourcing and transporting our own fuel.

Jørgen Evjen

executive
#4

Combined with the fuel agreement signed with the National Oil Company, this is really going to make a significant difference when it comes to reliable fuel sourcing and always having it available on site. Add to that the new diesel infrastructure we’ve installed there, including some big 60,000 L tanks, and I think we’re in good shape on that front. Earlier this year, we completed a successful restructuring of our debt obligations with Monetary Metals. We turned all other convertible loans into equity. We brought in $5.5 million of new equity, the balance sheet is in good shape, and the restructuring worked out well. Updated mine plan. We’re actually projecting some very solid revenue in the first full month, 3 to 4 months of full production. That doesn’t mean starting from July, but once we’re truly up and running. Still, it says a great deal about the potential in the near mining operations we’re moving into. We also expect improved EBITDA across the first 12 months versus the plan we shared earlier this year. So there’s a lot of positive stuff going on right now, and just watching the mill operate, the generators running, and power going to the plant gives me a good feeling.

Jørgen Evjen

executive
#5

If you’re not very familiar with us, I’ll walk through a few of the slides to give an overview of the company. Some of you know this and some don’t: we’re listed in Oslo on the Euronext Exchange. In New York, we trade on the OTC. Our base is Scandinavia, and our sole asset sits in Ethiopia. There we hold a license covering both exploration and mining in the Gambela Region. That’s in the far southwest of Ethiopia, nearer to the South Sudan border. Over the past few years it has been a good area in which to operate, and that remains true. By now we’ve been present there for 14 years. We’ve genuinely established a strong local foothold. Our ties with the community are good, and so are those with every relevant governmental body, from the regional level—the local Woreda area—right up through the ministries. We think we remain uniquely placed to turn into one of the leading participants in Ethiopia’s mining and exploration sector across the coming five, 10, 15 years. What still excites us so much, naturally, is that our area holds substantial potential for gold production. We hold the exploration license.

Jørgen Evjen

executive
#6

This is an appealing section of the Arabian-Nubian Shield. Gold is expected to be here, and that is exactly where we located it. Our goal remains to build a world-class deposit of 1.5 million-2 million ounces, and we have pinpointed multiple targets that we believe will get us to that point. The mining license we hold offers strong potential for meaningful cash flow from the Segele deposit by itself, but it is also big enough to allow nearby targets to be brought into production, letting us utilize the same production plant and processing plant to develop new areas. On the plant machinery and equipment front, the processing plant is now operational. It is finished, built, modern, and genuinely fit for purpose. And as everyone is aware, we still have a very low-cost drilling operation that we hope will now be back on track. What makes Segele interesting is certainly the very high grade visible here. The Indicated Mineral Resource by itself averages 40.6 g per ton. That is seldom seen anywhere else globally. It remains a small resource, but we anticipate expansion. It is still open at depth, and we have several near-mine targets that will feed into this.

Jørgen Evjen

executive
#7

We therefore anticipate gold output with strong margins ahead. On the basis of the present resource estimate alone, the projected free cash flow from Segele is approximately $50 million. We also have an arrangement in place with MKS PAMP, the refinery, which is going to take care of every logistics element and every refining element, from moving this gold out of our gold room to their refinery in Switzerland and then turning it back into cash. So the setup exists, everything is ready. But what more is needed? We also have to execute properly. This is a component, a significant component, of our company. We have an excellent ESG team at work, putting in hard effort to ensure we comply with international standards and international guidelines. We have created some award-winning programs. We are striving to lead the way by using technology and the newest innovations to truly make our operation as efficient as we can, while also staying within the framework of international guidelines and standards. So this is a highly important component of our business, and this is truly what gives me confidence that we have a strong foundation on which to build. So ESG — Environmental, Social, and Governance — we keep advancing it. They are putting in hard effort as an integral component of the wider organization, contributing ideas, contributing to the development of new projects, whether it be the tailings, whether it be the use of tailings that we hope we can achieve so that we do not need to keep a lot of tailings in storage, but rather use it in producing construction materials.

Jørgen Evjen

executive
#8

We're setting up a tree nursery too, which we'll use to help restore and enhance the environment in the surrounding area. That's also a key element of lowering our footprint locally. Once again, these efforts are part of all our work. Every choice on the mining side gets made in coordination with our ESG team as well. So they'll be conducting continuous environmental monitoring of air, noise, surface, and groundwater as we move toward production. And we're taking part in some high-level conferences as well, recently a global session of the UN Science Policy Business Forum on the environment. So we're putting a great deal of effort into this. Looking ahead on the ESG front, yes, we're working diligently on the mine closure plan. That's something that will be completed shortly. We'll bring on additional environmental performance coordinators to oversee our activities. Everything involving fuel tankers coming and going will be assessed. We're also broadening our partnership with the Link ESG data platform, which will improve training and ensure accurate recording of social, environmental, and engagement data. This has been a valuable tool for us and remains in development, and we see strong potential in it. Last year, we were also building a partnership with Jimma University, Addis Ababa University, and the University of Oslo to map wildlife in the Gambela region and hosting ecology researchers and contributing to biodiversity mapping.

Jørgen Evjen

executive
#9

Plenty is also going on over there. Perhaps we can now dig a little deeper into how things are running. As I mentioned, all of us are feeling pretty — yeah, it has been a solid day and a solid week, with plenty of developments taking place. So at this point I'll hand things over to Helge, who will walk through some specifics regarding the mining operations as well as the plant side. Over to you, Helge.

Helge Rushfeldt

executive
#10

Thank you, Jørgen. Right now at our mine, we've got three winzes sinking into the ground. The eastern winze stands at 66 m of 77 before we begin cross-cutting from the eastern to the western winze. The western winze is at 53 m of 65 — only 12 more meters remain before that one is finished. After that, the incline shaft, which is the long-term plan for hoisting ore out, sits at 52 m at present. We've brought on a Norwegian specialist mine planner, and a few months back he completed a new, updated mine plan for our project. That plan has now been revised to provide early access to a particularly rich section of the ore. So it gives us a really solid start on the mining side. There's no denying we faced several challenges during this first quarter of the year. We ran into import problems, with things taking a great deal of time in customs, et cetera. Matt will return to that later. Diesel availability also caused us trouble, and it got so severe that mining actually had to stop because there was no diesel at site.

Helge Rushfeldt

executive
#11

Naturally, that has affected us significantly. We've also experienced a handful of those severe rainfall occurrences that wash a great deal of mud into the mine, which is tough to clear out and also has a tendency to wreck the pumps. So those are the sorts of issues that are somewhat difficult to foresee. The positive side is that whenever our diesel is on hand and each pump is working properly, mining goes very well. Over the past month, I'd say, we've blasted daily. So that's really strong progress. At the eastern winze, we should hit the ore body at any moment now. The following stage there will involve beginning crosscutting. I want to drive a crosscut linking the eastern winze and the western winze. And once that's finished, stoping will get underway. So we have a trial stope we'll begin with that holds roughly 12,800 g of gold. This serves to test both the stoping method and the plant as well. Then after that's complete, we'll shift into an extremely rich section. Stope number one comes in at 306,000 g of gold. So that is a particularly rich portion of the ore.

Helge Rushfeldt

executive
#12

So yes, we've put a lot of effort into the external factors. Matt will return to a few of those later on in this presentation. Moving forward, we've brought in the global consultant DRA for mining operations to speed up ore extraction. So they have booked flights and will be with us on site already next week, and then they'll begin working alongside us to make the mine haulage even faster than it is today. We're also trying right now to build up a stock of consumables and spare parts so the operation is more robust against delivery challenges. We're also working on a permanent solution to keep rain events from affecting the mine. Yes. So this is the, the new mine plan. It's, if you can start showing it there. So you can see the, the green areas there are the, where we have, come by now. The one on the right is the western winze, and the one on the left is the eastern winze. The one on the left, the eastern winze has come further down than it shows here because this, was made some weeks ago. So the gray, gray ones are the first crosscuts going between the eastern and the western winze, and, the leftmost, light blue area is the first trial stope, and then the next very rich stope is the one you see, at the top right there.

Helge Rushfeldt

executive
#13

Alright, so this is how it begins, and how you'd begin generating gold from the ore. Yeah, I believe we can move on to the next one. This is simply to illustrate what it actually looks like at the mine site. In the picture on the left side, you can see the wall has been marked with red spray paint where drilling will take place, and then on the face. And on the right side, you can see the holes have already been drilled, and then the blaster is inserting the explosives and packing them into the holes so everything is ready for blasting. So this is what's being done daily right now to blast the face as we advance downward toward the ore. Yes. Also shifting over to the processing plant, and this is genuinely exciting for me to be able to present now because many things have happened even today. So that is, this is really, really great. Construction of the plant is complete. All the major items are done. Everything is finished, and commissioning has begun, and we have a plan to commence early production in July. So here you can see, on the left here you can see the large tailings dam has been completed.

Helge Rushfeldt

executive
#14

It's aligned with the black liner right there, so nothing spills onto the ground. And over on the right, our construction and operations crew is standing by, ready to go. Yes. Yeah. So the main thing on recent progress is that the plant wrapped up as of yesterday, and being able to say that is really quite a milestone, and saying it to everyone now really makes it. The big recent developments are that the TSF lining — the tailings facility — is done. That's what you see in the upper-left picture, and it's been fenced and approved by ESG, our ESG department. The MCC control center wiring is finished too, and that's no small feat. The MCC is what you see there, and thousands upon thousands of cables, control cables, run in and out of it. So it's a huge deal. The water pipeline to the factory has been laid. The crushing circuit has been upgraded and completed. All the internal wiring is done, and the gold room is now secured, with walls and doors and everything. So it's ready to take gold concentrate and smelt it into gold bars.

Helge Rushfeldt

executive
#15

So moving forward, there are still a few things happening at the site, though none of them are critical to the plant. The lab is under construction now, and an office building is going up on the site as well. Yes, and commissioning has begun. Commissioning actually kicked off yesterday, in May, essentially filling tanks and so on, to check for leaks and that sort of thing. But the genuine commissioning, I'd say, began yesterday, or the day before yesterday, when the generators were commissioned. So the generators are diesel units that generate electricity for the entire plant. There are five large generators running together to supply sufficient power to operate the mill and the whole plant. So being able to do that is a significant achievement. And I can also report that this morning we determined the generators are complete and fully commissioned. So they're up and running, and that's a major milestone for us in being able to produce electricity for the market. And as you can see in this short video clip, our mill is turning as well. And the reason that matters so much is that the mill is the single machine that consumes the most power.

Helge Rushfeldt

executive
#16

So once you can operate the mill, that means you've got sufficient power for the plant. Basically, this is the test that needs to happen for the MCC and the generators, to check whether they can deliver enough juice for our operation. And this morning, the mill ran for the first time. That's what you're seeing in this clip. So that's a huge milestone, and you're with me today to experience that right now. From here on, cold commissioning is expected to keep going for the remainder of the plant, perhaps until around the middle of July. It's moving faster than I expected. We haven't hit anything problematic so far, but naturally, commissioning is something we always need to give proper time and do correctly. We expect the first material to come into the plant mid to end of July, and first low grade ore production is expected to begin at the end of July. So that's the commissioning from here forward. Yes. Yeah, the plant is ready. The area has been finished. The crushing circuit has been finished. What you see on the left here — and the entire plant is ready for commissioning and then production.

Helge Rushfeldt

executive
#17

Nothing else is required in terms of wiring. No pipes are missing or anything like that. All the pieces are now there so the facility can operate, be commissioned, and run. Testing everything will take time — every motor, every pump, and all equipment at the plant — to confirm it all functions correctly together. But at this point everything is present, and we're beginning to bring things online. So this is a very positive day and moment for us. I think I'll hand it over to Matt to explain, though it does give us useful background on what took place earlier. Matt, perhaps you could continue from here.

Matt Jackson

executive
#18

Thank you, Helge. It’s genuinely remarkable to be here today alongside Jørgen and Helge, particularly after seeing this morning’s news and the videos showing the mill turning for the first time. To underline what Helge said: the mill turning is always an enormous milestone in developing any mine project, and especially for us, since our process plant is the second commercial gold mine ever to become operational in Ethiopia and the first since the 1990s. Getting through every challenge we’ve faced and reaching this point is a very significant milestone. That requires backing from all our shareholders and investors, and from all our contractors — Solar Resources, Universal Power Africa, Airland Logistics, and every other contractor in Ethiopia — and above all from our staff in Ethiopia, who came together to truly make this happen. The gravity tower at our project in Ethiopia is the tallest manmade, man-accessible structure within 50,000 sq km. That area equals all of Norway from Uttar southwards. So delivering an engineering project of that kind is a tremendous achievement, particularly considering the difficulties we’ve been handling, especially across the last 6 to 8 months, in fact.

Matt Jackson

executive
#19

Getting these issues fixed has required the whole team, with everyone pulling together to work them out. This slide focuses specifically on fuel and imports. So the position we're in right now represents a great deal of progress. Over the past few weeks, our operational capability has improved enormously, and I anticipate that this improvement will continue. The graph displays the green bars. Those green bars indicate how much explosive was consumed each week. Every bar represents one week. The orange line represents total advance — the quantity of meters we progress underground weekly, how much farther the tunnels extend. So you can see that we assumed responsibility from the contract miner in September last year, and we witnessed a tremendous lift in the pace of our mining work and in our operational capability. We actually reached a stage where, in total, we were developing 8 m each week. And after that, at the close of last year and during the beginning of this year in Q1 this year, we encountered some significant difficulties. The condition of our mining equipment was getting worse. Every mining operation needs a steady supply of consumables and spares to maintain the rate of advance — the speed at which we mine.

Matt Jackson

executive
#20

We also had to deal with import restrictions. Importation rules and the system in Ethiopia underwent some changes, and those changes created huge importation problems inside the country not only for us but for many, many companies in Ethiopia. That meant we had to change, and it also meant the federal government needed to make some changes as well as some improvements. All of that has now taken place, those changes have come into effect, and we're very glad to report that our systems are now running very smoothly. Unfortunately, there was also a limit on the fuel supply available locally. So we found ourselves in a situation where, just like all organizations, we bought fuel from the local municipality. For quite a period, between April and the beginning of June, that was severely restricted. But I'm very glad to report that we managed to pivot and arrange our own fuel supply from the capital, and we arranged for a fuel truck to be engaged to receive the fuel from the capital as an interim measure. That is now working. We also have an agreement with the National Oil Corporation, and we have already finished a 60,000 L site storage capacity that is ready to take the first shipment, not only from the capital, but from the distribution center in Djibouti.

Matt Jackson

executive
#21

We anticipate getting the initial delivery in roughly a week, and deliveries of 50,000 L will arrive two times per month. Consequently, having reduced the risk to our fuel supply, we anticipate a substantial improvement in our underground mining advance rate. As you could observe during late 2023, we were hitting quite elevated advance levels. From then on, Helge has done a tremendous job getting the mining team into shape, giving us additional personnel, additional equipment and additional pumps. Therefore I hold strong confidence that we can surpass our earlier weekly advance records. To give a bit of specifics on what we've carried out regarding importation: before, at the close of last year, we could source plenty of the equipment and consumables required within Ethiopia. That scenario shifted dramatically and extremely swiftly. So we needed to restructure our approach, shifting mostly toward importing the items we required. Happily, we've succeeded in establishing a system with a firm named Airland Logistics, serving as our sole expediter that coordinates shipments from across the globe.

Matt Jackson

executive
#22

In addition, several third-party procurement firms supply us with quotes. What this new system has shown us is a significantly quicker — significantly quicker — significantly quicker pace when it comes to sourcing equipment and getting it delivered to our team. We've also brought DRA Global on board, and I'll be discussing them shortly. DRA Global is handling supply chain consulting for us. More specifically, one consultant is working alongside us who brings mining-specific supply chain expertise. As a result, we've observed enormous gains in our capacity to bring items in from overseas to our site. We anticipate further gains ahead. This slide simply provides a kind of high-level view of our supply chain system. I have a great deal of confidence that we'll see progress within the coming few weeks and then continuing through the months that follow. A brief point on DRA Global. We take real pride in running what we've previously described as a boutique mine. It's a modest mining operation. It's considerably smaller than many others. Yet thanks to the extremely high grades we hold, we can achieve these outstanding margins and this revenue potential. To turn that into a success, we must be able to tap world-class knowledge and experience in solving problems for mining and solving problems for the process plant.

Matt Jackson

executive
#23

Like I said on the earlier slide, solving problems across the supply chain. Running a mine — any mine at all, be it one that handles 10 tons per hour or one that handles 100 tons per hour — running a mine of any size demands problem-solving that is very fast, efficient, and sophisticated. We're working with chemical processes. We're working with the movement of mass material. We're working with underground mining. The right people have to be in the right places at the right time. Coming from South Africa, the expats come from South Africa. We need solid sourcing of Ethiopians. The overall complexity of what we're dealing with is significant. Over the last 6 to 8 months, we've done a great job solving problems. You can see that the problems we've had have been significant, and we've done a great job in solving those problems. Additional problems will inevitably come, and additional challenges will come. So that's why we are developing a strategic relationship with DRA Global. As you can see, they, they have operated and worked on 50 mining projects, in processing operations and in underground mining. They've worked in 16 countries across five continents. They employ thousands of people.

Matt Jackson

executive
#24

They now bring more than 40 years of experience to the table, and their offices span the globe. So being able to bring DRA Global in and to rely on them for support—to help us sort out the issues we'll face down the road, and also to anticipate the problems we have and to fully de-risk the operation, or to finish the de-risking of the operation—is, is a really great, great asset for us. And I'm pleased to say we enjoy a fantastic partnership with DRA Global and their subsidiaries, Minopex and Senet. So just to give a bit of a picture of what we've done with DRA so far, as Jørgen mentioned, we had the successful refinancing of the whole project. The technical due diligence for that, for Monetary Metals, our largest lender, was carried out by DRA, and that was successful. So they gave us the stamp of approval in order to support the refinancing. So that was fantastic. We've always had successful due diligence assessments. And it's great to have DRA doing that for us again. And right now we have Christo from Minopex, the DRA subsidiary, who's working with us directly and attending all our meetings with regards to procurement and logistics.

Matt Jackson

executive
#25

He is pinpointing where risks lie and assisting us in reducing them. He makes certain our capital purchases are handled correctly. Cost is already coming down and speed is going up thanks to this effort. From an economic standpoint, we are considerably more effective at present. That optimization effort continues. I can see already that we have seen enormous gains. Delivery timelines have been shortened by weeks, and I expect further gains to occur as we proceed. Helge has already noted that the mining consulting team from DRA will be heading to site next week. That is excellent. They already possess some excellent concepts for optimizing and speeding up our present work in the winds. We are also strongly hoping and intending to have them engaged in accelerating the incline shaft too. That will have an enormous effect on how quickly our revenue generation is accelerated. So we are extremely, extremely happy with what we have been doing with DRA so far. We hold continuing talks with them about giving support in other parts of the Segele operation. With their backing, I know that we can get the project completed and delivered as our investors and shareholders expect. So, since some new people may be watching this video for the first time, I have discussed this previously, but I ought to state it once more.

Matt Jackson

executive
#26

Segele is going to bring in revenue, and I'm really thrilled that this will be happening soon. We remain an exploration company, and our exploration license holds fantastic potential. Inside that exploration license sits the Segele mine, and within it we have numerous targets. Shareholders who have been with us longer will recall how enthusiastic we were in the past about working on the Jodu target. We drilled at Jodu South. We found high-grade intersections there. Sorry — we drilled at Jodu Central. We found high-grade intersections there. Jodu South is comparable to Segele in that the grades in that area were quite fantastic and there was a lot of fairly intense artisanal mining there at one point. Beyond that, there are numerous further targets between Jodu and Segele. Gingebil remains very exciting. We have low-grade gold. In fact, over the last year we produced low-grade gold from bulk sampling at the surface at Gingebil. And we have similar targets at Kororima and Mitmita. Also, right near Segele, we have some fantastic targets that excite us very, very much. So over the last six months, our focus has been very much on developing the Segele mine.

Matt Jackson

executive
#27

During that stretch, our exploration efforts have operated at reduced intensity. Even so, our team has remained extremely busy, making the most of whatever resources they have on hand. The map displayed on the right is a newly produced geological map. The Segele mine appears there as the yellow star. Within 1.5 km of the Segele mine, we plan to begin drilling the moment we can. In that zone, we discovered gold nuggets, and the mineralization resembles what we see at the Segele mine. Some trenching is already finished, which assists us in targeting the holes. More than 60 line kilometers of magnetic surveying has been carried out. That work has kept our exploration team extremely occupied. Our drill rigs are almost set to begin drilling out the targets across this area. Our team has pinpointed a specific zone inside the black rectangle situated to the left of the yellow star, and it shares very similar characteristics with the Segele mine. Should we succeed there, this is mineralization that can be run through the process plant which, as Helge's slides showed, is ready to — you know, will be ready, ready to produce within a very short period of time now.

Matt Jackson

executive
#28

This is a really exciting project for us. If you step back and consider the larger picture, we're a fairly small company, and we're positioned in what geologists call elephant hunting territory. The saying goes that if your goal is to shoot an elephant — meaning a big gold deposit — you should head to elephant hunting ground. Well, we're located in the Arabian-Nubian Shield, which is definitely elephant hunting ground. Those mines visible in the green area with the small mine symbol — every one of them represents one of the elephants of the mining industry. Each of these mines has yielded multiple million ounces of gold. The green area is the Arabian-Nubian Shield. Take the Sukari mine, for instance: it produced 500,000 ounces of gold in 2022 and holds a total resource of 15 million ounces. Then there are the Ma'aden mines and the Barrick mines over in Saudi Arabia. So altogether, 48 million ounces of gold has been identified to date within the Arabian-Nubian Shield. And the portion that belongs to us has barely been explored. What's more, we're the sole professional exploration company operating in our section of the Arabian-Nubian Shield.

Matt Jackson

executive
#29

Within the Arabian-Nubian Shield, no other company possesses its own drill rigs the way we do — and, sorry, specifically in the portion of that shield where we operate, our geologists bring hands-on experience and deep familiarity with the local geology, plus every bit of logistics is already in place. Given how fantastic the progress has been at the Segele mine, I now have a great deal of confidence that we will make excellent headway toward our goal of defining a large-scale gold mine within our licensed area and in the surrounding region. At this point, I'll pass things back to Jørgen, who will walk us through what that means for us as a company going forward.

Jørgen Evjen

executive
#30

Thank you, Matt, and thank you, Helge. So, where does this leave us? Well, there's simply a great deal we're able to accomplish in the time ahead. As I mentioned, Ethiopia is the place to be during the coming 10, 15, 20 years. The new mining industry is going to be located here. Plenty of land is available to you. Competition is minimal, and not much is going on at present. And it truly is a genuinely good location in which to operate. We receive considerable backing from every relevant authority. In Ethiopia's economic development, this mining industry really ranks among the top three pillars. It gets a lot of attention. Our small project is going to be a significant piece of that, demonstrating to the world that mining in Ethiopia can be done, even by a small company such as ours, all the way up to Norway. So our strategy is to capitalize on that and to make use of the organization we already have in place. We have in excess of 200 employees. We have devoted a lot of time to developing that organization. We have gone through A to Z. We have gone through exploration. We have gone through licensing. We have gone through, well, constructing a plant and are now moving into production.

Jørgen Evjen

executive
#31

That is valuable — a valuable asset we'll build on moving forward. As Matt mentioned, we remain an exploration company. For us, Segele functions as a funding machine. Naturally, we'll aim to raise the tonnage and the resources passing through the plant. But the primary goal at this point — and where the value lies for our shareholders and investors — is really about growing a bigger, larger resource base. Yet as you can see here, over the short term we're still delivering on the strategy. We have to get the mine truly operating and generating cash. That is something set to happen in the very near future. Over the medium term, well, as I noted, we must establish a solid and attractive resource base, and the cash flow from the mine will be used to accomplish that. We'll examine new license areas. We'll expand the areas we already have, and we hold a long list of targets and things we intend to pursue. And of course, the long-term vision is for us to become the leading player in Ethiopia's mining industry. I believe we can achieve that. Doing it alone is probably not something we'll manage.

Jørgen Evjen

executive
#32

We’re going to look for partners, and we’ll look for the right ones—whether financial, industrial, or a mix of both. And I believe that with the correct setup and the correct partnering, we’ll truly be able to create long-term value here for everyone. That said, naturally, putting money into a company such as Akobo Minerals is a long-term project. As we all know, mining doesn’t happen overnight, and that’s what we’ve witnessed over the past couple of years. So that’s something to keep in mind. We’ll now build this company step by step and expand in the best way we possibly can. So, I think with that, we’ve gone through today’s presentation. I hope at least we’ve given a good picture of what’s happening. If anything is unclear, please get in touch with us. We might then take some questions at the end here if we have any.

Matt Jackson

executive
#33

Yep, there are a few questions that have come in. Should I go ahead and read them out?

Jørgen Evjen

executive
#34

Yeah.

Matt Jackson

executive
#35

Okay, so here's a question we've got: what risks come with repatriating cash, and what have you done to lower them?

Jørgen Evjen

executive
#36

Sure, there’s always some risk when it comes to repatriating cash, but here’s what we’ve done: every dollar of cash we’ve put into Ethiopian mining has been registered as a loan with the National Bank of Ethiopia. And once you’ve registered it that way with the National Bank of Ethiopia, you become eligible to have it repaid. You also get the chance to receive your yearly annual dividend, just like any other company. Naturally, paying a dividend is hard when you don’t have dollars in the company or at the National Bank of Ethiopia. But because we generate our own dollars, I don’t view that as a major risk down the road. There’s also a new directive from before Christmas this year under which holders of large-scale mining licenses — which we do have — will additionally gain the right to open an offshore account. So that’s something we’re already working on with the National Bank. And hopefully it will be in place, yes, within not too far future. So we’ve worked on it; we’re working a lot on that part. That said, cash repatriation is one thing, but we’ll also use portions of the cash we produce to invest into what is really the value proposition here.

Jørgen Evjen

executive
#37

That's meant to grow our resources and bring them up to a level that will draw in the bigger international mining companies.

Matt Jackson

executive
#38

All right, that's great. So here's another question.

Jørgen Evjen

executive
#39

Absolutely.

Matt Jackson

executive
#40

Right, so the market does need updates at a higher frequency. Is that a topic you'd like to tackle?

Jørgen Evjen

executive
#41

Okay, so the market moves often. We just put out an operational update earlier this month, and now we're doing this one. Honestly, I'd say we issue more operational updates than most companies listed on the stock exchange do. Whenever there's news that needs to be announced, we'll announce it when it's there. If there's nothing to announce, well, there isn't really much to do. We do have our quarterly reports, and that's just the nature of how a stock-listed company operates. So I think we're already handling that pretty well.

Matt Jackson

executive
#42

Thanks, and another question for you. Congrats on hitting that milestone — really well done. Do you see any hurdles ahead in securing a mining license for the remaining exploration area?

Jørgen Evjen

executive
#43

No — if it becomes necessary, we already hold a large area. Those 16 sq km, I think, rank among the biggest mining licenses you will come across, not just in Ethiopia but in other nations too. Still, this is a natural progression, and it forms part of the structure of shifting from exploration into mining. Once you advance or discover resources that can be mined, you will be entitled to expand and begin mining. I don't see any issues with that. And the dialogue we have with the Ministry of Mines these days is excellent. And we have all the support to get that done.

Matt Jackson

executive
#44

Great. So if we have time, there are a few more questions. Shall we work through them?

Jørgen Evjen

executive
#45

Uh-huh.

Matt Jackson

executive
#46

Do you feel sure that rain won't interfere with production going forward? That one might be for Helge.

Helge Rushfeldt

executive
#47

Sure, I’m able to field that one.

Matt Jackson

executive
#48

Yeah, go ahead.

Helge Rushfeldt

executive
#49

Yeah. It sounds odd that rain would cause issues, yet that’s where we are. And what we’re seeing at present—also from conversations with local people—is that today’s rainfall events are bigger than those before. So the impacts of weather change have reached the Gambela Region as well. So what we’re doing now is a three-factor barrier solution, with trenches as the first barrier. Then we’re currently building catchment walls to take the water once it comes farther down. And the third and final barrier would be to roof the remaining areas over the winds, so that none of this extreme rain enters the mine. And we’re quite confident that this strategy will all but negate the effects of the extreme rain.

Matt Jackson

executive
#50

Okay, one more question. When exactly will the mine be in a position to supply sufficient tonnage so that the plant can operate 24/7?

Helge Rushfeldt

executive
#51

Right, so at the moment the mine isn't generating sufficient output to feed the plant around the clock. Fair question. What we're doing now — and you saw this in my presentation for the mine under the updated mine plan — is that we'll target the very rich ore first. That way we can start delivering high-grade gold ore to the plant. It's our low-tonnage, high-grade answer to this problem. Moving forward, we're bringing DRA to site to try to accelerate the main. Their main job is to try to speed up how quickly we can get down the incline shaft, which will serve as our main haulage way for the gold. So that's how we're responding. So, to raise the speed of the incline shaft. So we're in a position to haul more tonnage via that route.

Matt Jackson

executive
#52

Great. Does that actually—should we keep going, or?

Jørgen Evjen

executive
#53

Sure. Go ahead and ask a couple more.

Matt Jackson

executive
#54

Right. There's actually a question here that we can address in terms of how we can put things together. What's our financial position, and when do we expect first revenue?

Jørgen Evjen

executive
#55

Alright. So, as you could see from the presentation, we expect to have our first low-grade ore produced by the end of July, and from there we'll ramp up. How much cash that generates in the first couple of months is a bit hard to pin down. And of course that will always affect, or have an impact on, our financial position as well. Our financial position today is good. Our operating expenses have been a lot less than what we planned for at the start of the year. So the financial position is good. We'll have to see what cash we can generate in July, August, and then, of course, we'll have to evaluate from there. But the general monthly operating expenses we have now, after completing the processing plant, are much lower than we expected, and they will also be low, lower going forward. Yeah, so I think that's it. Maybe just the last one here. I think we've answered it before, but it's always good to repeat how the gold will be taken out and sold. So the gold will be produced and it will end up in our gold room as small doré bars, smelted into that. We already have a setup in place with MKS PAMP and Brink's, who will be responsible for flying in, taking the gold out of the gold room, flying it out to Addis Ababa, then to Zürich and to the refinery of MKS PAMP, where it will be refined into nice LBMA approved bars, where it again will be sold on the London Bullion Market Stock Exchange.

Jørgen Evjen

executive
#56

That process alone takes roughly 5 days, starting when the gold departs the site and ending when cash comes in from MKS PAMP.

Matt Jackson

executive
#57

Yeah. That's great.

Jørgen Evjen

executive
#58

I believe that covers everything. Or would you like to — there's one last item here about exploration.

Matt Jackson

executive
#59

Sure, I'll take that one. As you could see in the presentation, we've already observed quite comparable geology and mineralization in that region. There are certain units known as sheared ultramafics, and those appear to actually carry gold mineralization — we've found gold in them. Around the margins of the Segele mineralization, we do in fact find those same sheared ultramafics containing gold. Our geologists are especially enthusiastic as well, because in West Segele they identified a similar contact. A contact is where two rock types meet. At the Segele mine we observe precisely that same kind of contact too. The magnetic surveying we've carried out supports this. That is why we're so eager to drill there. And naturally, should any discovery be made in the West Segele area, the process plant itself is only a very short distance away. So, you know, we already have the team, the equipment, and the logistical setup needed to actually generate revenue once a discovery is made in that area. So that's exciting. Yeah.

Jørgen Evjen

executive
#60

That seems to be all we have time for right now. Thanks to everyone for participating. Of course, we’ll do our best to keep you as updated as we can. It’s going to be an exciting time—an exciting period—ahead for all of us. And July will be our next key milestone. So stay tuned, and thank you all.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Akobo Minerals AB (publ) transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Akobo Minerals AB (publ) earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Akobo Minerals AB (publ) or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.