Jørgen Evjen
executiveGood morning, everyone, and welcome to Akobo Minerals' Q2 Presentation. To anyone who's still on the line with us, I sincerely apologize for the hold-up. I've just come in from an overnight journey out of Addis. Naturally, we ran into technical problems and delays today — on the train here, on the flight, across the board. But we're all here now, and I'll walk you through the most recent developments at Akobo Minerals. I won't spend much time on Q2, given that we've more or less kept you informed each month since that quarter. We'll discuss what's newest. On my most recent trip, the two weeks I spent in Addis, I'm witnessing very positive momentum and progress. The team is putting in hard work. They're doing the right things. The Sutton team managing our mining operations is giving us excellent support. Monetary Metals, our lenders, are providing great backing. We're also receiving strong support from the government, from stakeholders, and from shareholders. I'm delighted to share the latest news. Things look better than ever, the plan is sound, and we are executing on it. We'll keep moving forward. As always, Akobo Minerals is an Ethiopian gold producer — no longer merely exploring, but producing gold.
Jørgen Evjen
executiveWe have been operating in Ethiopia for 15 years. We have gone about it properly, and at this point we are set to take the next step with the mine running and producing gold as well as cash. From here, we will begin to focus more on what lies ahead and on the company's next phase. Turning to the most recent key events, to begin with, we produced 45 kg at the end of August. For anyone awaiting the September report, we are getting ready for smelting and processing over these days. That result will likely be ready within one to two weeks, and things are looking good. We expect our third quarter to be the first quarter in which we actually turn a profit on the operations. We will deliver positive cash flow. That will represent a major milestone for the company following 15 years of what I would describe as hard work. A few of the key points here. We managed 8 kg in July, 7 kg in August, totaling 15 kg so far in Q3. We even achieved 45 g per ton in average grade in July and hitting a purity way above 90%. This is pretty amazing. As you can see, the all-time average is hovering around 20 g per ton, which fits well with the overall grade of the resource.
Jørgen Evjen
executiveGold is still trading at a solid level. I believe as of today — or maybe yesterday — it went past $3,800 an ounce. Down the road, that should deliver a very large boost to the Segele deposit and to cash flow. Will the trend hold? Hard to say. Everything we're seeing points that way, but time will tell. Apart from certain royalties and taxes along the way, any rise in the gold price is simply pure margin as far as the company is concerned. A very significant milestone for us, naturally: EIH, the Ethiopian investment sovereign fund, has come in as a shareholder in Akobo Minerals, putting in $3 million. We'll go through that in more detail a bit later. We also wrapped up our financial restructuring with Monetary Metals, and we have now converted the 2 convertible bonds still outstanding that were held by existing shareholders. A very significant hire for us — Johnny from Sutton. He's our new Operations Manager now. He ranks among the very best available. There's no material he can't pull gold from, and we're already seeing major improvements since he got to site. The team is performing very well these days. Perhaps the most important thing at this moment is the fabrication of the vertical shaft gear — the head gear. Work has begun. It's on track.
Jørgen Evjen
executiveAnother key thing to note is that we're at the close of the rainy season. This year we came through that period in good shape. It takes a lot of effort, and I have to say the team has truly risen to the occasion and performed excellently. Now let's turn to the single most significant project we currently have, namely building the new shaft, which is what will elevate the company to a whole new level. Once that shaft is operational, our revenues will go up substantially. As you can see in these few photos we took not long ago, we were visiting the gold mine site where all the fabrication work is happening. It's underway. It's progressing well. We're already working on the logistics planning. Fabrication will happen at the gold mine site. After that it gets assembled, then taken apart and finally packed into two containers. To give you a sense of how complex this is, for the mine and the processing plant we brought in over 60 containers. What we're doing now is far less complicated than our previous work. I won't claim it's simple, but it's a considerably smaller project, and our local team along with the Sutton team are following up very effectively.
Jørgen Evjen
executiveI have no doubt it’ll be delivered on schedule. The plan is to ship it from Durban to Djibouti, and we do expect it to arrive before the end of the year. This is a close follow-up from our team in South Africa from Sutton, and as you can see, it’s all in progress now. Just to give you a sense of what the head gear looks like, this will sit on top of the sink shaft, the vertical shaft, and you’ll have a, looks like a, well, something you can jump off from. This will be on the ground, and it will be connected to a big winch that will pull the elevator coach up and down that you see in the middle. You see a bit more close up. I’ll also have the elevator in itself will look, and you can see the rails there. That’s for the cocoa pans that will go into the mine or into the ore body. We will have a much more efficient way of taking out considerable tonnage in a very safe manner. This is all progressing well. The other part of this is actually making the incline shaft. Oops, it’s not an incline. It’s a vertical shaft.
Jørgen Evjen
executiveThere's a slight misunderstanding on that point. What we're putting in is a vertical shaft, and it goes straight down. You can see a few images from a different project. What we plan to do is more or less identical. Site preparation has already begun. Heavy machinery is being brought onto that site. First you level the ground, then you begin the civil work for the head gear and the shaft, so it's secure and can bear all the loads moving up and down. A substantial quantity of rebar and cement is currently being purchased and shipped out to site. Then comes blasting, and once construction at the top is finished, we'll take off the first 12 m of overburden, and the following phase will blast down to 60 m initially, then later extend to 100 m or deeper if needed. At that stage, we'll look at deploying the small drill rigs to keep exploring from the bottom of this vertical shaft. Through this shaft we'll be able to reach the entire ore body very efficiently, and it can yield a considerable tonnage. To repeat, this is not an incline. It is a vertical shaft. Here you can see what it will look like.
Jørgen Evjen
executiveTo give you a sense of the volume of rebars and what this will look like, there's a great deal of steel and cement going into the upper section before you get down to the solid rock further below. That comes mostly from the top, where the overburden sits. Once you reach competent, solid rock, the structure won't be like this. Let's go through some of the production and sales progress we've made, and how we're getting paid as well. You can see the development right here. Q4 was very strong for us. In fact, it was remarkably good. At that point we hit a pocket very rich in gold, considerably earlier than anticipated and likely outside the resource model too. We ran into some issues in Q1 and early in Q2. From May and June onward, we saw things begin to improve and truly become efficient. Looking at Q3 here as an estimate, we're projecting at least 20 kg of production. That assumes we hit a minimum target of 5 kg in September. We also hope and believe it's possible to exceed that 5 kg. We'll know more in the next couple of weeks.
Jørgen Evjen
executiveThat's also going to push our gold sales in Q3 to an all-time record. Naturally, two factors are at play: higher volume and a higher gold price. On the right-hand side of this slide, you'll see information that's available on the National Bank of Ethiopia's website. It gets refreshed daily. That's the rate you receive when you bring gold to the National Bank of Ethiopia. Their terms are quite competitive. They pay you roughly the dollar spot price, but in birr, the local currency. To date, all of our deliveries have gone to the National Bank. We're paid in the local currency, birr, and that has worked well for us so far. A large share of our costs is denominated in local currency. We now also have an opportunity that used to be very hard to come by: converting birr into dollars so we can pay overseas suppliers. The foreign currency situation in Ethiopia has improved enormously these days. As you can see here, the record high of $3,800 per ounce that you read about is tied to the LBMA good delivery standard gold spot price, which requires a minimum of 99.5% purity.
Jørgen Evjen
executiveNaturally, we aren’t producing doré bars at that level of purity from the site. That’s the grade you obtain. They send it to a refiner like MKS PAMP in Switzerland. What we’re actually achieving from the doré bars and on-site smelting has tended to fall between 80% and +90% purity. Every day we’re working to raise that purity and secure improved payments for what we ship. It’s important to note that upon delivery, or if you deliver over 10 kg at one time, you’ll additionally receive a 15% premium. Right now we’re trying to plan sales in batches exceeding 10 kg each time so that we capture that extra 15%. That’s also the reason an exact correlation doesn’t always exist between what’s produced and what’s sold on a monthly or quarterly basis. Here you can see where to find the daily rates if you’d like to check what’s being offered each day. Also, to illustrate the gold loan versus the mine’s free cash flow, I’ve received a few questions, and most people believe that, wow, the rise in the dollar or the gold price really leaves us with a very, very expensive and large gold loan in dollars, which is true.
Jørgen Evjen
executiveIt goes up as the gold value rises. At the start here, as you can see, I believe the loan was actually taken at $1,750 per ounce. I've provided an illustration here running from $2,000 up to $5,000. The nice part is that this creates a natural hedge between the resource and the gold loan. When the gold loan's value grows, the deposit's value and the cash flow coming from the deposit grow far, far more. That's a natural hedge. That's how it's designed. As you can see here, there's no cause to be afraid of gold price increases. Quite the reverse — the higher it goes, the better. This is only an illustration using rough estimates. It isn't directly tied to the Segele deposit, but it should give you a sense of it. I mentioned that here, the gold loan is roughly 10,000 ounces. Suppose we produce 60,000 ounces and assume a total cash cost, or total cost of operations, of $1,500 per ounce. You can see here that a higher gold price is better for the project. Let's now walk through the latest financial restructuring we've completed. EIH is, of course, a historic milestone for Ethiopia and for Akobo. The first international investment, I believe, in 100 years out of Ethiopia.
Jørgen Evjen
executiveSpeaking for myself and the team, we're proud that Ethiopia chose to put money into our company. This was a private placement worth $3 million, and all of it flows into the business. They received 15 million shares priced at $0.20 each. Before the loans were converted, that gave them ownership of nearly 7.4%. Once conversion happens, their stake will sit at 6.5%. Another thing that mattered a great deal to us was restructuring the Monetary Metals loan. They are unquestionably a strong partner for us — not just regarding this funding, but also when it comes to operations and stakeholder engagement. Their network is enormous, and they back us in whatever way they can. Working with them is genuinely good. As you can see here, we succeeded in bringing the interest rate down from 30% to 22%. That remains a fairly sizable rate, but it is manageable, and it is now folded into the new shaft and the cash flow it generates. Everything has been modeled jointly to confirm this works. During the current period, we get an interest-free window running from August through February of next year. Then repayments begin. Our repayment schedule starts small and increases afterward, giving us the greatest possible flexibility early on as we ramp up and get the vertical shaft started.
Jørgen Evjen
executiveWe don't want that to cause any problems at the outset. They received some additional warrants. Previously they held 2%. That went up to 3%. The warrant's strike matches the private placement price with EIH, so $0.20. As you can see here, the loan may rise to a maximum of 10,490 ounces before default. We won't come near that. Our peak will likely be around 9,500 ounces. Once repayment begins in March next year, it will start declining. In addition, from our supporting long-term shareholders, we have now converted the two loans they granted us earlier. You can see some of the details here, along with the number of new shares from that and the total number of new shares in the company following both the EIH transaction and the loan conversion. Do we keep looking for money now? Do we want to raise additional funds? What does the cash situation look like? The company is in a good position these days with the current cash flow coming out and the strong gold price. We're in a very good position. With the money we raised from EIH, we'll be able to deliver on the gold and on the vertical shaft and keep our operations going.
Jørgen Evjen
executiveNaturally, part of my role involves keeping our attention on strengthening the capital structure and gaining flexibility. Whether anything can happen down the road remains to be seen. Nothing is actually in process at present, though that is something we will always pursue in order to see whether the way our capital base is structured can be improved. Turning to the current mining operations, we are achieving really steady mining at present. It makes me very happy to see that. Blasting is taking place consistently, and on the mining side we are truly performing well. Tonnage is on the rise. At this moment, our focus is actually on blending the high grade with the low grade. A consistent grade serves the processing plant better than one that is very high, very low, or medium. Stockpiling and beginning to blend is part of the job now. To illustrate where we are working in the mine at present, on the right-hand side you can see the various blocks and the areas in which we are working. It ranges, as the yellow parts here show, from 0.94 g pr ton up to some 360 g per ton, nearer the left-hand side. That is extremely rich.
Jørgen Evjen
executiveThat all has to come together so it lands at roughly 20 g per ton, and that's our target. On top of that, we keep opening up new underground zones, particularly the eastern winds. We'll push that further to reach ore at greater depth, which raises our ability to blend and produce a steadier grade from the plant — and that's the ideal situation for the plant. Looking at where the processing plant stands, you can see a photo here of the new shaking table. It's only a trial run, and you can genuinely spot the gold, that lovely, lovely color showing through. That confirms it's functioning and handling very good grade material. We've completed plenty of cleanup lately, with Johnny arriving on site. We've located a substantial amount of gold sitting in the plants. It's being recovered at this point and will form part of the September smelting. We've switched everything over to pure gravity, so there are no chemicals in use anymore. We have 2 new shaking tables. This is one of them, and another sits right next to it. Between them they'll handle all the tonnage coming from the new shaft, and that's our initial focus.
Jørgen Evjen
executiveLater on, we'll assess whether we want to launch the CIL portion of the plant or not. That decision is still pending. They are also refining their smelting methods so we reliably produce high-grade doré bars that can be delivered to the National Bank. As I mentioned before, the September batch is currently being processed, and smelting is scheduled for the coming couple of weeks. We expect, or are targeting, at least 5 kg, and we'll see how much additional, if any, we can extract from it. ESG, health and safety, represent a major part of what we focus on. You can see here some life support training. We're also doing routine things daily, checking the wastewaters, checking noise and air, staying compliant. We have a solid relationship with the Ethiopian environmental agency, and they've completed an audit. They had some minor corrective actions. Those have been implemented, and everything looks good. Health and safety, also very important. We have our own clinic, and we now have Leon, a Senior Paramedic at site from Sutton, who is really driving big changes to the way we focus on health and safety with training, PPE compliance. Also, you can see here, we're preparing a civil unrest plan.
Jørgen Evjen
executiveThe region is quite calm, yet we're getting ready—and no, we aren't being naive about it. People tend to be drawn in by gold. On the exploration front, this truly, yes, sits close to my heart. It's where we began, and going forward that's genuinely where the upside is. The Segele mine is now operating, producing, and generating cash, and it will keep doing so at an ever higher level once the shaft is up and running. Now we will, once again, shift our focus back to exploration. The team has completed a great deal of work. Their efforts have centered on additional mapping, magnetic surveying, soil sampling, trenching, and rock samples. Here you can see some of that work. We have also renewed the exploration license with the Ministry of Mines. Perhaps the key item is this first point. Throughout all this work, we have seen gold observed in the surface quartz vein system, and we've seen it extend all the way down to the northern part of Joru. This, once more, confirms many of the ideas and ambitions we have held. That isn't to say this is a large economically viable deposit, but it gives us a really strong indication that further checking is now needed.
Jørgen Evjen
executiveMoving forward, this will be a very important piece of work for us. I'll come back to that a little later. Actually, right here. The focus now going forward is simply to keep track of the vertical shaft development, make sure nothing slips, and get that going. We're making good progress there. We need to ensure consistent mining. That's what will keep the basis now for our cash flow and make sure we keep the cash we have and maybe also increase it. Again, optimizing recovery and gold purity is very, very important so we don't miss out on what we're taking out of the mine. We will expand the mine to new areas. On the exploration side, we will continue exploring with trenching and sampling and surface mapping. We are now going to recruit a new national exploration manager so that we can strengthen the technical capability of the team. Not only that, but also for us to understand what the national community is more looking for so we can be more savvy and more straight on the target of where to find the next interesting plot to start drilling or start working on. In that regard, we need to refine the exploration strategy, and we really need to work on the project development phase.
Jørgen Evjen
executiveWe’d like to examine three or four areas next. The first, naturally, is around existing Segele, where we continue to think additional discoveries are possible. The second is to pursue the strike visible in the other image that runs across the entire license area. As you can see on the corporate and financial side here, our aim is to secure the Joru license, which has been pending for over a year now. We’re currently in constructive talks with the Ministry of Mines so that it can be awarded. With those three things in place, we truly have a solid foundation for building a robust pipeline ahead. That also requires solid planning and solid project execution. It doesn’t automatically mean we’ll begin drilling right away. More likely, we’ll begin with additional high-level mapping so we can better understand the broader area, and from there move further into the details. Ultimately, once the target is genuinely defined, drilling will begin. On the corporate side, we’re now working to open an offshore bank account that would make international payments easier. I’m very pleased to see and to report that the Ethiopian government and the National Bank are now truly delivering on every one of their commitments.
Jørgen Evjen
executiveThis isn't a simple thing to accomplish. It's possible we're among the first firms to actually establish an offshore account in Ethiopia, and that effort is still underway right now. Down the line, it will be a big help for handling every international transaction. Once more, getting this Joru exploration license matters a great deal to us, and at present we're pushing to finalize the export permit too, so it's ready by the time the shaft begins operating. Every one of these matters, I think, will be resolved in the near future, and that's going to make a substantial difference for the company — both in how we operate day to day and in demonstrating to the world that Ethiopia genuinely backs its mining sector. As you can see, and as I mentioned, we're striving to reinforce our financial standing through an operation that generates positive cash flow. That's the central priority ahead. What does that involve? We'll keep things steady and now far less risky in how we operate. We'll push the vertical shaft forward, and we'll capture value from exploration zones we already hold as well as new ones. On financial performance, we're getting better each quarter. The third quarter should be even stronger.
Jørgen Evjen
executiveWe expect to post our first profit, or at minimum positive EBITDA. Things are certainly moving the right way. Equity and debt are what they are. As cash flow gets better, that will improve too. I'd say we're at the inflection point right now, through to year-end. That really has no impact on us as a business. We're a going concern, and we're paying every invoice and then some. We handle everything—yes—in a way where royalties get paid, taxes get paid, suppliers get paid, and for a mining company that matters to us. Not much has shifted in the corporate structure, other than what you can see at the top of the shareholder list: we've welcomed Ethiopian Investment Holdings. They now sit in third position with 7.38%. As I mentioned, they'll come down to 6.8%—no, 6.5%. There will be some adjustments among all the others once the convertible loan shares are issued. That is more or less happening as we speak. Beyond that, the corporate structure is unchanged. At the bottom left, you can see the company held 9,240 ounces in a gold loan from Monetary Metals.
Jørgen Evjen
executiveWe anticipate that figure rising to roughly 9,500 ounces prior to when repayment begins to kick in. I think I'll pause there for now. Get in touch if you'd like to talk through the finer details of the financial statements. It appears we've reached the Q&A portion now. A few questions have come in via email. I'll need to put my glasses on to read them. What drives the choice of where to drill samples in new areas? Returning to what I said earlier, we now need to bring in a new exploration manager with international experience — someone able to review all the documents and all the data, and genuinely craft a fresh plan grounded in the more modern approach to carrying out exploration work. I'm looking forward to that. Getting that started will really matter for us. Once more, the several exploration areas are showing very promising results. If production from these discoveries gets underway, will tonnage be moved to the main plant by truck, or would a new plant be needed? This license isn't very big. You can drive across it in two hours. At a minimum, we expect that the nearest part — Gingibil and that area — will certainly be easy to send through the existing plant.
Jørgen Evjen
executiveWe don't need to construct a new plant. But if we do—and we're hoping for this—find a deposit of a million ounces or more at this location, and it's a lower grade deposit, that would call for a very different type of plant. What I can tell you is that if we get there, we've accomplished what we set out to do, and we'll be in a position to take that to the next level as well. That's genuinely the ambition we hold at present. Are there any expressions of interest coming in from bigger gold producer majors? It's still early days. What I'm saying these days is that we now need to prove the new shaft, to get up to the next level. We'll produce up to 50 kg a month, and that will really transform the whole—yeah, the whole perception of the company, not just from us internally, but externally too. By the end of the year, we'll have far better visibility on that front. It's really not something we're concentrating on at the moment. We're concentrating on really getting the cash flow up and continuing consistent mining and delivering on the shaft. Beyond the $3 million in capital from EIH, what else do they bring as a partnership? First of all, they're a shareholder just like every other shareholder in Akobo Minerals.
Jørgen Evjen
executiveThat's a key point to flag. Second, naturally, they are Ethiopia's sovereign fund. They carry substantial political capital. We won't misuse that at all. Should we require certain assistance and backing that we believe they're able to provide, we'll request it. We'd also like to keep building this ourselves, aware that we have a solid partner. One item I can bring up is that we're in the process of setting up a joint project, examining this aggregator model I've mentioned previously. Doing that alongside them will be excellent. They bring experience with aggregator models in the coffee sector and in the flower sector. A great deal of knowledge can be contributed by them to that project, and to how we get every local artisanal miner delivering gold to our plants, improving things for everyone. That's likely where we'll begin a tighter partnership, working jointly. When might we see some kind of resource updates? Again, to circle back, we must sharpen our structure on the development side and on the exploration side. After that strategy is settled, answering a question like that becomes simpler.
Jørgen Evjen
executiveIf we handle this properly and focus tightly on just a handful of targets, I believe we can get there — possibly by mid-next year, provided we can get the project started right now. There's a bit of concern regarding delays with the vertical shaft, given the track record. As I mentioned on the first page, what we're doing here isn't comparable to our work to date. We have two containers coming in. We have a vertical shaft — or sink shaft — crew arriving from Zimbabwe, and this is what they do every day. I'm fairly confident that going forward we'll have much better control over this project. Also, as I noted, the rainy season is behind us for this year. There are a few questions about how we'll handle any potential cash surplus down the road, once the debt to Monetary Metals has been repaid. It's a little too early to answer that. Naturally, we'll reinvest a portion. I'm certain there will be some dividends as well, but that's a decision for the shareholders and the board to make when the time arrives. I think that covers it for today. No further questions. Please feel free to get in touch if there's anything you'd like to discuss or ask about.
Jørgen Evjen
executiveTo wrap up, things have never looked this strong. They appear better than at any point before. My view is that we'll keep getting better from here, keep delivering, and shift into this company's next chapter. Thanks for tuning in, and we'll be in touch before long.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Akobo Minerals AB (publ) transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Akobo Minerals AB (publ) earnings transcripts and 133,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Akobo Minerals AB (publ) or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.