Algoma Steel Group Inc. (ASTL) Earnings Call Transcript & Summary
October 29, 2026
Earnings Call Speaker Segments
Laura Devoni
executiveHello, everyone, and thanks for joining Algoma Steel Group Inc.'s conference call covering third quarter 2026 results. I'm Laura Devoni, Vice President of Human Resources and Corporate Affairs, and it's my job to moderate this session. Our Chief Executive Officer, Rajat Marwah, and our Chief Financial Officer, Mike Moraca, will be delivering the prepared remarks. Just so you know, today's call is being recorded, and a replay will be posted later today in the Investors section of Algoma Steel's corporate website at ir.algoma.com. I'd like to point out that what is said on this call may include forward-looking statements under applicable securities laws, and those carry assumptions along with inherent risks and uncertainties. Results that actually occur could differ materially from what is stated today. Beyond that, our financial statements follow IFRS, which is not the same as U.S. GAAP, and today's discussion references certain non-IFRS financial measures. You can find reconciliations of those measures to the closest comparable IFRS measures in our press release, MD&A, and earnings presentation. Yesterday evening, we posted an earnings presentation that goes along with today's prepared remarks. Slides for this call are available in the Investors section of our corporate website. With that said, I'd ask each of you on the call to review the legal disclaimers on slide 2 of the accompanying earnings presentation, and also to look over the risks and assumptions set out in Algoma Steel's Third Quarter 2026 Management's Discussion and Analysis. Please be aware that our financial statements use the U.S. dollar as our functional currency and the Canadian dollar as our presentation currency. Also note that figures mentioned on today's call are in Canadian dollars unless we say otherwise. After the prepared remarks, we'll open things up for a question-and-answer session. I'll now hand the call to our Chief Executive Officer. Rajat?
Rajat Marwah
executiveThank you, Laura, and good morning to all of you. We appreciate you being here as we go over the results for the third quarter of 2026. I'd like to start, as I always do, with safety. Our people were asked a great deal of this quarter. Within just a few weeks, our teams brought the melt shop back online following a power disruption, put a replacement turbine into service at the Lake Superior Power plant, and achieved first arc at EAF Unit 2. Making sure every employee goes home safely each day matters to us every bit as much as any of those achievements. I take pride in how disciplined our teams were during a challenging quarter. Third quarter results landed in line with the guidance we gave earlier this month, and our underlying performance showed further improvement. Volumes hit the low point of our transition as we finished the planned tie-in work on EAF Unit 2 and managed through the outage at Lake Superior Power. Before diving into the details, I'd like to call out three key themes. First, our results: we shipped roughly 145,000 tons and posted adjusted EBITDA inside our guidance range at negative $14 million. If you set aside the capacity utilization adjustment and the insurance settlement from last quarter, adjusted EBITDA was better by about $19 million versus the second quarter — our second quarter in a row of underlying improvement, achieved on lower volume, which Mike will take you through shortly. Second, plate performance. Plate shipments totaled 105,000 tons, about 73% of all shipments and above what we shipped in Q3 of last year. Average net sales realization climbed to $1,510 per ton, an 11% increase over the second quarter on high steel prices. As the only producer of discrete plate in Canada, we keep seeing healthy demand from infrastructure, construction, and defense customers. Plate volume eased from our record 125,000 tons in the second quarter, which reflects the outage and planned maintenance at the plate mill. Third, the transformation: we brought full generating capability back at Lake Superior Power on September 30th, and before the quarter closed, we finished first arc testing at EAF Unit 2. On October 9th, we produced our first commercial steel from the new EAF — a major milestone for Algoma and the product of years of disciplined execution by our employees and contractors. EAF Unit 2 is ramping up now and is part of our regular production schedule. Our attention now shifts to ramping the combined EAF platform toward higher capacity. Let me go into more detail on the outage, since it drove much of what we saw in the quarter: on August 17th, an abnormal condition was detected on one of the two turbines at Lake Superior Power, and it was automatically taken offline. The other turbine was unaffected. LSP provides electricity to our melt shop, so we temporarily halted EAF production to deal with this. We moved quickly with the Independent Electricity System Operator on interim operating arrangements and had the EAF restarted on August 29th. From the moment operations resumed, those setups have kept production going continuously, even through scheduled upgrades to the province's power grid. On September 30, we brought online a replacement turbine we had recently purchased, which brought LSP back to full generating capacity. My thanks go out to the IESO and Hydro One for standing behind us during that stretch. The steps we've taken put us on firmer footing today; under our current service contract with GE, we have exercised the option to place a leased turbine into operation while the damaged unit undergoes repairs. Installation should wrap up during the fourth quarter, and we anticipate no disruption to steelmaking. With the leased turbine running, the recently acquired unit will be available as a spare that's ready to go, which adds redundancy to our equipment and makes our power system more dependable. When the repairs on the damaged turbine are finished, we anticipate that the extra generating equipment will provide greater operational flexibility and open the possibility of growing generating capacity down the road. We took advantage of the outage to bring planned maintenance forward and to push ahead with commissioning of our second EAF. Turning to the wider market, steel pricing shifted favorably for us this quarter across both plate and coil. Plate continues to be the heart of our product mix, a segment where our market position is unlike any other. Coil pricing in Canada has strengthened as well, and we anticipate growing coil sales through the fourth quarter and on into 2027 as EAF output ramps up and market opportunities permit. Direct tariff costs dropped to $18 million this quarter, compared with $90 million a year earlier, as U.S. shipment volumes fell 83% versus the same quarter last year. The 50% U.S. Section 232 tariff on steel coming from Canada is still in effect. These circumstances keep reinforcing our Canada-centric, plate-first approach, and we manage the business for the market as it exists today. On the policy side, I'd like to acknowledge the federal government and the Ontario government for last week's announcement aimed at protecting the Canadian and Ontario steel industry. That measure sets up a new joint steel action fund to assist the industry in diversifying production toward the steel products Canada will require, gives Canadian steel priority in public procurement via the Buy Canada and Buy Ontario policies, tightens enforcement against unfairly traded imports, and creates a joint Canada-Ontario steel task force. Diversification sits at the core of our own strategy. Our shift to electric arc furnace steelmaking and our Canada-centric, plate-first mix are aimed at supplying more of the steel Canada needs from mills here in Canada. Taken together, this reinforces the domestic market that our plate-first strategy relies on, especially in infrastructure and defense. We look forward to carrying on our work with both levels of government on our diversification efforts. We appreciate that ongoing support as we complete this transition and build a Canadian steel industry that is stronger and more sustainable. I'll now hand the call to Mike for a closer look at the financials. Mike?
Mike Moraca
executiveThanks, Rajat. Good morning, everyone. Just a reminder that every figure we cite is in Canadian dollars unless we say otherwise. Let me begin with a quick word on currency. At quarter-end, the Canadian dollar stood at roughly $1.42 against the U.S. dollar, basically flat versus June 30th. The $10 million foreign exchange loss we recorded in the quarter comes from rate movements during the period affecting our monetary assets and liabilities denominated in Canadian dollars. Comparisons between Q3 2026 and Q3 2025 were heavily affected by our shift to EAF steelmaking. In last year's quarter, the company was still making steel at its legacy blast furnace operations, which were permanently shut down on January 18th, 2026. During Q3 2026, every ton of liquid steel came from Unit 1 of our EAF, and output was halted from August 17th to August 29th because of the LSP outage. On top of that, the prior year quarter carried a non-cash impairment loss of $503.4 million. Moving to the results. We shipped roughly 144,500 tons, versus 419,000 tons a year earlier and 181,000 tons in Q2. Volumes came in lower, driven by the faster move to EAF-only steelmaking owing to the effect of U.S. Section 232 tariffs on export sales along with the LSP outage. Shipments matched the approximately 145,000 tons we guided to on October 1st. Consolidated revenue came to $249.4 million, versus $523.9 million in the prior year quarter, including steel revenue of $218.2 million. Average net sales realizations reached $1,510 per ton, a 33.7% increase over $1,129 per ton in last year's quarter and above the $1,361 per ton posted in Q2, driven by stronger steel prices and a larger plate share of our mix, partly offset by a smaller proportion of our premium plate grades during the outage. The cost per ton of steel products sold was $1,492, versus $1,282 in the prior year quarter and $1,411 in Q2, mainly due to weaker fixed-cost absorption on lower production volumes and a larger plate share of shipments. I should point out that this metric leaves out $53.1 million tied to capacity utilization costs. Direct tariff costs in the quarter were $18.1 million, down from $89.7 million a year earlier, as U.S.-bound shipments fell substantially. Adjusted EBITDA for the quarter was a loss of $13.9 million, an adjusted EBITDA margin of negative 5.6%. That compares with an adjusted EBITDA loss of $87.1 million in the prior year quarter, a margin of negative 16.6%, which works out to an improvement of $73.2 million. Q2 adjusted EBITDA of $13.8 million included a $45 million insurance settlement that we'll return to. Without the capacity utilization adjustment, adjusted EBITDA was a loss of about $67 million, roughly $20 million better than the prior year quarter on about 1/3 of the volume. If we look at the previous quarter and strip out the capacity utilization adjustment for both periods as well as the $45 million insurance settlement booked in the second quarter, our results came in roughly $19 million better on volume that was about 20% lower. That marks the second quarter in a row of underlying improvement, and it lines up with the guidance we gave in July. Moving to cash flow and liquidity: operating activities produced $78.6 million of cash during the quarter, versus $79.4 million of cash used in the second quarter. Most of that gain came from a sizable working capital release. Within that, we had $163.9 million of income tax refunds plus a further drawdown in inventories. After the quarter closed, we collected another $35 million of income tax recovery, which is the remainder of the refunds from carrying back our 2025 losses; we also received the outstanding $45 million of insurance proceeds, which finalized and closed out the claim stemming from the 2024 utility corridor collapse. Capital expenditures totaled $67.7 million, including construction spending on EAF Unit 2 and the down payment on the replacement turbine, for which we are pursuing financing over a four-year term. In the quarter, we drew $124.5 million of advances under the LETL facilities, and we applied the cash proceeds noted above toward paying down our revolving credit facility, which was essentially undrawn at quarter end. We finished the quarter with $152.4 million of cash, $232.5 million of unused availability under our revolving credit facility, and $43.5 million available to draw under the LETL facilities. All told, available liquidity at quarter end was roughly $428 million. Turning to the fourth quarter outlook: on volume, we believe the third quarter marked the trough of the transition; with power back on and both EAF units now in our production schedule, we expect fourth quarter shipments to rise by approximately 25% to 35% compared with the third quarter, with volumes weighted toward November and December as we ramp our second EAF unit; we expect a substantial improvement in underlying EBITDA performance, excluding any benefit from the capacity utilization adjustment. Last, on legal matters: after quarter end, we reached a negotiated settlement with Haverhill Coke that resolves the dispute tied to historical coke supply arrangements. The settlement terms are confidential. As previously disclosed, we continue to respond to other legal proceedings connected with certain supply agreements affected by the extraordinary and unforeseen tariff environment. We're not in a position to comment further on this right now. I'd now like to hand the call back to Rajat for closing comments.
Rajat Marwah
executiveThanks, Mike. This team was tested in the third quarter, and it delivered; now that power has been restored and both EAF units are back in our production schedule, we believe the hardest stretch of our transition lies behind us. There are three points I'd like to leave with you. First, our underlying results got better for a second quarter in a row, and we achieved that gain despite lower volume. Plate stayed at the heart of our mix, and pricing worked in our favor. Second, LSP has its full generating capability back, and EAF Unit 2 is ramping up and now part of our regular production schedule. What we're focused on now is ramping both units and getting rid of the transition costs that remain. We head into the fourth quarter with a strong pricing backdrop and additional production capacity on the way. Third, our standing is unchanged as Canada's sole producer of discrete plate. Demand is healthy across the infrastructure, construction, and defense end markets. Once fully ramped, we believe our EAF platform will provide a structural cost and carbon edge through market cycles. I'd like to thank our employees for what they did during a demanding quarter, our customers for their trust, and the federal government and the Ontario government for their ongoing partnership. We look forward to bringing you an update on the EAF ramp-up when we report fourth quarter and full year results. Thank you for your continued interest in Algoma Steel. At this point, we're happy to take your questions. Operator, please give the instructions for the Q&A session.
Katja Jancic
analystHello, and thanks for taking my questions. Perhaps to begin with volume, you said 4Q would be up 25% to 35%. Then, looking ahead to next year, could you discuss how you're thinking about bringing the two furnaces up to speed, or how much volume you believe you can produce next year?
Rajat Marwah
executiveThe ramp is underway and going well. With both furnaces running, you have to learn how to operate them together, since we aren't arcing them at the same time; they're being arced alternately, and that learning is taking place right now. We expect to keep ramping through next year. By the end of the year, our production should average somewhere between 1.5 and 1.6 million tons. As for the average across the year, based on what we see today — since we're still ramping and watching how it goes — it could be about 1.2 million.
Katja Jancic
analystSo sheet prices up in Canada have gotten better, though I suppose that's partly since you weren't shipping much. Is there a worry that as you ramp up, pricing could take a hit — or is demand solid enough to absorb the extra sheet volume headed to market?
Rajat Marwah
executiveA range of forces is behind the price movements we've been seeing. For sure, utilization rates differ from mill to mill. There's the U.S.-Canada trade going on, the steps the government has taken around Buy Canada, and limits on incoming imports under the TRQs that were established. Multiple factors are at work here, and pricing in the market truly hinges on demand-supply dynamics; we've stayed quite disciplined while expanding; we have our customers here whom we've partnered with for a long time, and we'll be moving into those markets. Another point worth noting is that the bulk of our sheet shipments were mainly in the U.S., and those have dropped very, very substantially; we anticipate the market will settle as it settles, and we've kept this well in mind and remained quite disciplined.
Katja Jancic
analystThanks.
Ian Gillies
analystGood morning, all.
Rajat Marwah
executiveGood morning to you, Ian.
Ian Gillies
analystLet's start by looking at how the Canadian government responded last week and the money it's putting forward. Could you spend a little time laying out which projects you think the funding would suit, and how you see capital coming into your business fitting into the capital stack, since there's such a wide variety of debt in there at the moment?
Rajat Marwah
executiveIan. For quite a while now, the government has been rolling out a great deal of support. The latest announcement, which is quite favourable for the steel sector, centres on diversification and on the products that can be made which Canada requires. We've also been examining diversification on our end. Nothing has shifted regarding the beam mill's economics or the reasoning behind it, and we're cooperating closely with them to identify the appropriate program that works for us, for Algoma, and for everyone with a stake in it. That's what I'm able to share at this point. A great deal of discussion is taking place on that subject, and we're continuing to work through it.
Ian Gillies
analystAll right. Perhaps shifting topics to the demand side — you mentioned projects tied to nation-building infrastructure. Have tangible contracts shown up much, or are you currently bidding on a good deal of work that would indicate they're adhering to this Buy Canada process, since it's relatively new and we're still merely watching for signals there?
Rajat Marwah
executiveThat's accurate. It is newer. Getting through the organizations is taking time; we have observed movement occurring, and we have observed orders arriving. From a plate standpoint, when you say substantial, there are assorted projects spanning infrastructure and defense, and we see ourselves taking part in many of them. Alongside the demand arriving here, we're also seeing the Buy Canada policies assist considerably; customers who typically haven't purchased from us are now purchasing, and even those who have purchased from us are purchasing more. We're witnessing that activity on that front, and I believe it will persist and expand as an increasing number of these procurement contracts reach completion and can be awarded; we're seeing activity, it's rising, and it's encouraging too.
Ian Gillies
analystAlright. Picking up from the previous round of questions about how the EAF is ramping up, is that entirely a matter of learning and getting to know the facilities, or have you run into any problems so far with scrap procurement when it comes to pushing the facility toward a higher utilization rate?
Rajat Marwah
executiveNo, scrap has been fine. Procurement hasn't posed any issues. I believe it comes down to the learning curve you face during a ramp-up. The most recent outage, which occurred because of the power problem, didn't help us while we were ramping, since it stirs up plenty of other problems around it. It's purely a learning matter. The equipment has done well. The second EAF unit that started up has been ramping much, much quicker, since we picked up a great deal on the first unit, which took us longer, and the second one is tremendously, tremendously better. That will help. After that comes the learning curve involved in figuring out how to switch between the two while you're arcing; it's simply that learning curve which helps you grow. We haven't seen any significant issues as such from an equipment or supply standpoint.
Ian Gillies
analystAll right, so I guess what follows from that is: if next year brings a demand signal that means you'd need to turn out more than the 1.2 to 1.3 you referenced, do you figure there's sufficient flexibility built into the system for you to handle it? I realize that's asking a lot, but I'm just curious about that angle.
Rajat Marwah
executiveFair point — that is a lot at this moment, and we're in the middle of ramping up. My sense is that if the ramp goes forward and the learning curve speeds up, there are certainly possibilities for going higher. From a capacity standpoint, given the power available to us plus alternate arcing, we could reach a run rate as high as 1.8, 1.9 million tons; we're working through it, and it's a bit too early to say if we'll get there next year and how soon in the year that would happen. I know we'll likely be there by the end of next year, but right now it's hard to say how soon, since we're ramping up. I'll definitely give more color on the next call about how we're doing it.
Ian Gillies
analystGot it. Thanks a lot. I'll hand it back over.
James McGarragle
analystHey, thanks for having me on. Just one quick housekeeping item — did you say you expect production to exit Q4 of '27 at roughly 1.5 to 1.6, or was that exit at 1.2 million tons for Q4 '27?
Rajat Marwah
executiveThe exit was at 1.5, 1.6. That's the exit for next year, end of 2027.
James McGarragle
analystThanks for that. Could you give us an update on how you're viewing your cost base at that production level? I know you first mentioned costs or scrap plus $225, but at that level of output, how would you be thinking about your cost base at 1.5, 1.6 million tons of production per year?
Mike Moraca
executiveGood morning, James. I think when you look at the cost side, the scrap-plus figure that you were referencing was when we have greater capacity, which we expect to have early '28 with the additional power that will be available to our site. Next year, through the ramp-up, we expect to have that directionally higher from $220 or $225 at this point. Then
James McGarragle
analystthe reduction in '28, when the added power arrives and aligns more closely with those initial targets?
Mike Moraca
executiveVolume is genuinely the primary factor. As we boost volume, even starting from our current position, the cost structure will get better, and what we're truly concentrating on here is lowering the costs and enhancing productivity at the units.
James McGarragle
analystAll right. Now regarding the capacity utilization charge, I recall that early in the year we discussed it declining in a linear fashion. Clearly, the outage in Q3, I'm sure, had an effect on that. Could you speak to the revised cadence and how you see that utilization charge playing out across the next couple of quarters?
Mike Moraca
executiveIn quarter three, I believe it was still higher than we would have anticipated given the outage we experienced. Our stance on this hasn't changed. We aren't expecting any add-back to EBITDA in Q4. We're bringing that down; that being said, we remain on the ramp-up curve, and today's costs in the business support significantly higher volumes, which is exactly why we're so focused on improving along the ramp-up curve. We don't anticipate an add-back to EBITDA, even though we're still on the ramp-up curve, and we expect our cost structure to get better as more volume is produced.
James McGarragle
analystAlright. So one last thing from me regarding the capex tied to that turbine. Could you help us put a number on it as we think through modeling capex for Q4 and possibly into early 2027? Are there any structural implications here? Might this indicate the LSP facility was undercapitalized, and is there any chance of additional unplanned outages going into next year? Was this genuinely a one-off event? Any detail you can give us on that?
Mike Moraca
executiveSure. Well, the outage at Lake Superior came as a surprise. One of our turbines failed prematurely. We also have the ability, hopefully, to recover some insurance proceeds as a result of that failure, and we'll be pursuing those as we work through the process. We genuinely believe that adding the third turbine is the correct decision from a redundancy standpoint. It also reduced additional downtime we could have experienced at the LSP outage in the prior quarter, and putting that third turbine into service gives us not just added redundancy but future opportunities if we're able to produce more power, subject to market conditions in the power environment here in Ontario. We see it as a prudent decision; these assets aren't losing value. Turbines are extremely, extremely difficult to obtain; we were lucky enough to have access to this one, and we're pleased to have that redundancy in place now. On the financial side, during the quarter, Q3, the down payment went through capital, which you'd see on the capex line; that represents roughly 25% of the turbine's cost, and the all-in cost of the turbine comes to about $35 million USD, with the remainder expected to be financed across a four-year period.
James McGarragle
analystThanks, I appreciate that.
Albert Realini
analystMorning, everyone. Thanks for taking my question.
Mike Moraca
executiveHi there, Albert.
Albert Realini
analystIn the second quarter, I believe we guided to shipments being 10% to 20% lower because of certain planned maintenance. So 3Q shipments landed right about at the top end of that 20% reduction, though that was clearly prior to the LSP outage. I suppose I just wanted to check whether you managed to pull all of that maintenance forward during the outage, or whether some of it has perhaps slipped into 4Q or possibly into 1Q '27, during a seasonally slow or weaker stretch?
Mike Moraca
executiveWe managed to complete a good portion of the tie-in work while we were down in August, during that outage from the 17th to 29th. We also managed to ship some additional volumes out across the quarter, which flows through our inventory and is what backs the shipment figure for the quarter relative to the full expectation for that outage. We'll also run slightly higher production in Q4, which will support some of the inventory we're holding, but that's how we handled the quarter.
Albert Realini
analystGreat. So this is a follow-up, then. The balance sheet probably has quite a few moving parts. If you could just share a high-level expectation for the fourth quarter — perhaps how a few of the working capital items are shaping up, any of those excess income tax refunds, any excess receipt from that insurance payment. Then I realize the SunCoke settlement is confidential, but I believe they may have mentioned $70 million of working capital impact stemming from the dispute. Is there anything to call out there — perhaps not the amount, but anything regarding what you expect on the timing of a potential outflow in the fourth quarter and into sometime next year?
Mike Moraca
executiveSure. I think I won't comment specifically on the amount, even though their view of working capital obviously differs from how the impact of this may flow through; on our side, we do have the balance of the income tax receipts that have come in post-quarter, and we will have some impact from the settlement, which will flow in the quarter as well. Those really are the exogenous items sitting on cash flow. From a working capital perspective, we will build a little bit of raw material working capital as we get closer to the end of the calendar year to support the ramp-up at the EAF.
Albert Realini
analystGreat. Thank you.
Mike Moraca
executiveThanks, Albert.
Laura Devoni
executiveOnce more, thanks for joining our Third Quarter 2026 earnings conference call and for the ongoing interest you show in Algoma Steel. We're eager to bring you up to date on our results and the progress we've made when we report the fourth quarter and full year results.
Operator
operatorThat brings us to the end of today's teleconference. You can disconnect your lines now. Thanks for taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Algoma Steel Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Algoma Steel Group Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Algoma Steel Group Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.