Alpha Metallurgical Resources, Inc. (AMR) Earnings Call Transcript & Summary

November 1, 2024

New York Stock Exchange US Materials Metals and Mining earnings 38 min

Earnings Call Speaker Segments

Emily O'Quinn

executive
#1

Thanks, Rob, and hello everybody. Before we begin, I want to note that while we make our prepared comments, anything we say about expected business and financial results includes forward-looking statements, and real outcomes could vary significantly from what we discuss; for additional details on forward-looking statements and certain elements that may impact them, please look at the company's third quarter 2024 earnings release along with the related SEC filing. Those documents also contain information on how we use non-GAAP measures and how they reconcile with GAAP measures. On today's call we have Alpha's Chief Executive Officer, Andy Eidson, plus our President and Chief Operating Officer, Jason Whitehead. Joining us as well are Todd Munsey, our Chief Financial Officer, and Dan Horn, our Chief Commercial Officer. With that, I'll hand things over to Andy.

Andy Eidson

executive
#2

Thank you, Emily, and good morning, everyone. After putting out our preliminary numbers two weeks back, we filed the final figures for Q3 today, showing adjusted EBITDA of $49 million along with 4.1 million tons shipped during the period. Several factors dragged down our quarterly performance: lower coal processing volumes, weak market dynamics, plus difficult geology and weather-related challenges that hurt our productivity and, in turn, drove up our costs. As we stay focused on cutting expenses through this market slump, we've implemented a few modest yet significant adjustments to what we expect from production, and those are baked into the guidance assumptions for the coming year. Broadly speaking, these steps involve scaling back certain Saturday and evening shifts and pulling out sections at select mine sites so output and quality align better with demand, all while keeping an eye on our cost structure relative to where coal markets stand right now. Beyond those sorts of adjustments, which are typical reactions to shifting market conditions, we are currently winding down operations at our high wall Checkmate Powellton mine, steering it toward a hot idle state prior to the close of this year. The Chess Processing Plant, which people also call Elk Run, will go idle as well once Checkmate stops producing; among all the mines and complexes in the Alpha footprint, this is the sole one being idled because of today's market conditions. Since Checkmate ranks as our newest mine, it remained in ramp-up phase, meaning its costs stayed considerably above what we'd anticipate at full production capacity. High wall indexes have fallen by about one-third since development kicked off 12 months ago at Checkmate, rendering the mine unprofitable under current market circumstances. We're likewise mindful of today's high wall market, which appears oversupplied and out of balance right now. Shutting down a mine is something we never do without careful thought, since it clearly affects workers and their livelihoods. That said, after delivering a warn <<inaudible>> notice to Checkmate employees in early October, we managed to move a large number of those Checkmate workers into other vacant roles across the company, which lets us keep their skills on board while filling essential openings elsewhere. Over the past few weeks, we wrapped up our yearly budgeting work, which generated our 2025 expectations, among them the guidance released this morning. At the midpoint, you'll notice we anticipate shipping 16.7 million tons of coal in the next year, roughly 400,000 tons below this year's guidance midpoint. Our 2025 domestic commitments look comparable as well, with 3.7 million tons committed, representing 22% of our total sales book for next year, at an average price of $152.51, roughly $8 less than a year ago, on a similar relative volume. Particularly in light of the progressively tougher market conditions we've been facing, I'm glad we could secure a volume that enables us to plan for part of our 2025 cash flows as we pursue chances to capture upside in the export market. Like we've covered at length on recent calls, our leadership group is still concentrating on where we stand with liquidity and on safeguarding our capacity to keep getting through this stretch of weaker pricing. From July 1 through the close of the third quarter, total liquidity rose by $150 million, which works out to 42%. Having that extra cash on the balance sheet lets us cover the capital requirements of the portfolio we already have, and at the same time keep putting money into key projects such as the Kingston Wildcat Mine — previously called Kingston Sewell — our new low-low operation now under development. Jason will share more details on Wildcat shortly. Even with the tough conditions we're seeing right now in steel demand and Metco pricing, I'm still optimistic about Alpha's prospects over the long term. Operations like Kingston Wildcat serve as a thrilling addition and a boost to quality for the portfolio we already hold. The Alpha team keeps working safely and responsibly, even when conditions are difficult. October has the fourth quarter off to a solid start, so our hope is to sustain that momentum and close out this year in a strong position. A robust balance sheet and the absence of long-term debt give us more flexibility to run the business during stretches when the market is weak. We stay committed to safety and efficiency while watching the market for opportunities; so with that, I'll hand the call to Todd, who will provide further detail on our quarterly financial results.

Todd Munsey

executive
#3

Appreciate that, Andy. Turning to Q3, adjusted EBITDA landed at $49 million, down from the $116 million recorded in Q2. Third-quarter sales volume reached 4.1 million tons, compared with 4.6 million tons during the second quarter. Within the Met segment, realizations fell sequentially, averaging $132.76 in Q3 against $141.86 in Q2. Export Met tons sold against Atlantic indices and other pricing arrangements brought in $129.31 per ton in the third quarter, whereas export coal tied to Australian indices fetched $128.61; by comparison, those same categories realized $135.47 per ton and $153.52 per ton, respectively, in the second quarter. On the metallurgical side, our Q3 realization came in at a weighted average of $136.35 per ton across the board, a decline from the $145.94 per ton we saw in the previous quarter. For the incidental thermal portion within the Met segment, realizations climbed to $76.33 per ton during the third quarter, versus $75.82 per ton in the second quarter. Within our Met segment, the cost of coal sales moved up to $114.27 per ton in Q3, an increase from $109.31 per ton in Q2. Lower productivity on a quarter-over-quarter basis was the primary driver behind that higher cost. On SG&A, when you exclude non-cash stock compensation along with non-recurring items, the figure declined to $13.4 million in the third quarter, compared with $14.2 million in Q2. During the quarter, capital expenditures came to $31.5 million, compared with $61.1 million in Q2. Now, moving on to the balance sheet and cash flows: at September 30, 2024, unrestricted cash stood at $484.6 million, which is $148.5 million higher — an increase of about 44% — than our June 30 figure of $336.1 million; meanwhile, we finished the quarter with $97.5 million of unused availability under our ABL, though that was partly offset by a minimum required liquidity of $75 million. At the close of September, total liquidity at Alpha reached $507 million, versus $356.7 million at the end of the second quarter. Operating activities generated $189.5 million of cash in the third quarter, compared with $138.1 million in Q2. Looking at the third quarter, our cash flows got a boost from working capital coming down by $144.5 million. When we closed out September 30, we had zero borrowings on the ABL facility, and letters of credit outstanding totaled $57.5 million, which is just a bit lower than the $59.4 million we had the quarter before. Now, regarding what's locked in for 2024, if you take the midpoint of guidance, then within the Met segment, 86% of metallurgical tonnage has both commitment and pricing in place, averaging $152.42. The remaining 14% of Met tonnage for the year is committed, though pricing hasn't been set yet. On the thermal byproduct side of the Met segment, everything is committed and priced at the guidance midpoint, coming in at an average of $75.97. Because Met coal markets stayed weak, no shares were bought back during Q3 through the company's buyback program. The count of common stock shares outstanding stood at about $13 million as of October 31. Buybacks totaling roughly $400 million remain open under the current repurchase authorization, contingent on how cash flow levels and market conditions evolve. So far under the existing plan, 6.6 million shares have been repurchased, at an average price of $165.74 each. Moving to next year, guidance for 2025 was released this morning; we expect to ship 15 million to 16 million tons of metallurgical coal, along with 1 million to 1.4 million tons of thermal coal by-product. All together, the total shipment guidance we anticipate comes to between 16.0 million and 17.4 million tons. For 2024, the guidance for cost of coal sales is $103 to $108 per ton. Selling general and administrative costs for next year ought to fall in the range of $53 million to $59 million, not counting nonrecurring expenses and noncash stock compensation — roughly an 11% decrease compared with 2024's guidance range. Idle operations expense should be somewhere from $18 million to $28 million; net cash interest income is projected to be $2 million to $10 million, while depreciation, depletion, and amortization should be $165 million to $185 million. Looking at 2025, we expect capital spending to land somewhere between $152 million and $182 million. That figure accounts for ongoing sustaining maintenance capital, money put toward mine development at the Kingston Wildcat Mine, plus certain items carried over from 2024 that slipped due to timing along with the availability of supplies and contract labor. On top of that, capital contributions to equity affiliates ought to come in at $44 million to $54 million. That covers the cash required for routine operations at the DTA facility as well as what we anticipate spending during 2025 on infrastructure and facility upgrades at the port. Looking ahead to next year, we expect our cash tax rate to land somewhere between 0% and 5%. As for 2025, on our committed and priced position: at the midpoint of guidance, 24% of metallurgical tonnage is committed, carrying an average price of $152.51, while an additional 35% is committed but not yet priced. On the incidental thermal side, at the midpoint of guidance, 96% is already committed at an average price of $79.90, leaving the remaining 4% of that midpoint uncommitted. With that, I'll turn things over to Jason for the operations update.

Jason Whitehead

executive
#4

Thanks, Todd, and good morning to everyone. When we look at guidance for the coming year, we expect coal sales costs to land somewhere between $103 and $108 per ton. The midpoint there comes in $7.50 below the midpoint of the range we're currently guiding for 2024, which sits at $110 to $116. About two-thirds of that drop should come from spending less on purchased coal, driven both by volumes coming in under what we'd expected and by the softer pricing conditions we're seeing. On top of that, we think we'll capture savings slightly above $2 per ton during 2025 thanks to better pricing on supplies and maintenance items including diesel fuel, steel, roof support, plus lower spending on third-party mining services; together with anticipated reductions in sales-related expenses, those items represent the main reasons cost guidance is coming down versus last year. On several prior calls, we've talked about Alpha's investments in our manufacturing and rebuild facilities. Our capabilities have expanded across the last few years, and at a time when third-party and OEM manufacturers were shrinking and frequently unavailable, that let us keep our fleet in a condition built to withstand market declines. Those investments are what helped bring our mining fleet into a healthy state, letting us pull back on spending in the near term without hurting safety or productivity. Turning to CapEx guidance for next year, you'll also notice we've lowered what we expect for sustaining maintenance CapEx to approximately $7 per ton at the midpoint of volume guidance, compared with the $10 per ton rule of thumb we'd been using most recently. That again reflects the exceptional health of the AMR fleet and is supported by a flattening, and in some cases reversal, of inflationary pressure on materials and supplies relative to the last couple of years. At the midpoint of shipment guidance, we anticipate selling 16.7 million tons next year, which at $7 per ton works out to roughly $117 million in sustaining maintenance CapEx across our existing portfolio of mines. The remaining two categories, development and rollover CapEx, are mostly tied to our Kingston Wildcat mine. At the midpoint of guidance, we expect to spend approximately $40 million on development CapEx and about another $10 million in carryover from this year, nearly all of which is headed to Wildcat. As a reminder, this is the mine we've been developing in Fayette County, West Virginia, previously called Kingston Sewell after the coal seam's name <<inaudible>>. It will fall within our mid-West Virginia surface region, and as our teams moved forward on the preparatory groundwork for this mine, they chose to rename it Wildcat out of appreciation for its location, our community ties, and the rich local history of Pax, West Virginia, where the Wildcats of Pax High School took the state basketball championship in 1954. Regarding our development schedule, work is underway right now at Slope at Kingston Wildcat, and that effort is going to carry on through the bulk of the coming year. This operation is going to yield a low-vol product, and we're eager to get it into the marketplace. Although we expect the initial production cuts to take place late in 2025, we don't anticipate meaningfully larger tonnage volumes until 2026. Once running at full capacity, our expectation is that Wildcat can generate as much as 1 million tons each year. Also, during these quarterly updates, we frequently share certain safety and environmental accomplishments from Alpha; today, I'd like to express my heartfelt gratitude toward a set of Alpha's senior leaders along with extraordinary employees who gave their time as volunteers to help Western North Carolina following Hurricane Helene; they pitched in with recovery work and road rehabilitation efforts that restored residents' ability to reach their homes and businesses between Bat Cave and Chimney Rock, North Carolina. My thanks go out to those who brought this to my attention for consideration, and to the many volunteers who sought to take part in helping. To the people who forged the connections on the ground there, arranged the tactical plans, moved and lent equipment, and finally the miners now known as the West Virginia Boys, who left folks throughout Central Appalachia impressed by their skill level, drive and fortitude. These individuals stand as proof of Alpha's strength, and I could not be more proud to know and work alongside such an outstanding group of people. Thank you. With those operational updates covered, I'll now hand the call over to Dan for an update on the markets.

Dan Horn

executive
#5

Jason, thank you, and good morning to all. Throughout the third quarter of 2024, coal prices continued their downward trend, pushed by ongoing weakness in steel demand globally. In its most recent short range outlook, which came out in mid-October, the World Steel Association issued significant reductions to its 2024 steel demand forecasts, especially for China and other developed economies facing soft manufacturing, economic headwinds, and geopolitical uncertainties. WSA anticipates a slight rebound in steel demand during 2025, along with the potential for broad moderate growth spanning 2025 and 2026. Elements identified as possible drivers of that growth include stabilization in China's real estate sector, monetary policies such as interest rate changes designed to spur economic activity, and the trajectory of infrastructure spending in major global economies. In the third quarter of 2024, metallurgical coal prices continued to decline. All four indices that Alpha monitors closely fell by 10% or more during the quarter, with the Australian Premium low-vol index experiencing the largest drop at 16.5%. The Aussie PLV index decreased from $245.20 per metric ton on July 1 to $204.75 per metric ton on September 30, 2024. The U.S. East Coast low-vol index fell from $218 per metric ton at the start of the quarter to $189 per metric ton at its conclusion. The East Coast high-vol A index declined from $212 per metric ton in July to $184 per metric ton by the end of September. Finally, the U.S. East Coast high-vol B Index moved from $190 per metric ton to $171 per metric ton at quarter's end. Since the quarter ended, all four indices have remained relatively stable. As of October 30, the U.S. East Coast low-vol, high-vol A, and high-vol B indices were at $190, $185, and $170 per ton, respectively. The Aussie PLV index dipped slightly from quarter close levels to $204 per metric ton on that date. In the seaborne thermal market, the API2 index was at $105.85 per metric ton on July 1, then increased to $119.40 per metric ton on September 30, 2024. And by October 30, the API2 index hit $121.15 per metric ton. Given current market dynamics, pricing remains weak and spot demand is limited. We continue to see the low and medium vol markets as relatively balanced, but high-vol coal is in oversupply, which has also pressured pricing. Recently, severe weather has posed some issues, leading to rail delays in certain parts of our operating areas, although those impacts remained localized and we've made efforts to navigate around them. Turning to next year, we announced this morning that 3.7 million tons of coal are contracted at an average price of $152.51 per ton for shipment to domestic metallurgical customers in 2025. I want to thank the sales team for their diligent efforts in finalizing these domestic negotiations successfully, especially considering the weak market conditions over the past several months. We're happy with the outcome. In the guidance we released this morning, we also provided our expected DTA spending for next year: between $44 million and $54 million. This amount accounts for Alpha's portion of routine working capital, along with the dedicated funds needed for improvements to machinery and facilities at this important coal terminal. And on September 30, that rises to $19.40 per metric ton. We remain in frequent contact with our counterparts at DTA, allowing us to schedule downtime so that it creates as little interference as possible with our shipping activities. With that, operator, we're ready to take questions on the call.

Lucas Pipes

analyst
#6

Thanks a lot, operator. Morning, everybody. Andy and the team, I'd like to start by applauding the rehabilitation work you've done following Helene. It's genuinely impressive to see, so thank you for it. I realize a great deal of effort and deliberation goes into your guidance and budget, and I have real respect for what you released this morning. Andy and Jason, could you perhaps speak to how costs look for 2025 compared with 2024? My assumption is there are several buckets, and you referenced them in your prepared remarks, covering sales-sensitive costs and lower purchase tons. Would you elaborate on those and perhaps attach a dollar amount to each bucket? Many thanks.

Andy Eidson

executive
#7

Yeah, I'm not — hey, Lucas, and thanks for the kind words, by the way. I'm not sure we're ready to disclose that level of detail, because it is — I wouldn't call it still in development, but we're evaluating other items, other steps we might want to pursue between now and next year. That said, as Jason said, well over half will tie to purchase coal. And that isn't some shift in philosophy or anything of that nature. It's simply capitalizing on various opportunities inside the business instead of buying coal. So in terms of volume and simply because the market has moved lower, we'll manage to achieve a reduced true blended cost of sales, encompassing our organic tons and purchase tons; we'll see some decrease in that cost. We've put substantial effort into our sourcing side. The sourcing team has performed truly outstanding work over the past 6 months, really, reaching out to vendors, locating new vendors and genuinely striving to remove costs from the system wherever they can. We've managed to recapture at least a modest share of the post-COVID inflation. We believe there's hopefully more ahead on that front, but it's just a lot of genuinely strong work and staying alert to places of leakage we can recover. And then, as we noted, we've made some changes in the operating lineup, whether that's removing a section from a particular mine where we potentially, there are chances to potentially achieve productivity gains by cutting manpower at certain mines, which runs somewhat against the grain, but I believe we're demonstrating in certain cases that it genuinely works. So it's sort of a wide-ranging initiative. We understand our costs must come down, especially in this market. We're hopeful that once these procedures are in place and these new philosophies are adopted, this will also deliver benefits in a stronger market, but we definitely need it at present; and, Jason, anything you'd like to add to that?

Jason Whitehead

executive
#8

In my view, Andy, you did a genuinely great job condensing a great deal of material into only a handful of brief minutes. There's truly nothing I can add.

Lucas Pipes

analyst
#9

Thanks. And to build on that, if I understood your comment correctly, roughly 50% of the, let's say, $7.50 in savings comes from purchased tons. And can you remind us how many tons you bought during this year, and what the outlook would be for next year? Thanks.

Andy Eidson

executive
#10

Lucas, we're not through the year at this point, so I'd rather not — I'd rather not — since a portion of that would involve forecasting what happens in Q4. So I'll likely just let the response stand as it is.

Lucas Pipes

analyst
#11

All right. Though it's roughly 50%, correct? That's what I caught. Of that 750, half ties to this.

Andy Eidson

executive
#12

Yeah, yeah, approximately. It might be 60%, it might be 40%. I'm sort of speaking without notes here.

Lucas Pipes

analyst
#13

On top of that, we've got a distinct $2 allocated toward supplies, maintenance, and service providers. Also, just as a reminder, roughly 2 bucks of that likely ties to higher-cost production items — things of that nature — that are being pulled out.

Andy Eidson

executive
#14

Correct. Beyond that, I'd say there's also, folded in somewhere, the effect on sales-related costs from one year to the next, whatever that turns out to be. Our view was that the market would look fairly comparable next year to what we've witnessed across the last couple of quarters. So having that apply for the whole year adds a modest amount to the cost reduction as well.

Lucas Pipes

analyst
#15

That's really useful. I appreciate all the detail.

Andy Eidson

executive
#16

Yeah.

Lucas Pipes

analyst
#17

I've got a similar one about CapEx and SG&A. Starting with CapEx, you framed it as roughly $7 per ton against $10 per ton for sustaining CapEx. Would you call that $7 sustainable across a couple of years, or is it really more of a 2025 answer to what the market is doing? How should we think about it? Then on SG&A, there were very meaningful reductions. It's great to see, and I'd like your take on what's driving most of that. Thanks so much.

Jason Whitehead

executive
#18

Jason here. I'd say under $10 can definitely hold up beyond 1 year. If I claim $7 works for '25 and '26, that might be pushing it. It really comes down to how our operations look at the end of next year and the number of continuous miners we intend to deploy. That said, $7 is something we're very comfortable with for 2025. And again, you could probably land in the middle and figure on something around $8 or $9 for 2026. Of course, that could shift at the drop of a hat. There are plenty of variables and plenty of moving pieces that are hard to pin down. Well, before I get to SG&A, Lucas, the gain we've posted on CapEx really stems from what the operations team has done over the past few years to build out additional capabilities. I mean, standing up max <<inaudible>> manufacturing from the ground up at the beginning of last year has been a genuine help in removing chunks of the supply chain, whether that's actual dollars or simply waiting time or lead times for equipment. But our maintenance team has put all these new assets to really good use in bringing CapEx down. We'll see what the full effect turns out to be in the years ahead, but I know that will be significant as time goes on. On the G&A side, naturally, we don't only examine operating costs when we're trying to pull dollars out of the system. We got a little bit aggressive. Much of this comes from outside spend. A couple of one-off items did hit us this year that we don't expect to see again next year, but we're pretty confident. We've pulled real dollars out of the system. I mean, look at $6 million or $7 million, but as a percentage, when you can bring your SG&A down by over 10%, and I think we were already pretty lean to start with. I really appreciate the back office folks who have been digging around for every penny and really just trying to make this as lean as we possibly can be.

Lucas Pipes

analyst
#19

Andy, nice job on everything you've been doing here. It's genuinely impressive to watch. Don't stop.

Andy Eidson

executive
#20

Thanks, Lucas.

Nathan Martin

analyst
#21

Thanks, operator. Good morning, everybody.

Andy Eidson

executive
#22

Hey, Nathan.

Nathan Martin

analyst
#23

Hey, how are things? I wanted to piggyback on what Lucas asked earlier about the cost per ton outlook. Andy, you may have already touched on this, but to sharpen the picture a bit: with that 103 to 108 guidance for 2025 cost per ton, what net price are you building in?

Andy Eidson

executive
#24

Yeah, as I said, I'd rather not plant a specific flag because projecting prospects for people isn't what we do. We've got our own internal views, but we see 2025 shaping up like the last couple of quarters, and probably weighted even more toward the current environment. Some recency bias could be at play there. Perhaps that's making our take a touch more pessimistic, but right now that's really the best basis we have. I don't see much in Dan's remarks that suggests a big upward shift as we head into the start of next year. We're still hopeful, and I think after the election next week, things may begin to take shape in terms of how people position themselves and where economic activity picks back up in various parts of the world. For the moment, though, we're fairly at ease saying that for planning purposes, next year's view will resemble what we're seeing right now.

Nathan Martin

analyst
#25

All right, understood. Thanks for that, Andy. And maybe if we pull back and look at Q4—Lucas brought up CapEx and where it's headed in '25—but I just checked the full-year '24 guidance, which is $210 million to $240 million, and I believe that suggests a quarter-over-quarter increase of more than $20 million. Is that calculation correct, or might there be a chance that '24 CapEx ends up somewhat below what you're expecting?

Andy Eidson

executive
#26

Well, I mean, we restated guidance two weeks back, so I think we're—I don't know exactly where we'll finish. Part of it comes down to timing. Once more, whatever we can't complete during '24 will simply spill over into the start of '25. So I'd say the range feels fine. I can't tell you if we'll land at the high end or the low end of it. Like always, we usually come in right around the middle. I don't anticipate that being much different this time. That said, there is some timing risk.

Nathan Martin

analyst
#27

All right, and you're correct, Andy. That's the reason I was simply curious, since if you make it down the fairway, that would represent a fairly significant sequential increase in Q4. So — and you did reference some carryover, I believe, of spending in '25, so I was just curious whether that was sort of explaining that shift.

Andy Eidson

executive
#28

Yeah, I mean, that's what makes the fourth quarter difficult. You're not just examining the bridge of one quarter, you're examining the bridge into an entirely new year. And so it becomes somewhat challenging. A difference of 1 week in timing can matter a lot.

Nathan Martin

analyst
#29

Understood. Then regarding shipments for the entire year, I believe a few weeks ago you mentioned they're now anticipated to land at the upper end of that range, which once more suggests a bump in sales during Q4. But what's the right way to view cost per ton? Assuming nothing else changes, ought it to decline versus the prior quarter simply because there are more shipments and a larger denominator, plus possibly some softening on the pricing front, which would ease sales-linked expenses? Any additional factors worth factoring in, like the persistent weather or geologic problems you referenced?

Andy Eidson

executive
#30

No, and once more, when it comes to those geologic problems and weather, they don't last. Sometimes you get a stretch where no single major thing breaks down, yet a bunch of minor ones pile up. Jason frequently points out to me that we run 70 mining units, and at any given moment you'd likely find, say, 3%, 4%, or 5% of them coping with some small problem. That works out to 2 or 3 operations potentially facing difficulties. This quarter we saw somewhat more than that, and it did play a part in some productivity declines. Worth mentioning that among our room pillar competitors we remained at the very top, yet even so it came in under our usual productivity level; that, combined with some weather arriving toward the close of the quarter, bringing things such as power outages, made it somewhat harder to keep operations running. Those factors explain what happened there. As for Q4 costs, once more, much like CapEx, we restated our guidance on the cost range. So now that you have three quarters of actuals available, you can somewhat infer what we expect for Q4. Keep in mind there are numerous holidays and vacation days during Q4, which usually results in a modest cost increase relative to a typical quarter. I'm not certain I'd call Q3 a typical quarter for us, but I believe everything will settle into place and remain fairly close to the annual cost guidance range we've set.

Nathan Martin

analyst
#31

All right, that's clear. And then perhaps just one additional item, if we focus on 2025, particularly that shipment guidance. Of course, you all mentioned how hard it was to decide to place Checkmate Powellton on high idle. Within the guidance, are there any further assumptions or factors you're considering when it comes to other rationalizations, or anything along those lines, that we ought to keep in mind?

Andy Eidson

executive
#32

No, I'd say the portfolio gets assessed by us all the time, and that's essentially how we arrived at the Checkmate decision. At this point, it simply wasn't a fit with the market. When its moment arrives, it will be an extremely productive mine, but making it through the development stage is just very difficult while the market remains where it is right now. Regarding the remainder of the portfolio, like I mentioned, it's always — every single thing is under constant review; but, no, nothing material exists to discuss right now; we're quite happy with our positioning, not only in terms of the portfolio but throughout the whole company, the balance sheet, all the rest. Even in a fairly challenging market, I believe we're feeling quite good about things.

Nathan Martin

analyst
#33

Understood. Thanks a lot, Andy. I truly value the time and the details you've shared, and I wish you and the team the best of luck in Q4.

Andy Eidson

executive
#34

Yes, thanks, Nate.

Andy Eidson

executive
#35

Thanks, Rob. And prior to finishing up, I wanted to add my voice to what Jason said about how our team performed in North Carolina. Alpha as an organization has been fortunate to have an extraordinary number of extremely giving individuals. These are folks of strong character, and this Group exemplifies such character wonderfully. What they managed to achieve makes me genuinely proud. I value the way they stood for not only Alpha as an organization but the whole coal mining sector. In my view, they drew considerable favorable notice and demonstrated the capabilities of coal miners; for that, my thanks go out to them. That covers it, I believe. That's everything we have for you at this point. We appreciate you joining the call, and I hope everyone enjoys a wonderful weekend.

Operator

operator
#36

That brings us to the end of today's call. At this point you're free to hang up, and we appreciate your having joined us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Alpha Metallurgical Resources, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Alpha Metallurgical Resources, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Alpha Metallurgical Resources, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.