Altius Minerals Corporation (ALS) Earnings Call Transcript & Summary

November 11, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 30 min

Earnings Call Speaker Segments

Flora Wood

executive
#1

Thanks, Vincent. Good morning, everyone, and welcome to the Q3 2026 conference call. We released our press release and interim filings yesterday after the close, and those documents are available on our website along with the presentation for this call. There's a live webcast of this event, and a replay will be available together with the presentation slides. You will also have noticed that at 7:30 a.m. we announced our definitive agreement to acquire TNR Gold, and we're happy to take questions on that as well. With me in the room is Ernie Ortiz, VP, Corp Dev. Joining us online are Brian Dalton, CEO, and Stephanie Hussey, CFO. Brian and Stephanie will be our primary presenters, and Ernie is also present to handle questions during the Q&A. Everything we say in our formal remarks and in the Q&A is subject to the forward-looking statement found on Slide 2 of the deck; with that, Stephanie will begin by walking us through the numbers.

Stephanie Hussey

executive
#2

Appreciate that, Flora, and morning to all of you. We reported yesterday Q3 net earnings of $10.1 million, equating to $0.17 per share, and versus a year ago both revenues and expenses rose, the latter covering cost of sales, share-based compensation and amortization. The 2025 third-quarter figures benefited from a gain on our partial divestiture of the Arthur royalty. Royalty revenue reached $33.3 million, a record, while adjusted EBITDA for Q3 totaled $27.1 million, driven by improved realized prices, the timing of copper stream deliveries, 4 additional operating lithium royalties, and higher electricity royalty revenue. Cash flow from operations came in at $11.8 million, driven by increased royalty receipts and interest income, though this was partially offset by larger tax payments, interest paid, and changes in working capital. For the quarter, adjusted net earnings reached $0.18 per share, up from Q3 2025, with foreign exchange and derivative revaluation being the primary adjusting items. During Q3, we announced a number of significant transactions, which we covered on our Q2 call. On July 21st, we completed a bought deal public offering of 3 million common shares at $6.50 per share, generating net proceeds of $174 million. We finished an amendment to our credit facility on July 24, and that increased the size of it to $350 million, up from $225 million. It swapped out the earlier term and revolving debt for one single revolver, and there are no principal payments required from here on. The $87 million outstanding debt balance was transferred into the amended credit facility when we closed, and the maturity date got pushed out to July 2030 from August 2028. At the close of July, the corporation finished a $100 million drawdown on the revolver. Then on July 30, the corporation wrapped up a share purchase agreement with Northampton and certain funds managed by affiliates of Apollo. Altius paid purchase consideration of USD 167 million, which was funded through existing liquidity — made up of cash on hand and debt. Once that deal closed, Altius's effective stake in Great Bay Renewables went up to 50%, having previously been 29%. The corporation currently has roughly $500 million in total liquidity available, which consists of cash on hand, $163 million accessible through the revolver, and $150 million that could potentially be drawn via an accordion feature, subject to certain criteria set out in the terms of our expand credit facility. In the quarter, we paid cash dividends totaling $6.1 million and issued about 6,000 shares through the dividend reinvestment plan. Yesterday our Board of Directors approved a quarterly dividend of $0.11 per share, payable to shareholders of record on November 30, with a payment date of December 15; in August we also renewed our normal course issuer bid, which will end no later than August 21, 2027. No shares were repurchased under the NCIB in Q3; and with that, I'll turn it over to Brian.

Brian Dalton

executive
#3

Thanks, Stephanie, and good morning, everyone. Besides reviewing the quarterly results we put out last night, we also have the opportunity today to talk about our new acquisition. This morning we announced the signing of an arrangement agreement to acquire TNR Gold. As we see it, the key elements of this deal are the addition of a royalty on the advanced-stage Los Azules copper development project, along with consolidating the remaining portion of a royalty interest we already partly owned in the operating-stage Mariana Lithium Project. What ties these assets together — a hallmark attribute of Altius — is their very large resource endowments, and all the optionality for life extension and production rate expansion that comes with that. I'll keep my remarks on the deal mechanics brief, though I'd direct your attention to the release as adjusted to wires. We're delighted to have TNR shareholders join Altius, and we thank him for seeing the greater strength and value this combination delivers to both parties. Now to the quarter's results. In Q3, we kept working to fold in our Lithium Royalty acquisition along with the larger stake we picked up in ARR, and we also completed an equity raise plus the restructuring and expansion of our credit facilities that Steph covered. Beyond that, we remained active in growing our PG equity portfolio and our longer-term royalty pipeline. Following the quarter's close, we announced a deal to buy a royalty tied to a potash solution mine in Saskatchewan that is still in development. Your team has certainly been active. Our operating royalties once more delivered solid results in Q3, with revenue continuing to climb at a pace matching, or a bit ahead of, our robust five-year growth forecast. We additionally continued to receive encouraging indications regarding several royalties in the preproduction phase, which leave us confident that our revenue growth path may stretch considerably past the outlook window we have published at present. In lithium, there were both gains and setbacks. Sigma went through a stretch of halted production because of challenges connected to permitting. Those issues have been settled since then, and the operation is running again while it keeps moving forward with its Stage 2 expansion. At Finance, Core carried on with restart activities and anticipates initial production sometime in the current quarter. Production levels kept climbing at Mariana, 3Q and Goulamina, where expansion planning and execution work also progressed. Much of the steep rise lithium prices posted earlier has been surrendered, and it can reasonably be argued they now sit beneath levels that would incentivize supply. Demand keeps growing at an exceptionally fast pace, and inventories are still comparatively lean. Turning to base metals, Chapada delivered yet another really solid production quarter, and at the same time it broke ground on building the infrastructure needed to grow operations and bring in higher-grade ore from the new Saúva discovery. Silvercorp kept making progress on schedule with construction at Curipamba, while PFS work carried on at Gunnison Copper. Vale indicated that, having successfully completed ramp-up at its two new underground mines, it is now exploring options to expand at Voisey's Bay. Base metal prices were broadly unchanged during the quarter, despite more volatility and uncertainty in the global economy and geopolitics. On the electricity side, we had a particularly strong quarter, with GBR and inter ARR making their largest portfolio contribution to Altius to date. A portion of that resulted from the bigger ownership interest we hold, yet it likewise mirrored continuing commissioning of royalty projects that were developed via our developer investments with longer lead times as well as directly into projects already in late operating stages. Growth activity continues to accumulate throughout the electricity generation portfolio, and 15 royalty projects are presently under construction, with commissioning anticipated during the coming couple of years. Financing fully refundable interconnection deposits accounted for a meaningful portion of GBR’s revenue in the quarter just reported. For project proponents, those deposit sums are becoming increasingly burdensome as grid authorities attempt to address the <<inaudible>> congestion in connection requests. Through providing this capital on the proponents’ behalf, GBR enables them to focus their direct capital resources instead on moving projects forward. Even though GBR makes a margin between what these deposits cost it under its own financing arrangements and what it earns on them, and retains control over how the refundability mechanics work, the primary aim of this business line is to advance royalty corporate development efforts. The core idea is that when projects move forward and interconnection fees and refundable deposits must be swapped for nonrefundable ones, we can continue backing our partners with royalty-based capital in projects that by then would have been de-risked from the standpoint of key interconnection progress. On potash, we heard ongoing positive remarks from our operators. We anticipate record worldwide demand both this year and next, together with limited production and shipping capacity among major global competitors. In most areas, pricing continues to climb. Nutrien and Mosaic both kept talking about low-cost production growth that might allow them to maintain or expand market share while overall demand rises steadily. That capacity to add volume incrementally stays solid over the coming few years, before larger brownfield-style expansions become necessary to preserve market share. Following the quarter, we bought a royalty interest in a new potash mine project that Buffalo potash is developing. The project relies on newly patented solution mining technologies meant to boost efficiency compared with traditional solution mining. Buffalo has since started injecting solution into the targeted potash horizon in what the company refers to as its first production modules. During the quarter, benchmark-quality iron ore prices declined. Higher-purity concentrate and pellets, however, saw premium increases that offset that drop. Quarter-over-quarter, IOC production likewise rose, yet it remained comparatively low relative to nameplate capacity. Across the operations, substantial spending is underway to enhance ore accessibility along with equipment and plant performance. Because of those investments, IOC has continued not to issue equity dividends to shareholders, and lately the enhanced shareholder dividend has come entirely from royalty revenue. At Kami, our partners Champion, Nippon, and Sojitz are continuing feasibility work along with discussions involving stakeholders. We received encouraging news too about possible large hydroelectric agreements and development in that region, which could address the bottleneck that this specific project was designed around. On project generation, the team stayed occupied locating opportunities for deployment at the equity level, and those mostly featured royalty creation elements too. This effort keeps expanding our longer-term royalty pipeline and adds to the strong progress achieved last year, which stood out through the swift advancement of the Arthur Gold project and the underlying royalty interest we hold there. At Arthur, AngloGold Ashanti kept moving its feasibility study forward. They said the goal is to keep producing for decades at about 500,000 ounces annually, and they mentioned that current exploration targets might significantly boost the district's annual output capacity. If anyone's curious, there's a property in our presentation that AGA recently put up on its website. That presentation lays out the potential for more growth and scale <<inaudible>> streams. So with that, I'll open it up for questions—but first, let me thank my teammates one more time for their amazing work. You're the smartest, hardest-working team in the business, and it's a real privilege to work with you. Thank you.

Orest Wowkodaw

analyst
#4

I was hoping you might be able to share a little more detail about the acquisition announced this morning. From what the press release said, I believe there's an NPI tied to the Josemaria project, which I take to be within the Kona district alongside Lundin BHP. Could you walk us through what the royalty actually is? And roughly what share of Josemaria it might cover? I'm just unclear whether it's only a small slice or whether it applies to the entire deposit.

Brian Dalton

executive
#5

Orest, yes, it spans 2 claim units, I believe, inside the broader land package. It doesn't really cover any of the known mineralization, though the southeast corner of the Josemaria deposit essentially touches right at that corner. So yes, I'd view it as more of a longer-term optionality play within the district rather than something tied to any of the known mineralization states; and yes, it is a net profits interest royalty. We would certainly rank it as a lower priority than the other 2 assets we covered in the presentation; so it's not good long-term optionality.

Orest Wowkodaw

analyst
#6

Got it. Alright. So that isn't included in the present reserves, resources, or mine plan?

Brian Dalton

executive
#7

Possibly, though it clips a corner of it.

Orest Wowkodaw

analyst
#8

Okay, understood. And then, I do like that you're putting additional copper exposure into the portfolio here. I'm also wondering whether you're seeing further opportunities out there similar to this one that could, I suppose, build up that copper exposure?

Brian Dalton

executive
#9

A few. I mean, we maintain our own roster of projects that we believe have a chance of entering this market and addressing that shortfall that all of us see coming. And with some of them, especially as they line up project finance, the signals we're receiving suggest there will be a few openings on certain things there. Now the question is always whether those operators will attempt to stream buy products rather than the copper we'd be interested in. But yes, there is a bit of a pipeline building. Obviously, plenty of people are pulling studies off the shelf and working toward the stage where they're aiming at investment decision dates and that kind of thing. Obviously, this is the first time we've witnessed that in over a decade.

Orest Wowkodaw

analyst
#10

Yes. That's fair enough. And clearly, we have observed — I mean, Altius has been quite busy on the deal side over the past year or so. Should we expect that to keep going through '27?

Brian Dalton

executive
#11

Perhaps it isn't really something that — apart from the moment we closed the Arthur transaction, we did feel what I'd describe as pressure, though really an opportunity, to put that capital back to work in even more assets, and in things that sit more probably along our more traditional commodity interest lines. But this particular one was more opportunistic in nature rather than any sort of big concerted effort? Like I'd just like right now, the growth optionality already embedded in the portfolio across current operating assets or things that are under construction or that we believe can get sanctioned. If something really attractive comes along, sure, we'll be there, but it's not an imperative by any means; so we're in really good shape for this market and what's coming.

Craig Hutchison

analyst
#12

I've got a couple of questions, and they're specifically about the renewables royalty business. With the political landscape shifting here in the U.S., do you view that as an opening for you folks? The Democrats were clearly quite supportive of renewables, obviously. That's my first question. Then, you brought up these interconnection deposits in your opening remarks, and obviously they're very uneven from one quarter to the next. But how should we be thinking about that as we head toward Q4? And are there any expectations of that looking out to 2027?

Brian Dalton

executive
#13

That's a good question. The question is whether the incoming Congress will be a tailwind or a headwind. Some people would make the case that the restraint the data center industry is going to run into could signal a longer-term drop in demand. I don't really accept that, because frankly, there was never any possible way to supply enough electricity for what was being promised in any scenario; and I suppose, more broadly, the Democrats definitely lean more toward — at least they're not — it isn't a full-on assault on the industry the way it has been, right? So again, even so, despite a full-on assault on the industry, in a really ironic way, this recent administration has probably done more to grow the industry than any of the prior recent Democrat government; so who knows. All I know is the U.S. needs so much new electricity generation overall, data centers or no data centers; and if you can get it onto the grid, if you can connect to the grid, there's going to be somebody who wants to buy that power and help to finance our projects. So it's a busy, busy pipeline there.

Craig Hutchison

analyst
#14

About the interconnection deposits—any sense of how much visibility that gives us into Q4, or thoughts on what we ought to factor in as we head toward the next year?

Brian Dalton

executive
#15

Yeah. Demand is still very much there. As I mentioned in the prepared remarks, the size of those deposits has been climbing quite sharply—that's really the dynamic at work—and the queues are simply too backed up. So pushing deposits onto developers does weed out some of the weaker, more speculative players, but real projects are genuinely feeling the pressure, I think, from having to put up a deposit that large while also trying to keep the project moving forward. So, yes. The team now has a very solid pipeline. Whether that business is sustainable over the long haul, I can't say at this point. It will depend on how this congestion—the interconnection congestion problem—how long-lasting it turns out to be, and on how much system operators feel they need to keep pushing back with these sizable deposits. I don't see any easing of it on the horizon. That said, it's a fairly new situation, and we hold a really strong position there. Hopefully it translates into far more long-term recurring cash flows through royalty deployments, though I can't promise that right now. For the moment, though, we're seeing it, to claim.

John Tumazos

analyst
#16

Could you walk through the timeline for the T&R assets, or say in which year you expect each of them to start reporting revenue?

Brian Dalton

executive
#17

Well, Mariana is in production already, so it's in ramp-up at the moment; revenue from it ought to start flowing very, very soon. As for the Los Azules asset, I can really just point to what then copper has published; they're aiming for a final investment decision around the middle of next year. And they've outlined a construction window of about 3 years after FID. So they're aiming at some point in 2030, and that will be a leachable operation. So when it comes to revenue, I think we'd probably be looking more at 2031 for royalty revenue, if their plan comes to fruition.

Gabriel Chu

analyst
#18

Sorry, I had myself on mute there. My apologies for that. I just wanted to return to the renewables side, since given the demand you're seeing, maybe you could talk about where bottlenecks are showing up that would serve as a kind of ceiling on GBR growth?

Brian Dalton

executive
#19

Well, that's sort of what it's built to do, isn't it — locate bottlenecks in the sector and locate ways to tackle them. So obviously, we're all aware the interconnection process is a total bottleneck, and that's really just a reflection of the state of the grid at present. Another one, though, would have to do with — we've seen the — lots of the tax credits beginning to phase out. So much of what's going on today is people hurrying to get ahead of those deadlines. But past that, that leaves a gap in the capital stack overall that is going to hurt or certainly probably shrink the amount of tax equity these projects receive. So that shortfall will have to be filled somewhere; so we're fairly confident our offering will be able to substitute quite well for a chunk of that; but past that, it's the things we all hear about, it's simply hard to source equipment — everything from transformers, the panels to you name it, there's just tightness and bottlenecks everywhere. It's a generational level increase in demand growth in the system, it's system straining all over, but it's everything really — there's bottlenecks and challenges everywhere, and that's our job, to find solutions for it.

Analyst

analyst
#20

Right. Okay. But I'm just wondering — since you brought up the capital hold — do you think there are more opportunities to allocate, say, additional capital to that side? Or is it perhaps like, are you thinking maybe...

Brian Dalton

executive
#21

I think royalty financing can work really well as a substitute for tax equity in this case. I guess the other side of that, being really honest, is that compared with a few years ago, what we're seeing right now is that if you have an advanced stage project, you can pretty much name your duration for even a contract with really high-quality counterparties over long durations. So that obviously is really supportive of how much leverage you can put on one of these projects. But still, I think really our job is to think about the equity side of the equation and the holes that are there and finding ways to substitute for that; and that is where we're getting a lot of our traction right now and where most of our — most of our discussions and term sheets are flowing around. It's people who are thinking about ways they can optimize the equity returns on their projects with our capital.

Mac Whale

analyst
#22

Could you just remind us about the <<inaudible>> expansion, now that they have Riggi — what's the timing for that expansion?

Brian Dalton

executive
#23

Ernie, maybe you'd like to jump in on that one for me? I honestly don't know of any timeline that has been published.

Ernie Ortiz Ortega

executive
#24

Yes, Brian, that's right — no specific timeline has been published by them. But if you go back to when they acquired Neo Lithium, from that point to first production, it happened fairly quickly, somewhere in the range of 2.5 to 3 years. So judging by what they're currently doing, first production out of Pordaskobradas could come before the end of the decade. They're also finding efficiencies for Phase 2, since the chemical plant will very likely be located on site, which could bring down both cost and transportation. So, as Brian mentioned, no specific timetable has been given. Still, given how Phase 1 went, we believe it could happen before the end of the decade, and their commitment to Argentina and Tuscarora is full.

Mac Whale

analyst
#25

All right. You brought up that there was some bad weather — rain, I believe — affecting the ponds. Would that tend to be worked through inside a year? Or could it stretch production out for longer?

Ernie Ortiz Ortega

executive
#26

That's a fair question. So I believe we will see, with the unfavorable weather patterns this year and a notably stronger El Nino. Rio Tinto, along with a few other companies in Argentina, flagged the bad weather. So we'll see. What's reassuring, though, is that they are still raising output on the whole and they intend to expand; so on balance, they are showing some improvement. But regarding when that situation improves, we'll just have to wait and see.

Mac Whale

analyst
#27

All right. All right. And since you're at the mic, regarding core lithium, is there any expansion plan once this ramp-up is done?

Ernie Ortiz Ortega

executive
#28

From what I understand, expansion plans do exist over time. So as you may remember, the DMS plant was originally 1 million tonnes of ore; at this point they are specifically citing 1.2 million tonnes of ore. And based on what we gather and what's in the public domain, they have plans that could go beyond that. The ramp-up is progressing well. Production began in the third quarter, and the first shipment remains on track for this fourth quarter. The team and I will be on site next week, in fact. But from our discussions, everything is ramping up smoothly, though they do have plans for potential growth as the market keeps expanding.

Flora Wood

executive
#29

Thanks, Vincent, and thanks to all of you for being with us. We appreciate the excellent questions in particular, and we look forward to speaking with you once more when we share our year-end results.

Brian Dalton

executive
#30

Thanks, everyone.

Stephanie Hussey

executive
#31

Thank you.

Operator

operator
#32

Ladies and gentlemen, that brings us to the end of today's conference call. Thanks to each of you for joining us. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Altius Minerals Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Altius Minerals Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Altius Minerals Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.