executiveThanks, Ashya. I appreciate everyone being with us for Alto Ingredients' conference call covering fourth quarter and full-year 2024 results. Joining us are our President and CEO, Bryon McGregor, along with CFO, Rob Olander. After the market shut today, Alto Ingredients put out a press release laying out the company's financial results. We've also put together a presentation for this call, and you can find it on the company's website, altoingredients.com. There will be a phone replay of this call you can access until March 12, and you'll find those details in today's press release. A webcast replay is going to be available too on Alto Ingredients' website. Keep in mind that what we share on this call is only accurate as of today, March 5. Be aware that any information that's time-sensitive might not be correct anymore whenever a replay gets played. Take a look at the safe harbor statement on Slide 2 of the presentation that's online — it explains that certain remarks made during this call are forward-looking statements and considerations involving risks and uncertainties. Alto Ingredients' actual future results might wind up differing materially from those statements. Among the factors that could cause or contribute to those differences are events, risks, and other factors that have been disclosed previously and may be disclosed periodically in Alto Ingredients filings with the SEC, though that list isn't exhaustive. Unless applicable law requires it, the company takes on no obligation to update any forward-looking statements. During management's prepared remarks, non-GAAP measures are going to be referenced. Management relies on these non-GAAP measures to keep tabs on the financial performance of operations, and management believes they'll help investors evaluate how the company performed during the periods being reported. Consolidated net income or loss before interest expense, interest income, provision for income taxes, asset impairments, unrealized derivative gains and losses, acquisition related expense, and depreciation and amortization expense — that's how the company defines adjusted EBITDA. A reconciling table was part of today's press release to help with the company's review of non-GAAP information. On this call, Bryon is going to walk through a review of our strategic plan and activities, while Rob will offer commentary on our financial results. Bryon is going to wrap things up and then open the call for questions. I'm happy now to hand things over to Bryon McGregor. Go ahead, sir.
Bryon McGregor
executiveThank you, Kirsten. I appreciate everyone being here today. There's quite a bit on the agenda. The things that went our way and the things that did not. The steps we've already taken in response and the further actions we'll pursue to build on our strengths and capture our opportunities. Let me begin with a few highlights; back in January, we used a long-term partnership to pick up a beverage-grade liquid CO2 processing plan next to our Columbia facility, which strengthens the economics and lifts asset valuation. This deal will boost both revenue and earnings at our Columbia site, and it will also generate cost synergies and avenues for growth. On top of that, during the fourth quarter of 2024, and once more in the first quarter of 2025, we moved to streamline our footprint and lower costs while continuing to serve customers and pursuing our aim of being a low-cost producer. We'll get into that in more detail shortly, but I want to point out that these steps, together with the related non-cash impairments, account for a substantial share of the losses in Q4 and in the 2024 year-end results. Finally, as part of what we're continually doing to maximize shareholder value, and with help from our financial and legal advisors, we're evaluating a wide set of alternatives, among them asset sales, a merger or other strategic transactions, so that the company's long-term value potential is better aligned. Moving to our operational review, as we anticipated and talked about on our previous call, market conditions in the fourth quarter were difficult and crush margins declined versus both the prior quarter and the prior year, which Rob will get into shortly. As I mentioned, we've put the following cost saving initiatives in place. First, we cold idled Magic Valley. For some context, back in 2022, we identified a chance to capitalize on premium pricing in high quality protein and corn oil. Chasing higher output of high margin products, we installed and commissioned a high-quality protein and corn oil technology. That said, the installation ran far longer and cost much more than we had anticipated. On top of that, we failed to fully appreciate how much the buildout of renewable diesel and soy crush capacity would depress corn oil and protein market prices in that region. With the added effect of the sharp swing in delivered corn prices for Western operations relative to Midwestern facilities, running our Magic Valley plant at a profit became impossible. By cold idling the plant and reducing our variable and fixed costs to the greatest extent we could, we ended the drag on the profitable parts of our business. For the fourth quarter, we recorded a significant impairment charge tied to this plant. To partly cover the remaining carrying expenses and to keep serving our customers in that area, we are using Magic Valley opportunistically as a renewable fuel terminal. Second, we rationalized Eagle Alcohol. Since we acquired it, we've folded Eagle Alcohol's high-quality alcohol bulk operations and customers into our Pekin and Kinergy marketing business. Through this reorganization, we lowered headcount at the Eagle Alcohol. At this point our focus is on making the remaining break-bulk warehousing and trucking operations into a profitable service center. Third, we carried out further actions to right-size the business; we matched the organization to a reduced operational footprint, all while keeping customer support at a high standard. Across Q4 2024 and Q1 2025, we adjusted our workforce, bringing down both COGS and SG&A; taken together, we anticipate annual savings of roughly $8 million, which should strengthen our bottom-line run rate and help us manage liquidity. We keep assessing ways to expand our higher-margin products, releasing untapped value and gaining better efficiency. To be more specific, carbon markets remain promising, and as of January 1, 2025, we bought Kodiak Carbonic, a processor of beverage-grade liquid CO2, for a little more than $7 million in cash along with working capital. This processing site, now called Alto Carbonic, sits on the very same property as our Columbia plant in Boardman, Oregon, and has run at a profit since its first full year of operations in 2016. At Alto Carbonic, biogenic CO2 gas that arises as a byproduct of fermentation at our Columbia plant is taken in and turned into premium liquid CO2. That finished product goes to buyers in the Northwestern region of the United States, where it is used for food and beverage processing, industrial cooling, and other purposes. On average, the facility turns out about 56,000 tons of liquid CO2 each year, and it has the capacity to make more than 70,000 tons annually. This deal, which featured an amended long-term sales offtake agreement with a leading North American industrial gas supplier, was immediately accretive and comes with an attractive payback of roughly two years; we have been integrating the plant with our Columbia facility, which is improving coordination and collaboration between the operations. We anticipate capturing further cost savings through synergies in production and overhead. We are also looking at a chance to expand storage capacity so we can improve logistics and capitalize on spot market demand for premium liquid CO2. To put an even finer point on it, this acquisition immediately halts the recent unprofitability at the Columbia site, gives us a sturdier financial base for overcoming destination plan competitive challenges, and substantially raises the value of these combined assets. At our Pekin campus, we likewise keep working hard on opportunities to optimize our CO2, which in the past was viewed merely as a waste stream of little value. In November, we reached a milestone by completing our CO2 transportation and sequestration agreement with Vault. This partnership will be essential as we execute carbon capture and storage, or CCS; in December, Vault filed the formal application for the EPA Class VI permit that is needed to begin construction of a CCS pipeline and for long-term CO2 storage in deep geological formations. The complexity involved in building operations to capture, transport, and store CO2 demands considerable development and planning work. The EPA calls for extensive site analysis, monitoring, and safety measures to protect underground water supplies. At present, the approval process is expected to take at least two years. We think this gives us the time we need to deal with Illinois's existing moratorium on new CO2 pipelines, which falls under the SAFE CCS Act and stays in force until July 2026, or until revised federal safety standards come out, whichever happens first. Even though the CCS project timeline has moved slowly, it's worth acknowledging the major shifts that have taken place in the CCS landscape and in the carbon regulatory and political markets over that period. Alto's deliberate pace has worked in our favor as we work through these changes and find more effective and efficient options. The longer period needed for regulatory approvals gives us room to put the necessary infrastructure plans in place, including compression and energy solutions. We also plan to use this time to lock in financing; beyond that, together with Vault, we're concentrating on meeting local groups and authorities to teach the community about the process, build stronger support, and respond to concerns. As for our ongoing business at the Pekin campus, we're proactively adjusting operations to supply the higher value products the market wants. During our biennial wet mill outage in May 2024, we managed to boost plant utilization. Because of that, the wet mill has been running at nameplate capacity of 100 million gallons. Q4 Pekin campus production volume rose 3.8 million gallons compared with the prior year; this 7% increase shows how well our maintenance program works. Bringing these improvements into 2025, we expect to make an additional 8 million gallons for the year, bringing down our cost of production on a per gallon basis and giving us a chance to produce a larger volume of specialty alcohols. On renewable fuel, more than a year ago, we sought ISCC certifications so we could ship qualified renewable fuel to the EU at a premium to our domestic alternatives. Both Alto ICP and Pekin received ISCC certification in late summer. We started exporting certified product to Europe markets in Q4 and expect to grow exports further in 2025. In premium specialty alcohol, our certifications and customer relationships remain material differentiators. For 2024, we sold almost 92 million gallons of specialty alcohol. In 2025, our aim is to balance production levels between specialty alcohol and ISCC product to maximize margins and meet customer needs. Since our last call, we finished another ISO 9001 audit; and I'm proud to say there were no adverse findings, which speaks to our culture of quality at Alto; now, I'll hand the call over to Rob.
Rob Olander
executiveThank you, Brian. Prior to going over the quarter, I want to call attention to the actions on the cost side that we have implemented to bolster our financial performance. As Brian noted, we placed the Magic Valley facility into a cold idle, streamlined our Eagle Alcohol operations, and brought our headcount down by 16% so that it matches the smaller footprint of the company. Taken together, the reductions to our workforce should bring our yearly costs down by $7.8 million. That savings breaks down as 74% within cost of goods sold, or COGS, and 26% within SG&A; we anticipate capturing the complete financial benefit starting in Q2; these reductions are significant. To put that in perspective, if those measures had been in place throughout 2024 and nothing else changed, adjusted EBITDA for the year would have been positive. Now I'll go over how the financials looked in Q4 2024 compared with Q4 2023. Our volume reached 95.1 million gallons, up from 92.5 million gallons during the same quarter a year earlier, driven by better output at our Pekin campus thanks to the scheduled repairs and maintenance program. At the same time, the average price we sold each gallon for was $1.88 in Q4 2024, down from $2.24 in Q4 2023, and those softer market prices reduced net sales by $38 million on a year-over-year basis for that quarter. The market crush margin fell by almost $0.18, which produced an $8.7 million net unfavorable effect on gross profit. Beyond that, our protein returns took a hit from the expanded soy crush needed to satisfy renewable diesel demand, a larger wet feed product mix, and a key customer's inability to accept deliveries in the wake of Hurricane Helene. Although low carbon fuel credit prices were likewise lower than a year earlier, they came up from Q3 2024 and are climbing back from their market lows. I'll go through the factors that affected our COGS in Q4 2024. Within adjusted EBITDA, derivative losses we actually realized came in $1.2 million above the comparable 2023 quarter — $3.5 million this time, compared with $2.3 million then. Unrealized derivative gains, which adjusted EBITDA excludes, totaled $5.5 million on the plus side, versus an $8.2 million loss — a year-over-year improvement of $13.7 million. A $3.5 million reserve stemmed from our non-cash adjustment bringing physical inventories to a lower cost per market plus the mark-to-market on corn commitments, and that figure was $1.3 million worse than twelve months prior. As a result, we had a total gross loss of $1.4 million, which is better than the $2.5 million gross loss we saw in Q4 2023. In Q4 2024, we took $5.7 million in final expenses related to the Eagle Alcohol acquisition—$5 million of that was non-cash—compared to $700,000 in Q4 2023. Asset impairments in Q4 2024 added up to $24.8 million. That breaks down into $21.4 million from cold idling our Magic Valley plant and $3.4 million on intangibles from integrating certain Eagle Alcohol activities. In Q4 2023, the comparable figure was $6 million tied to goodwill for Eagle Alcohol. Our consolidated net loss was $41.7 million, and that included $30.5 million in asset impairments and acquisition-related expenses. In the same quarter of 2023, we posted an $18.9 million net loss, a period in which net expenses reached $6.7 million across asset impairments, costs tied to acquisitions, and the USDA grant. For Q4 2024, adjusted EBITDA came in at negative $7.7 million, a figure that reflects $3.5 million of realized losses on derivatives. The comparable quarter of 2023 showed positive $3.5 million, which included $2.3 million in realized derivative losses. Keep in mind, as you may recall, that the most reliable method for determining the derivative value or obligation set to be realized later, valued as of a given date, involves checking the amounts recorded on our balance sheet. The net derivative asset or liability reflects the amount Alto would realize by settling every position at that particular period-end date. At December 31, 2024, the company's net derivative asset position came to $2.1 million. On that same date, cash on hand was $35 million, while total available borrowing capacity under loans reached $88 million — this comprised $23 million through the operating line of credit plus $65 million available under the term loan facility, subject to certain conditions. Cash flow from operations for 2024 was negative, with $3.5 million used. Capital expenditures during 2024 totaled $11.1 million. Repairs and maintenance expense came in at $34.6 million, matching the estimate for 2024. To wrap up, the steps we took to reorganize have strengthened where the business stands financially. More than $30 million came through in the form of asset impairments along with costs tied to earlier acquisitions, which gave us a fresh starting point. On top of that, we trimmed yearly ongoing costs by $8 million. Alongside better results from the Pekin wet mill, the premium liquid CO2 processing deal that fits well with what we already do, and our push into Europe, we feel good about 2025. At this point, I'll hand things back over to Bryon.
Bryon McGregor
executiveThanks, Rob. To sum up, on a daily basis our attention is on going beyond what customers expect from the services we deliver and the products we offer for sale, along with getting the most value possible out of our specialty alcohol and essential ingredients. The Alto Carbonic acquisition we completed not long ago strengthens the economics and lifts the valuation of assets at the Columbia facility. The reorganization we carried out boosts profitability in a way that is more sustainable and consistent, and it strengthens our pledge to build shareholder value over the long term. Operator, we're ready to start the Q&A with sell side analysts.
Sameer Joshi
analystHello there, good afternoon, Brian and Rob. I appreciate you both fielding my questions.
Bryon McGregor
executiveGood afternoon, Sameer. Regarding what we're doing with Carbonic, in what way do you intend to strike a balance between sequestering carbon and obtaining that high-premium carbon dioxide meant for beverages? Do you have some kind of plan for that? Now, opportunities for sequestration of carbon might exist in the Pacific Northwest, but they aren't nearly so obvious or widespread there as they are at our facility in Pekin. Plus, the way carbonic is structured and arranged is plainly advantageous to us, especially across the duration — an extended stretch of time spent under contract. Things are intriguing and unusual in the Pacific Northwest, since CO2 supply there is scarce, especially when you consider the Pacific coast, where you've witnessed a substantial decline in how much CO2 refineries and similar operations generate. Thus it's a distinctive marketplace, and nearly all product entering that area travels long distances, which isn't efficient. That leaves the facility uniquely positioned to capitalize on the requirements present and the demand from the market in that region. So at present, this is likely the single most effective use of that CO2.
Sameer Joshi
analystGot it. As far as this location goes, has it already been approved for the 45Q incentives, or would additional steps be required before that can be sorted out?
Bryon McGregor
executiveWe're quite near on that. Yes, quite near. Obviously, 45Z still has tasks left to complete, but when you consider the Columbia facility's total score, it sits close enough to meet what's needed. So this is definitely an area we intend to concentrate on. Once those regulations get formalized and the potential becomes clear to us, we'll share further details with you.
Sameer Joshi
analystGot it. Then regarding specialty ingredients or high-value alcohol, I believe you mentioned 92 million gallons for 2024. You also have the EU export possibility. Do you know, or can you estimate, what portion would go to the EU rather than domestically? And in what way does that split affect pricing and profitability for this?
Bryon McGregor
executiveBecause of how this product is, it genuinely commands a premium, and that clearly hinges on — there isn't a single price across the entire EU. Every nation and every site has its own specific needs. So this isn't simply an easy win. That being said, view it as replacing what would otherwise be sold as fuel in the domestic market. Thus it isn't necessarily a substitution or a use of our premium product. And we still aim to keep reaching the large volumes we have managed to achieve. But it comes down to — considering the versatility our Pekin location gives us, our capacity to switch among products and capitalize on better market conditions, it offers a strong chance for us to optimize profitability there, or at minimum revenues in that part of the world and within our operations.
Sameer Joshi
analystGot it. Then for the final one — the asset sale compared with a merger or other strategic alternatives — where do these talks stand right now? Is there a specific asset you've already singled out as the first candidate for divestiture, or are you in conversations with someone? I'm just trying to understand where things are on that front.
Bryon McGregor
executiveYeah, that's a good question. Discussing M&A, the opportunities and the activities isn't really something that's productive for us. But let me be clear: every option is on the table as part of what we're continually doing to maximize shareholder value and to better align the company's long-term value potential. So when updates happen, we'll effectively provide them.
Sameer Joshi
analystThat seems reasonable. I appreciate you fielding these, Bryon.
Bryon McGregor
executiveOf course.
Eric Stine
analystHi, Bryon. Hi, Rob.
Bryon McGregor
executiveHello.
Eric Stine
analystHi there. Could we circle back to Pekin regarding the CCUS? I realize you've got plenty on your plate. You're managing how long the EPA permit process stretches out, plus that moratorium over in Illinois. Just mulling it over. So, the expectation is that this takes 2 years, which lands you in early 2027; during that window you'd be pursuing financing. Then thinking ahead, okay, if you decided to greenlight the project at that point, give us a reminder of how much time construction would require, and what kind of schedule we should anticipate before this begins adding to results. Would that be 2029, or 2030, or might it come earlier than those?
Bryon McGregor
executiveYeah, great question there, Eric, and I suppose I'm a bit hesitant to hand you an exact date. What I can tell you, though, is that it hinges heavily on which technology gets used, your compression tech, that sort of thing. So, and the, the line you might need to wait in based on whatever technology you're applying with; with that said, if you consider the, running your math once more, it brings you to, just for your classics permit approval, assuming EPA holds to their pledge, which amounted to 2 years, and we're all aware of how tough the situations EPA is currently facing are, along with how many items sit in their queue; that said, if we proceeded that way, you'd figure that — I can't address the queue, but the line is — the backup line alongside the others in the technology. But suppose it's an additional 1 to 2 years, let's be generous and call it 2 years, where does that leave us, 2029, 2030?
Eric Stine
analystAll right, understood. I was just verifying whether that...
Bryon McGregor
executiveThere's also a chance you could speed things up, correct? Eric, it's possible for you to move faster. Should the situation shift among those who've made deposits on piping and other items, and you receive approval, opportunities might exist for you to capitalize on that, which others might lack; that could be hastened considerably. So once more, numerous elements are influencing this. Yet we're keeping our attention fixed on it, highly dedicated, and we've got a solid ally in pushing this forward and attempting to speed it up to the greatest extent possible.
Eric Stine
analystOkay, so regarding the Columbia plant — you brought up that acquisition. If you hadn't done that deal, would you have considered putting that site into a cold idle too? It seems like now that the purchase has happened, that option is no longer on the table, but what was the reasoning behind it, given where the market stands?
Rob Olander
executiveSure, I can address that. Like I've said before, our two Western locations faced real difficulties from regional factors — specifically elevated corn bases and the fact that those plants are on the smaller side. In the end, what we did at Magic Valley using high protein and corn oil technology simply couldn't offset those regional problems, especially once you factor in how the extra soy crush affected carbon, corn oil, and protein pricing. That's what drove us to shut things down in Q4 — we simply had no way to get past it, at least not right now. With Columbia, though, the situation was favorable, and we managed to use the connection we already had to pick up this CO2 processing facility, which truly transforms things for that location. Let me emphasize that point. This is a highly compelling deal with a strongly accretive payback for the site. So we're quite enthusiastic, especially since there's a bigger chance to grow the CO2 side of the business. At present, we're running roughly 55,000 tons annually through that facility, but existing capacity could take us nearer to 70,000 — and we're currently utilizing only about 50% of the CO2 waste gas available at Columbia.
Eric Stine
analystUnderstood, all right, no, that's completely logical. Perhaps one more from me — you brought up Magic Valley. I'm simply wondering, given that cold idle situation, I recall you were working through the possibility of possibly returning to CoPromax, whether that was about damages or determining the best way forward. How does — I mean, does this affect that effort in any way, perhaps alter what we ought to expect the outcome could be?
Bryon McGregor
executiveBroadly speaking, no, Eric. I believe we have assessed things — that isn't to say we won't chase whatever we're able to when it comes to tackling problems beyond the plant itself, involving technology providers and such; even so, we reached a decision and have — taken the steps that were necessary to stop the bleeding and essentially to get that facility positioned until a chance arises to capture more of that value; and whether that comes about via an asset sale or some other unique opportunities, there's a meaningful shift in the marketing. But as things stand right now, the facility sits idled and the staffing adjustments have been substantially made there too. So we're operating it as a terminal, as we mentioned, in our — and it's offsetting — it's advantageous on that front since it offsets a portion of the fixed costs you'd otherwise be stuck carrying.
Eric Stine
analystGot it.
Bryon McGregor
executiveEven with <<inaudible>> plan.
Eric Stine
analystAll right, got it. Appreciate that.
Bryon McGregor
executiveThanks, operator, and once more, everyone, thank you for being with us today. As a closing point, later this month we'll be taking part in the 37th Annual Roth Conference, and we hope to see those who are there. We're grateful for the feedback you continue to give us, as well as your support. Have a good day.
Operator
operatorThat brings us to the end of this call. We appreciate your joining us for today's presentation. You're welcome to log off now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Alto Ingredients, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Alto Ingredients, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Alto Ingredients, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.