Ampco-Pittsburgh Corporation (AP) Earnings Call Transcript & Summary

November 15, 2022

New York Stock Exchange US Materials Metals and Mining earnings 35 min

Earnings Call Speaker Segments

Michael McAuley

executive
#1

Thanks, Jason, and good morning to all of you who have joined us for this third quarter 2022 conference call. With me today is Brett McBrayer, our Chief Executive Officer. Additionally on the line today are Sam Lyon, who serves as President of Union Electric Steel Corporation, and Dave Anderson, President of Air & Liquid Systems Corporation. Prior to getting started, I want to remind all of you that those participating on this call might make statements or comments that are forward-looking and could include financial projections or other statements regarding the corporation's plans, objectives, expectations, or intentions. Such matters carry certain risks and uncertainties, and many of these lie outside the corporation's control. The corporation's actual results could differ significantly from what is projected or suggested in any forward-looking statements because of various risk factors, including those addressed in the corporation's most recently filed Form 10-K and subsequent filings with the Securities and Exchange Commission. We assume no obligation to update or otherwise publicly release any revision to our forward-looking statements. A replay of this call will be made available on our website later today. To access the earnings release or the webcast replay, please look at the investor section of our website at ampcopgh.com. With that, I'll hand the call over to Brett McBrayer, Ampco-Pittsburgh's CEO.

Brett McBrayer

executive
#2

Thanks, Mike. Morning, everyone, and I appreciate you being on the call. As we noted in the press release that went out recently, Ampco-Pittsburgh had net income of $0.8 million during the third quarter of 2022, which worked out to earnings per share of $0.04. Sales for the quarter grew 23%, and on a year-to-date basis we're ahead 14% compared with the prior year. Air & Liquid Systems set yet another record for backlog this quarter, and we don't see any weakness on the horizon. This December, the first piece of new equipment arrives for the modernization of our U.S. assets. We delivered this positive quarter even though there were considerable negative headwinds coming from European energy prices, which hurt volume at our facilities in Sweden, the U.K., and Slovenia. Softening in the European market is still visible, and that will persist for as long as energy prices stay at historically high levels. The North American market, on the other hand, is still strong for forged and cast engineered products as well as for Air & Liquid Systems. On the safety side, I'm happy to say that our results this quarter remain on a positive trajectory. With that, I'll hand the call to Dave Anderson, President of Air & Liquid Systems, who will discuss how his segment performed.

Dave Anderson

executive
#3

Thank you, Brett, and good morning to everyone. When the third quarter closed, Air & Liquid Systems hit yet another all-time peak in its backlog. For a third quarter in a row, that backlog has set a fresh record. Over the last nine months, backlog is up 54%, and across the past 12 months it has climbed 80%; order activity remains substantial, since the adjustments we've implemented in our sales force keep delivering favorable outcomes. Q3 sales came in 20% above the same period a year earlier, driven mainly by greater shipments of heat exchangers and custom air handling units. We're still working through near-term supply chain challenges, among them longer lead times for materials and deferrals requested by customers. Third-quarter operating income matched the previous year, as the benefit of higher shipments was canceled out by an unfavorable product mix. On a year-to-date basis, operating income ran 12.6% higher than a year ago. Air & Liquid Systems has now completed nine months of its multi-year strategic growth plan. Sales in Q3 stood 22% above Q1 of this year, and each quarter our backlog has kept setting records; looking at the quarters to come, we'll press ahead with a number of growth initiatives as we extend the positive momentum already in place.

Brett McBrayer

executive
#4

Thanks, Dave. At this point I'll hand things over to Sam Lyon, who serves as President of the Forged and Cast Engineered Products segment.

Sam Lyon

executive
#5

Thanks, Brett. In the third quarter of 2022, the Forged and Cast segment's backlog fell 10% from the prior quarter, though it has risen 2% since the start of the year. The main reasons are erratic ordering patterns, lower activity in oil and gas, and adverse currency translation on our foreign backlogs. Sequentially in Q3, currency translation was responsible for 30% of that decline, and on a year-to-date basis it has cut our backlog by roughly $16 million; October brought a very strong booking month of $35 million, lifting our backlog 6%. Activity in the U.S. roll market is strong, driven by a shift toward a more local supply chain. Europe remains weak because of high energy costs there. We keep flexing costs and moving products to the locations that deliver the greatest value to our customers. The intermediate term outlook for the U.S. is very strong, with new projects being installed by Big River Steel, Nucor, Novelis, and most recently Steel Dynamics, which announced a $2.5 billion aluminum mill. Historically, we have held a very strong position in aluminum mills. We are also pursuing a zero carbon footprint in Sweden and aim to achieve certification to that effect in 2026. This plant's carbon footprint is already extremely low, and it is 100%. Non-CO2 producing generation supplies 100% of its electricity. Inflation has started to ease and in some cases has turned deflationary. Compared with the end of 2021, key inputs including scrap and moly oxide are in a deflationary position. Transportation has eased and is roughly flat versus January 2022. Ferrochrome has stayed stubbornly high because of where supply is located and how energy-intensive it is to produce this material. Energy in the U.S. has eased, as it has in the U.K., where we have faced the largest headwinds. The U.K. government recently announced a price cap for natural gas and electricity, lowering the cost by more than 50%, and it will remain in place through the end of Q1 2023. As we said before, we worked tirelessly to get these volatile costs incorporated into a surcharge so our business end results are insulated from these types of swings. We have succeeded in this arena; beyond that, we have managed to raise base pricing in 2022 and 2023, though not by the level of general inflation; we will concentrate on raising base pricing in future contracts to recover costs such as general operating supplies and thereby improve profitability. As Brett said, our expansion and modernization programs for our U.S. plant assets keep moving forward. The first machine arrives in December, with commissioning expected to be finished in Q1 of 2023. This quarter we will complete acceptance testing on the next two machines. Machine two and three are set to be fully operational in Q2 and Q3 of 2023. These investments have us enthusiastic, since they will deliver a cheaper cost structure within our roll business along with additional expansion in the non-roll business. At this point I'll hand things back to Brett.

Brett McBrayer

executive
#6

Thanks, Sam. Right now, our Chief Financial Officer, Mike McAuley, is going to walk us through additional specifics about how we did financially during the quarter.

Michael McAuley

executive
#7

Thanks, Brett. The Form 10-Q for the third quarter of 2022 was filed yesterday, so I'll go through some Q3 highlights at this point. Ampco recorded net sales of $99.6 million for the third quarter of 2022, an increase of about 23% over net sales in the third quarter of 2021. Driving that was a 23% increase in sales in the Forged and Cast Engineered Products segment, which came from improved pricing, including surcharges, as well as higher shipment volumes. Turning to the Air & Liquid Processing segment, net sales for the third quarter of 2022 were 20% higher than the same period a year earlier, on the strength of increased shipment volumes in the heat exchanger and custom air handling businesses. The loss from operations for the third quarter of 2021 was $0.1 million, compared with a loss from operations of $2.8 million in the prior year quarter. Operating results in the Forged and Cast Engineered Products segment were stronger in the third quarter of 2022 than a year earlier, primarily because of improved cost recovery and higher shipments. Operating results in the Air & Liquid Processing segment were even with the prior year period despite the sales increase, since the sales mix was less favorable, which resulted from supply chain issues. Other income expense net improved overall in the third quarter of 2022, mostly because of higher foreign exchange transaction gains and the timing of dividend income from one of the corporation's Chinese joint ventures; those items more than offset higher interest expense driven by both increased borrowings and rising interest rates. On the bottom line, the corporation reported net income attributable to Ampco-Pittsburgh of $0.8 million, or 4 cents per diluted share, for the third quarter of 2022, compared with a net loss of $1.6 million, or 8 cents per diluted share, for the third quarter of 2021. Capital expenditures were $6.7 million in the third quarter of 2022 and $13 million year-to-date, mostly in the Forged and Cast Engineered Products segment. As of September 30th, 2022, the corporation's balance sheet and liquidity position included cash on hand of $12.2 million and approximately $35.6 million of undrawn availability under a revolving credit facility. During the quarter, the corporation completed several key financing transactions that significantly strengthened our liquidity position and set up future financing for the strategic modernization CapEx plan at our U.S. forged operations. On August 30th, 2022, our Air & Liquid segment completed a sale and leaseback transaction for its real estate at two plants in Virginia, valued at $15.5 million, with a subsidiary of STORE Capital, a major real estate investment trust. That deal also included a supplemental disbursement agreement with UES of up to $2.5 million for building improvements at the Carnegie, PA finishing plant, tied to upgrades to be completed under the UES modernization program. This came on top of $0.08 per diluted share for the third quarter of 2021. Additionally, UES entered into a master loan and security agreement dated September 29th, 2022 with a leading equipment finance lender, which permits UES to borrow up to $20 million for specified equipment under its modernization CapEx program. During the quarter, we drew $4 million from that facility in order to repay earlier supplier progress payments. Those proceeds, along with the funds from the Air & Liquid sale on leaseback, were used to pay down the credit line, which unlocked substantially greater availability under it. As a result, total debt did not increase from the transaction. Accordingly, as a subsequent event, in October, Air & Liquid also completed the sale and leaseback of its North Tonawanda, New York property to STORE Capital; these key financing moves greatly strengthen our liquidity and put us in position to carry out our strategic capital reinvestment plan and, going forward, to back our sales growth initiatives. Operator, at this point, we'd now like to open the line for questions.

Justin Bergner

analyst
#8

Good morning, Brett. Good morning, Mike.

Michael McAuley

executive
#9

Morning .

Brett McBrayer

executive
#10

Good morning, Justin.

Justin Bergner

analyst
#11

I'd like to get a clearer picture of a few of the financing transactions that happened during the quarter and following it. There are perhaps three quick points I'd like clarified. First, the $2.2 million — as a financing transaction, I didn't quite grasp what it pertained to. That's the first one. Second, I could use a bit more detail regarding the $4 million drawn under the equipment financing facility to cover reimbursement of certain earlier payments. Third, you brought up an October sale-leaseback involving Air & Liquid Systems for the New York facility, but I don't believe you gave the figure.

Michael McAuley

executive
#12

All right. I appreciate the question, Justin. Let's begin at the beginning. Within the sale leaseback deal that closed in September, there was one more component: funding of as much as $2.5 million for improvements to the building at our Carnegie, PA roll finishing facility. The connection is that back in 2018, the company carried out a sale leaseback of its plant properties at Union Electric Steel U.S. with STORE Capital. At that plant, STORE Capital serves as our landlord. It simply appeared logical that, were we to upgrade the building through a leasehold improvement, maybe STORE Capital would provide the funding. This fits within the $27 million CapEx that we had incorporated into that, into the overall CapEx upgrade program at Union Electric, and we had a chance to pursue it. That is the purpose of that $2.5 million. No reimbursements have come to us from it so far. The project remains underway. It involves broadening how the Carnegie facility is used so we can open a new machining bay, put in additional equipment, and strengthen a section of the building that previously hadn't been employed for that kind of heavy work. That's item one. Does that make sense?

Justin Bergner

analyst
#13

Does that cash fall under the equipment financing facility? According to you, reimbursement for it hasn't come through.

Michael McAuley

executive
#14

No, we should keep these distinct. STORE Capital and sale-leaseback stand apart. My attention is on that at the moment. Equipment finance comes afterward; this belongs to sale-leaseback, and it's an additional component for obtaining financing to carry out a leasehold improvement on a property that had been sold before.

Justin Bergner

analyst
#15

Understood.

Michael McAuley

executive
#16

That figure is just 2.5 million dollars, and no money has come in from it so far. It relates to what lies ahead.

Justin Bergner

analyst
#17

Sure, I follow.

Michael McAuley

executive
#18

Before we move on to equipment financing, let's stay with sale-leaseback a bit longer. We expanded our relationship with STORE when we moved into the Air & Liquid segment, and we decided to do a deal that was originally intended to total $20 million; we just divided it into two parts. Some environmental testing was requested at the North Tonawanda, New York facility, and that delayed things somewhat. Nothing turned up, so it was simply split apart in timing; we closed first on the Virginia facilities — the two Virginia facilities in the sale-leaseback. That brought in $15.5 million. Also, wrapping up this topic, we had an event after the quarter ended, in October: we finalized the purchase of the North Tonawanda facility, paying $4.5 million. Altogether, that brings us to $20 million in fresh debt recorded on our balance sheet, classified as long-term. However, in each case the money received went toward reducing the credit line, so there's no net rise in borrowing. If you check the debt footnote in the Form 10-Q we filed yesterday, that's where you'll notice the sale and leaseback figure appearing elevated, larger than before.

Justin Bergner

analyst
#19

Good, that helps clarify things. I believe the third item concerned the equipment financing portion.

Michael McAuley

executive
#20

Correct. Indeed.

Justin Bergner

analyst
#21

That $4 million figure.

Michael McAuley

executive
#22

Our goal was to arrange something more lasting, or at least longer in duration, to cover that costly and vital piece of equipment. We'd been considering — instead of what we'd done previously, drawing on our credit line to fund progress payments on these big machine tools — that the moment had come to secure some permanent financing for it. So we signed an agreement that supplies funding both for progress payments and across the term; on the progress payments side, we now have a term loan sitting at 8%. As each machine comes online, those loans convert into separate term notes, with the timing tied to whenever each machine gets installed, since the machine serves as collateral for the line, or for that loan. We took down $4 million against it, since we've incurred — in fact we've incurred a larger amount than that — but we're attempting to keep our overall interest expense in check. For us it's a good mechanism to handle liquidity down the road, pursuing reimbursements for progress payments already made, so that liquidity stays fairly level. In time, we'll draw on that line to fund the equipment over the long term.

Justin Bergner

analyst
#23

Alright, that's really useful. The 4 million dollars related to the progress payment for machine number one?

Michael McAuley

executive
#24

That covers a couple of machines. It applied to a number of the machines, within that group. Correct.

Justin Bergner

analyst
#25

All right, that's really useful information. Regarding the revolver, none of those financing deals put a cap on it, correct? Since that facility is mainly connected to working capital, whereas this other piece relates to the longer term.

Michael McAuley

executive
#26

Honestly, it gives a big lift to what's available under that revolver, since we'd been drawing on it to cover all sorts of things, CapEx included, and the CapEx portion had grown burdensome. Through these borrowings, we eased the strain on the revolver. Once more, let me note that the fresh agreements now in effect haven't raised our overall debt, given that every dollar of proceeds received has paid down the revolver, and at this point the revolver carries plenty of room.

Justin Bergner

analyst
#27

Understood. Yes, I simply wanted to make sure that none of those other financing transactions imposed any restriction on what you could draw from the credit line.

Michael McAuley

executive
#28

Oh, no.

Justin Bergner

analyst
#29

All right. And finally, Brett, during your prepared remarks you mentioned some sales headwinds. Did that scheduled outage have a meaningful effect on sequential sales and profit for the third quarter in Forged and Cast Engineered Products? Could you also shed some light on why oil and gas declined somewhat on a sequential basis?

Brett McBrayer

executive
#30

Yes. That scheduled downtime certainly affected the quarter in a meaningful way. It involved some substantial outages throughout every one of our businesses. Once again, this comes from a proactive standpoint, ensuring we keep the assets we have in place properly maintained and are able to perform going forward. Justin, I'll let Sam talk briefly about the oil and gas sector and provide a bit more detail on that subject.

Sam Lyon

executive
#31

Yes, Justin. Regarding oil and gas, we shifted away from certain second-tier clients toward several first-tier clients within the frac block portion of our operations. I won't mention specific names. One of those companies has resumed sourcing from abroad. We're bringing in other parties to broaden our base. We expect this situation to be short-lived. Certain safeguards exist, tariff safeguards exist. So my view is this is a short-term matter, though it will create some effect in Q4 and carrying into Q1, while we replace the volume we previously had with one specific customer.

Justin Bergner

analyst
#32

Okay. Thank you.

Brett McBrayer

executive
#33

Thanks, Justin.

David Wright

analyst
#34

Hi. Good morning, everyone.

Brett McBrayer

executive
#35

Morning, David.

Michael McAuley

executive
#36

Good morning, David.

David Wright

analyst
#37

All right. Let's begin with Dave. So you said that business is booming. You brought up the new five-year strategic plan. Could you maybe break down how much of what you've seen this year comes from simply strength in the economy, existing things in the pipeline closing, versus efforts to expand to new customers and new markets producing orders?

Dave Anderson

executive
#38

David, what I'd say first off is that it's mostly the third item. Mostly, it comes down to growing our sales team. We've put dedicated people on staff to bring some folks aboard. During this year's Q1, that's really paid off for us, and much of this year has gone into growing the network of independent sales reps we work with. We've grown that quite a bit. That's the main answer. It isn't really the second item so much — wrapping up older things. Sure, there's a bit related to your first point about the economy, but if I had to rank them, it's the third item, growth of our sales team, then to some degree the economy, and really not number two, getting orders closed.

David Wright

analyst
#39

Sticking with that point for a moment — it's still a fairly impressive quick win. Does that come mostly from simply entering new territories, or is it that the brand names carry such strong recognition and reputation that it's been — easy isn't the right word — beneficial for the new reps when it comes to landing orders?

Dave Anderson

executive
#40

A mix of the two, honestly. It's made a real difference. As you know, in the markets where we compete, we've built very strong reputations, and with our new reps it's come down partly to replacing certain ones who simply weren't delivering at the standard we were after, and partly to expanding our geographic reach into fresh markets. Both of those elements are at play. This year we've brought on a substantial number of independent sales reps — over 12 changes on that front. That's a meaningful boost to our team.

David Wright

analyst
#41

Okay. Well, great. Thanks for talking about your efforts there, and continued good luck.

Dave Anderson

executive
#42

Well, thank you.

David Wright

analyst
#43

Sam, you brought up machines one, two, and three — one in December, two in Q1, and three in Q2. Do those basically make up the equipment program?

Sam Lyon

executive
#44

One additional unit is coming. We're purchasing four machines — actually, let me correct that: one, two, three, sorry, it's five machines. That accounts for three out of the five, and beyond that, two furnaces are also being installed, which will assist us in melting a greater amount. This is likely the first. I'd say the third of those three machines will represent the initial third of the whole.

David Wright

analyst
#45

All right. I realize waiting for these machines has stretched on quite a while. How confident are you that the delivery timeline will actually stick?

Sam Lyon

executive
#46

Right, since we're the only machine — the containers got to the United States roughly 7 days back, so we'll have that one set up. As for the remaining 2 machines, they're already built, and we're heading over to see them. Their process is to construct the unit, then we travel there and confirm it operates properly and meets the specs, after which they take it apart and send it to us. At this moment those machines are being put together in Europe, and we'll be there in December to observe and verify they work the way the specification calls for.

David Wright

analyst
#47

All right. You brought up the solid bookings along with those fresh projects — the additional mills under construction, and I believe you named 4 of them. Across what timeframes is the company going to experience the combined impact from those new facilities?

Sam Lyon

executive
#48

The mill rolls, for example, are scheduled to take place around 2023 and the beginning of 2024 — late 2023 and 2024 — after which they'll be brought up to full capacity. That's work for down the road, but the encouraging part is that it's located in the U.S., a market where we're strong and have a solid footprint.

David Wright

analyst
#49

Shipments would start in the latter part of 2023 for the most part?

Sam Lyon

executive
#50

Certain ones, such as Big River Steel's, have progressed considerably more. Construction on that aluminum mill from Steel Dynamics isn't scheduled until 2024. With every one of them, we're already talking about what they'll need at the start.

David Wright

analyst
#51

Okay.

Sam Lyon

executive
#52

It's 2023. End of 2023 and 2024.

David Wright

analyst
#53

Well, Brett, I'd put it this way: with COVID, the supply chain, and higher input costs, there have been plenty of moving pieces, and it's been a difficult stretch. Honestly, the company hasn't posted any poor quarters. You've seen a number of quarters with fairly small losses, you know, and that has to be encouraging for everyone. It certainly encourages me. Beyond the savings you expect the new equipment to deliver once everything is installed, what else would you point to as the next biggest piece you have to move in order to truly reach consistent profitability?

Brett McBrayer

executive
#54

Okay, the major item here, I'd say — and David, I appreciate what you said. Beyond what we're putting into the UES assets' capital here in the U.S., what's happening is that growth on the Air & Liquid Systems side is speeding up even more; that's a massive chance for this company. As Dave has described what's going on at present, from a top line and a profitability standpoint, we think we're right at the edge of something considerably larger. Coming back to UES, it truly comes down to pricing. Sam pointed out during his opening comments that we have to keep driving prices higher in the market. From a demand standpoint, what we observe is that customers see value in our products, and we want to be sure we offset ongoing cost increases and can bring more money down to the bottom line.

David Wright

analyst
#55

Okay, I don’t want Mike to be left out of this. Time and again, I’m struck by how you manage to produce financing rabbits from a hat, so excellent work on that. This is especially true given every one of those sale-leasebacks was completed at capitalization rates far below what I’d expect could be obtained in today’s market.

Michael McAuley

executive
#56

Thanks, David.

David Wright

analyst
#57

All right. Best of luck ahead. I appreciate your answering my questions.

Sam Lyon

executive
#58

Thank you.

Michael McAuley

executive
#59

Thank you, David.

Justin Bergner

analyst
#60

Thank you, everyone. A few additional questions. Regarding the Big River Steel facility and the Steel Dynamics aluminum facility, my understanding was that you indicated orders and revenue would land at the close of 2023 in the case of Big River Steel, and at the close of 2024 for the Steel Dynamics aluminum facility. Is that the schedule you had in mind?

Sam Lyon

executive
#61

Let me clarify something. I should go back and verify those dates. Right now we are only talking. We aren't certain yet. There are instances when the company constructing the mill purchases the rolls, and there are instances when the end customer purchases the rolls. At this moment we are simply in talks—or perhaps not even talks. What we're doing right now is examining the specifications. I'd rather not commit to a specific timeframe for that, nor to how they will increase production or how they will construct things. What I was trying to say is that, as you know, there's considerable capacity growth happening across the United States, and the two aluminum facilities—Novelis and Steel Dynamics—are the first two new mills erected in this country in more than 30 years. My sole purpose was to point out that the market where we hold a strong position is expanding, though the schedule is somewhat... I don't want to commit to a date right now.

Justin Bergner

analyst
#62

All right. Based on what you've said, it sounds as though you're anticipating that you'll also hopefully secure business with that Novelis mill. I mean, what would you say has defined your robust standing when it comes to aluminum mills?

Sam Lyon

executive
#63

It all comes down to performance. The number of tons they receive relative to what the rolls cost them; whether it's been Kaiser, Alcoa, or Novelis, we've simply delivered solid results and held a strong share of the market with each of those companies over the last 5, 10 years, if not longer.

Justin Bergner

analyst
#64

All right, I understand. So regarding Air & Liquid Processing, who exactly are you gaining share from, and which areas of that operation is that share coming from — maybe helped along by the stronger sales team?

Dave Anderson

executive
#65

Justin, what I'd tell you is that no single customer accounts for it, and honestly it spans each of the 3 businesses we have. Backlog has risen in every one of them. Geography plays a role, since we've brought on independent reps and pushed into new markets. I wouldn't point to any one customer specifically. That's my view.

Sam Lyon

executive
#66

Just one rival.

Dave Anderson

executive
#67

A single rival, yes. We're noticing that everywhere.

Justin Bergner

analyst
#68

Alright, so your view is that this comes down to share dynamics. It isn't the kind of market situation in which activity late in the cycle helps orders, and where both you and competitors are experiencing improved conditions. Your belief is that it's mostly share?

Dave Anderson

executive
#69

My belief is that share accounts for the majority. Some of that other element is definitely present, but in my view share makes up the dominant portion. Yes.

Justin Bergner

analyst
#70

All right, thanks.

Brett McBrayer

executive
#71

Thanks, Jason. Steps have been taken, and we'll keep taking them, to lessen the adverse pressures affecting us in Europe. Sadly, the gains achieved throughout our operations have been eclipsed by the consequences of the conflict in Ukraine. Seeing the constructive measures this organization is implementing to set us up for better profitability makes me enthusiastic. Once more, I wish to express gratitude to our staff for their dedication, attention, and devotion to our achievements. I appreciate your presence on this morning's call.

Operator

operator
#72

Conference has now concluded. Thank you for attending today's presentation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ampco-Pittsburgh Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ampco-Pittsburgh Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ampco-Pittsburgh Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.