Andfjord Salmon Group AS (ANDF) Earnings Call Transcript & Summary

November 17, 2026

Oslo Bors NO Consumer Staples Food Products earnings 41 min

Earnings Call Speaker Segments

Martin Rasmussen

executive
#1

Good morning, and welcome to Andfjord Salmon's presentation covering the third quarter of 2026. I'm Martin Rasmussen, the company's CEO. Joining me for today's presentation is our CFO, Bjarne Martinsen. We'll finish with a Q&A session, and you can send in questions at any point via the webcast solution. Let me begin with a short introduction to Andfjord Salmon; the heart of our concept is the location, with direct access to natural seawater that suits Salmon farming perfectly, paired with simple, proven technology. Our approach merges the strengths of conventional sea-based farming with the advantages of operating on land. We draw temperated, oxygen-rich water from the Gulfstream at a depth of 50 meters; this keeps energy costs low since there's no pumping, heating or cooling. Since the system is closed, we avoid salmon's life Tokadelafish, we prevent escapes, and the biowaste is collected and recycled. Our pools are big and square, built to mimic the Salmon's natural habitats, the Gulfstream brought on land; that gives the fish ample room to swim and act naturally. The class system, protected fish from Salmon live jelly fish and algae, and it shields the surrounding environment from the effects of a large concentrated biomass. After a little more than a year in operation, we're very proud of what we've achieved. We've demonstrated that we can produce Salmon with excellent fish health while coexisting responsibly with the surrounding ecosystem. This is today's agenda; first we'll review highlights from the quarter and subsequent events. Then we'll examine our fish farming operation and provide a status update on the Kvalnes build-out. Bjarne will then take you through the financials, and we'll close with a summary outlook and Q&A. These are the key highlights from the third quarter and subsequent period. Beginning on the left, the most important point is that solid biological results continue. poor conditions has been healthy and political performance has been strong throughout the quarter in all operational pools. We've also finished our first dedicated postman cycle, with around 390 tonnes of post smolt delivered from PK in October. Harvesting has begun, Grow our Salmon and the first of 3 harvest backers has been completed in both K0 and K1; we harvest in stages to optimize biomass density in the pools, which supports growth and capacity utilization. We keep ramping up production capacity. And in late October, we released around 800,000 smolt into pool K2, which is now the fourth pool in operation at Kwalnes. And finally, investor support is strong. After the quarter, we completed a successful senior secured bond issue of NOK 1.250 million which refinanced our existing NOK 750 million. So let's take a closer look at our fish farming operations. This slide illustrates how our biomass has evolved since Q3 of last year. Standing biomass in tonnes appears on the left, and we closed the third quarter at 2,581 tonnes, which is up from 1,255 tonnes at the close of the second quarter — more than a doubling during the quarter. As of November 16, standing biomass stands at 1,908 tonnes. That is slower than at the end of Q3, because we are removing fish from the pools. From K3, 391 tonnes of post smolt were sold, and 864 tonnes of Groatsalmon were harvested from K3 and K1. Net production per quarter is shown on the right, and net production came to 1,325 tonnes in the third quarter versus 559 tonnes in the second quarter. So far in the fourth quarter, net production is 495 tonnes as of 16 November. This figure demonstrates that the pool delivered strong growth even while we harvest and sell in stages. That gives us a solid foundation for further scaling. K0 is our first generation, and the first of 3 harvest batches has now been completed. Around 350,000 small fish, with an average weight of roughly 180 grams, were released on 30 September 2025. So we are now about 13.5 months into the cycle. Survival has been very good throughout the cycle at 97.6%, and the feed conversion ratio is 1.09. These are strong numbers for our first generation, and they confirm that the operational model works. This is also our pilot pool, and we see further improvements in the new Air pools K1 and K3. The first batch harvested in October was 437 tonnes live weight at an average of 3.6 kilo live weight, or 3.1 kilo HOG, and 93% of the harvest was superior grade. Average weight has grown steadily from 180 grams at release to around 3.5 kilo at the end of the third quarter and 4.4 kilo as of yesterday. Standing biomass peaked at about 1,195 tonnes at the end of the third quarter and is now 976 tonnes. Growth has picked up since the first harvest. This is in line with our biomass density strategy: taking out part of the fish gives the remaining fish more room to grow. The remaining 2 batches are planned for December and January. In short, K0 is delivering on plan, with the first harvest done and 2 batches to go. K1, our second generation, has had an exceptional quarter. Around 750,000 smolt with an average weight of around 160 grams were released on 10 to 12 November last year. So we are now 12 months into the cycle. At the end of June, we sold about 450,000 fish as post smolt, which you can see in the biomass chart. With fewer fish in the pool, the remaining fish have more space, and growth accelerated. Average weight went from 1.3 kilos at the end of the second quarter to around 3.5 kilos at the end of the third quarter, and 4.35 kilo as of 16 November. Also, feeding had been halted for nearly a month because of the harvest. Last week we took out the first of 3 growth batches; the average rate came to 4.2 kilo live weight, or 3.6 kilo HOG, and 97.5% graded as superior; altogether we harvested 359 tonnes HOG, and that is a really strong quality outcome for the first grow harvest out of the pool. Biomass density stood at 58 kilos per cubic meter prior to harvesting and 44 afterward. And once more, this is the density strategy in action. We keep the pool at the higher end right now, and then we harvest it down so the fish left behind have space to continue growing. For the cycle to date, the feed conversion ratio is 0.98 and survival is 98.42%; both figures are excellent and a bit better than K1 — K0, which demonstrates the performance can be repeated; in short, K1 has validated the post smolt sales channel, and the combined post smolt strategy is producing strong growth, high quality and low mortality; and these slides illustrate what one pool can produce from a release of 750,000 smolt — we anticipate a total of 1,700 to 1,800 tonnes from 1 pool in 1 cycle. And that is before the extra benefit of splitting fish into new pools and releasing more smolt, which will push the numbers even higher.

Martin Rasmussen

executive
#2

That volume splits into two components. The first is the June post-smolt sale: 562 tonnes, approximately 458,000 fish, averaging 1.2 kilos. The second is grow-out, where we anticipate delivering between 1,200 and 1,300 tonnes HOG. The chart shows how we reach those figures. The shaded region is standing biomass in the pool. And those numbered markers — each one lines up with the fourth step of the cycle. Step one: June's post-smolt at 562 tonnes. Step two: this month's initial grow-out harvest, about 392 live weight at 4.2 kilos. Step three: the second harvest in January, roughly 400 tonnes at 5 to 5.3 kilos. Then for the last harvest, in February or March, we're looking at roughly 630 tonnes at about 5.5 kilos. The peak standing biomass comes to 1,255 tonnes, and once each harvest is done, the fish that remain have more space and continue to grow. That's how we end up with a much larger total volume from the pool than its maximum standing biomass at any single point. So the takeaway is that K1 has demonstrated Singapore's capacity, and that serves as the foundation for the capacity we're building in the coming phases. K3 is the first pool to finish our complete post-smolt production cycle, which wrapped up in October. We put in about 550,000 smolt in early June, averaging roughly 110 grams. By the close of the third quarter, standing biomass had risen to roughly 390 tonnes from approximately 60 tonnes, with average weight hitting 734 grams. The cycle saw robust growth from start to finish, with a feed conversion ratio of 0.86 and a survival rate of 96.5%. In October, the whole batch went to market as post-smolt. Cleaning and disinfection of the pool are underway, along with periodic maintenance, which is a scheduled component of the cycle. Around 800,000 smolt will be released into K3 in late November, and that volume will probably be split between post-smolt and some human grade production. Towards the end of October, we placed roughly 800,000 smolt into K2, with an average weight of about 110 grams. The release went really well, and the fish had a good appetite right from the start. They adapted quickly to their new environment, which is shown by a survival rate of 99.81%. Growth has been solid so far. Average weight has risen from 110 grams at release to 160 grams as of yesterday. Outstanding biomass has increased from 88 to 129 tonnes. This is a very good beginning to the cycle, and K2 will be run according to our combined polt smolt and grow strategy, applying the same model that has worked very well in K1. Once those plans are locked in, we'll share additional volume specifics. This slide lays out our harvest schedule for every pool between June 2026 and February 2027. All told, we anticipate harvesting roughly 3,900 tonnes live weight across that window. Starting on the right side with post-smolt: from K1, we sold about 450,000 fish at approximately 1.2 kilos in June — roughly 560 tonnes — while K3 contributed around 390 tonnes. The month-by-month human-grade harvest plan is shown on the left. Because those first harvests carried a lower average weight, pen density dropped, which allowed the fish space to keep growing. Following that, we increase the harvest rate gradually, maximizing profitability—starting at 3.6 kilos flyweight in October, moving to approximately 4.2 kilos in November, then 4.6 to 4.8 kilos in December, 5 to 5.3 kilos in January, and 5.4 to 5.6 kilos in February. The first batch from K0 and K1 has now been harvested, and harvesting continues across December, January and February. Bear in mind that all of these numbers hinge on factors such as ocean temperatures, fish growth, biological conditions and the exact timing of each harvest. Now I'll move on to where things stand with the Kvalnes build-out. This illustration shows the Karla's facility at full build-out, with each phase in its own column. So Phase 1, which covers K1 through K4, has now been completed. Combined with the pilot pool, K3, that gives us production capacity of roughly 11,000 tonnes. Next comes Phase 2a, covering K5 through K8, and K5 and K7 are expected to be in operation during the first half of 2027, with K6 and K8 in the second half. When Phase 2a wraps up in 2027, annual capacity will reach about 17,000 tonnes. After that, the next step is Phase 2b, covering K9 and K12. This slide shows where each pool stands, and as of today 3 pools are stocked — K0, K1 and K2 — while K3 and K4 are being prepared for smolt release in late November. So it won't be long before 5 pools are stocked. For Andfjord Salmon, 2026 has proven to be a very strong year — both when it comes to biological outcomes and on the construction side, which has unfolded in line with the schedule we set out. Having said that, I'll hand things over to Bjarne, who will take you through the financial figures.

Bjarne Martinsen

executive
#3

Thanks, Martin. I'll walk through the financial results for the third quarter at a high level. The quarter's key figures came out in October, so much of what I cover today should be familiar. We also released the interim financial report this morning for anyone who wants the details. As Martin noted, all 5 pools in Phase 1 of the Kvalnes buildout are finished and running. Combined with the pilot tool, that gives us annual production capacity of 11,000 tonnes HOG and post smolt. Phase 2a, the next 4 pools, will be done in 2027 and will lift capacity to 17,000 tonnes. A big portion of the investments in Phases 1 and 2a is infrastructure that will also support the later construction phases. The waterways and Harbor are sized for the fully developed collect at a capacity of roughly 48,000 tonnes. We've also put in technical infrastructure for fish logistics, feeding, sludge handling, oxygen and power that will serve the first 3 phases up to a capacity of almost 29,000 tonnes. Looking ahead, the focus is on building additional pools and fully using the infrastructure already in place. We had no harvesting or sale of post smolt in the third quarter. The negative sales revenue in the accounts that some anti relates to a later settlement tied to sales in earlier periods. Operating loss, excluding depreciation and fair value adjustments, came to just over NOK 12 million, and the cost increase versus last year reflects the ramp-up of operations with more pools running and more employees. Biomass was valued at NOK 193.8 million at quarter end. Cash and cash equivalents stood at NOK 36.3 million; and beyond that, the group has an overall facility for working capital financing with NOK 154 million undrawn at quarter end. Note also that other current assets include a VAT receivable tied to the disputed trade payables on the liability side, in addition to the ordinary VAT receivable from ongoing operations. So total available liquidity at quarter end was NOK 490 million, cash of NOK 36 million, NOK 300 million undrawn on the construction loan and NOK 154 million undrawn on the overdo facility. As biomass and receivables grow with the production ramp-up, the overhead facility will be an important part of our working capital financing. After quarter end, the group refinanced and increased its bond loan to NOK 1.25 billion, which will show up in the year-end accounts. Borrowings at quarter end consist of bank loans totaling NOK 1.2 billion and a bond loan of NOK 750 million, both valued at amortized cost. Disputed trade payables of NOK 691 million, including VAT related to our claim against the former main contractor. The cash flow statement reflects the buildup of biomass with negative operating cash flow of NOK 93 million in the third quarter. We spent NOK 234 million on the buildout, and the cash flow from financing activities comes from drawdowns on the construction loan. And with that, I will hand it back to Martin for the summary.

Martin Rasmussen

executive
#4

Thanks, Bjarne. Now let me summarize the quarter and the outlook, and I'd like to emphasize 5 points. First, we delivered solid biological results, with healthy conditions in the pools and strong performance across all stock closed during the quarter. That is the most important point, and everything else at the plants rests on it. Second, with K2 and K4 now in operation, we have achieved a production capacity of 11,000 tonnes. Third, smolt will be stocked into K3 and K4 in November, which brings the count of stock pulled in to 5. Fourth, for the coming harvest, the remaining batches in K0 and K1 will be harvested between December and February; and last, we anticipate record revenue in the fourth quarter, driven by post-smolt sales from K3 along with the harvest from K0 and K1. In brief, strong Belge, additional capacity, cupola and record revenue ahead. Okay. We'll play a video before moving on to the Q&A; and as I mentioned earlier, questions can be submitted through our webcast solution. <<presentation>> And now, are we ready for the Q&A. And as we've noted several times, you can submit questions via the webcast solution, and they will be read out here. So, Bjarne, have any questions come in so far?

Bjarne Martinsen

executive
#5

A few questions have come in. The first one is whether you've gotten any feedback on how the new batch tastes.

Martin Rasmussen

executive
#6

Yes, we've gotten feedback covering taste, texture, and many other quality parameters for the fish we've sold, and our customers have given us very good feedback on that.

Bjarne Martinsen

executive
#7

You previously posted an EBITDA cost of NOK 40 per kilo. Does that still hold? Yes, we already put out our guidance this autumn as part of the bond loan process, and the updated guidance at that point was NOK 49 per kilo based on using the first 3 steps of the Kornit facility, which is 28,000 tonnes. So that still stands. Does your facility remain light free?

Martin Rasmussen

executive
#8

Yes, that was exactly the question. So, we've been running for 1 year now, and up to this point we've produced roughly 3,500 tonnes of Salmon. It's really encouraging to see that Salmon lives haven't given us any trouble at all, so honestly it's something we don't even discuss at the facility, simply because we don't encounter it.

Bjarne Martinsen

executive
#9

Moving on to the next question. Is there anything you can share about the identity of the purchasers of the K0 and K1 batches?

Martin Rasmussen

executive
#10

Yeah, so those customers in the two first batches are different producers over in Europe, plus a few European supermarkets as well. We've also sent product out to importers in the U.S., and in fact some larger volumes to China too. So I'd put it this way: we've spread the volume around in order to gather as much feedback on the product as we can. So I'd say it's Europe, the U.S., and China all together.

Bjarne Martinsen

executive
#11

Alright. Let's take the next question. Cooperation with Holmay appears to be working well and locking in vertical integration. What are your thoughts on lengthening the term of that agreement?

Martin Rasmussen

executive
#12

Yeah, that's right — the collaboration with Tom has worked out well for Salmon. A lot of the joint efforts on the operational side have gone well, particularly the strategic ones. And naturally, we see this as a partnership for the long haul. Compression has fallen off, above all over the last year, when we've had strong results on the smolt, on all the post-smolt, and more recently on the slaughter process as well.

Bjarne Martinsen

executive
#13

Could you say a little more about why K0 and K1 show a meaningful difference in the SCIT conversion rate?

Martin Rasmussen

executive
#14

Yes. When it comes to selecting assets in K0, that is the pilot pool, while K1 is the pool where we have optimized a lot of operational functions, particularly the way we distribute feed within the pool and how we monitor the feed the life to chime, the walk tele and all of that affects the feed conversion rate, above all the distribution of feed and how we feed. So this lets us distribute the feed more evenly, which in turn gave the weakest groups in the pool more pet available. And then again, you get a much narrower normal distribution in the size, normal in the sizes, which is a very good quality stamp. But the water quality in K1 is also significantly better than 0, and if you have better water quality and better fish welfare, the fish's capability to utilize the fish, the field for growth rather than just maintenance, is also an important factor.

Bjarne Martinsen

executive
#15

All right. There's a VAT receivable tied to disputed trade payables. What has to happen for that to be collected? Right, the way this works is that if we paid the claim to the former main contractor, we'd recover the VAT portion of it. So the net exposure equals the disputed trade payables less the VAT we reclaim from the other authorities, just as we do on every invoice we pay. What is the expected weight in the market to be released in K3 and K4 in November?

Martin Rasmussen

executive
#16

The smolt we're expecting to release in November is roughly 120 to 130 grams.

Bjarne Martinsen

executive
#17

Yes. When will you guide on 2027 harvest volume and post smolt.

Martin Rasmussen

executive
#18

Absolutely, we’ll return to the 2027 figures once every number is ready. That depends particularly on the balance between — and on how much of the harvest weight we will nonetheless divide the volumes between, and also on how we prioritize the set of new smolt in the spring and the smarter lies in the autumn. We are also in talks with the Post customers. So that is also a very important part of the total volume for 2027. We will come back on that number quite soon.

Bjarne Martinsen

executive
#19

When will you send a license application for Stage 3 and onwards on Kvalnes?

Martin Rasmussen

executive
#20

Yes, at this point we're getting ready to raise our license, and we're able to secure a license increase, with the target being the first half of 2027. So right now we're putting together all the documentation that's required for that. And given the track record we've built up to this point, this is a really strong — this is a really strong concession to obtain a new license.

Bjarne Martinsen

executive
#21

Could you say something about what we should expect for EBIT cost per kilo in Q4, and also about HOG volumes? Yes, we'll address that. I think when we publish the production cost figures, we want to compare complete production cycles so they're comparable with other companies and with ourselves as well. So once a full production cycle in pools has been completed, we will also publish the EBITDA cost, and we have also given guidance on future EBITDA costs, as I mentioned earlier; over a long period, that is what you would normally expect to spend on full maintenance between the final harvest and the stocking of new smolt.

Martin Rasmussen

executive
#22

Yes. I said it depends on the situation, right? If we're only talking about cleaning and disinfection, that can be done in a bit more than 1 to 2 weeks. But we've also planned to monitor the call, essentially for quality assurance across all the pool's functions. So that means sometimes there's more space between batches, which lets us carry out various maintenance works. But for cleaning and this infection alone, it's around 2 weeks.

Bjarne Martinsen

executive
#23

Could you give us some sense of what CapEx will look like in the fourth quarter of '26? Sure — what's happening right now on the investment side is the concrete construction work at goods K5 and K7, and as soon as that concrete progress is finished, technical installations will begin. From this point forward and until all 4 pools in Stage 2a are done, investment activity will be steady; so I doubt I can provide specific figures quarter by quarter, but our guidance is that the remaining CapEx will be spent at a steady rate from now until spring, when the concrete work is largely complete. Your superior share appears to be much higher than the rest of the market. What impact does super fish versus normal have on price per kilo?

Martin Rasmussen

executive
#24

Yeah. So first off, we're really proud of the superior share, particularly in that last K1 batch, where it hit 97.5%. But speaking for the whole industry, we're also noticing that this superior share is much higher than what we saw previously. What that means is the volumes available for production fish are lower, good fish is reduced, and prices are climbing. So the price gap we've observed has ranged from NOK 5 to NOK 10 between production fish and superior fish.

Bjarne Martinsen

executive
#25

Does building the tools the new way cost less than it used to? And is the approach you're using also quicker?

Martin Rasmussen

executive
#26

Yeah. Construction during 2026 has gone quite well. We're seeing a meaningful gain when it comes to efficiency as well as the material costs tied to this method. And the thing is, we make the whole wall through 1 congrats process, which is a castle process, rather than splitting it into elements — I still have a few elements, but based on what we've seen up to now, this is the more efficient way to produce.

Bjarne Martinsen

executive
#27

Right, would a water filtration system need to be installed if you obtain the license expansion?

Martin Rasmussen

executive
#28

I believe we've responded to that question on far too many occasions; and, if you take a look at Salmon, a license is already in place. We have a facility — and we're able to raise our license with no disinfection requirements across more of the volumes. That being said, if it's also for a new license, then possibilities exist there to avoid these effect requirements during the period when you have a system lack 1 Salmon, where water flow capacity is extremely high. And given the results we've seen so far on behalf of the fish and the fish welfare and all the 4 parameters that you provide with the concept, and the environmental impact as well. There is no need for disinfection of the water; that merely increases the electricity costs; and we also do see support from the authorities, and they see our production numbers too. And the proof for repeating what we already are doing rests on what we are achieving.

Bjarne Martinsen

executive
#29

Yeah, I believe we've begun addressing the questions. So there are a few additional questions on the same subjects that you've already covered; we can take 1 more question here. Is the right figure for smolt going into K3 and K4 800,000 each, and what will the average weight be? We commented on that.

Martin Rasmussen

executive
#30

Yeah. For 2026, we're planning a modest increase in each of the pools. So we're going up from 750,000 in 2025 to 800,000 in 2026. We still believe there's room to raise the small numbers even more, but we're doing it one step at a time.

Bjarne Martinsen

executive
#31

Yes, I think that was it. So we have covered the questions.

Martin Rasmussen

executive
#32

Yes. And if any of you happen to have questions for the company's management, please get in touch with us directly. You can find our telephone number and email address on the website. So I'd like to thank all of you for your attention today, and have a good day.

Bjarne Martinsen

executive
#33

Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Andfjord Salmon Group AS transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Andfjord Salmon Group AS earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Andfjord Salmon Group AS or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.