Apogee Enterprises, Inc. (APOG) Earnings Call Transcript & Summary

April 2, 2020

NASDAQ US Industrials Building Products earnings 51 min

Earnings Call Speaker Segments

Jeff Huebschen

executive
#1

Thanks, Kevin. Hello everyone, and welcome to the earnings call for Apogee Enterprises covering the fourth quarter of fiscal 2020. Joining us are Joe Puishys, who serves as Apogee's Chief Executive Officer, and Jim Porter, our Chief Financial Officer. I want to point out that slides accompany the remarks we're making today, and you can find those in the Investor Relations portion of the Apogee website. On this call, we'll be mentioning certain non-GAAP financial measures. You'll find definitions of those non-GAAP measures, along with a reconciliation to the closest GAAP measures, in the earnings release that went out this morning, which is also posted on our website. Also, a reminder that forward-looking statements will be part of our call, reflecting what management expects based on information available at this time. Actual results could differ materially. Additional details on factors that might impact Apogee's business and financial results appear in our SEC filings. With that, Joe, I'll hand the call over to you.

Joe Puishys

executive
#2

Okay, thank you Jeff, and I appreciate all of you being with us this morning. My hope is that each of you, along with your families and coworkers, remains safe and well through these difficult days. I’ll offer a handful of remarks regarding our fourth quarter and the way we finished fiscal 2020, after which I’ll take some time to bring you up to date on what has taken place since that quarter ended, how Apogee is addressing the COVID-19 crisis, and what effect it might have on our business. Jim is going to share further specifics regarding the results and our financial position, and following that I’ll respond to your questions. Let me begin with what happened in the fourth quarter. We wrapped up the fiscal year with a strong quarter, posting earnings that came in above our guidance range, driven by ongoing robust performance in the architectural services segment, while every one of our businesses either hit or surpassed expectations, and on top of that we gained from certain favorable discrete tax items during the quarter. We kept securing new business and growing our backlog. Architectural services lifted its backlog by more than $50 million, reaching a fresh record of $660 million as the year closed. Backlog likewise rose 14% in architectural framing systems, and order flow stayed solid in our short lead time U.S. framing businesses too. Cash flow proved especially robust this quarter. Jim will go into greater detail about our financial condition, but I want to call attention to the year-over-year rise in cash flow from operations and free cash flow, since we generated more than $50 million of operating cash flow during the quarter. That cash allowed us to keep up our balanced capital deployment strategy — putting money into our business, giving cash back to shareholders, and, quite importantly, bringing down our debt. I should also note that we acted to add more financial flexibility by pushing out the maturity of our term loan, which Jim will cover. Beyond that, we achieved solid progress on our key strategic initiatives during the quarter. Our new automated architectural glass facility, built to serve the small projects market, is now fully operational. We made meaningful headway on our enterprise-wide procurement savings program, and we moved forward with efforts to enhance execution, generate synergies, and lower cost in architectural framing systems; we kept line of sight toward hitting our annual cost savings target of $30 million to $40 million once these initiatives are completely implemented, and we expect substantial benefit during this fiscal year. As before, Jim will give more specifics on these cost savings. So on the whole, it was a good quarter. We met our commitments, came in above guidance, and finished the fiscal year from a position of strength. We headed into fiscal ’21 with positive momentum across our business and a route to delivering significantly better performance. We were carrying out a plan that would produce mid-single-digit top line growth along with an operating income increase of more than 30% versus fiscal 2020. Since the close of our fourth quarter, the globe has witnessed extraordinary developments and is grappling with the COVID-19 outbreak, now the central concern for everyone here. Our organization is rising to meet this moment. I’d like to recognize the extraordinary dedication shown by the entire Apogee team—our staff who put in relentless effort across the last several weeks to reshape how we operate, allowing us to look after both our workforce and our clients amid such fast-moving circumstances. My thanks go out to each Apogee employee for what you’ve given throughout this exceptionally demanding period. On page 5 of our slide deck, you’ll find an overview of certain main measures within our COVID-19 response plan; a cross-functional group has been put together to steer that effort. In every action we take, safeguarding the health and safety of our employees comes first. We have rolled out strong on-site preventive measures, such as social distancing, dramatically heightened cleanliness protocols, limits on travel, limits on visitors and meetings, plus working remotely wherever feasible. Beyond that, we’ve set up business continuity plans aimed at preserving essential operations and keeping service going for our customers; our dialogue with customers has been intensified so we can grasp and meet their needs, and we’re collaborating intensively with supply chain partners to guarantee the movement of vital materials. As all of you are aware, things are shifting at a very fast pace. Because of this deeply uncertain climate, we’ve chosen to withhold financial guidance for fiscal ’21 right now. Still, I want to offer a few observations regarding what we’re noticing across our operations and end markets, along with how we’re situated to react to the current circumstances. To begin, practically every day brings fresh directives from federal, state, and local authorities in the places where we do business; we are evaluating those directives and making sure we follow them in order to uphold health and safety obligations. In the majority of instances, activities tied to construction have been classified as essential under federal CISA critical infrastructure guidelines and keep right on operating. Right now, all three of Apogee’s architectural segments remain in operation, delivering products and serving our customers, while adopting the precautions required to protect the health and safety of our outstanding workforce. On the whole, demand for architectural products and services has remained quite stable; we’re adjusting to customer schedules and requirements that change quickly, and certain projects have decelerated, a handful have been temporarily paused, and that will affect results; even so, the bulk of projects are proceeding without interruption. Once more, I want to express gratitude to every Apogee employee for the work you’re doing to keep our facilities up and running through this tough period. I take great pride in the way our company has united to assist our nation and make sure critical infrastructure projects keep advancing. Our large-scale optical segment, largely a consumer products operation, has felt a more pronounced hit from the pandemic. Currently, that segment’s two main manufacturing sites are shut down in order to follow state government directives, and a large number of the retailers carrying our products are closed at present. Our goal is to get back up and running as quickly as we can, and I have every confidence that the LSO segment is going to get back to the high level of performance it normally delivers. Let me stress that our outlook on the long-term potential of every one of our business segments stays positive; because of our market leading brands, the strong relationships we have with customers, and a substantial backlog, we are in a good position once we get past this COVID-19 situation. When it comes to our cost structure, we are lucky to have gone into this uncertain stretch with a solid set of cost-out efforts already in motion. Those efforts should produce meaningful savings in fiscal 2021. On top of that, we are looking at further steps to handle costs and capacity as needed. Last, we closed fiscal 2020 with very strong cash flow and a sound financial position. As I mentioned, Jim is going to walk through the specifics of the steps we are taking to preserve our financial position and liquidity. When we consider where things stand right now, a few key takeaways come to mind. First, we are confronting this uncertain stretch from a position of strength; we keep operating, serving our customers, while doing what is necessary to protect our troops, and we are confident that the team and the resources we need are in place to get through this. We went into the global COVID-19 pandemic from a position of strength and, because of that, we will emerge on the other side in a terrific position. With that, I will hand things over to Jim, who will give more detail on the quarter and our financial position, and then I will come back with a few brief remarks and be ready for your questions. Jim?

Jim Porter

executive
#3

Thank you, Joe, and hello everyone on this call. First of all, I want to join Joe in expressing heartfelt appreciation to each member of the Apogee team as we have pulled together to confront the impact of the COVID-19 pandemic. Each of you ought to feel proud of what has been achieved in keeping our sites both safe and up and running, allowing us to keep serving our customers and to keep supporting vital construction projects. Now, moving to the quarter, you can find our consolidated results on Page 7 of the earnings presentation. Total revenue reached $337 million, a decline versus the fourth quarter of last year, which was what we anticipated, driven mainly by weaker sales in architectural framing systems and architectural glass, partly offset by stronger revenue in architectural services. Operating margin stood at 4.6%, versus negative 4.3% during last year's fourth quarter. That prior-year quarter contained project-related charges as well as an impairment charge. Adjusted for those items, operating margin for the fourth quarter was 5.2%, against 9% a year earlier. Adjusted EBITDA totaled $29.8 million, compared with $42.4 million in last year's fourth quarter, largely a reflection of reduced revenue and thinner margins in architectural framing systems and architectural glass. Net interest in other expense fell to $1.5 million, helped by lower debt balances and a reduced effective interest rate stemming from the debt refinancing we finished earlier in the fiscal year. The tax rate came in at 15.3%, lower than last year's figure, since we gained from a decrease in state tax reserves and certain discrete tax matters. And lastly, our diluted share count declined to 26.7 million shares, down from 27.1 million a year ago, mostly because of share repurchases made over the past year. Adding all of this up, earnings came to $0.45 per diluted share for the quarter and $2.32 for the entire year. On an adjusted basis, fourth quarter earnings reached $0.51 per share and $2.38 for the full year, which is above our guidance range of $2.15 to $2.30 per share; I'll now move on to the segment results, found on Slide 8. Architectural framing systems results matched the guidance we gave previously. As anticipated, framing systems revenue declined in the quarter, landing at $153 million versus $171 million a year ago, as segment revenue took a hit from certain customer driven schedule delays that we talked about last quarter. The impact fell mainly on our longer lead time curtain, wall and window businesses. That was partly offset by greater revenue in our short lead time U.S. framing businesses. Framing systems operating income was $2 million, with an operating margin of 1.3%, compared to an adjusted operating margin of 5.6% in last year's fourth quarter. Operating margins this quarter were affected by leverage on the reduced volumes and by the effect of the operational difficulties in a couple of businesses that we discussed last quarter. Those operational issues have been resolved through a number of actions, and we have witnessed significantly better execution now and going forward. What mattered here is that this segment gained traction through new orders, and we booked a number of fresh projects in the quarter, which pushed backlog up 14% versus the prior quarter. Revenue for architectural glass came in at $98 million, a 5% decline against last year's particularly strong fourth quarter, since we kept experiencing softer large project volumes caused by more competition from suppliers abroad. Operating margin stood at 3.9%, versus 7.1% a year ago. Margins in the glass segment for the fourth quarter took a hit of roughly 160 basis points from start-up expenses tied to the new manufacturing facility supporting the small projects growth initiative, plus somewhat higher insurance costs and less leverage given the softer volumes; those pressures were partly offset by better operational performance in our factories, where productivity gains have been strong all year. Across the full year, start-up costs for the new facility totaled $4.5 million, matching what we had projected all year long. That facility is now running at full capacity and should add to segment revenue and income as the year ahead unfolds. Architectural services kept enjoying excellent results, with multiple new product wins in the quarter that lifted its backlog to a fresh record of $660 million. Services revenue rose 11% in the quarter, helped by higher volumes stemming from favorable project timing. Operating income reached $8.5 million, with an operating margin of 11.6%. Those results were quite strong, with very solid project execution, yet they fell short of last year's fourth quarter, which delivered record quarterly profitability thanks to a favorable mix of several mature projects that wrapped up in that prior-year period. Lastly, large scale optical revenue totaled $21.5 million, lower than the $24 million posted in last year's fourth quarter, reflecting weaker sales to U.S. retailers, who faced a shorter holiday selling season than a year earlier. Even with the revenue decline, LSO's operating income was about even with the prior year, which shows strong cost management and better factory productivity. Let me briefly cover our cost savings efforts. As Joe noted, we made considerable headway on the cost savings initiatives announced last quarter. To start, on our procurement savings project, we finished our engagement with the outside consulting firm on the early phases and are starting to see the benefits show up in our results. In January, our new Chief Procurement Officer joined, and he is now actively steering this initiative as we shift into later phases of the project and keep working toward building a world-class purchasing organization. In the framing systems segment, we acted to cut salary and headcount as well as controllable costs and operations within SG&A. We have also put together plans for additional optimization of our facility footprint, which we intend to roll out during fiscal '21, and that should deliver more efficiencies and cost reductions. As the year progresses, we will keep executing our road map to create a more integrated and efficient framing systems business. Now, if we look at cash flow and the balance sheet, and go to Slide 10 in the presentation, cash flow was strong, with $54 million in cash from operations during the quarter. Across the full year, cash from operations came to $107 million, which was up 11% compared with fiscal 2019. Capital expenditures for the full year totaled $51 million, lower than the $61 million recorded a year earlier. Because cash from operations was higher and capex was lower, free cash flow for the full year reached $56 million, significantly above the $36 million we saw last year. In the quarter, we directed our free cash flow toward paying down $33 million in debt, bringing total debt to $218 million, down from $251 million at the close of the third quarter; we finished the fiscal year with a leverage ratio of 1.6 times debt to EBITDA, comfortably under our covenants; we kept up our balanced approach to capital allocation, giving cash back to shareholders, putting money into organic growth and productivity initiatives, and lowering debt. Over the full year, we returned $44 million in cash to shareholders via dividends and share buybacks. As Joe said, we are taking steps to preserve our financial position and liquidity amid this period of heightened uncertainty. We will keep pursuing the aggressive cost savings plans already in motion and will evaluate further cost savings actions when necessary and appropriate; for now, we are also limiting capital expenditures to essential maintenance and safety projects and have paused share purchases at this point so we can conserve cash. In addition, we have coordinated closely with our bank group and have obtained commitments to extend our $150 million term loan, pushing the maturity out to April 2021. We anticipate this will be completed within the coming two weeks, possibly as soon as next week. As the fiscal year ended, we had nearly $200 million in unused capacity under our total credit facility, which, together with our cash flow, we believe gives us substantial liquidity to support our operations. In closing, we delivered a solid quarter and finished fiscal 2020 having achieved strong progress on our initiatives, with a solid financial foundation that leaves us well positioned for the future; we are taking proactive measures to manage our resources and to safeguard the long term health of our business; with that, I will hand the call back to you, Joe.

Joe Puishys

executive
#4

Okay, thank you Jim. Although the past few weeks have brought difficulties that nobody predicted, what I've witnessed has given me hope — here at Apogee as well as throughout the markets we serve in the U.S., Canada and Brazil. Individuals are uniting to navigate this COVID-19 crisis, and I take real pride in the fact that Apogee could contribute in a meaningful way to those efforts. Once more, let me stress that protecting the health and safety of our employees remains our number one concern right now, and I appreciate all that our team is doing to take care of our customers under these conditions. We are indeed facing a time of extraordinary uncertainty, yet brighter days lie ahead, and I have strong confidence that together we will come out of this positioned for tremendous success. The moment we gain greater clarity regarding how the COVID-19 pandemic will unfold and what effect it will have on our business, we will be eager to share refreshed guidance and financial targets for fiscal 2021 as quickly as we can. Thanks once more to every one of our employees, customers, suppliers, and other business partners for what you are contributing right now. With that, I'd like to begin taking your questions, so Kevin, please let the audience know how they can ask questions. Thank you.

Chris Moore

analyst
#5

Hi there, good morning everyone. Perhaps we could begin with framing. You mentioned that orders for framing with short lead times appear to still be fairly robust. Could you remind us how framing breaks down, from the shorter lead time side to the longer lead time curtainwall and window products?

Joe Puishys

executive
#6

Sure, Chris, it's roughly 50/50 between book and bill during the quarter and quarters that stretch out beyond that, so approximately 50/50.

Chris Moore

analyst
#7

Understood. Based on your current vantage point, when you consider those 3 architectural segments, which one likely carries the greatest near-term uncertainty?

Joe Puishys

executive
#8

Honestly, uncertainty exists across every one of them, just as it does for everybody, though I did bring up the CISA guidelines — these days, all of you are familiar with what CISA means. Let me offer a single illustration — Viracon, the glass operation we own, by itself holds orders within the active pipeline; those are confirmed orders scheduled for delivery across the coming 8 weeks covering 56 hospitals located in 20 separate states; we also have a matching count of healthcare projects lined up ahead, and that covers only Viracon. Hospitals and healthcare get support from our remaining businesses too. At this moment we feel quite optimistic regarding the architectural operations, yet naturally, as a country, everyone has concerns about whatever comes next, but things have gone well up to now.

Chris Moore

analyst
#9

Understood, thanks for that. Regarding the $30 million to $40 million in yearly cost reductions, I'm just looking to get a clearer picture on the timing. Is the aim to reach that run rate by the close of fiscal ’21? Just want to clarify that —

Joe Puishys

executive
#10

For sure. Our team is putting together contingency plans for how to ramp that up even further if volume does shrink this year for our industry, and how we can keep pushing for more savings; but we remain very, very confident about — you know, the procurement savings have been pinpointed. Our outside partner has finished their work. As Jim pointed out, I brought in a new Chief Procurement Officer who completely owns carrying out the project, and this isn't blue sky. We've pinpointed by part number throughout our company where those savings sit, so we feel very good about it. That's the end of the year run rate, but once again this year there's a substantial impact within the fiscal year too.

Chris Moore

analyst
#11

Understood. One final thing I wanted to ask about LSO — from what I'm hearing, you've likely had just 15 days of activity in the quarter so far. When it comes to LSO orders, is it typical for them to be weighted toward the back half of the quarter? Does a pattern like that exist?

Joe Puishys

executive
#12

The first quarter tends to be a weak one, since it comes after the holiday buy-out in Q4 — that works in our favor. Our facilities are located in states where — one site is shut down through the end of April, while the other is only closed through April 10 — that one's in Minnesota, and it's the one that might reopen earlier. But the truth is, I'm expecting that during the month of April, both facilities will remain closed. We've got inventory on hand to ship to our customers. I believe that market will bounce back nicely; in fact, a lot of the arts and crafts retailers in that space are experiencing a surge right now, as people search for activities to do at home and discover what they can cover using our incredible product for custom framing, so I'm confident there will be a strong recovery. As you're aware, our LSO business is a remarkable marketing powerhouse, and they understand how to manage costs, so they're pursuing significant cost measures at this very moment.

Jim Porter

executive
#13

Regarding what Chris brought up about how orders are moving, over the past 10 days, since a large number of our retail customers have been forced to shut down, order activity has fallen off considerably.

Chris Moore

analyst
#14

Understood, that’s clear. Thanks, both. I’ll get back in the queue.

Joe Puishys

executive
#15

Appreciate it, Chris—we’ll speak later.

Eric Stine

analyst
#16

Hey Joe, hey Jim. Morning. I'd really like to hear what you think — you mentioned this briefly — but when it comes to construction across the country, it appears quite inconsistent. Certain places have declared that no building work may proceed, yet for the large majority, things are essentially carrying on as they always have. So I'd appreciate hearing your perspective on which of your businesses are performing best, which carry the most risk, and within those markets, what you're observing regarding projects that can keep going versus locations where they've simply halted all building activity.

Joe Puishys

executive
#17

Eric, thank you, that's a fair question; in the majority of states, construction along with associated work has been classified as essential. On the whole, conditions are remarkably ordinary. Every one of Apogee's architectural operations is up and running and delivering product, guided above all by the mandate to take steps safeguarding the health and safety of our employees. A handful of markets impose greater restrictions on building work. Honestly, those tend to be places where our position isn't particularly strong, and we've seen certain projects decelerate or be placed on a short-term pause, and we're collaborating closely with those clients. Certainly, we'll experience some adverse effects before long, yet the phrase I'd choose is that building activity is remarkably ordinary at this moment. As a matter of fact, when all is said and done, my hope is that this crisis gets people to understand that extended logistics supply chains can be risky and there's no place like home cooking.

Jim Porter

executive
#18

Like Joe mentioned, on the whole, progress is happening. Across the entire company, there isn't any concentration by geography. You'll find certain individual businesses that might have particular elements — for instance, the Boston market's impact has been somewhat larger, and San Francisco in a more uneven way — yet on the whole, none of those areas show any geographic concentration for us.

Eric Stine

analyst
#19

All right, understood. Let’s shift over to backlog for a moment — that isn’t what it sounds like, but I just want verification: there are no cancellations sitting in backlog, correct? Perhaps some timing has moved around. This stretches back a long way, yet if we treat history as our guide, would you anticipate that a considerable stretch of time has to pass before cancellations begin appearing, or how do you think about it?

Joe Puishys

executive
#20

The number of cancellations has been extremely low. Nothing came from backlog, in my view. What we saw came from our awards. If my memory serves, one involved a Carnival Cruise Line project — correct, Jim? That wasn’t a shock. There have been certain delays, however the pipeline is still strong, and our business with the longest lead time, the services segment, is putting up another solid quarter. In Q1, I predict and anticipate that backlog will rise within services, which carries our longest lead time.

Eric Stine

analyst
#21

Understood, alright. One final question from my side — you brought up capex, saying you're only doing what's considered truly essential. Could you put that in context, or give us a reminder about maintenance capex?

Joe Puishys

executive
#22

At this moment, capex is on hold, apart from safety and maintenance. We'll hold off even on solid productivity projects and see how things go.

Jim Porter

executive
#23

Right, and for this year, that amount of maintenance capex should land somewhere between $15 million and $20 million.

Eric Stine

analyst
#24

Alright, that's quite useful. Many thanks.

Brent Thielman

analyst
#25

Thank you, and good morning.

Joe Puishys

executive
#26

Hello there, Brent.

Brent Thielman

analyst
#27

I'd like to return to LSO for a moment. From what you said, it sounds as though you're currently shipping some product out of inventory. I get that the facilities and the retailers are already settled. Could you give us a sense of how severe the drop was in March? I'm just trying to factor in the near-term hit to sales, or at least some expectation about it.

Joe Puishys

executive
#28

To repeat, in March we had — I believe Eric or Chris brought this up — roughly 15 days' worth of typical order volumes. That figure is falling sharply, since the majority of buyers in that segment, meaning retailers and independent custom framers, are currently closed, so we won't discuss March results over the phone, but that business is taking a serious blow. My expectation is that April will be just as weak, and we're hoping to get back up and running during the month of May, though once more that's — my hope and my projection is that when we return and the stores reopen, they'll experience strong business. Still, it will without question be the business hit hardest in Q1.

Brent Thielman

analyst
#29

Yep, all right. Got it, that makes sense.

Joe Puishys

executive
#30

Brent, I’d add this too: clearly, we are taking steps on costs, and that applies not only at LSO but throughout the entire company. It’s amazing how much cash gets freed up when there’s no travel, no hotel stays, no eating at restaurants, and so on. Down the road, if the world returns to something resembling normal, I don’t want a company that never goes to see its customers, but the cost benefits we’re getting from this situation are pretty significant.

Brent Thielman

analyst
#31

Joe, on that note, margins came in really strong in the February quarter, even considering that segment. Did any particular piece factor into that quarter?

Joe Puishys

executive
#32

Yes. Expenses? Yes.

Brent Thielman

analyst
#33

Alright. Joe, other contractors have told us plenty about how they've had to spend more to protect workers on-site, and obviously that matters greatly. My guess is the same holds for your services segment moving forward. What's our take on that effect? That unit's margins have been excellent, yet how should we view the pressure on margins in the short run, since surely you're handling the same thing?

Jim Porter

executive
#34

Brent, this is Jim. Right now, the situation keeps shifting even as we talk. Within the services portion, out on job sites, a good amount of social distancing naturally already occurs. There's some minor loss of efficiency when it comes to controlling how many individuals ride the construction elevator simultaneously, a few other things along those lines, yet as of now we don't view it as a material impact. Still, it changes daily regarding what particular site or general contractor rules apply to the work environment, so at present it isn't material.

Joe Puishys

executive
#35

People in construction share the same concern for their own well-being and that of their loved ones as anyone else does. That said, they tend to be quite resilient, and when you're 50 stories high on the exterior of a building, you understand how to deal with fear and toughness. So we're ensuring these individuals put on appropriate face masks while riding an elevator, when necessary, but up to now — once again, the workers have been pretty amazing.

Brent Thielman

analyst
#36

Alright. Joe, regarding the backlog in either segment — though I suppose I'm thinking about how services take longer to lead — could you remind me, or explain, what portion of that is granted before a project even breaks ground?

Joe Puishys

executive
#37

You mean granted to us before any hole is dug?

Brent Thielman

analyst
#38

Correct.

Joe Puishys

executive
#39

So, that falls under the glass division for us, since we're named in the specs prior to a GC even being picked. As before, the orders and awards in our glass operation are still at typical levels. When it comes to our services arm, the installation side, by the time an order comes in, excavation is already underway, and like we mentioned, we're watching those projects move forward. I believe it's unavoidable that if this crisis keeps going, work that hasn't broken ground yet will likely face a delay of 30 to 90 days, though up to now that hasn't had any effect on our business.

Brent Thielman

analyst
#40

All right, that’s useful. Perhaps this question is directed at you, Jim. I noticed you managed to extend by one year the maturity on that $150 million of term debt. There’s $15 million of cash coming in today, and I’m certain you’ll bring in some cash during this year. Could you maybe just talk through what choices you have for handling that? It’s 1 year off, though that isn’t all that far.

Jim Porter

executive
#41

Yeah, speaking purely about how our capital structure looks, as you might expect, we were in fact actively engaged with our bank group regarding an extension of the term loan, and in fact, until roughly three weeks ago, we were pursuing a 3-year extension of that term loan prior to the credit markets becoming seriously disrupted. Having said that, we truly do believe — I mean, generally we — receivables represent our primary working capital element. Typically, even in the event that things do slow down, we collect a substantial amount of cash, we hold lien rights across all of our projects, so we have confidence regarding our liquidity and our cash flow. That being said, once conditions settle down in the credit markets, we will keep assessing capital structure options and examining how we may wish to structure things over the longer term.

Brent Thielman

analyst
#42

Alright, appreciate you all fielding our questions.

Julio Romero

analyst
#43

Hi there, hope everyone's having a good morning.

Joe Puishys

executive
#44

Good morning to you, Julio.

Julio Romero

analyst
#45

If we pull back for a moment, how do you see this situation possibly creating a lasting shift in demand for office construction over the long haul, especially with what may be a faster move toward working from home?

Joe Puishys

executive
#46

I don't know. In my view, it's premature to tell whether our end markets will see what you're calling a structural change. Is work from home going to cause the office sector to decline? That's not my view. My belief is that in the end, folks have to perform their jobs. I'd like my team back at the office as quickly as we can manage; we get more done, leaders get more done, so I expect that pattern to hold. Our economy keeps shifting further toward services, and I think that's a positive sign for the office sector too, and naturally healthcare and education, in my view, will keep expanding strongly. It's also my hope that what we're going through brings about somewhat greater resilience or dependence on partners based here in the U.S., and that we can react more quickly than anybody else, and I hope that shifts things in our favor somewhat.

Jim Porter

executive
#47

Julio, when we came into this stretch and looking at where we stand across this cycle, the office sector has been quite balanced — employment growth versus new square footage being delivered has been in equilibrium, which matters a great deal, and speculative construction has been minimal. Even right now, professional business services employment has held up more or less steady. Then when it comes to the longer-term picture, like Joe mentioned, whether any structural shift toward more working from home materializes is genuinely unclear. That isn't something I anticipate. The area that's perhaps already felt some pressure is co-working space, though keep in mind it represents a tiny share — roughly 2% of all office utilization. Given today's conditions, we aren't anticipating any meaningful structural change.

Julio Romero

analyst
#48

Got it. Thanks a lot for that detail. During fiscal ’20, there was an increase in corporate costs, as you pointed out around this same period a year ago when it occurred. There was plenty of uncertainty, I realize, but could we possibly frame some reasonable projection for how much that figure might be in fiscal ’21?

Jim Porter

executive
#49

You mean with regard to corporate costs?

Julio Romero

analyst
#50

That's right.

Jim Porter

executive
#51

So, our expectation is for that figure to decline somewhat. During fiscal ’20, we incurred several million dollars in elevated legal and consulting costs, and we anticipate those will mostly disappear.

Julio Romero

analyst
#52

That’s useful. Thanks for the added detail, and please take care of yourselves and remain in good health. Many thanks.

Joe Puishys

executive
#53

Thank you, Julio.

Barry Haimes

analyst
#54

Morning, and I appreciate you fielding these. I only have a small number of things to ask regarding working capital — apologies, I mean free cash flow. You brought up the $15 million to $20 million figure for maintenance capex. I'm just wondering, prior to the onset of the entire COVID crisis, did you have a sense of what your typical capex plan would have looked like, simply to understand what a standard year's capex figure for this year could have been. My second thing, working capital, my assumption is that it was a source during the most recent fiscal year, and if that's right, what was the amount? And once more, setting aside the virus, if we were only considering your standard plan, would working capital serve as a source, a use, or stay neutral for the upcoming fiscal year? Thank you.

Joe Puishys

executive
#55

The capex figure I'll handle, and your F20 source question Jim will take. Our guidance would have been around $55 million, likely within a $50 million to $60 million band for capex during fiscal '20, with an effort to move toward the bottom of that band. Lately we've put a lot of money into glass and other segments, so let's simply say it would have landed in the $50 million to $55 million range.

Jim Porter

executive
#56

When it comes to working capital, the main thing I'd say about fiscal ’20 and fiscal ’19 is that the environment for working capital actually worked in our favor, though that benefit got partly canceled out by the negative working capital we needed in order to handle the work on acquired projects that was underway. Looking ahead to fiscal ’21, what we expected was a favorable trend line in working capital, and like I said, if we found ourselves in a situation where a slowdown occurred, we would typically see working capital become a genuine contributor to cash, since we'd be harvesting receivables.

Barry Haimes

analyst
#57

Thank you. Perhaps only one additional item. Regarding those cost reductions of $30 million to $40 million, you referenced the run rate by the close of the year, yet do you have any sense of the span for how much would truly land during this fiscal year, and consequently, logically speaking, the remainder would likely fall into the following fiscal year? Simply to understand the division. Thanks.

Jim Porter

executive
#58

Yes, so the savings from that are beginning to appear for us at this moment, and a greater portion of the substantial savings will come through procurement as they build up over the course of this year and begin toward the procurement savings, likely around the midpoint of fiscal ’21, we ought to build up to that annualized level. Then concerning our remaining cost-out efforts, we have a variety of actions across the year, a few of which in fact carry some expense to carry out and establish during fiscal ’21 in order to produce the savings from that, so we will observe several good contributors. We have not provided particular guidance and put a figure on the exact amount in fiscal ’21, but we will observe several very strong contributions throughout the fiscal year.

Barry Haimes

analyst
#59

All right, many thanks. I appreciate the assistance.

Joe Puishys

executive
#60

Barry, thank you.

Bill Dezellem

analyst
#61

Thanks. There are several things I'd like to ask. To start, could you give us some clarity on those hospital orders you referenced? I believe you said the figure was somewhere around 56. My impression is that we're not seeing 56 brand-new hospitals going up, so if you could walk us through that, I'd appreciate it.

Joe Puishys

executive
#62

Sure, that number only reflects one moment in time. As I noted, we hold glass orders for more than 50 hospitals across 20 states that sit in our present backlog awaiting shipment, and on top of that backlog we also have awards spanning the whole healthcare sector. Not all of these structures are newly built. Some involve renovation, while others are additions and expansions to existing facilities. Bill, I would need to dig into the details to determine how many are new buildings as opposed to extensions. This is entirely routine for us. There's nothing new about it. That's just a standard profile for that business.

Jim Porter

executive
#63

Yeah, I’ll just chime in — like Joe mentioned, it genuinely combines brand-new hospitals along with additions to existing ones, and it’s truly varied when it comes to geography.

Bill Dezellem

analyst
#64

That's useful, thanks. You also said that at some point, upcoming orders or activity could get delayed by 60, 90 days. From where you sit in the business, with bookings or backlog, when do you think that slippage or gap in orders — whatever we choose to call it — would show up?

Joe Puishys

executive
#65

I don't know at this point. Once more, we're in a waiting period. As things stand right now, building activity is still strong throughout much of the nation. A few pockets exist where state-level authorities have imposed tighter rules. Should that spread, I'd anticipate certain holdups. At present, a delay of one to 3 months in a few pockets around the U.S. makes sense. That isn't what we're observing. Once again, what we're doing today is solid, quite typical; I'm simply watching the clear patterns nationwide if shelter-in-place directives keep widening, if states begin adopting a tougher stance toward commercial construction. That isn't what we're observing. The National Association of Manufacturers, an organization I belong to, is putting in serious effort to keep the machine humming and look after our workers, along with the business partners we have; public-private partnerships carry significant weight too. So to answer you, Bill, that's something we cannot forecast.

Bill Dezellem

analyst
#66

Thanks, Joe. On the capital spending side, since you mentioned that the safety maintenance figure for the entire year would land between $15 million and $20 million, does it make sense to view Q1 as being in the $3 million to $5 million range for capex, or is there some reason it would look different?

Jim Porter

executive
#67

It might actually be closer to $5 million to $7 million; a few projects were already underway when we entered the quarter.

Bill Dezellem

analyst
#68

All right, thanks. Jim, you have the floor?

Joe Puishys

executive
#69

What I wanted to add is that I’ll keep a very tight grip on capex and aim toward the lower end of what we normally spend on maintenance. At this moment, safety comes first for me; maintenance comes second; and anything beyond that ranks third, and for now we’re keeping that flow shut off.

Bill Dezellem

analyst
#70

Okay, thanks. For our final question, could you give us an update on the EFCO project that was acquired, along with any remediation or compensation that might flow back to you?

Joe Puishys

executive
#71

We're still finishing up — well, every project we bought has now been closed out. The largest one, which we discussed and on which we recorded a fairly sizable charge 12 months ago, is nearing the finish line. My belief is that we've accrued properly for it, and our accountants as well as our lawyers keep working to settle the financial matters. As for our quarter — you know, had we been giving guidance, I noted where my guidance was headed prior to this crisis, and it factored in all the assumptions about cost to complete, and I don't really count on recoveries, though we keep making efforts toward seeing recovery. At this stage it isn't substantial; the big project is nearly finished.

Bill Dezellem

analyst
#72

I appreciate the two of you, and best wishes as you handle whatever lies ahead.

Joe Puishys

executive
#73

Thank you, Bill. I appreciate that.

Joe Puishys

executive
#74

Alright, thanks Operator, and thanks to all of you for joining. A lot of you, we'll be speaking with over the next several days and weeks; we'll be doing that, of course, remotely and safely, just as you are; as individuals and as leaders, we're battling a war on two fronts — one personal and one business — and as I enjoy telling folks, though the personal side matters far more, the business side is more pressing right now provided your family is secure, so we'll proceed on the basis that each choice we've made in this period, when we reflect later, will be one we're proud of — for our customers, above all our employees, and our other stakeholders in the communities, and naturally our shareholders too. We get the balance, and I can promise you I intend to take pride in every decision I make once we reach the other side of this. As I mentioned, I truly believe we came in from a position of real strength and feel we've definitely gotten our ship set right, and I look forward to making it through this crisis. Thank you. I'm eager to speak with some of you offline. Have a wonderful day. Stay safe.

Jim Porter

executive
#75

Thank you.

Operator

operator
#76

That brings us to the end of today’s presentation, everyone. You’re welcome to disconnect now, and have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Apogee Enterprises, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Apogee Enterprises, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Apogee Enterprises, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.