ARC Resources Ltd. (ARX) Earnings Call Transcript & Summary
May 10, 2024
Earnings Call Speaker Segments
Operator
operatorGood morning. I'm Ina, and I'll be serving as your conference operator for today's session. Right now, I'd like to extend a welcome to all of you joining the ARC Resources First Quarter 2024 Earnings Conference call. Every line has been muted so that no background noise comes through. Following the speaker's remarks, we'll open things up for a question-and-answer session. Should you wish to pose a question at that point, just press star and then the number 1 on your telephone keypad. To pull back your question, please press star and then the number 2. Thank you. Mr. Lucco, the floor is yours to begin your conference.
Dale Lucco
executiveThanks, operator. Morning, everyone, and thanks for being with us on this First Quarter Earnings Conference call. With me today are Terry Anderson, President and Chief Executive Officer; Kris Bibby, Chief Financial Officer; Armin Jahangiri, Chief Operating Officer; Lara Conrad, Chief Development Officer; and Ryan Berrett, Senior Vice President Marketing. Before I hand things to Terry and Kris to walk you through our First Quarter results, I want to remind everyone that this conference call contains forward-looking statements as well as non-GAAP and other financial measures, and the risks tied to those are laid out in the earnings release and our MD&A. Every dollar figure we discuss today is in Canadian dollars unless we say otherwise. Lastly, the press release, financial statements, and MD&A are all posted on our website and on SEDAR+. Once our prepared remarks are done, we'll open the line for questions. With that, I'll pass it to our President and CEO, Terry Anderson. Terry, over to you.
Terry Anderson
executiveThanks, Dale, and good morning, everyone. Q1 marked yet another period of consistent delivery, producing robust operational and financial results. Output averaged 352,000 BOE per day, which came in 2% above consensus and rose 8% on a per-share basis versus the first quarter of 2023. That makes it the 11th quarter in a row in which production per share has grown. This fits with our plan to expand free cash flow per share by investing in our assets with discipline and repurchasing our shares when they offer good value to investors, as they do today. Looking back at the quarter, if I were to sum it up, we ran a capital-efficient program, moved our marketing strategy forward with another long-term LNG agreement, and finished several key milestones for Attachie Phase 1. Discipline, efficiency, and execution—these themes have long been the foundation of our operational excellence. At the asset level, operating performance beat expectations, and that drove the production outperformance against our forecast. Much of this stemmed from revisions we've made to how we develop the Sunrise asset. We recently changed the well layout at Sunrise to further boost capital efficiencies and bring down the supply cost at what is already one of the most economic natural gas plays in North America.
Terry Anderson
executiveJust to remind everyone, Sunrise is an outstanding asset with a lengthy development runway, and it's now tied in directly to Coastal GasLink, the pipeline supplying natural gas to the LNG Canada project. Turning to Kakwa, during the quarter production came in at an average of 175,000 BOE per day, including 65,000 barrels per day of condensate. That's right in line with what we expected, since we intend to hold Kakwa output around this level going forward so as to optimize free cash flow. To put that in perspective, Kakwa produced more than CAD 300 million of asset-level cash flow in the quarter, and since we acquired it in 2021, it has built up roughly CAD 5 billion in asset-level free cash flow, well in excess of the price we paid for the asset. Looking forward, after the turnaround work we have scheduled at Kakwa in Q2, we expect growth in the second half of the year as we go back to developing a region of the field with a higher condensate gas ratio. We've also made some modifications to our frac design here, and although it's still early days, the preliminary results look positive. Moving to a few financial highlights, ARC generated CAD 100 million of free cash flow in the quarter and, as planned, returned all of it to our shareholders.
Terry Anderson
executiveNotably, we generated that free cash flow despite weaker natural gas prices and a quarter with heavier capital spending as Attachie Phase 1 moves toward completion. That demonstrates our business can endure and remain resilient, thanks to competitive strengths built up over 28 years — among them a low-cost structure supported by infrastructure we own and operate, a balanced commodity mix that includes being Canada's largest condensate producer, and a diversified transportation portfolio letting us sell natural gas into key demand markets throughout North America and secure stronger margins. ARC's diversified transportation portfolio was a highlight this quarter, with a realized natural gas price of $3.19 per MCF — more than 150% of the AECO benchmark. We've talked extensively about what market diversification delivers. Our long-term takeaway agreements providing access to U.S. markets have contributed substantially to corporate profitability. Indeed, across the past 10 years, ARC has averaged realized prices above 125% of the AECO benchmark. Building on this strategy, ARC has signed long-term agreements to supply natural gas to LNG projects along the U.S. Gulf Coast and the Canadian West Coast. Most recently, we announced a 20-year agreement with Cedar LNG under which ARC will supply 200 million cubic feet a day of natural gas, starting in the second half of 2028, when the project begins commercial operations.
Terry Anderson
executiveAt present, ARC has signed a non-binding Heads of Agreement with a global investment-grade counterparty covering the purchase and sale of those LNG volumes, and under it we'll get international pricing. We're now working toward definitive agreements, and we're happy with how far things have progressed so far. With this announcement, ARC now has three LNG supply agreements in place that link our physical gas to worldwide markets in exchange for international or LNG-based pricing. That starts in 2026 with our first Cheniere contract, and before the decade is out, we'll hit our goal of marketing 25% of our natural gas production into global markets. Last, I'll wrap up with an update on Attachie. I'm extremely pleased with what our team has accomplished so far. This year is a pivotal one for our company, since Attachie will deliver significant value over the coming decade, and it starts with Phase 1 coming on stream later this year. As a reminder, ARC holds 300 sections of contiguous Montney acreage at Attachie, and this asset is large enough in scale to replicate Kakwa, the biggest condensate-producing asset in Canada. This first phase will add roughly 40,000 BOE per day in 2025, which represents 10% production growth year-over-year, and the project remains on schedule and on budget with zero safety incidents.
Terry Anderson
executiveDuring the quarter just ended, we reached several significant milestones that deserve mention. We have just finished a pipeline bridge, and it is essential to the takeaway plan we are pursuing. Of all the critical path items standing between us and our intended timeline, this one mattered most, so getting it done is a welcome result. Our drilling program is proceeding as scheduled, and we have drilled 22 of the 40 wells required to initially fill the facility capable of 40,000 BOE per day. Last, work is advancing very well on bringing electricity to Attachie via BC Hydro, and that will make Attachie one of the condensate-rich natural gas developments with the lowest emissions anywhere in North America. It will additionally reduce the emissions intensity of our corporation and preserve our standing among the lowest emissions producers on the continent. In closing, we remain on track and are concentrating on delivering the long-term plan we introduced a year ago. I will now hand things over to Kris.
Kris Bibby
executiveThanks, Terry, and good morning to all of you. Before I hand things back to Terry for closing remarks—and then we'll move on to questions—I'd like to add some context around the quarter and our financial results. On the operational side, we produced 352,000 BOEs per day for the quarter, with 63% weighted to natural gas and 37% to condensate and liquids. That came in ahead of our first quarter guidance even with the extreme cold in January, and it gives us good momentum as we begin the year. First quarter cash flow came to CAD 607 million, and free funds flow was CAD 102 million—3% and 8% above analysts' forecasts, respectively. The outperformance versus analysts' estimates was driven by lower operating costs and lower capital spending. Both operating and transportation expenses landed below the bottom end of company guidance, and operating costs in particular benefited from lower power pricing in Alberta. G&A exceeded guidance, mainly because share-based compensation expense came in higher than budgeted, tied to recent share price performance. Turning to the liquids side of our business, pricing realizations remain strong, with condensate averaging over $94 during the quarter, and as a result, condensate and crude oil accounted for roughly 60% of our revenue in the quarter.
Kris Bibby
executiveTerry has already covered the price realization topic for natural gas, but I think it bears repeating. ARC's unhedged natural gas price came in at $3.19 per MCF Canadian, and that compares with an AECO benchmark of $2.05 and NYMEX Henry Hub of roughly US$2.25, which works out to about $3 Canadian on a Canadian basis. All told, ARC put $505 million to work during the quarter, which was exactly in line with what we expected, and that figure included about $180 million of spending on Attachie Phase 1. Roughly 75% of that capital went toward drilling and completions, while the remainder was mainly allocated to facilities, including Attachie Phase 1 and a super pad currently under construction at Kakwa. As we had planned, net debt was unchanged from one quarter to the next, holding at CAD 1.3 billion, which is roughly 0.5 times cash flow measured on a trailing four-quarter basis. We keep showing that we are committed to a total balanced return, and that approach includes giving back essentially all free funds flow to shareholders. During this quarter, dividends plus share repurchases amounted to 114% of free cash flow. That number will move around from quarter to quarter, but when you look at the full year, we anticipate returning essentially all free funds to shareholders, much like we did in 2023. Our view on the best method for returning capital has not changed.
Kris Bibby
executiveFrom where we sit, the right approach combines a dividend that keeps growing with buybacks of our stock. This isn't just a financially prudent and value-enhancing way to deploy capital — our shareholders have backed this approach overwhelmingly. Since we launched our first NCIB in September 2021, we have put more than CAD 2.1 billion into repurchasing 18% of the shares outstanding. On our present assumptions, that pace will pick up in 2025, reflecting the free cash flow growth we expect once Attachie Phase 1 joins our producing assets. Turning to the outlook, our 2024 guidance for production and capital spending is unchanged. ARC expects to invest roughly CAD 1.8 billion, and full-year output should come in at an average of 350 to 360 thousand BOEs per day. For the second quarter, we expect output to average 325 to 330 thousand BOEs per day, then rise to an average of about 370 thousand BOEs per day across the second half. The softer Q2 figure reflects scheduled turnaround work at Kakwa and Greater Dawson. We planned these to line up with major third-party turnarounds so that total downtime is kept to a minimum. Momentum in operations during the back half of the year will come from Kakwa and Greater Dawson, along with some contribution from Attachie as we aim to start commissioning that asset before the year is out.
Kris Bibby
executiveLooking forward, our view through 2028 is basically the same as the five-year plan we laid out a year ago. For 2025, we'd anticipate a significant rise in output and free funds flow per share. That comes mainly from a 10% bump in production, which reflects a full year of contribution from Attachie plus reduced capital spending as we move from growth to sustaining capital at Attachie Phase 1. Under strip pricing, we project free funds flow per share will more than double to about CAD 3 per share in 2025. With that, I'll hand it back to Terry for closing remarks.
Terry Anderson
executiveThank you, Kris. Delivering sustainable growth in free cash flow per share is what our strategic priorities aim at, and we do so while sticking to our long-held principles of capital discipline, profitability, and financial strength. Our plan for getting there is to put money into our most profitable assets while offsetting that with a meaningful return of capital, which includes a growing base dividend along with share buybacks. I have confidence that we can achieve this. In a lot of ways, the momentum and enthusiasm I've seen throughout the organization brings to mind our first Montney development at Dawson. Fourteen years ago, we started Dawson Phase 1, and that facility had a capacity of 10,000 BOE per day. That year taught us a great deal, and although we knew the Dawson asset held tremendous potential, we did not fully appreciate that the Dawson area would expand to the roughly 100,000 BOE per day it produces today. Now we stand on the verge of commissioning Attachie, a far more significant development opportunity, whose first phase of 40,000 BOE per day is coming on stream later this year. While there are similarities to Dawson, one of the biggest differences is that our understanding of this asset's development potential is far better. Today we bring more experience, improved technology, and greater depth of Montney knowledge, and all of it works in our favor.
Terry Anderson
executiveThat makes me confident in how well we can carry out and build out Attachie, and I feel genuine pride in being involved in this next chapter of our company's story. So I want to thank every one of our staff for staying focused on expanding our business profitably and safely. With your backing as we execute our five-year plan, we are positioned to create substantial shareholder value, with free cash flow per share nearly tripling by 2028. With that, thank you, and we can now open the line for questions.
Operator
operatorThank you. Ladies and gentlemen, at this point we'll open it up for questions. If you'd like to ask one, please dial star and then 1 on your phone's keypad. A prompt of 3 tones will confirm that your request has been received. We'll take questions in the sequence they come in. To withdraw your request, dial star and then 2. When on a speakerphone, kindly lift the handset prior to pressing any keys. Please hold for a moment while we get to your first question. Our first question is from Michael Harvey of RBC Capital Markets. Please go ahead.
Michael Harvey
analystOkay, thanks. Morning, everyone. Just a few questions, if I may. First, regarding Phase 2 Attachie and 2028 — is there anything that might lead you to pull that forward, such as commodity prices or performance, or is 2028 essentially fixed? Then, on the Sunrise performance, which looked good, I wanted to confirm that when you begin sending gas to LNG Canada, that is in fact the gas you'll be directing there to meet that commitment. And then perhaps for Ryan, could you take us through the pricing dynamics — what sort of benefit you'll see beyond Station 2, and then how you backfill that on the West Coast system?
Terry Anderson
executiveHey Mike, Terry Anderson here. I'll handle your first question, then hand things off to Ryan for the second. As for Phase 2, the plan remains 2028. We're working hard to stay disciplined, making sure capital allocation is balanced and keeping our attention on that reinvestment ratio of roughly 50% throughout the five-year plan. So if commodity prices turn out to be extremely strong, we'll certainly factor that in, but our planning assumes the three-year cadence, and that's where we stand. Ryan?
Ryan Berrett
executiveGreat, thanks Michael. On your Sunrise question: the gas that’s going to supply LNG Canada comes from an agreement we closed a couple of years back with Shell. Among the non-equity participants in LNG Canada, we’re the only one with a direct connection into the Coastal GasLink pipeline. That gas is currently landing at AECO and will most likely be redirected into Coastal GasLink around early 2025. On pricing, it will be a slight premium over the AECO benchmark.
Michael Harvey
analystAppreciate it. Thank you all.
Operator
operatorThanks. The next person to ask something is Patrick O'Rourke of ATB Capital Markets, calling in on that line. Go right ahead.
Michael Harvey
analystMorning, everyone, and thank you for the chance to ask a question. I’m a bit curious about something. At Attachie, you’re now at 22 of 40 wells in the program, and there could be hundreds, perhaps thousands, of wells that you’ll ultimately drill. Clearly, over the years you’ve been quite deliberate about enhancing and refining how you do things. We saw at Kakwa that the inner well spacing was widened. It also sounds like you’ve adjusted the wine-racking of the horizontals somewhat at Sunrise. So I’m just wondering, as you get your hands and arms around this project, how are you thinking about well configuration design and completion design, and what might potentially come next as you roll out what the opportunities are?
Terry Anderson
executivePatrick, this is Terry. Clearly, we're at an early stage of this project, and optimization will always be ongoing. Right now we have a plan for how the wells are being drilled, though it will get refined as we progress. And we're going to bring in — just to remind everyone, the last time we drilled our 227 pad and that completion design was 2019. So there are other wells nearby to the north and over in Conoco's lands and that area that we're reviewing and reassessing and working to optimize. So without going into specifics, we'll keep optimizing where we are. That's the same as any other field and any development we've begun. And we've taken learnings from Kakwa and are folding those in. I know I'm not being specific about anything, but it's too early for us to be specific about how we'll be changing things up.
Patrick O'Rourke
analystAlright, thanks — this will be brief. It sort of follows up on what Mike Harvey asked regarding Attachie Phase 2, and I also have a question about return of capital. One item worth noting is the electrification of Attachie Phase 1 along with its carbon footprint. For upcoming phases, is the power supply already locked in, or what does that market look like from your perspective?
Armin Jahangiri
executivePatrick, it's Armin here. Yes, power is available for Phase 2. We're sorting through the specifics regarding all the transmission lines and everything needed to bring electricity to the site. But the intention is that Phase 2 would be electrified as well.
Patrick O'Rourke
analystAll right, thanks. Last thing from me on capital returns — you touched on it briefly in the prepared remarks, but in the first quarter the dividend plus buybacks came in a bit above free cash flow. So I was hoping you could add some detail on how you intend to handle that across the years. Is it roughly an even load, or will it look more like a sweep of free cash flow each quarter?
Kris Bibby
executiveHi Patrick, this is Kris. So in 2023, our distributions came in a little bit higher than free cash flow. Q1 was at 114%. Our real approach is to look at it annually, so it'll fluctuate from quarter to quarter. In Q2, capital spending is fairly heavy and production is lower too. So I wouldn't be too surprised if we end up slightly above free cash flow in that quarter as well. But with production and pricing both significantly higher in the second half of the year, the plan is certainly to bring that back in line. So there's no fixed formula quarter to quarter. Part of it depends on where the share is trading in terms of our buyback terms, and then the plan is to balance it out on an annual basis.
Patrick O'Rourke
analystAll right, that’s excellent — thank you so much.
Dale Lucco
executiveI appreciate that.
Operator
operatorThank you. As a reminder, if you'd like to ask a question, press star then one on your phone's keypad. Our next question is from Jamie Kubik at CIBC. Go ahead, please.
Jamie Kubik
analystMorning, and thanks for taking my question. Just on Sunrise output for the quarter — correct me if I'm mistaken, but that was actually below the Q4 2023 levels. Could you expand a bit on the well performance you're referring to at that asset?
Lara Conrad
executiveThanks, Jamie. Lara Conrad speaking. Overall, when it comes to how the wells are performing, we've made a change to our design at Sunrise. Previously we drilled three layers up in the upper Montney plus one down in the lower. What we've discovered is that two layers in the upper are enough to reach the resource while we continue to keep that single one in the lower. That means we need to raise our tonnage per meter intensity, but we're genuinely seeing that design substantially enhance the capital efficiency of an asset that is already excellent.
Jamie Kubik
analystAll right. And I realize you've mentioned that this asset has 360 million cubic feet per day of gas processing capacity, though ARC's output through it in earlier quarters. Could you just describe what the productive capacity for that region is in that area?
Armin Jahangiri
executiveYeah, Jamie, Armin here. Yes, that facility can handle 360. Of course, while you're running the plant, subject to seasonal circumstances, you might be able to push somewhat more throughput via those plants. Still, in terms of facility capacity, the figure stands at 360 million cubic feet per day.
Jamie Kubik
analystOkay, staying with gas for a moment — AECO and Station 2 forward strip pricing still looks fairly weak over the coming 4 to 6 months, sitting under CAD 1.50 per GJ. In that kind of price environment, might you consider holding back production and pushing it to later in Q3 or Q4?
Kris Bibby
executiveNo, Jamie — this is Kris speaking. As things stand, it isn't the way you described it: pricing isn't great, but it remains comfortably above the level required for us to achieve our rates of return. Just to remind you, Sunrise is the sole dry gas asset that we hold. And we've discussed with you before how low-cost that property's structure is, so producing under those conditions continues to make sense. As we move into the second half of the year, we do expect pricing to strengthen somewhat.
Jamie Kubik
analystAll right, thanks — and perhaps my final question concerns Attachie and Kakwa. Could you discuss water availability for ARC across those areas, plus the completion programs still remaining in 2024, and how you plan to schedule those in line with water supply? Thank you.
Armin Jahangiri
executiveYeah, regarding Attachie, Jamie, our ponds are holding water, and we also hold a long-term license. So at Attachie we don't anticipate any problems or worries. Kakwa enjoys that very same setup. We already have substantial water infrastructure constructed in the field that carries all of our drilling and completions work for the year.
Jamie Kubik
analystAll right, I appreciate it, and I'll hand it back over. Thank you.
Operator
operatorI appreciate it.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete ARC Resources Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to ARC Resources Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ARC Resources Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.