ARC Resources Ltd. (ARX) Earnings Call Transcript & Summary

August 2, 2024

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 25 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning. I'm Sylvie, and I'll be serving as your conference operator for today's call. Right now, I'd like to welcome all of you to ARC Resources' Second Quarter 2024 Earnings Conference Call. Please be aware that every participant line has been muted so that no background noise comes through. Following the speaker's remarks, we'll open things up for a question-and-answer session. Should you wish to ask a question at that point, just press star and then the number one on your phone's keypad. And if you'd like to drop out of the question queue, simply press star followed by the number two. Thank you. Mr. Lucko, the conference is yours to begin.

Dale Lewko

executive
#2

Thank you, Operator. Good morning, everyone, and thanks for being with us on our Second Quarter Earnings Conference Call. With me today are Terry Anderson, President and Chief Executive Officer, Kris Bibby, Chief Financial Officer, Armin Jahangiri, Chief Operating Officer, Lara Conrad, Chief Development Officer, and Ryan Berrett, Senior Vice President, Marketing. Before I hand things to Terry and Kris to walk you through our Q2 results, I want to remind everyone that this conference call contains forward-looking statements as well as non-GAAP and other financial measures, and the related risks are set out in the earnings release and our MD&A. Every dollar figure we discuss today is in Canadian dollars unless we say otherwise. Lastly, the press release, financial statements, and MD&A can be found on our website and on SEDAR+. After our prepared remarks, we'll open the line for questions. With that, I'll pass it to our President and CEO, Terry Anderson. Terry, please go ahead.

Terry Anderson

executive
#3

Thanks, Dale, and good morning, everyone. On today's call, I'll look back at the quarter and discuss the outlook. Execution is our singular focus, since the coming few quarters will mark a substantial favorable shift for the company, as Attachie Phase I starts up later this year. After that, I'll hand things to Kris, who will walk through the financial results and then open the line for questions. Turning first to how we operated, Q2 delivered yet another robust quarter of execution. Output averaged 330,000 BOE per day, landing at the high end of our second quarter guidance. Given how packed the period was with planned maintenance work, getting all of that done is, in my view, no simple matter. It reflects a strength in our people that often goes unrecognized. Along those lines, the team performed outstandingly in finishing major turnarounds across our assets, every one of them within the second quarter. Each was finished on schedule and within budget and, above all, safely. Altogether, approximately 140,000 hours were logged in the field during this turnaround season, and we had no recordable incidents. I want to thank our staff and contractors for staying focused on safety and operational excellence. That focus proved essential in building operational momentum as we move into the second half of the year.

Terry Anderson

executive
#4

On the production side, our base assets came in as we had anticipated. The one standout was Sunrise, which did significantly better than expected. Toward the end of last year, we modified the well design at Upper Montney. Those benefits are now showing up, and that has led to an upward revision of our type curve. For each well, we anticipate these adjustments will deliver a 40% gain in natural gas output across the first 12-month period, while cost rises by just 25%. In effect, we are cutting the overall well count and the total capital we spend in order to recover the same volume of resource. The upshot is a 10% yearly decrease in sustaining capital at Sunrise, along with a lower break-even. It is also worth noting that these type curve revisions will bring the full cycle break-even at Upper Montney down to roughly $1.10 per MCF. As a lot of you are aware, Sunrise offers a lengthy inventory runway and links directly to LNG Canada, which makes it an excellent choice for us to deliver natural gas into that project starting early next year. Moving on to our capital investments, we ran an efficient program centered on pushing Attachie forward while staying active at our condensate assets in Kakwa and Greater Dawson.

Terry Anderson

executive
#5

By the end of this year, we expect this to generate record condensate volumes for the company. At Attachie, Phase I remains on schedule and on budget, and the project is roughly 75% complete. As of today, the plant is close to finished, and the last remaining pieces of equipment have arrived on site. Of the 40 wells needed to fill the 40,000 BOE per day capacity, we have drilled 30 and completed 20. Electrification of the project at startup is progressing as planned, with construction and installation of critical infrastructure finished and ready to be energized. The liquids gathering lines and pipelines are on schedule and nearing completion as well. As one shareholder reminded me some time ago, the only percent complete figure that truly counts is the 100% one. So we will not get complacent, and we will stay focused on delivering on our key objectives for Phase I. I look forward to giving another update in October and to showing firsthand the progress we have made at this exciting growth project at our first-ever investor tour at Attachie. Turning to another topic, I want to highlight a couple of key developments of strategic importance to ARC. The first was an agreement recently announced by the government of BC and the Halfway River First Nation, which included a landscape planning pilot that further de-risked the long-term development plan at ARC's Attachie asset.

Terry Anderson

executive
#6

This agreement sets out a fresh framework that exempts ARC from the disturbance cap for Attachie that had been put in place earlier through the Blueberry Agreement. As part of this landscape planning pilot, ARC will be the only oil and gas producer in this area granted an exemption from the disturbance caps. ARC being included in this pilot is directly linked to our dedication to operating as a best-in-class responsible energy producer and to the strong relationship we have built with the Halfway River First Nation over the past 20 years. I want to thank Chief Hunter and Council for their partnership. I am genuinely proud of the collaborative work to advance responsible development in Northeast BC. In addition, during the last quarter, we saw the positive FID of Cedar LNG. In June, I had the chance to attend the celebration event and witness firsthand the impact this project will have on Canada, BC, and the Haisla Nation. This project matters, and we are excited to be part of it. ARC will deliver roughly 200 million cubic feet per day of natural gas to the project, about half of the facility's capacity, for a term of 20 years, which is expected to begin in late 2028. We keep making excellent progress on the sale and purchase agreement for the associated LNG offtake and remain on track to have it completed by the end of this year.

Terry Anderson

executive
#7

Along with the two additional Cheniere LNG deals that start later this decade, ARC will hit its goal of roughly 25% of future natural gas supply being physically delivered and priced off international benchmarks. Near term, we're at a cyclical low for natural gas, while condensate prices are above CAD 100 per barrel. With a balanced commodity mix and as Canada's largest condensate producer, we have significant flexibility to maximize returns across our asset base. ARC is a highly disciplined company that prioritizes profitability over BOEs. With gas prices under $1, we've chosen to shut in 250 million cubic feet per day at Sunrise, our only dry gas asset. That's roughly 18% of our natural gas production, and it can be brought back easily once prices rebound. And although Sunrise carries a cash break-even of $0.65 per MCF and ranks among the lowest-cost assets in North America, we aren't achieving full cycle returns below $1 per MCF. We have substantial operating momentum in our condensate assets at Greater Dawson, Kakwa, and Attachie. Together, those assets will drive record condensate volumes for ARC by year-end and throughout 2025.

Terry Anderson

executive
#8

When we look ahead to the back half of this year and on into 2025, all the things we can control are lining up to our advantage. As an organization, we're concentrating on executing efficiently, and we're nearing a substantial boost in profitability as the first phase at Attachie comes online. On that note, I'll hand things over to Kris.

Kris Bibby

executive
#9

Thanks, Terry, and good morning, everyone. Starting with the quarter itself, second quarter production came in at 330,000 BOEs per day, and cash flow per share was $0.84 — both squarely in line with what we had forecast internally and what analysts were expecting. Output landed at the top end of the 325,000 to 330,000 BOEs per day range we had previously guided for the second quarter, while capital spending of $530 million came in slightly under consensus and included $180 million of investment at Attachie as we push Phase I forward. We expect second quarter production to be the low point for this year, which reflects all the scheduled maintenance that was concentrated in the quarter. We expect fourth quarter production to be roughly 17% higher, at approximately 385,000 BOEs per day, as we bring Sunrise production back and get some contribution from Attachie late in the year. Cash from operations in the second quarter was CAD 503 million. Natural gas prices were weak in both the U.S. and Canada, averaging CAD 1.40 at AECO in Canada and $1.90 at Henry Hub in the U.S. Condensate, though, averaged CAD 104 Canadian per barrel, which contributed to an operating netback of CAD 18.50 per BOE. That highlights both how low-cost our assets are and the benefits of a diversified commodity mix that includes a high proportion of condensate.

Kris Bibby

executive
#10

Looking ahead in the near term, AECO still looks difficult. That said, we were lucky to have had the foresight to keep our AECO exposure limited. Thanks to the production curtailment at Sunrise, we could leverage the optionality within our transportation portfolio — cutting our Station 2 volumes in BC down to zero and selling only minimum volumes into the AECO spot market for the remainder of the summer. If we extend our natural gas view a few months out, the fundamental outlook will be structurally different. Today's prices will — or certainly should, assuming rational behavior — drive shut-ins or at the very least slow activity. Later this year, Western Canada will see a material rise in natural gas demand as LNG Canada ramps up, sending more than 10% of our current supply off the West Coast. Consequently, we anticipate significant price volatility that at times will need to be high enough to incentivize additional supply growth to backfill this incremental demand. Past the next few years, we would expect an incremental 2.5 to 3 BCF per day of demand growth from LNG capacity across the following four to seven years from LNG Canada Phase 2, Woodfibre, and Cedar LNG, all of which allocated capacity on existing pipelines.

Kris Bibby

executive
#11

Now turning to how we return capital: during the first half of this year, ARC delivered 115% of free cash flow back to shareholders via buybacks and dividends. Quarter by quarter, that figure will move around, yet across a full year we anticipate returning essentially all free funds flow to shareholders, much like we did in 2023. The capital we hand back will grow materially starting in Q4 of this year, once Attachie Phase I is complete. Since September 2021, when our share buyback program began, ARC has bought back 132 million shares at an average price of roughly $16 per share — 18% of the shares outstanding at that time. That was a good investment then, and we believe it is still a profitable investment today. We plan to renew our NCIB once again in September, for an additional 10% of the public float. At quarter end, net debt rose slightly to CAD 1.5 billion, as capital investment plus dividends came in a touch above our cash flow. Part of that reflects the CAD 180 million invested at Attachie, together with low gas prices and a heavy turnaround quarter. ARC has always been, and will remain, a balance sheet-first organization.

Kris Bibby

executive
#12

We closed the quarter with net debt to cash flow at roughly 0.6 times trailing cash flow, along with about CAD 1.3 billion in undrawn credit capacity. Last, I'll go through guidance and then hand it back to Terry. Our production, cost, and capital spending guidance for 2024 is entirely unchanged, including the natural gas shut-ins at Sunrise. We expect full-year production to come in at an average of 350,000 to 360,000 BOEs per day, with the capital program unchanged at between CAD 1.75 billion and CAD 1.85 billion. Where average production lands within that range will be influenced by how long the natural gas shut-ins at Sunrise last, and our current expectation is to be at the lower end of the range. Fourth quarter production, as Terry said, should average 380,000 to 385,000 BOEs per day. Under this scenario, that would include restored gas production at Sunrise, condensate growth at Greater Dawson and Kakwa, and some contribution from Attachie. Looking ahead to 2025 and beyond, ARC remains on track to meet the goals of the long-term plan we introduced last year. In 2025, shareholders will benefit from the first full year of Attachie production, which represents a 10% increase in our production, with a commensurate decrease in capital spending.

Kris Bibby

executive
#13

So because of that, we'd anticipate free funds flow nearing $3 per share under current strip pricing, and the plan is to return that to shareholders. On the question of how we get that free cash flow back to shareholders, our stance is unchanged. We give back all free cash flow to shareholders through share repurchases and a base dividend that keeps growing. The balance sheet is still strong, so there's little need for debt repayment. At the bottom of the cycle our business is bulletproof, and we're returning a deep inventory of drilling inventory across some of the most profitable assets in North America. So M&A isn't required to backfill that inventory. We intend to disclose formal 2025 guidance in November alongside our Q3 results. With that, I'll hand it back to Terry for closing comments.

Terry Anderson

executive
#14

Thanks, Kris. I'd like to wrap up by emphasizing how energized the organization is about the positive momentum as we head into the back half of the year and look ahead to 2025. Across our assets, we're realizing operational efficiencies, and Attachie is advancing as planned, with first volumes later this year. Taken together, these milestones will drive a significant change in our business beginning later this year and extending well through the decade. To all our shareholders, thank you for your trust as we execute the plan. With that, thank you, and we can open the line up for questions.

Operator

operator
#15

Thank you, sir. Ladies and gentlemen, as was said before, should you wish to pose a question, kindly press star and then one on your touch-tone phone. A three-tone prompt will then sound to confirm your request. Should you wish to remove yourself from the question queue, you will need to press star and then two. And if you happen to be on a speakerphone, please pick up the handset before pressing any keys. Please go ahead and press star one now if you do have a question. Your first question comes from Josh Silverstein at UBS. Please go ahead.

Josh Silverstein

analyst
#16

Yeah, thanks, and good morning, guys. Since we're getting nearer to Attachie's startup, I just wanted to ask whether you could walk us through a bit more detail on how the ramp looks. Does the condensate come on before the gas, or the other way around, or does it all kind of come online together and ramp through the first quarter? Thanks.

Kris Bibby

executive
#17

I can take that one. Thanks for the question, Josh. Kris speaking. So, as we've been suggesting, our expectation is that the ramp-up will take place in late 2024, which means Attachie Phase I should essentially be running at full rates in Q1 of 2025. In other words, we ramp during late 2024 and then hold it steady right through Q1 of 2025.

Josh Silverstein

analyst
#18

Understood. Kris, you brought up a few points regarding the balance sheet as well as the capital return profile. I'd guess there may be some debt paydown you'd like to accomplish during the latter half of this year. Yet once that pre-cash flow inflection arrives, are you thinking about directing 100% of free cash flow toward shareholder returns, or would you rather accumulate some cash for Attachie's next investment phase?

Kris Bibby

executive
#19

Right. So our approach is to review this yearly, meaning it's basically a payout window of 12 months. And we're saying, in essence, all free cash flow returns to shareholders on that annual basis. Now, we've built up a modest amount of debt during the first half of this year. So the plan is that by year-end, or soon after, we'll even that out, so that measured annually, the payout comes in very close to 100%. Then, as we move ahead over the next couple of years, we're quite comfortable using our balance sheet to develop these assets. So going forward, we'll keep to that approach of effectively all free cash flow being returned to shareholders.

Josh Silverstein

analyst
#20

Excellent. Appreciate it, Kris.

Kris Bibby

executive
#21

I appreciate that.

Operator

operator
#22

As a reminder once more, press star one if you have any questions. Our next question comes from Patrick O'Rourke at ATB Capital. Please go ahead.

Patrick O'Rourke

analyst
#23

Hey everyone, good morning, and thanks for taking my question. Just a couple of quick items. Q2 2024 production appears to be roughly the weakest level since we acquired Seven Gen back in 2021, clearly because of planned turnaround work. Could you perhaps give some detail on the turnaround that happened, and then maybe from a cycle standpoint, when should we expect turnaround activity of the same order and magnitude going forward, or how frequently do you anticipate turnarounds at these levels to occur in the future?

Armin Jahangiri

executive
#24

Yeah, Patrick, this is Armin. So that turnaround is essentially a maintenance event we carry out, say, once every 3 to 4 years. It really depends on the facility and on what we find during prior turnaround work. For big facilities, you should expect a turnaround of this magnitude roughly every 3 to 4 years. So, to state the production impact precisely, I'd say it depends on the year, since you need to consider what level of activity is occurring in that year and how those activities overlap. I think it's worth noting that these activities matter for ensuring we sustain production through the integrity of the assets.

Patrick O'Rourke

analyst
#25

Yeah, thanks for that. And obviously, turnarounds matter a lot. For my second question, you mentioned the ramp on Attachie, but the press release said the build-out of the facility and everything that needs to go on there is about 75% complete from an operational perspective. Could you maybe walk us through what the remaining steps and milestones are before commissioning?

Armin Jahangiri

executive
#26

Yes, Patrick — it's Armin once more. The mechanical side is largely complete now. That 75% figure is really an estimate we're applying at present to reflect where the project stands. Most of the mechanical work has been finished — perhaps 90%, 95%, and as Terry mentioned, every piece of critical equipment has arrived on site. So right now the majority of our efforts are directed toward electrical and instrumentation tasks, which is what will bring the plant up to the point where commissioning can begin in Q4.

Patrick O'Rourke

analyst
#27

All right, thanks.

Operator

operator
#28

Thanks. Our next question comes from Jamie Kubik with CIBC. Go right ahead.

Jamie Kubik

analyst
#29

Yes. Morning, and thanks for taking my question. Regarding the shut-ins at Sunrise, I have a couple of questions. Could you discuss perhaps how price sensitivity would factor into when you might consider bringing those volumes back online? And then also, regarding the 250 million cubic feet a day that is shut in, ARC produced 360 million cubic feet a day there in Q2. Could you talk about the remaining volumes and how you're thinking about price sensitivity on those? Thank you.

Kris Bibby

executive
#30

Sure thing, Jamie. This is Kris speaking. I'll give it a try and see whether anyone else wants to chime in. Regarding pricing — and this is the reason we emphasized it in the release, and Terry brought it up too — cash operating costs come in at about CAD 0.65. The other figure we wanted to put out there was the break-even of roughly $10-ish. That gives you a sense of our thinking. We've stated many times that BOEs don't matter to us; what we care about is adding value. So if value isn't being added, we won't hand over the molecules. There's also a modest extra upside: if we aren't producing the molecules right now, we can defer some capital going forward. What will happen is that, as time goes on, we'd expect AECO and the Western Canadian market to normalize toward more reasonable price levels. We haven't settled on any specific dollar figure at which we'll bring this production back. It will depend on the market context at that moment. So: what's the supply-demand situation, and where are inventories, when we make that call? I mean, if pricing drops right back down the moment we bring Sunrise back on, that wouldn't do our pricing any good.

Kris Bibby

executive
#31

That's one factor, yes. Then the second part of your question — why 250 was the correct figure. Basically, our aim is to cap how much we're exposed to the Western Canadian market while concentrating on downstream markets. You heard me say we have zero exposure to Station 2, which is actually weaker than AECO, and we're keeping our cash exposure in check. Right now, under CAD 100 million a day of ours is exposed to AECO cash. We always require a bit of flexibility and some gas moving, but essentially that's our approach — trying to reduce Western Canadian exposure and concentrate on the downstream. And the other reason we decided to keep gas running through the facility is that things can shift very fast. AECO is a fairly small market — CAD a few hundred million a day is enough to really shift the needle on supply and demand. So when we see the right price signals indicating it makes sense, we want the ability to ramp this facility back up fairly quickly.

Jamie Kubik

analyst
#32

All right, that gives me a helpful picture. That was my sole question. Thanks.

Kris Bibby

executive
#33

Appreciate that, Jamie.

Operator

operator
#34

Just a quick reminder, everyone: if you’d like to ask something, hit star and then 1. Right now, Mr. Lewko, we don’t have any further questions queued up. Go ahead.

Dale Lewko

executive
#35

Thanks, everybody, for being on the call. That brings us to the end. Enjoy your weekend.

Operator

operator
#36

Appreciate that, sir. Everyone, that truly brings today's conference call to a close. Thanks again for joining us. Right now, we'd ask that you kindly disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ARC Resources Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ARC Resources Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ARC Resources Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.