ARC Resources Ltd. (ARX) Earnings Call Transcript & Summary
November 7, 2024
Earnings Call Speaker Segments
Operator
operatorGood morning. I’m Ivo, and I’ll be serving as your conference operator for today. Right now, I’d like to welcome all of you to the ARC Resources Third Quarter 2024 Earnings Conference Call. Every line has been muted so that background noise is prevented. Following the speaker’s remarks, a question-and-answer session will take place. If you’d like to ask a question at that point, just press star and then the number one on your telephone keypad. If you wish to withdraw your question, please press star followed by the number two. Thank you. Mr. Lewko, you may begin your conference.
Dale Lewko
executiveThank you, Operator. Good morning, everyone, and thanks for being with us on our Third Quarter Earnings Conference Call. With me today are Terry Anderson, President and Chief Executive Officer, Kris Bibby, Chief Financial Officer, Armin Jahangiri, Chief Operating Officer, Lara Conrad, Chief Development Officer, and Ryan Berrett, Senior Vice President, Marketing. Before I hand things over to Kris and Terry to walk you through our Third Quarter results and the 2025 budget, I want to remind everyone that this conference call contains forward-looking statements and non-GAAP and other financial measures, and the associated risks are outlined in the earnings release and our MD&A. Every dollar amount we discuss today is in Canadian dollars unless otherwise stated. Lastly, the press release, financial statements, and MD&A are all available on our website as well as SEDAR+. After our prepared remarks, we'll open the line to questions. With that, I'll turn it over to our President and CEO, Terry Anderson. Terry, please go ahead.
Terry Anderson
executiveThanks, Dale, and good morning, everyone. I'd like to start by saying that ARC's long-held values of safety, capital discipline, and operational excellence are part of our culture and were again on display this quarter. We posted robust operational results, and in October we brought the first phase at Attachie into service successfully — our eighth major development project in the Montney. Beyond that, we keep delivering on what we promised shareholders, declaring a 12% dividend increase while still repurchasing shares, and both are evidence reinforcing our confidence in the business. Going forward, with Attachie now on stream, our asset base is performing very well. ARC is set up to achieve a meaningful step change in free cash flow per share growth in 2025. To give more detail on the quarter, average production came in at 327,000 boe/d. That figure included 89,000 bbl/d of light oil and condensate, which is 20% growth quarter over quarter. Higher condensate volumes helped drive strong margins and robust free cash flow generation, making up for weak Western Canadian natural gas prices. We also held our 2024 guidance, as high deliverability at Kakwa helped counter voluntary natural gas curtailments at our Sunrise asset. That strong Kakwa performance stemmed partly from frac design changes the team made earlier this year.
Terry Anderson
executiveOutput at Kakwa came in at an average of 180,000 boe/d, and there were periods when it was putting out more than 200,000 boe/d. That really showcases how strong our technical teams are and how dedicated we are to getting better all the time. Sunrise ranks among the cheapest dry gas assets anywhere in North America, yet choosing to pull back output demonstrated how carefully we manage for profit. Because Western Canadian natural gas prices remained weak, we made the call to curtail roughly 250 million cubic feet per day so the resource would be there for a time of stronger prices. And right now, we can take advantage of our dual connected infrastructure by sending gas toward U.S. markets that offer better prices. That gave us stronger realized pricing and improved margins. One more upside from curtailing Sunrise output is that we can push CAD 20-CAD 30 million of capital spending into next year that otherwise would have gone toward sustaining production. Partway through October, we brought back some volumes at Sunrise once natural gas prices rose past the thresholds needed to beat our hurdle rates. We've made this point before, though it bears repeating: ARC will forever run on a profitability over BOE mindset, and what we did operationally at Sunrise stands as evidence of that. Now turning to Attachie.
Terry Anderson
executiveRewind to May 2023: at that point, when we said we'd move ahead with Phase I, we gave our word on an 18-month build schedule. Now, 18 months on, I'm happy to report that we kept that commitment, and Phase I has been commissioned on schedule, within budget and — above all — without safety incidents. This result represents the payoff from years of development planning, engagement with stakeholders and Indigenous communities, and thorough technical effort. Running projects well is a core strength of ours. All told, construction and commissioning across this project, together with our service providers, added up to over 3 million combined work hours, and I take pride in how our team carried this project out, showing yet again that operational excellence and safety sit at the heart of the way ARC does business. As of today, Attachie is putting out roughly 20,000 BOE per day, with 11,000 bbl/d of that being condensate. Startup drilling and completion work is almost finished, and we remain squarely on track to reach our productive capacity of 40,000 boe/d by year-end. Attachie plays an essential role in delivering the profitable growth built into our long-term plan, so watching it come together is genuinely thrilling. My thanks go out to everyone at ARC for pulling off this project and for continuing to keep safe, efficient operations front and center right across our company.
Terry Anderson
executiveNow turning to the budget. For the coming year, everything is lined up for us to achieve a substantial lift in free cash flow per share. With a capital budget between CAD 1.6 billion and CAD 1.7 billion, we anticipate delivering record average output of 380,000 boe/d to 395,000 boe/d — that works out to 10% production growth, a 20% rise in condensate production, and at the same time a 10% cut in capital expenditures relative to 2024. At strip pricing, we look for this program to more than double free cash flow to roughly CAD 1.5 billion, and we intend to give that back to shareholders via a growing base dividend along with share repurchases. Attachie should generate about CAD 500 million of asset-level cash flow on an annual basis. It will also lift margins by contributing high-value condensate, while cash costs per BOE stay flat. What you get is production growth combined with margin expansion as Attachie scales up. Three main factors explain the better implied capital efficiencies versus 2024. First, we capture the advantage of a full year of production from Attachie Phase I. Second, now that the infrastructure investments at Attachie are finished, 90% of the capital goes toward well-related activities, and those generate a strong return on invested capital.
Terry Anderson
executiveFinally, improved capital efficiencies at certain core Montney properties, including Kakwa and Sunrise, are delivering benefits for us. Before handing things over to Kris, I want to discuss Attachie Phase II. To remind everyone, Phase II essentially mirrors Phase I — a facility with capacity of 40,000 boe/d, made up of roughly 60% liquids, most of which is condensate. We're prepared to move Phase II forward as part of our long-term plan. Our expectation is to fold the capital investments into the 2026 budget, with an on-stream date of 2028. So far, we've taken steps aimed at building further confidence in the regulatory environment. We keep positive relationships with the First Nations we operate alongside, and under low commodity price scenarios the returns sit well above our hurdle rates. Phase II sits in the heart of the condensate-rich areas of the Montney. Consequently, we anticipate growth and margin expansion continuing as we bring higher margin Attachie barrels into our base production. To sum up, our conviction in Phase II stays strong, and we look forward to sharing more as we keep advancing this project. With that, I'll hand it over to Kris.
Kris Bibby
executiveThanks, Terry, and good morning, everyone. I'll start by covering the quarter. Our average production came in at 327,000 boe/d, and we generated funds from operations of CAD 592 million. That production figure beat analyst expectations by 2%, and cash flow came in 12% above what analysts had forecast. Third quarter output landed at the top of the range we had previously guided to, 315,000 boe/d to 330,000 boe/d. The upside versus what we expected came from strong well productivity at Kakwa. That helped drive light oil and condensate production, which came in at an average of 89,000 bbl/d for the quarter — a 20% increase quarter-over-quarter and 4% growth year-over-year. Over the last several months, ARC has repeatedly shown up in a number of top well reports across a few of our assets. The latest example is September, when we scored nine of the top 10 oil and liquids wells in Alberta. Even with the recent swings in WTI, condensate demand is still robust, and you can see that in the tight differentials, with condensate presently trading at a premium to WTI. We keep managing risk and exercising discipline throughout our business. This quarter, we chose to curtail some of our natural gas production at Sunrise so we could limit our exposure to weak Western Canadian-based natural gas pricing, where prices were particularly weak.
Kris Bibby
executiveSo because of that, we ended up with a realized natural gas price of CAD 1.78 per Mcf during the quarter, and that was basically twice what the local AECO market was paying. In hindsight, shutting in gas gave us a realized natural gas price at the corporate level that came in $0.20 higher than it would have been had we chosen to produce that gas. Through that approach, we kept the resource in the ground for a time when prices are stronger, captured better margins, and can defer between CAD 20 million and CAD 30 million of capital spending that had previously been allocated to sustaining production in 2025. From where we sit, that was an easy call, and it's something we'll keep weighing as we look at how to optimize our assets to create value. Along those lines, even though natural gas prices are low right now, demand in North America driven by LNG and power generation is expected to expand at an accelerated pace in 2025, and we think that will produce a favorable fundamental shift in supply and demand. At ARC, we've built up a deep inventory position in the Montney, and it sits well beneath the marginal cost required to serve that demand growth. We also have a transportation portfolio supporting that resource, which lets us move our natural gas to key demand markets across North America.
Kris Bibby
executiveStarting in 2026, when our inaugural LNG agreement with Cheniere kicks in, we'll be taking our natural gas diversification beyond Canada into international markets. Turning to capital: during the quarter we put about CAD 460 million to work, which included roughly CAD 200 million spent to finish the first phase at Attachie. Once that investment was made, our operations generated CAD 135 million in free cash flow for the quarter. On returning capital to shareholders, we paid out CAD 220 million this quarter via dividends along with share buybacks. That figure drew on the CAD 135 million of quarterly free cash flow plus CAD 80 million in proceeds from selling a non-core asset. As we look forward, now that Attachie Phase I is producing and output at Sunrise has been partly brought back, we expect the fourth quarter to set a production record, averaging somewhere between 380,000 boe/d and 385,000 boe/d. That puts full-year production at the bottom of the range in our 2024 guidance, even with the natural gas curtailments, which trimmed our full-year average by about 10,000 boe/d. To frame it another way: had we not curtailed any natural gas output, we would have anticipated hitting the high end of our 2024 production guidance.
Kris Bibby
executiveTo wrap up the quarter, we finished with net debt of CAD 1.6 billion and long-term debt of CAD 1.4 billion. Given the quality of our assets and the depth of our inventory that support this business, that's a comfortable debt position, and it works out to a net debt to cash flow ratio of about 0.6 times. Moving to the 2025 budget, we've laid out a capital program focused on profitability that balances organic growth against a meaningful return of capital. That budget of CAD 1.6 billion to CAD 1.7 billion delivers 10% production growth, or reinvesting roughly 50% of cash flow at strip pricing of $60 WTI and CAD 2.40 AECO. We estimate the program will generate around CAD 3.2 billion in cash flow and approximately CAD 1.5 billion of free cash flow. For a third consecutive year, our intention is to return essentially all free cash flow to shareholders. Under our guidance, this budget marks a record year for natural gas and condensate production, with average output of 380,000 boe/d to 395,000 boe/d, including about 105,000 bbl/d of light oil and condensate. That reflects steady production of 350,000 boe/d at ARC's base assets plus a full year of production at Attachie ranging between 35,000 boe/d and 40,000 boe/d.
Kris Bibby
executiveCapEx is down by about CAD 200 million compared with a year ago, now that the infrastructure spending at Attachie Phase I is finished and we've captured some of the capital efficiency gains seen at Kakwa and Sunrise. The margin improvement in 2025 comes from a production mix weighted more heavily toward condensate, plus all-in cash costs per BOE that we expect to be flat to slightly lower versus last year. With dividends of about CAD 400 million, or a 3% yield, the budget points to CAD 1.1 billion in free funds flow after dividends — enough, at yesterday's share price, to buy back approximately 8% of our shares outstanding. That fits squarely with our long-term plan to grow profitably on a per-share basis while still returning capital to shareholders. We keep a strong balance sheet and a resilient business: ARC's net debt to cash flow is roughly 0.6 times, and under one times at $50 U.S. WTI and $2.50 U.S. Henry Hub. Cash flow fully covers both the capital program and the dividend at below $50 U.S. WTI and $2.50 U.S. Henry Hub, thanks to ARC's low-cost structure, balanced commodity mix, and owned and operated infrastructure. With that, I'll hand it back to Terry for some closing remarks.
Terry Anderson
executiveThanks, Kris. In closing, the targets we set out with our long-term plan 18 months ago remain well within reach. Bringing Attachie on stream marks the first milestone achieved, and that positions us to more than triple free cash flow per share to above CAD 4.00 by 2028. Once more, I'd like to express my appreciation to every member of our staff for the focus, discipline, and effort they keep bringing to delivering outstanding results throughout every part of our business. My thanks as well go to the investors who came along on the Attachie tour. It was a wonderful chance to show what all of us have worked so hard together to accomplish over these past few years. We're grateful for your ongoing support. Thank you. With that, we can open the line for questions.
Operator
operatorThank you. Ladies and gentlemen, we are now ready to start the question-and-answer portion. If you have a question, kindly press star and then the number one on your touch-tone phone. A prompt will sound to confirm that your hand has been raised. In case you prefer to withdraw from the polling process, simply press star and then the number two. When calling in on a speakerphone, please pick up the handset prior to pressing any keys. Kindly hold for a moment while we bring up your first question. Our first question is from Michael Harvey with RBC Capital Markets. Your line is now open. Please go ahead with your question.
Michael Harvey
analystAlright, thanks. Morning, everyone. I’ve just got a couple of questions. The first one is probably for Lara or Armin. I’m just curious whether you can share any early detail on how the wells are performing at Attachie. I realize it’s still early, but anything such as how many wells are producing right now to reach that 20,000 initial IPs, condensate ratios, that sort of thing would be useful, to whatever extent you’re able to provide any high-level information. Then the second one is maybe for Ryan or someone else. Has LNG Canada indicated anything about when they may begin taking your Sunrise gas into Phase I? And perhaps you could remind us what kind of impact that will have on your pricing realizations once that does occur. That’s all from me.
Lara Conrad
executiveThanks, Mike. Lara here. Yes, I appreciate the question. Regarding initial rates, all of what we're observing at Attachie is performing in line with our expectations. In the same way that you don't see us publish rates when a well first comes online, I'd rather not get into specifics, since a substantial amount of water is still being recovered. Those wells are continuing to clean up. That said, we're genuinely pleased to see gas along with robust condensate volumes from these initial wells, and we look forward to discussing this further once Attachie moves into more stabilized production.
Ryan Berrett
executiveHi Mike, Ryan here. Regarding your question about LNG Canada, we anticipate our volumes beginning to flow at some point during the first half of 2025. No additional notice beyond that has come our way. As you're aware, the pricing under that arrangement with Shell represents a slight premium over AECO, so we wouldn't anticipate significant shifts in our realized gas prices.
Michael Harvey
analystUnderstood. Appreciate the feedback, everyone.
Operator
operatorKalei Akamine from Bank of America has the next question. Your line is open now, so please go ahead.
Kalei Akamine
analystHey, good morning, everyone. Appreciate you having me on. For my first question, I'd like to focus on the soft gas market out at AECO. Could you expand a bit on how you're planning to handle this winter? What's the reasoning behind not simply leaving Sunrise shut down for a longer stretch, maybe until LNG Canada helps move the market toward a new balance?
Kris Bibby
executiveAbsolutely. Morning, Kalei. Kris speaking. During our Q2 release, when we first told the market we'd be taking some production off at Sunrise, we discussed a few different price levels. The key price level for us — and Terry has brought it up several times — is our full cycle break-even. Producing the resource beneath what's needed to hit our targeted return rates isn't something we want to do, and for an asset such as Sunrise, that figure sits in the CAD 1.00-CAD 1.30 range. So once we saw AECO return above those levels and we can achieve our hurdle rates, bringing that asset back on makes sense. Inventory doesn't constrain us at all at our asset. So if hurdle rates can be achieved and the asset can run profitably, we believe doing so makes sense. Had someone been a bit short on inventory, that decision could shift and you might prefer to save all of it for another day. But with our inventory length, it makes sense, and it boosts the profitability of the overall organization to keep running it.
Kris Bibby
executiveYou've heard us use the phrase "partially restored production" at Sunrise. What we're really doing is capping our exposure to Station 2, which is a separate local market here in Western Canada, since pricing hasn't yet hit our hurdle rate. So we'll hold off on restoring that production until it does.
Kalei Akamine
analystThanks, Kris. The tricky part, as I see it, is that condensate-focused operators such as yourselves don't require an elevated gas price for the economics to hold up, yet gas continues to sell at a fairly low level. So when you think about your business from a commercial standpoint, what levers do you have to move more gas out of the basin? During this quarter, one of your peers in the U.S. announced a fresh LNG deal tied to an existing facility, apparently because someone else stepped away from their capacity. I'm curious whether you're seeing comparable chances in the market, and if so, whether you'd pursue them?
Ryan Berrett
executiveThat's a fair question. As you're aware, roughly half of the gas we produce is already being delivered into the U.S. We keep a constant eye on capacity, as you mentioned, that becomes available on export pipelines. Canada's export pipelines are completely subscribed and running at full rates. So these aren't opportunities that appear daily, but we're certainly monitoring them. As you know, our LNG contract does begin in 2026. So for us, this is somewhat of a longer-term perspective. And when you consider our exposure to Western Canadian gas prices next year, it represents approximately 30% of our gas production. So our exposure to Western Canada is quite minimal.
Kalei Akamine
analystMuch obliged. That means a lot.
Ryan Berrett
executiveCorrect.
Operator
operatorJosh Silverstein from UBS has the next question. Your line is open now, so please go ahead and ask.
Josh Silverstein
analystThanks. Morning, everyone. Josh Silverstein here from UBS. It's really good to see that startup happening at Phase I at Attachie. During the site tour and in a few of the remarks made today, you mentioned that the next area of focus is going to be Phase II. Which lessons from Phase I could you bring over to Phase II — whether to speed up development or to make use of the infrastructure already in place so that costs come down?
Armin Jahangiri
executiveThanks for that question. This is Armin. So Phase II, as Terry mentioned, is going to be almost an exact replica of Phase I when it comes to the facility design. It definitely benefits from some of the infrastructure we've already invested in building the area. So that is definitely a savings and opportunity for more efficient execution of the project as we move to Phase II. In terms of cost, the team has looked into the design of the facility to find and identify opportunities to make it more efficient and make the process a lot streamlined for the purpose of construction as well as the operation of the facility. So in all likelihood, I guess the sheer fact that we are just basically repeating what we've done and all the investment we have done in the area already is going to make us a lot more efficient as it comes to Phase II.
Josh Silverstein
analystThat’s useful. Now, regarding the Kakwa productivity gain — this is a major asset. I’m interested in whether the gain you’re observing, or the improvements you’re observing, are focused in a single area. Is it basin-wide, and how are you considering possibly adjusting your program this year versus 2024 or, sorry, next year versus 2024 in order to benefit from some of that productivity? Thanks.
Lara Conrad
executiveThanks, Josh, for that question. This is Lara. Yeah, so as you're planning your wells, it's really important to ensure you're maximizing how well you connect to the reservoir. The change we've made to our completion design is squarely aimed at that. So it would be applied across the whole field. It isn't really confined to a single area. When we're drilling at Kakwa, we're also managing our super pad capacities. So as you said, it's a large asset, 180,000 boe/d. So we do have activity across the asset, and we've made that same design change throughout all of our operations.
Josh Silverstein
analystUnderstood. Appreciate it, everyone.
Operator
operatorTo ask a question this time around, folks, just hit star and then the number one on your touch-tone phone. A prompt will come on telling you your hand has been raised. If you'd rather drop out of the polling process, simply press star and then the number two. When on a speakerphone, do lift the handset prior to pressing any keys. Our next question is from Travis Wood at National Bank Financial. Your line is open now. Go ahead with your question.
Travis Wood
analystMy question’s already been asked, but it dovetails nicely with the previous one, so I’ll follow up on that. Armin, you discussed the infrastructure spending and the strategic planning around Phase I and Phase II. Could you help us put numbers on what that translates to in terms of efficiency capture? Clearly, the additions at Attachie are very efficient when measured by capital efficiency for 2025. With the cost savings on infrastructure spending from Phase I and Phase II for future volumes, what kind of compression might that represent, as a percentage — or if you think there’s a better way to frame it, I’m just trying to understand the efficiency gain on that production addition for the Phase II volumes?
Armin Jahangiri
executiveTo clarify, no funds are being allocated to Phase II during 2025. Essentially, the Phase II budget sits below CAD 10 million. As for when Phase II will actually be carried out, it's presently planned for 2026, with spending spread across 2026 and 2027 to support the 2028 on-stream timeline. I believe we've put a figure on this before — we estimate roughly CAD 70 million in savings tied to the joint infrastructure. That covers work already completed to right-size the pipes, set up the water infrastructure, and position some of the equipment so it can accommodate the additional 40,000 BOE of production flowing through the condensate terminal we have at 7 of 17. So a portion of that work is already in place. As I see it, we've quantified it as approximately $70 million in savings linked to Phase II. That said, moving from Phase I to Phase II, we are seeing some inflationary pressure. I mean, when we sanctioned the project and bought equipment for Phase I, conditions were different. Even so, our expectation for Phase II is that we can hold the cost flat at around $800 million to build out the infrastructure and all the related wells needed to fill that facility.
Armin Jahangiri
executiveAnother point I can add is that we've also achieved some efficiency improvements in drilling and completions work now that we've restarted operations at Attachie. Phase I and Phase II will both gain from that as we develop the new property, clearly, and also as we keep drilling for Phase I to keep the facility full.
Travis Wood
analystThat’s great. I really appreciate that detail, Armin. That’s everything from my side.
Operator
operatorPatrick O'Rourke with ATB Capital Markets has the next question, and your line is open now, so please go ahead.
Patrick O'Rourke
analystMorning, everyone, and thanks for that thorough overview. A lot of the operational and reservoir questions have been addressed, I think. Mine is probably a bit more on the strategic side, specifically regarding the return of capital plan. You've clearly increased the dividend, and I believe you mentioned an estimate of roughly 8% of the flow being repurchased in 2025, given the current share price and free cash flow yield. What I'd like to ask is whether you could offer some perspective on — when you describe a balanced return of capital between dividends and buybacks, how do you set the parameters for that balance? What is the appropriate split between the dividend and the share repurchases? Is it tied to break-even, which I think you alluded to as being about 50 bucks to fund the CapEx and the dividend? Or is there another kind of formula that helps you determine that division between the two mechanisms?
Kris Bibby
executiveAbsolutely, Patrick. Appreciate the questions. This is Kris speaking. I'll take the first part, and Terry may chime in toward the end too. When we refer to a balanced capital allocation, what we really mean is our three primary buckets. That's where we aim to put approximately 50% of our cash flow back into the organization's assets, covering both sustaining capital and growth capital. That then leaves us the remaining 15%, which we see as a very defensible and sustainable dividend policy. When you see us raise the dividend this quarter, on strip it will be somewhat lower than that next year. So we simply want to make sure we're being very prudent about it. That then leaves roughly 35% of that cash flow amount, which we've currently allocated to share buybacks. And that produces the roughly 8% potential stock retirement over the coming 12 months. So when we discuss the balance, it's about those three primary buckets. We don't have a specific rule regarding dollar amounts that must go into buybacks versus dividends. But if you look at the last 12 months, dividends are taking more of the free cash flow than buybacks are.
Kris Bibby
executiveEven so, one would expect that over the coming 12 months this reverses, with a fairly substantial amount of dollars likely flowing toward the buyback side of things.
Patrick O'Rourke
analystAll right, thanks so much. That covers everything on my end.
Operator
operatorThat concludes the question portion for now. Speakers, please go ahead.
Dale Lewko
executiveOkay, thanks to all of you for being here today. That brings the call to a close. Thank you.
Operator
operatorThat brings us to the end of today's conference call. Thanks for taking part, and you're free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete ARC Resources Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to ARC Resources Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ARC Resources Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.