Thanks for being here, everyone, and welcome to ArcelorMittal's Q2 analyst call. <<operator_script>> At this point, I'll hand the conference over to Daniel Fairclough, Vice President, Investor Relations. Please go ahead.

Daniel Fairclough

executive
#2

Thanks, Moritz. Good afternoon, everyone. Daniel Fairclough here, from the Investor Relations team at ArcelorMittal. We really appreciate you being with us on today's call to go over how we performed in the first half of 2023. On the line with me today are our CEO, Aditya Mittal; our CFO, Genuino Christino; and Stefan Buys, the CEO of our Mining segment. Before we get started, a few housekeeping points. As always, we won't be walking through the results presentation that we posted on our website this morning. That said, I'd like to point you to the disclaimers on Slide #2 of that presentation. We'll go straight into the Q&A session. <<operator_script>> With that, I'll turn things over to Aditya for opening remarks.

Aditya Mittal

executive
#3

Thanks, Daniel, and hello everyone. There's a lot I could point to, but I'll keep my comments short and centered on 3 key messages. First, the structural improvements we've made to our business keep showing up in our results. Second, we're seeing unmistakable headway on our decarbonization agenda. And third, the investments we're making to grow and develop our business are putting us in a very strong position for the future. Let me say a bit more about each of these. On structural improvement of the business, it isn't only the EBITDA improvement per tonne we're achieving — it's also the dramatically different capital cost of our balance sheet and the effect of the strong contribution from our equity investments, which together drive the structural improvement in our free cash and net income. On decarb, as a truly global multi-region steel producer, the scale and breadth of our business hands us far more options. I remain convinced we can develop the right set of solutions that lets us decarbonize our footprint effectively and at a competitive cost. Our DRI/EAF projects are moving forward. We're currently taking these projects from the pre-FEED stage into FEED stage, which includes ordering long lead time equipment.

Aditya Mittal

executive
#4

We're making headway with smart carbon technologies too, and we're tightening vertical integration across lower carbon supply chains by locking down and developing several of the resources needed for decarbonization. Commercially speaking, traction is building in the marketplace for our products and solutions. With our ex car brand of lower emission steel solutions, we got to market first, and customer interest remains highly encouraging. You can see that in the recent announcement that General Motors will be supplied with our ex-carb RRP product. Turning to growth, our distinctive asset portfolio leaves us strongly placed to gain from rising steel demand. That demand increase will come from megatrends including the renewable energy transition and new mobility systems in developed economies, while in less mature markets, population growth and the wish to raise living standards will fuel strong steel demand. We'll keep investing in the finest opportunities to seize and gain from this growth. Investments made in recent periods are paying off beyond what we expected. Enhanced margins are coming from our hot strip mill in Mexico. Our newly acquired asset in Brazil is doing well, and the team there has found synergies at more than double the initial estimate.

Aditya Mittal

executive
#5

In Texas, our HBI facility turned in a record first-half performance, turning out 1 million tonnes of top-grade HBI, matching its nameplate capacity. Our pipeline of high-return strategic CapEx projects is moving forward nicely. That pipeline includes the iron ore project we have in Liberia, which we redesigned so it gets the most out of our Tier 1 resource. Having gained a better picture of the ore body, we are now studying the feasibility of making DRI quality concentrate and the possibility of lifting capacity to 30 million tonnes per annum. That said, the CapEx needed for the 15 million tonne concentrator has gone up, which mirrors the redesign of the plant and the equipment that goes with it, yet since we expect it to deliver $350 million of EBITDA at conservative long run prices, it is still a very strong project. On the near-term outlook, inventories across the system stayed low, and that lends support to demand. Automotive trends differ from what we see in construction markets, and we expect apparent demand for flat steel in Europe and North America to come in higher this year than in 2022. We are well positioned to produce healthy levels of free cash so we can keep advancing our decarbonization and growth agendas along with our capital returns program.

Aditya Mittal

executive
#6

At this point, I’d like to have Genuino walk us through additional specifics regarding how we performed financially.

Genuíno Christino

executive
#7

Thank you, Aditya. We have plenty to feel good about regarding how we performed during the first half of 2023. Our EBITDA came to $4.4 billion. That works out to $155 of EBITDA for every tonne we shipped — the strongest figure for any 6-month stretch in the last 11 years, if you set aside the extraordinary 18-month window running from 2021 through the middle of 2022. That speaks to the underlying resilience we have embedded in the business over recent years, the calibre of our asset portfolio, and the value coming through from the acquisitions and strategic growth projects we have completed lately. Still, you have to look deeper into the P&L to genuinely grasp the complete effect of everything we have done. Net income for the first half reached $3 billion. That is twice the average posted across the last 11 years, 2012 to 2022. What is driving this shift? It comes from our portfolio improvement. It comes from the rising contribution of our JVs. It comes from the impact of a lower cost balance sheet. And those effects are then amplified further by our steady share buybacks. The value being created is obvious. We keep delivering a solid return on book value, which now stands at $66 per share.

Genuíno Christino

executive
#8

To my mind, the results we've posted show that ArcelorMittal is able to create value across every phase of the steel cycle. We keep producing solid levels of cash flow. And building on what Aditya said, we're expanding and building out our capacity to earn by putting money into the most appealing growth openings available within our business. Through our share buyback programs, we go on giving our shareholders appealing returns. And all of this rests on the base of a solid investment-grade balance sheet. With that said, we're ready for your questions.

Daniel Fairclough

executive
#9

Okay, thanks, Genuino. And thanks, Aditya. We already have a line of questions lined up, so we'll start with the first one from Alain over at Morgan Stanley.

Alain Gabriel

analyst
#10

There are a few moving pieces we should keep in mind when it comes to Q3 EBITDA. I think some of your peers have mentioned that seasonality in Europe is more pronounced during Q3. Do you agree with that view? And what does that imply for your shipments? That's my first question.

Genuíno Christino

executive
#11

Let me address your question. Honestly, the clearest way I can explain this is through our order book. In Europe, looking at the order book for quarter 3, we're full. That means we're already taking orders for October. So our base case is that not just Q3 — and let me say a bit about the second half too, since obviously we don't anticipate a repeat of the severe this stock we dealt with in the second half of 2022 — our base case is that this year's second half will come in better than 2022.

Alain Gabriel

analyst
#12

My second question concerns CSP in Brazil. It's clear this asset is producing an EBITDA run rate that's over twice the figure you guided at acquisition, even though the spread environment in Brazil looks fairly ordinary. From Aditya's remarks, the introduction on synergies, I take it that your initial numbers were a bit too conservative. So going forward, what do you view as the real EBITDA run rate for this asset?

Aditya Mittal

executive
#13

That's a really good question. And I believe we can safely say this has proven to be an excellent acquisition. What we've taken on is a strong group of people along with very good assets. As you pointed out, the synergies are double, and at this stage I would add that to the EBITDA figure we've provided guidance on and treat that as the baseline. The company is additionally assisting us in boosting our overall results in Brazil. So the synergies work both ways. Some of them, in fact, are also to be found in Tubarao. Another important element of this deal has been certain fiscal incentives. And so, all in all, this has proven a sound strategy for us — strengthening the leadership position we hold in Brazil and at the same time putting money into genuinely high-quality assets and people.

Daniel Fairclough

executive
#14

And with that, let's go on to the following question, which I think comes from Patrick over at Bank of America.

Patrick Mann

analyst
#15

Turning to decarbonization and the way government subsidies or support get approved — how should we think about the timing on these projects at this point? I know you mentioned that FEED work is underway and that you're beginning to order the long lead items. But when would you expect ground to actually be broken on these projects so they really get going?

Aditya Mittal

executive
#16

All right. It has been a busy quarter for our decarb projects across Europe. As I believe everyone on this call is aware, and as I noted in my prepared remarks, we have secured funding support from Spain, Belgium and France. We are holding talks with those governments about making the energy complex competitive. What does that mean? It means having hydrogen supply on hand at the right price, and the same goes for renewable energy. My expectation is that these talks will prove constructive and that we will reach the right conclusion. So we are working through all the details. At the same time, we are not standing still. We are progressing from pre-FEED to FEED stage, which means 90% certainty on cost, detailed engineering, and ordering long lead items as well. Looking at the overall timeline for these decarb projects, we filed for approval 2 years late. As a result, we are receiving approval from these various governments 2 years afterward. So it is fair to say we are already 2 years behind on implementing these projects. Obviously, during those 2 years we have done some work. It is not as though we did nothing — that is, we moved from pre-FEED to FEED — but a delay is implied.

Aditya Mittal

executive
#17

Typically, a CapEx level like this takes about 3 to 4 years. So keep that in mind as you watch us go from pre-FEED to FEED, since these projects would be fully commissioned and on the marketplace 3 to 4 years from now. Obviously, we'll keep you updated as we finalize the FEED work, the actual timeline, and where we land on these respective covenants.

Patrick Mann

analyst
#18

And maybe I could ask one follow-up question. You just touched on having a global footprint and, I suppose, being able to reach various energy markets. And when I consider the other partner in the HBI plant, they plan to begin their decarbonization efforts by using HBI from Texas, and clearly you now have slabs in Brazil. We have seen interest in German production facilities where, again, it appeared the partner — the potential partner — wanted to ship slabs there for rerolling. How do you weigh making green iron in Europe, where energy prices are very high, against, I suppose, taking advantage of your global footprint, where perhaps you can access lower energy costs, and maybe producing green iron and shipping either green iron or slabs to Europe rather than doing the actual iron making in Europe? How do you balance those 2 things? It must be quite difficult.

Aditya Mittal

executive
#19

Patrick, thanks for that question first of all, since it really brings out what makes ArcelorMittal strong. That is precisely where our strength lies. Slabs can come in from Brazil. HBI can come from Texas, and as I said, it's reaching record output. So the plant is operating as it should now and performing very well. All these opportunities are available to us. There's also a mini mill in the picture, so it isn't as though we lack one. We have a — it isn't a big mini mill, but it is a 1.2 million tonne EAF facility located in Sestao, Spain. So many of these capabilities exist, and that is why we're able to move fast to the market and commercialize our products, which we're doing in both Europe and NAFTA. But as for how we assess it. We're examining it holistically. We're asking, okay, what's the net capital cost, including the total cost of producing these products at some of our facilities versus sourcing some of these products from outside. And on that basis, wherever we find competitiveness, wherever we find the most competitive option. Those are the projects that will see the light at the end of the day.

Aditya Mittal

executive
#20

So that's the way we're approaching it. We're not examining our strengths on their own. It's definitely one piece of the puzzle. It adds difficulty. It's harder since forecasting markets isn't simple. Markets swing, prices swing. Still, at minimum it gives us specific boundaries within which to work, so we can make sure we have the most competitive CapEx and the most competitive OpEx in order to deliver low cost from a carbon standpoint. yet high-quality steel to our customers.

Daniel Fairclough

executive
#21

We’ll go ahead and take the next question, which comes from Ephrem at Citi.

Ephrem Ravi

analyst
#22

Two questions. First, the CapEx guidance has been rising for both the Brazilian long products plant and Liberia. I get that there's been some reshuffling of scope, but are you also seeing broader cost inflation on projects that's affecting the CapEx guidance? And a subquestion on Liberia: you've always mentioned optionality to 30 million tonnes. What changed in the project scoping this time around that kind of makes that 30 million tonnes possible? And my second question: in the slide deck, it was good to see a slide on direct electrolysis for the first time, I think, in terms of a date of the first 40,000 to 80,000 tonnes of plates by 2027. You always talked about direct roses more like a 20, 40-ish type of decarbonization path. Does that mean it's possibly going to be brought forward?

Aditya Mittal

executive
#23

Alright. That's a lot of questions, so I'll take them one at a time. Let me start by saying that Monlevade and Liberia are unique situations. I wouldn't hold them up as examples of what's going on elsewhere in ArcelorMittal. What makes them unique? Each project was halted for a different reason, but in both cases work stopped and then began again. Now that these projects are back underway, let me address them specifically — for instance, to your question about Liberia, we've had the opportunity to take another look at the grade, meaning literally the ore body, and also at what we intend to do going forward. We've become quite focused on wanting more DR concentrate qualities. As a result, we've actually altered the way we plan to grind the ore so that we can turn out even higher quality steels. That has demanded investment in equipment, in civil works, in backup infrastructure, and in the backup power plant, so the cost has escalated. That accounts for most of the cost increase in Liberia. And of course, since the project has been delayed, inflation plays a part as well. As for Monlevade, that project was stopped in '20.

Aditya Mittal

executive
#24

We first started considering this project nearly 12 years ago. So it was a long while back, and the equipment order was halted a long while back too. Since we restarted the project, we've spent additional money on automation. We've carried out considerably more engineering and civil works, and that accounts for half of the cost increase, while the other half, obviously, is inflation. So I won't hold that up as an example. Clearly, what's occurred with inflation and with scope increases is not good news. Liberia is still okay — or relatively okay — because we have a rising level of EBITDA from the project. But taken as a whole, these are not good developments. And obviously, as a company, we've been very focused on minimizing the cost and making sure these projects stay cost competitive and meet our return thresholds, and they do. In Monlevade, besides the facility being franchised using our own iron ore to expand, we also obtained a higher level of fiscal incentive. So that offsets some of these cost increases. But again, I don't want to offer any excuses for that. When it comes to the CapEx overrun, it is, therefore, confined to this.

Aditya Mittal

executive
#25

Broadly speaking, the remaining projects are moving along nicely. There’s a good slide in our deck, for instance, showing 3 additional projects we have in Brazil. The first is in Vega, the second is in Barra Mansa, and the third is in Serra Azul. Every one of them is on schedule and every one is on track. So I’d urge you to view these as isolated issues. On direct electrolysis, look, we’re beginning the pilot sell at this point. If we get through all the stages, then obviously we’d have the capability to produce 40,000 to 50,000 tonnes of plate direct electrolysis plate steel. I think I’d still say this remains in the experimental stages, but clearly we are making progress. When we think about decarb as an organization, we have 3 avenues. One obviously is the DRI-EAF stage. We talked about that. But we’re also focused on and are building capability in the Smart Carbon route. The Smart Carbon route is essentially capturing the carbon or reducing the carbon from the integrated route and storing it or sequestering it or converting it into something else. And we’re making progress on the smart carbon route as well. And the third is what you highlighted, which is the direct electrolysis route.

Aditya Mittal

executive
#26

I hope that covers everything you asked about. If anything still needs clarifying, just tell me.

Daniel Fairclough

executive
#27

All right, we’ll take the next question now, coming from Tristan at Exane BNP.

Tristan Gresser

analyst
#28

Starting with volume. Last quarter, your guidance called for a 5% rise in steel shipments this year, excluding CSP in Ukraine. Now you have your demand outlook for the years, and you've also seen some operational disruption in Europe. So do you expect group volumes to grow organically this year? And could you perhaps give us some color by division and, let's say, nearer term into Q3, more specifically for ACIS, Europe, and maybe mining volumes? Do you expect a sequential pickup there? That's my first question.

Genuíno Christino

executive
#29

Yes, Tristan, I’ll handle that question. Right. So, Tristan, we’re not keeping the earlier guidance of a 5% organic increase in shipments. The reason is that we did encounter some delays in getting the 2 finances back in Europe. As you know, our original expectation was that we’d be able to do that by the middle of June. So there are delays there. The finances are back now, but we only restarted them recently. And then, of course, we’re also adjusting our presentations to the consumption forecast for the year, as we pointed out in our presentation. Still, we continue to expect to be at least flat on an organic basis. And then once you have CSP percent, then I think it’s fair to say that we would still expect to be at least 5% above. If we look at the trends for quarter 3 by region, I think the trends we’re seeing are quite similar. So we do expect shipments to be relatively stable across the divisions. We will see, of course, the usual seasonality in Europe. But I’d just caution that, of course, our shipments in Q2 were lower because we were constrained in terms of capacity.

Genuíno Christino

executive
#30

You need to factor that in. Our volumes are fairly steady, and I think there's an opportunity to improve somewhat in CIS — we'll see. Then in mining, we ought to perform better on volumes. We did encounter some unplanned maintenance at Mine Canada, plus a strike in Liberia, and I wouldn't expect either to happen again. So we should do better there. That's basically how we're looking at shipments, Tristan.

Tristan Gresser

analyst
#31

Alright, that's quite clear and really useful. My second question concerns public funding. I mean, you've succeeded in securing substantial public funding in recent months, and that's genuinely positive. However, it appears those grants come with certain clawbacks if the project earns additional net revenues. Could you explain how those operate? And also, one of your peers in Germany succeeded in securing some OpEx subsidy too, which I understand is the conditional payment mechanism. Are you likewise exploring this kind of support? And do you think there are strong prospects of obtaining this sort of OpEx subsidy beyond Germany as well?

Aditya Mittal

executive
#32

Yes, look, thank you for that question. I think it's very important. I think the main takeaway from our perspective is that the approvals we've gotten from Spain, France and Belgium are more comparable. And what are we requesting? We're requesting half CapEx support, 50% of the investment -- capital investment to be backed by these governments through grants, and that's really what we've seen. The headline number, I know in Belgium isn't the same, but other factors make the project equally attractive. When it comes to OpEx support, we aren't seeking OpEx support. So what we've seen perhaps others do differs from what we're asking. We are focused on CapEx support, we think that makes the most sense for us, and that has been the dialogue. At the same time, we are in discussions with these governments, as I mentioned in my previous answer, to ensure there is a competitive, reliable energy source, and that includes both hydrogen as well as renewable energy. You know we went through energy prices in Europe, prices were high, prices were volatile, and we need to get some stability and some visibility on that.

Aditya Mittal

executive
#33

I also wanted to add that I'd already said these discussions are going well. And I expect that at least in some of these jurisdictions — maybe not all of them — we'll reach the right conclusion and move forward.

Daniel Fairclough

executive
#34

Alright, we’ll go ahead and take the next question, which comes from Andrew at UBS.

Andrew Jones

analyst
#35

I just want to follow up on a couple of points. First, regarding CapEx: given the strategic CapEx increase, and I guess we've seen fairly significant inflation at some of your rival peers in Europe on their green steel projects, I'm wondering how you still feel about that original gross CapEx figure of $10 billion — is there risk around that? And over the next few years, what trend should we expect, given obviously you're still working through some engineering studies and so forth? I mean, how should we think about the group's overall CapEx being phased across 2024, '25 and beyond? And just to follow up on Alain's earlier question, he was asking about the third quarter dynamics, I guess, by division. Could you give us a bit more of a steer on where you're likely to see the most earnings pressure in terms of relative movements in pricing and costs? You've already given us some details on volumes, but can you spell that out by division and scale?

Aditya Mittal

executive
#36

Sure, I'll handle the first part of your question, and then Genuino can address the second part. Regarding overall CapEx, let me begin with the strategic CapEx, just to make sure we're all clear on that. As you heard earlier, we discussed Monlevade and the Liberia project, which has gone up because of scope changes, other improvements, and inflation. But both of those projects are also delayed. So the overall impact on an annual basis isn't changing. So the guidance we give on strategic CapEx per year stays the same. So there's no increase in '24, '25 because of Brazil or because of -- that is, because of Monlevade or because of Liberia. On the decarb envelope, the $10 billion you mentioned, the goal of that capital investment is to cut our global carbon emissions by 25%. And that continues to be the focus. Yes, I agree with you. There has been inflation, and we're seeing some of that inflation too. But we're very focused on a few things as we think about our plan to reduce our carbon footprint by 25%. Can we repurpose or rescope, right, some of this?

Aditya Mittal

executive
#37

And I believe someone raised a question earlier, very kindly, about how ArcelorMittal is strong when it comes to decarb, right, energy, slabs, and HBI in Texas. So, can we leverage some of the assets we already possess to reach those same goals? Obviously, value engineering is a big focus for us. Given that all of these things cost more, what can we do — how can we value engineer so the cost increase doesn't end up being that significant? We spoke about technology development earlier. Are there new technologies, new capabilities that we can develop? So the focus stays on achieving the 25% reduction in carbon emissions with the $10 billion of capital. And that's what we're working toward. Genuino?

Daniel Fairclough

executive
#38

Genuino, could you speak to the dynamics we saw in the third quarter?

Genuíno Christino

executive
#39

Yeah, so regarding that, Andrew — we discussed volumes by region, correct? And once again, when it comes to spreads and prices, we're observing those same dynamics throughout our business too. As we're aware, during the second quarter, prices and spreads have moderated. So that's going to affect our results in Q3. Prices are down, and that will have an impact. Yet at the same time, costs have decreased. I mean, we witnessed a decent reduction in coking coal prices — I'm not sure — also easing somewhat, which should bring some relief. But on the whole, as we know, spreads have moderated. Then in Europe, given the production constraints we're facing, and as we bring back this finance, I'd anticipate our fixed cost position being a bit better as well in the second quarter — third quarter, sorry.

Daniel Fairclough

executive
#40

We're going to go ahead and take the next question, which comes from Phil at KeyBanc.

Philip Gibbs

analyst
#41

Let's start with the Mexico hot strip mill project — how has that been going, and have you hit critical mass when it comes to output?

Aditya Mittal

executive
#42

That's a great question, Phil. The Mexico hot strip mill has actually done better than we expected, both in terms of overall profitability and in how it's serving the marketplace. On critical mass, the equipment is capable. But right now, when it comes to some of the slabs, we're raising the amount of slab production we can do in Mexico so that we can supply that hot strip mill. So the constraint has moved away from the hot strip mill and over to actual slab production, which is where it ought to be. And as we continue making progress upstream in Mexico, we'll be raising output at the hot strip mills. Some of the slabs, as you know, also go into Calvert. And so not all of the capacity is available to this hot strip mill. So its ramp-up and its market acceptance positively surprised us, and that's why the bottleneck has shifted to the EAF facility there. So yes, it's all good news when it comes to the Mexican hot strip mill.

Philip Gibbs

analyst
#43

And then just to follow up on that, when we look at Europe, are there any annual or semi-annual contracts that reset in the second half of 2023, or any resets that are largely isolated to — even in '24?

Genuíno Christino

executive
#44

In Europe, most of the contracts we established at the start of the year. And we did — we had certain contracts reset at the beginning of Q2, and that accounts for the large majority of our European contracts. So there isn’t much we need to reset now in the second half.

Daniel Fairclough

executive
#45

Alright, we’ll take the next question from Bastian at Deutsche Bank.

Bastian Synagowitz

analyst
#46

I have 2 remaining. The initial one concerns AMNS India. You achieved EBITDA per tonne above $330, which is quite impressive, to put it mildly, considering today's pricing conditions. And I suppose, given that substantial exports have been arriving from your Chinese neighbor, I was curious whether you could provide a brief update on the main trends you are observing in the third quarter and also the second half, and whether you anticipate sustaining these run rates in the near term? That is my first question.

Aditya Mittal

executive
#47

Yes. Great. Thanks for pointing that out. Look, AMNS is a success story. We've managed to ramp up production. We've managed to improve quality. We had great customer acceptance of the value we're bringing to the Indian marketplace. And we've been growing the business frantically as well. So this quarter, we will be inaugurating CGL 4, a continuous galvanizing line, which will let us produce <<inaudible>> product. Next year, we will be doing automotive. And as you know, we're in the midst of doubling that facility both upstream and downstream to produce 14 million tonnes of high-quality steel at a coastal site in the country. So overall, the company does really well. In terms of its results, I would expect results to remain elevated for most of this year. We had the benefits of really low gas pricing, the contracts we entered in 2020. And clearly, relative to the rest of the energy complex, these contracts are quite favorable to AMNS. And that has been supporting its profitability in the second quarter and will continue to support its profitability into the third quarter -- into the second half. I don't know, Genuino, whether you'd like to provide any more specifics on that.

Genuíno Christino

executive
#48

No, I believe you covered all the important points, Aditya. So let me check whether Bastian has anything to follow up with.

Bastian Synagowitz

analyst
#49

Only a brief add-on regarding that. Aditya, you may have mentioned gas. My understanding is that gas was among the sectors at the time you acquired the asset. I believe one of the main points was that you intended to renegotiate the gas contract. How does that operate at present? Is it something like an annual pricing mechanism? Does it float? Is it set at a fixed level? What is the arrangement on your side?

Aditya Mittal

executive
#50

Right, so it comes down to a mix of the factors just mentioned, though at its core the approach relies on gas bought at market rates. There's no government arrangement or anything of that sort involved. We're simply participating in the open market. Back in 2020, we entered into contracts running about 3 to 5 years. Those agreements were already in force, which meant AMNS sidestepped the energy price surge that has hit, as you'd expect, other producers using gas elsewhere in the world. But AMNS has managed to avoid it. That's my way of looking at it. And to be clear, part of this works like a rolling hedge. So as prices return to normal levels, we'll be lengthening that hedge. The upshot is the company remains fundamentally exposed to global gas markets. That fact hasn't altered. Still, we clearly benefit from longer duration, a greater share of fixed prices, and steadier pricing, and that gives the business room to develop and expand.

Bastian Synagowitz

analyst
#51

Right, that helps a lot. So for my second question, I'd like to ask about Calvert and the EAF project. As I recall, it was meant to be on schedule back in March, and then we heard about a delay at fairly short notice, since startup had been planned for this year's second half, I believe. So what's causing that? And is the CSP acquisition connected to it, given that it provides somewhat greater flexibility on supply over the near term? That's my first point. And second, once that bigger slab capacity is complete, are there any plans to expand Calvert's product capability too?

Aditya Mittal

executive
#52

Okay, so looking at Calvert overall — and you're correct about the supply side — the EAF project has slipped. What's mainly behind this is a delay in the construction work and in securing the right skill set, meaning the personnel needed for the critical jobs. I wouldn't interpret anything beyond that. So as time passed, we came to see that this project would be pushed back, and we used today's opportunity to let you know. Regarding overall product capability at Calvert, our focus remains on a second year. That will keep strengthening our ability to serve the U.S. marketplace and to keep turning out value-add product. First DM, as you're aware, is automotive capable. So we intend to make automotive grades through the stream — we have the right asset base and the right equipment, which we've invested in, to make sure we can do so. On overall slabs, yes, for CSP we now hold more slabs as a group. But when you consider what we're aiming for and my answer's in Mexico, we're quite comfortable with this exposure. So we're very pleased with the CSP acquisition, very pleased with our Tubarao slab capabilities, and the same goes for the Mexican slab capability.

Aditya Mittal

executive
#53

We're really pleased with the overall mix we've got as we grow our business.

Daniel Fairclough

executive
#54

We’ll go next to a question from Max at ODDO.

Maxime Kogge

analyst
#55

I saw that you raised your EBIT guidance for the Liberian project from $250 million to $350 million. I didn't understand why that was the case, since the scope is unchanged and I assume the assumptions for iron ore prices are unchanged as well? So maybe you could elaborate a little on that?

Aditya Mittal

executive
#56

Yes. Let me pick that up. Look, at bottom, it comes down to all 3 items you mentioned. So through these changes, we're able to turn out a product of higher grade. And obviously, a higher grade product means we earn more premia. And we do think that the pricing on that premia, along with the overall price deck, has shifted too. So we refreshed our assumptions, and EBITDA has now gone from $250 million to $350 million. If you examine the assumptions inside the model, it's still far below where iron ore pricing sits today. right? Today's iron ore pricing is far more elevated than these long-term assumptions. This asset is a Tier 1 asset. It's a well-invested -- it's a well investor -- resource body is going to be a well-invested mine. It's low cost. We own the railway. We have port access, and because of that, you should expect greater profitability. Even by our estimate, the overall iron ore pricing and our $350 million EBITDA estimate sit below consensus assumptions. We've made other enhancements as well, such as changing how we handle the transshipment and all of that on the logistics side, and that too contributes to EBITDA and brings down the FOB cost of the product.

Aditya Mittal

executive
#57

Hopefully, that gives you sufficient color.

Maxime Kogge

analyst
#58

Got it. My second question concerns the Texas HBI unit. You sound quite pleased with it. Yet a few weeks back, talent recorded an impairment on that asset. So I'm wondering how the two of you can hold such differing views regarding the same asset?

Genuíno Christino

executive
#59

Honestly, Max, that's a tough one to address. I mean, obviously, we see no basis for recording an impairment on our side. The asset is doing extremely well. We hit record production, and profitability is pretty robust, as we pointed out in our planning. That said, I really can't speak to why our partner chose to take it against.

Maxime Kogge

analyst
#60

Sure, that makes sense. And maybe the final point on Fossil — in France at least, there was a fair amount of concern about the unit, since at one stage people had the impression it could shut down for an unspecified period. Do you feel that is entirely behind you at this point, and that any danger of a closure is now fully gone?

Aditya Mittal

executive
#61

Yes. Thanks for asking. Let me lay out what happened. Basically, an inspection took place, and it found dust levels were higher than allowed. Naturally, we disagree with that finding. Plenty of corrective measures are already in progress on our side. The matter went before a court, and the court ruled in our favor. The responsibility sits with us to carry out every action. We're actively working through — actively putting all of those directives into practice. It's also worth noting that the dust rules have kept shifting. So this isn't a case of — of us being noncompliant over a long stretch while the regulations changed; under the new rules, we're still completing the actions, and the court sided with us. So provided we complete those actions, which we fully plan to do, I don't foresee additional risk. On the whole, the facility has cut its dust emissions pretty substantially. If you consider what's taken place across the past few years, there's been a 70% reduction, for instance, overall when it comes to the coke facilities and other areas. So the company is heading in the right direction.

Aditya Mittal

executive
#62

That said, it's obviously still a work in progress.

Daniel Fairclough

executive
#63

I think, Aditya, we have time for a few more questions, and the first one comes from Tom at Barclays.

Tom Zhang

analyst
#64

Only 2 remaining from me. First, on China exports: you credited the rise to global price gaps—those have narrowed somewhat, though FX is moving against you, I suppose. European HRC prices remain well above China's, in your view. Do you believe that spread has now shut? Or do you still perceive risks of Chinese exports across Q3 and Q4? That's my first question.

Genuíno Christino

executive
#65

Alright, I'll take that question. Yes. So naturally, we've observed export volumes out of China climbing. That's certainly something to be concerned about. Lately, the government has been stepping in with measures aimed at reining in production levels, and that's clearly very welcome news. You've also noticed that our outlook regarding the mailing challenge is essentially the same. Therefore, if we do witness a production adjustment during the second half, we'd expect export volumes to decline in line with that. And naturally, there's talk of fresh stimulus as well, which is always encouraging for the Chinese market. It's somewhat an industry-wide matter. But as we're aware, once such stimulus measures are formally announced and take effect, some time will pass before we observe real-world results. So for this year, our base case stays that apparent steel consumption in China will be fairly flat. Should that materialize, it will support us in 2024, perhaps at the start of the year and more so in the second quarter of 2020.

Tom Zhang

analyst
#66

That makes sense. Then the other thing I wanted to ask about was perhaps a bit more detail on the guidance. So on Slide 7, there's a pretty helpful chart, I think, showing EBITDA per tonne, and H1 came in at $155. That's well above the long-term average line you've drawn at $120. But considering the commentary around spread compression, and given the ArcelorMittal PMI, which I see is the lowest basically ever apart from COVID and GFC — is it fair to say that H2 EBITDA per tonne ought to be trending below that $120 average? Or do you view this as a new sort of floor level, fee, despite the macro headwinds?

Genuíno Christino

executive
#67

Tom, we won't get into specifics on that. What we're trying to make clear, I think, is all the improvements we've delivered over the past couple of years. That's very, very clear, I think, and it really shows in our results. We're very pleased about that. But I won't be specific regarding — some of it relates to guidance for the second half.

Aditya Mittal

executive
#68

I'd just like to say that the picture you're painting is quite a negative one. And every figure you cited is correct. So I'm not disputing the data. But I think there's also a positive side, which is that inventories in the system are still low, right? So maybe we have those PMI readings and all of that. But fundamentally, what we don't have, when real demand is moving sideways, is the inventory destock. That we went through in the fourth quarter of last year. And so parent demand is relatively flat. We expect second half '23, as Genuino said earlier, volumes to be better than second half 2022. Auto is relatively strong in this marketplace. Auto is doing well. It's offsetting some of the weakness that we're seeing in the construction segments.

Tom Zhang

analyst
#69

Got it, that's very clear. Apologies — I didn't intend to make things sound negative. I was only referring to your slides, but yes, that is helpful.

Daniel Fairclough

executive
#70

All right, I believe we’re ready to take our final question now — a follow-up from Alain at Morgan Stanley.

Alain Gabriel

analyst
#71

I've got a question about gearing. In the past, your net debt target was roughly $7 billion, yet for some time now we've consistently stayed under that mark. The business is cyclical, of course. Still, assuming nothing else changes, where would you want net debt to sit by the end of next year and over the coming 12 months, taking into account your growth projects, the buyback program, and decarbonization? That's what I'd like to ask.

Genuíno Christino

executive
#72

Okay, Aditya, as you're aware, we actually don't set a target for net debt. What we've consistently said is that we don't want to exceed the $7 billion limit we set for ourselves, correct? So we will stay inside that range. That said, as we've mentioned before, we have no intention of structuring things so the balance sheet also carries a positive net debt position. That isn't really the goal. Still, I think we're quite comfortable with where we stand at the moment, and they let the company concentrate on carrying out its strategy. So we feel at ease. We've been watching what's going on in the market, and we remain capable of continuing to execute our strategy, which is very good.

Daniel Fairclough

executive
#73

That brings us to the end of the question portion, Aditya. I'll hand it back to you now to wrap up the call.

Aditya Mittal

executive
#74

Alright. Great. First off, many thanks for all the questions and for your interest in the company. As I mentioned in my opening remarks, we wanted to emphasize 3 things. I hope you saw that structural improvement in our earnings profile. The fact that we're making headway on decarb — we're highly focused on cutting our carbon emissions, but keeping the overall CapEx envelope intact. We have unique strengths that make that possible, which we also discussed, and also how well we're performing on our growth agenda. I know this quarter, we went through Liberia and Monlevade. But if you just look at what we've achieved, Pecem is performing really well in Brazil, Texas had record shipments. It had a positive EBITDA contribution. We talked about the Mexico outstrip mill. We talked about AMNS, how well that is doing. So there's real tangible progress on our growth agenda. All these growth projects are beating our expectations and the EBITDA guidance you would have thought of or we would have provided. So it's all very good news. So from my standpoint, and I said it in the last — second to last question. I think, look, the second half of 2023 is not like the second half of 2022.

Aditya Mittal

executive
#75

Looking at the big picture, market conditions are encouraging too. What matters most for us, obviously, is how far we've come operationally to make sure we're able to serve that market. We've got safe, high-quality steel products out there in the marketplace, and we've delivered structural enhancements to the business. With that said, I'd like to express my thanks once more to all of you, and I hope everyone enjoys a safe holiday if you happen to be taking some time off.

Genuíno Christino

executive
#76

I appreciate that.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ArcelorMittal S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ArcelorMittal S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ArcelorMittal S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.