Arcosa, Inc. (ACA) Earnings Call Transcript & Summary

August 4, 2023

New York Stock Exchange US Industrials Construction and Engineering earnings 45 min

Earnings Call Speaker Segments

Erin Drabek

executive
#1

Hello, everybody, and welcome to the Arcosa earnings call for the second quarter of 2023. Joining me on this call are Antonio Carrillo, our President and Chief Executive Officer, and Gail Peck, our Chief Financial Officer. After they deliver their prepared remarks, we will hold a question and answer session. You can find a copy of the press release issued yesterday along with the slide presentation for today's call on our investor relations site, ir.arcosa.com. Today's call will be replayed for the next 14 days. Details on how to access that replay number appear in the press release. A webcast replay will remain available on our website under the News and Events tab for 1 year. Some of the financial measures discussed today and shown in the presentation slides have not been prepared in accordance with GAAP. You will find reconciliations of these non-GAAP financial measures to the nearest GAAP measure in the appendix of the slide presentation. Also, this conference call includes forward-looking statements as defined by the Private Securities Litigation Reform Act of 1995. Such forward-looking statements carry risks and uncertainties that may cause actual results to differ materially from those statements. For additional information about these risks and uncertainties, please see the company's SEC filings, including the press release we filed yesterday and our Form 10-Q, which we expect to file later today. I will now hand the call over to Antonio.

Antonio Carrillo

executive
#2

Thanks, Erin. Good morning, and thanks for being here as we go over what we delivered in quarter two along with our revised guidance, our updated outlook for 2023. Kindly move to Slide 4. I'll begin with a handful of key points. Our financial results for the second quarter came in line with what we had anticipated, powered by gains in Construction Products and Transportation Products segment. Construction Products gained from robust improvement in unit profitability for natural and recycled aggregates, whereas Transportation Products results showcased the considerable operating leverage within this segment coming from greater production volumes. These strong results were partly offset by anticipated softness from Engineered Structures, mirroring a less favorable mix of utility structures projects booked in 2022. I feel good about what we accomplished in the first half of the year. We've delivered double-digit growth in revenue and adjusted EBITDA, normalizing for storage tanks, and margins expanded roughly 100 basis points, excluding the first quarter land sale. This better profitability mirrors proactive pricing actions, effective cost management, and improved operating leverage in Transportation Products. Via disciplined working capital management, second quarter cash conversion came in strong, pushing free cash flow up 11%. The strength in our free cash flow generation stands out particularly given our expanded CapEx program in 2023 that includes a broad set of organic growth, organic growth initiatives. Looking forward, our cyclical businesses are set for accelerated growth and profitability next year, fueled by improved production volume. Our Engineered Structures backlog has more than tripled over the last year, while our Transportation Products backlog has more than doubled. In addition, order inquiries for dry cargo barges remain strong and hot-rolled coil steel prices have retreated from the recent highs. In Construction Products, we stay committed to prioritizing value over volume, concentrating on increasing unit profitability and expanding margins. The overall pricing environment remains supportive, helped by favorable demand conditions in our geographic markets, and we keep working proactively to mitigate inflationary pressures. Our solid first half financial performance and improved visibility for our cyclical businesses has boosted our confidence in the second half outlook. Because of this, we're raising the low end of both our revenue and adjusted EBITDA guidance ranges for 2023. Gail will now provide detail on our financial results for the second quarter, and I will return to discuss our updated outlook. Gail?

Gail Peck

executive
#3

Thanks, Antonio. I'll pick up on Slide 11 and walk through what happened in our segment results for the second quarter. Let's start with Construction Products, where revenues came in 8% higher. That was powered by greater volumes along with price improvement in recycled aggregates, plus organic gains and the contribution tied to an acquisition in trench shoring. Over in natural aggregates and specialty materials, revenues were about level, since stronger pricing was mostly canceled out by softer volumes. Adjusted segment EBITDA rose 5% compared with a year earlier. Better pricing and less pressure from inflation lifted unit profitability across our aggregates businesses. Adjusted segment EBITDA margins fell 50 basis points, because operating inefficiencies in specialty materials wiped out the margin gains we saw elsewhere. Now for natural aggregates: pricing stayed robust across the markets we serve, with average organic pricing climbing mid-teens on a freight-adjusted basis, and our West region led the way. Volumes for natural aggregates dropped mid-single digits, which is an improvement versus how steep the declines were in the prior couple of quarters. Ongoing pricing strength, combined with inflation easing — especially cheaper diesel — produced better unit profitability and a healthy margin gain versus last year. In recycled aggregates, demand is still solid, especially in Houston and DFW, where organic volumes rose roughly 20% and pricing was up low double digits. Those two factors together delivered substantial margin growth for recycled aggregates during the quarter. When it comes to specialty materials, demand overall is still healthy, above all for our plaster and lightweight aggregates lines. Several items weighed on second quarter profitability, pulling business unit EBITDA and margins down. Finding skilled labor at a handful of specific sites remained difficult. We've acted to fix that and are now seeing better hiring and retention. Production volumes were also held back by unplanned maintenance and downtime, and long lead times for some repair parts made that worse. The expansion at our plaster plant is still on budget and on time. As we anticipated, inefficiencies show up early on while production is ramping. We're intent on lifting business unit profitability in the coming quarters. Last, revenues for our trench shoring business climbed 27%, helped by higher organic volumes and by the Houston acquisition that closed in the first quarter. Margins grew too, more than covering acquisition integration costs. Customer confidence overall is solid, and our backlog and inquiry levels continue to point toward growth in 2024. Now on to Engineered Structures — Slide 12 illustrates how the storage tanks business sold in October 2022 affected the prior period results. In the second quarter, revenues for utility, wind, and related structures were flat, as utility structures saw higher volumes that were offset by lower wind tower volumes. Adjusted segment EBITDA and margin both dropped versus a year ago, mainly because of a less favorable product mix in Utility Structures. We look for the margin in Utility Structures to return to normal in the back half of this year. The segment's margin got a lift of $5.9 million in net benefit from AMP tax credits laid out in the Inflation Reduction Act, and that more than made up for the hit from softer wind tower volumes. Order activity for Utility and related structures remains solid, and order levels stayed in step with shipments. No new wind towers orders came in this quarter, though customer inquiries point to strong interest. We closed the quarter with combined backlog for utility, wind, and related structures at $1.5 billion, the same as the first quarter. Moving to Transportation Products on Slide 13, segment revenues rose 28%, powered by healthy volume growth and better pricing in both our barge and steel components businesses. Adjusted segment EBITDA was more than twice as high, and margins widened by over 500 basis points, which shows the considerable operating leverage these businesses naturally carry. We booked $81 million in barge orders, mainly for hopper barges, which held backlog roughly level and stretched our visibility into mid-2024. Total barge backlog at quarter's end stood at $287 million, and we expect to deliver about 55% of that during 2024. I'll wrap up on Slide 14 with a few remarks about our cash flow and balance sheet position. Free cash flow of $76 million was generated in the quarter, an 11% increase, helped by operating cash flow rising by close to 50%. Strong working capital management gave us a $41 million source of cash in the quarter, which helped recover the bulk of the $55 million use of cash in the first quarter. With our growth businesses still expanding and our cyclical businesses recovering, we anticipate working capital will be a slight use of cash for the year. Our second quarter free cash flow generation looks even better when you factor in capital expenditures of $53 million, nearly twice the prior year level. We're still making headway on the organic projects in progress in Construction Products and Engineered Structures. As a reminder, our full-year CapEx guidance is $185 million-$210 million, including $85 million-$100 million of growth CapEx in 2023; at quarter's end, net debt to adjusted EBITDA was 1x and available liquidity was $673 million. Our solid balance sheet and liquidity keep giving us plenty of flexibility to pursue disciplined capital allocation. I'll hand the call back to Antonio now for an update on our Outlook.

Antonio Carrillo

executive
#4

Appreciate that, Gail. Let's move to Slide 16. We feel good about how we did in the opening six months of 2023, since our growth segments turned in strong results while our cyclical segments beat what we had anticipated when the year began. Because of that, the bottom end of our 2023 revenue outlook moves up to $2.25 billion, compared with $2.2 billion before. Using the middle of our updated range, we now project revenue growth of 11% against 2022. In addition, the bottom end of our adjusted EBITDA outlook rises by $10 million to $355 million, while the top end stays where it was, at $370 million. At the middle of our updated range, that works out to 30% adjusted EBITDA growth over the prior year. As with the guidance we gave earlier, our 2023 adjusted EBITDA projection factors in roughly $20 million of wind-related tax credits while we wait for the IRS to provide final clarification. Now let's go to Slide 17 and go over the outlook for our Growth segments. Higher infrastructure spending at the federal and local levels is keeping the outlook for Construction Products positive. Although volume has faced some pressure in the single-family residential market, strong organic pricing along with solid demand from non-residential, multifamily, and public infrastructure end markets has more than made up for it. We're encouraged by the recent uptick in single-family permits and starts, and we're starting to see that flow through into volumes stabilizing. Outlays from the infrastructure bill and the Inflation Reduction Act, together with healthy state budgets, are giving our Construction Products business a tailwind that we expect will keep helping our results. We remain active in looking for potential acquisitions. Right now our M&A pipeline holds a number of appealing bolt-on opportunities that would both complement and broaden our geographic footprint; in Engineered Structures, the strength of our utility structures backlog confirms our belief that customer demand and pricing are still solid. Utilities keep investing heavily to make the electrical grid more resilient and to grow their infrastructure so new renewable energy sources can be connected to their networks. The decline in second quarter profitability didn't reflect today's market conditions; it stemmed instead from particular orders booked during 2022. As we look at the back half of the year, we expect utility margins to show a better project mix. Demand for telecom towers remains steady as 5G networks continue to be built out, and traffic structures is gaining from more surface transportation investment. Now let's shift to the outlook for our Cyclical segments on Slide 18. This is an exciting moment for Arcosa, because our Cyclical segments are entering what we think will be a sustained upcycle lasting multiple years. We're, we're already catching a glimpse of the financial impact these segments can produce as production volume scales up and drives better operating leverage. Since we anticipate that our output levels will climb even higher in 2024, the businesses in our Cyclical segment are set up to deliver robust expansion in revenue, margins, and cash flow, which should translate into better returns on invested capital; when it comes to wind towers, capacity utilization right now is still fairly low, which lines up with the demand pause we had projected for this year. That said, because we keep concentrating on boosting operating efficiencies, we now anticipate that the wind towers business will come in above break even in 2023, prior to factoring in the net advantages from tax credits. As you're aware, we are putting roughly $60 million into our New Mexico facility at present, and that site ought to begin producing wind towers in mid-2024. As output rises at New Mexico and at our other sites, steadily better profitability should follow. Despite our wind backlog having expanded considerably during the last year, customer interest is still robust and the market is quite active, which strengthens our belief that wind is set for an extended stretch of growth. Securing orders in this market is complicated and takes time to negotiate. Because of that, we don't anticipate announcing fresh orders each quarter, though we do anticipate that order volumes will move upward. Even though we expect to keep running with capacity utilization on the low side in 2023, we retain the flexibility to raise our throughput so we can satisfy strengthening market demand while spending very little operational CapEx. Kindly go to Slide 19; since our barge backlog has climbed to almost $300 million, our confidence in the near to mid-term outlook for this business keeps growing. Our visibility into production now reaches well into 2024, which lets us be pickier about how profitable the orders we take on will be. Our emphasis is on achieving margin gains via efficient cost management, creating operating leverage as volume increases. During the past couple of months, prices for hot-rolled coil steel have fallen, whereas plate steel prices are still high. This pricing gap is beginning to produce appealing market conditions for barges built with coil. Because capacity is tight and the fleet is aging, we expect customer interest in these products to stay elevated. Our steel components business keeps delivering solid results even though it runs at a fairly low capacity level. Although we don't foresee any meaningful pickup in market demand for the rest of this year, the outlook for the coming several years looks promising. Railcar couplers are among the primary products of our Steel Components business. Our profitability in this market has faced pressure from railcar couplers made in China and Mexico. Trade remedy investigations conducted by the federal government resulted in the recent imposition of duties exceeding 400% on couplers imported from China. During the second half of this year, the government is likewise expected to issue final determinations regarding possible duties on couplers imported from Mexico. Those trade measures assist in making competition fairer and ought to let our Steel Components segment produce larger volumes while driving better efficiencies; to wrap up, the results from the first half of 2023 demonstrate the caliber of our skilled team as we successfully steer through tough market conditions. When we look forward, we feel good about the prospects for our Growth and Cyclical businesses alike. Arcosa stays in a solid position, thanks to our extensive exposure to infrastructure markets that we expect will gain from tailwinds lasting multiple years. Our robust balance sheet gives us plenty of flexibility as we keep chasing appealing organic and inorganic opportunities; we stay dedicated to widening margin, producing robust cash flow, and deploying capital to create long-term shareholder value. At this point, I'd like to invite questions on the call.

Noah Merkousko

analyst
#5

Morning. Thanks for taking my question.

Antonio Carrillo

executive
#6

Good morning.

Noah Merkousko

analyst
#7

To start off, I'd like to discuss the Construction Products segment and what your outlook is for the latter portion of this year. It seems pricing is still holding up quite well, and sure, there are some volume challenges, but I believe the hope for the second half is that certain costs will moderate. Basically, I'm attempting to understand your view on margin for the back half, and whether we ought to anticipate an increase compared to a year ago.

Antonio Carrillo

executive
#8

Absolutely. Allow me to provide a bit of detail. From the start of this year, and actually since last year, we anticipated that during the second half we would begin to observe a bit of a lift in volume, since housing is anticipated to begin bouncing back. We feel good about a housing rebound beginning at some point in the second half. We keep witnessing robust pricing traction in our business, and in the best case, as volume bounces back and pricing retains its power, we ought to keep experiencing a degree of margin improvement in natural aggregates and recycled aggregates. What we aim for in the second half is to boost our margins, particularly in specialty materials, which hurt us badly during the second quarter. I'd say we're hopeful. The core elements of the market, I believe, are solid. We do anticipate a robust second half. Naturally, we're enduring a summer that has been incredibly hot, which leads to problems such as certain projects closing down early so that workers remain safe, and so on. Those things are, you know, short-term in nature. On the whole, I believe the pricing landscape and the rebound in volume ought to assist us in the second quarter.

Noah Merkousko

analyst
#9

Speaker Q, Noah Merkousko: Understood. That's clear to me.

Antonio Carrillo

executive
#10

Speaker A, Antonio Carrillo: Apologies — the latter half. The latter half.

Noah Merkousko

analyst
#11

Yeah. Yep. So for my next question, shifting over to the wind towers segment, during earlier cycles, back when demand for wind towers was significantly higher, what were the EBIT or EBITDA margins like for wind towers? Or to frame it differently, how should we think about margins for that segment once you begin delivering on this rise in orders?

Gail Peck

executive
#12

Good morning, Gail here. I'll handle that one. As we consider the wind business, we're definitely in a ramp-up phase; as you know, we've secured over $1 billion in orders since the Inflation Reduction Act was passed almost one year ago. Our backlog is solid. We hold $1.5 billion in backlog for wind utility, with the majority tied to our wind businesses. We don't record long-term backlog for utility; we're in a strong position. Looking ahead to 2024, roughly 25% of that backlog is scheduled to come out in 2024. Given the backlog we currently have, our plants certainly aren't running at full utilization, so from a margin standpoint, we'd anticipate seeing gains in our wind margin next year. As Antonio said in his script, our expectation is that with the Inflation Reduction Act, there will be additional, potentially larger orders throughout this Inflation Reduction Act, which will certainly help boost our volumes and drive our margins up, independent of the tax credit. When we consider normalized margins for the wind business historically, they fall in that solid 10% plus range. The tax credit would certainly be additive on top of that. As our volume grows and our efficiencies get better, we'd expect our wind margins to keep improving.

Antonio Carrillo

executive
#13

Just to give you a rough idea, I believe the biggest EBITDA figure we've ever posted for wind is roughly $90 million, back when the last cycle was at its peak, or close to that amount, and the margin was likely somewhat better. Volume matters enormously in this business, which is exactly why we're so enthusiastic about volume here.

Noah Merkousko

analyst
#14

Understood. That's genuinely useful context. Thank you for making the time. I'll stop here.

Ian Zaffino

analyst
#15

Hi, great. I wanted to build on what was just asked. So, on the wind side, talks are moving further along. What's your thinking regarding the tax credits, and possibly how those credits get shared? And also, regarding the wind conversations you mentioned, what does the lead time usually look like? At what point will it show up in backlog? Thanks.

Antonio Carrillo

executive
#16

Yeah. Let me take the tax credits first. As we said earlier, within the backlog we currently hold, during negotiations we handed over a share — a rather small share — of those tax credits to our customers. Going forward, the ideal is for that figure to shrink, though we retain most of the tax credits, right? The way I look at the tax credits is that they ought to boost our margins. Considering earlier cycles, once you factor in the tax rates, our margins ought to be considerably stronger this time, and that shows up in the results — even take a look at this quarter. On your second question: when orders come in — take the order we booked in the first quarter — these tend to be bigger orders, which is why I noted during my prepared remarks that negotiating them takes time. You aren't bargaining for — historically we aren't a company that has, you know, built 10 towers here and five towers there, and typically we favor — we excel at repetitive manufacturing. What suits us is orders with a longer term. If you consider the timeline, assuming we land a backlog this quarter, my estimate is production would begin at some point in mid-next year or the first quarter, first quarter of next year, roughly around then. From the moment an order arrives until you truly begin delivering against it, at minimum six months pass. Keep in mind, we already hold a backlog, so any order we take on would mean hiring staff, training staff, et cetera, et cetera. Reaching that point requires a ramp-up.

Ian Zaffino

analyst
#17

Thanks. I suppose, just to make things clear, broadly put, we could likely take past margins and tack on, say, an extra $85,000 for each tower, it appears. All right. And, you know, it looks like nearly all of the businesses are genuinely bouncing back and performing, you know, quite strongly. So how are you thinking these days about portfolio optimization, given this current climate where you're witnessing substantially better fundamentals? Thanks.

Antonio Carrillo

executive
#18

Certainly. To address your initial point regarding the $85,000, keep in mind that the tax rate depends on how big the tower is. Based on a tower's size, that $85,000 might be lower or higher. It hinges on the terminal's power atop the tower. That will differ and, I believe, there's a spectrum, yet, you know, 85 ought to fall roughly within that range. On your second question, you know, I think that's, that is a, a truly excellent question since the truth is our approach hasn't shifted. This company, we will keep directing the bulk of our capital toward Engineered Structures and Construction Products, as that's where we think the growth opportunity lies. This business improves, I think what occurs is they simply turn into something more valuable for us, and they, they... The approach hasn't shifted. We still hold the view that this company is heading toward Engineered Structures and Construction Products; we are deliberately steering that way. As our business gets better, we may or may not choose to, to, to refine the portfolio over the shorter horizon. My aim would be to keep making the story simpler and stay focused so we can, you know, even ease your work as an analyst, recognizing we are a complicated story, and, and, given our size, we're overly complicated.

Ian Zaffino

analyst
#19

All right, thanks a lot.

Garik Shmois

analyst
#20

Oh, hello there. Appreciate you taking my question. I was hoping you could put a number on how much the inefficiencies affected things, particularly in the aggregates business. What exactly was the hit to margin during the quarter?

Gail Peck

executive
#21

I'll handle that question. Good morning, Garik. As you're aware, we chose not to include a figure in either the press release or our prepared remarks regarding that matter. What I can say is that profitability for the segment declined by 50 basis points compared with the prior year, even though we saw considerable improvement in margins across our Aggregate, Natural, Recycled, and shoring operations. We devoted some time to walking through the difficulties in that area, since they weighed heavily on how the segment performed overall during the quarter. As for a precise figure, the Specialty Materials business accounts for roughly 1/3 of our revenue, somewhere in that vicinity. We were displeased with how margins performed versus the prior year, and that led to a 50 basis point decrease for the segment.

Garik Shmois

analyst
#22

All right. Turning to the back half of the year and what you're doing to fix some of the inefficiencies from the second quarter, should we expect that segment margins will remain under pressure during that period? Or are you expecting margins to expand in the back half, simply because of the pricing, and hopefully better volumes along with reduced costs that you're observing across the wider Construction Products group?

Gail Peck

executive
#23

Okay, so perhaps I can just briefly recap a few of the things Antonio just said about how Construction did in the second half; we feel really good about what we can achieve in the second half. Conditions in the market are working in our favor; we definitely have pricing power; we've discussed, you know, a few difficulties coming from some hard comparisons in the back half. My guess is we're up against pricing in the high teens for the second half. You know, we've put through some price increases in July, announced others in August, so I think from a pricing standpoint we feel fairly good. We keep doing a solid job of managing costs. You know, when it comes to Specialty, like we mentioned, we're taking action to address it. A number of steps have been taken, and we expect profitability to get better in the quarters ahead; we're really optimistic about the back half in construction.

Garik Shmois

analyst
#24

Alright, that’s helpful. For my next question, I’d like to focus on Engineered Structures. I’m hoping for a bit more detail regarding the outlook for margins in that area too. I believe you said you anticipate getting back to normalized margins during the second half of the year. Does that pertain specifically to wind, or does it apply to the wider segment as well?

Antonio Carrillo

executive
#25

Antonio, regarding this segment's profitability in Q2, it simply didn't mirror what's happening in the utility structures market right now. During last year, several of our clients had gaps in their requirements, so we needed to fill the backlog using what people refer to as a bid market — meaning lower-margin goods — and those are the items we manufactured across the second quarter. Once we move into Q3, those orders have cleared out, and we're back to what I'd call our more profitable backlog alongside our long-standing customers. Therefore, we anticipate better profitability within our utility structures business. Wind tower production keeps getting better and picking up speed. Like we said, we now anticipate that operation will be above breakeven for the year; that's materializing as they boost their efficiencies, which ought to benefit Engineered Structures. Adding in the tax credit, we ought to see enhanced margins during the second half of the year.

Garik Shmois

analyst
#26

Understood. Thanks for taking my questions, and I'll pass them on.

Alex Hantman

analyst
#27

Hello, and good morning to Antonio and Gail. This is Alex Hantman, here on behalf of Julio.

Antonio Carrillo

executive
#28

Good morning.

Alex Hantman

analyst
#29

Morning. To start, I'd like to ask about Transportation Products. Can you describe the inquiries coming into the barge business? And how steel prices factor in.

Antonio Carrillo

executive
#30

Of course.

Alex Hantman

analyst
#31

... moving downward, how do you see that affecting potential buyers who haven't committed yet — does it push them to place orders soon?

Antonio Carrillo

executive
#32

Absolutely. Yeah, inquiry levels are elevated, particularly when it comes to dry cargo. There are really two separate markets here, as you're aware — dry cargo and liquid. Things have been quieter on the liquid side. The bulk of what we're booking today is dry cargo. Inquiries are coming in for dry as well as liquid. Dry mostly, though some liquid too. The dynamics differ between them. Across both of those markets, barge utilization is running extraordinarily high. We've just been through several years, as you know, of output that was very, very low — far under replacement, and replacement is what's required simply to hold the fleet at the size it should be. That demand, from what we can tell, exists out there, and inquiries reflect it. With steel prices declining — and in my prepared remarks I noted that coil prices have dropped considerably in recent months, while plate prices stay elevated — a broader spread is beginning to open up between those two, which lets us begin building and quoting barges using coil and plate, and that ought to assist us in turning inquiries into orders. Meanwhile, as I said, our backlog extends to mid-2024, and margin is where our attention is. We're not about to give barges away. A strong demand picture is coming, we believe, so we're staying very disciplined regarding the pricing we apply and when we schedule those deliveries. Our ramp-up at the facilities is being planned so that efficiency can improve. I'd say we're positioned quite well to take advantage of market conditions, the backlog we currently hold, and steel pricing that's turning more and more favorable, in order to convert inquiries into orders.

Alex Hantman

analyst
#33

Got it. Thanks, Antonio. One more quick question about Transportation. When it comes to that segment's strong margin results, is operating leverage the only thing driving it, or are there additional tailwinds or efficiencies you're seeing behind those margins?

Antonio Carrillo

executive
#34

Yeah, I'd say operating leverage is largely behind it. Barge isn't the only place we see this. Take our Steel Components margins — even though, like I said, they're running at fairly low capacity, those margins have looked really good. As we ramp up — and I brought up the trade case against China — that ought to help our volumes improve across the next several quarters. When volumes move higher, these businesses carry a lot of operating leverage, and it really doesn't take much to shift the market. Another thing about this business: margins go up, but these operations also don't need much CapEx, so their cash flow profile is extremely strong. The recovery in these businesses should give return on capital a substantial boost.

Alex Hantman

analyst
#35

Understood. Thanks. Turning to a different segment, Engineered Structures, could you discuss the project mix within Utility Structures? In the third quarter, how does the bid customer component stack up against what you saw in the second quarter?

Antonio Carrillo

executive
#36

Specific guidance on customer types isn't something we provide, but here's the thing — most of our orders have traditionally gone to a set of buyers we refer to as our Alliance customers. How that arrangement functions is that you hold an agreement with those buyers covering a set quantity of backlog across a set timeframe, yet it isn't pinned down. There's no specification of which tower types you're constructing; that backlog is quite substantial, but we don't count it as backlog until it turns into a real design and a real pole that we'll ship, and that represents the bulk of our backlog. That's what we report once we know the pole type we'll be delivering; additionally, each quarter we make a certain volume, a lesser share, for the bid market; during the second quarter, in particular, the bid market's share was far bigger than usual. Beginning in the third quarter, as I said, that ought to return to normal, and we anticipate the second half being far stronger than second quarter margins, so to speak.

Alex Hantman

analyst
#37

Thanks. That was really useful background on the alliance compared with the bid. For my final question, I want to ask about the balance sheet. I see you have roughly $200 million in cash on hand, and that's a bit above the level you normally keep. What's the right way to view capital allocation across the coming few quarters?

Gail Peck

executive
#38

Yeah, good question. We are definitely happy about how strong our balance sheet is and how solid our liquidity stands, and, as I believe we've shown, as you can tell from our history, we've been quite active when it comes to deploying capital. The bulk of that capital has gone toward acquisitions and organic investment, so that's where our attention sits. That said, we still have a $50 million share repurchase in place, so we'll act opportunistically on that front. The liquidity, we look at it as an asset, and we will keep directing our capital to acquisitions and organic growth. On the organic side, we have several large projects currently in progress within Construction and Engineered Structures. Like Antonio said, there's a live pipeline of bolt-on acquisition possibilities that we are evaluating.

Alex Hantman

analyst
#39

Thanks, Gail. That's really useful. Appreciate it, Antonio. Good background. I'm all set.

Antonio Carrillo

executive
#40

Thanks.

Gail Peck

executive
#41

Great.

Jean Ramirez

analyst
#42

Hello, Jean here from Brent Thielman. I appreciate you letting me ask.

Antonio Carrillo

executive
#43

Good morning.

Gail Peck

executive
#44

Good morning.

Jean Ramirez

analyst
#45

Morning. I'll begin with a question that has two parts. When we look at aggregates in this quarter, how much was growth held back by Texas weather, and how much by other things such as housing? And when do you think volume will reach an inflection point?

Antonio Carrillo

executive
#46

Yes.

Gail Peck

executive
#47

Yeah, that's a fair question. In Texas in particular, we felt good about the volumes we posted during the quarter. Broadly speaking, on aggregates, we were down in the mid-single-digit range. In Texas, I'd say we were likely nearer to flat, so we're encouraged by what Texas is showing us. On the weather side, the only thing on our minds at the moment is the heat in Texas, though I guess we did get a bit of wet weather early in the quarter. We're encouraged by how quickly lettings are moving on the infrastructure side. We keep seeing solid commercial health in Texas. Then, broadly, when it comes to housing, we're beginning to see some stabilization. Our comps, as opposed to price, on the volume side, are somewhat favorable to us in the back half. We're optimistic. That said, I'd add that we remain focused on price and remain focused on value rather than volume. On the whole, though, the Texas market did well for us in Q2.

Jean Ramirez

analyst
#48

On that volume, does it lean more toward Q4, or does it just come in evenly across the back half, so we'd expect steady improvement?

Gail Peck

executive
#49

Yeah, well, I mean, if you just consider seasonality, Q4 tends to be somewhat slower because of weather, as things get a bit chillier and we head into the winter months. Typically, volumes look stronger in Q2 and Q3. At the same time, I'd say there's some momentum building that wasn't there earlier in the year, when it comes to infrastructure lettings and, you know, some, some stabilization on the single-family side.

Jean Ramirez

analyst
#50

Understood. I realize wind has drawn plenty of inquiries, yet I'd like to spend a moment on what you're producing. I realize you don't disclose the quantity of wind towers you make, but could you give me a rough sense — do you anticipate wrapping up 2023 at production volumes matching those of 2022? Simply based on our assumptions regarding your output during that period.

Gail Peck

executive
#51

The way we view wind, I'd say, is that given the orders we've secured plus those currently sitting in backlog, when we consider 2024 through a volume lens, it would rise compared with 2023. As we've discussed, in a similar fashion across our barge and wind operations, we anticipate finishing 2023 possessing greater production capacity than what existed when the year started, since we're scaling up within those operations.

Jean Ramirez

analyst
#52

All right.

Gail Peck

executive
#53

Is that... I want to be sure I give you a response—

Jean Ramirez

analyst
#54

Yeah, I just — you know, I wanted to ask, because, I guess, based on what was said back in 2020, there was this idea that it was a strong year, at least when it came to wind towers. So I just wanted to find out, what do the end of 2023 and 2024 look like next to that, in terms of the number of wind towers you made?

Antonio Carrillo

executive
#55

Let me share a few figures with you.

Jean Ramirez

analyst
#56

that's the point I'm driving toward.

Antonio Carrillo

executive
#57

...a bit more detail, looking at 2022 versus 2023. In 2022, through July of 20-

Jean Ramirez

analyst
#58

2020.

Antonio Carrillo

executive
#59

20 or 2022?

Jean Ramirez

analyst
#60

Yeah, 20... Sorry, 2020 compared with 2023. That's the comparison I was interested in.

Antonio Carrillo

executive
#61

Since we launched in 2018, our wind operation has been declining. The trajectory is a fairly severe drop, going downward. If you check the presentation, one page there displays our Cyclical businesses—at the time of the spin, they accounted for nearly 70% of our EBITDA; in the current year, that figure will drop below 10%. Wind falls inside what we call our Cyclical businesses. Wind, barge, rail components. In the middle period, barge saw a modest bump, but on the whole, you know, Arcosa's expansion has truly come from our construction segment and engineered structure. Since the spin, wind has experienced what amounts to a cliff dive. When we reach 2023 and the Inflation Reduction Act takes effect, you're going to witness a fairly sharp reversal as additional orders arrive. At this moment, the backlog doesn't support a steep, shall we say, hockey stick, yet we are laying the groundwork so that more orders can pile on top of it. That's the reason we feel enthusiastic about this business.

Jean Ramirez

analyst
#62

Understood. When it comes to Engineered Structures, is the margin level we're currently observing a sustainable minimum, or will there be additional upside across the remainder of the year?

Antonio Carrillo

executive
#63

As I said earlier, Q2 does not represent where margins stand today. The mix of projects lined up for the back half is considerably more favorable, so utility structures ought to deliver somewhat better margins, and as wind towers continue ramping up more effectively, along with that tax credit, the ideal outcome is a stronger margin picture in the latter half of the year.

Jean Ramirez

analyst
#64

Alright, I really appreciate you taking the time.

Gail Peck

executive
#65

Thanks.

Operator

operator
#66

Thanks. That wraps up the teleconference for today. We appreciate everyone joining us. At this point, feel free to disconnect, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Arcosa, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Arcosa, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Arcosa, Inc. or any ticker on your watchlist.