Arq, Inc. (ARQ) Earnings Call Transcript & Summary
May 7, 2025
Earnings Call Speaker Segments
Anthony Nathan
executiveThanks, Operator. Morning, everyone, and thanks for being with us today for the call covering our first quarter 2025 earnings results. Joining me are Bob Rasmus, who serves as Arq's Chief Executive Officer and President; Joe Wong, Arq's Chief Technology Officer; Stacia Hansen, Arq's Treasurer and Chief Accounting Officer; and Jay Voncannon, Arq's Chief Financial Officer. We're webcasting this conference call live inside the investor section of our website, where a downloadable version of today's presentation can also be found. A replay of the webcast will be posted on our site too, and Arq's investor relations team can be reached at investors@arq.com. Please be aware that today's presentation and remarks contain forward-looking statements as defined in Section 21E of the Securities Exchange Act. Such statements rest on information currently available to us and carry risks and uncertainties that might cause actual future results, performance, and business prospects and opportunities to differ materially from what those statements express or imply. Among these risks and uncertainties are, without limitation, the factors identified on slide two of today's slide presentation, in our Form 10Q for the quarter ended March 31, 2025, and in other filings with the Securities and Exchange Commission. Unless the securities laws expressly require it, the company assumes no obligation to update those factors or any forward-looking statements to reflect future events, developments, or changed circumstances, or for any other reason. Also, it's especially important that you review the presentation and today's remarks alongside the GAAP references in the financial statements. With that, I'd like to hand the call over to Bob.
Bob Rasmus
executiveThanks, Anthony, and I’m grateful to everyone for joining us this morning. For the first quarter of 2025, we had another busy and productive stretch, shaped by continued progress in the legacy PAC business and by the GAC expansion effort. As I’ve said on prior calls, we made a commitment to transform the PAC business, and the Q1 numbers make it clear that this goal has been achieved. With positive adjusted EBITDA now reported for 4 consecutive quarters, our focus has shifted toward further cost optimization and strategic price management to drive profitability higher. I have full confidence that our core PAC business can produce EBITDA in the double-digit millions annually, and that gives us a reliable foundation for everything else we pursue. With that sort of stable base under us, we can chase highly attractive growth opportunities in GAC, asphalt, rare earth minerals, and several other areas. Now I’ll walk you through the first quarter 2025 results we released earlier today. I’m pleased to report that we delivered another strong quarter, with healthy volumes, continued pricing strength, and additional margin improvement. Revenue for the quarter reached $27.2 million, up 25% from the prior-year period. The primary drivers were a 13% rise in our ASP, favorable product and customer mix shifts, and higher volumes. I’d also note that this marks our eighth consecutive quarter of double-digit year-over-year percentage growth in ASP. Taken together, these results reflect the ongoing and sustained turnaround of the PAC business. Demand for our PAC products remains solid. Even though recent administration policies may extend coal-fired power plant operations, we continue to diversify strategically beyond mercury emission solutions. That approach not only reduces our possible exposure to fluctuations in coal-fired power plant demand but has also proven effective in lifting ASPs by opening access to premium pricing markets. In addition to the pricing benefits we’re seeing, cost control is still a top priority. We built on our 2024 actions and found further ways to lower both operating expenses and SG&A, as our Q1 results again confirm. Our SG&A, as we’ve said before, is still higher than a business our size should carry, and we’re pursuing additional reductions; those efforts will produce both stronger near-term profitability and a leaner organization prepared to seize future growth. This mix of higher revenue and disciplined SG&A spending helped us reach a 36.4% gross margin, about flat versus last year. In the first three months of 2025, our gross margin was at roughly the same level as in the comparable period a year earlier. The quarter gained from greater sales, improved pricing, and a favorable customer mix, but those positives were offset by launch-related costs for the GAC line and a nonrecurring accounting item recorded in Q1 2024. Adjusted EBITDA reached $4.1 million, plus we recorded positive net income — a fantastic result that stands yet again as clear proof of the turnaround we've delivered. I want to point out that the strong momentum from Q1 has continued into April, which is typically a slower shoulder-season month. Turning to volumes, the numbers look very promising — they're up over 25% versus last April. Beyond that, we've just secured a landmark life-of-asset deal with one of our biggest customers, and measured by value it stands as the second largest in company history. This agreement delivers two main advantages: it provides us with better visibility into our PAC business, and it confirms our position as a trusted industry partner. Customer loyalty remains very strong — retention among power generation and industrial clients reached 95% in 2024 — and that reflects both how effectively we partner with them and the exceptional work of our sales and technical teams. Overall, PAC has grown into a solid, durably profitable foundation for the business, which positions us well to pursue larger growth opportunities, such as Granular Activated Carbon and our other initiatives. Now, moving to GAC, starting with the commissioning status. We informed you last night that while progress continues, a few hurdles remain before the first GAC production line at Red River is fully commissioned. I know this update is disappointing — certainly for our investors, and for me personally, as well as for everyone at Arq. With any facility startup, mechanical issues are simply to be expected. Each time such issues have arisen, we've been able to successfully resolve the equipment challenges. The main reason commissioning completion keeps slipping is largely tied to shaping and binding our product before the kiln is turned on. Our foundational PAC business continues its turnaround, which is hugely important and, in my view, quite remarkable — but for accelerating the growth we anticipate ahead, Granular Activated Carbon output is what's essential. To give investors the clearest possible picture, we want to share more technical detail about where our commissioning process currently stands. I know it matters greatly to everyone who has invested with us to understand what remains outstanding, and to hear from us how we plan to address it. With that in mind, I've handed things to Joe Wong, our Chief Technology Officer, for a brief rundown of where things stand. Joe?
Joe Wong
executiveAppreciate that, Bob. My goal is to make this straightforward, while giving enough detail that everyone comes away with a clear picture of our current position. We've managed to get the plant equipment commissioned, and that includes turning out small volumes at non-commercial scale, but the consistency needed for commercial scale production still eludes us. To be specific, the granules do initially take the right form, yet they occasionally fall apart structurally while moving through kiln processing. As Bob laid out during our results call in March, we've been bringing our new GAC line at Red River online through a highly methodical, step-by-step approach, splitting the startup across six functional zones. Zone one is the point where our highly purified bituminous feedstock from Corbin gets introduced, and I can report that every piece of receiving and conveyance equipment is running the way it was designed to. Zone two covers the feedstock preparation step, where we confirm that bituminous feedstock holds steady in terms of size and moisture level, so that raw material properties stay stable at the beginning of our GAC process. At this zone, we've had to bring in one extra chemical ingredient, something our initial testing didn't call for, in order to manage the surface properties of the feedstock and boost binding efficiency in zone three. This zone has now reached full commissioning as well. Zone three consists of equipment that combines our GAC additives with the bituminous feedstock particles and re-agglomerates, or glues, those particles together into our GAC shape. Zone three is highly complex, and that's where the outstanding problem still needing a fix sits. Even though more adjustments are needed on product binding and shaping to raise yield enough for commercial scale production, I can report that we have successfully delivered hard, well-formed GAC granules into zone four. Zone four is the first of two high-temperature heat treatment steps, in which granules coming from zone three get heated to drive off leftover moisture, carbonize the granules so carbon content is concentrated, and activate the glue so the GAC shape is fixed; this first heat treatment zone has run well enough to make on-specification product, and though it is commissioned, additional fine-tuning is needed to lift the throughput rate. Zone five is the second of those two heat treatment steps. Inside zone five, we activate the granules arriving from zone four using very specific thermal profiles of steam to produce the activated GAC; we have run this heat treatment equipment successfully, though not at consistent higher throughput rates. That said, we're confident this existing equipment, already in use at Red River, can be readily adapted to deliver consistent high throughput for commercial scale GAC processing. Zone six is the last zone, where the final GAC product gets screened and inventoried. As with zone five, zone six uses equipment similar to what we've relied on at our facility for years, and we expect no problems when we run our new GAC products at commercial scale production. Taking things zone by zone through the process has let us pinpoint trouble spots and deal with them in a disciplined, thorough way. Considerable headway has been achieved, and a cross-functional team is now handling what details are left as we increase throughput and look for ways to boost efficiency. Most of the process has now been successfully commissioned, yet it is clear the difficulties encountered in zone three were far from minor and required more time from us than we had expected before they could be settled. Those issues have been pinpointed and isolated. Our confidence stays very high that we can tune them up and correct them, and once that is done, reach production at commercial scale. Over to you, Bob.
Bob Rasmus
executiveThanks, Joe. I hope that overview gave all of you a helpful grasp of the process, how we've approached commissioning, and the way we intend to get past these difficulties. Given those difficulties, I can confirm that GAC output in Q2 will probably be very limited, and we now estimate that full commissioning plus first commercial production will arrive by the close of the second quarter or in the early part of the third quarter of 2025. That does mean a slip versus what we previously expected, but this guidance is being given conservatively, since our aim is to beat these targets rather than fall short. Once commissioning wraps up and first commercial production occurs, we still anticipate a ramp period of three to six months to hit nameplate capacity, which would push the timeline for reaching full production capacity a bit past 2025. That isn't our base case assumption; we are simply leaning toward even more caution. Although design mistakes inherited from the contractor we used before still play a part in some of our difficulties, let me say plainly that we take responsibility for fixing these commissioning and first commercial production problems; in commissioning, you have dealt with both expected and unforeseen difficulties, and we have had our share of each. As you're aware, we gave our latest update in March, when we still expected production to begin later that month. Though we recognize the near-term slippage, we urge all of our stakeholders to keep in mind the project's long-term potential, which spans decades. Even with these setbacks, I take pride in the commitment and problem-solving mindset of our Red River team, which reflects the positive cultural transformation at Arq. Everyone on our team is working hard to get this right and reach successful commercial production, and we will. I stay fully confident in our technology and its capacity to generate enormous economic and environmental value for our customers and stakeholders alike. I want to emphasize that, notwithstanding the commissioning difficulties we've faced, there are no fatal flaws when it comes to applying our technology to achieve commercial scale GAC production. On the market side, demand for GAC continues to be strong. The April 28 remarks by recent EPA Administrator Lee Zeldin regarding PFAS regulation line up closely with our mission when he stated, and I quote, "We are tackling PFAS from all of the EPA's program offices, advancing research and testing, stopping PFAS from getting into drinking water systems, holding polluters accountable, and providing certainty for passive receivers." That is only the beginning of the work we will do on PFAS to ensure Americans have the cleanest air, land, and water. Here at Arq, we are actively engaging with stakeholders to back these initiatives. We're seeing strong customer momentum in PFAS mitigation adoption, where GAC is widely accepted as the industry-leading solution, together with rising demand from air filtration and Renewable Natural Gas applications. On top of that, we're getting many partnership inquiries from providers of alternative technologies. When it comes to phase one contracting, customer engagement remains strong. During our Q4 update, we noted that a large share of the first phase of Red River's initial output had been set aside for in-situ testing by customers. Those tests, however, had to be pushed back because of the newer schedule we gave for commercial-scale production. Even so, we have confidence that we can hit the specification requirements, and we anticipate that testing will wrap up and contracts will then be finalized in a way that lines up nicely with our ramp-up of production during the latter half of 2025. Market conditions more broadly keep working in our favor. We have observed no significant movement on added supply capacity from rivals, and since permitting, financing, and building new facilities typically take two to three years, we anticipate that the present mismatch between supply and demand will last at least through 2027 or 2028. That timing helps us a great deal, since it lines up with the demand acceleration we expect before the 2029 regulatory deadline, which calls for lowering PFAS levels to four parts per trillion. With our market entry coming so soon, we are positioned perfectly to take advantage of these supportive conditions. Now let me discuss the recent tariff news. Although things keep changing, these shifts end up benefiting us on the whole. We are the sole domestic producer of activated carbon whose supply chain is fully vertically integrated, which gives us a competitive edge that no one else has. Competitors relying on imported feedstock may be hurt by these tariffs. Our integrated supply chain was first built with customer service in mind rather than tariffs, yet it still leaves us well placed to improve how we operate and how we perform financially. On the wider government policy front, the EPA's guidance in April indicates that PFAS-related drinking water rules will not be relaxed in any meaningful way. Customers, we find, keep acting proactively, motivated by sound business reasoning in light of possible litigation exposure and the costs that come with it. We are also looking into an intriguing chance that fits with the administration's emphasis on domestic rare earth minerals and graphite. Drawing on our purification technology and Corbin inventory, we are examining whether we could extract rare earth minerals and make synthetic graphite from our coal waste feedstock. Though it is at an early stage, this effort, together with our asphalt opportunity, amounts to yet another promising path for growth. We are also looking into possible government funding to back this strategic effort. To wrap up, Q1 produced outstanding results in our core PAC business, beating expectations and showing momentum that can be sustained. Although delays in GAC commissioning and the first commercial-scale production are disappointing, we stay confident about the fundamental opportunity and about our capacity to capture it. We look forward to sharing more updates on commissioning progress over the next few months. I will now hand things over to Stacia for a thorough financial review.
Stacia Hansen
executiveThank you, Bob, and I appreciate everyone being here today. Once again, Arq posted robust financial performance in the first quarter, as revenue rose 25% compared with the same period a year earlier, reaching $27.2 million. The main driver was better contract terms — a 13% lift in average selling price, beneficial product mix changes, and higher volumes all played a part. Worth pointing out, this is now our eighth quarter in a row of double-digit year-over-year percentage gains in ASP. Gross margin for the quarter came in at roughly 36.4%, basically in line with the first quarter of 2024. As Bob noted, gross margins held steady against the year-ago period, since better pricing and a favorable customer mix were canceled out by startup costs tied to our GAC line plus a one-time accounting adjustment taken in Q1 of 2024. Excluding that adjustment from the first quarter of 2024, we estimate gross margin would have risen about 5% versus the prior year period. We produced positive adjusted EBITDA of roughly $4.1 million, versus an adjusted EBITDA loss of $400,000 a year earlier. I should mention that, like many market participants, we added back stock-based compensation in Q1 of 2025 when calculating adjusted EBITDA and restated the Q1 2024 adjusted EBITDA figure for comparability. Net income reached $200,000, a major step up from the net loss of $3.4 million in Q1 of 2024. Every one of our sales contracts is now a net contributor in 2025. Prioritizing profitability above volume brought us to this milestone — a notable accomplishment in our PAC portfolio, considering that 24% of our volumes were unprofitable as of December 2022. Selling, general and administrative expenses came to $6.1 million, a decrease of roughly 21% against the year-ago period. That decline stemmed from lower payroll and benefits as well as reduced general and administrative costs. I'd point out that part of this drop relates to our Corbin facility beginning operations in January of 2025, meaning payroll and benefit costs for that facility are now capitalized as inventory on our balance sheet rather than expensed within SG&A. Research and development costs in the first quarter fell 46% relative to Q1 of 2024. During the first quarter of 2024, R&D spending was mainly for additional product qualification testing with potential lead GAC adopters, but that dropped considerably in Q1 of 2025 because many lead adopters finished such testing during the 2024 period. All told, our Q1 of 2025 results show we can run our PAC business in a manner that adds positively to our economic position in a genuinely sustainable way, while also positioning us to pursue and capture high-growth, high-margin opportunities in our expanding GAC business. We continue to concentrate on making our PAC business even more profitable and believe it is now cash-generative on an annualized basis. Like Bob mentioned, the turnaround of the PAC legacy operation locks in the base business that we're now layering the faster-growing GAC opportunity on top of. Moving to the balance sheet: we closed out Q1 with $14.8 million in cash, roughly $6.3 million of which carries no restrictions. What shifted relative to the prior quarter came from trailing CapEx at Red River tied to the GAC line, plus growth in Arq Wetcake inventory and essential spare parts. Also today, we're reaffirming our 2025 CapEx guidance of $8 million-$12 million. Our expectation remains that we'll cover our CapEx requirements through current cash on hand, cash we generate, and the cost reduction efforts already underway. Beyond that, we've amended the MidCap agreement so that, should the need arise, extra borrowings are permitted under that facility as a result of pushing back commissioning of the granular line. On that note, I'll hand it back over to Bob.
Bob Rasmus
executiveThank you, Stacia. Prior to taking your questions, I'd like to call attention to some very good news here at Arq — specifically, that Jay Voncannon is joining us as our new Chief Financial Officer. Jay comes to us with more than 35 years of experience leading finance organizations, most recently serving as CFO of CoorsTek, a multi-billion-dollar advanced engineering manufacturing company that the Coors family owns outright, and while there he steered it through a period of considerable growth and better profitability. Before joining CoorsTek, he worked for over two decades as a senior finance executive with Koch Industries, where he was responsible for large investment programs and strategic acquisitions, among them putting roughly $7.5 billion of capital to work. Jay's office will be at our Greenwood Village headquarters, and he'll be responsible for every part of our financial strategy and operations, covering planning, accounting, tax, treasury, and internal audit. His deep experience and strategic vision will play a key role as we keep transforming and scaling the business. I have every confidence that under Jay's leadership our finance organization will be stronger and our future growth well supported. With that, I'll hand things over to Jay for a short while so he can say a few words. Jay?
Jay Voncannon
executiveThanks, Bob. Even though it's been just about a month since I got my feet under the desk, the team I've met so far has really blown me away. As Bob said, there's a very clear can-do mentality here, and that's part of the culture across the whole organization, and I'm extremely excited to be joining a company as it embarks on such a compelling growth trajectory. Given my background in financial strategy across similar businesses, I'm confident that I can build on the great work that's already been started over the last year or so. On the priorities front, my initial focus is going to be on leveraging our cost position through the growth period, along with potential strategic initiatives; with a great team already in place, I'm very confident that together we can further streamline and enhance both the current business and our future growth potential. In the meantime, I look forward to meeting more shareholders and investors in due course and updating the market on our progress at the time of our next quarterly results. With that, I'll turn it back over to Bob.
Bob Rasmus
executiveThank you, Jay. To wrap things up, the first quarter marked yet another period of solid advancement. Our PAC division keeps performing very well, and I have every confidence that we can grow its profitability even more. The restructuring plan we launched back in 2023 has mostly been completed, although we will keep fine-tuning results. Above all, I think we have built a base that supports consistent profits each quarter. Going forward, we are set up to pair this primary operation with the opening we see in Granular Activated Carbon. The holdups in commissioning and commercial scale output have been deeply aggravating, yet my belief in what GAC can become, and in our capacity to produce the greater growth profitability our investors bought into, has not wavered. We think a solution to the commissioning and first scale production hurdles is near, and once that happens, we can start ramping output up toward nameplate capacity. During the next several months, our attention will go to finishing commissioning and reaching steady commercial scale production efficiently and on schedule, running customer tests, and locking in more contracts. Naturally, we will keep telling the market about anything significant as it arises. I will hand things over now to our operator so we can take questions.
Gerry Sweeney
analystGood morning, Raz. Stacia, Joe and.
Bob Rasmus
executiveMorning, Jerry.
Gerry Sweeney
analystYeah. I believe I've reached everybody now. Thank you for allowing me to ask a question today. Clearly, I mean, I'll begin with what's happening with commissioning, and I simply hoped to get a clearer picture of what's driving that inconsistency. So this, I suppose, might be aimed somewhat at Joe, yet based on what I'm hearing, the plan has been divided into 6 zones. Zones 6 covers screening plus inventory, which probably isn't the critical piece. Still, it sounds like you've identified where things go wrong — and this is me putting it in my own words, not yours — maybe instability kicks in around zone 4, the point where the first of those two heat activation steps takes place, and back in zone 2 a chemical was added to keep things steady. So now you're in a position where, well, that additive could have changed how the product travels through, or the way it gets activated in zone 4, meaning certain equipment had to be tweaked so utilization could rise. That's probably an oversimplified account of what's going on, but I'm just asking whether I'm more or less headed in the right direction.
Bob Rasmus
executiveJerry, that isn't just a watered-down version of events — it sounds like you're practically attending our commissioning meetings, the ones we hold daily or even twice a day; yes, that's essentially correct. We've reached production at commercial scale, or maybe I should call it modest volumes. Our objective is to improve how efficiently those operations run. In practice, we're refining the process, and that refinement relates mainly to zone 3, since that's the point where the chemical additive is introduced, and it serves to bind things and assist with re-agglomerating the process in that regard. So what do I mean when I say refinement? I mean we're continuously examining ways to refine or optimize each part of the production process. Like Joe mentioned in his comments, and you obviously caught that, the biggest focus is on getting zone 3 as efficient as possible. Zone 3, as you were saying, is the place where the machinery takes the GAC additives along with the bituminous feedstock and then binds them together again, or re-agglomerates them. What we're changing is aimed at boosting consistency, efficiency, volume throughput, and production speed. We made a minor adjustment to the binder's formulation to get better consistency and efficiency out of it, and we're already seeing the payoff.
Gerry Sweeney
analystOn that topic, clearly you have some level of certainty or confidence that this will be resolved in the near term rather than further out. Could you provide any kind of example step functions that gave you that confidence? I mean, I believe you reworked the new product, and does that mean you're observing greater utilization and then something is getting jammed up? Or, to put it in simpler terms, I was hoping to gain a bit more insight into where this confidence is originating. Are you beginning to observe rising utilization, greater consistency at elevated utilization, that sort of thing?
Bob Rasmus
executiveSure. The primary objective, as I stated, is to boost the throughput along with the consistency of that throughput. Once again, we can and have generated small non-commercial scale volumes—or commercial scale volumes, pardon me. Our aim is to generate that on a consistent, uninterrupted basis. What we observe, and the difficulty we've encountered, is that we have not managed to produce on an uninterrupted basis. There have been either feed issues, or we experienced a controller breakdown; we had a belt issue. A portion of it is simply ordinary things that happen when it comes to commissioning. The rest is just effort to guarantee a continuous, uninterrupted quality process so we can declare that we are in full commercial production; we have produced commercially, but we simply don't feel at ease saying we're in full commercial production since we lack that uninterrupted manufacturing process taking place for us.
Gerry Sweeney
analystOn that continuous process, are you cutting down on a few of the problems surrounding it, and is that sort of checklist shrinking? Once more, I'm simply attempting to gain slightly more insight regarding the confidence here.
Bob Rasmus
executiveYeah. What I'd say is, the actual issue is — and I'll put it in different words, or I don't want to sound like a politician who responds to something else entirely, but I believe I'm addressing what I think you're actually asking, which is this: considering the holdups and difficulties so far, what makes me sure we will hit the updated timelines and ramp-up schedule? Would you agree that sums it up fairly?
Gerry Sweeney
analystSure.
Bob Rasmus
executiveYes. On that point, I think it makes sense to go over what we're aware of. The mechanical side of things is proven to work. We're capable of making Granular Activated Carbon at a small scale, and we've already done so. What remains is getting our process faster and more consistent so it hits the production profile targets we've set. Like I mentioned earlier, that falls under the fine-tuning effort. You're likely wondering again how this ties into timing. We're nearly there. That said, I'm aware you've heard that from me before. Like Joe said earlier, bringing a facility like this online doesn't follow a straight line, and we've gained experience from that in prior instances. Pinpointing exactly how much time will be needed to reach that point is genuinely difficult. Given that we previously fell short of timelines we had publicly set, I recognize we should err on the side of caution from here on. Consequently, the revised outlook we shared in today's remarks and in yesterday's 8K filing spans a broad range, and I want to emphasize that our hope is to arrive at those targets ahead of schedule. When you consider where we stand, saying we'll hit full commercial-scale production either near the end of Q2 or at the start of Q3 strikes me as the careful approach. Given the difficulties we've run into so far and the fact that we didn't make our prior target, giving a window we feel very sure we can hit or come in ahead of just makes sense.
Gerry Sweeney
analystGot it.
Bob Rasmus
executiveSorry to be so long-winded.
Gerry Sweeney
analystNo, no, definitely. There's one more thing I want to ask about, and on this one I'll definitely be clearer, since it's a lot simpler to pose. The PAC business, fantastic margins. My apologies. I never had the opportunity to look through the 10Q. Two items. First, I'm wondering whether the quarter included any take-or-pay advantage. And then second, if Stacia could, I'm not certain whether I picked it up, but did startup activity on the GAC side create a 5% drag on margins?
Stacia Hansen
executiveHi, Jerry. Yes, that's right. No take-or-pay effects show up in the Q1 results. On your second item, correct, we figured roughly a 5% gross margin gain once you remove the GAC line's startup costs in Q1, along with that one-time accounting adjustment in 2024.
Gerry Sweeney
analystIn one quarter, our gross margins would have come in above 40%?
Stacia Hansen
executiveThat's right.
Gerry Sweeney
analystUnderstood, understood. I'll rejoin the queue. I'm sure others are waiting their turn, so thanks very much.
George Gianarikas
analystHello, and good morning.
Bob Rasmus
executiveHello there, George.
George Gianarikas
analystI want to pose something in a comparable vein. Clearly, we're looking at the second postponement within just a handful of months, and out of curiosity, simply to break it down: how sure are you that going through the process over and over again, continuing that iteration, gets you to the revised schedule, rather than forcing you to commit extra money toward fixing this? My aim is just to confirm I've got a clear picture of precisely what's taking place here, and that it amounts to an engineering effort requiring further rounds of iteration, rather than a matter capable of altering the company's CapEx profile. Thanks.
Bob Rasmus
executiveYeah. Once more, if I restate or put it in different words, it's essentially this: is there some fatal defect? No, there is not. Definitely not. What it comes down to, once more, is why do we feel sure? What steps are we taking? What is happening such that we don't need to lay out a bunch of additional funds, push CapEx higher, and so forth? Would you call that an accurate summary?
George Gianarikas
analystYes.
Bob Rasmus
executiveTo repeat myself — I don't want to sound like I'm covering the same ground — but we know it's possible, we've done it, and right now we're making commercial small-scale Granular Activated Carbon. Doing so isn't a problem. During my prepared remarks I noted that we ran into certain difficulties that needed solving regarding how the equipment was designed, tied to Harris Group's original design. Every one of those has been resolved. From a mechanical perspective, we're aware that the machinery functions — all of it does — and that's now confirmed. Then there's process integration, clearly a different kind of commissioning, which basically means making sure the different zones and mechanical parts run together as a single, continuous, integrated process. I can tell you that's true. They do. We've managed to feed the Corbin Wetcake feedstock into the system successfully, and we've successfully carried that product through every stage, with production results to show for it. The bottom line: we know this system functions. We're able to make product and we have made it — though not yet with (and here I'm repeating myself once more) consistency, efficiency, or without interruption. What we're truly engaged in, in my view, in the team's view, and in Joe's view, along with Deke Williamson, our Chief Operating Officer, is fine-tuning output at the necessary rates and consistency so that operations become continuous. Once again, I regret going on at such length in my answer, but our confidence is high that this isn't a design problem. It's simply a matter of fine-tuning, or tweaking, the process.
George Gianarikas
analystThanks. Perhaps I could shift topics a bit here. During your opening comments, you brought up what Lee Zeldin said. What I'd like to know is whether you've gotten any kind of indication, possibly from the administration, that the 2029 deadline remains in place, or that in spite of all the talk regarding clean water, the deadlines they established could potentially be altered. Thanks.
Bob Rasmus
executiveYes. Last week I was in Washington, D.C., actually, sitting down with senior EPA officials. It happened to be the morning after Zeldin's announcement came out. As far as they're concerned, there's no delay ahead when it comes to rolling back the PFAS rules; in fact, their aim was to strengthen those rules further, give them more teeth, and also zero in on the wastewater side, not merely the drinking water side. Neither from what Zeldin said nor from my EPA meetings did I receive any sign that a postponement or a weakening of the regulations was anticipated.
George Gianarikas
analystThanks.
Tom Ware
analystAppreciate it. I just have a single brief follow-up regarding the GAC volumes commercialization delay. Thanks for giving us that update. I believe that's useful for investors. You brought up the postponed testing, but what kind of lead time might there be for a few of your biggest contracted customers when it comes to the PFAS removal? Would they require 30 to 40 days to try out the new output before they return and you turn production on? I'm just curious how those discussions are progressing and what sense you could give us of the review lead time.
Bob Rasmus
executiveYes. So on the PFAS removal side, or municipal water, we truly don't have any testing problems or leftover testing problems when it comes to that part of the marketplace, since our product has been certified by customers along with states and municipalities. It's simply a matter of gaining access to the production so we can implement as they start their PFAS remediation. That lead time is more tied to the RNG segment, which favors in-situ testing, as we've said before.
Tom Ware
analystThat's excellent; that's a genuinely excellent clarification. It's quite useful, since I realize you were keeping some of the volume back for the RNG side, but it's good to learn that the water removal is proceeding as planned. The next question is for Jay. Jay, I realize you've held the CFO position for just 5 weeks, and you brought up leveraging the cost basis a moment ago. Could you perhaps offer some detail on things you may wish to add or improve from possibly your prior best practices? It may be too soon to respond to this next part, but are you finding additional SG&A cost savings leverage potential? It's been pretty strong since last summer. Is there potentially more to come when it comes to leverage on the SG&A side? That's really all I'm asking.
Jay Voncannon
executiveAbsolutely, thanks. So, over the course of my first month, as I've been meeting folks, learning about the business and how things work, and getting brought up to speed regarding the delay we experienced — I'd say I genuinely think there's further opportunity when it comes to cost. I'm just beginning to really examine that part of things, and my belief is that an opportunity does exist. When you look at the scale of the company and where we currently stand, I certainly don't expect us to see cost go up as revenue grows. In fact, I think there are chances to actually take some cost out. We'll be tackling that during the coming quarter. Speaking from my own background, I'd add that there are likely additional chances in other areas—perhaps even more so when it comes to the overhead costs tied to the plants, and examining things from that angle. Honestly, nothing is off the table. No topic is forbidden or untouchable; we've been taking sensible steps and working to figure out what serves the company and its shareholders best.
Tom Ware
analystThat's excellent, since operating leverage has looked pretty strong over the past three quarters, and it's encouraging to see there's still room to run there. My final question goes back to Bob. On the topic of your promising asphalt production product, with R&D now in progress, would it be too much of a stretch to think that perhaps this year you could bring on a strategic partner and begin generating some commercial revenues from that by the close of next year?
Bob Rasmus
executiveHaving a partner doesn't strike me as a stretch. Honestly, in some sense, partners already exist among those involved in the testing we're doing right now, and we've got plans to kick that off later this year. So I don't see it as a stretch in the slightest. That said, I'd note the earliest point any revenue would show up is 2026 when it comes to that. Basically, what we're examining, asphalt emulsion, represents one more route to monetize or build shareholder value tied to our distinctive Corbin feedstock; that's the reason I also brought up synthetic graphite and rare earth minerals in my comments. We understand that rare earth minerals come out of the coal washing process once we start that, for producing the Arc Wetcake. As I said earlier, I was in DC last week. I also sat down with Department of Energy officials, and they were actually the ones who raised rare earth minerals along with possibly using our product for synthetic graphite; they were the ones who suggested potentially supplying funding so we could make that happen, because clearly, under the present administration, that remains a vital priority on a continuing basis, the rare earth minerals and synthetic graphite. Great. That's nice. Thanks for staying consistent about asphalt revenues not coming until next year. You said that before. That wraps up my questions. Thanks. Thank you.
Peter Gastreich
analystThanks so much. Hey, Bob, and greetings to the whole team. Nice work on the numbers, and I appreciate you walking us through things this morning. I also want to say thanks to Joe for that thorough technical walkthrough. I've just got a couple of things to ask. My first one leans more macro, more of an industry-level question. Based on what you went through with this initial GAC expansion, what does that suggest about where industry supply might be headed? Your technical group is strong and has plenty of experience, so it wouldn't be much of a leap to think the wider industry might hit comparable teething problems when it comes to ramping up with GAC, and because of that, perhaps the market ends up even tighter than people expect. Any views on that?
Bob Rasmus
executiveRight. Yes, of course. There are a few points to make. First, as I've said before, getting new GAC capacity up and running takes a minimum of 2 or 3 years for anyone. It's likely to take even longer, but once again, I prefer to assess it from the most pessimistic angle in terms of what it means for our business. That's the first thing. Second, I value the remarks regarding their technical abilities and our operations team. I agree that they're top-tier, and in some ways, there's comfort in shared struggle. I'm aware that a competitor of ours added some GAC capacity some time ago, and they ran into major hold-ups compared to their initial target date for starting it up. I have no desire to be in that position, I'm not pleased about it, and it's deeply aggravating. That said, I believe both we and they are among the best, and we've encountered problems and keep addressing those problems on that front. I think, first, this gives me even more confidence in the long-term clarity and potential when it comes to the investment's economics. The second thing is the supply-demand gap that served as the initial investment thesis and justification for entering the GAC business. It hasn't just persisted — it keeps tilting further in our favor, meaning demand keeps rising, demand for what we make, customer questions about what we make, since as we're all aware, supply hasn't grown. Over the long haul, again, both in the near term and the long term, the original investment thesis and justification for entering the GAC business hasn't merely held up — it's still incredibly, incredibly robust.
Peter Gastreich
analystAll right, thanks a lot. So, for my next question—obviously, I get that the priority is reaching commercial output first. When it comes to phase one at GAC, do you still see that potential for production that's 10 to 33% higher?
Bob Rasmus
executiveSure. Like you mentioned, we need to reach complete commercial output at our maximum run rate. As we've stated before, when we hit that maximum run rate, we'll be in a position to identify the land gap regarding extra production capability.
Peter Gastreich
analystAlright, thank you. That’s my last question. I’ll rejoin the queue afterward. Regarding phase one, how much of the output is under contract at this time, in percentage terms?
Bob Rasmus
executiveFor the first phase, with that $25 million assumption right now, we've got roughly 60% under contract. Once more, we have the option to lock in the whole thing immediately and be completely contracted. We're deliberately keeping it available for the RNG market, since that market gives us a better price point and a bigger margin. Also, the way production ramps up lines up with what testing demands in the RNG segment.
Peter Gastreich
analystOkay. Great. Thanks, Bob. I'll get back in the queue.
Bob Rasmus
executiveAppreciate that, Irene. Looking at the numbers, we turned in a solid result for the first quarter, which extends the momentum from what we accomplished in 2024. Like I said before, PAC volumes in April were strong as well. The broader economic picture underpinning our operations is still favorable. The PAC turnaround has been a huge accomplishment, but there remains substantial opportunity to push things further, which boosts the worth of this core asset as we expand into the Granular Activated Carbon sector. As I noted, the initial rationale behind our move into GAC hasn't just held up — it's stronger than it has ever been. Let me be direct: the hold-up in getting Red River to commercial-scale output is aggravating. That said, it doesn't alter reality. Supply in this market falls well short of demand. The drivers of demand over the long haul are solidly established, and our conviction in GAC as a long-term growth engine for Arq stays very strong. With how robust the market is and the production we anticipate in the near term, I'll say this both as CEO and as someone with a significant ownership stake: my confidence and enthusiasm about what Arq can achieve right now matches anything I've felt since I came on board. I appreciate everyone spending time with us today.
Operator
operatorEveryone, that brings today's call to a close. We appreciate your participation. At this point, please hang up your phones.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Arq, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Arq, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Arq, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.