Good morning, everyone. At this point I'll hand things over to Elizabeth Hamaue, who serves as Director of Corporate and Financial Communications at Aya Gold & Silver. You have the floor.

Elizabeth Hamaue

executive
#2

Thanks, operator, and hello to all of you joining us for Aya's first quarter 2026 earnings conference call. Accompanying me today are Benoit La Salle, our President and CEO; Ugo Landry-Tolszczuk, Chief Financial Officer; Elias Elias, Chief Legal and Sustainability Officer; Raphaël Beaudoin, Vice President of Operations; and David Lalonde, Vice President of Exploration. During this call we'll be walking through a presentation, which you can access through the webcast and which has also been posted to our website. Since forward-looking statements will be made on this call, we ask that you review the cautionary notes contained in the presentation, the news release, and the MD&A, along with the risk factors set out in our Annual Information Form. The technical information in this presentation has been reviewed and approved by Raphaël Beaudoin, Aya's Vice President of Operations, and David Lalonde, Aya's Vice President of Exploration, and both are Aya's qualified persons as defined under National Instrument 43 to 101 Standards of Disclosure for Mineral Projects. I'd also like to remind everyone that a Q&A session will follow our presentation. With that, I'll now hand the call over to Benoit La Salle.

Benoit La Salle

executive
#3

Thanks, Elizabeth. Morning, everyone. Appreciate you joining this Q1 2026 conference call. Let me give a quick summary of the quarter before we move into the presentation. I think the way we should frame it is that Q1 was an exceptional quarter for Aya. It stands out as exceptional given that Q1 is consistently the toughest quarter for the company, since we sit at 2,200 m above sea level up in the mountains, with plenty of snow, rain, and wind. This year, even though we lost 5 days of operation because of weather-related conditions, we still turned in an outstanding quarter. Aya posted record revenue, record cash flow, expanding margin, a rising silver price, and lower cash costs. We had a very strong Q1. If you compare Q4 of last year with Q1 of this year, on a per-day basis, production per day looks very similar, approaching 15,000 oz. Production came in a little lower in Q1 because we lost the equivalent of roughly 5 days of production. Looking at the highlights, revenue hit a record $117 million. Cash flow hit a record $70 million. Net income after tax reached a record $49 million.

Benoit La Salle

executive
#4

We finished the quarter with unrestricted cash of $172 million. Output for the period came in at nearly 1.5 million oz, driven by record mining rates — genuinely a strong quarter. Along with those record mining rates, our stockpiles have also grown. If you follow along in the presentation we use, which includes some graphics, and turn to page 4 past the forward-looking statement, you'll see precisely what I just described. Revenue hit a record $117 million in Q1 2026, versus $34 million a year earlier. Net income was $49 million, compared with $7 million last year, with EPS of $33 fully diluted — 34, 33, or 33 cents, sorry — fully diluted, and 34 on a non-diluted basis. Q1 operating cash flow this year was $70 million, against $8 million last year. Very strong quarter. You can see it on the right-hand side. The production profile we're showing has risen from Q1 2025, when we produced a million ounces of silver, to Q1 of 2026, where we're at 1,490,000 oz. Naturally, that's a bit below Q4 of last year, since Q4 of last year saw no weather-related event, while Q1 of this year had roughly 5 days of weather-related events.

Benoit La Salle

executive
#5

Now if we go to page 5 of the presentation, there's something quite interesting on the left side — the quarterly mining tonnage. We've consistently said mining must keep pace with the plant. The plant's expansion — its production profile — has been running 30% to 40% above nameplate capacity, but the mine also has to keep up with the plant, and in fact the mine is now surpassing the plant. As you can see on the left-hand side, last year we were operating at 2,200 t/d. In Q4, we hit 4,200 t/d. Then in Q1, this quarter, we were running at 4,600 t/d. Truly outstanding performance from the mine, from the open pit, and from the underground mine. Grade is also stable and getting better — we're happy with how mining, grade, and throughput have turned out. Then on the right-hand side, you look at the plant. In Q4, the plant ran at 3,800 t/d. In Q1, the plant is running equally well and at times even higher, but as noted, because of the lost days — and some of you have been following the weather in Morocco — it was extremely unusual. They had double the historical average rainfall and snowfall across all of Morocco.

Benoit La Salle

executive
#6

I was over there 2 weeks back, and during the week prior to that, Marrakech got snow, which is really unusual. In a sense, it made actual production somewhat challenging, but at the site we currently hold over 15 months of water inventory, and the rivers continue to flow. That production difficulty turned out to be excellent for water management, for us, and for the entire country. At this point every water reservoir has been filled up. Certain reservoirs that hadn't held water in many, many, many years are now at capacity. Globally, the water situation for the country was extremely favorable. Turning to slide number 6, a brief note on Boumadine. At Boumadine, we are recovering the pyrite. The operation is going very well indeed. We generated 127,000 oz of silver along with 1,737 oz of gold, somewhat below our target. Once again, this was weather-related, since naturally the severe weather at Zgounder was likewise tied to conditions at Boumadine. The other issue at Boumadine stems from the fact that, since we export the pyrite tonnage, Morocco's ports were closed for 1 month owing to weather and flooding.

Benoit La Salle

executive
#7

Absolutely, and that explains it — when you look at page 6, the silver equivalent sold, you'll see 227,000 oz was produced while only 50,000 oz was sold. One reason: on the export side, we produce it, we ship it to port, and then it sat there, since we couldn't get it out simply because of extremely, extremely challenging weather. That's all behind us now. The next rain is probably coming in November or December. It's all behind us. The reality was that even at Boumadine, we were somewhat impacted, particularly when it came to shipping the concentrate to Asia. The Boumadine project is really an add-on to Zgounder. CapEx is minimal, cash cost is very, very low. It generates positive cash flow. Grade reconciliation is actually better. The gold grade is somewhat better, and the silver grade beats what we had in our model. Overall, it's a highly profitable project, and at the same time it's an ESG project, because we're cleaning up all the historical waste that was left there over many, many years. That's still ongoing, and it's accelerating now.

Benoit La Salle

executive
#8

During Q2, Q3, and Q4, we're speeding up the reclamation of the Boumadine pyrite. If you turn to page 7 of the presentation, this again refers back to last quarter. This slide matters most. The chart on the left shows the margin. Take a look at those margins. Between Q1 2025 and Q1 2026, we had a $12 margin in Q1 of last year and it held at $12 in Q2 of last year. After that, margins began climbing to $20 in Q3, and then you saw roughly $40 in Q4, and at present margins stand at about $63 in Q1 of 2026. Naturally, you're tracking the silver price, and we're seeing that this is a very, very strong silver price right now, and our costs are stable. The war and the rise in fuel price don't affect us much. Cyanide rose slightly. We'll see that in Q2, but it's marginal. The key reason is that our electricity comes from the grid, and it's solar and wind. Most companies are affected because they must generate their own power; at Zgounder, and it will be the same at Boumadine, the power is solar and wind.

Benoit La Salle

executive
#9

We shouldn't expect costs to rise by more than perhaps $1 an ounce, if they rise at all by that amount, and the real reason comes down to where the energy is sourced. On the right-hand side you can see revenue growth, and as I mentioned, Q1 came in at $117 million US in revenue with net income after tax of $49 million. That's a very strong revenue performance. Naturally, it reflects the silver price, given what we know about the production profile, but the silver price was exceptionally good in Q1. Our top selling unit, or selling price, in Q1 — at one point we managed to sell at close to $120/oz. It shows. Right now the average is 82, and as we speak the silver price sits above the Q1 2026 average. As for net income, net income after tax was $49 million with an EPS of $33. Very — and moving to page 8 — a very strong balance sheet. We ended the quarter with $172 million US in the bank, and in addition we hold restricted cash tied to the EBRD loan of $16 million US.

Benoit La Salle

executive
#10

Looking at this, the cash position is extremely strong, and so is the balance sheet. There's just a single debt facility with EBRD, and that's now under $100 million — we could repay it, but it's a very favorable loan from EBRD and not particularly costly. There's really no reason to accelerate paying that debt down. Cash from operations came in at $70 million, while our capex program sits at $4 million. Exploration and evaluation — mostly exploration — is $14 million. Exploration had a really good quarter, and I'll get into the drilling. Overall, when you factor in an $18 cash cost and with all the capital expenditure now behind us, this was a highly profitable quarter. Turning to page 9, our guidance: this guidance was laid out for you at the start of 2026, and we're keeping it unchanged. We are running slightly under where we'd hoped to land on production guidance, but we understood Q1 always comes in somewhat softer than the remaining quarters due to seasonality — we were aware of that, and it factored into our planning.

Benoit La Salle

executive
#11

We feel quite confident about our guidance range of 6.2 to 6.8 million oz, with Zgounder output coming in between 5.2 and 5.8, and Boumadine at 1 million oz of silver equivalent. That guidance sits well with us. Now, regarding the Zgounder cash cost of $21.50 — I realize we came in at $18 this quarter — but that comes down to the strip ratio, and as we've said, over time this figure will run somewhat above where it is now. We're at ease stating that the $21.50 guidance level is the right place for it to be. As for the Boumadine cash cost of $10.10: in Q4 it stood at 6, and in Q1 of this year it's closer to 11. We're right in that neighborhood. We'll also be scaling up volume, and as volume rises, naturally the cash cost per ounce will decline somewhat. Turning to sustaining and growth capital: sustaining accounts for roughly half, at 18, while growth capital is 18, giving 36 in total. The bulk of that growth capital goes toward pushing the ramp all the way down to the granite, which lets us access those deeper zones where we find high-grade silver.

Benoit La Salle

executive
#12

Regarding exploration spending, the budget stands at $60 million. As a company, we intend to drill approximately 240,000 m during this year. That work is continuous. At any given time, we keep somewhere between 14 and 18 drills operating. David oversees a group of nearly 400 people in exploration, drillers included. It is a sizable program, yet that program is necessary so we can convert the resource at Boumadine from inferred into measured and indicated for next year's feasibility study. Moving to slide number 10. What are our targets this year? Which items come first? Boumadine, of course, ranks as the top priority. We feel very pleased and are in an exceptionally strong position, since Boumadine can be advanced without any outside debt and without equity financing. The funds are on hand to move Boumadine forward. We are accelerating the feasibility study, which we aim to have finished for next year, 2027, along with the updated PEA, due to be completed by the end of June or the start of July. On every front we are ramping up — as I often put it, every chapter of the study: make it water, PSF, energy, flow sheet, logistics. Work is underway on each chapter, and once a chapter is finished, it gets implemented.

Benoit La Salle

executive
#13

The feasibility study is still underway. For the open pit, we've selected the contractors. For the flow sheet, we've selected the contractors. We'll be moving into detailed engineering soon. We're collaborating with our partners on logistics. All of this is progressing toward finishing the feasibility study next year and starting construction. On the drilling side at Boumadine, in Q1 of 2020, we drilled 42,000 m. That reflected the ramp-up, plus it included the one month of Ramadan, during which we sometimes don't drill as much, and we also take a week off at the end of Ramadan. In Q1, we drilled 42,000 m. We're ramping up there because the target is 180,000 m for the main structure plus an additional 20,000 m on the regional play. That work is underway, and we will deliver on it. At Zgounder, the plan is simply to be more efficient, keep your costs controlled, make sure we maximize our revenue, ensure the mining is very precise, and that there's no dilution. The key thing at $80 or $90 silver is let's not leave an ounce behind and sterilize those ounces.

Benoit La Salle

executive
#14

We remove it. When it falls between 50 and 80 g/t, we stockpile it. Otherwise, we don't — we expense it. It's included in the cash cost, but we stockpile it. If it's between 80 and the deposit grade, we put it through. We have a stockpile, and then we run it through the plant. Maximizing what we mine — the ounces we're mining — is extremely important to us, and that's why we're operating well above 4,000 t/d while keeping costs under control. We've also been working on the tailings facility, because originally the tailings was planned for 2,800 t/d. We're now running close to 4,000 t/d. We've decided to carry out the first phase of the tailings construction to boost the tailings capacity, and that will be finished this summer. We will be completely done over the summer. When you look on page 11 of where we are, we have Zgounder, which will be producing life of mine 6 million oz a year, life of mine cash cost at $16, ASIC around $19, life of mine extremely profitable, and that is only from one structure. In the coming weeks you will see some more exploration results coming out of Zgounder, because, of course, at Zgounder, we would like to increase the life of mine from 11 years hopefully to 15 years and, if possible, even increase the throughput.

Benoit La Salle

executive
#15

Regarding our development asset, Boumadine — the PEA is currently under review. The resource update is going to be released alongside that PEA. At the close of 2024, we had in view 450 million oz of silver equivalent. That figure is going to be revised, since we've been drilling the structure for more than 1 year, so it will be refreshed and incorporated into the new PEA. Over on the right-hand side, in my view, this is the most important strategic picture of Aya: right now we're a 6 million oz producer at $19 all-in life of mine at Zgounder. By 2029 we will add 37 million oz of silver production equivalent at an all-in cost of $14, which makes us a 43 million oz producer — silver equivalent, naturally. The average ASIC, when you take 20 or 19 for Zgounder and 14 for Boumadine, comes out at mid-teens per an ASIC. Depending on whichever silver price you care to assume, you can run the math yourself. Beyond that, Aya is a major exploration play. We hold two districts: the Boumadine district and the Zgounder district. Not only are there two projects, there are two mines — the Zgounder mine and the Boumadine in-development mine — plus the Boumadine regional play.

Benoit La Salle

executive
#16

This is a really big play for us. We've got 800 sq km there. On the regional play, we're going to be drilling 20,000 m. The 180 on the main zone, of course, is infill. That said, we're finding new zones — you saw in the latest press release that we'd identified new zones. On the main zone, of course, we'll be pushing the drilling up to 180,000 m. On the regional exploration side, as we keep telling the team, the moment you've got another structure you really want to drill out, just come back to the committee and to the management committee, and we'll give you more budget. As an exploration play, Boumadine is very unique. It's got big systems. The main zone is over 5.4 km. You also have Imhirine, which is a structure 8 km long. We have a very, very, very strong zone. Tizi is a parallel zone, and it's 5.4 km long as well. Boumadine is a major regional play. Zgounder, well, Zgounder is — we've done a lot of work there. We've done a lot of geological work. We've used AI. We have many targets. There are new theories and a new geological concept behind Zgounder that we're going to be testing this year.

Benoit La Salle

executive
#17

This is also a really compelling geological story. At Aya, you get all the geological upside you'd expect from a major, major exploration company drilling 230, 240,000 oz oz, 240,000 m of of exploration drilling coming in 2026. On top of that, you've got production coming from Zgounder, plus the development at Boumadine. So again, to wrap up and move into the Q&A period, a very strong quarter in our weakest quarter, as as planned, as planned. We're pleased with the the production. We're confirming our guidance, and we look forward to a stronger Q2 and a much stronger Q4 and Q5 to close the year again. Given the the silver price, it it should be an extremely profitable year. Thank you, and I'll turn it back to the operator for the Q&A period.

Operator

operator
#18

Thanks. To ask a question, hit *11. If we've already answered it and you want out of the queue, just hit *11 once more. Our first question is from Larry Liu at CIBC. Your line is open.

Larry Liu

analyst
#19

Hi Benoit and team, thanks for taking my question. I guess I'll start by asking about the severe weather conditions. Benoit, could you tell us what precautionary measures the team has taken at this point? I know you mentioned this is a very rare event, but were any precautionary measures taken to prevent any further impact to your current operations? I guess the second part of that question is, your stockpile did increase by 44%, or 15 months' worth of production. Is there an optimal kind of size of stockpile you're looking for, or should we start to see it gradually decline as the milling throughput comes back up again?

Benoit La Salle

executive
#20

Appreciate the question. I'll hand things to Ralph, who spent that entire stretch on site and can walk you through the steps we've taken to reduce exposure to weather-driven disruptions, along with how that affects our production profile — which, by the way, applies only to Q1, since beyond that point the remainder of the year is all sunshine.

Raphaël Beaudoin

executive
#21

We're up in the mountains, and mountain weather being what it is, once rain starts it really comes down hard. What that basically does is make the ore sticky and cut the throughput of the crushing circuit. To make up ground — and this is something we've been focused on for some time, raising crushing throughput, since that's the real bottleneck in the plant — we averaged 3,633 t/d in Q1, and once the sun returned in April we were right back on track at 4,000 in April. Essentially, the worst is now behind us for the remainder of the year. To respond to your question, as a mitigation we awarded a small contract to a contractor — a crushing contractor — that is now up and running, partly as a contingency against weather and partly to help debottleneck the plant on the crushing side a little. That contractor will remain on site for as long as we need it, and we're also looking at raising our own crushing capacity at the Zgounder plant, which is currently under study and we should be in a position to decide on it soon. The bottom line is that we've had a contractor assisting us for perhaps slightly under a month now, able to offset somewhat lower crushing capacity so the plant stays saturated.

Benoit La Salle

executive
#22

As for the stockpiles? Oh.

Raphaël Beaudoin

executive
#23

Yeah, sorry about that. On the stockpile, we're sitting at roughly 300,000 t at the moment. That's approximately 3 months' worth of production. It's a buffer I'm personally comfortable with. Over the last year we've been pushing hard to get the open pit to steady state. Right now we're producing comfortably above 3,000 t/d from the open pit, with peaks well beyond that. That gives us time to do the pushback if we choose to later this year. It also gives us time to shut down the upper levels in the underground that will be mined in the open pit. It's a flexibility we've always believed in, and it has helped us out in many ways. To answer your question, 300,000 t is probably where we want to be. It gives us the flexibility we need for future pushback and the flexibility to maximize, again, the ore recovery by the open pit. Now that we've reached this capacity and this flexibility, we'll look to keep optimizing the underground development, especially on the sublevels — we can focus more of our efforts now on the lower levels and keep the stockpile around 300,000. I wouldn't be surprised to see it come down a bit through the year, which is fine, that's what it's there for.

Larry Liu

analyst
#24

That's great. Works for me. Appreciate it, Ralph.

Raphaël Beaudoin

executive
#25

We expect some pushback in the open pit as we get closer to the end of the year.

Larry Liu

analyst
#26

All right, that’s great. Thank you, Ralph. I’d like to move away from Zgounder for a moment and return to Boumadine. During this quarter, some pyrite concentrate was sold commercially. The costs came in at $11.86 per ounce of silver equivalent. How should we think about that? I understand mining is excluded, but how does it stack up against your PEA, for instance, and would it be reasonable to view it as a useful indication of the costs we should expect in the upcoming feasibility study?

Raphaël Beaudoin

executive
#27

So for the pyrite reclaim we're doing right now, basically we excavate a stockpile of pyrite, run it through a crusher, and haul it out by truck. Our costs are really low. Those costs will stay in place for the remainder of the operation, but it's hard to draw a parallel with our future Boumadine project. There's no comparison. This is a small project. It's going to be reclaimed for the next 2 years. It gives good cash flow. It's a good exercise to start building a small operating team at Boumadine and to have more presence on our Boumadine site as we go from PEA to feasibility to construction, but one is not comparable with another.

Larry Liu

analyst
#28

Understood. That works well. All right, I believe those are all the questions I have for today. I appreciate it, Raphaël, and thank you as well, Benoit and the team, for answering my questions. Thank you.

Benoit La Salle

executive
#29

I appreciate it.

Operator

operator
#30

Thanks. We now have a question from Justin Chan at SCP Resource Finance. Your line is open.

Justin Chan

analyst
#31

Hey everyone, nice work on a solid quarter, and I appreciate the update. My first question is about the mine plan for the remainder of the year. Relative to Q1, how should we be thinking about stripping at the open pit? Then I noticed the underground really drove tonnage quite aggressively. Should we expect that to keep going, or were you perhaps hinting that you're moving more toward development and into the deeper levels — should we anticipate mined tonnage easing somewhat from that strong Q1 pace underground?

Raphaël Beaudoin

executive
#32

Hi, Justin. That's a fair question, actually. As all of you are aware, we've been ramping up tonnage at both the underground and the open pit. We genuinely wanted to restore the stockpile to its rightful place and demonstrate to everyone that we can achieve solid throughput at Zgounder — across the open pit, the underground, and the plant. I believe those conversations are now behind us. Underground, we're running at full steam. The open pit has proven it can deliver. At this point the open pit is wide open. We have space to operate. First, on your strip ratio: for the long term, we expect it to match what we published in our latest 43 to 101. That strip ratio of 9 is temporary. Some months we'll see 8 or 9, as we do now, and other months we'll see 20, as happened previously. On the whole, it falls between 13 and 16, and that's our expectation. That's what we expect over the longer term. Can you hear me, Justin?

Justin Chan

analyst
#33

I'm able to hear you clearly. Thank you, Ralph.

Raphaël Beaudoin

executive
#34

All right, on the underground side, definitely. We've been running above 1,500 t/d from underground, and a few of those levels are ones we'd like to close because our goal is to boost maximum ore recovery through the open pit. To address what you asked, yes, focus will shift in Q2 and for the remainder of the year toward speeding up the ramp down and moving some of that production capacity into stope development and sublevel development. An underground rate of roughly 1,000 t/d is a level we're comfortable with, since the open pit is well established at this point. Going forward, you should expect the underground rate to come down somewhat. Somewhere between 1,000 and 1,200 to 1,300 t/d is probably the sweet spot, since we really need to concentrate on those sublevels, where we also know the grade going down is pretty good.

Justin Chan

analyst
#35

Understood. Thanks, Ralph. That's really helpful context. Regarding the plant, do you expect to retain the mobile crushers even once conditions dry out, and if so, what throughput potential would you have?

Raphaël Beaudoin

executive
#36

Once more, the feasibility study we released showed figures above 3,600 for this year and 38.50 for next year. In-house, we're aiming to do better than those numbers. At present, our strongest days come in at roughly 4,300 t/d. Those represent our best punctual daily results. Justin, I'd say somewhere near 3,800 is likely the level where we'll sit comfortably in the near term, and as you're aware, we're really driving this plant hard. Nameplate capacity stands at 2,700, and we're now close to 4,000. Speculating beyond that is tough for me, since we have to address one bottleneck after another. My sense is there's still a bit of juice remaining in the plant, though achieving it requires additional crushing capacity. So 3,800 is likely where we'd land, with certain strong months exceeding it and weaker months hovering near it. To address your question: 3,800, counting the mobile crusher that we'll retain for as long as necessary.

Justin Chan

analyst
#37

Thanks. I'm not certain who is the right person to direct this to, but regarding Boumadine, the ounces that did not get sold during this quarter — do you anticipate selling those in Q2, or should they instead be spread out over the remainder of the year? And also, considering that the world is fairly short on sulfur, do you think there will be any meaningful rise in payability for Q2 and Q3, or is it too soon to tell?

Ugo Landry-Tolszczuk

executive
#38

Hi Justin, this is Ugo. Regarding Boumadine sales, it isn't a case of customers lacking interest. In fact, we receive calls weekly asking, "Can we get more material?" — particularly given the current situation in the sulfur market. We're using truck logistics, and we're gaining experience with it. Shipments will be distributed across the year, and we're making some adjustments in order to send bigger loads. On that point, I believe it will extend through the year, but the 1 million oz of silver equivalent remains what we're on track to achieve. As for payability, there will be no change, since this is old material that has sat there for a long time, and its sulfur quantity is considerably lower than fresh rock from Boumadine. The volumes are small relative to the two to 240,000 t total, so we've settled on a price and a contract with our traders, and that won't change for the duration of that stockpile.

Benoit La Salle

executive
#39

Justin, if I may jump in regarding payability, the larger project is seeing a shift in that area. You see, it contains 45% sulfur. As Ugo mentioned, the tailings are somewhat depleted, though they hold quite strong gold and silver content. The pyrite is rather tired as well. Nothing is shifting on the smaller project, but when it comes to the larger one, an important change is taking place.

Justin Chan

analyst
#40

Sure thing. That's genuinely useful context. Thank you, Ugo, and thank you, Benoit. Thanks to everyone. I'll step off the queue now.

Benoit La Salle

executive
#41

Appreciate it, Justin.

Operator

operator
#42

Thanks. We now have a question from Mike Kozak at Cantor Fitzgerald. Your line is open.

Mike Kozak

analyst
#43

Morning, Benoit and everyone. I have a few questions. First, Q1 marked the fourth consecutive quarter in which per-ton unit costs at Zgounder moved lower. Part of that clearly reflects a greater share of open pit material, though they came in at roughly $80 a ton in Q1. A few quarters back they were above $100 a ton. Should we treat that $80 a ton as a solid figure for the future? Do you expect it to keep declining, or where do you think it will level off?

Raphaël Beaudoin

executive
#44

I can say a little about the ounce unit costs. Our costs have been declining, and that pleases us. Throughput has been rising, and production in the open pit and in the underground has been steadying. Much of that per-unit cost improvement stems from the underground cost per ton along with the open pit cost per ton, and we've also seen gains in the plant as we handle more throughput and bring our cyanide consumption into a stable range. We've been succeeding on every front, including site services and surface and utilities, as we move toward becoming a more mature operation. It's good to see that. That said, there is considerable cost variability at Zgounder driven by the open pit strip ratio, as you can imagine. Depending on the sequencing, we have months. This quarter, the strip ratio was about 9, which is quite exceptional. The open pit's overall strip ratio improves over the life of mine, and again, we've made that quite clear in our latest 43-101. It will rise somewhat this year, particularly toward the end of the year, when we'll have a slightly higher strip ratio in the open pit, and I expect our strip ratio for the year to land between 13 and 16.

Raphaël Beaudoin

executive
#45

We'll keep getting better on overall cost, but by nature the open pit is going to carry a higher cost per ton, since we'll move closer to a 13 to 16 strip ratio rather than 9. And don't forget that underground, we have to develop new stopes. Right now we've got lower levels near 1925 that are running, and those costs are good, but over the long term, the underground cost at the Zgounder mine will gradually edge upward the deeper we go, which is normal as well and is reflected in our projections.

Mike Kozak

analyst
#46

Thanks. That's helpful context. And second, given how much money you're bringing in now, what do you figure your average income tax expense rate will come out to for this year?

Raphaël Beaudoin

executive
#47

Ugo, you have the floor.

Ugo Landry-Tolszczuk

executive
#48

On income tax, the rate — I believe it was 5 years ago, when we were still at 20%, Morocco's government issued a new law stating it would rise to 35% in 2026, 35%. Then COVID came and they introduced a 5% COVID tax, which became a 5% solidarity tax, meant to be temporary, right? That tax has now lasted 3 years, and we're into a fourth year of it being around. Out of 187 companies in Morocco paying at that rate, we're one of them. Anyone else earning under 100 million dirhams in profit pays 20%. We're aware the World Cup is coming. Like every government, I think this one needs money, but increasingly companies such as ours, and among the 127, are saying, "Hey, a 40% income tax just isn't competitive." My expectation is that from '27 onward, at minimum that 5% goes away, and then we'll see what happens with the additional rate. Today it's our biggest cost.

Mike Kozak

analyst
#49

Understood. Then just one more, if that's alright. Cash is clearly accumulating quickly. Are there any options you could use to speed up paying back what's left of the EBRD debt?

Ugo Landry-Tolszczuk

executive
#50

Right. If we wanted to pay off all of the debt, prepayment penalties would apply. There is a slide-out available to us, though — we're able to do cash sweeps from the country back to head office, and that cash sweep is 30%. Doing it that way carries no prepayment penalty. We have to do it at specific timings, when we repay capital in January and July. If things keep going the way they are, I believe we'll be using that option to sweep cash out of the country and then force a cash sweep and prepay some of that. That's the expectation. Cash has to keep rising, but if it does, I think that's an option we will use.

Mike Kozak

analyst
#51

Alright, that's quite useful. I'm all set on my end. I'll rejoin the queue later. Thank you.

Operator

operator
#52

Thanks. We move to our following question, which is from Eric Winmill at Scotiabank. Your line is open.

Eric Winmill

analyst
#53

Oh, hello everybody. Appreciate you fitting my question in today. I just wanted to ask something brief regarding the tailings — I understand capacity is being raised there. Could you remind us how much time that buys you, and what kind of runway you'll have after the expansion wraps up?

Raphaël Beaudoin

executive
#54

Of course. The initial phase was clearly brief so that capital expenditure stayed low during the first build. Our largest raise is Phase 2. Within it we hold roughly 2.5 years of storage. Clearly, that figure declined since throughput rose considerably. We have more than 2.5 years, and following that, an additional phase is planned.

Eric Winmill

analyst
#55

Thanks a lot. On Boumadine, you mentioned a new PEA is coming in roughly the June–July window. Do you have any thoughts on CapEx for that? Should we be expecting significant changes compared with the previous study you released?

Benoit La Salle

executive
#56

Ralph is here with us today, and he leads the group that's supervising the Boumadine study, so I suppose this is a good moment to bring him in.

Raphaël Beaudoin

executive
#57

Within the PEA, the CapEx included a solid contingency appropriate for a study at that stage. As we move forward with this updated PEA and the feasibility study as well, some additional costs will arise while we define and detail the project, though we'll likewise bring the contingency down as the project becomes well defined. At present, we don't anticipate capital exceeding the PEA or landing in that same range.

Eric Winmill

analyst
#58

Great, that's genuinely useful — thanks. Perhaps one last thing on Zgounder too. You're aiming to boost crushing capacity at that site. Are there any updates regarding orders for long-lead-time items or critical-path items that we ought to be watching, or perhaps news on how things stand, please?

Raphaël Beaudoin

executive
#59

On the positive side, we already possess the process unit — the cone crusher is in place. That's a relief. When we make the decision to proceed with that expansion, we'd likely be looking at a 9-month build-out. It's the sort of thing that can probably be completed inside a year. That timing isn't really critical, since during the interim we have the crushing contractor, which bridges that gap.

Eric Winmill

analyst
#60

Great, that’s really useful. I appreciate the extra detail. I’ll get back in the queue. Cheers.

Operator

operator
#61

That brings our question-and-answer session to an end, everyone. At this point, I'd like to hand the call back to Benoit so he can offer some closing remarks.

Benoit La Salle

executive
#62

Thank you, operator, and thanks for all the questions. So, as I said, what lies ahead for us is that we'll have some exploration results coming through. Within the next few weeks, a Boumadine exploration press release will be out. Within the next week or two, we'll have the same thing at Zgounder. We're also examining consolidation of ground within the country, since Morocco is very interesting. The geology there is fantastic, and we hold a first-mover advantage, which we are taking advantage of. You should expect further news from us. Over the coming 2 months, we'll be on the road meeting some of our shareholders in the United States and in Europe. As you're fully aware, we began trading a week ago or 10 days ago on NASDAQ. It's going extremely well. A lot of positive feedback is coming our way. We're really pleased with the NASDAQ listing. Globally, and again, I'll close on this, Aya is a company that is in Morocco, focusing in Morocco, where the geology is exceptional. You can see it on our discovery cost. There were some slides that a competitor put together recently on discovery cost, and we have the lowest discovery cost in our industry because of the geology.

Benoit La Salle

executive
#63

This jurisdiction might be among the finest anywhere on earth when you consider permitting, the workforce, and the people. We're operating in a nation that doesn't merely put up with mining — mining forms part of its strategic plan, and they're determined to see it succeed strongly. At Aya we now have a team that has constructed a great many mines and has demonstrated geological expertise. You've got a very robust growth profile, with Boumadine being developed and beginning construction within the coming few quarters, heading toward 37 million oz of yearly silver equivalent production at Boumadine, and that comes from just one structure. The company's growth profile is beautiful. You have core assets across two districts: the Boumadine district and the Zgounder district. This is a company set to spend $60 million US on exploration, drilling beyond 200,000 m and beyond 230,000 m this year. Major geological upside, strong cash flow, great core assets, in one of the best jurisdictions in the world. Look, we'll be returning to cheer for Morocco in the World Cup of soccer — or football, as they call it — since their team is amazing, and that's going to dominate all the news flow coming out of Morocco over the next couple of months.

Benoit La Salle

executive
#64

Once more, many thanks for being part of this conference call. We’re eager to have you with us on the Q2 call, and for a lot of you, we’ll be crossing paths at all the conferences that kick off next week in Vegas, then carry on to London the following week, and keep going right through to the Rick Rule conference in July in Boca Raton. After that, we ought to take a few weeks off over the summer. Thank you so much. We’ll be seeing you over the coming weeks, and if not, we’ll be with you on the Q2 conference call in August. Thank you.

Operator

operator
#65

Appreciate everyone joining us. The line is now open for you to hang up. All of you, enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aya Gold & Silver Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Aya Gold & Silver Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aya Gold & Silver Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.