Aya Gold & Silver Inc. (AYA) Earnings Call Transcript & Summary
August 14, 2026
Earnings Call Speaker Segments
Elisabeth Hamaoui
executiveThanks, operator, and welcome everyone to the Second Quarter 2026 Earnings Conference Call for Aya. With me on the line today are Benoit La Salle, our President and CEO; Ugo Landry-Tolszczuk, Chief Financial Officer; Elias Elias, Chief Legal and Sustainability Officer; Raphael Beaudoin, Vice President of Operations; and David Lalonde, Vice President of Exploration. There's a presentation you can follow through the webcast and on our website. Since forward-looking statements will be made on this call, please see the cautionary notes contained in the presentation, the news release and the MD&A, along with the risk factors in our annual information form. The technical information in the presentation has been reviewed and approved by Raphael Beaudoin, Aya's Vice President of Operations, and David Lalonde, Aya's Vice President of Exploration, and both are qualified persons as defined under National Instrument 43 to 101 Standards of Disclosure for Mineral Projects. After the presentation, we'll hold a Q&A session. At this point I'd like to hand things over to Benoit La Salle. Benoit?
Benoit La Salle
executiveElisabeth, thanks so much. Welcome, everybody, to the Q2 2026 conference call; this is another really strong quarter for Aya. We've already pre-released the production results for the quarter. As you remember, Q2 production came in at 1.7 million ounces of silver equivalent, an increase of 61% year-over-year, and up 12% quarter-over-quarter. That fed through into very strong financial results; revenue for the second quarter of 2026 is $97 million, up 151% year-over-year. Net income for Q2 came in at $35 million, which is also a very strong increase from the prior year. And cash flow is USD 48 million, a 522% increase from the previous year, Q2 2025. So we had a very strong quarter on revenue, a strong quarter on profit, and a strong quarter on cash flow. And this, as we all know, is because of the seasonality in Morocco — Q1 is always a little lighter given the weather. Q2 comes out of the winter and is a stronger quarter. Q3 is stronger than Q3 — Q2, sorry, and Q4 has historically been our strongest quarter. So we're very pleased with the first half of the year, as we'll go through some of the numbers; now for the KPIs, the key performance indicator of the mine, the Zgounder mine has performed extremely well. The mining rate keeps improving, and it's up 7% quarter-over-quarter. And I'm pleased to say the mining rate on a daily basis reached 4,900 tonnes a day. You remember the plant was designed for 2,700 tonnes a day. And one of the key elements was making sure the mining rate would be aligned with the plant's nameplate, which was supposed to be 2,700. We know now it's a lot higher, but the mining rate sits at 4,900 tonnes a day. We had record performance from both the underground and the open pit; so we're extremely pleased with the outcome, the grade through the plant was 141 gram per tonne, which is right where we wanted it to be; and another important element is that because we're mining more than we're processing, we have an ore stockpile of 374,000 tonnes. That is extremely important; it's the buffer that's there if we reduce mining rates for more development, especially on the underground, where we want to go to the lower levels, we have 374,000 tonnes of ore stockpile. At the plant, we had a record milling rate in Q2, which again reflects our strong execution. The Q2 average is 3,900 tonnes a day versus the previous quarter at 3,600 tonnes a day and versus last year, same quarter-over-quarter was 3,000 tonnes a day, and that we know the nameplate was 2,700. So during the ramp-up we went from 2,700 to 3,000 last year, then began this year at 3,600 tonnes per day and we're now running at 3,900 tonnes a day, and we expect a modest increase again in Q3 and Q4. Recoveries are strong at the plant as well, along with other KPIs, with recoveries above 90% and availability above 90%. So every one of our KPIs is green. We track them daily, weekly and monthly. Right now, all of it sits in the green. We've also engaged a temporary crushing contractor to boost throughput, and we're installing a new crushing section at the plant, which ought to be ready by the start of 2027. Turning to the next slide, which covers the selling price across the quarter. You'll remember Q1 was exceptional, with silver hitting $120 per ounce in January. Naturally, we've had a sharp correction since then. So for Zgounder, the average selling price in Q2 2026 is $68.29, which is $15 below Q1. And yet it's quite close to the quarter's average. You appreciate that hitting the quarterly average is very difficult when prices are falling, since you don't sell each day. So in a declining price market, you end up slightly under the average. The quarter's average is a touch above $70, and we're at $68.29. In Q1 we were above the average, because prices were rising at that point. That made it somewhat easier to beat the average, but it remains an extremely good selling price, considering that in Q4 last year we were all very pleased with $59.23. So once more, a strong selling price in Q2 for Zgounder. And in fact, the selling price at Boumadine was, for good reason, slightly better at $70 an ounce, though payability there is 50%. So the net selling price was $35, because as you recall at Boumadine we sell tailings containing plenty of difficult elements. So turning to cash cost, we expected costs at Zgounder to decline, since we're now at a steady rate, actually raising throughput, but at a steady rate. And indeed, we're very pleased that in Q2 2026 the cash cost at Zgounder stands at $17.69. That compares with $18.64 in the prior quarter and $20 in Q4 of 2025. So again, these are small refinements, better efficiency, and we keep working on cash costs. But at $17.69, given this is a brand-new plant, development cost and additional cost, sustaining costs are extremely low at Zgounder. Probably $3 an ounce at most, not even that in Q1 and Q2. So you're looking at a cash cost of $17.69, a very, very good position to be in. On to the next slide at Boumadine. Quickly, Boumadine is somewhat of an add-on to Zgounder. What we're doing is processing the old tailings — it's a reclamation operation. There was no CapEx involved, and the cash cost was very low at $10.58 an ounce. It simply produces cash flow. On the production side we're a bit lower, and we knew that about Q1 again — when there's a lot of rain in tailings, of course it gets a little more complicated, since it turns slushy. So Q1 and Q2 came in somewhat lower. We knew Q3 and Q4 would be much higher, yet we still managed to produce 187,000 ounces of silver equivalent, and we achieved a margin of $20. As I mentioned, we sold it at $35 an ounce. At Boumadine our cash cost is $10.58. We earned $20 an ounce, so 20 times 185,000 ounces of production; that's still $3.6 million of free cash flow coming to Boumadine to cover the operation and the drilling. So it's a really nice addition to Zgounder, which we have in operation and ramping up in Q3 and Q4. On the next slide you'll see the cash position at quarter end. We began the year on January 1 with $136 million of free cash in the bank. We always carry $16 million of restricted cash, which forms part of the EBRD loan package. We started with $136 million. And during the first 6 months of the year, we generated $119 million of operating cash flow.
Benoit La Salle
executiveSo that's $136 million, and then we add $119 million of operating cash flow on top of it. Exploration and sustaining CapEx comes to $38 million — $38 million. During the first 6 months we repaid $33 million of the EBRD. There was one payment, and we also repaid a $15 million short-term debt we had taken on last year for Boumadine; it was simply available, so we took it. That has been paid back, meaning $33 million went back out. We put $38 million into exploration and sustaining CapEx. And we closed the quarter at $183 million. Naturally, we report in U.S. dollars. So $183 million, plus we hold $16 million in restricted cash, which in effect can be applied against the EBRD loan at the end if we choose to; so H1 delivered strong cash flow; CapEx is limited, as we know; our exploration program is large, though that forms part of our value creation strategy. We made an early repayment of the $15 million to EBRD, and we still have $183 million available to move into the development of Boumadine, which gets underway toward the end of this year. So a very, very strong quarter; the next slide gives just a summary of the first 6 months. Looking at operational performance, as a company we produced 3.2 million ounces of silver equivalent, at a consolidated cash cost per silver equivalent ounce of $17.59. Zgounder contributed 2.8 million and Boumadine contributed 0.5 million. So if — and we'll go through the guidance, but we're already at half year and halfway to the guidance. So we are completely in line with the guidance we presented to you at the start of the year; completely in line with that guidance. Zgounder's cash cost for the first 6 months is $18.18. Boumadine's cash cost is $18 — sorry, $10.85 per ounce. So we're fully in line, and we'll go over the guidance in a minute, but we're halfway through the year and halfway to our guidance. Revenue for 6 months stands at USD 205 million. Net income is USD 84 million. Basic EPS is $0.58, and operating cash flow for 6 months stands at USD 119 million. The guidance, which is on the next slide, was presented to you at the beginning of the year. Our production guidance for Zgounder is 5.2 million ounces to 5.8 million ounces. And at midyear, Zgounder sits at 2.8 million ounces. So you can see we're tracking right along with our Zgounder production guidance. Boumadine is at 1 million. We're at 0.5 million right now, 400,000, but we know Q3 and Q4 at Boumadine will be a lot easier, with no rain and much, much, much easier warm weather. Some days Boumadine currently sits between 40 and 50 degrees. So it's very dry, which makes working on tailings easy. For Zgounder's average cash cost, we had guided at $21.50. We understood that Q1 and Q2 would come in somewhat lower, and that's due to the strip in the pit, which directly affects our cash cost. So our guidance on that stays the same. For Boumadine, we had been at $10.10 and now we're at $10.40, so we're very, very close. Sustaining and growth CapEx sits at $36 million. It's roughly half and half — half sustaining, half growth: a new crusher, a new installation, an ore sorter and various other items we're putting in, which really count as growth CapEx, while sustaining covers development of the underground. Exploration expenditure is at $60 million; that figure is unchanged, perhaps slightly higher owing to the new assets we've acquired and the new permits, which I'll go over in 1 minute. So the guidance is confirmed. At the midyear point we're well into it, and we remain very positive about what's coming in Q3 and Q4. Moving on to strategy and operational priorities: at Boumadine, which is now the main leg of value creation for Aya, every independent consultant firm has been engaged across all the key feasibility work streams. That means metallurgy, energy, water supply, logistics, TSF location and the feasibility study — all of it is now underway and will be ready next year, the feasibility study. Meanwhile, the updated PEA is being finished as we speak and will be ready for publication early in September, when we all return from Labor Day weekend. So we're in the middle of it right now. We're into the mine plan. We're into the financial model for the PEA review. At the same time, feasibility is being completed. And we've already begun the RFP process for mining, for construction and for electricity. So all of that is ongoing. So the investment decision has been made. The project is extremely profitable. We will also confirm CapEx in the revised PEA, which will be available in 1 month. So Boumadine is a strategic project for us, and we're working on it thoroughly to bring the revised PEA in September. At Zgounder, you saw the optimization of the Zgounder mine. It's working well. The open pit, the underground, the grade control — all of that is going extremely well. We've added ventilation. We've added safety equipment. We had to finish the first phase of the TSF because we were putting more material through the tailings, given that we went from 2,700 tonnes per day planned in the feasibility study to 3,900 tonnes a day today, even 4,000 tonnes a day. So of course, the direct effect is that the TSF fills much sooner than expected. We've completed the first phase of the new TSF, which is the same one, just with bigger capacity. That's been done. We actually did it on time and below budget; and the new crusher expansion is being installed. Commissioning is scheduled for this fall, and it should be ready by early 2027. Turning to exploration — that's Slide 12 — on the exploration side, we spend USD 60 million annually; at Boumadine we're drilling 200,000 meters. At Zgounder, we're drilling 30,000 meters. Right now, drilling at Boumadine stands at 93,000 meters. As we know, the first half of the year — again, winter, Ramadan — runs a little bit slower. A third contractor is coming in with 3 machines, or 3 drills. At Boumadine we'll have as many as 15, 16 drills turning, and our expectation is to finish the 200,000 meter program as planned. And should all go well, perhaps somewhat more. The quarter's big highlight was the new zone we found lying parallel to the main zone, where we had an intercept of 51 meters at 890 gram per tonne silver equivalent. That clearly isn't in the resource model at present. More drilling on this will take place this year; but it is a significant discovery parallel to the main zone.
Benoit La Salle
executiveWe have kept drilling the Main zone as well as the Tizi zone, and the structure’s length has now grown to 5.4 kilometers, so it continues to expand. There are also plenty of other targets where we are mapping and prospecting to back upcoming drill programs across the large Boumadine project, which covers more than 1,000 square kilometers of ground under the exploration license plus the <<inaudible>> license of 600 square kilometers. So Boumadine is a very large land package, and we keep adding to it. At Zgounder, the plan is 30,000 meters. So far we have completed 10,000 meters. Some results came out in June, and additional results will be released in September. Zgounder runs at steady state, and drilling keeps delivering very good results. We continue to encounter high-grade mineralization. The structure is far wider than we first expected. When we arrived, we assumed a 20-meter wide structure. That is not the case; it is much wider. We are now pushing west to test beneath the fault, and drilling there will begin within the next few weeks to few months to determine whether it continues under the West fault. Drilling is also underway to the Northeast. So this is a very, very strong project. Our understanding of the geology keeps improving. We are making extensive use of AI to interpret the regional play. Regional drilling will take place this fall, and we hope to see some very positive results. To wrap up, I want to discuss the acquisition we announced last week. We announced the acquisition of 259 square kilometers. We have said all along that Morocco holds tremendous potential. Some families control ground, some families hold many projects, and they have done very little exploration. They have walked the ground a little and done very little exploration; mostly they have completed a lot of infrastructure work, but they lacked the expertise for exploration work. So we were able to acquire from 2 families a 259-kilometer portfolio in a district called Zagora, which has potential for copper, lead, zinc and silver. Agadir Melloul, which is copper, silver and gold and probably some rare earth as well; and Goulmim, which is lead — copper, lead, copper, gold and silver; those are very, very good projects. You should know that we review projects every week. People come to us and show us ground, and we are very selective, very, very selective, because we already hold over 1,000 square kilometers of ground between Zgounder and Boumadine. But this was something that, when we showed it to the team, they said, "No, this is very, very interesting, and we should move and acquire this." We acquired it for MAD 10 million, so USD 1 million. The budget is about $800,000 this year for what we always do, which is satellite imagery, spectral, stream sediment; we will see if we do some geophysics a bit later. But this is low-cost acquisition, low-cost exploration. There's a team in place — a team already existed — and a portion of our people can handle this work. Nobody is being pulled off Zgounder, and nobody is being pulled off Boumadine, since we'll have 18 to 20 drills turning in total. We will be producing 240,000 samples. So this isn't a case of taking resources away from those 2 assets in order to explore this new ground. It will have a dedicated team. It strengthens our first-mover advantage in Morocco. We're working with Managem and, naturally, ONHYM, the biggest player in the country. All of these are district scale exploration footprints. Each one brings together very large permit packages; and for us, this simply builds a pipeline of opportunities going forward. You'll see us pick up additional ground, quite similar, some of it near Zgounder, some near Boumadine, but we're constantly reviewing assets because we genuinely believe Morocco is underexplored. We know that it is underexplored. We believe there's more Zgounder, there's more Boumadine. There's more Imiter, owned by Managem, which is a world-class silver asset. There's more of that. There are copper deposits, there are more silver deposits, and we hold our first-mover advantage, and you'll see us keep making small acquisitions — very small — but some very, very good ground that we like; so that wraps up the formal portion of the presentation. I'll hand it over to you, operator, for the Q&A period.
Bryce Adams
analystI just have a few questions about the Zgounder outlook. The disclosure mentions higher strip ratios during the back half of this year, so what do you think the strip ratio has risen to for Q3 and Q4? And then the same question applies to next year as well, for 2027. Does that represent an accelerated stripping campaign next year? And then similarly on some of the outlook, you mentioned slower mining rates in the underground. What are the expectations there?
Benoit La Salle
executiveYes. Thank you, Bryce. Rapha is with us this morning. As you know, he serves as our VP of Operations. So I will let him answer this. The strip ratio for quarter 3 and 4, the life of mine strip ratio and why we believe there will be a slower throughput in the underground over the next few quarters. Rapha?
Raphael Beaudoin
executiveBryce, yes, I'm glad to talk about that. Let's begin with the open pit. Year to date in the open pit, we're at a strip of about 10, and that's pretty consistent with our 43 to 101 over the long term. We anticipate the strip rising to roughly 16 over the next 6 months, and we expect to finish the year nearer 13, which lines up well with what we expect long term for the open pit. Regarding the pushback, we have multiple pushbacks scheduled across the life of mine for the open pit. And there's one arriving near the end of the year that's included in this year's mine plan. We may move it earlier into next year. We're taking our time to evaluate the best way forward. So the open pit is well under control, to the point where we have options. We can do it this year; we can do it somewhat later at the start of next year. That hasn't been finalized yet, depending on how things keep progressing. So for the open pit long term, we expect a 13 strip ratio, with some months nearer 8 as we saw at the beginning of the year, and some months nearer 16 depending on where we are and what's the best way to mine it as we proceed with the detailed planning in our rolling 3-month plan. Now for the underground, I'd like to add some nuance, which is that we're focusing on new zones, and we really want to focus on continuing to build out the infrastructure for the lower levels. We're on plan. We're closer to the 1760 level right now, and we need to go all the way down to 1625. We have a healthy stockpile. We're bringing in extra crushing capacity that in the meantime is being compensated by a crushing contractor. So we have — we want to be comfortable on the ground. We are comfortable at present. We worked a lot over the last 2 years to reach that point, and we want to keep it. We want to keep it that way; so right now, underground, we have about 12 — around 1,200 to 1,500 tonnes per day rate, which is fine. The reason we'd prefer to slow it down is that we have that option available, and we want to really focus on developing the sublevels to open more stopes and to stay in this comfortable position. So as the open pit keeps sustaining essentially a solid portion of the mill throughput with the extra crushing coming available, we also have an ore sorter coming that we want to commission later this year. So on the underground, it's not so much that we'll reduce the throughput a little bit, yes, but it's to really sustain and even, I'd say, accelerate the infrastructure development for the sublevels.
Bryce Adams
analystAll right. And from what I understand, you're still in the process of assembling the 2027 open-pit mine plan. Right now, my model shows a strip ratio of 20:1 for next year. So do you feel that's overly conservative?
Raphael Beaudoin
executiveYes. For next year, a 20:1 strip ratio isn't what we're planning for.
Bryce Adams
analystAll right, that's something we can make an adjustment for. That ought to benefit our figures. Then my final question concerns silver sales. During Q2, sales fell a bit behind production; so Benoit, will that be made up in Q3? Has the catch-up already happened in July? And do you see that as a tailwind for the coming set of financial results?
Benoit La Salle
executiveYes. Bryce, thank you for raising this, since I believe the market was somewhat puzzled by the selling price. I'll let Ugo, who leads treasury and sales together with the team, respond. He is here with us. Because I think the market needs a clear understanding of why our selling price, for some of you, came in a bit lower. And perhaps, Ugo, you'd like to go ahead.
Ugo Landry-Tolszczuk
executiveYes, absolutely. So the LBMA average sale price of silver for the quarter, if you will, came in at $73. At Zgounder we were slightly above $68; timing also matters here; and looking at June in particular, the price dropped quite sharply from above $70 to under $60 by the end of the quarter. And when we produce, we have to produce and then sell. So certainly, one third of our quarterly production was sold at a fairly low level relative to the quarter's average. So that had a slight impact on revenue. We're 6.4% below the LBMA average price on average. And then on volumes, there are a few factors. At Zgounder, we had a bit of inventory, and you can see that in inventory. And at Boumadine, we sold less than if you take our roughly 1 million ounces and divide that by 4 quarters, we sold less in Q2, but that's definitely going to be made up here in Q3 and Q4. Things are going very, very well; and then the rest of the inventory we had at Zgounder is — has been sold in July. And so yes, I think Q3 is looking good, especially at Boumadine, we'll see a significant catch-up from the first half just — we were learning, it's our first time doing this reclaim. But I think now we've got the wind in our sails; so I think that will be made up here in Q3 and Q4.
Benoit La Salle
executiveCorrect. Thank you, Bryce. Perhaps I could just build on what Ugo said: it's clear the entire sector wasn't happy with the price in June. There was a lot of waiting around, and since we watched how other companies handled it, we all ended up caught by that very rapid deceleration, or price reduction. As a result, the average selling price of $68 at Zgounder and $70 at Boumadine is slightly under the quarter's average. Still, in a falling market, hitting the average is really hard, because you keep sliding as you sell, whereas in a rising market it's far easier to sit above the average. So, but again, as I said in my short presentation, we're quite pleased with $68 and $70. We would have preferred $82 in Q1, but with the cash cost at $18 or $16 and AISC plus 3 or 4, I mean, we remain very happy; and look, over 6 months, we produced $119 million in operating cash flow. So we like the silver price. We like its current level. We'd prefer it much higher in Q3 and Q4; but look, time will tell.
Bryce Adams
analystYes, for sure. That's a lovely shade. I know we're diving into specifics here, but zooming out, this market is quite robust and delivering solid numbers.
Justin Chan
analystWell done. It's encouraging to see that cash flow, especially set against the original CapEx figure. My first question concerns — you brought up installing a crusher at Zgounder. I'm wondering whether, over the longer term, how much throughput might that allow? Or is it mainly just to keep up the upper 3,000 to 4,000 tonnes per day?
Benoit La Salle
executiveThank you, Justin. I'll pass it to Raph, though first I'd like to draw attention to what you just said. Exactly — my mistake, it was $119 million in operating cash flow against $140 million of CapEx, not 1,000. That's something I left out of the presentation, so thanks for catching it. In my view our return on investment leads the entire industry, and Boumadine should show something comparable; I appreciate you bringing that up.
Raphael Beaudoin
executiveJustin, it's Raphael. Glad to talk about the crusher. So let's be clear from the outset: at Zgounder we do have a crusher, correct? The nameplate capacity is 2,700. The plan is properly engineered. At this point we're pushing it. The simplest route to push it further is adding crushing capacity, since that work can be completed later, and it differs considerably from, say, installing another ball mill. Early in the year we frequently get some rain, and that makes it hard to drive the mill as hard as it can run. If we return to our 43 to 101 that we published, we committed to raising throughput from, let's say, 3,600 to 3,800; we've already reached that level thanks to the mobile contractor. What the crusher addition is meant to achieve is independence. Right now a contractor is assisting us. He's performing very well. The costs are quite reasonable given the benefit we receive. The plan is to install a tertiary crusher so we can sustain the throughput we have now and, who knows, perhaps raise it somewhat. That remains to be seen. Quarter after quarter, in nearly every quarter apart from one across the last 6 quarters, we've raised the mill's throughput. I wouldn't say we've hit the ceiling, though we're definitely nearing it somewhat. The coming 2 quarters will show us how far we can keep pushing. On some days we comfortably exceed 4,000; as a quarterly average that hasn't happened yet. We're working toward it. With luck, we'll reach it. But to answer your question straight, the tertiary crusher formed part of our commitment to steady the mill at 3,850 tonnes per day, and we've already hit that. So I don't believe it's a stretch to think we can surpass it, and that's exactly what we're attempting.
Justin Chan
analystUnderstood. Then as we look toward the updated PEA for Boumadine, is there any scope change you're weighing, maybe regarding throughput, or on how the open pit and underground are split? Or is it mainly a refreshed CapEx estimate, and perhaps we'll see shifts in payabilities?
Raphael Beaudoin
executiveWell, the updated PEA is exactly that — an updated PEA. So there's a new resource. There's a new method for calculating the NSR. Payables are changing. But in material terms, the project stays largely the same. There are some — I'd anticipate some changes on the open pit side and on the underground side; we've completed quite a bit of drilling since the previous resource, but the PEA is mostly centered on the resource, Justin. And any other significant change, if there were to be one, would come closer to the — in the feasibility study.
Justin Chan
analystAll right, understood. And just one final question. I believe we experienced a heavy rainy period — or wet season, I should say — this year. I suppose that puts you in a really strong position for the second half when it comes to — when it comes to water supply, just to clarify, since Europe has been extremely dry, but my understanding is this year went well in Morocco.
Raphael Beaudoin
executiveIt's already August for us. We're at — we're halfway through the dry season, or perhaps even beyond the halfway mark. Our water reservoirs are at full capacity. So on that front we're quite comfortable. And we've just finished Phase 2 of our tailings facility, which additionally provides a bit of water storage capacity. So at this moment, the river flows of Zgounder, and we keep topping up a little — or keeping full, rather — our water storage. So yes, water isn't something that worries us over the short and the medium term.
Benoit La Salle
executiveAppreciate it, operator, and thank you for all the questions. Honestly, we had a very solid quarter, and we're quite pleased with both Zgounder and the team. As Raph mentioned, the Boumadine study should be finished within a couple of weeks; it's largely a fresh resource model along with the addition of the new payability for the metal. Some people raised doubts about the metallurgy previously. The thing is, there's no metallurgy issue at all, because we ship the entire concentrate to a smelter; metallurgy therefore isn't a concern. Payability is what counts, and the PEA will include the updated payability numbers; so major catalysts are on the way — or rather, the catalyst that came in Q2, which we didn't bring up, but the U.S. The listing has been a huge win. Our G&A did increase this quarter because of the NASDAQ listing. A few of you probably spotted that. It caused a small uptick in our G&A, but we've got it under control. Still, the U.S. listing in Q2 is a really major success. Our volume has risen. New funds came on as shareholders. A few of them took stakes of 5% to 8% in the company. It has genuinely reshaped our distribution and our shareholder base. So the listing makes us very happy; it was a major catalyst in Q2. And of course, drilling — we saw great results in Q2. Looking ahead, the Boumadine study is due in early September. Its significance also stems from serving as the foundation for the feasibility study slated for the first half of next year. Ultimately, work at Boumadine is getting underway. Groundbreaking is planned for year-end on electricity, the power line, water, the camp, location and all of that. So this is a construction project that is actively progressing. Raph has assembled a crew up in Canada, and we've also got a team that's been put together in Morocco — the construction group and everything else — so this is genuinely turning into our major undertaking for 2027 and 2028, and it keeps expanding. At Zgounder, drilling continues. Drilling also continues at Boumadine. David will have fresh results ready in September, and many of you will be seeing us at Beaver Creek or the Denver Gold Show, so updated results from Boumadine and Zgounder will be available. On top of that, expect us to acquire more ground. When you stack Morocco against much of Africa and South America, it's turning into a really strong jurisdiction. Mining is central to Morocco, and while we do see some newcomers arriving, we hold the advantage of having moved first. We're purchasing — we will be picking up additional ground, ground that David and his team favor and see as having enormous potential. So to wrap up, you'll recall we routinely reference the organization's 3 pillars: geology, people and jurisdiction. Every quarter, when we see commodity prices climb once more, I think it's just further proof that our jurisdiction is the right one, with the right mining code, the right people, and the right government support for mining. The geology is exceptional—genuinely exceptional. And we'll continue showing you that Morocco holds more Zgounder, more Boumadine, and more Imiter. Our talent pool is expanding all the time, and people are thrilled to come aboard Aya, whether in Canada or Morocco. That's a recipe for success; we've done very well so far. Since we took control 6 years ago, this has been a huge success, but we believe much more lies ahead. I'd say the finest is yet to arrive. That puts considerable pressure on David and on geology, yet I believe the finest is yet to arrive. We're in a great position from a jurisdictional standpoint. And listen, we'll connect with you on the Q3 call; plenty of you we'll catch in Denver before then. But honestly, we're really looking forward to a strong third quarter—strong geology, plus production and financial numbers coming in Q3. Thanks so much. We appreciate you joining us today and for your backing, and we'll catch up with you in Colorado in just a few weeks. Thanks.
Operator
operatorThis concludes today's conference call. Thank you for participating. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aya Gold & Silver Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Aya Gold & Silver Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aya Gold & Silver Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.