Aya Gold & Silver Inc. (AYA) Earnings Call Transcript & Summary
November 12, 2026
Earnings Call Speaker Segments
Elisabeth Hamaoui
executiveThanks, operator, and welcome everyone to the third quarter 2026 earnings conference call for Aya. With us on the line today are Benoit La Salle, our President and CEO; Ugo Landry-Tolszczuk, Chief Financial Officer; Elias Elias, Chief Legal and Sustainability Officer; Raphaël Beaudoin, Executive Vice President of Operations; and David Lalonde, Executive Vice President of Exploration. There's a presentation you can follow through the webcast and on our website. Since forward-looking statements will be made during this call, we ask that you refer to the cautionary notes contained in the presentation, the news release, and the MD&A, along with the risk factors set out in our annual information form. The technical information in the presentation has been reviewed and approved by Raphaël Beaudoin, Aya's Executive Vice President of Operations, and David Lalonde, Aya's Executive Vice President of Exploration, and both are qualified persons as defined under National Instrument 43 to 101, Standards of Disclosure for Mineral Projects. After the presentation, we'll hold a Q&A session. At this point I'd like to hand things over to Benoit La Salle. Benoit?
Benoit La Salle
executiveElizabeth, thank you. Everyone, welcome to our Q3 2026 call. For Aya, the third quarter set another record, since both Zgounder and the Boumadine reclaim operation reached their highest output ever. The work we've been doing operationally is delivering results — more scale, reduced cash costs, and healthy cash flow. We also shared an updated PEA for our Boumadine project during the quarter, and it demonstrated better economics along with an extended mine life. Beyond that, we announced two acquisitions that bring new permits into the portfolio. So if you'll turn with me to slide 5 of the PowerPoint deck you have, as we do every quarter, we'll take a quick look at the KPIs and how the operation performed in the third quarter. If you go to slide 5, you'll notice we delivered a really strong quarter, with revenue climbing 90% compared to the same period a year ago — from $54 million to $103 million in 2026. Net income rose from $12 million last year to $35 million, which is a 182% gain. Operating cash flow increased from $22 million last year to $48 million this year, up 115%. Over on the right side, the production profile is shown. In Q3 of last year we stood at 1.3 million ounces; in Q2 of 2026 we hit 1.7 million ounces; and for Q3, as we already announced, the quarter came in at 2.03 million ounces. Production has risen 51% compared with a year earlier — 11% at Zgounder and 21% on a consolidated production basis — so it was a very strong quarter financially, and we'll get to that, but as I mentioned at the start, we're managing costs and they're coming down; despite the rise in oil, our Q3 costs came in below our Q2 costs. Turning to slide 6, the next slide, here are two KPIs we've tracked since the beginning, since the mine's 2025 ramp-up: we've monitored mining tonnage and we've also monitored the milling rate. Mining tonnage held steady, as you can see, at 4,700 tons a day, all of it coming from the open pit. The open pit turned in a record performance this quarter at 3,500 tons per day — a genuine record for the quarter. We also have considerable flexibility because our run-of-mine stockpile now stands at 435,000 tons, which equals 100 days of processing. On the right-hand side, you can see the milling rate for Q3 averaged 4,100 tons a day. Our target, as you know, is to move toward 4,000 to 4,300 tons per day, and for Q3 of 2026 we averaged 4,100 tons a day. With 435,000 tons stockpiled, that means 100 days of mill feed is already mined next to the crusher and set for processing. It's a great inventory to have on hand — a safety cushion, not because we anticipate any problem. We're aware that underground development will be necessary next year. The open pit still requires some pushback work. Even so, we have a full ore supply available that has been pre-mined. On top of that, 1 million tons of lower-grade material is held in reserve, which is truly exceptional. Turning to slide 7 — average selling price is always a pretty interesting one. At Zgounder, where we turn out 1.5 million ounces, Q3's average selling price landed right in line with Q2, at $69.32. Everybody is aware things got a bit softer late in Q3. It was firmer early in Q3, but on average, at Zgounder first, we achieved a selling price of $69.32, and we succeeded in lowering our costs to a cash cost of $17.46. As you know, for an AISC you tack on about $3. But we're very happy with every one of the cost-reduction initiatives and really, as we are — as I like to put it — Zgounder is now running at cruising speed. Looking back at that 43 to 101 report, Zgounder is set to yield roughly six million ounces of silver each year across the coming 11 years, with a life-of-mine cash cost of $16.26. So, as you can see, we're still above that life-of-mine cash cost. That was anticipated on our side, since we understand the cash cost is going to come down as we move into the later years; so Zgounder is a strong operation for us; it's performing very well. Our attention is on managing and reducing costs, even while we recognize that going forward, you know, we're producing six million ounces of silver per year. So let's turn to slide 8, the Boumadine pyrite reclaim operation. As you remember, we anticipated about 2 million ounces produced over a two-year span — the final quarter of 2025, the entirety of 2026, and likely three quarters within 2026; we needed to relocate 240,000 tons of mineralized ore. And the third quarter proved to be a very strong one. The first two quarters came in a bit soft because of weather disruptions, though Q3 turned out to be a strong one — we moved 50,000 tons, which is a 191% increase quarter-over-quarter. Assuming decent weather, that’s roughly the run rate at this point. We also shipped tailings to Asia using a bulk shipment, and that went extremely well, so we remain on track for our guidance. Over on the right-hand side, you’ll see silver equivalent production for the quarter came to 536,000 ounces, with 492,000 ounces saleable — naturally there’s always some lag between shipping and selling — but this is a very profitable operation. We realized $34 per ounce of silver equivalent, since we do receive 50% payability. Keep in mind that material is tailings containing problematic elements, and it gets sent to a smelter in Asia, so payability comes in at 50%. As you remember, at Boumadine, once we're running at full capacity with the pyrite, payability is closer to 83%. For the tailings, payability is 50% and the cash cost per ounce is roughly $10, which makes this a highly profitable operation as we remediate the site, given that those tailings are located right above one of the structures we'll start mining in 2030. Slide 9 shows how cash moved during 2026. We started the year with $136 million in cash, and by the end of the quarter we're at $184 million — and that figure leaves out the $16 million of restricted cash we hold with EBRD. The waterfall lays out where the money came from: we brought in $163 million of cash flow, and $54 million of that landed in Q3. Then we saw some working capital movements. On the investment side, as everyone knows, that's exploration, a little sustaining capex, but mainly exploration at Boumadine and Zgounder. Under financing, there's the EBRD repayment, which we're speeding up — we paid down $15 million in Q2 2026. That leaves us with a net position of $184 million. Our balance sheet is really solid, and our ratios are quite robust.
Benoit La Salle
executiveLooking at the balance sheet, total assets come to roughly $700 million, with equity at $500 million. That gives us a very pristine balance sheet, strong enough that we're positioned to develop Boumadine using our own liquidity. The year-to-date figures on slide 10 are very interesting. You can see the operational performance there. Consolidated production stands at 5.2 million ounces, and consolidated cash cost is $16.82, which is excellent. Production is fully in line with our guidance. Cash cost is a little bit below our guidance. So we're aligned with what was presented to you at the start of the year. Zgounder currently sits at 4.3 million, with cash cost of $17.97. And Boumadine is at 0.9 million. You know our guidance was 1 million. So we're at 0.9 out of 1 million. We're very close, with a cash cost of $10.56. Turning to year-to-date revenue, we're looking at $317 million, with net income after tax of $119 million. That's an extremely good business when your net income after tax is one-third, more or less. So that's a 33% net profit margin, an extremely good business. And operating cash flow for the first nine months is $167 million, so it's extremely strong. I also need to point out something you saw when you read the press release: at quarter end, we held in inventory 383,000 ounces of silver that was ready to ship but had not yet been shipped for processing in Switzerland. It was shipped immediately after; so it's a very small timing difference, but those 383,000 ounces of finished goods have not been accounted for in revenue. They sit at cost on the balance sheet. So it was something sold immediately thereafter; we weren't holding it; it was a matter of shipment and some changes in procedures. And so it got done at the start of Q4; so obviously you can now imagine that Q3 revenues were excellent, but now it was sold in Q4. So you can expect Q4 to be a regular quarter, plus 383,000 ounces of production that came from Q3 and is now, or was, sold in Q4. Coming to guidance, well, we know where we stand today. We know what we'll be doing in the fourth quarter. So we've upgraded our guidance, and we're raising the lower end of it. At the beginning of the year, we took the guidance — I told you it should be between 5.2 and 5.8 million ounces. Today, we're extremely comfortable saying the guidance is now between 5.6 and 5.8 million ounces. We're really progressing very well toward the upper part of our guidance, and that's why we've made a change to it. Boumadine is at 1 million, though we're currently at 900,000 ounces. We are holding it at 1 million. And we are not — the same applies to cash cost; we are not raising that either, even though we sit right at guidance for Boumadine and slightly under guidance for Zgounder, we still are not raising it. Sustaining capex looks much the same, and the exploration expenditure program is similar too. So you now have fresh guidance, somewhat tighter because we are in the 11th month of production. That gives us a considerably tighter range of 6.6 to 6.8 million ounces for the year 2026. Turning to slide 11, what are our strategic priorities right now? In our recent press release, we told you that the 2026 drill program at Boumadine is complete. We drilled it in 10 months, and I must say congratulations to the team that pulled this off. We drilled 181,000 meters — a 181,000-meter program — and we did it in under 10 months, since as you know we did not begin in January exactly on day one. So it has been a fantastic accomplishment; now, we are not slowing the drilling down. We are keeping the 16 drills — I believe there is even one more on the way — so we keep the drills turning, and we will likely close out the year approaching 220,000 meters of drilling at Boumadine. You know the Boumadine program was planned across two years at 360,000 meters, which covers all the infill drilling of the three main zones that we know are included in the PEA; and so those three main zones are getting infill drilled so we can move the resource from inferred to measured and indicated, so that in the feasibility study we are working on, we do have M&I in the feasibility study; that is ongoing. Beyond that, in the feasibility study, things are moving extremely well. The water pipeline route is fully done. We are now finishing the detailed engineering. Same situation with the power line — that is done, and we are working with the government on building this power line. We have to finish the detailed engineering. Same situation with the water pipeline. The power line is ongoing. We have secured the land for the village and the buildings we are going to build. So all of that is done and progressing. We have identified where the tailings dam will go, so that too is being handled. And at the start of next year, we will update you on the detailed engineering, selection of contractors for open-pit mining, selection of the EPC contractor, and all of that. So it is ongoing; every chapter of the feasibility study is ongoing, and it is progressing as quickly as we can. I know often in meetings when we present to you shareholders or to our analysts, they ask, "How can you accelerate? Can you go faster? When can you start ordering the long-lead items?" We are at maximum speed. We go chapter by chapter through the feasibility study, finishing each one and completing detailed engineering so the equipment ends up properly sized. As you know, the PEA was based on 8,000 tons per day. The feasibility study uses 10,000 tons per day, which means we'll be raising the plant's capacity; and just like at Zgounder, where nameplate was 2,700, today, as you know, we run at 4,100 and hope to reach 4,300. Our philosophy — our construction philosophy — will remain the same. This project is much bigger, but we always build with the idea that we could go bigger. At Zgounder, executing the plan is the priority. We have the 43 to 101 plan that has been filed, and right now it's about raising throughput with a tertiary crusher that is being installed and will be complete by Q1 of next year. The open-pit development, the pushback, the underground development — all of that is underway; we finished the work on our tailings dam to expand its capacity; so Zgounder is an aircraft at 35,000 feet; it's cruising, it's keeping costs down, it's optimizing production, and going extremely, extremely well.
Benoit La Salle
executiveWe're also applying AI to geological interpretation, and we're adding substantial ground at Boumadine as well. Those are really the two main areas we're focused on right now: optimizing Zgounder and developing Boumadine. Speaking of Boumadine, we updated the PEA. We've walked you through that repeatedly. Slide 13 lays it out. It's a Tier 1 asset. Only three years of drilling are reflected in the PEA. Yes, we've drilled 180,000 meters, but that isn't included in the PEA. The drilling completed to date will feed into next year's feasibility study; so the PEA rests on three years of drilling. It's a Tier 1 asset. The economics are fantastic, since capex is low. You can get this project done for less than $500 million. The payback period is really quick. And the risk is minimal since the configuration is quite straightforward: three concentrates that can be sold — a zinc one, a lead one, and a pyrite one. As you remember, sulfur makes up 43% of the ore, and that's precisely what you need for making sulfuric acid; so it's a low-risk, standalone model. We're able to self-fund this from the equity we're holding — or really, from cash flow. So cash flow is capable of funding it. And our bank, EBRD, plus our off-takers can provide debt. So should a funding gap emerge, the money exists to cover it, and that depends on how silver prices move over the next three years. We have a demonstrated history in that region of delivering projects within schedule and within the budget we set. That's something we've shown, and it serves as a showcase for us — a genuine success story. Then there's the last element, which as everybody appreciates can be decisive: permits. For this particular project, the permit is already secured. That explains the investment decision being taken, and why it happened ahead of feasibility completion — because the permit sits with us, the funding sits with us, the geology sits with us, and the mine plan sits with us. At this point we're transitioning into detailed engineering, but the project is moving forward. Slide 14 lays out the main financial figures: an after-tax net present value of $3.5 billion using a 5% discount rate, plus an after-tax internal rate of return of 93%. That IRR is extraordinarily uncommon for our sector, particularly since it covers just three years of drilling. This is only the start — three years of drilling. Typically a polymetallic project needs about 15 years to get to the start of construction. In this case, construction begins after three years, and within 7 years it will be in operation, whereas that usually takes 20 years. So the economics are very robust, upfront capex is quite low, the capital efficiency ratio comes in at a fantastic 7.6, and all of that is on the base case. During the initial five-year period, output will reach 350,000 ounces of gold equivalent; the mine's lifespan is 14 years, and it will throw off roughly $5 billion in free cash flow. Slide 15 shows this presented under various scenarios. The break-even for that project sits at $1,700 gold and $24 silver. That's roughly the break-even level. When it comes to the base case — we've seen the numbers — it's exceptionally robust. And even with a 25% drop to $1,600 gold and $38 silver, you still end up with a 57% IRR, while a 25% rise to $2,400 gold and $67 silver gives you an IRR of 128%. That reflected the spot price at the moment this study was prepared. As a result, you're looking at a project that stands out as highly distinctive and quite sturdy, with excellent economics, located in a region that from an ESG standpoint is exceptionally welcoming, simple to develop, and requires no relocation of people. It's therefore fairly uncomplicated: we hold the permits, and within the country there's the workforce available to carry this out, and we'll be relying on a large number of the same subcontractors we engage for Zgounder. And something we've consistently noted on page 16 is our intention to grow our presence across Morocco; we hold the view, and I hold the view, that Morocco ranks as a tier-one mining jurisdiction; it's extraordinarily welcoming. The mining code is strong. The government backs the mining sector. Your workforce is there. Electricity comes in from the grid, and water is supplied either from wells or from the surrounding community. That's infrastructure — I often joke that it's slightly superior to Canada's. There are bullet trains and excellent international airports, so our footprint keeps growing. We've completed acquisitions in which we purchased permits from families who held them for many years, did limited work, but lacked the financial capacity to do more, and also didn't possess all the capabilities we bring, such as technology, satellite imaging, spectral geophysics, and other tools. We're now taking that same approach and using it across all the fresh permits — Boumadine, Askaoun, Agdz, plus several others. Those are newly announced licenses. At Azegour last week, we divested it to a company, Sama Resources, that was already in existence, and once the deal closes we'll hold 19% of Sama. So our portfolio management is going very well. The reason we exited Azegour is that it involves copper and tungsten, which isn't a space we're looking to enter. Still, we're quite pleased to now have a 19%-owned subsidiary focused on copper-tungsten, so this transaction leaves us very satisfied. And we keep building out the portfolio. Additional permits are going to be announced by us over the next few weeks and months; our portfolio keeps growing since people now understand that Morocco is a tier-one jurisdiction. The geology in that country is tier-one, its workforce is tier-one, and the mining code is tier-one as well, so in a rare earths and energy metals mining world such as today's, that is certainly a place you want to be. That concludes my presentation. I'll now turn things over to the operator for the Q&A period. Thank you.
Cosmos Chiu
analystThanks, operator, and good morning to you, Benoit, and the team. Benoit, I appreciate all the extra detail you gave us on the quarter. So, thinking about the sequencing you described, how much of that more than 400,000 ounces sitting in the stockpile do you figure you'll draw down during '27? And with that in mind, should investors be looking for '27 to stay around the current life-of-mine average, or might this sequence produce a temporary...?
Benoit La Salle
executiveThank you, Don, and thanks for your comment. Don, the entire team is here with us; we're in Morocco; our Q3 board meeting was held in Casablanca, and Raphaël is here too, and as you're aware, Raphaël is our Executive VP of Operations and he keeps an eye on the operation together with the team here in Morocco. So, Raphaël, I'll hand it over to you for Don's question about the stockpile. Yes, glad to discuss it. We already have more than 400,000 tons of ore in stock. Under the 2027 plan, the stockpile stays stable; it could dip briefly and then rise again. The intention is for it to remain stable all year long. There's a pushback in the open pit that will bring the ore mining rate down for several months, roughly three months. During that period the stockpile will shrink, and that's fine; that's exactly why we have it well in place, but over the course of the year, we really don't anticipate the stockpile declining.
Cosmos Chiu
analystAll right. Then as a follow-up, do you figure output in 2027 will stay in line with life-of-mine averages, or, since the stockpile grade is somewhat lower, would you expect it to step down temporarily in '27 as you work through this sequencing?
Benoit La Salle
executiveNo, we expect production to stay at the current level. We remain on track to deliver essentially the 43 to 101 we published last year, and I would point back to that; we're executing it quite well. Things are going to plan, and I don't see a drop in production in 2027.
Cosmos Chiu
analystAll right, great. And then only one last thing: you know, costs have come in really strong so far this year, you know, quite a bit under the guidance range. Is there anything in Q4, maybe if you strip out inventory maintenance items, that might push the unit cost up quarter-over-quarter compared with Q3 or, you know, what we've seen so far this year?
Benoit La Salle
executiveSo the stripping ratio, the low cost all through the year, has partly been driven by the fairly low stripping ratio we had, roughly 11. During the last quarter of this year, we've got a planned increase in stripping to roughly 14. So that could make costs a bit higher for the fourth quarter, though not significantly, in proportion to the modest rise in stripping for the last quarter.
Cosmos Chiu
analystAll right, that helps; I'm done with my questions. Best of luck for the remainder of the year.
Benoit La Salle
executiveThanks, Don, and yeah, the rest of the year is a month and a half, so we're set.
Bereket Berhe
analystHello, and thanks to Benoit for the update on the quarter. I have one quick question regarding the Zgounder costs. You touched on this a bit earlier. Could you possibly give a little more detail on what's driving the significant reduction in costs and how you expect that to look into 2027, leaving aside the stripping costs that were just mentioned? But yes, I'm just curious to hear a little more about those costs.
Benoit La Salle
executiveWe're having a pretty solid year at Zgounder. As I said, the lower cost so far year-to-date came mainly from the open-pit strip. The long-term stripping plan is roughly 13 in the open pit, and that's what we've been carrying out at Zgounder. Over the last six months it has been below that. We anticipate next year will be above that, above the current strip. Next year is likely closer to around 16 or 17, which fits well within plan for our cost structure, again, as we've shown quite transparently in our 43 to 101. So we expect costs to remain near that $17 to $20 bracket.
Bereket Berhe
analystThank you — I appreciate that.
Benoit La Salle
executiveYeah, many thanks. Thanks, everyone, for being with us today for our Q3 conference call. It was a terrific quarter, honestly. The whole team is on site with us in Casablanca, and we're really pleased with the way things came out. Of course, we understand the inventory push-out has slightly affected earnings per share, because roughly $30 million in earnings is parked in inventory — it's just been pushed back by a few weeks or days — but of course we run the business on an annual basis, and that will flow straight into our Q4. We feel really good about both this quarter and how the operation is running. Raphael covered costs. As I mentioned, a huge effort has gone into trimming expenses now that we've reached cruising speed, and we're very strong at that. Beyond that, we've also shifted a number of people from the Zgounder operation across to Boumadine, since Boumadine is now entering genuine development. So several of the managers who used to be at Zgounder are currently leading the Boumadine project. All in all, we had an excellent first nine months. As you're aware, we completed the U.S. listing, and it's genuinely a significant contributor to the volume and the appreciation. The Boumadine PEA was a huge achievement that we finished in the quarter. You've seen the technical report. Drill results are continuing to arrive. David is here with us, and he's aware that every month we issue one press release for Zgounder and one for Boumadine. Those results are consistently outstanding. You see them yourselves. We'll push even harder on step-out drilling next year. David has a big job with infill drilling; it's beyond spectacular. It gets done in 10 months, and we're maintaining that pace. We aren't decelerating it, which likely means significantly more step-out drilling can happen next year too, and that pattern will keep going; so work at Zgounder carries on, work at Boumadine carries on; we've got excellent results at both. So we anticipate a strong finish. We anticipate a fantastic year. And we feel very good about operations in their current state, very good about Boumadine and about the acquisitions completed; and honestly, the additional ground we pick up leads to even more ground being offered to us. So keep watching, since we're evaluating ground near Zgounder and near Boumadine that comes our way on what I'd call an almost monthly cadence. So thank you once more. To close, I've often noted that success in mining comes down to three factors. The first is geology — and we've got it; that slide on page 19 shows Morocco's geology is truly exceptional. Then there are the people — we have a superb team, a strong group of employees, and motivated shareholders who are aligned with what the shareholders want. Finally, jurisdiction: Morocco ranks as a tier-one mining jurisdiction, and while we all know things are becoming very difficult in certain countries, Morocco is tier-one, and mining ranks at the very top of the priority list. So if you take those three success factors — geology, people, and jurisdiction — then what's required is a solid silver market and a solid gold market, and on our end, we'll continue to produce a robust quarter next quarter and a robust year. So thanks so much. See you in March, because that's when the next call happens, when we'll have the year-end financial statements. Until then, we'll see some of you this weekend in Frankfurt. Others will see you in Geneva or in Zurich at the end of next week, in London the week after. So we're on the road meeting shareholders. Thanks so much, and we'll talk to you very soon. Thank you.
Operator
operatorThat brings today's conference to a close. Thanks for joining us. You're free to disconnect at this point; this live transcript is produced automatically, with no human involvement or review.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aya Gold & Silver Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Aya Gold & Silver Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aya Gold & Silver Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.