Good day, everyone, and welcome to the Q2 and H1 FY27 earnings conference call of Asian Energy Services Limited. This call might include forward-looking statements regarding the company, and those are based on management's beliefs, opinions, and expectations as of today's date. Such statements do not guarantee how the company will perform in the future, and they carry risks and uncertainties that are hard to foresee. Joining us from management today are Mr. Kapil Garg, Managing Director; Mr. Aman Garg, Director; Mr. Sumit Maheshwari, Group Chief Financial Officer; and Mr. Neerav Talati, Chief Financial Officer. As a reminder, every participant line is in listen-only mode, and there will be a chance to ask questions once the presentation wraps up. If you require help at any point during the call, please signal an operator by pressing star and then 0 on your touchtone phone. Kindly note that this conference is being recorded. I'll now turn the conference over to Mr. Kapil Garg, Managing Director. Thank you, and the floor is yours, sir.

Kapil Garg

executive
#2

Thank you. Good evening, everyone. I’d like to welcome all of you to the Q2 and H1 financial year ’27 earnings conference call. Joining me on this call are Mr. Amangad, Director, Mr. Sumit Maheshwari, Group CFO, Mr. Nirav Talati, CFO, Asian Energy, and Adfactors PR, our investor relations advisors. I hope each of you has had a chance to review our financial results and investor presentation, which are available on the stock exchange’s website as well as our own website. To start, I’ll share a few perspectives on the operating environment in the first half of financial year ’27, and then I’ll cover the key strategic and operational developments across our businesses. In H1 FY27, geopolitical tensions in the Middle East weighed heavily on the energy landscape, with supply chain disruptions and elevated crude prices driving volatility in global energy markets and reinforcing how important energy security through domestic production is. Governments are placing growing priority on investment in domestic production, operational efficiency, and resilient infrastructure, while higher energy prices have made marginal fields more attractive and more profitable. For India, where import dependency stands at 85 to 90% for crude oil and about 750% for natural gas, energy security has become an increasingly critical national priority.

Kapil Garg

executive
#3

Recent government moves such as Samudra Manthan—together with earlier efforts including the discovered small field bid round—add weight to the push for more domestic exploration and production, and through these Oilmax has assembled a set of promising hydrocarbon assets. Going forward, all of these efforts are opening up meaningful chances for growth and expansion. Turning to Asian AESL, the order book is still strong. With the Vedanta project executed successfully, we expect faster uptake and more outsourcing of integrated field development work from producers, private and public alike, which creates long-term opportunities for AESL. At the Indrora and Mevad fields, the planned production ramp-up is proceeding as scheduled, supported by the drilling of 3 wells in calendar year 2026, all of which came in successfully and are producing. As for the 4th well, horizontal drilling technology is being used there for the first time in the field—and drilling is underway right now. We stay confident about hitting the target of 800 to 900 barrels of oil per day of capacity. Shifting to the company's key developments for the period, one strategic milestone was the NCLT Mumbai Bench approving the scheme of merger by absorption of Oilmax Energy Private Limited into Asian Energy Services Limited.

Kapil Garg

executive
#4

We've also gotten in-principle approval from the Ministry of Petroleum and Natural Gas regarding the proposed merger, which marks one more key step toward completing it. And we're now waiting on final approval from them in the coming days so the merger can be implemented. This merger is a significant milestone in our long-term growth strategy, transforming AESL from a services business into an integrated energy platform. By combining our established services capability with Oilmax's upstream oil and gas and mineral assets, we aim to strengthen our presence across the energy value chain, improve operational efficiency, and build a more comprehensive business platform. Given the imminent merger between AESL and Oilmax, we believe it will be prudent to give an update on Oilmax's activities. With respect to Oilmax, we achieved 3 important milestones in first half of financial year '27. Oilmax — the first one is Oilmax was awarded the Kutch offshore hydrocarbon block forward under discovered small field bid round number 4, in which it holds a 50% participating interest and has been designated as the operator. After the quarter, Oilmax has also executed the revenue sharing contract with the Government of India for the awarded block, marking a significant step towards — forward for the company's upstream journey into large offshore blocks.

Kapil Garg

executive
#5

Significant headway. The second item is that significant headway has likewise been — has likewise been achieved by linking Assam's DNPL pipeline into the broader IDGL network, and that work is underway and should assist every hydrocarbon producer in the Northeast, Oilmax included, in lifting natural gas offtake and securing improved prices. Third, Oilmax has been given a letter of intent covering the Pakro vanadium and graphite block located in Arunachal Pradesh. That marks its entry into the critical mineral segment. We additionally signed a gas field agreement covering Tiphuk, where output is anticipated to start in Q4 FY27. Such developments fit with our approach of broadening our upstream asset base and diversifying into mineral assets possessing long-term growth potential. We observe global conditions generating opportunities overseas too. Our international operations within Kuiper Group saw a recovery in Q2 FY27 after certain operational challenges encountered at the start of the financial year caused by shifting geopolitical conditions in West Asia. Business activity came back to normal levels over the quarter. The latest tensions, hitting Saudi Arabia in particular, still call for careful watching. Our operations in Saudi Arabia stay unaffected so far, and overall project activity remains on track despite the effect on operating costs.

Kapil Garg

executive
#6

Our view of the near-term outlook is still one of cautious optimism, and we're excited about what the region's post-war reconstruction will open up, since our aim is to grow Kuipers revenue to the guided US$100 million by financial year ’30. Turning to our mineral infrastructure segment, our first project in Rajmahal, Jharkhand, is now complete, and 2 additional projects are in trials and commissioning at present. Together with the project we won earlier from Gujarat State Electricity for Ukait TPS in Gujarat, these recent developments give us a lot of confidence when it comes to building and executing mineral handling projects from here. Based on historical operational performance, we expect large revenue booking in H2 from this segment, and we stay active in taking part in every opportunity on the horizon, not only with Coal India but with other customers as well. As we move into the second half of financial year ’27, we remain focused on speeding up project execution, strengthening our order book, integrating Oilmax operations with AESL, and keeping CapEx and financial discipline in place. I'll now hand the call over to Mr. Sumit Maheshwari, our Group CFO, to speak about the financials.

Sumit Maheshwari

executive
#7

Thank you, Kapil sir. Good evening, everyone. Turning to H1 FY27 financial performance: revenue from operations came in at INR 537.9 crore, which is a 148% rise YOY, more than doubling from INR 217.4 crore in H1 FY26. That reflects a strong growth trajectory. EBITDA was INR 52.3 crore, up 148% YOY, while EBITDA margins came in at 10%. Profit after tax was INR 29.8 crores, which translates into a PAT margin of 6%. Moving to Q2 FY27, revenue from operations was INR 266.7 crore versus INR 102 crore in Q2 FY26. That's growth of 161% YoY. EBITDA for the quarter grew 235% YoY to INR 30.3 crores, compared with INR 9.1 crore in the same period last year, while EBITDA margin came in at 11%. Profit after tax for the quarter was INR 71.1 crore, with PAT margin at 6%. In the Oil and Gas segment, Q2 FY27 revenue stood at INR 239.8 crores, with an operating profit of INR 42.8 crores. For H1 FY27, that segment reported revenue of INR 484.5 crores and a profit of INR 76.1 crores. In the Mineral and Other Energy Services segment, Q2 FY27 revenue amounted to INR 26.9 crores, with a profit of INR 4.3 crores.

Sumit Maheshwari

executive
#8

When it comes to H1 FY27, this segment posted revenue of INR 53.3 crore, and profit reached INR 8.4 crore. Turning to the balance sheet, our financial position stays strong, with gross debt-to-equity at merely 0.25, and on a net basis we are nearly a company free of debt. That also mirrors the strength of our financial fundamentals and gives us a solid foundation for pursuing future growth opportunities while keeping a disciplined approach to how we allocate capital. Although revenue was broadly stable on a sequential basis in Q2 FY27, we turned in a strong showing at the EBITDA level, which reflects better operational efficiency and profitability. Going forward, we are confident about delivering strong revenue in H2 FY27, backed by our robust order book, faster project execution, and a healthy pipeline of opportunity. We remain firmly focused on sustaining this momentum and are well on track to meet the stated guideline guidance for the financial year. Thank you. We now open the floor for questions.

Operator

operator
#9

Thanks very much, sir. At this point we'll open things up for questions and answers. If you'd like to pose a question, just hit star and 1 on your touchtone phone. Should you want to drop out of the queue, press star and 2. We ask that participants speak into the handset when asking. Ladies and gentlemen, we'll pause briefly while the queue fills up. Thank you. Our first question is from Siddharth Chauhan of 361 Capital. Please go ahead.

Siddharth Chauhan

analyst
#10

Hey, sir. Thanks for the chance to speak, and congrats on a solid set of results. I've got a couple of questions. First, on the oil and gas segment — when I look at it sequentially, EBIT has gone up quite sharply, you know, even though revenue has moderated. So could you share why that is?

Sumit Maheshwari

executive
#11

Siddharth, is there anything else you wanted to ask, or are you all set?

Siddharth Chauhan

analyst
#12

Yes, I actually have 2 additional questions. Should I, should I go ahead and ask them?

Sumit Maheshwari

executive
#13

Yes, go ahead.

Siddharth Chauhan

analyst
#14

Okay, second, regarding how big the opportunity is that you're considering from the angle of upstream firms such as ONGC, Oil India, and even Vedanta farming out their fields under integrated service contracts. So I just want to understand what the total size of that opportunity is, and are any tenders presently out there? That's my second question. And finally, on the coal handling segment, are there any tenders underway where you are bidding? And if you could share the quantum or the size of those contracts, I think that would be helpful. That's all from my side.

Sumit Maheshwari

executive
#15

Alright, so Siddharth, to address your first question regarding the EBITDA increase — that largely reflects our strong operational and financial performance, and we've put quite a few cost efficiency measures in place that are now starting to pay off. Then the second part is more of a — the project mix that we executed in Q1 and Q2, and that's what drove the sharp EBITDA increase on a sequential basis from Q1 to Q2. Okay, yeah, with regards

Kapil Garg

executive
#16

On the 2 other questions regarding integrated oilfield opportunities: as I said earlier, following Vedanta's success, ONGC has begun examining this area, and Oil India has started looking into it as well. Right now, as we speak, 2 tenders are underway, and we intend to take part in them. On size — some of these contracts run 15 years and involve roughly 5,000 barrels apiece. So to give you a figure, I'd say somewhere between 500 and 700 crores per tender annually across 15 years. And this is just the start; as I mentioned, these are 2 projects currently out to tender, and we anticipate more coming. You can work out that the overall opportunity is a very, very decent size. As for your question on coal handling plants, yes, there is some activity there at present. The rough size is around ₹250 crores for that project, and a few — and further opportunities are in the pipeline.

Siddharth Chauhan

analyst
#17

Got it, got it, sir. I really appreciate that, and I wish you the very best going forward.

Kapil Garg

executive
#18

Thanks, thanks.

Operator

operator
#19

Thanks. Our following question is from Raj at TPR Capital. You have the floor.

Raj

analyst
#20

Hello, sir. First off, congratulations on that excellent set of results. My first question, sir, concerns the in-principle approval—how much time do you figure it will take for us to secure the approval from MNO, MN, uh, from MOPNG? That's for the Oilmax merger. My second question relates to the contribution from Project Kuiper in this particular quarter, and we've been given guidance of ₹500 to ₹550 crores. So based on the current momentum in H1, how are we looking when it comes to meeting that guidance? And my third question was simply about the overall acceptance you're seeing with the Samudra Manthan scheme and the other CapEx that have been announced by the likes of Oil India for drilling, by ONGC for drilling. So what is the, uh, you know, scenario or change we're seeing in the industry today as a result of all those initiatives being taken by the government in terms of orders, tenders coming up?

Kapil Garg

executive
#21

All right, so your first question concerned the MoPNG approval. Since the in-principle approval is already there, we'd anticipate getting the final sign-off before long. I mean, I wouldn't want to — I'd rather not attach a specific number of days to it, given that it's the government we're working with,

Raj

analyst
#22

However,

Kapil Garg

executive
#23

We’re hoping that happens before long.

Raj

analyst
#24

Alright.

Kapil Garg

executive
#25

Your second question concerned the guidance on CAIPR.

Raj

analyst
#26

I want to begin by discussing CAIPR.

Kapil Garg

executive
#27

Regarding the figures we guided at the start of the year, we're still firmly on track to hit the guidance of between ₹500 to ₹550 crores for the year. As I said earlier when I was speaking, we're all aware there's some crisis unfolding in the Middle East, and we're watching it very carefully. But luckily, fortunately, our operations aren't impacted at this point in time. So going forward, we expect to deliver those numbers.

Raj

analyst
#28

Alright, sir. Do you have a figure for how much Kuiper contributed this quarter?

Sumit Maheshwari

executive
#29

Right, so for this quarter, what separates the standalone figures from the consolidated ones is just the revenue coming from Kaiphar.

Raj

analyst
#30

Got it, got it, Kaiphar.

Sumit Maheshwari

executive
#31

It brought in revenue of approximately 135 CR.

Raj

analyst
#32

Understood.

Operator

operator
#33

Yes, Mr. Raj — does that address your question?

Raj

analyst
#34

And then a third question, if I may, about how the Samudra Manthan and the other investments that ONGC, Oil India, and similar companies have announced have been received. What does the bidding pipeline look like, and how is the opportunity scaling up for you folks?

Kapil Garg

executive
#35

The detailed guidelines for Samudra Manthan came out just last week.

Raj

analyst
#36

Yeah,

Kapil Garg

executive
#37

So how the whole scheme would work. We're evaluating the detailed guidelines on how it will impact us and how we can use the opportunity. But on a broader level, what we understand is that out of let's say 84,000 crore which have been provided in Samudra Manthan, about the majority chunk goes for deepwater drilling. So there we don't really have much role to play, but the balance which is directed towards building common infrastructure pipelines, there could be potential for us to work with regards to Samudra Manthan policy. But as I just mentioned to you, the detailed guidelines were only published last week.

Sumit Maheshwari

executive
#38

Will Kuiper stand to gain from deepwater drilling?

Kapil Garg

executive
#39

Kuiper is certainly going to gain from this, since many of those deepwater rigs that will be brought in from elsewhere to drill those wells are going to create a direct opportunity for Kuiper.

Raj

analyst
#40

Right, right, that makes sense. What we observed, generally speaking, was that the market reacted somewhat negatively to the policy regarding the replace — regarding the repayment scheme the government has introduced. Be it in terms of 7 years or 50% of the cost being recovered. So do you have any views on those specific guidelines, sir?

Kapil Garg

executive
#41

You're right about that. I mean, a few of the international firms could view it somewhat negatively, perhaps, but when it comes to the domestic side, the companies already operating here — ONGC, Oil India, Reliance, British Petroleum, Vedanta, for instance — my sense is they'd definitely want to capitalize on this policy, since they're already present and they're keen to pursue some of these initiatives. That's my perspective. I mean, we'll have to watch how it unfolds.

Operator

operator
#42

Understood.

Raj

analyst
#43

And, sir, about Northeast — you mentioned that fellow — uh, just my final question before I switch back again. You said the gas pipeline would also be helpful when it comes to realizations, and we already know Vedanta holds a large, you know, unexplored block available there. So what's your, uh, view on Northeast development, in terms of the blocks that are, uh, you know, not explored there and the potential gas pipeline that's coming up? Uh, what benefit could we accrue from this?

Kapil Garg

executive
#44

See, for the past 2 to 3 years, pipeline connectivity has really held us back. So we were, we were essentially compelled—we've been selling gas to the local grid, mostly tea gardens, a small amount to Brahmaputra Crackers and the Assam Power Corporation, since we aren't linked to the wider grid. And this Manush gas grid, which was meant to be finished 2 years ago, slipped a bit, but it's now beginning to come through. What we hear is that later this—in November, the DNPL pipeline is going to hook up with the IDGL network. Certain sections of ONGC are already linked to IDGL, and we're beginning to see a broader market opening up. Take Indian Oil, for instance—it brings in imported LNG for the 2 refineries running in Gujarat—in Assam.

Raj

analyst
#45

So,

Kapil Garg

executive
#46

All of that imported LNG is going to be swapped out for gas produced domestically, which every producer—ourselves included—is bringing up in Assam. So as soon as demand for that local domestic gas rises, we see—we believe the pricing will get better. At the moment we're getting roughly plus minus $7 per million BTUs, despite the fact that gas sold across India goes for over $10. So the expectation would be that with better connectivity, that gap in pricing would begin to shrink.

Raj

analyst
#47

Understood, sir. Thank you. Many thanks indeed, sir.

Operator

operator
#48

Thanks. Our following question is from Rajesh Jain at Jain Investment. Please proceed.

Raj

analyst
#49

Hi there, and thanks — first off, congratulations on the strong set of results. I’ve got 2 questions now, really, since Oilmax is set to merge with Asian Energy. Could you shed some light on Oilmax’s revenue and profit for H1, and can you provide guidance on that same front for FY28, with all 3 companies combined — Kaipor, Asian Energy, and Oilmax?

Sumit Maheshwari

executive
#50

Rajesh, as we mentioned, once the Oilmax merger closes, we'll begin giving detailed figures and financials for Oilmax. Yes. And regarding the guidance we provided for FY27 — as we've already said for Asian Energy — we remain on track to deliver against it. Once that merger is finalized, as an organization we'll issue annual guidance, and that will also include next year's guidance for Oilmax. And if you look, we've already given the long-term guidance covering the next 2 to 3 years for the combined company — Asian, Oilmax, and Kuiper — where our target is ₹3,000 crore of top line and ₹700 crore of EBITDA. So we'll stay with that guidance, and as soon as the merger is completed and implementation is underway, we'll start providing the required financial details along with guidance for Oilmax as well.

Siddharth Chauhan

analyst
#51

Okay, thanks a lot.

Operator

operator
#52

Thanks very much, ladies and gentlemen. Should you want to pose a question to the management team, you can press star and 1. Our next question is from Hina Parekh of Starklume Investments. Please go ahead.

Hina Parekh

analyst
#53

Thanks for taking the question. First, congratulations on a solid set of results. I just wanted to ask: on a year-over-year basis, both for the half year and the quarter, our mineral and other services businesses have stayed roughly flat or actually declined. Could you walk me through which parts of the business drove that contraction in this segment? And I have another question about the Duarmara plant. We had indicated production should begin in Q4, and that still hasn't happened. So when do you expect that

Sumit Maheshwari

executive
#54

Alright, to address your first question regarding the mineral segment. As we explained earlier as well, and if you've looked at our PPT, typically Q3 and Q4 — the latter half of the year — is when we deliver and execute a greater number of projects, owing to seasonality and the monsoon season that affects Q1 and Q2. So for the mineral segment, we anticipate momentum building in H2 of the year, and we will definitely perform much better in H2 than we did in H1. And on a full-year basis, we do foresee growth over last year's numbers in the mineral segment. On the very specific point of the 2 new projects that have been awarded to us — generally, during the first 6 months you spend more time on engineering and all of those activities, so revenue recognition is somewhat slower. Then once 6 months have passed, revenue recognition picks up. So we do believe that in H2 we will see much better performance in this mineral segment relative to H1, and we will see improved growth, and we'll also see growth compared with last year's numbers.

Sumit Maheshwari

executive
#55

Would you mind restating your second question? I was just —

Hina Parekh

analyst
#56

Right, right, that's great. I'm on it, since regarding the plant, we said production ought to begin in Q4. So I was just hoping for an update, say by,

Kapil Garg

executive
#57

Um,

Hina Parekh

analyst
#58

What's your best guess for when that would begin?

Kapil Garg

executive
#59

Regarding Duarmara, as you know, Antelopus serves as our partner and the operator of that field. They gave guidance during the call. The well drilled last year hit 3 zones. On the — we had thought the gas zone would be more prolific, but the oil zone performed better there, which was somewhat of a — I'd have to say it was a slight surprise for us. So we're now discussing the future plan with Antelopus, and we plan to return and carry out additional workovers plus additional testing. As for your specific question about when production can be expected to begin, I'd say Q1 FY28, or Q1 or Q2 FY28 would be closer to our current expectations.

Hina Parekh

analyst
#60

Understood, that's great. Thank you very much, that was genuinely useful, and best wishes to you.

Operator

operator
#61

Thanks. Anyone who’d like to ask a question can press star and 1. Our next question is from Pawan Kumar at Agarwal Investments. Please go ahead.

Pawan Kumar

analyst
#62

Hello, sir, good evening. Congratulations on the strong set of numbers. I just have, uh, one question. How is the Vedanta project progressing, and when do we expect revenue from that project?

Kapil Garg

executive
#63

The Vedanta project is still very much on track, and we expect to finish every CapEx element within this financial year. It remains firmly on schedule exactly as it was planned. Yes, and we're already booking revenue for the work we're carrying out on the

Sumit Maheshwari

executive
#64

On a quarter-over-quarter basis.

Pawan Kumar

analyst
#65

And one more question: do we have any active contracts we're bidding on that will be awarded in the second half of the year?

Sumit Maheshwari

executive
#66

As we mentioned, there’s a highly active bid pipeline we’re engaged with, so we won’t go into very specific details, but yes, on both the oil and gas side, we’re actively working on 3 to 4 tenders at this moment, and we expect a couple more tenders to arrive. And on the CHP side as well, uh, we have, uh, uh, one active tender that is live right now, for which we plan to submit our bid, and then we expect a couple more tenders to come in during November. So the bid pipeline remains very robust and very active.

Pawan Kumar

analyst
#67

Appreciate it, thank you, and best of luck to you too, sir.

Operator

operator
#68

Thanks. Our following question is from Raj at TPR Capital. You have the floor.

Raj

analyst
#69

Sir, I’d like to get a clearer picture of the CDL we already have in Chhattisgarh at the block level. As of this quarter, we’ve also said it’s under development. Could you give me a little more detail on what the potential is at that project and what we should expect over the next 2 years for it?

Kapil Garg

executive
#70

Okay, so every permission we need is in place, and that covers all the environmental clearances as well. The contract is now finalized. We expect drilling to begin around the middle of November, right after Diwali. As for the drilling results, gathering them will take roughly 6 months, and on that basis we anticipate production in line with our initial guideline — guidance. Starting production will take about 2 years, but the activity itself, as I just mentioned, gets underway around 15th of November.

Raj

analyst
#71

Understood.

Operator

operator
#72

Thanks. Just a quick reminder for everyone that pressing star and 1 will let you ask a question. Our next question is from Tina Maheshwari at OP Equity Advisors. Please go ahead.

Tina Maheshwari

analyst
#73

Hello, sir, and congratulations on these results. First, I'd like to get a handle on something: now that NCLT has approved the anticipated merger and just one regulatory approval remains outstanding, how capital-intensive is this whole thing, and in what way will it support hitting the overall growth they've envisioned for FY30? Thank you. Thank you.

Sumit Maheshwari

executive
#74

As we mentioned — and you can see this in our presentation — the Oilmax vertical, which is the ENP vertical, plus we also have a couple of mineral mines. So for FY30, starting from 2,000 BOE per day of production today, the goal we are aiming at is 10,000 BOE per day. That will deliver a huge benefit and a huge contribution to the growth the company is targeting. And regarding CapEx needs and all of that, as we said, these blocks are all discovered blocks, and the necessary infrastructure is already there, along with some wells in place. So we don't expect particularly heavy investment in this sector over the coming years. And this business, especially once the merger is done, as we ramp up production from the Oilmax ENP assets and the Oilmax blocks, will make a huge contribution to the company's overall top line and bottom line.

Tina Maheshwari

analyst
#75

Understood, sir, thank you very much.

Operator

operator
#76

Thanks. Ladies and gentlemen, to put a question to management, you can press star and 1. Those who would like to ask something may press star and 1. Thank you.

Kapil Garg

executive
#77

If there are any more questions, we can take them, but otherwise, thanks everyone for being on the call, and we’re looking forward — should you have anything else you’d like to ask, just contact our PR agency and we’ll be glad to help with that. Thanks very much. Good evening.

Operator

operator
#78

Appreciate it, sir. That wraps up this conference on behalf of Asian Energy Services Limited. Thanks for being with us — you can go ahead and disconnect your lines now. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Asian Energy Services Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Asian Energy Services Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Asian Energy Services Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.