Aspen Aerogels, Inc. (ASPN) Earnings Call Transcript & Summary
April 29, 2021
Earnings Call Speaker Segments
John Fairbanks
executiveGood afternoon, and thanks for being with us on the Aspen Aerogels call. This is John Fairbanks, the company's Chief Financial Officer. Before I hand things to Don Young, our President and CEO, there are several administrative matters I want to cover. Our press release, which reports Aspen's financial results and business developments along with a reconciliation of management's non-GAAP financial measures to the most applicable GAAP measures, can be found in the Investors section of Aspen's website, www.aerogel.com. That release contains a summary statement of operations, a summary balance sheet, and a summary of key financial and operating statistics covering the first quarter, which ended March 31, 2021. Additionally, a recording of this webcast will be accessible on Aspen's website within the Investors section for approximately twelve months. Please note that during today's call, we will be making forward-looking statements — meaning any remarks regarding expected outcomes, assumptions, beliefs, forecasts, approximations, objectives, future possibilities, strategic initiatives, or any other matter that does not constitute a historical fact. Such forward-looking statements carry risks and uncertainties. What Aspen Aerogels ultimately reports could vary significantly from what is conveyed in those forward-looking statements. A compilation of elements that may influence the company's real outcomes can be found in the press release Aspen published today, and is addressed more thoroughly in the documents Aspen submits to the SEC, particularly the most recent Annual Report on Form 10-K. Today's press release from the company, along with its SEC filings, can also be accessed in the Investors section of Aspen's website. The forward-looking statements we're making today represent the company's views as of today, April 29, 2021. Any obligation to update these forward-looking statements to reflect future events or circumstances is disclaimed by Aspen Aerogels. On this call, we will refer to non-GAAP financial measures, including adjusted EBITDA. These financial measures are not prepared in accordance with US Generally Accepted Accounting Principles, or GAAP. These non-GAAP financial measures are not intended to be considered in isolation or to substitute the results prepared in accordance with GAAP. You can find the explanations of these non-GAAP metrics, how they line up with the closest GAAP equivalents, and the reasoning behind showing them in the release we put out today. Don, over to you.
Don Young
executiveThanks, John. Good afternoon, everyone, and thanks for being with us on the Q1 2021 earnings call. What I'll do today is walk through the chances we see to create substantial value across the coming five years, and I'll also give you a progress report on our strategic initiatives. John is going to recap how Q1 went and then wrap up with our updated outlook for 2021; after that, we'll close today's call with a Q&A session. Here are the main takeaways from what I plan to say: number one, we're now developing and supplying both prototype and production thermal barriers to five of the 10 largest automotive OEMs; number two, acid battery materials has gotten requests from five battery and automotive companies asking for evaluation samples of our carbon aerogel materials; and number three, our energy infrastructure business is displaying early signals of a post-pandemic rebound, and that includes a new LNG win. When we held our last earnings call, we put a new company presentation up on our website. I'd like to go over the key points that deck captures, since fully appreciating our potential requires understanding our strategy, how large our opportunities are, and the progress we're making toward creating value. At the heart of our strategy — being a global technology leader in sustainability — is leveraging our aerogel technology platform, with attention on multibillion-dollar opportunities in markets that are high-growth and high-value, and on building a proprietary business that is diverse and valuable. Right now we have a number of opportunities in motion that match that profile, with a spectrum running from the R&D phase all the way to the full commercial node. Three of them are what I'll cover today: PyroThin thermal barriers, which we think represent a $30 billion opportunity through this decade; acid battery materials, which we think represents an opportunity of more than $35 billion through this decade; and Pyrogel and Cryogel products for energy infrastructure, which we think represent an opportunity of over $30 billion during this decade. With our PyroThin thermal barriers, EV manufacturers can manage thermal runaway. Thermal runaway is the phenomenon in which a cell inside a lithium-ion battery pack suddenly releases energy, which can lead to a fire, and every EV battery platform struggles with it. PyroThin thermal barriers are built to impede propagation of thermal runaway and to lessen how severe the event is. What Aspen's technology provides is a unique mix of performance attributes, letting EV manufacturers hit critical safety goals while keeping drive range intact. Back in Q4, 2020, we announced that a major U.S. automotive OEM had awarded Aspen contracts to supply PyroThin thermal bearers for use in its EV battery platform. From these contracts alone, we could potentially generate revenue of $75 million in 2023 and $150 million per year from 2024 through 2030. On their own, these contracts amount to an opportunity of roughly $1 billion for Aspen over this decade. How much the contract is ultimately worth hinges on our customers' success in taking part in the global transformation to electric vehicles, and we think this customer is well positioned to succeed. From that point onward, we've built a strong pipeline for business development around PyroThin thermal barriers. We're turning into a top industry source for fast development, testing, and prototyping of thermal runaway solutions aimed at lessening thermal runaway's effects; it could be useful for me to walk through the different phases of that pipeline. Phase one is our first contact, which is characterized by being linked with the subject matter expert at the company we're targeting so we can trade technical concepts and needs; dozens of companies fall into this group. Today I won't dwell on phase one, and will instead address the more meaningful second and third phases; during phase two, we hand PyroThin samples to possible buyers so they can do basic testing. Over 15 companies are in this phase, among them automotive OEMs, battery OEMs, plus stationary and energy storage firms. Here we start dealing with those potential buyers more formally, bring our technical know-how to bear. And deliver the best solutions for handling thermal runaway within that customer's battery system; this set of firms represents commercial possibilities mainly starting in the 2022 to 2024 timeframe. In phase three, we move on to giving chosen customers complete thermal barrier prototypes along with production parts, meant for system, testing and integration. Our aim at this point is to shift, our prospective buyer from testing PyroThin samples, toward buying prototypes and then toward granting us multi-year supply contracts like those we announced in Q4 2020. We're currently working with five of the 10 biggest automotive OEMs, at this phase three. Combined, those five firms sold more than 35 million ICE vehicles and EVs during 2019 and have dedicated over $140 billion toward electrification. Every one of those firms has pledged all-electric line-ups inside a decade. Such firms either have introduced EVs or will introduce EVs no later than 2022, and offer a tremendous chance for Aspen to scale volume fast, over the next few years. As our thermal barrier work speeds up, we're boosting our spending on the business; we're hiring individuals who bring deep automotive and EV backgrounds, spanning technology, supply chain, quality, automation and business development. We're additionally preparing a capital investment in our Advanced Thermal Barrier Center or ATBC. That investment fits with our aim of being the expert industry source for thermal barrier solutions; this best-in-class facility will make possible rapid prototyping, performance testing, collaborative customer engagement and both, low volume and automated production parts. We think these investments plus our thermal barrier opportunity could produce considerable returns. The second opportunity, I want to go over today, is Acid Battery Materials, which we call ABM, where we're putting our carbon aerogel technology to use in designing low-cost, high-performance silicon rich anodes, within lithium-ion batteries. Swapping out graphite anodes for silicon is broadly seen as the top short-term method for improving lithium iron battery performance while lowering expenses. That method allows for material reductions that work with the production processes behind the battery gigafactories of today. Our efforts focus on drawing from 20 years of know-how in designing and producing aerogel nano materials at scale, so that we can fine-tune both cost and performance for our carbon aerogels. We have confidence in our ability to hit the goals our valuation partners have laid out. As of today, we're answering requests for evaluation samples coming from 5 battery and automotive companies. What these firms want are high capacity silicon anodes that can be easily put to use in the battery designs they have now. Such anodes could also factor into designs down the road, among them solid state. The progress on our silicon carbon aerogel solution has us feeling upbeat. This higher degree of market interest in our carbon aerogels has emboldened us to speed up our intention to put more investment into ABM. We're bringing scientists and engineers onto the team and have launched a major facility expansion meant to speed up in-house development and testing of full multi-layer lithium-ion battery cells.
Don Young
executiveThis buildout will likewise accelerate the growth of the market by supplying greatly needed output capability for bigger volumes along with evaluation materials, so we can satisfy requests from an expanding roster of battery and automotive OEMs. We're making the investment in the ABM facilities alongside an enlargement of our broader laboratory holdings that back our R&D and new business creation groups, all in line with our approach of using our aerogel technology platform to enter new markets with high growth and high value. Now I'll offer some remarks about our energy infrastructure business. At $28.1 million, revenue came in above what we had anticipated and was about level with Q1 2020 before the pandemic. A single quarter doesn't mean the pandemic is over, yet we saw green shoots pointing to a fairly solid first half and something nearer to normal as we move through the year. Specifically, activity in a handful of our regions is starting to pick up in what looks like a post-pandemic trend. Within the U.S. market, our distributors appear to be restocking, and our end-users are starting to tackle maintenance work that had been put off. We're also seeing more LNG project work, including the Arctic LNG contract being awarded. We think we're positioned well to come out of the COVID-19 period with a robust operating platform in energy infrastructure and considerable strategic momentum for the entire company. Right now, I'd also like to update you on the 2023 targets and milestones we first rolled out earlier in the year. For 2023, we established a revenue goal of $225 million, which is roughly double the revenue in our 2021 outlook. The scope and depth of our work with automotive OEMs on pyro and thermal barriers, plus the encouraging signals in the energy infrastructure market, made us even more sure of our capacity to hit this 2023 revenue target; we also think we have a chance to double revenue not just from 2021 to 2023, but once more from 2023 to 2025. This conviction rests both on the favorable macro backdrop supporting e-mobility and on our ability to land several more multiyear battery platform wins for our distinctive and protected PyroThin thermal barrier technology. Beyond the investments we're making to keep up with the advances of PyroThin thermal barriers and Aspen battery materials, we're also intending to grow capacity through a second aerogel manufacturing plant. Today, our East Providence plant has the capacity required to back our 2023 revenue target of $225 million; however, given the chance to double revenue again by 2025, we'll require extra capacity by late 2023. Our plan is to construct plant two in a modular way, and we'll set the capacity of plant two's first phase according to the potential value of further thermal barrier contract awards. For the big EV OEMs, having a firm blueprint for plant two — one that includes a scheduled set of site locations plus a suitable balance sheet — matters a lot. They expect us to deliver not just plenty of capacity, but also manufacturing sites spread across different regions. Within the next few months, we'll provide the specifics of what we intend for plant two. Stepping back, the main takeaways from what I've said today are as follows: to start, we are right now developing thermal barriers — both prototype and production versions — and supplying them to five among the 10 biggest automotive OEMs. Five battery and automotive companies have asked Aspen battery materials for evaluation samples of our carbon aerogel materials. Beyond that, our energy infrastructure business is displaying the first indications of a rebound after the pandemic, and that includes a fresh LNG win. And finally, given considerable momentum and opportunity, we've chosen to speed up investment in these businesses. John, over to you.
John Fairbanks
executiveThank you, Don. To kick things off, I'll walk everyone through the summary-level financial results we reported for Q1 2021. Revenue came in at $28.1 million, down 1% from $28.4 million during the same period in 2020. Our net loss grew to $6.3 million, which works out to $0.22 per share, compared with a net loss of $3.2 million, or $0.13 per share, in last year's first quarter. Adjusted EBITDA came in at negative $2.6 million, versus positive $500,000 a year earlier. When we refer to adjusted EBITDA, we mean net income or loss prior to interest, taxes, depreciation, amortization, stock-based compensation expense, and other items we don't consider reflective of our core operating performance. Now I'd like to give more granularity on what drove these results. Let me begin with revenue. Coming in at $28.1 million, total revenue was down 1%; the decline for the quarter stemmed from softer demand in the refinery and petrochemical market, especially within Asia, along with less project work in the subsea market, largely offset by robust demand in the global LNG market, led by shipments tied to the Arctic LNG and PTT LNG projects. Shipments for the quarter rose 6% to 8.6 million square feet of aerogel blankets, even as our average selling price fell 6% to $3.25 per square foot. That drop in average selling price came from a smaller mix of higher-priced subsea products combined with a larger mix of lower-priced 5-millimeter and LNG products this year compared with the first quarter of 2020. Turning to gross profit. For 2021, gross profit was $4 million, or 14%, versus $6 million, or 21%, during 2020. The lower gross profit stemmed from the 6% decline in average sales price and higher material costs, partially offset by a 6% gain in volume and lower manufacturing expense. I'd like to point out that a $1.8 million reduction in our finished goods inventory during the quarter cut our first quarter gross profit by $1.2 million and our gross margin by 400 basis points; we anticipate rebuilding those finished goods inventories and recovering that contribution later in the year. Now let me cover operating expense. Operating expense for the first quarter rose $1.1 million, or 12%, from last year, reaching $10.1 million. That rise was mostly attributable to additional recruiting expense and compensation costs tied to new hires, including those supporting our e-mobility business development initiatives, partly offset by lower travel expenses due to ongoing COVID-19 related restrictions. Next, I'll go over our balance sheet and cash flow for the quarter. Cash used in operations totaled $1.9 million, which reflected our adjusted EBITDA of negative $2.6 million, partially offset by a $700,000 decrease in working capital investment during the quarter. That working capital decrease was mainly due to a $2.3 million reduction in inventories during the quarter. Capital expenditures for the quarter were $1.5 million. Our efforts are centered on making the East Providence manufacturing plant more efficient and dependable, and, to a smaller degree, on getting our thermal barrier fabrication operations up and running. The $4.1 million in cash from financing activities consists of $6.2 million brought in through our sale of equity under the existing ATM facility, partly offset by a net $2.1 million of cash spent on employee equity transactions. Consequently, we closed the quarter holding $17.2 million in cash, with net current assets of $27 million, nothing drawn on our revolving credit facility, and shareholders' equity of $66.6 million. At the close of the quarter, we additionally had $13.1 million in available capacity remaining under that revolving credit facility. Now I'll move on to our outlook for the full year 2021. COVID-19 is still holding back activity in our energy infrastructure markets, especially in Asia, yet we are noticing the first indications of demand picking up in North and South America. Because of that, we now forecast revenue growth across the final three quarters of 2021 ranging from the mid-single digits to the mid-teens. In addition, we are raising our 2021 revenue outlook by $3 million, to a range of $103 million to $111 million for the year; we have also chosen to boost our strategic investments over the rest of 2021 to back our e-mobility business development initiatives. This investment will involve $10 million of incremental expense aimed at strengthening the technical, commercial and operational teams and resources supporting our thermal barrier and battery materials opportunities. Within that total, we anticipate incurring $6 million of incremental expense and cost of sales. That covers additional manufacturing, fabrication, supply chain, quality and engineering personnel, plus the operating costs tied to our new fabrication facilities; the other $4 million of incremental expense we expect to incur in operating expense, for scientists, researchers, salespeople and administrative support personnel to grow and safeguard our patent portfolio, including our e-mobility products and technology, and for operating costs tied to our expanded research and corporate facilities. Our 2021 strategic investments will also encompass an incremental $18 million of capital expenditures to build our advanced thermal barrier center, to grow our battery materials production, fabrication and testing facilities, and to finish the initial engineering designs for our second silica aerogel manufacturing plant. Counting that strategic capital investment, we project capital expenditures in a range of $20 million to $25 million for the full year. We believe these strategic investments will put Aspen in position to seize the considerable growth opportunities open to us today in the electric vehicle market, to leverage our aerogel technology platform, to build new high-growth businesses, and to return to the strong operating performance that defined 2019 once the impact of COVID-19 subsides. Taking into account the effect of these strategic investments, our updated 2021 full year outlook is as follows: we expect total revenue between $103 million and $111 million; net loss between $28.3 million and $31.9 million; adjusted EBITDA between negative $15.2 million and negative $18.8 million. When it comes to earnings per share, our guidance ranges from a loss of $1.01 to a loss of $1.14 per share. That EPS projection is based on a weighted average of 28 million shares outstanding for the year. On top of that, the 2021 outlook factors in $8.9 million of depreciation, $4 million in stock-based compensation expense, and $200,000 of interest expense. Our full year outlook also anticipates gross margin in the mid-teens and an average selling price ranging from $3.35 to $3.40 per square foot. Now shifting to cash: we have confidence that our cash on hand, our available credit, and proceeds from possible equity sales under our existing ATM facility will be enough to fund operating requirements and strategic capital expenditures for the rest of the year. Over the longer term, we are pursuing a number of potential financing alternatives to fund construction of our second silica aerogel manufacturing facility, the other capital expenditures needed to support our e-mobility business opportunities, and post 2021 operating requirements. As our planning efforts move forward during the year, we'll share additional details about the second plant and other capital projects. At this point I'll hand the call over to Mike for Q&A.
Eric Stine
analystHi, Don and John.
John Fairbanks
executiveHi, Eric.
Don Young
executiveHey, Eric.
Eric Stine
analystAfter going through everything, I'm not really sure where to begin, but let's perhaps focus on the thermal barrier area — you mentioned 20 — that you have significant involvement with the five that are further along. I'm just wondering how things have sped up since you revealed your initial partner, what — clearly those five feel urgency, but what are you generally observing regarding urgency in this space from the whole group? And I'd imagine you remain confident about locking in at least one or two additional ones during this year?
John Fairbanks
executiveYes, I'd say that urgency is something we feel, and we've stated previously our belief that now is the moment to secure these deals. These represent multiyear design victories, and from an outside perspective or a broader macro view, the drive behind e-mobility electrification and the expansion of EVs is progressing at least as fast as anticipated, possibly even faster. So — we're confident we'll secure more deals in 2021, Eric. Considering the advancement we've achieved from the first stage as I outlined it, to the second, and currently into the third phase; we expect to keep guiding businesses along that path. Additionally, I believe thermal runaway is growing more common, as you've witnessed recalls happening at numerous companies and other, shall we say, regulatory-type cautions regarding these matters across all three areas: Asia, Europe, and right here in the United States.
Eric Stine
analystUnderstood. One development I'm aware of is that, during the past couple of months, your confidence grew regarding your eventual capacity to build flow with your existing customer. I'd like to know whether that remains an area where you feel confident. Also, does some event set that in motion, or what should our expectations be regarding possible timing?
John Fairbanks
executiveRight, we indicated our expectation was to accomplish that in Q2 of this year. Our view is that remains true. What's interesting is that not only with this particular one, but also with other parties at stage three, strategy plays a role for them. That includes how they may be tackling thermal runaway. Consequently, I don't believe every company will—my sense is that a lot of companies will treat this as something proprietary within their battery platform and possibly prefer not to make a large announcement. That said, our expectation is that we can issue announcements as we go, since it serves their interest—consider that we are putting money into a second plant, which, as I mentioned, is a sizable investment. That confidence has to be there. Those of us at the company need to grasp what underlies that confidence, and having big names in the EV sector line up with the figure concerning thermal runaway is simply a crucial validation, and I think it kind of sustains that sort of major capital decision.
Eric Stine
analystAlright, and is it accurate to say that this is a capital choice you wouldn't make unless you had an extremely high degree of confidence in additional business across both paths — thermal runaway and the carbon aerogel path?
John Fairbanks
executiveYeah, that's correct. One of the good things about how we're able to — the manner in which we put these manufacturing plans together is in that modular format, including the one we constructed previously in East Providence. We constructed the initial line. We first expanded that initial line, and after that we added a second module as line two, and then one more as line three. So we're quite experienced at being able to, so to speak, extend the line somewhat here, and at how we approach this. One of the fascinating elements of what we're doing now, and contemplating plant two, is getting the sizing right for that first module; and it will be determined by contracts in hand. That's beyond dispute. But that's an excellent method for building these things, where demand truly serves as the driver rather than, say, build and they will come. This will be genuinely driven by demand.
Eric Stine
analystSure thing. That's really great to hear. Perhaps my final question is about what's happening with carbon aerogel. Obviously, during the previous call, you mentioned that this had sped up. The schedule got pulled forward somewhat, and it appears that trend is carrying on. When you brought up those 5 businesses, do SK and Evonik fall within that group of 5, or do those 5 come on top of those 2?
John Fairbanks
executiveOne of those 2 is part of it.
Eric Stine
analystAlright.
John Fairbanks
executiveWhen I say "in the way," I'm not trying to dodge the question. On the customer side, that's really where SK sits. And Evonik, as you're aware, supplies materials to them, and in that sense acts as a partner to us. So out of the five we brought up, one is SK — or, shall we say, it's more of a market-facing one.
Eric Stine
analystAll right, understood. Thanks a lot.
John Fairbanks
executiveAppreciate it, Eric.
Don Young
executiveThank you, Eric.
Chris Souther
analystHey, everyone. I appreciate you letting me ask something here. Perhaps I'll begin with that $18 million of extra money going toward the advanced thermal battery center — once that investment wraps up, does it serve as some sort of obstacle to further wins, in your view, or is the real point just showing off manufacturing know-how for these bigger clients and sort of shortening your production timelines? I'm simply trying to understand how you folks are — as you're sort of putting this together, possibly to show customers, what's the thinking behind it and what abilities will result from it.
Don Young
executiveJohn, would you like to handle that?
John Fairbanks
executiveAbsolutely, sir. It genuinely serves two purposes. First, the advanced thermal barrier center is going to function as a customer-focused facility, one where we handle rapid prototyping in response to what customers need. That's something we already do, and we currently manage it with pretty limited resources, so the ATPC is going to make that easier for us. Beyond that, though, it's also — it's actually going to be home to our automated fabrication operations too; and for the contract we've already secured, we're going to turn out millions of thermal barriers annually. And we expect that as we — with more wins coming in, that figure is only going to grow; so automating that thermal barrier fabrication process is necessary for us to ultimately succeed in getting these components delivered to our customers. So it's going to help us bring in more customers, and then it's going to help us manufacture product for those customer contracts in the end.
Chris Souther
analystAlright, that's very clear. Now regarding where things stand with planning for the second facility, it clearly depends somewhat on the customer. So depending on when those awards might land across this year and next, but assuming we're looking at 2022 to 2024 ramps involving several of these customers, how do we — and with the modular strategy, when do you reach the point of finalizing and then update the street about what the plans will look like? It appears the scale you're targeting could keep shifting. I'm just wondering whether by year-end we'll receive more specifics, and then it might grow in 2022 should there be more customer wins? What's the right way to frame this?
Don Young
executiveChris, my view is that plant 2 is going to get built. As for us, we're currently evaluating the size of that initial — that initial line, so to speak, or that initial phase of this project. And that matters. I mentioned it briefly in my notes that it matters not just because capacity is required, but also since these large OEMs expect us to have ample capacity as well as wanting us to have manufacturing sites in diverse locations. And I'd call this a major commitment on our side to this new business we've moved into. So on timing, my expectation is that we'll issue announcements prior to the year ending regarding how this unfolds concerning site location and in all likelihood size too, because we truly need to get moving on it. That capacity is needed as we move deep into 2023 and definitely when 2024 begins. And this takes roughly a 24-month process; therefore, we have a dedicated team working on it right now. As John described, putting some of the initial design together, plus all the lessons we've learned from building line 1, line 2, line three at our East Providence facility. So an enormous amount of effort is going into this today. So my sense is you should expect announcements sooner rather than later, definitely prior to this year ending.
Chris Souther
analystUnderstood. Then, roughly 24 months from when production begins for those additional lines, what kind of timeline do you figure you would require if you were to extend beyond what was originally planned?
Don Young
executiveSo, if what you're asking is whether constructing the second phase takes us less time, the answer is absolutely yes. Even so, it likely shortens that period from 24 months down to 15 or 18 months, roughly speaking. That holds when we already have a structure in place along with the infrastructure. So it's a figure — it does cut it down somewhat. Still, we have to get this first phase right in terms of size as well as we possibly can.
Chris Souther
analystGot it, that clears things up. Then here's my final question. Regarding that extra $10 million of cost for the EV business during this year, you said it breaks down as $6 million and $4 million across COGS and OpEx. Could you share how much of an effect it had in Q1? Perhaps I overlooked it? And it would also be useful to know how that remaining spending will be paced across the balance of the year.
John Fairbanks
executiveSure — the additional amount is entirely for Q2 through year-end. So it will all occur from here onward. As a result, nothing spent during the first quarter was part of it.
Chris Souther
analystHow much did the higher DV side affect COGS?
John Fairbanks
executiveAt this point, it amounted to roughly 1 point of margin. It wasn't particularly large. Yet it's going to ramp fast once we shift out of prototype production — which is where we are now — into full-scale commercial production. And so — but that had been part of our original projections. We're essentially pulling forward certain expenses we'd initially budgeted perhaps for 2022 into 2021; responding to this, simply this rising interest in our thermal barriers plus our belief that the thermal barrier business will expand quickly across the 2022 through 2025 time period.
Chris Souther
analystI'll jump into the line. Appreciate it, everyone.
John Fairbanks
executiveThank you.
Jed Dorsheimer
analystHello, and thank you for taking my questions. I have a few, if that's alright. To start, perhaps on energy infrastructure. First, congratulations on the improved top line and on the rather bold decision to expand capacity at these levels. So if we look more closely at energy infrastructure, it's clear that pricing is beginning to rise for traditional fuels derived from hydrocarbons. Beyond rig counts and refineries or utilization, is there anything else giving you a certain level of confidence in this part of the business when it comes to that ramp? Then I have follow-ups regarding the other two areas.
Don Young
executiveI'd say our signals come in three parts. The first is that restocking is occurring. You may recall that during Q2 of last year, I mentioned the destocking taking place through our highly established distribution network in the United States and across the globe. Those distributors are quite close to the ground, so to speak, and they understand well what's going on at each facility. So we see that as a favorable indicator. Second, we've been explicit that, in our view, given the low-density work sites required throughout this COVID period — which is still the situation in many places worldwide, probably most places worldwide — there was undoubtedly deferred maintenance, and we're starting to see some of that postponed work get underway and attempted now. And so, we see that as a favorable indicator. And third, we're observing the project pipeline starting to — starting to revive. The worst thing a contractor or asset owner can do is launch a project and have its team on site, off-site, on site, off-site; that's a dreadful way, a costly way to run a project. So more projects than not were either never begun or shelved. And we're starting to see some of them come back to life now. And we're positioned well in the specifications for a number of these projects. So that gives us confidence. And naturally, we announced earlier the new LNG project, the so-called Arctic LNG win. So those are three things, Jed, that I believe we're seeing in the numbers, we're seeing in the activity levels; and it's — again, it isn't the case everywhere around the world, but it certainly is the case in pockets. And we think that as the pandemic gets a bit further behind us, it will become the situation in nearly all regions.
Jed Dorsheimer
analystUnderstood. Then, only to refresh everyone about the value proposition, if you don't mind. Regarding oil, as far as I know, I think thermal advantages related to heat, plus corrosion protection beneath the pipe, are basically the key factors. For LNG, does it operate identically, except cryogenically when it comes to lower temperatures, or does a thermal heat value proposition still apply in that case?
Don Young
executiveThermal management remains a significant component of what we offer in that area. Fire Protection is a significant component too. And something that is somewhat — it's genuinely striking, I'd say, regarding LNG, is how our materials can be installed faster, using a workforce with fewer skills in modular yards instead of necessarily at the site itself. Then there's how well our material withstands being moved on pipe or on vessel from a yard to, let's say, a distant location. Our materials hold up extremely well in that regard. So what we offer on the LNG side is extensive and robust. And I believe the reality that we assembled a 50% revenue CAGR since 2015, ever since we truly, truly, let me put it this way, committed ourselves to that area, communicates that quite effectively.
Jed Dorsheimer
analystUnderstood. Maybe now let's shift toward EVs and battery materials. Regarding the thermal runaway chance, what exactly are you displacing when it comes to the core shell? Since thermal mitigation and propagation—or reduction of mitigation—solutions already exist, I'm simply wondering what you're ready at this stage to discuss concerning the gains you're observing, compared with whatever an OEM or battery maker might be swapping out and instead putting your material into?
Don Young
executiveYeah, look, several points come to mind. I mean, many battery platforms we're engaged with—through that one, two, three stage process I mentioned—are brand new; and they're seeking the best materials to solve this problem. So in a way, we're not actually displacing an incumbent from the box. We're involved in the original design of those battery platforms; and that's a powerful position for us; and that's why investing in the advanced thermal barrier center matters so much—to truly serve as that industry resource, helping them tackle this challenge that every battery platform faces. And so, it differs from the energy infrastructure business, where we mostly had to displace incumbents that had occupied the space for many years; and that was a slow, difficult effort and we've put in the hard work and we're achieving meaningful progress in that area; it's somewhat different here with these new battery platforms, Jed, since they lack long histories with existing materials. And if I may add, the attributes of our material—we refer to them. It's a truly unique blend of that thermal management, the non-combustibility, the mechanical durability, with that very thin profile, occupying minimal space inside these packs so they can fit more cells in place so — meaning, more drive range; and so, we really have, I think, a significant product here and we're doing our utmost to guide these companies through our development funnel here, as they themselves — let me say, sort of, settle on their battery platforms.
Jed Dorsheimer
analystThen for my final question, I suppose it concerns the battery materials over on the anode side. Clearly, shifting toward silicon in anodes brings an enormous number of advantages. However, the problem has consistently been the coefficient tied to thermal expansion that comes with the heat increase. So I'm simply wondering, where do you stand regarding the data from testing with the five — with the customer base you're involved with? Are there any metrics you could possibly share right now concerning that solution?
Don Young
executiveMaking the data available is something we aim for — going public is our objective in 2021, and we view that as a fairly daring step. Few companies do so, and few of the companies working on this are releasing their data; we're keen to do it. And you're correct, that's the difficulty — it's the silicon expanding to roughly 3x, considerable, and how do you safeguard that expansion across cycle life. A great deal of the effort we're putting in with our evaluation partners centers on precisely that cycle life. Just how durable are these materials? And we believe our carbon aerogels serve as ideal scaffolding for that, thanks to their mechanical durability, our capacity to control the pore size, produce consistency in the pore size, and do various things that shield that silicon as effectively as possible; so that's truly our emphasis, and a huge portion of our scientific team is devoted to that problem, but the notion of making our data public here in 2021.
Jed Dorsheimer
analystGreat. Thank you.
Don Young
executiveThank you, Jed.
Doug Becker
analystHi, Don.
Don Young
executiveHi, Doug.
Doug Becker
analystDon, you raised the point that you aren't displacing established players, to be specific, but I'm wondering whether anything noteworthy has shifted regarding the competitive field when it comes to rival offerings for thermal barriers or those carbon aerogels.
Don Young
executiveSo, our working assumption — and I believe it's reasonable to assume this — is that these automotive OEMs, and we're in five of the world's 10 biggest automotive OEMs, are evaluating every material out there. And regarding the one where we won the contract, we're aware that in the initial phase of that three-part RFQ, they began with multiple materials. So right now we're moving quite efficiently through that funnel, as are as many of these firms as we can manage. To repeat, dozens during stage one, 15 or 20 during stage two, and currently five major companies during stage three. We aren't familiar with every material we're being measured against, though we do know a few of them; and this is a tremendously difficult challenge, one where you simply don't arrive at a — you don't arrive at an answer without effort. And something crucial for us, plus the reason we've remained so robust in this area up to now, is that the product PyroThin descends directly from the passive fire protection offerings we deploy in energy infrastructure, a space where passive fire protection matters enormously. Sure, we've tuned it considerably for lithium-ion batteries. Yet we came into this with substantial experience on the matter. And once more, that has placed us in a really solid position. You brought up as well the acid battery materials and that silicon-rich anode material we've discussed. Indeed, quite a few businesses are concentrated on this. I'd say it's thoroughly, thoroughly grasped and I believe universally accepted, that introducing silicon into the present form of lithium-ion batteries represents — is the next sensible phase along the technology road map. And the wonderful upside of that, naturally, is that it aligns with the process technology, the production technology of these massive plants, a portion of which run today and a portion of which have been declared and will be running within the next year or two; so that's something these sorts of materials demand and I believe that's how nearly everyone sees it; and — thus it's a space where we believe the effort we've invested in creating and then producing at scale these nano materials across roughly 20 years provides an edge at that level, particularly when discussing cost alongside performance, cost alongside performance; those two elements belong together. Having pure performance at an extremely steep price is one thing. That won't succeed; it's cost performance. Once again, we believe we're sitting in a favorable position. Also, since our previous discussion on this topic, three more businesses have come on board—they're asking for samples and have gone over the data and materials we provided, among other things. As a result, that roster keeps growing. There's plenty on our plate; we're putting money into the business and will hire scientists and engineers. Our conviction has increased, and in my view the next sensible steps involve sharing data and putting it up against other offerings, plus revealing more partnerships beyond the one in Korea and the one in Germany.
Doug Becker
analystEverything you just described lines up well with your previous comments — yes, rivals exist in the market, yet nothing significant has shifted regarding that strategy as it stands. Perhaps you could also give us a brief status report on the potential in stationary energy storage plus distributed generation. That topic appears to be drawing considerable attention at the moment. Given the other chances sitting directly in front of you, has this particular possibility simply been pushed aside?
Don Young
executiveActually, no, not at all. What I'd say is that our group definitely remains concentrated on it. Clearly, electric vehicles dominate so heavily in today's world. As for stationary energy — for anyone tuning in, picture storage setups usually tied to homes or modest commercial operations. That means behind-the-meter, occasionally solar-to-battery configurations. Once more, this relies on identical lithium-ion battery cell tech, generally installed beside someone's house, so certain regulatory approval hurdles crop up in that context too; because of that, we've kept moving forward alongside two organizations — one based in Germany, another located here in the United States, or rather one in Europe and one in the United States; and we have achieved — we keep achieving solid advancement together with them. Still, honestly — to me this represents a genuinely fascinating and significant space for our company.
Doug Becker
analystSo during the previous quarter, you said you had some RFQs in play, and my assumption is those are still progressing. Is there a way, though, to give us a sense of the size of those opportunities coming specifically from this part of the business?
Don Young
executiveThe way I'd put it is that five major OEMs are now in stage three of development with us. You can regard that as fairly far along. Whether it's technically an RFQ or instead advanced prototyping plus delivery of production parts, things are quite advanced by now. So at that stage, I'd say they've narrowed their options to a very small number of conceivable solutions. As I've said, nothing is won until it's won, yet we have a strong belief that we're positioned very well to be able to come out with further contracts during this calendar year.
Doug Becker
analystAlright, to be clear, my question was really about stationary energy storage, or — Oh, my apologies.
Don Young
executiveI'd say that we are going to announce one of those in 2021.
Doug Becker
analystPerfect. Thank you.
Don Young
executiveThank you, Doug.
Don Young
executiveHi, Amit.
John Fairbanks
executiveGood afternoon. How are you?
Don Young
executiveAmit, can you hear us?
Amit Dayal
analystMy apologies — I had myself muted.
John Fairbanks
executiveAmit, hello there. How's it going?
Amit Dayal
analystThanks. On this EV chance, there've been a few recent headlines regarding supply chain difficulties in the auto sector. Does that affect any of your schedule, or is it not really an issue right now?
Don Young
executiveWell, it's not hitting us in a direct way, meaning if you mean chip shortages and that kind of thing. So not directly, though maybe indirectly, yes, it inevitably causes delays. I'd say, just in a broader sense, if you like. Everyone is dealing with this — no matter if you're the largest OEM or a company in Aspen's position on the supplier side, the supply chain is definitely under pressure at the moment. It really comes down to how things get brought in as the process moves along afterward — obviously I don't have to tell anyone that the pandemic has ended, but at least we're getting past it. The thing is, these massive supply chains weren't designed to repeatedly halt and then restart. That's not how they're built. As a result, a lot of these parts experienced a major disruption, and in some cases came to a complete halt. Resetting everything is going to require some time. If there are interruptions at some point, that wouldn't shock me — I believe we've already seen reports about a few. Still, as far as what we're doing, we don't expect any problems on our end.
Amit Dayal
analystGot it, thanks for that. Then you'd mentioned that for 2021 and 2022, you anticipate sales in the single-digit millions going after that opportunity. Has anything shifted in that view, or do you basically remain in that same territory?
Don Young
executiveThat seems like a solid — we believe that's a solid thing for you to expect. That said, in my notes I did mention that our confidence is at least as strong — we're actually more confident — regarding the 2023 target of $225 million, once more because we now have these major automotive OEMs sitting in stage three of our development funnel. Plus we're noticing more encouraging activity in our energy infrastructure business; it's beginning to feel somewhat normal once more; and sure, we still have a distance to travel, yet the trajectory is positive. You know, for four quarters we hadn't been able to say that — it was essentially flat at a low level. Now we're actually seeing it. Perhaps you caught a hint of it in our Q1 revenue. I'd say it beat expectations; and yes, a single quarter doesn't mean the pandemic is finished, but we sense we're headed the right way. So regarding that 2023 target once more, we're confident, and we're building toward 2021 and 2022. The investments we're making in our capacity to advance toward automated, higher-volume parts production on the thermal barrier side — every one of these is a crucial ingredient for succeeding here.
John Fairbanks
executiveAnother thing to mention: during 2021 and 2022, the single-digit millions came solely from the automotive OEM located in the US. Therefore, should we secure further contract wins, that might provide upside to those figures, especially during 2022. However, provided that US automotive company does well, we ought to hit those figures, and extra contract wins would deliver upside for us.
Amit Dayal
analystAlright, I appreciate the clarification — that clears things up. I have just one more question. Regarding the drop in average selling prices, which might be tied to the product mix in 1Q, would you call this a short-term thing, and are you all steering through it as you move ahead?
John Fairbanks
executiveYeah, that's essentially what's driving it. A large volume of our 5-millimeter product was sold, and that 5-millimeter item goes for roughly 50% of what 10-millimeter products fetch on average. So the mix pushed it lower. Consequently, it's short-term in nature. It's tied to specific projects. We anticipate that persisting through the second quarter, then returning to our stronger average selling price levels during the second half of the year. And to be clear, our per-square-foot bill of material costs for the thinner item — the 5-millimeter product — are also reduced. So our margin is genuinely preserved. Revenue comes in lower, and material costs come in lower too, delivering identical contribution; therefore, there's been zero economic deterioration from this, and we'll bounce back in the second half of the year.
Amit Dayal
analystGot it. Thanks for that. Hey, that's everything from me. I appreciate all the detail. Thank you.
Jeffrey Campbell
analystGood afternoon, and thanks for finding room for me. The first item I wanted to raise with you, Don, was whether there's a lot of separation between the battery teams heavily engaged in adopting, sampling, and testing high levels of PyroThin, and the ones expressing strong and growing interest in the common anode offering. It appears that, assuming both perform as hoped, they're both required products within the same battery.
Don Young
executiveYes. That's a solid question, and I'd say that as I consider it, there is some overlap; though I'd put it this way — on one hand, I'd call it somewhat coincidental. On the other hand, though, I'd say, you know, it isn't all that surprising. Within these companies, separate groups are handling these efforts. Still, let's be honest, there are a limited number of participants when all is said and done, and we think only a limited number will ultimately succeed. A portion of the established businesses will come out ahead, and a portion of the newer entrants will come out ahead. So it isn't too surprising. That said, I wouldn't claim they're inherently linked to each other. Often, I'd even bet. Well, I'm aware that within one of these large organizations, one team hardly realizes another team is engaging with us on the other item; so once more, I'd describe it as somewhat coincidental, yet not surprising.
Jeffrey Campbell
analystAll right, and I appreciate that answer. When it comes to the OEMs along with the battery makers involved in either the second or the third of those PyroThin stages you described, could you give us a bit of detail simply about where they're located — the US, the EU, Asia — so we can get some kind of feel for that?
Don Young
executiveThey come from all three areas — pardon me, all three of the big regions; so this won't be especially useful, but in Phases 2 and 3 there are those taking part from Asia, those taking part from Europe, and those taking part from the US.
John Fairbanks
executivePlus, inside Asia, that includes China along with additional nations in the region too; so, truly strong geographic variety.
Jeffrey Campbell
analystYeah. And John, what you brought up regarding China is both intriguing and meaningful, since in earlier conversations we discussed how a certain organization over there violates your patents. But it sounds as though perhaps this — if you now have — if operations are happening in China, that suggests the situation involves far more than simply producing some aerogel, unless all of the remaining research has already been completed along with the other individuals you're collaborating with. Is that the correct way to view it?
Don Young
executiveYes, I believe there are…
John Fairbanks
executiveMy take is that these firms want to become global players, and we have acted quite forcefully and effectively when it comes to, shall we say, protecting our intellectual property across the globe. So what I'd say is, they are — excuse me. What I'd say is, they are concentrating on the fact that if they aim to operate internationally, there's no need for them to infringe on intellectual property. And their conduct has shown us that too.
Jeffrey Campbell
analystThat's a really good observation. They're looking to make sales beyond the moat. This is my final question, and you touched on it somewhat earlier, though I'll just give it a bit more detail. You said certain big OEMs are aware of having supply locations spread out. I was curious, when you think about your upcoming roof line expansion — perhaps not only Phase 2, but possibly a later phase too as that develops — are there any sizable overseas customers signaling they'd want a Pyrogel or PyroThin site positioned nearer to where they manufacture? Does that matter at all?
Don Young
executiveJeffrey, our materials ship quite well and quite affordably. Over the years we've sent roughly two-thirds of what we make to every part of the world; so I'd say having supply diversity, and having plenty of supply, are the two things that matter most. A nearby source of supply, I'd say, has been mentioned more as a nice-to-have rather than something required. Once plant 2 reaches full capacity, we'll need to think quite carefully about where plant 3 goes, and it will probably be shaped by where we're especially strong on the thermal barrier portion of the plate; so I could put forward a — if I were to look ahead five years. I could put forward a solid case for Europe, and I could put forward a solid case for Asia. So we'll see how it turns out.
John Fairbanks
executiveMeanwhile, we could point to manufacturing sites over in Europe and Asia too, yet ensure the main aerogel-based PyroThin item is produced right here in the United States, so we can keep that closeness along with fast turnaround for prototype work and shipment of finished components as well.
Don Young
executiveJohn, you've raised an excellent point there. I believe you're going to witness additional instances of this; undertaking such an initiative and constructing a complete aerogel production facility involves far less groundwork. Therefore, in my view, that represents a quite sensible potential stopgap.
Jeffrey Campbell
analystYeah, yeah. I value that perspective. That adds even more clarity. Thanks.
Don Young
executiveWonderful. Thanks, Jeffrey. I appreciate that.
Don Young
executiveThanks, Mike. I’m grateful for that. I appreciate the assistance. Thank you, all of you; we value how interested you are in Aspen Aerogels, and we’re eager to share our Q2 results in late July. Stay well, and enjoy your evening. Many thanks. Take care.
Operator
operatorThis concludes today's conference call. Thank you for participating. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aspen Aerogels, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Aspen Aerogels, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aspen Aerogels, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.