Aspen Aerogels, Inc. (ASPN) Earnings Call Transcript & Summary

February 17, 2022

New York Stock Exchange US Materials Chemicals earnings 75 min

Earnings Call Speaker Segments

Laura Guerrant

executive
#1

Thank you, Lauren. Good evening, and thanks for being with us on the Aspen Aerogels conference call covering fiscal year 2021 financial results. I'm Laura Guerrant, Vice President of Investor Relations and Corporate Communications at Aspen. Joining us today are Don Young, President and CEO, John Fairbanks, our Chief Financial Officer, and Ricardo Rodriguez. Ricardo serves as Aspen's Chief Strategy Officer and will take over as CFO when John retires on April 1st. Before I hand things to John, there are a few housekeeping items I want to cover. The press release with Aspen's results and business updates—plus a reconciliation of management's non-GAAP measures to the closest applicable GAAP figures—is posted in the investor section of Aspen's site, www.aerogel.com. You'll find in that release a summary statement of operations, a summary balance sheet, and key financial and operating statistics for both the fourth quarter and the full year that closed December 31st, 2021. I'd also like to note that a slide deck has been posted to our website to go along with today's discussion; it's located in the investor section of our site. A replay of today's webcast will stay available on our website for roughly one year. I want to remind everyone that what we cover today will include forward-looking statements—things like outlook, expectations, beliefs, projections, estimates, targets, prospects, business plans, and any other remarks that aren't historical fact. These forward-looking statements come with risks and uncertainties. Aspen Aerogels' actual results could differ materially from what those statements express. You can find a list of factors that might affect the company's actual results in the press release Aspen issued today, on page one of the presentation, and they're covered in more detail in the reports Aspen files with the SEC, especially the company's latest annual report on Form 10-K. You can find the press release we issued today along with our SEC filings on Aspen's website in the investor section. Any forward-looking statements we make on this call reflect our views as of today, February 17, 2022. Aspen Aerogels assumes no obligation to revise those forward-looking statements should future events or circumstances arise. On this call, we'll be referencing non-GAAP financial measures, Adjusted EBITDA among them. Such measures aren't prepared in line with U.S. generally accepted accounting principles, or GAAP. They should not be viewed on their own or as a replacement for results presented under GAAP. You can find the definitions and reconciliations for these non-GAAP financial measures against the most directly comparable GAAP measures, along with an explanation of why we present them, in today's press release. At this point I'll hand things over to John. John?

John Fairbanks

executive
#2

Thanks, Laura. I'll summarize the 2021 financial results, discuss what we expect for 2022, and then hand things over to Don and Ricardo. Broadly speaking, the same forces shape both last year's results and this year's outlook. To start, revenue is climbing across all of our main markets. Adoption of our PyroThin thermal barriers is happening quickly in the EV space, and that's working in our favor. In energy infrastructure, we're posting healthy growth as a post-COVID recovery gets underway, and with our Spaceloft product line we're picking up share in Europe's sustainable building materials market. Next, we are putting money into staff, tools, and physical assets so we can keep up with the fast expansion of our e-mobility prospects. We're putting more money into several areas: our technical, operational, and commercial teams that back the thermal barrier business; the R&D group working on the carbon aerogel battery material opportunity; legal resources so we can grow and protect our IP portfolio; and our finance, IT, and general management staff, who are needed to handle the strong growth in the business. The investment also covers planned capital expenditures—designing and constructing our second silica aerogel manufacturing plant, building out thermal barrier fabrication operations, and expanding the production, fabrication, and testing facilities for carbon aerogel battery materials. We're confident that these investments are commensurate with the scale of our EV opportunity. Turning to 2021, revenue came in at $121.6 million, which was up $21.3 million compared with 2020. Breaking that $21.3 million gain down, energy infrastructure contributed an additional $12.6 million, the EV thermal barrier market brought in $6.7 million of initial revenue, and sustainable building materials grew by $1.9 million. We could have done better on revenue. COVID-related staffing problems and certain raw material shortages, we believe, held production back by roughly $6 million to $8 million in the fourth quarter. Absent those challenges, 2021 revenue would have landed at the top of our outlook range — a range we lifted three times over the course of the year, as a reminder. We should note that staffing conditions and the supply of raw materials have gotten better so far in the first quarter of 2022. Now looking at costs and expenses: in 2021, material costs rose 33%, which came to $14.5 million; manufacturing expenses were up 28%, or $11.6 million; and operating expenses climbed 40%, or $14.3 million, all compared with 2020. Higher revenue, along with money we put into personnel and resources to get ready for growth in 2022 and afterward, drove those increases in costs and expenses. As a result, net loss grew to $37.1 million, or $1.22 per share, in 2021, compared with a net loss of $21.8 million, or $0.83 per share, in 2020. Adjusted EBITDA came in at negative $26 million for 2021, versus negative $6.4 million in 2020. Just to remind everyone, our definition of Adjusted EBITDA is net income or loss prior to interest, taxes, depreciation, amortization, stock-based compensation expense, and any additional items we don't consider reflective of our core operating performance. Among those additional items in 2021 was a $3.7 million gain on debt extinguishment. Turning now to the 2021 balance sheet and cash flow: operating cash usage was $18.6 million, which tracked our Adjusted EBITDA of negative $26 million, partially offset by a $7.4 million decrease in working capital investment. Capital expenditures for the year totaled $13.8 million, which covered engineering and design work for our second manufacturing facility along with investments aimed at expanding carbon aerogel capacity. Financing activities generated $92.5 million in cash, comprising $73.5 million in proceeds from the June 2021 private placement with Koch Strategic Platforms plus $19.4 million from equity sales through our ATM facility. We closed the year holding $76.6 million in cash, with no borrowings drawn on our revolving credit facility and shareholders equity of $128.4 million. At year-end, we additionally had $12.6 million available under that revolving credit facility. Turning now to the full year 2022 outlook: we anticipate continued revenue growth in 2022 tied to a tripling of PyroThin thermal barrier revenue to $20 million for the year, ongoing post-COVID recovery in the global energy infrastructure market, and sustained demand growth in the European sustainable building materials market. Consequently, we are establishing a 2022 revenue outlook of $145 million to $155 million for the year, which equates to growth of 19% to 27% versus 2021. As we discussed earlier, we intend to keep raising investment in personnel and resources to seize our rapidly-growing e-mobility opportunities. Accordingly, our initial full year 2022 outlook is as follows. We anticipate total revenue between $145 million and $155 million. We expect a net loss ranging from $66.7 million to $70.7 million. Adjusted EBITDA should land between negative $42 million and negative $46 million. For earnings per share, we're projecting a loss of $1.95 to $2.07 per share. That EPS figure assumes 34.2 million weighted average shares outstanding for the year. The 2022 outlook also assumes $9.7 million in depreciation, $8.2 million in stock-based compensation expense, and $6.8 million in interest expense. In addition, we expect capital expenditures of $250 million to $275 million this year, primarily tied to the Plant Two project. Before turning things over to Don, I'd like to note that serving alongside my fellow Aspen employees since 2006 has been a privilege. Aspen's people are skilled, dedicated, and deeply devoted to making this company win. I particularly want to thank Don for guiding us over the years and for the ambition we share of turning Aspen into an outstanding business full of opportunity. Beyond that, I want to say how truly impressed I am with Ricardo. His abilities are remarkable, and he brings exactly the right blend of automotive and financial expertise to make sure Aspen prospers in the years ahead. With Don leading and Ricardo as CFO, I have every confidence that we will keep moving forward smoothly once I retire. Last, my thanks go to our investors and analysts. It has been an honor to work alongside all of you since the 2014 IPO. Don, the floor is yours now.

Don Young

executive
#3

Appreciate that, John. Evening, everybody. Glad you could be with us for the Q4 2021 earnings call. Back in 2006, when John and I met for the first time, I talked him into coming aboard to help lay a solid groundwork. My pitch was, "Give us three years, that's all." Naturally, across those 15 years since, John has been pivotal in shaping a company with enormous potential and a culture built on openness, transparency, and fairness. As a way of honoring John, all of us on the Aspen team pledge to keep that culture central to who we are. From everyone here at Aspen, thank you, John. I'd like to welcome Ricardo Rodriguez to this call. He is our Chief Strategy Officer, and when John retires at the end of the first quarter, Ricardo will take over as CFO. Ricardo brings a deep background in automotive and Tier 1, and he has already become a valuable member of the Aspen team. Ricardo is one more example of the many talented people at Aspen who are turbocharging our efforts to become a highly valuable technology leader in sustainability. Today I'll describe the key elements of our progress toward achieving our near-term and longer-term business goals. Ricardo will provide a detailed assessment of our thermal barrier opportunity. John, Ricardo, and I will wrap up today's call with a Q&A session. To start, I want to address the $150 million that Koch Strategic Platforms recently invested. That funding came through convertible notes along with common equity, and it builds on the $75 million equity stake KSP took in June 2021. We're grateful for the confidence KSP has shown, and just as significant to us is the way our working ties with different Koch Industries entities have deepened. As I've explained before, we're drawing on multiple Koch resources so that scaling our operations carries less risk while we grow into a high-velocity provider of essential components for EV OEMs. The clearest illustration right now is how Plant Two's capital project is being planned, engineered, and executed. With the $150 million that KSP has invested and a cash balance above $75 million at year-end, we have a solid base for bringing in more capital during the coming year as we finance our major growth and value creation efforts. The next key item is a refresh on the growth targets we initially laid out roughly a year ago. Back then, we set goals of doubling revenue between 2021 and 2023, and then doubling it once more between 2023 and 2025. We're reaffirming our goal of doubling revenue between 2021 and 2023, and we're now raising that target to tripling revenue from 2023 to 2025, reaching roughly $720 million in 2025; over the past year we've made substantial strides toward hitting and extending these goals. Back in 2021, PyroThin revenue came from 10 customers. PyroThin revenue for 2021, along with our 2022 estimate, is several times larger than the figures we anticipated and discussed a year ago. The expectation that revenue will double between 2021 and 2023 rests on two things: our industrial business getting back to pre-pandemic activity levels — something we're well along the path to achieving — and PyroThin thermal barrier revenue ramping in line with existing awarded programs with our North American and Asia-based automotive OEMs. From those two customers, to whom we are now delivering production parts, we estimate the awarded business accounts for 100% of the 2023 PyroThin thermal barrier revenue target. As with other Tier 1 suppliers, we use the term awarded business to mean estimated gross program revenues drawn from customer volume forecasts, factoring in the program pricing we have negotiated. The raised target of tripling revenue from 2023 to 2025 presumes low double-digit growth in our industrial business along with continued penetration we anticipate in the EV space. For 2025, we estimate that 60% of the targeted PyroThin revenue will come from programs already awarded to us. On top of that, we expect to turn our very active prototyping and quoting work into further program awards on the battery platforms of additional automotive OEMs. Our third key point centers on the plans and expectations for Plant Two as it supports a demand plan that is expanding and accelerating. We announced today that Plant Two will be located in Statesboro, Georgia. A university town close to the port city of Savannah, Statesboro sits at the center of a growing automotive and battery ecosystem. Our plan is to build Plant Two substantially larger than we first anticipated, with expected revenue capacity of roughly $1.35 billion. Phase one of Plant Two will carry revenue capacity of approximately $650 million and start up in late 2023. At that point, revenue capacity across our two plants will total approximately $900 million — sufficient to serve our industrial business and roughly 2.2 million electric vehicles. As we near full utilization of capacity at that level, we project gross margin of approximately 35% and EBITDA margin of approximately 25%. As we construct the first phase of Plant Two, we're also planning to install the infrastructure that will serve both phases. Doing it this way gives us the best cost efficiency, and it enables us to bring on another $700 million in revenue capacity in about 15 months from the start of phase two. That kind of flexibility around volume and timing is very important, because we expect there may be more awards for battery platforms from other automotive OEMs. As a reminder, we believe our current capacity is sufficient to hit our goal of doubling revenue from 2021 to 2023 to roughly $240 million. Hitting our goal of nearly tripling sales between 2023 and 2025, to about $720 million, is achievable using Plant One plus the first phase of Plant Two — and that is exactly why Plant Two is being built far bigger than we first intended. After phase two wraps up, we expect the two facilities together to support revenue capacity of around $1.6 billion. Given that the auto sector is forecast to spend $0.5 trillion over the coming five years to finish its transition to electric vehicles, the size and speed of the ramp available to us are expanding fast. Our technology and scale put us in position to serve as a valued supplier to an ever-longer roster of EV manufacturers. Our estimate for Plant Two's initial phase, covering all infrastructure, is a capital requirement of roughly $575 million, and the subsequent phase is expected to require about $125 million in capital. Across the entire project, capital expenditure per dollar of revenue lands under $0.55 — a cheaper figure than the 65 cents per dollar of revenue capacity we had previously forecast. With our year-end cash sitting above $75 million and the $150 million KSP investment added in, we now have the financial base for a company that can reach $1.6 billion in revenue, roughly $550 million in gross profit, and about $400 million in EBITDA; during the coming year we'll look at financing options to bring in the extra cash required to fund the remainder of our substantial business opportunity. In addition to our EV and industrial operations, we continue to put money into the plan to take our aerogel technology platform into other high-value markets tied to sustainability themes. Our carbon aerogel work serves as the catalyst for Aspen Battery Materials, whose first area of emphasis is silicon-rich anode materials. In 2022, we intend to disclose important performance, cost, and third-party validation metrics, and to benchmark them against other noteworthy companies in the sector. Thanks to the people and equipment investments made in 2021, ABM is well-positioned to handle growing requests from battery and automotive OEMs for evaluation materials and development collaborations. Lastly, I'd like to start the practice of spotlighting our ESG work on quarterly earnings calls. ESG has become a business imperative for every good company. So we've started restructuring our environmental and social work into a more formal ESG strategy. This spring we intend to release our inaugural ESG report, and after that will come a fuller report in which we'll review how our 2022 ESG efforts went and set out where our ESG positioning is headed going forward. What we're aiming for is to lay a foundation for richer conversations about particular ESG subjects with investors and other stakeholders, so that the different ESG scorecards and rating agencies can get information that's both accurate and timely. With that said, I'll hand things over now to Ricardo. Ricardo?

Ricardo Rodriguez

executive
#4

I want to thank you, Don. That means a lot to me, and there’s nothing that would make me happier than being on this team. As we carry out the plan Don described and put investment into expanding our PyroThin capacity via Plant Two, we believe it makes sense to pause and take the time to explain thoroughly why this mission is so compelling. Thermal runaways and uncontrolled energy release inside the cell, set off by a range of design, manufacturing, and usage problems that end up causing every material in the cell to decompose. The elevated temperature of a cell in runaway can force the cell next to it into thermal runaway, and that kind of propagation typically destroys the battery or ignites a fire. A lithium-ion battery pack on fire will consume whatever it can because of its high temperature, an entire car included. Such fires generally get worse with water, since it reacts with lithium and expands the fire, and only Class D extinguishers are usable to control them and extinguish them. The energy released during thermal runaway is substantial and exceeds the energy required to charge the pack, owing to the flammability of certain materials inside the pack. This ranks among the most intricate system-level challenges our customers confront as they integrate and launch safe, reliable electric vehicles on record timelines. It’s genuinely exciting to be enabling a safe and dependable transition experience toward electrification as part of some excellent vehicle nameplates and body styles that all of us can enjoy safely with our families. If we imagine ourselves in our customers’ position, integrating an EV is no simple task. That complexity grows further when an OEM also takes on the design and integration of the battery pack. In this feat of system integration, a vehicle carries many competing requirements or considerations that define it, where improving one tends to impact the other. These factors decide whether your car is big, small, fast, efficient, agile, fun to drive, or boring. Elements such as vehicle size, weight, range, its performance targets, charging/discharging rates, ease of assembly, crashworthiness, recyclability, etc., drive battery pack design and architecture choices. Those choices cover which cell chemistry, which form factor, pack design, or layout gets used, all aimed at delivering as much energy density per unit of mass and space in the vehicle as possible. A central concern is that this energy density must endure over time and remain within an acceptable, consistent range that consumers observe daily on their gauge while fast charging or driving in every sort of temperature and condition for more than 10 years. The integration is extremely complex, even when safety is given lower priority. Still, we observe most OEMs going the extra mile, putting safety first and tackling thermal runaway through both active measures and passive systems, like our PyroThin thermal barriers. Our value proposition is strongest in NMC and mixed silicon graphite anode chemistry. The OEMs that are quickest to come forward seeking solutions for their challenges tend to concentrate on pouch or prismatic form factors, because those offer high energy density plus room for passive protection features. Recent reports of manufacturing defects, severe impacts, or unpredictable charging and usage cycles leading to EV fires demonstrate that active systems by themselves cannot stop thermal runaway 100% of the time. From an R&D perspective, OEM spending on sophisticated active systems is costly and slow, since validation means testing many variants of each control strategy, multiplied by every cell, module, and pack type, all the way to failure. It is difficult to validate advanced controls for electrochemical processes. We take encouragement from recent investments by OEMs and other tier ones in this area, since all of us are only in the first inning of making electric vehicle safety a certainty. Our customers view a passive system as an essential element of their battery pack design, just as a vehicle equipped with traction control, automatic emergency braking, and collision avoidance systems still needs crumple zones, high-strength steel beams and doors, impact-resistant fuel systems, airbags, and seat belts. Once more, this is a multivariable problem involving differing requirements, customer priorities, and approaches. As we began production and hold discussions with additional customers, the necessity of passive design elements and materials that function as a system delivering thermal and fire safety is growing ever more evident. No silver bullet exists for preventing or halting the effects of thermal runaway, and we plan to collaborate with the rest of the industry to supply a very good lead bullet for this problem over the long term. We all understand that materials are not all alike, and when such materials compete for scarce space and weight inside a battery pack while performing a critical safety role, they had better perform and demonstrate their value. Fundamentally, our customers seek the thinnest, lightest material offering the greatest level of runaway prevention and protection. They also want a material able to compress and recover without degradation so that cells stay in place as their form shifts over their lifetime; on the left, you can see in simplified form how PyroThin and other materials cooperate as gas barriers, cell-to-cell barriers, and compression pads within the pack. They tend to behave quite differently across this thermal runaway thermal resiliency or fireproofing range, as well as across the range of force under which they can be compressed and then fully recover. You can also see that per unit of thickness, delivering the performance of PyroThin would require twice the material and 2.8x the mass of the nearest cell-to-cell barrier material. These charts also illustrate why raising the thermal and fire resistance of the material per unit of thickness and weight, while widening its compressibility and recovery range, sits at the heart of our PyroThin R&D efforts. A thermal barrier that doubles as a compression pad shows how we intend to optimize content per vehicle, or CPV. Past that, our R&D will keep concentrating on scaling up manufacturing of the aerogel base, as well as on automation tooling and systems used to fabricate thermal barriers. Over on the far right, you can see our current thinking on CPV. Since we're only in the first innings of this kind of vehicle content — we began supplying production parts just this past quarter — we're presenting a wide range for where our supplied CPV falls, whether we serve as a Tier 1 or a Tier 2 supplier. What we understand comes from the vehicle programs we supply, and it keeps evolving as we quote. One thing we know for certain: we won't succeed by concentrating only on raising CPV, because we have to earn each cubic inch or ounce within customers' battery packs. Instead, our focus is on raising the share of total thermal barrier content accounted for by PyroThin. In our projections, we assume CPV settling between $300 and $325, with PyroThin content comprising roughly 60% of it. We recognize this will shift with design changes, new program awards, and customers' growing wish to put safety first. We're eager to help customers speed up EV product lines and meet evolving needs through a system-level approach to thermal runaway solutions. Acting as a partner with the right R&D, validation, design, integration, and production capabilities earns us the right to play across multiple levels of the value chain, and we'll keep delivering accretive CPV. Once more, these are our initial thoughts, and we'll give updates as our thinking develops. With that, I'm glad to hand the call back to Don to summarize our strategy and give his closing remarks.

Don Young

executive
#5

Thanks, Ricardo. Before we open it up for questions, I'd like to recap the main points. Everything we do centers on generating substantial value from our aerogel technology platform; we operate in sizable markets as a sustainability technology leader. Our highly capable team is carrying out our plan to maximize and grow the value of the markets we serve today while putting investment into extending the technology into the next set of opportunities. KSP made a $150 million investment in us, and combined with our year-end cash balance of more than $75 million, that gives us a solid base and momentum to raise further capital during the next year to fund our efforts aimed at creating significant value. We're reaffirming our 2021 to 2023 revenue growth target of 2x and raising our 2023 to 2025 revenue growth target from 2x to 3x, reaching $720 million in 2025; we're dedicated to constructing Plant Two so it is bigger and more capital efficient than first envisioned, the better to align with a customer demand plan that keeps growing and accelerating, and to back a business capable of producing an estimated $1.6 billion of revenue, roughly $550 million of gross profit, and roughly $400 million of EBITDA. I'll now hand the call back to Lauren for the Q&A session.

Eric Stine

analyst
#6

Hey there, everybody. Appreciate the thorough rundown.

Don Young

executive
#7

Thank you, Eric.

Eric Stine

analyst
#8

Yeah, it's really helpful that GM and Toyota came up in the presentation. I'm wondering, could you shed a little more light on those 10 OEMs you shipped to in 2021 — maybe how that breaks down between the two customers getting commercial-volume shipments and the remaining eight? And then, what sort of visibility does that give you into things like RFQ activity ahead, upcoming awards, that kind of thing?

Don Young

executive
#9

Well, thank you, Eric. We're among those ten, and I want to make the point that the reason we have revenue coming in is that we're supplying prototype material to these prospective longer-term customers. What I'd say is that we're gaining far more expertise in this area and turning into a significantly better resource for this next group of customers while they build out their battery platforms. Those battery platforms, I'd note, are essentially the deciding factor when it comes to winning further programs — developing them is really what it comes down to. And I'd add that the customers we had earlier were further along in numerous respects when it came to getting those battery platforms developed. We're moving along at a good clip toward growing that list, and our expectation is to accomplish that across 2022 and beyond.

Eric Stine

analyst
#10

Understood. So would it be reasonable to say this is really more about development? When we consider the timing for further awards, the key factor is progress on the OEM side, rather than you securing those awards or advancing within those OEMs.

Don Young

executive
#11

Yes. Eric, we believe we offer a strong solution that delivers genuine value to these companies. Ricardo, I think, did a good job laying that out. I'd also like to restate one point I made: for our 2023 target revenue from PyroThin, we believe we hold 100% of that projected revenue from programs awarded to date; we're in a solid position in this first double. Then regarding the tripling between 2023 and 2025, we estimate we have roughly 60% of the revenue from our existing awards, again expected to materialize over that period. We're in a solid position. With that progression, so to speak, we're confident we can add more battery platforms and more awards to, let's say, bolster our revenue mix as we move into that 2023 and 2025 timeframe. But as you know, Eric. These things build over time, correct?

Eric Stine

analyst
#12

Yeah. No, absolutely.

Don Young

executive
#13

Yeah.

Eric Stine

analyst
#14

Now, regarding 2025 — I realize you've raised that number considerably. More OEMs involved, clearly, but could you sort of clarify that, or frame it the way you have before? You've spoken before about the three levels of engagement. Maybe where things sit at present, and perhaps where it stood compared with a quarter back, or a year back.

Don Young

executive
#15

Right now we're supplying detailed prototype components to a broad set of those automotive OEMs. Let me just put it this way: we're tracking much like we did on the two wins we've secured so far and the two awards we've picked up. We're following a very comparable path toward capturing further awards, Eric. Once more, we hold a great deal of confidence that we'll be announcing more awards during 2022 and 2023 and filling out that revenue mix so that we're serving, you know, a solid number of those EV producers.

Eric Stine

analyst
#16

So I'd take that to mean that with Toyota, you're assuming — or would it be fair to say you're assuming — that you capture the entire platform and not merely that one vehicle?

Don Young

executive
#17

We believe we're well positioned to move past the one nameplate, the one model, and to capture a solid share of Toyota's business across its battery platform.

Jeff Osborne

analyst
#18

Yeah, I was just wondering — thanks for all the details. Looking at page nine of the deck, that non-PyroThin revenue, could you explain what that consists of? It's 40% at a weighted average content of $300-$325.

Don Young

executive
#19

Oh. Sorry about that.

Jeff Osborne

analyst
#20

You got 60% down for PyroThin.

Don Young

executive
#21

Yeah, definitely.

Jeff Osborne

analyst
#22

40% as non-PyroThin. I was just curious, is that advanced battery materials or is that-

Don Young

executive
#23

Yeah, exactly.

Jeff Osborne

analyst
#24

How much of that revenue comes from the finishing step?

Don Young

executive
#25

No. What that revenue really reflects is where we're placing — if you consider how a thermal barrier is configured, the extremes of what one looks like sit at the simplest end. Essentially, it's simply aerogel molded into a specific shape and shipped to the OEM. At its most sophisticated, though, it's a sandwich made up of several layers of differing materials — very close to, I mean, basically the very ones we display in the chart at left on page eight. When we say other content in the context of CPV, what we mean is those additional purchased materials that get incorporated into the thermal barrier assembly.

Jeff Osborne

analyst
#26

Understood. That's useful. I was also curious whether you could briefly address the $0.10 in savings for each dollar of revenue — where did that come from compared with what was originally expected? And how should we think about the cost per square meter in Georgia versus Rhode Island?

Don Young

executive
#27

John, would you like to handle that?

John Fairbanks

executive
#28

Yeah, well, look, I want a bit more detail on that $0.10. Could you clarify that question?

Jeff Osborne

analyst
#29

Yeah, I believe at the start, John, you mentioned that $0.65 of CapEx was the target—

John Fairbanks

executive
#30

Oh, all right. Yeah.

Jeff Osborne

analyst
#31

...for each dollar of revenue, and at present it stands at $0.55. I was wondering where that $0.10 originated-

John Fairbanks

executive
#32

Yeah.

Jeff Osborne

analyst
#33

...when compared with what we had anticipated roughly 12 months back.

John Fairbanks

executive
#34

Yeah.

Jeff Osborne

analyst
#35

If you could compare-

John Fairbanks

executive
#36

Yeah, gotcha.

Jeff Osborne

analyst
#37

...the cost structure on a per-square-meter basis compared with, say, your most recent of the three lines in Rhode.

John Fairbanks

executive
#38

Yeah; that depends on several factors; really it comes down to the better design we're putting into place at the Georgia plant, ultimately, regarding how well it can turn out product. You know, we've consistently stated that our second line outperformed our first in East Providence, and our third, you know, is 20% more productive than the second line; we've managed to, you know. We brought the third production line online in East Providence in 2015. Our designs, our development, our technology, our manufacturing process technology have all moved forward considerably over that span. As we laid out this plant, and we've addressed bottlenecks one by one, it's simply a much more productive design, more energy-efficient, cleaner, greener, and more productive. Beyond that, regarding how it uses utilities, and many of the operational costs, we're realizing savings on operating costs of roughly 33% compared with, you know, what we actually run in East Providence, Rhode Island. Simply a more efficient, more productive asset. When we designed it and examined the productivity of that design, ultimately it came out better than what we had expected a year ago.

Jeff Osborne

analyst
#39

Understood. That helps a lot. Thanks for that, John.

John Fairbanks

executive
#40

Thanks, Jeff.

Alex Potter

analyst
#41

All right. That's great. Thank you, everyone. Nice work, John. Appreciate all your assistance. I think I've got a few questions-

John Fairbanks

executive
#42

Thanks, Alex.

Alex Potter

analyst
#43

Moving on to fabrication — has a dollar figure ever been put on that plant down in Mexico? I'm unclear on how material it is, or if it genuinely shifts your CapEx guidance. And maybe following on from that: what share of the time — I know you brought up the 60/40 split within your overall CPV math — but what share of the time do you figure you'll simply be selling straight product out of the Georgia site? How many of your customers will really be asking for additional value added via the fabrication step?

John Fairbanks

executive
#44

Well, I believe — I can likely take on both of those questions. To start, we haven't offered any guidance right now regarding the fabrication facility in Mexico. That said, it's a process requiring less capital than what we're deploying at an aerogel manufacturing plant, and scaling it is considerably easier for us. As revenue growth comes in and develops, we can put capital to work perhaps 9 to 12 months ahead of when that kind of facility is needed. Taken as a whole, as this opportunity expands, we'll be investing a substantial amount of capital there. This can scale, and it's quite different from our prior experience with the aerogel manufacturing plant. Regarding the content we're examining, when we see content per vehicle in that $325 range, that reflects our review of existing contracts, our award wins, and the range of quotes we've provided to prospective customers. That figure is our best estimate of where content per vehicle will likely settle over time; however, as Ricardo mentioned, we do expect it to evolve, and these systems will keep evolving over time. Right now, I'd describe it as being driven by those 10 customers from 2021, along with every other customer we've responded to in RFI or RFQ situations. That's our best estimate of where we believe it will land over the long term.

Alex Potter

analyst
#45

All right; that's really useful.

Don Young

executive
#46

If I might just build on that regarding what John said.

John Fairbanks

executive
#47

Sure.

Don Young

executive
#48

Yeah. Alex, let me just build a little on what John said. It's a strategic question we'll be weighing over the next year or two — Tier 1 versus Tier 2. And it's also true that right now, even with the awards we've already been given under these programs, in one instance we're squarely Tier 1, and in the other we're Tier 2. The benefit to us of the Tier 1 position at this point is that we're far more deeply engaged as a technology partner, working alongside the customer to engineer a solution. As Ricardo said in his remarks, that places us in a considerably stronger spot to raise the aerogel content. As you know, I've spoken before about the notion of battery performance and safety. Being able to take on bigger roles inside a battery pack matters a great deal to us and is something we're sharply focused on, and we believe, again, that it can add substantial value from where we sit.

Alex Potter

analyst
#49

Assuming nothing else changes, when you could pick either a Tier 2-type relationship or a Tier 1 one, you'd go with Tier 1 whenever possible. Would you agree with that?

Don Young

executive
#50

Ricardo, what's your take?

Ricardo Rodriguez

executive
#51

Yeah, I mean, I think that's really the case. At this point, what matters is making the most of the opportunity and supplying as many OEMs as we can while holding on to those deep technical relationships. Honestly, whether we sit as a Tier 1 or a Tier 2 — like I said in my remarks — the industry doesn't enjoy paying companies for contributing nothing in their value chain. We simply want to earn our place in that value chain. When you look at the current content and the 60/40 split in our planning expectations, that's essentially OEMs telling us they value what we bring by integrating the thermal barrier as a system, right? For certain parts where the configuration is basically just aerogel, we'll happily be a Tier 2 with a strong technical relationship on the material side, using a material capable of doing what, you know, four or five materials on this chart can do, right? To be honest, we don't view it as an either-or situation, as long as we're maximizing the opportunity and putting OEMs' problems first in what we solve.

Alex Potter

analyst
#52

Excellent. I'll be sure to relay that. Appreciate it, everyone.

Don Young

executive
#53

Thank you, Alex.

Colin Rusch

analyst
#54

Thank you very much. Folks, now that you're drawing nearer to a number of these customers and examining the actual requirements inside this battery pack, are you pursuing any significant initiatives to advance the formulation or the recipe for the PyroThin technology so as to achieve improved performance in areas where you could potentially secure somewhat greater value?

Don Young

executive
#55

That's a great question, and the answer is definitely yes. When I talk about how much we're learning — that we're gaining real expertise in grasping the phenomenon itself — and given the leverage we've figured out how to apply with our own materials and the requests we get to do more inside these systems, that positions us really well, Colin, to become the industry expert we're aiming to be. You know, look, you're well aware that we've put well over $1 billion of material into certain settings, and much of that has centered on passive fire protection. This represents a very logical next step from that grasp of those learnings; so I think we've been moving along an accelerated path here. That's what has given us the confidence to reiterate our 2x goal in 2021 to 2023 and upgrade to the 3x revenue growth goal 2023 to 2025. It stems from how we understand the situation. It stems from our engagement with a host of what we believe will be some of the leading OEMs in the EV space.

Colin Rusch

analyst
#56

Thanks, that's really useful. Regarding how you plan to finance the Georgia facility, could you describe how far along your discussions are on insured equipment finance or on bringing leverage to that facility as you start construction?

Don Young

executive
#57

John, would you like to handle that one? As you know, John and I have tended to favor a mix of methods for this across the years. I believe you can safely expect the same to hold true once more, and, you know, during the next year or two while we finance our plan. Naturally, since we have a quite clear route to profitability, it keeps creating plenty of chances, extra chances for us to bring in capital, plus producing our own cash as we progress through this period we've discussed. Sure, that's the finest kind of financing available. That's genuinely what we're concentrating on, Colin. We figure we'll need to fund our growth plans here in a smart and inventive way across the coming, you know, one, three, and five years.

Chip Moore

analyst
#58

Thank you. Congratulations on the incredible momentum, Guy and John. Thanks and congrats; working with you both over roughly the last 10 years has been great. I just wanted to return to that Tier 1, Tier 2 conversation. You know, I think being OEM agnostic was a very smart move on your part. Obviously, supply chains are a big worry for everyone right now. Is there a chance to speed up more wins as OEMs try to lock up capacity, or do you think you've already seen that?

Don Young

executive
#59

Well, we've got a really strong group of people, many of whom joined our company in the last, you know, one and two years, with deep automotive and Tier 1 backgrounds, and they come from the very same companies that we're engaged with, whether as automotive OEMs or as Tier 1s. You know, we're going through qualification processes really on a regular basis. We're engaged in experimenting with different products for different battery platforms really on a daily and weekly basis with a whole host of companies. You know, our engagement, and I've said this before. You know, I think winning these is, you know, the gating item is the development of the platform itself; we believe that we're well-positioned to play an important role not only in the two companies with whom we're delivering production parts, but to a good number of the companies we expect to be leaders in the EV space going forward in all three major regions.

Chip Moore

analyst
#60

Good. Perhaps just one more somewhat nearer-term item — as we anticipate Statesboro launching later next year. You mentioned certain supply chain constraints experienced during this quarter. Price per square foot appeared to get a decent increase. Maybe just broad thoughts regarding margins, for this year and next as we approach that startup.

John Fairbanks

executive
#61

Yeah. So I'd say those are, yeah, somewhat a path-to-profitability kind of question. In 2022, as you know, we are putting substantial investment into manufacturing resources; consequently, we are seeing manufacturing expenses rise. We're building out facilities that will support, you know, really substantial expansion of thermal barrier operations during 2023 and 2024, consistent with our growth targets — the 2x and the 3x. So that is weighing down gross margins currently, and it shows up in our 2022 outlook. We didn't bring it up in the scripts, but our gross margin expectations for 2022 would be within the high single digits, given the addition of those expenses. They were going to Monterrey, Mexico, to establish a fabrication operation, hire people, add overhead there. That's significant and will affect earnings this year, yet it will position us for substantial profit growth in 2023 and beyond. After 2022, we would approximately see that for each dollar of revenue generated, we get roughly $0.40 in gross profit. So an incremental gross margin of roughly 40% on that incremental revenue, and roughly $0.33 of incremental Adjusted EBITDA per dollar of revenue. About, you know, one-third of that will flow down to the Adjusted EBITDA line. That's the incremental profitability that ultimately results until we reach $900 million of revenue, we fill the second plant, the first phase of the second plant, at which point we'd see gross margins of roughly 35%, EBITDA margin of roughly 25%; so the trough in terms of margin and profitability is 2022. As revenue grows, we'll see very substantial gains in profitability in, you know, 2023, 2024 and beyond, up to those capacity economics we provided in our comments.

Doug Becker

analyst
#62

Thank you. You noted that when we're at full capacity, we'll produce substantial free cash flow to finance upcoming capacity expansion. I was wondering whether you might walk through a few of the major components involved in getting from $1.6 billion of revenue to $400 million of EBITDA. What kind of free cash flow would you anticipate generating at that stage?

John Fairbanks

executive
#63

Yes. Doug, I mean, it's mainly, CapEx, you know, once we begin filling the second plant, you know, the bulk of our financing need, our capital need over the coming couple of years relates to the Plant Two construction. As Don alluded to, much of that is front loaded. The $575 million for the first phase, $125 million for the second phase. And after that, you know, we'd simply have incremental CapEx tied to expanding our fabrication operations, which would be at a considerably lower level than the kind of investment we require for constructing an aerogel plant. CapEx, maintenance CapEx would not be a significant drag on our operating cash flow. Much of that Adjusted EBITDA would be available to us as free cash flow.

Doug Becker

analyst
#64

At that level, would you anticipate being a cash taxpayer, or are there—

John Fairbanks

executive
#65

Oh, yeah.

Doug Becker

analyst
#66

...NOLs?

John Fairbanks

executive
#67

Yeah. I mean, Doug, you can figure that out pretty fast, but you know, once we're profitable at those incremental margins I just mentioned, we'd very quickly be Adjusted EBITDA positive and begin producing net income; now, we do have a sizable NOL that will shield us from cash tax payments for a stretch of time, but we can actually use those up in fairly short order. When you're talking about a $1.6 billion company with $400 million worth of EBITDA, very significant net income, we would have used up our NOLs by then, and at that point we'd be a cash taxpayer.

Amit Dayal

analyst
#68

Thanks. Good afternoon, all. Nice work on the progress.

John Fairbanks

executive
#69

Thanks.

Don Young

executive
#70

Thank you.

Jed Dorsheimer

analyst
#71

Hi there. Appreciate it, guys. Coming to you from the back of the bus. I've just got a handful of questions for you. My assumption is this: when we look at slide five, regarding annual revenue capacity of $900 million and $1.6 billion, does that come on top of the $250 million from East Providence, or does it count the $250 million from Providence within it?

Don Young

executive
#72

50 from East Providence.

Jed Dorsheimer

analyst
#73

Understood; regarding the Providence plant, 250 has never been achieved there. Has the yield from that facility shifted in terms of being able to roughly double revenues at that site? Because it looks as though some kind of breakthrough has occurred.

John Fairbanks

executive
#74

Yeah. I'll handle that one. Jed, we've consistently stated that our East Providence plant — this predates the thermal barrier business — has had capacity of roughly $200 million. That figure is purely aerogel for the energy infrastructure market. The jump to $250 million reflects a mix of the aerogel content we sell into the energy infrastructure market, together with the aerogel content we'd use to support the thermal barrier business, plus the extra materials Ricardo mentioned that we incorporate into the thermal barrier sandwiches we ship to customers; it's aerogel content plus purchased materials, plus the associated revenue. You know, we also mark up fabrication expenses to our automotive customers. It's all of those combined. This is a productivity gain. It's really a shift in the character of our business. It's the same underlying aerogel capacity we had previously, with additional billable items layered on top.

Chris Souther

analyst
#75

Yeah. Hey, thanks. I just wanted to get confirmation about that 60% visibility on 2025 tripling — that counts GM's platform plus only the single model with Toyota and Subaru. You could presumably, you know, get nearer to 100% if you landed the whole platform with Toyota. Is that a fair way to think about recurring visibility?

Don Young

executive
#76

Yeah, I mean, I think a reason we included that statistic, if you will, that estimate in there was that we wanted to show it. I think you know that with one or two more wins on other battery platforms. The math works out quite neatly, let me just say that. Why we're confident in those targets, why we're raising those targets, is simply a function of, you know, how we're engaging with not just the two customers we're delivering production parts to, but a range of others where we're confident we're very engaged, again, from prototyping, quoting, working through quality systems, you know, very detailed engagement with these additional companies; we feel we're in a strong position to support those 2x and 3x targets.

Chris Souther

analyst
#77

All right, great. Out of those 8 you shipped PyroThin for revenue last year, leaving out GM and Toyota, could you speak to the range of battery chemistries those customers are using? My assumption is most are NMC, but is anyone using LFP or other chemistries you're seeing?

Ricardo Rodriguez

executive
#78

Yeah, I mean. Yeah. I doubt you know absolutely all 8 of them in that kind of detail, but go ahead and take it even more at a high level.

Don Young

executive
#79

Right, so those are basically all prototype components at this stage, which means diving deep into the particular chemistry involved wouldn’t really line up with what might ultimately make it into production; for the most part they’re NMC, in either pouch or prismatic format, just as we said in the remarks.

Tom Curran

analyst
#80

Finally—though definitely not the least important—I believe. Right, John, I just wanted to make certain I could congratulate you on—

John Fairbanks

executive
#81

Coming in as the cleanup hitter.

Tom Curran

analyst
#82

One, on the financial side, right. Batting cleanup. There you go. John, congratulations on steering Aspen financially through, you know, each stage of its development and growth across the last 15 years. I've genuinely valued your thorough guidance, your responsiveness, and your clear explanations. Best of luck to you.

John Fairbanks

executive
#83

Thanks, Tom. I appreciate it.

Tom Curran

analyst
#84

Looking at your 2025 total annual revenue target of $740 million, thermal barriers should account for 75%, or $540 million. Within the other $180 million, how do you expect that to divide between energy infrastructure and the battery materials segment?

John Fairbanks

executive
#85

Tom, perhaps the simplest way to figure that out is to recall that our industrial business stood at roughly $130 million before the pandemic. Suppose we've built in low double-digit growth from that point. If you spread that across those three or four years, applying a 10% or 12% growth rate, we feel quite good about that, with that sort of-

Don Young

executive
#86

Yeah, and-

John Fairbanks

executive
#87

Get you up into that. Yeah.

Don Young

executive
#88

Tom, we were—

Tom Curran

analyst
#89

190, sort of.

Don Young

executive
#90

Tom, regarding the Aspen Battery Materials business, it's somewhat unclear how that will be structured. A decision will have to be made on whether we license that technology to others and let them produce the materials, or whether we invest in additional assets, you know, to produce those materials ourselves and sell them into the market. Right now, in our estimates, we have the cost and expenses and the R&D investment required to fund that initiative in our models, but we haven't put in revenue assumptions; we think that's a conservative approach. Ultimately we're very excited about that business. We think it will generate revenue. We don't know what form yet. On that basis, we've tried to exclude it from all the projections we provided today.

Tom Curran

analyst
#91

Understood. That's all-

Don Young

executive
#92

That query. Appreciate it, John.

Tom Curran

analyst
#93

No, that's. The two of you helped answer what I was driving at, and it's good to hear that no revenue contribution from battery materials is assumed, so you do expect to cover that entire $720 between thermal barriers and the legacy industrial business. Now that you've confirmed the mystery Asian automaker is in fact Toyota, we can focus our questions on the pacing and potential of that relationship. Could you bring us up to date on where they stand with finalizing their own dedicated battery platform, so we can gauge the timing of when you might win more than just the bZ4X? Would you expect that an expansion to some kind of platform-wide contract would also bring in Subaru?

Don Young

executive
#94

We just want to be very careful about discussing specific programs at this point and, you know, specific expectations regarding these companies. We just want to be very mindful and respectful of their own developments and so forth. Let me just say perhaps what I've mentioned a bit previously, which is that we believe we're in a very strong position, and that these companies — again, those we've been awarded business with and others where we're in the later innings, so to speak, of being awarded business — we anticipate. You know, those; we just feel that we're in a very strong position. We feel we're bringing a great deal of value to the discussions. Yes, it stems from our technology, but it also stems from the strategy we've discussed for more than a year now about being OEM-agnostic, about truly being the industry resource here, bringing expertise to this really difficult, challenging problem. I thought Ricardo did a nice job describing just how complex this is and the likelihood of these automotive OEMs attempting to manage this situation with active and passive systems at the same time. You know, that's how we see it playing out certainly over any period of time. Again, we just want to be a little careful about discussing specific programs.

Don Young

executive
#95

Thanks a lot, Lauren. Everyone, we’re grateful for your interest in Aspen Aerogels, and we look forward to sharing our Q1 2022 results in late April. Take care. Have a good evening. Thank you so much.

Operator

operator
#96

This concludes today's call. Thank you for joining. You may now disconnect your line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aspen Aerogels, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Aspen Aerogels, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aspen Aerogels, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.