Aspen Aerogels, Inc. (ASPN) Earnings Call Transcript & Summary
April 28, 2022
Earnings Call Speaker Segments
Laura Guerrant
executiveThanks, Emily. Hello, everyone, and we're glad you could join us for this call about Aspen Aerogels' Q1 FY2022 results. On the line with us are Don Young, our President and CEO; Ricardo Rodriguez, our Chief Financial Officer; and Keith Schilling, Senior Vice President, Technology. Before Don takes over, I'd like to go through a few housekeeping items. Aspen's press release, which includes the financial results and business updates, plus a reconciliation explaining how management applies non-GAAP financial measures compared with the most relevant US Generally Accepted Accounting Principles, or GAAP, measures, is available in the Investors section of Aspen's website, www.aerogel.com. Inside that release, you’ll find three things: an overview of our operations, a snapshot of the balance sheet, and a rundown of the main financial and operating metrics for Q1 2022, which closed on March 31, 2022. Also, I’d like to mention that we’ve posted a slide presentation on our site to accompany today’s discussion. That presentation is located under the Investors area of our website. An archived version of this webcast will be accessible on our site for about twelve months. Before we get started, just a heads-up that we'll be making forward-looking statements today. That covers anything about outlook, expectations, beliefs, projections, estimates, targets, prospects, business plans — anything that isn't a historical fact. These statements come with risks and uncertainties, so Aspen Aerogels' actual results could end up differing materially from what's expressed in them. You can find a list of factors that might affect the company's actual results in Aspen's press release from yesterday, on Page 1 of the presentation, and in more detail in the reports Aspen files with the SEC — especially the most recent Annual Report on Form 10-K. You can find the press release we put out yesterday, along with our SEC filings, over in the Investors section on Aspen's website. Any forward-looking statements we make on this call reflect where the company stands as of today, April 28, 2022. Aspen Aerogels takes on no obligation to revise those forward-looking statements later on to account for things that happen down the road. On today's call, we'll be talking about some non-GAAP financial measures, adjusted EBITDA among them. Those measures aren't put together following GAAP; they also shouldn't be looked at by themselves or treated as something that replaces results put together following GAAP. You can find the explanations of these non-GAAP financial measures, how they line up with the closest GAAP equivalents, and our reasons for showing them in the press release we put out yesterday. Before we move on, one more note. To keep the Q&A portion moving, please ask no more than two questions per turn. Should you have more after those first two, just rejoin the queue, and every question will get its turn. At this point I'll hand things over to Don. Don?
Don Young
executiveThank you, Laura. Everyone, good morning. We appreciate you being here for the earnings call covering our first quarter of 2022. To begin, I'll give an update on how things have been going in the business lately. Ricardo is going to go over results and the outlook, while Keith will walk through what's happening at Aspen Battery Materials; after that, we'll take questions in a Q&A. If you look at Slide 3, the strides we're making toward our objectives have me feeling very optimistic. Across the entire company, our teams are performing at a very high standard. We keep bringing in skilled individuals who bring substantial experience, which makes these already excellent teams even stronger. Coming off a robust 2021, Aspen has entered 2022 with strong momentum. Revenue for the first quarter totaled 37% higher than the same period last year and rose 22% compared to the prior quarter, which shows our ongoing gains in the EV sector along with a steadily improving energy industrial market. Given this commercial traction, plus the programs we've already been awarded with GM and Toyota, we feel certain that we'll hit or surpass the 2022 revenue guidance range of $145 million to $155 million; furthermore, we're confident in our ability to reach the $240 million revenue goal for 2023. I'll get into more detail on that in a moment. This quarter, we were proud to accept the Overdrive award during GM's 30th Annual Supplier of The Year event. The honor came in the category of launch excellence, acknowledging what we contributed to GM's thermal propagation approach for its Ultium battery platform. This kind of recognition shows how deep the technical and commercial ties run between Aspen and GM; seeing GM's steadfast dedication to battery performance and safety within its Ultium battery platform is thrilling for us, and we're just as thrilled to play a role in GM's rapid shift toward electrification. Now on Slide 4, let's dig deeper into our growth objectives and what's fueling our momentum and confidence. We view our growth targets as doubling yearly revenue between 2021 and 2023, then tripling it from 2023 to 2025, reaching roughly $720 million, which makes up stage one of our long-range plan. The robust forecast for the energy industrial segment stems from deferred maintenance needs that built up during the pandemic, elevated energy prices, and brisk activity in LNG projects. The Thermal Barrier side of things is moving faster than we originally expected. PyroThin Thermal Barrier brought in $7.6 million during Q1 by itself, which is more than what we earned for all of 2021. There's a lot of momentum behind PyroThin Thermal Barriers. We've got awarded programs that we currently put at about $1 billion in value, and those are scheduled to be delivered in stage one of our long-range plan through 2025. On top of that, there's approximately $2 billion more expected to be delivered in stage two, which begins in 2026. Our estimates show that the awarded programs from GM and Toyota — and we've been shipping production parts for those over two quarters now — make up 100% of the 2023 revenue target for PyroThin Thermal Barriers and 60% of the 2025 target. Like other tier one suppliers, when we say awarded programs, we're referring to projected gross revenues based on customer volume forecasts, with the pricing we've negotiated factored in. Alongside what we're doing with GM and Toyota, we're in close contact with other automotive OEMs, and we're pushing hard to convert additional quotes into awarded programs using our unique Thermal Barrier offerings. During stage one, we committed upfront capital to people, more efficient processes, automation, and added capacity — and that did more than enable revenue to double and then triple; it also moved us into positive cash flow and let us capture the payback on those investments throughout stage two. Investments like these are a near-term drag on margins, but in our view they give us a structural foundation, so that in 2025, with revenue targeted at $720 million, we're set up to produce gross margins near 35% and EBITDA margins near 25%. That kind of margin is in line with what you'd see from other sophisticated engineering parts made for automakers that serve essential roles in electrification — things like high voltage connectors, advanced power electronics, and silicon carbide components. Our proprietary technology and our scale put us in a position to be a valued supplier to an expanding roster of EV producers. I'd also like to give a brief update on plant two. We held a groundbreaking ceremony on March 31st for our second Aerogel manufacturing facility in Statesboro, Bulloch County, Georgia, and we began buying long lead time items in Q4 2021. Phase one of plant two is on a projected timeline for completion in late 2023. The initial stage of plant two is designed to support $650 million in yearly revenue capacity, which would lift our total annual revenue capacity to roughly $900 million. Once we get close to fully utilizing capacity at that level, we estimate EBITDA of about $225 million each year. When plant two's second phase is finished, we anticipate combined targeted annual revenue capacity of $1.6 billion across both facilities, along with the ability to produce gross profit of approximately $550 million and EBITDA of approximately $400 million. Given that the auto industry is expected to put $0.5 trillion into the EV transition over the next five years, how quickly and how large our potential ramp can become is rising fast. In addition to what we're doing with electric vehicles and our industrial energy operations, we continue to put money behind the plan of bringing our Aerogel Technology Platform into additional markets that carry high value and center on sustainability. The team we have working on this segment is exceptionally capable and entirely dedicated to it, and our expectation is that the capital we deploy will go on demonstrating how much potential the Aerogel Technology Platform holds while generating substantial worth. Within Aspen Battery Materials, our carbon aerogel project, in our view, is the closest to becoming a commercialized product. At this point I'd like to hand things over to Keith Schilling so he can speak in greater detail about ABMs. Keith?
Keith Schilling
executiveAppreciate that, Don. Now if we look at Slide 5, I'd like to start by painting a picture of what this opportunity looks like. Today's electric vehicles rely on several different battery types, which get stacked or wound into pouches or cylinders, and every one of them contains lithium ion moving through the electrolyte, starting at a negative anode, passing through a permeable separator, and arriving at a positive cathode. For this conversation, we'll zero in on the anode, because that's among the tougher problems the industry has to solve. Batteries being made right now use graphite as the anode material. Silicone would be the superior option, given that it's abundant, costs less, and can hold 10 times as much lithium as graphite does. It's broadly agreed that gaining better performance depends on getting more silicone into the anode. Here's the difficulty: whenever silicone reacts with and takes in lithium ion, it expands by close to 300%, whereas graphite only expands by about 7%. Across charge and discharge cycles, that expansion ultimately ruins silicon's capacity to transport the lithium ion, which you can see in the cracking of silicone caused by swelling in the images here, along with solid electrolyte interface formation, which also appears in the images, and the end result is weaker battery performance. On the right, you can see how a carbon aerogel solution stacks up against other options when it comes to the key performance metrics of energy density, sync range, and cost. As is clear, what's commercially available and currently deployed in the market appears as a white ellipse. Additional potential alternatives are being researched but haven't reached commercialization, and those show up as the colored ellipses in the upper right of the chart. Our solution appears in the lower right of the graphic, which represents our ambition and is supported by early test results for our solution that have been very encouraging. So what precisely is a carbon aerogel? It's a distinctive technology platform in which we take advantage of the unmatched blend of mechanical, electrical, and nano morphology properties to allow greater quantities of silicone in the anode. Now on Slide 6, why should this matter, and how do we establish our right to win within the battery space? It's common knowledge and broadly accepted that adding greater amounts of silicon is the closest available route to improving energy density. Other silicon technologies have shown substantial energy density gains while delivering the cycle life performance that EVs require. What's left is the capability to reach that performance while keeping cost low. We think the Battery Materials team at Aspen has a solution that's on track to hit the performance targets set by automotive and battery OEMs, through synthetic approaches that can be scaled. Aspen's team has worked extremely hard to overcome silicon's challenges, drawing on its expertise in carbon aerogel synthesis and the significance of its close interaction with the silicone held inside it. Keeping silicon bonded with the carbon aerogel through cycling has enabled us to start evaluating our materials in complete single-layer pouch cells, which, when tested in multi-end power pouch cells, would mean an energy density gain above 10%. On the graphic's right side, we explain where we stand today against our targets, along with the important cell-level validation milestones we'll keep pursuing in the near term. Aspen silicon carbon anode materials have already shown energy densities that satisfy what next-generation electric vehicles require, while still hitting the crucial dollar per kilogram cost goals of automotive OEMs. Our materials match or beat the energy densities of competing products, yet they can be inserted into current battery manufacturing processes at a cost that competes. We envision our materials supplying the performance roadmap for EVs, starting as an additive to graphite and advancing toward a fully tunable silicon carbon composition. Roughly 60 to 70 kilograms of graphite sits in the anode of the average EV battery. That therefore amounts to an opportunity of about $1,000 of content per vehicle for Aspen; we've already met our testing targets for cell variability, and we'll keep validating those metrics as we scale. So what makes our development approach distinctive, and what should we expect across the coming 18 months, technically as well as commercially? Our chemical synthesis process for the silicon carbon aerogel anode is genuinely distinctive, since it provides a tunable platform capable of accommodating growing quantities of silicon to satisfy the EV industry's performance and cost roadmap. Prior methods for raising silicon content in the anode have run into a barrier, with the only available options being either excessively costly or largely still in research. For Aspen, across the next 18 months, we expect to finish the development phase of our silicon carbon anode aerogel platform and to use our ties with battery and automotive OEMs to start commercializing these materials at a rapid pace. Our manufacturing capability, competitive cost structure, and connections with automotive and battery OEMs give us confidence that these materials can be moved swiftly into production. Our anode materials are just one of many improvements we're already pursuing with our Aerogel Technology Platform, in line with our strategy, and I couldn't be more enthusiastic about what lies ahead. I'll now hand the call to Ricardo. Ricardo?
Ricardo Rodriguez
executiveThank you, Keith. Good morning to all of you. I'll begin with a recap of how we performed financially in Q1 2022, then briefly revisit our expectations for the full year and explain where we currently stand on how to fund stage one of our business plan, and after that I'll hand the call over to Don. If you look at Slide 7, which covers our quarterly financial highlights, what you see at a high level is that our numbers demonstrate an obvious ongoing momentum from the growth drivers we've been putting money behind for a number of quarters, and quarterly revenue rose 37% versus a year ago, powered by each of our main markets. As Don noted, the Thermal Barrier opportunity is coming together more quickly than we had thought, on the strength of several successful vehicle launches plus initial volumes that came in above what we anticipated. To give you a sense of this, we had internally projected Thermal Barrier revenues of $4.3 million for the quarter when we put together the annual budget back in December of 2021; during Q1 2022, we actually delivered $7.6 million in Thermal Barrier revenue, which is 76% above what we originally planned. Energy industrial revenues climbed 10% compared with the prior-year period, moving from $27.9 million in last year's same quarter up to $30.7 million in this year's first quarter, which mirrors the industry's requirement to add capacity while also supporting alternative value chains. What we anticipate for growth in the energy industrial market matches the order books we've reviewed at our distribution partners and across the wider value chain. Making sure our sales channels are stocked with sufficient inventory to support the near-term bump in demand sits at the forefront of our thinking as we close out the first half of the year; another point worth noting is that we're planning for the capacity and service levels we foresee at minimum five quarters out, and we keep making the people, systems, and equipment investments ahead of when they're required, because of the growth needed to deliver our awarded Thermal Barrier programs in a world-class manner; we feel sure these investments fit the size of our opportunity, and we can see a clear route to profitability, made possible by our pricing, our material estimates, and structural conversion costs, which hold considerable potential for operating leverage once we hit our target revenue level run rates. Getting better at handling engineering changes in our favor and pushing toward convergence among the requirements of multiple OEMs means that adding more engineering resources up front is an investment worth making. Before I move on to cost and expenses, I want to emphasize as strongly as I can that we're already carrying most of the overhead for the much larger run rate revenue operation we'll grow into, as we aim to double our 2021 revenues by the close of 2023 and then triple them by 2025. Our material costs similarly reflect delivering world-class automotive tier one service levels within a Thermal Barrier operation running at roughly $30 million annually, which we recognize is suboptimal over the near term. If I think about the folks working at our Rhode Island site where we make Thermal Barrier, or if I'm meeting with the group in Monterey, Mexico, at our fabrication plant that's getting the launch ready, what I see is a team whose quality and size match what you'd expect from a company used to handling a billion-dollar business—whether that's a top-tier automotive supplier with advanced capabilities or a specialty materials firm. We're instilling in ourselves the kind of discipline and routines required to run an operation at a scale that the biggest OEMs globally can count on. Like Don mentioned, customers such as GM really appreciate what we're doing here, because it's helping them accelerate their electrification goals. On the cost side, our expenses have grown and are going to continue climbing in a stair-step fashion, whereas Thermal Barrier's revenue run rates are on a curve that accelerates and therefore has to take on the next tier of fixed costs plus the investments we presently carry as material or conversion costs. In the quarter, material costs were up 65% from a year earlier, amounting to $8.3 million, while conversion costs increased 68%, or $7.8 million. What those numbers tell you is how comparatively modest the business we operate now is — it's there to support our customers' launches — even as we develop the capacity for an automated, multi-site operation with a much bigger run rate. Expenses tied to running the company—something that really determines whether we meet the revenue and profitability targets we've set for 2023 and the years after—rose $6.7 million compared with the prior quarter, reflecting greater investment in a number of areas. The first of those is the group of technical, operational, and commercial staff who back our Thermal Barrier operations. The second is the R&D personnel working on our main aerogel development programs as well as the Battery Materials opportunity whose goals Keith outlined a moment ago. The third is our legal team, which handles broadening and protecting our IP portfolio. The fourth is our foundational infrastructure—meaning the finance, IT, and general management staff required to support the growth we're aiming for in the business. Consequently, we posted a net loss of $19.5 million, which works out to $0.59 per share. That compares with a net loss of $6.3 million, or $0.22 per share, during the same quarter in 2021. For Q1, adjusted EBITDA was negative $14.7 million, compared with negative $2.6 million in last year's Q1. Just to reiterate, we calculate adjusted EBITDA by taking net income or loss and excluding interest, taxes, depreciation, amortization, stock-based compensation expenses, along with other items we don't consider representative of how our core operations perform. Those other items in Q1 consisted of $1.8 million in stock-based compensation and $0.8 million in interest expense. I'll now turn to our balance sheet and cash flow. Operational spending drained $22.8 million, a figure that captured our adjusted EBITDA loss of $14.6 million along with an $8.2 million addition to working capital. On the capital expenditure side, $14.5 million went out during the quarter, funding engineering and design work tied to a second aerogel production site, assembly machinery for the higher-volume side of our Thermal Barrier business, and improvements to the R&D lab supporting our carbon aerogel battery material programs. From financing, we pulled in $165.9 million. That total consisted of $100 million generated by issuing convertible notes to Koch Strategic Platforms, another $50 million from that same party's purchase of common stock priced at $27.90 per share, and $23.6 million in net proceeds from our ATM offering transactions, which carried a gross average price of $35.10 per share. Offsetting all of that was a $4.7 million repayment to BASF, along with $2.7 million in other financing-related disbursements. We closed the quarter holding $205.2 million in cash, with nothing drawn on our revolving credit facility and shareholders' equity of $181.6 million. Now I'll give an update on how we see the remainder of the year. We anticipate revenue will keep growing in 2022, tied to our plan to more than triple PyroThin Thermal Barrier revenue, reaching $20 million for the year. A further tailwind is the ongoing post-COVID rebound across the global energy industrial market. Because of this, we have strong confidence in hitting or beating our annual revenue outlook of $145 million to $155 million for the year, which equals growth of 19% to 27% versus 2021. The 37% year-over-year growth we posted in Q1, combined with strategic purchases of key materials that de-risk our ability to fulfill this year's revenue plans, gives us encouragement.
Ricardo Rodriguez
executiveEven so, we're staying cautiously upbeat amid a supply chain landscape that's volatile and isn't unique to Aspen, and we're actively keeping an eye on how key material inputs reach our processes. In practical terms, the primary force behind this year's CapEx is expanding our capacity and being prepared to meet the growth Don described in stage one of our long-range plan. Making sure that capacity is ready to be put to work will take priority over any near-term variances in capital cost. The R&D spending needed to get our ABM team equipped so they can deliver and validate the development milestones Keith described when he spoke about our battery material efforts will wrap up in the first half of this year. Last, I'd like to walk through where we currently stand on how we plan to fund our business plan. As we move through the year, finishing up the funding for stage one of our long-range plan is something you should expect us to pursue opportunistically, with the goal of raising the necessary funds efficiently to expand our capacity. To build on what Don said earlier, we're putting money to work aggressively in the early portion of stage one of our long-range plan — more precisely, across the next five quarters. Those investments underpin a far longer stretch of growth that puts us in position to produce cash by the close of stage one, and will let the company keep expanding without needing more funding. For distinctive assets such as Aspen, a variety of capital sources exist that make sustainability possible alongside major customers who've handed it substantial business to fulfill. These stretch from selling equity to suitable strategic partners like KSP, to debt matching our cash flow profile, to equity. We have multiple levers available within a carefully constructed plan to make certain our balance sheet keeps backing our growth targets. Now that stage one of our long-range plan is fully funded for the near term, we're confident we can efficiently convert capital investments into capacity that gets put to work right away to hit our target revenues in 2025, and additional growth is the perpetuity — or what we now refer to as stage two of our long-range plan; with that, I'm glad to hand the call back to Don.
Don Young
executiveThanks, Ricardo. Moving on to Slide 8, and prior to opening things up for questions, I want to keep up the habit of putting a spotlight on our ESG efforts during these quarterly earnings calls. Environmental, social, and governance criteria matter to us as a fundamental piece of how we run the business, and we've begun the work of restructuring our sustainability-related policies and programs under a formal ESG strategy. Exploring fresh applications for our Aerogel Technology Platform is a natural extension for us, aimed at enhancing the environmental performance and safety of what our customers make and how they make it. Respecting and celebrating our employees also sits at the heart of our culture, through efforts to build a diverse and inclusive environment where people thrive. Our first ESG report will be published soon, laying out key sustainability initiatives and ESG priorities. We aim to establish a foundation for deeper conversations with investors and other stakeholders about specific ESG topics, and to make sure accurate and timely information is available to all. I'll hand the call back to Emily now for the Q&A session.
Eric Stine
analystMorning, everybody. Appreciate all the information. Now, regarding that PyroThin revenue of $7.4 million — clearly, GM and Toyota account for the majority of it — I'm just wondering whether you could share how many customers were included in that figure? And on the unit side, can you simply take that amount and divide by your average content, or are there additional revenue streams baked in, like development milestones or something else?
Ricardo Rodriguez
executiveYes, Eric. I believe — well, if you're attempting to work backward to the quantity of units we shipped, then using the weighted average CPD we roughly laid out last quarter to divide by the CP would be reasonable. Honestly, as far as customer count goes, it's reasonable to presume that GM and Toyota together generated most of that revenue. When it comes to separating out the other customers we've sold prototype parts to, we don't see that as a meaningful gauge of commercial advancement. Actually, our prototyping work has ramped up with additional customers; and whether we ship parts to 10 customers, which we reported last year, or to 20 or 4, we don't view that as reflecting the real depth and the momentum of the commercial pipeline. So, we'd prefer to leave it there.
Don Young
executiveAbsolutely, Eric — let me jump in here and really drive home the intensity piece that Ricardo brought up. When it comes to our Thermal Barrier group, the level of activity across each of the three key regions where EVs are being built right now has reached a point it has never hit before.
Eric Stine
analystOkay, so for my follow-up, I figured I’d ask about those 10 — and maybe not in terms of how many units or how much money, but whether it’s those 10 or some other ones. It sounds like you’re definitely seeing an acceleration in those programs going forward. My assumption is that some of those launch plans will firm up, and then where does your confidence sit regarding being on the platform when it launches? So if you could just share whatever you can — again, not from a unit standpoint, but more at a high level — and then your thinking on why this wouldn’t become the industry standard down the road, given the early progress you’ve made and the progress you’re seeing in that pipeline right now?
Ricardo Rodriguez
executiveYes. When it comes to handling those customers we’re working with at the prototyping or technical assessment stage, right, that’s an area where you do all your work, and then you’re basically at the mercy of whether the various programs are available to take on the technology. And not every OEM is set up the way somebody like GM is, where they’re beginning from a clean sheet with a completely new battery platform that immediately scales across multiple vehicle nameplates. Some of those customers we’ve shipped prototype parts to, or are working with in the commercial funnel, are juggling a mixed portfolio of nameplates that includes old battery platforms, combined with what looks on the surface like a brand-new battery platform, but it’s actually just an evolution of the previous battery. So, to your question about why this isn’t adopted as a standard from the GetGo, it’s really because adapting prior batteries is difficult, unless you’re in the lucky position that GM is in, where they’re truly starting from scratch and have the means to invest as aggressively as they are today. So for us, honestly, we also have to pick and choose which customers our prototype team supports. And it’s really with those OEMs that have taken a platform approach to the battery and that have the resources to scale something similar to what GM is doing with Altium; so, you can at least find one customer in each region of the world taking that approach, and that’s really where our focus is.
Don Young
executiveEric, one more thing I'd tack on — if you push the thinking just a bit further, my sense is our conviction has never been firmer that there's no way around it: every one of these EV makers will need some kind of thermal management approach, plus a way to reduce thermal runaway risk. To me, that's turning into something totally obvious across the board. Sure, a few of them may have dragged their feet on embracing it, but the picture keeps getting clearer. The other point I'd make — and this echoes both what I believe was in my prepared remarks and in Ricardo's — is that when it comes to doubling revenue in 2023, we already hold the awarded programs we need on the PyroThin Thermal Barrier side to get us to that goal; that figure also bakes in 10% growth from our energy industrial segment, which we're quite bullish on; and we believe we've got 60% of the revenue — the EV revenue — required to achieve the tripling in 2025. So when you consider those programs Ricardo mentioned, plus the extra ones he cited from other OEMs, we are making up the difference — at least through this stage one of the long-range plan, we're covering that final 40%. And as you can see, these arrive in fairly substantial chunks whenever a design win lands. So let me put it this way: we've got several shots at closing the remaining 40% gap toward our 2025 objective. There's plenty we share in common. And if you reflect on the General Motors timeline — how things unfolded, how we fought it out in the RFQs, how we notched early wins, then delivered prototype parts, and eventually production parts — looking at that whole arc, you're talking about an 18, 24-month kind of window. Right now we're in the middle of that same process with a number of other OEMs, which suits us perfectly, since it should translate into meaningful volumes around the 2024, 2025 period, right as we're starting up phase one of plant two. So — solid questions, and hopefully that gives you some added detail.
Eric Stine
analystYep. Many thanks. That means a lot.
Alex Potter
analystGreat. Thanks. So, clearly, it's heartening to observe the better-than-anticipated top line for PyroThin this quarter. I was curious whether you might elaborate a bit further on that. Would you say this shows that your buyers got caught off guard by how much demand there was, plus their capacity to essentially pull production forward? Or could they be attempting to, I don't know, build up stock ahead of their own rollout so as to reduce risk on their output timeline? Whatever light you can shed on why you believe revenue for that specific product is running above plan would be useful.
Ricardo Rodriguez
executiveYes. Thank you, Alex. I'd say this really appears to be simply — these rollouts in particular, for example, LYRIQ, LYRIQ, based on what we're seeing, went to market in fact multiple months earlier than the point at which even GM intended to bring it out. So that's a solid illustration of GM putting its EV introductions first as it works to hit its electrification targets. And then, naturally, keeping the material available to build the vehicles themselves. As for demand for those vehicles, I think it's clear to all of us that the new car market at present is genuinely starved for inventory and units to sell. So what we're witnessing now is an abrupt surge in revenue. And as we collaborate with our customers over the coming quarters, we'll find out how much of that genuinely shows up as true incremental demand for the year, correct.
Don Young
executiveYes. I believe Ricardo and I both say that these efforts, along with what you brought up, Alex, provide us with the drive and the assurance to declare that we believe we are set up to hit or surpass our outlook of $145 million to $155 million — our revenue outlook. If we had known precisely how your question would play out, we probably would have been somewhat bolder in adjusting that outlook, but we have strong feelings about reaching and possibly going beyond it, simply based on how things are trending; and it isn't every time that these new technologies arrive sooner. Typically, they arrive later, correct? So the reality that this one is arriving sooner is certainly worth noting, and we are putting in serious effort to be ready to deliver on that and to reach or exceed our revenue outlook for the year.
Alex Potter
analystAll right, great. That is really useful. So, another thing — perhaps building on what some others have already brought up. When it comes to customers, would you agree that — clearly, there are tons of different OEMs, each with their own approach to batteries, yet you also have a small group of tier one battery specialists aiming to reach scale and produce cells that are essentially “commoditized.” Where would customers or prospective customers of that type rank on the priority list, and what are the advantages and disadvantages of partnering with a player like that versus something such as Ultium, which clearly is a battery platform tied more to a specific brand or company? Thank you.
Ricardo Rodriguez
executiveRight. If you consider the manufacturers capable of providing consistent quantities through established, trusted vehicle lines, what we observe is no movement toward a desire to bring in a battery pack sourced from an outside party. So what’s happening is they’ve really committed to this path, shifting significant resources away from work on internal combustion engines and toward every aspect of the battery — building out a battery platform that treats the battery not merely as a sales item but as a complete system nested inside the larger system, which is the vehicle. Given that, for our own products, partnering with customers who have the resources to approach things that way is the smarter move. Honestly, if we consider the accounts our team is working with, it would be tough to feel more pleased about the companies we're involved with and how deeply you can get into technical matters when your approach operates at the system level — meaning the whole vehicle, rather than just the battery or the cell, correct? So for us, approaching this from a cell-only standpoint, or pushing harder to work with parties whose focus stops at the cell, when the real problem spans a wider system, makes less sense compared to certain OEMs we already partner with.
Don Young
executiveRight. We can plainly see that the automakers themselves are taking charge of this matter, and beyond that, of how their battery platform strategy is handled. As you pointed out, Alex, each of them has its own slight variations in the way they approach that battery platform, yet they are the ones taking charge of this matter.
Ricardo Rodriguez
executiveAnother element we consider is simply people's ability to obtain funding, correct? So it appears manufacturers enjoy fairly substantial availability of capital; and what's fascinating is that even when we examine where the specialists in batteries are located, many of them are actually with the manufacturers now.
Alex Potter
analystThat's really interesting. Thank you so much, everyone.
Jed Dorsheimer
analystHi there, congratulations, and great work on the progress you've made here, everyone. I only have 2 questions, and I'm feeling a bit sick today, so I apologize if that (confuses) you, but I suppose first, regarding the Georgia ramp, could you lay out some of the timelines we ought to be watching for in order to measure how that facility is progressing?
Don Young
executiveSure. Our 2023 revenue target — that doubling would be — we've set a target of $240 million, and we believe our revenue capacity using our current assets, and as we expand our fabrication capability, and so on, sits at roughly $250 million; therefore, we're pressing right against that limit as we move further into 2023. As a result, we are intensely focused on getting that plant up in late 2023, and having it add value during the early portion of 2024. And so, we've assembled a fantastic team to carry out that project. And as I've mentioned previously, that team consists not only of an exceptional Aspen strategic capital projects group, but also a solid set of supporting personnel and leadership, honestly, from our colleagues at Koch too, who have deep experience constructing a facility of this size, along with other great resources. And honestly, very collaborative people in Statesboro, Bulloch County, Georgia as well, who are helping us with everything we do there. So, we truly — we believe we have a powerful team and we're on schedule to accomplish what we've committed to, which is to get that facility operating in the late part of 2023.
Jed Dorsheimer
analystGreat. Then, as a follow-up—this one might be a little more technical—regarding the silicon composite anode solution, you mentioned certain technical specifics about the states versus charge. I'm curious whether you can address dendritic growth inside the battery in that context. Or has any peer-reviewed literature data been published by you on this? Because it appears you're becoming more open at this point. That's simply my interpretation of what you're doing here, and it looks like a directional shift, I suppose, given the progress you're now seeing. So that interests me.
Don Young
executiveYes. We—our commitment is to be more open about this as—over the course of 2022. And I think—I hope today was a good example of that. I'll let Keith and Ricardo comment on more—on the more technical aspect of the question.
Keith Schilling
executiveAbsolutely. Thanks, Don. Nothing has been released publicly as of yet. What we plan to do, clearly, is keep pushing ahead with validating our solution; after that, clearly, we'll become more open regarding those sorts of technical specifics. As you might expect, we're sorting through a lengthy roster of possibilities when it comes to further addressing this problem that represents an opportunity within the industry. And like Don said, we'll become more open going forward once those technical specifics reach a point where we're able to disclose them in light of where our intellectual capital stands. So, I value the question and we anticipate sharing additional details there as we keep developing.
Jed Dorsheimer
analystThanks.
Chip Moore
analystGood morning, and thank you. I'd like to build on what was said regarding Battery Materials. It's encouraging to hear the latest news and see how well things are moving, especially after your remarks about R&D and bringing products to market across roughly the coming 18 months. Could you perhaps say more about what we ought to expect regarding future investments? I recall you've previously mentioned possible licensing deals, along with other initiatives. If there's anything you can share on that front.
Don Young
executiveKeith, do you want to take that one?
Keith Schilling
executiveSure. Thanks, Chip. At this point, we've put some money into all of our lab space and, maybe even more significantly, into the people side of that business. Like Ricardo said during the prepared remarks, we expect that bigger space and facility to be finished; we're aiming at the first half of this year. And honestly, our focus has been very sharply on working through certain technical challenges, since, as you're aware, those are pretty formidable, but we've achieved some genuinely solid progress; we've called that out here. And as we keep moving toward those validation targets, I believe we're getting good results, and we'll keep putting money into that area when it's needed and when it makes sense, but we feel the investments we've made so far are required and satisfy what we need today to truly speed up our program. (indiscernible).
Ricardo Rodriguez
executiveAnd Chip, let me jump in on what you raised about licensing as opposed to pursuing this independently. As Keith explained, there's a big opportunity in front of us, yet we certainly want our spending commitments to line up with how eager others are to partner with us on this, along with our hitting the technical milestones that make commercial viability possible. So we're working to avoid getting out over our skis when it comes to financing this, locking ourselves into processes, and actually producing the material at scale before commercial viability has been demonstrated — ideally with support from some third parties or customers — and then to fund it as efficiently as we can. And should licensing turn out to be the business model that gets us there faster and more effectively, then that's fine, but we'll deal with that question when it arises.
Chip Moore
analystYeah, definitely. We'll keep listening in. Thank you.
Chris Souther
analystYeah. Hey, I appreciate you guys letting me ask. I was hoping to understand, could you break down margins for the Thermal Barrier segment compared with the energy infrastructure segment? I'd really like some detail on the investment and the fixed costs from ramping up, plus how the sampling piece factors in on the thermal side. And what's the right way to think about gross margin progression across the year? That would be useful, I think.
Ricardo Rodriguez
executiveYeah. Well, that's a solid question. Chris, for us really, when we look at the Thermal Barrier side, and during our remarks, we noted that we're feeling good regarding the structural costs we've got in place there, correct? So when you're pricing something at this scale, clearly you don't want material costs to exceed a certain threshold, and then truly hold your conversion costs within that 20 to 35% of sales range, right. For us at present, really the — when you're operating a $30-million run rate business, yet carry a significant amount of fixed expenses and overhead that could nearly support a $240 million operation, you end up with a negative gross margin there. So we're sorting through the allocations and you'll see that breakdown in the Q. But in that regard, we can anticipate our energy industrial business delivering low double-digits gross margins, whereas the Thermal Barrier side remains slightly negative near term, possibly getting worse next quarter, since we've got two facilities running, right? We've got the overhead from the Mexico facility being ramped up with no revenue yet to justify it. But then, as we said during our remarks, we're really managing toward five quarters out, when we'll have the higher volume manual processes the team designed, plus an automated facility coming online, and simply a far greater revenue run rate.
Chris Souther
analystAll right, understood. That's all logical. And clearly, since PyroThin revenue is far beyond the run rate you'd mentioned before, I simply hoped to clarify something — it appears you're adopting a wait-and-see stance regarding total volumes arriving, yet there may have been some pre-shipments tied to the LYRIQ launch, and so on. I just wanted insight into visibility for the coming quarter: ought we to anticipate a comparable run rate to what we observed, or a bit of moderation in the PyroThin business while customers absorb those impressive shipments you delivered?
Ricardo Rodriguez
executiveYes. What I mean is, we view the present run rate as a signal of where matters stand, but once more, there are numerous players beyond our control — or even GM's, or Toyota's — when it comes to actually getting vehicles built; so, as we operate — that's the reason I referenced, even during my remarks, the $30 million run rate rather than the $20 million run rate, since we're preparing ourselves for a far greater run rate in any case, correct? So, whether it's 20 or 30, that isn't the primary factor shaping our choices. At this moment, our choices are genuinely anchored to the $200 million to $240 million annual run rate that we must be set to deliver. And what's fascinating is that service levels don't truly alter how our quality team engages. Our supply chain team maintains identical intensity, regardless of whether the operation runs at 20 or 30, or whether it runs at 220 or 240.
Don Young
executiveTo be blunt about it, when we talk about revenue doubling between ’21 and ’23 — meaning from 2021 through 2023, reaching $240 million — obviously, 2023 is only a year away, so, 240. What we're describing is a significant scaling up of this business. That's the reason we're putting these pre-investments in place. That's the reason we'll have two facilities manufacturing simultaneously, since our aim is to reach those greater volumes, achieve more automation, improve design manufacturability, operate in a lower labor cost setting, and so on. So, we're pursuing that, yet at times we get these kinds of overlapping efforts happening, and that's essentially what we're up against this quarter and the next one. Still, let me state that we have confidence in the ramp and in what we're hearing from General Motors and Toyota, and honestly, from a number of the other OEMs with whom we're currently involved quite intensely and in the quoting process.
Chris Souther
analystGot it. Appreciate it, everyone.
Colin Rusch
analystReally appreciate it, everyone. With this new anode material, could you discuss how many cells you're currently putting through testing, and also how developed your work is right now on electrolyte and separator tech to back up that material?
Don Young
executiveKeith?
Keith Schilling
executiveYeah. Appreciate that question, Colin. Regarding where we stand — right now our attention is squarely on the anode side. There are additional projects sitting in our pipeline that we aren't talking about at this moment, mostly involving cathode materials, though not really separators or anything like that. So to keep things narrow, the main thing is an anode material that works plug-and-play, and that's genuinely where we're concentrating. As far as performance quality and volumes go, we're moving through a fairly methodical validation effort, and we're managing it the right way and at an appropriate patient scale; I believe we've shown solid progress; and as we keep advancing that technology and expanding our platform, more information will come out across the coming 18 months. Still, the team has made what feels like genuinely strong progress, and we wanted to bring that to everyone today.
Colin Rusch
analystAll right. Thank you very much. Now, regarding what we pay for inputs, what we charge, and how the market is set up — clearly, you're reaching improved utilization rates at the existing plant while still more or less operating at margins around breakeven. Could you share a bit about whether you're interested or willing to move toward a cost-plus approach? Are you currently looking into that with your buyers? Do you actually want to pursue it? Also, how many additional places exist where you can begin removing expenses and keeping those under control, so margins start improving beyond just utilization rates?
Ricardo Rodriguez
executiveYes. I'd say when it comes to pricing, that's an ongoing and evolving discussion we're having with people, especially in energy industrial. For certain inputs, it makes sense to consider the cost-plus model, and we're already applying something similar for a number of our inputs. Returning to what you mentioned about cost — at this stage, on the energy infrastructure side, our attention is really on getting the material side correct, then refining the conversion side as we invest further, and those same investments underlie the added capacity at our Rhode Island facility. So once we grow the Thermal Barrier side, it becomes quite compelling, because many of the investments we're making to achieve greater throughput will also improve how production flows for energy industrial. As an example, right now energy industrials gets disproportionately penalized whenever we switch between products at the Rhode Island site, or because of additional overhead we carry in managing how critical the operation is while supplying GM and Toyota. So as the run rate growth helps absorb that better, both businesses stand to gain, and you'll begin to notice the improvement, especially in conversion.
Colin Rusch
analystGreat. Thanks so much, guys.
Tom Curran
analystGood morning, guys. Don, you've often stressed that the true battle among electric vehicle manufacturers for leading positions in the EV future is essentially a contest over branded battery platforms. Looking at the potential customers currently in stage three of your commercial development funnel — the furthest along — how many of them possess proprietary platforms, or have signed on to the platform of arrival, the way Honda has with GM? And if Toyota were to choose PyroThin for another EV model launch, or even decide to standardize it across an entire platform, when do you think that additional award from Toyota would come through?
Don Young
executiveI'll take the first half of that question. Ricardo touched on this already, though he framed it a bit differently. What we're really targeting are the OEMs building one wide-ranging architecture that stretches across every model and every nameplate they sell. For us, that kind of partnership tends to be far more efficient. And the party — actually, I should say the parties — working with us most intensively are the ones with those broad platforms that will carry over into many different models. Once more, these deals tend to arrive as sizable blocks of business, which is another factor behind our approach to adding capacity. I've mentioned that plant two will be constructed in two stages, yet within stage one we're installing the groundwork needed to accommodate stage two — that's another $700 million in yearly revenue capability — since the design wins and award programs we receive work that way. As a result, our main emphasis is on the large platforms rather than specific models; for us that simply makes more sense; and then, clearly, we have a strong, deep relationship with Toyota. That point runs somewhat counter to what I was saying a moment ago. Yet when it comes to Toyota, what we're observing is a shift toward what may not be a single platform for everything, but rather one that supports several models and several nameplates. We're involved quite deeply in those conversations with them, and we believe the product we're providing is outstanding. Everything is proceeding according to plan, and so on. Our track record as their partner has been strong, and in our view, that serves as the finest kind of endorsement—so to speak—for expanding our role across that nameplate. Thus, we feel that when you consider the vehicles Toyota intends to launch from now through 2025, a large number of them fall within the 2023 and 2024 window. As a result, we see ourselves well positioned to take part in those.
Tom Curran
analystUnderstood.
Don Young
executiveTom, I believe the other — oh, pardon me. The remaining piece of what you asked, the response to that, yes, is this concept of leveraging someone else's nameplates. Wow, owning your own battery platform demands a great deal when it comes to capital, investment, technical know-how, and scale. And it isn't something for those who lack courage. So we are convinced that these kinds of collaborations will keep appearing more and more. Doing so simply makes enormous sense. Yes. Your illustration involving Honda and GM — and even since our last conversation, we've seen further announcements regarding some high-volume vehicles arriving. If I recall, that was around the 2025 timeframe — I could be slightly off on that — though not right away, but within that 2025 timeframe, with some high-volume GM/Honda vehicles arriving, which would be — which are set to utilize the alternative battery platform.
Tom Curran
analystAll right. So shifting over to ABM — regarding your plug-and-play silicon carbon anode material, in the past you considered possibly establishing a commercial goal of having that material designed into a battery of the 2023 vintage. Should that still be viewed as, more or less, the crucial commercial milestone to watch for as the initial commercial breakthrough? And if that's the case, what kind of timeline do you appear to be on schedule for right now?
Don Young
executiveHey, Keith, would you like to say a bit more about, roughly, that 18-month profile you mentioned in your script?
Keith Schilling
executiveAlright, so maybe to move forward, it helps to step back for a moment. What comes first for us is really validation. We want to make sure third parties can verify a solution offering 300 watt-hours per kilogram, one that delivers 80% energy density across 500 cycles. Those are roughly the near-term metrics we're aiming at. And we think we're on schedule to hit that inside the next 18 months. So validation really is the starting point. Then, clearly, the second part involves being able to do that while keeping variability low. With the point cells we have now — if you look back at that chart we presented — you can see our cell variability, at least for those current point cells, has been at levels typical of OEMs. Around 3%, which truly is state of the art. That gives us some confidence. Our goal is variability under 10% in a 31-amp hour pouch cell that uses our material; and we're fairly confident that because of our variability, we can keep tuning and reach a point where commercialization happens at a very commercially viable target. So I hope that addresses your question. We have an 18-month roadmap, and we're making strong progress, with some very early and excellent results from our extremely talented team at Aspen. And we're really proud of what we're showing; we want to be open and share what we're learning as we go through this process, because it's pretty exciting and meaningful in terms of our ability to service this market.
Don Young
executiveLet me just chime in on that, Tom …
Tom Curran
analystThen the following milestone would be technical in nature, correct?
Don Young
executiveThat strikes me as reasonable; this approach sits well with us. And like we mentioned during the prior quarterly call, and we'll repeat it now, and I believe Keith has as well, and honestly this probably ties back, I think, somewhat to what Jed asked, regarding delivering useful information, benchmarking information, independent information, like-for-like information — that's genuinely what we're aiming for throughout 2022. And the natural outgrowth of that, I'd say, is stronger ties with a select few significant partners in this arena.
Tom Curran
analystUnderstood. So 2022 is going to be a year of technical validation, and after you've cleared those hurdles, you can then focus on commercial targets? Got it.
Don Young
executiveI'd say that's …
Tom Curran
analystAppreciate you fielding these.
Jeff Osborne
analystMorning, everyone. Only a couple of quick items from me. Don, quite a bit has taken place over the past three months since that prior call of yours — specifically what you said regarding the programs that have been awarded, $1 billion through ‘25 and then $2 billion beyond ‘26. Is that a fresh development, or has anything shifted on that front across the last three months?
Don Young
executiveThere's been a slight shift, though honestly nothing major. Those, of course, originate with General Motors and Toyota. And we're — even though revenue is reaching us somewhat more quickly, the awarded programs remain essentially unchanged when it comes to the volumes projected across time. So, we needed to give it some thought, yet I'd say that although it's arriving faster, the total figure has remained about the same, which I think captures it well.
Jeff Osborne
analystUnderstood, that's useful. My next question is this: is there anything on your radar that you'd suggest investors keep watching across the coming 12 to 18 months regarding policy, in case the US or Europe decides to follow China's regulations on safety — or perhaps adopt something even tougher? And regarding that follow-up — apologies — would possible policy shifts alter how OEMs are engaging with you?
Don Young
executiveI touched on this somewhat, and I think it came up in Eric's question, so: the certainty that these battery platforms — that automotive OEMs will need a thermal management approach and a plan for mitigating thermal runaway — and I see that as having two parts. The word I chose, certain, applies for two reasons, in my view. First, a disastrous incident for any single brand, we believe, genuinely damages the whole sector and the whole mega-trend. And we believe the industry will have its own internal motivations to adopt these approaches, these thermal management approaches — that's one. And the second, which I'm placing second since I consider it the second most significant, is this: I believe it's also a certainty that we will witness regulation throughout Asia, throughout Europe, and right here in the US that imposes some minimum standards on such companies when it comes to safeguarding battery safety, so to speak. For those two reasons alone, I expect you'll see every one of these companies carry out — put into action — their own plan concerning thermal runaway.
Ricardo Rodriguez
executiveYeah. A lot of this comes down to a basic question: do you think in terms of a whole system, or do you think in terms of individual components? And looking at the industry lately, in the push to bring batteries to that $100 per kilowatt hour mark, performance has gotten a great deal of attention. But once you step back and consider the larger system — a car sitting beside a house — that is the point where safety turns truly essential. And more and more OEMs, we're beginning to see, are adopting that wider system and user level approach rather than concentrating on how specific components perform.
Don Young
executiveIn my view, Jeff — and honestly, when it comes to brand, this matters enormously — I don't mean to suggest otherwise — these companies are putting billions of dollars, tens of billions of dollars, into this, and we understand how easily a brand can be damaged, and how just a handful of disastrous occurrences would be enough for any single one of those brands to destroy those billions of dollars of investment; so once more, I believe there is — for a great many reasons, there is no avoiding eventually getting a handle on this problem, and we do offer a solution.
Jeff Osborne
analystThat's clear, and I appreciate it. Thanks for sharing your perspective, everyone.
Amit Dayal
analystThanks. Good morning, all. I only have a handful of questions. Don, if you ended up beating guidance this year, would the upside come from energy infrastructure, or would it be from the EV side?
Don Young
executiveIn his remarks, Ricardo mentioned that we're seeing business accelerate across both of our primary markets, and I completely agree with that. Yes, we did note that the $7.6 million in EV Thermal Barrier revenue during Q1 came in above the internal expectations we had set when entering the year, without question. At the same time, there's a lot going on in energy industrial. That stems largely from demand that built up during the pandemic and is now being released. Whenever energy prices are high, activity tends to pick up. Part of this is geopolitical in nature, yet with LNG, it's difficult to picture a busier period for that business across all three major regions. So at this moment we're genuinely enthusiastic about energy industrial. And once more, regarding your question about the outlook: a wide range of factors could lead us to raise it eventually, though as of today we're quite at ease stating our confidence in hitting or surpassing it.
Amit Dayal
analystAlright, thanks Don. I've got just one more question. For the Thermal Barrier product, are you actively going after use cases beyond EVs at this point, or is that premature? What I'm getting at is, do you simply lack the capacity at the moment to go after that kind of customer?
Don Young
executiveHonestly, we're paddling as hard as we possibly can given how much is already on our plates; and I'd tell you that — everything we're focused on with the Thermal Barriers right now involves turning more prototype efforts and more quoting work into programs that get awarded. And for us, that changes everything. And should we land one or two additional ones, then we could begin saying that existing awards no longer cover 60% of our 2025 target — instead it's 70%, 80%, 90%, 100%, which places us in an extremely, extremely strong spot across stage one of this long-range plan. And like Ricardo mentioned, that places us in a very solid cash position, cash flow position, self-sustaining, and truly monetizing these investments we're making today across the next four or five quarters, in what we believe is a very attractive way.
Amit Dayal
analystGot it. Thanks. I have no further questions. I appreciate it.
Don Young
executiveThanks, Emily. We're grateful for all of your interest in Aspen Aerogels, and we're eager to share our second quarter 2022 results in late July. Take care, have a great day. Thanks so much.
Operator
operatorAppreciate all of you being here today. That wraps up this session. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aspen Aerogels, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Aspen Aerogels, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aspen Aerogels, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.