executiveThank you, and good morning to all of you. I'd like to direct your attention to Slide 2 in the deck, where you'll find our disclaimer regarding safe harbor. On this call today, we might deliver some forward-looking statements. Such statements rest on what we currently expect and assume, and because of that, they carry risks along with uncertainties. A number of factors might lead actual outcomes to vary materially from the forward-looking statements shared during this call. To learn more regarding those risks and uncertainties, please look at the Risk Factors portion of AST SpaceMobile's Form S-1, which was filed in June with the Securities and Exchange Commission, together with Form 10-Q covering the second quarter of 2021, plus other documents AST SpaceMobile frequently submits to the SEC from time to time. We advise readers against placing excessive reliance on forward-looking statements, and the company expressly disclaims any duty to revise the forward-looking statements that might come up on this call. Having said that, I want to welcome Chairman and CEO Abel Avellan, along with Chief Financial Officer Tom Severson, to join us. Abel, the floor is yours.
Abel Avellan
executiveThank you, Scott. It means a lot to be here and to give all of you — our shareholders and the wider community — an update on how far we've come. This marks our first quarterly update and stands as a truly notable milestone in our life as a public company. As a lot of you are aware, AST SpaceMobile is everything to me, and everyone on our team is absolutely dedicated to our mission, working around the clock to make it happen. Solutions based in space keep growing in importance and are becoming woven into daily life, yet we believe the finest and most enduring answer will come from leveraging the handset already sitting in your pocket. As always, there will be no added expense for a specialized device or satellite gear. Today there are over 5 billion mobile phones already. More than 600 million individuals lack any cellular service; and roughly half the global population has no cellular broadband. During our discussion today, we'll aim to walk you through several highlights of our corporate plan and strategy, and we also intend to cover our second quarter financials. But I figured I'd begin with a report on business execution, which is where my daily attention goes. Beginning on Page 4. Our approach splits into 3 parts: industrialization, commercial and organizational. Within industrialization, we break things into BlueWalker 3 efforts, which will signal the end of our development phase; and then BlueBird 1. On the commercial side, we separate into 2 parts: securing market access in nations where we intend to serve and entering agreements and MOU with mobile network operators to reach their subscribers; and for organizational, it's about placing the right individuals for execution. Beginning with BlueWalker 3, we anticipate launching in March 2022 from Cape Canaveral. BlueWalker 3 is our upcoming prototype spacecraft featuring a 693 square foot phase array. Chain launch service supplied to SpaceX so we can boost certainty of launch timing and simplify delivery of transportation to our launch site. A successful launch and test of BlueWalker 3 will signal the end of our first development phase and the start of our production phase. Now on to BlueBird 1. BlueBird 1 is our production spacecraft, which we expect to become the biggest communication phase array ever placed into space. Throughout the second quarter, we kept making headway in finalizing the design of BlueBird 1 along with making investments in our Midland, Texas, facilities and global supplier development. Once operating at full rate, we anticipate that our Midland facilities will have the capacity to produce up to 6 spacecraft per month; on commercial; we keep having a broad based disclosure with mobile network operators and regulators globally, both directly and through our partners. We recently signed new MOUs with Smart Communications, Africell, MUNI, UT Mobile, LIBTELCO and others. So because of that, our MOU subscriber total with mobile network operators rose to 1.5 billion, compared with 1.3 billion when the first quarter closed. Though it remains early days, we've now secured regulatory approval in 6 countries, covering a population above 360 million; on the organizational side, we keep hiring to back the ramp-up of spacecraft production. Just in the second quarter, we added 62 employees across every one of our offices, giving a substantial boost to our internal engineering, manufacturing, procurement and corporate work. That takes the team to 454 — made up of 261 full-time employees, 49 full-time contractors and 144 people at third-party engineering services devoted to AST Space Mobile; we also launched our U.K. office; staff had been based there for a while, yet we decided the moment was right to establish an office, and it will serve our business development, engineering and regulatory functions. Thank you. I'll hand it back to you, Scott.
Scott Wisniewski
executiveAlright, thanks Abel. In the next few minutes, I'd like to quickly lay out the opportunity and the solution AST SpaceMobile is pursuing, and tie that back to what we're doing right now ahead of the BlueWalker 3 launch. A fair amount of this might sound familiar, but since our audience keeps expanding, we want our first quarterly update to be anchored in the fundamentals. Moving to Slide 6. Let me begin with the market opportunity and what we're aiming for. Wireless services represent more than $1 trillion in yearly revenue. That covers every monthly payment we make for the phone in our pocket; this market is shifting rapidly yet sees the same intense demand you find throughout telecom, and it's a sector that grapples with problems tied to coverage reach and rural connectivity. Certain figures strike us as useful for grasping where a service like ours would fit, starting with 5.2 billion unique cellular subscribers. These are individuals with mobile devices who pay mobile network operators and who pass in and out of coverage as they live, work and travel; so that's a substantial figure. And bear in mind that 1.2 billion among these subscribers aren't even on broadband at present. Another important figure is the 3.8 billion people lacking cellular broadband service, which is half of the world's population. When you break that figure down, many factors drive what's termed the usage gap across age, gender and income. But notably, it takes in more than 600 million people who fall into what's termed the coverage gap. They simply aren't within range of cellular broadband. We know intuitively that Earth is large and that coverage becomes progressively harder, with tougher unit economics for terrestrial networks, as you move into lower and lower population countries. That's among the reasons you see governments putting forward policies with universal coverage requirements and frequently attaching subsidy programs too. So when we examine the state of play in cellular broadband, we see an enormous installed base of users alongside unmet needs. Turning to Slide 7. It's against this backdrop that we're so thrilled about SpaceMobile. Put simply, we're building the first and only space-based cellular broadband network; this means there's no terminal or satellite dish to purchase, no changes needed to the phone in your pocket. You'll be able to connect directly to our network, nothing more. For those who know less about resolving global telecom network pinch points, sidestepping this need for a costly extra device is quite remarkable because it alters the unit economics when a user weighs adopting the new service. And once you've removed a several hundred dollar purchase requirement for the user or a subsidy from the network provider, you can begin focusing more on delivering service at lower price points and growing the potential user base. So we see SpaceMobile as a really strong answer to these networks that are changing and becoming ideal, which we just discussed, and that requirement exists alongside a subscriber group that really wants coverage and bandwidth and these days will pay for connectivity before almost any other household necessity. Turning to competition. We feel the character of the SpaceMobile offering stands apart from anything else out there now or on the drawing board, and behind that distinction are more than 1,200 patents and patent-pending claims, plus the advantage of getting there first. As the telecom world keeps changing, macro cell towers, small cell towers, fixed wireless, WiFi hotspots, fiber-to-the-home, satellite fixed broadband, satellite backhaul — all of these are excellent options for users too and will address an enormous market need, yet they won't be capable of delivering the kind of service we think we can. One more piece of our competitive protection is that creating a worldwide operation is tough, and that's the reason we aren't going it alone — instead we're working with truly amazing partners, partners who have put in investments and brought key development and commercial ties, partners who lead the industry and drive serious innovation. Among them are Vodafone, Rakuten and American Tower. Moving to the commercial part of the business. Our approach to going to market is fairly straightforward, and our intention is to construct and arrange our network and service so it resembles and feels like a cellular offering, and we work with mobile network operators to bring that service to the subscribers they already have. When it comes to the user experience, we want to cut friction down to the bare minimum, which ought to also accelerate adoption. Today's cellular networks can program text messages that present space mobile service that can be activated through a straightforward yes text message reply sent at exactly the moment our service is required. So our ties with mobile network operators matter a great deal. They sit at the heart of our technology solution and of how scalable our business is. They bring an existing, sub-subscriber customer base that's ready to be switched on. As we add more agreements and collaborations, we'll share updates; but so far, we hold MOUs with close to 20 separate MNOs that together represent 1.5 billion subscribers. All in all, we think we have groundbreaking technology paired with a refined commercial strategy. On to Slide 8. So what comes next? A few weeks back, we announced that we expect BlueWalker 3 to launch in March with SpaceX from Cape Canaveral, and we're delighted to be lifting off from our own home turf. As a reminder, our test satellite, BlueWalker 1, went up in 2019, served to confirm our network architecture and could handle the consequences of Doppler and communication delays from low Earth orbit through 4G LTE protocol. Taking that further, BlueWalker 3 is now set to show the SpaceMobile end-to-end system design, talking directly to cell phones through 3GPP standard frequencies. This particular spacecraft stands out because it carries one of the biggest phased arrays ever put into orbit, coming in at 693 square feet — roughly the footprint of a studio apartment. That scale matters greatly, since it's what allows the system to produce the power and signal strength needed to reach a comparatively tiny, low powered handset located hundreds of miles away. On the whole, work on manufacturing, assembly and testing keeps moving forward, and we think we remain on schedule for a March time frame, having incurred and paid more than 75% of planned project CapEx, nonrecurring engineering expenses included. Once we near the launch date, we'll share further specifics, but to give a flavor of what comes after launch, the spacecraft test plan contains a few distinct pieces. Right after launch, we'll run health and wellness checks, covering orbital placement, deployment and basic connectivity; during the months that follow launch, full system testing will take place in Texas, Hawaii and other locations globally. In the end, BlueWalker 3 aims to configure ground equipment so that SpaceMobile's production spacecrafts are assured. We'll be capable of interconnecting with mobile network operators for backhaul and with unmodified 4G and 5G mobile phones. Turning to Slide 9, and before passing things to Tom, I'd like to leave you with several key points of differentiation for AST SpaceMobile and place them in a broader context. Given the heavy investment pouring into space tech, we believe that demonstrates how important space-based solutions are to telecom networks, and AST SpaceMobile stands as the only pure play for public investors in LEO broadband. What's more, we're operating in an enormous market with a solution relevant to over 5 billion mobile phones and a related $1 trillion TAM, and we're going to market jointly with industry giants rather than competing against them. Our revenue share business model is built so users can sign up through a simple text message, and we hold approximately $400 million cash to fund business operations and the first phase of production spacecraft; with that said, it's my pleasure to hand off to Tom.
Tom Severson
executiveThanks, Scott. First off, I want to welcome everyone to our second quarter business update — this is the first conference call we've had since going public. Our business combination with New Providence Acquisition Corp. wrapped up on April 6, and we started trading on NASDAQ under the ticker ASTS. The transaction generated net proceeds of $416.9 million, and that money will fund the operations of the business along with building our first phase production satellites. As of June 30, 2021, we finished the quarter with $402.6 million in cash, and right now the company has no debt. The capital from the transactions came from cash held in the New Providence Trust account plus the sale of a $230 million pipe financing. In addition to new investors, that pipe financing brought in backing from our pre-transaction investors, including Rakuten, Vodafone, American Tower and Cisneros; for the company, this transaction was hugely important, because it took away the funding risk associated with delivering and proving our space-based cellular technology, and it also provided capital for the first phase of our production satellites. Now that we have public currency in place, we're well positioned to raise the additional capital required to complete the SpaceMobile constellation of 168 satellites. Now I'd like to turn to financial highlights for the second quarter and give some color on the operational initiatives we have underway and the trends we expect as we head into the second half of 2021 and into 2022. Cash operating expenses — engineering services, R&D and G&A included — went from $11.5 million in the first quarter of 2021 up to $24.5 million in the second quarter of 2021, a sequential quarterly increase of $13 million. That increase was mainly driven by R&D expenses, which reached $9.1 million for the second quarter of '21, compared with $300,000 for the first quarter of 2021. During the second quarter, we engaged aggressively with our third-party technology partners and ramped up our work on long lead time engineering items so we could meet our constellation timing goals. I expect third-party R&D expenses to continue through the rest of 2021 and 2022 as we work to complete and optimize the electronic design of our production satellites. In addition, Q2 G&A climbed to $9.2 million from $5.5 million in the prior quarter, reflecting costs related to becoming a public company, including D&O insurance, legal, corporate staff and other related expenses. Engineering Services grew to $6.3 million for the second quarter of 2021, up from $5.7 million for the first quarter of 2021; we expect engineering-related expenses to keep rising as we add more engineering staff and also grow our team responsible for satellite assembly, integration and testing — which we call AIT — at our facility in Midland, Texas. Looking ahead, we anticipate third-party R&D expenses in the range of $12 million-$14 million. At this point in time, we are focused on scaling up our AIT process to an industrial level so that it can meet the requirements of full production. Regarding personnel, if you add together our engineering and AIT staff along with our full-time consultants, that number rose from 156 at the end of Q1 to 193 at the end of Q2. As we expand our AIT capabilities, we expect that number to get to approximately 300 by the conclusion of 2022. On the CapEx front, we have invested $51.7 million in constructing the BW3 satellite up to now, and we believe an additional $14 million to $16 million will be needed to complete the project. A significant portion of BW3's total project cost is made up of nonrecurring development, and it also includes satellite components and watch costs. As of the end of the second quarter, our cumulative investments in property, plant and equipment totaled $15.7 million. We are pleased to report that Phase 1 of the AIT facility we are constructing in Midland, Texas, is basically complete, and assembly, integration and testing of the BlueWalker 3 satellite is currently in progress; we plan for it to be ready to launch in March of next year. As we prepare to transition to full-scale production, we will continue to expand our AIT capabilities in whatever manner supports our production and launch timing goals. Finally, regarding CapEx spending, we are now engaged in procurement for our first phase production satellites, and we expect these investments to begin ramping up as 2021 draws to a close, carrying on through 2022 and into the first half of 2023. Our cost estimates for building and launching the first 20 satellites are still reaffirmed, with each one in the $13 million to $15 million range. For the entire constellation of 168 satellites, the average cost per satellite we currently project falls within the $10 million to $11.5 million range. As we move further along in procurement and finalize our production satellite design, our confidence remains steady regarding execution of the plan, what the plan costs, and our ability to deliver the technology. With that, operator, please open the call for questions.
Analyst
analystStarting with Tom. I didn't catch any adjustments on your CapEx outlook, so my read is that moving from Soyuz over to CapEx, or to phase <<inaudible>>, didn't bring about any significant bump in cost.
Tom Severson
executiveCorrect, Chris. There's nothing material there. Clearly, some engineering modifications were required, and those got done. So when it comes to what BlueWalker 3 costs in total, as you can see, we still have 12 to 14 left to go, and we're at 75% complete.
Analyst
analystGreat. So, regarding that specific event, do you still intend to carry out a rideshare launch? And if you could remind us, will that be an equatorial launch or an inclined orbit? Does it make a difference for your testing needs? And what's the availability if it's a rideshare for both of those kinds of orbit insertions?
Scott Wisniewski
executiveChris, I'll begin. We aren't the primary payload, but we're comfortable with the window we've been given and the number of launches that SpaceX intends to carry out, so we're fairly protected, and that was one of the reasons we chose them, as it will boost timing certainty. So we feel good about that despite not being the primary payload. And as for the orbit, I'm not sure, Abel, would you like to...
Abel Avellan
executiveYeah, that orbit sits at 400 kilometers, and it's inclined — a really solid match for what we're aiming to achieve with BlueWalker 3.
Analyst
analystAnd regarding that 400-kilometer orbit—lower than the altitude planned for operations—am I right in assuming that this computation relied on a smaller antenna size, in order to mimic what a bigger antenna would achieve from a greater height?
Abel Avellan
executiveCorrect. Essentially, whether we're talking 400 or 700, the ability to link straight to a handset doesn't shift. What does shift is how much testing time you get, on both sides—BlueWalker 3 and BlueBird 1, each built to link straight to a handset at broadband speeds. And we can pull that off, the 400 within an altitude band of 400 to 700 kilometers.
Analyst
analystWonderful. And Abel, since you're here, congratulations on those recent MOUs and the regulatory approvals. I suppose what everyone's really wondering about is the FCC. Could you give us an update on the status of your regulatory waiver and what your expectations are for when we might see some progress milestones?
Abel Avellan
executiveYes. Well, as a quick reminder, we serve the U.S. later, after the equatorial countries. Our application was in fact approved by the FCC, and it's subject to comments around November, so we anticipate hearing from them regarding the next step once that commentary period in November concludes. But at this point, our application is in process with the FCC.
Analyst
analystAlso, regarding the altitude you were aiming for and the NASA A train, I understand there had been certain problems. Could you bring us up to date on where things stand?
Abel Avellan
executiveActually, NASA sent the FCC an official notice stating they won't object to our application. A cooperative relationship has been established between us. We reached an agreement to provide them with the location data of our satellites, and we look forward to a lasting partnership with NASA concerning how our satellites are operated. However, that matter got fully settled a great many months back.
Analyst
analystGreat. Given the worldwide chip scarcity, it's clear you haven't started manufacturing yet. Still, when you look at your supply chain and the vendors you work with, are you anticipating any issues — maybe critical parts, components, or chips that you're currently attempting to obtain?
Abel Avellan
executiveYes. Regarding BlueWalker 3, we don't; every component we need is already in our possession. In fact, we've reached the last phase of integration and testing for BlueWalker 3. All of the electronic components were actually bought by us roughly twelve months ago. As for BlueBird 1 and the constellation, our approach involved creating our own ASICs. We're also acquiring long lead items ahead of time to get ready for building the BlueBird 1s, the production satellites. We're keeping a close eye on that problem. Right now, our sense is that we can handle it by essentially buying the long lead items ahead of time.
Analyst
analystOkay, one last thing from me. So the cost currently projected for BlueWalker 3 is a lot higher than what you'd anticipate for the units once they're in production. Naturally, a big chunk of that is likely NRE, which I'd imagine also carries over to the BlueBirds. But setting that aside — when you put the projected expense of BlueWalker 3 next to the production satellites, is the reduction mostly coming from volume? Or do other factors also get you to the price you're aiming for?
Abel Avellan
executiveYes. BlueWalker 3 carries an extremely heavy NRE load. Essentially, it's a pre-metal satellite, and we moved through a development stage to arrive at the design we now have. We'll find out what BlueWalker 3 costs, and our estimate for Bluebird 1 was extremely close, purely because of how BlueWalker 3 was constructed. Certain parts see benefits — in some instances, sizable ones — tied to volume. Moving from FPGAs to ASICs is one example; beyond that, the solar panel on the production satellites is far more cost efficient compared with the one BlueWalker 3 uses. And like I mentioned when this conference began, we're putting intense effort into industrializing the process so BlueWalker 3's cost lands at the prices we've set; our confidence in the developed material and the design is high, given that we're at the final stage with BlueWalker 3. One more thing we always want to remind people when they consider our satellites: ours are modular. They're assembled from identical parts, relying as much as possible on equipment or technology that's likewise used on the ground, so we can leverage consumer electronic pricing for components. Our design is fully vertically integrated — we essentially manufacture, design, or buy at volume every component and all the electronics in our system. That means our own electronic system. Our own solar panel system; our own reaction wheels, to be produced en masse, so we can hit the cost we're anticipating for BlueBird 1.
Analyst
analystThat actually raises a different point. In the script, I believe you referenced a goal for output of 6 satellites each month; and considering how large the worldwide constellation is, my question is whether that rate of manufacturing is meant to apply during the initial equatorial phase, with output increasing afterward? Or is that the maximum rate you plan to aim for permanently?
Abel Avellan
executiveCorrect, that represents our manufacturing capability for 2023. We'll keep raising it. However, we must walk before we run. So we had a facility measuring 85,000 square feet in Midland. We're going to enlarge it so it can handle 6 satellites each month; assuming launches are available, that would approximately let us send up 50 to 80 satellites per quarter using the manufacturing capability we're engineering. To reach that goal, we're developing a completely modular architecture for the satellites. Every satellite is essentially the same. We use a production approach more similar to automotive than to space so we can generate this quantity of satellites within the timeline we've established, which is about letting us launch 15 to 18 satellites each quarter.
Bryan Kraft
analystAbel, as you're aware, certain people within the satellite sector harbor doubts about whether your satellite design can actually work — specifically concerning the array's dimensions. Could you walk us through the reasons those doubters have it wrong, plus the level of confidence you currently hold regarding both the design's effectiveness and its engineering? And if you would, please include your read on which parts you might still be working through versus those you believe are already settled.
Abel Avellan
executiveSure. Broadly speaking, this industry has historically been extremely cautious, essentially repeating the same approach across many decades. More recently, though, players such as us, SpaceX, and a few others have begun shifting how space hardware gets manufactured. Our architecture differs entirely from every spacecraft configuration that came before it — that's precisely why roughly 1,200 patents and patent claims exist to back it up. So when you look at thermal performance, mechanical performance, weight considerations, and the capacity to generate sufficient power and gain for a direct handset link, this represents something new relative to what the sector has traditionally built. What I can tell you is that we proved the feasibility of connecting straight to a handset using our initial test satellites. That was exactly what those satellites were meant to accomplish. We've gone through that satellite design in great detail alongside our wireless partners — Vodafone, Rakuten, American Tower. Then there's BlueWalker 3, which will measure approximately 683 square feet as a phase array. That's a key element enabling direct handset connectivity. It will rank among the biggest phase arrays ever put into service. We've devoted more than 1.5 years to testing that deployment on the ground, which gives us strong confidence that we'll successfully deploy it and that the technology will hold up. So right now, we feel very good about both the viability and the feasibility of this technology. Fundamentally, it's a novel method of constructing a satellite module specifically so it can generate adequate power and gain to deliver broadband-speed connections straight to handsets. The reason nobody managed this previously is that someone had to crack the code — and we've done so. With BlueWalker 3's launch, we're essentially wrapping up the development stage and beginning the transition into industrialization, at which point we've demonstrated the ability to manufacture these satellites. Despite being multi-ton and large in size, we build them quickly — 6 per month.
Bryan Kraft
analystCould I pose a second question? Before you send up numerous satellites together — in case adjustments are needed once the first one is up — will you run any test flights of BlueBird 1 to check the entire design in a space setting, confirming it opens as intended and that you can place it in orbit smoothly? Or are you instead skipping straight to commercial launches, where several commercial deployments go up aboard a single rocket? I hope I phrased that clearly — I'm simply attempting to grasp how much risk sits in that initial tranche.
Abel Avellan
executiveNo, that's an excellent question. Our intention is, clearly, to send BlueWalker 3 up in March. After that, we have a method to put as many as 18 satellites on one launcher, or 4 aboard a smaller launcher using the same vehicle. That's not what we'll do. So BlueWalker 3 goes up. Before 2022 finishes, we intend to send up a small number of BlueBird 1s, and for those we're buying every long lead item and component we'd need; next, depending on launch availability and other matters we must arrange, we'll send up 15 to 18 during Q1, Q2 2023. So on that first launch we won't use the full capability we expect for putting our satellites up, which reaches 18. So BlueWalker 3, a single satellite, followed by a few during 2022. After that, we're hoping to be able to send up somewhere between 15 and 18 on each launch.
Operator
operatorAt this point there are no additional questions, and with that we're wrapping up today's conference call. Thanks to everyone for joining. You're free to disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AST SpaceMobile, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to AST SpaceMobile, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AST SpaceMobile, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.