Scott Wisniewski
executiveThanks so much, and welcome everyone on this afternoon's call. I'd like to direct your attention to Slide 2 in our deck, where you'll find the safe harbor disclaimer. On this call today, we might make some forward-looking statements. Those statements rest on what we currently expect and assume, which means they carry risks and uncertainties. A number of factors could lead actual events to turn out quite differently from the forward-looking statements made on this call. For a deeper look at those risks and uncertainties, check out the Risk Factors portion of AST SpaceMobile's annual report on Form 10-K covering the year that concluded on December 31, 2021, which was filed with the Securities and Exchange Commission, as well as other materials the company periodically submits to the SEC. We'd advise listeners not to lean too heavily on forward-looking statements, and the company explicitly states it has no duty to revise any forward-looking statements that may be shared during this call. After we wrap up these opening comments, we'll move into a Q&A portion, and the questions we'll use are ones our shareholders sent in beforehand. Let's go now to Slide 3. If you're just getting to know our company and what we're trying to do, here's some context: there are over 5 billion mobile phones in use around the world at this point, but many of us still hit dead zones in daily life, whether at work, at home, or on the road. That's the problem AST SpaceMobile is going after — we're building what would be the first and only space-based cellular broadband network, one meant to connect directly with ordinary, unmodified mobile devices, and it's backed by our large IP and patent portfolio. Our team of engineers and space researchers is working toward a single goal: doing away with the coverage shortfalls that the 5 billion people using mobile service today have to deal with, and at long last delivering broadband to the billions who still lack any connection. A lot has gone well for us since the previous quarterly business update, and I'm glad to hand things over now to our Chairman and CEO, Abel Avellan, who will walk you through those developments.
Abel Avellan
executiveAppreciate that, Scott. I'd like to give a brief update on technology and industrialization. Starting with BlueWalker 3 — it's now at Cape Canaveral, and the plan is to launch it within a window that opened in early to mid-September. While we construct BlueWalker 3, we're also building the following 5 satellites, which are in the initial construction phase and use designs and parts comparable to those in BlueWalker 3 — FPGA, reaction wheels, and antennas among them — with a planned launch in late 2023. Before that, we've also essentially wrapped up commercial agreements with partners and vendors so we can obtain the components needed for those next 5 Block 1 satellites as well as the next-generation satellites. In addition, our extension facility, Site 2, remains on target to support our scheduled launch plan. A bit more detail on what happens when BlueWalker 3 launches, and where we stand on the launch and testing timeline: in July '19, we shipped BlueWalker 3 to California for testing — environmental testing — which was completed successfully there. On August 9, we reported BlueWalker 3 to Cape Canaveral, where testing continues. Testing will keep going here at the Cape while, at the same time, we finished launch preparations. The launch is then planned for a window running from early September to mid-September, aboard a Falcon 9 from Cape Canaveral. At T+2 — so roughly 2 months following launch — we'll have the locative placed into its orbit, and we'll begin initial in-orbit testing. We'll unfold the array and deploy the QV antenna for re-sharing communication into the RAM. Then from T — from launch — across the initial 6 months, we'll kick off a campaign to test our broadband direct-to-cell phone system together with participating MNOs on 6 continents. We'll also test the BlueWalker 3 satellite using Nokia and Rakuten infrastructure to interconnect with local operators. That's essentially our plan for BlueWalker 3 from now through launch. Business momentum remains strong; we've brought on 3 new operators, among them a memorandum of understanding with Smartfren Telecom in Indonesia, a large and important market. Together with them, we've reached more than 1.8 billion subscribers accessible via the agreements or memoranda of understanding we hold with operators worldwide. Our patent portfolio has grown to more than 2,400 patent and patent-pending claims, supporting our strong and expanding competitive advantage. We've also reached an agreement to sell a majority ownership of NanoAvionika at an enterprise value of $65 million, and the company anticipates receiving approximately $27 million in net proceeds at closing. And very recently, we finalized an agreement with Nokia for 4G and 5G technology to be integrated into our space network. The tech we're going to deploy for those is the AirScale System, and the plan is to offer it as the interconnection infrastructure linking our satellite infrastructure with the MNO infrastructure; so with that said, I'd like to pass things over to Sean, our Chief Financial Officer.
Sean Wallace
executiveAppreciate that, Abel. Hello, everyone, and good afternoon. AST is in a thrilling period right now, and I'd like to express gratitude to the whole AST crew for what they did to bring the BlueWalker 3 test satellite down to Cape Canaveral. Getting to this point required an enormous amount of labor and commitment, and it was genuinely a collective achievement. Having now spent 3 months at AST, I keep feeling impressed when I look at how much meaningful progress this company has achieved across the last few years. That progress has drawn attention from big, significant outside parties, among them MNOs we've signed agreements with, plus understandings that cover more than 1.8 billion subscribers. It also shows up in what we recently announced alongside Nokia, since a top mobile equipment supplier globally has seen what our system can do and is prepared to devote considerable time and resources toward backing what we're doing. Now let me turn to a few of our main operating metrics, which you'll find on Slide 7. On the first chart, for the second quarter of 2022, non-GAAP adjusted operating expenses came to $31.8 million, compared with $29.4 million during the first quarter. Those non-GAAP adjusted operating expenses leave out noncash operating costs, which include depreciation and amortization along with stock-based compensation, and those amounted to $3.6 million and $3.4 million in the second and first quarter, respectively. We anticipate that this level of operating expenses will keep growing across the next 2 quarters. The $2.4 million rise in adjusted operating expenses relative to the first quarter came from higher employee costs as well as other research and development and engineering expenses, driven by our ramp-up of development and infrastructure investments supporting the BlueBird program. Turning to the second chart on that page, total property plant and equipment grew by $9.4 million during the second quarter. That's against a rise of $19 million in the first quarter. Both that $9.4 million and the $19 million figure represent capital expenditures for those periods. A payment made to our launch provider during the first quarter explains why capital expenditures were bigger in the first quarter. Then, on the last chart on this slide, we closed out the second quarter holding $202.4 million in cash; in our view, that cash is enough to cover our cash expenditures beyond the next 12 months. Beyond what we hold on hand, we've been putting in hard work to build up additional sources of cash and liquidity that can supplement our activities; we recognize how capital-intensive this project is and we remain sharply focused on looking into a broad set of options so we can fund our efforts efficiently. With our BlueWalker 3 satellite now sitting at Cape Canaveral, our investments are shifting toward producing our BlueBird satellites. We see a major strength of the SpaceMobile system in how it can be rolled out in phases, letting us aim at a relatively small number of satellites to deliver limited coverage for particular countries. We think that being able to roll out our coverage in stages will give us an edge as the first mover and let us collaborate with MNOs to bring services online and grow the market. Right now, we put the capital expenditures needed to design, build and launch our first 20 commercial satellites at roughly $300 million to $340 million. That's up from a midpoint of $14 million per satellite to $16 million per satellite, which is a bit more than 14%. A variety of factors have driven up the projected capital cost to finish the satellite configurations compared with what we previously estimated. The first 5 satellites, which we anticipate launching in late 2023, will now rely on existing components from our BlueWalker 3 test satellite design, including some integrated circuit components, navigation controls and antennas. This shift in the satellite mix works in AST's favor because it will allow us to build and launch these satellites sooner. However, it will also push up the cost per satellite, given the currently higher price of these first-generation components; beyond this change in the mix of our first 20 satellites, several factors — among them inflation, supply chain disruptions, design changes and rising costs for electronic components, assembly equipment, launch costs, salaries and other elements of our satellite design and assembly work — have raised the expense of designing, assembling and launching our satellites; these projected cost trends are preliminary and rest on certain assumptions and information we have at present, and they may shift because of numerous factors noted earlier, along with delays in developing components and materials, launch costs and other considerations. The progress the team has achieved makes me optimistic, and I'm enthusiastic about what lies ahead for the company as we move from the development phase into commercial satellite production. I appreciate your ongoing backing of the SpaceMobile mission. With that, I'll hand it back to Scott.
Scott Wisniewski
executiveThank you, Sean. Ahead of opening things up to the analysts waiting in the queue, I want to take up several questions that our investors sent in before this call. Operator, would you mind kicking things off with question number one?
Abel Avellan
executiveThanks for asking that, Terry. What we intend to do is leverage the 2 manufacturing sites we have in Midland, Texas. One of them is the plant where BlueWalker 3 was assembled — that's Site 2 — and at that location, together with Site 1, we need to ramp things up until we're producing as many as 6 satellites each month. So the way we're going about it is in stages: to start, we're assembling our upcoming batch of satellites with comparable technology and drawing on both our existing Site 2 plant, so that we can handle the launches coming in the next year, and after that we'll expand Site 2 further so it can deliver that capacity of 6 satellites per month.
Sean Wallace
executiveSteve, I appreciate that. In our filings, we've shared that our approach is to run the company with sufficient liquidity for a minimum of 12 months ahead. And like I mentioned before, we're confident that our cash position and available resources are adequate to support operations over the coming 12 months. That said, before we begin Phase 1 commercial service with 20 satellites, we'll need to bring in more capital. To pursue this funding, we've been active on several fronts — among them, we filed a $500 million shelf covering debt, equity and preferred; we divested Nano, which brings us $28 million in gross proceeds. Additionally, we're far along in finalizing an equipment facility that will assist us in buying equipment for our manufacturing facility. Our approach to securing this capital will be opportunistic and strategic, and we'll keep drawing from multiple sources to finance our plan. Yes, Rick. The expenses tied to BlueWalker 3 stem from one-time research and development, establishing supplier relationships, and figuring out what succeeds and what doesn't. Much of that spending happens once and won't recur. Our Block 1 BlueBirds will gain from what we've learned, from design and manufacturing and material selection, plus economies of scale and earlier upfront investment. As I noted before, the higher capital cost estimates for the first 20 satellites came from using older generation BlueWalker 3 parts in the first 5 satellites, along with general inflation and supply chain challenges; this has pushed our projected satellite costs up roughly 14%.
Scott Wisniewski
executiveThanks, Astrid. The way our tech is built, no user terminal is needed, and it's meant to link straight up with handsets that haven't been modified. That's genuinely perfect in situations where networks on the ground can't be reached. As for Ukraine, it would be wonderful if our solution could one day help humanitarian efforts and save lives. That goes for natural disasters too, along with outages or other emergencies; however, testing BlueWalker 3 in Ukraine isn't something we're planning right now.
Abel Avellan
executiveThanks, Andrew. So, BlueWalker 3 is going to keep undergoing testing right up to the point when it gets enclosed within the launch vehicle. The launch itself is set for early to mid-September. From now until that point, a lot of testing will keep going on, and we're also continuing to get everything ready so we can launch on that date. Everything so far has been done at the Cape, in the lab facility where this satellite is going to be launched from. Once that wraps up, we launch and head into space. An in-orbit test will be run, mainly to confirm that all systems keep functioning properly as we reach space and then bring it to our orbit; after that, we deploy. Then, as I described before, we keep going with our test campaign alongside our network partners worldwide. So that represents quite a substantial logistics effort. There's a test plan on each continent that has people living on it. A large number of test facilities and locations are already arranged for this. Those are the logistics we need for it, so that all the testing can be done on schedule.
Scott Wisniewski
executiveHaving said that, I want to express our appreciation to those who hold shares in the company for sending in these inquiries. Operator, please go ahead and begin the analyst question portion of the call at this point.
Griffin Boss
analystTo start, the stock has clearly pulled back lately. I won't attempt to guess what exactly caused that. Still, it looks like the big jump on the 11th happened right after the FCC said SpaceX would not receive the $900 million from the RDOF fund. Nobody can say for sure whether that played a role in the rally. At the end of the day, though, Starlink isn't a direct competitor of yours, and the RDOF has nothing to do with AST since it targets fixed broadband. That said, I wanted to return to government funding more broadly. We know you're pursuing a portion of the 5G fund in the U.S. I was just wondering whether you could share any additional detail. Are there other government programs internationally that you already aim to take part in, or do you anticipate many similar opportunities outside the U.S. down the road?
Scott Wisniewski
executiveGriffin, this is Scott. I'll handle that question. So, to begin, our belief remains that we meet the criteria for a prospective 5G for America FCC fund. No specifics about it have come out yet, and it's still being worked through, but given the rule making from some time back, we still think we're eligible, and that's definitely an opportunity for us. Around the world, comparable kinds of funding exist. We haven't discussed those in detail. Broadly, though, I'd say our message and our story have been received quite well. Beyond grants, there's also debt backed by governments that can be accessed. So I think our story keeps landing well with governments and with regulators. And crucially, as a launch gets nearer and nearer, and we brought a satellite to Cape Canaveral, being able to see that satellite and that concrete milestone has carried a lot of weight across many different audiences. But our belief remains that we meet the criteria for that prospective FCC fund, though on that we're just waiting.
Griffin Boss
analystUnderstood. All right, that's great. So moving on to the BlueWalker 3 launch that's coming up, plus the testing that follows. Assuming all goes to plan and there are no problems, clearly, once that technology risk is behind us, signing deals gets a whole lot easier; and I realize you folks referenced several more during the quarter, which was nice to see. But as you're aware, the BlueWalker 1 launch back in 2019 served as kind of the foundation for the investment from Vodafone, Rakuten and AMT. And as far as anything you're able to share on that front, have there been discussions with other MNOs that perhaps have already signaled they'd be willing to sign MOUs should the BlueWalker 3 testing pan out?
Scott Wisniewski
executiveYes. As of now, we've entered into an agreement or understanding with a substantial number of the worldwide MNOs. So we're getting close to 2 billion subscribers covered by some kind of agreement or understanding. And that message keeps landing really well. Once again, in the earlier question, I brought up the tangibility, the fact that the satellite has been delivered. Those are extremely compelling points that our customers and regulators are highlighting. There remain a handful of other big MNOs out there, each with over 100 million subscribers, that we haven't signed; but broadly speaking, we're aligned with almost every leading MNO that isn't, let's say, in China or that doesn't clash with Vodafone. So honestly, we've achieved a great deal of progress on that front. From our standpoint, this tangible milestone carries a lot of weight, and we'll keep speeding up the customer discussions, but we're quite pleased with where things stand right now.
Griffin Boss
analystAll right, that's clear. Following up on that point—you brought up the Nokia deal, and I was wondering whether you could share a bit more detail about this partnership, specifically what Nokia's involvement looks like when it comes to rolling out and commercializing SpaceMobile, and in what ways this arrangement differs from the other MNO agreements we've seen previously?
Scott Wisniewski
executiveSure, happy to. As for Nokia, they rank among the three largest suppliers worldwide of branded network equipment, both hardware and software; in other words, these firms serve the very same client base. Their business involves supplying both hardware and software to wireless carriers, which those carriers then deploy when expanding their infrastructure. This particular technology can be found atop the tower, at its base, and also within the network core. As a result, they hold a leading position in this space. Alongside Rakuten—a recent market entrant and among our largest backers—they make up two vendors of this kind of gear, which gets installed at the gateway in a handful of sites per nation and becomes part of the network, specifically the MNO network, for linking up with our backhaul. So having a partner of that caliber on board strikes me as a genuinely strong signal. The combination of standard, readily available equipment with software tailored to their needs should prove highly useful for our MNOs, giving them the ability to expand at a rapid pace.
Griffin Boss
analystOkay, that's good to hear, Scott, and I appreciate it. Once more, I'm excited about the September launch.
Bryan Kraft
analystIt's wonderful to witness BlueWalker 3's development and the September launch that's approaching. However, I'd like to inquire about what was announced regarding when those 5 BlueBirds will go up in late 2023. From what I understand, that's about a 2-quarter delay compared to what you told us back in May. If that's correct, could you explain what's causing the schedule to shift for those launches, and also tell us where things stand right now with your broader timeline for turning the BlueBirds into a commercial operation — beginning to sell services and bring in revenue from those satellites?
Abel Avellan
executiveBryan, our intention is to send up those 5 satellites aboard one launcher, again using Falcon 9. What we're aiming for is to begin earning money from these first satellites through a service offering that won't run continuously, yet will let us generate revenue from them sooner instead of holding off until the full block of satellites is ready. This launch should happen later in 2023. There are a few things we've accomplished with them; we're taking a substantial portion of the <<foreign_lang>> design and applying it to BlueWalker 3, <<inaudible>>. While we examine that, we're simultaneously working on designing the next-generation satellites and beginning to produce certain components for them in a strategic manner. So the reasoning behind this is essentially to reach service with these first satellites. It won't be ongoing service, since we require additional satellites to provide ongoing service, but it will let us start earning revenue from those first satellites sooner than if we waited for the entire fleet.
Bryan Kraft
analystSo we're looking at the beginning of 2024, then? Would that be a fair reading of what you've said?
Abel Avellan
executiveCorrect. I'd say the end of 2023 — the very end — into the start of 2024, yes.
Bryan Kraft
analystAll right, that's excellent. Regarding your degree of certainty about that schedule for the launches happening late in 2023, it sounds as though many of the components are now ready. Therefore, it appears you have a good deal of confidence about it.
Abel Avellan
executiveThat's right. As we said previously, a reservation has been made for the launch. Essentially, we're making the most of all the knowledge and the construction work from BlueWalker 3. A great many lessons have been picked up. We did construct the first one. Clearly, we're putting those into practice within our operations for building; and indeed, I mean, as we keep repeating the manufacturing of these satellites, things will speed up. So that is — so we — for that reason, this is the path we've chosen.
Caleb Henry
analystI've got a handful of things to ask. Regarding the initial 5 satellites, is there anything you can share about what sets them apart from the rest of Block 1, meaning the remaining 15?
Abel Avellan
executiveSure. The biggest distinction comes down to being FPGA based. Actually, there are 2 differences. The first involves their size along with mass. The second meaningful distinction concerns whether ASICs or FPGAs get used. Those represent the 2 separate differences separating the 2 satellites.
Caleb Henry
analystAll right. What kind of gap in size are we talking about when comparing those 2 designs?
Abel Avellan
executiveOne is about half the other, roughly.
Caleb Henry
analystAll right. So then the later ones — the ones where ASICs are involved — those will be the smaller satellites?
Abel Avellan
executiveNo, those are going to be bigger.
Caleb Henry
analystThose are going to be bigger, then. All right, so roughly double the size. All right. You brought up that your company does satellite testing in California, while the manufacturing happens in Texas, and for now the launch takes place in Florida. I'm just curious whether there's any intention to attempt to bring testing together at one site that sits nearer either the manufacturing or the launch? Or does having it in California not really create a problem?
Abel Avellan
executiveNo, for every satellite that came after, that was truly a one-off occurrence, including the environmental testing, which is just one among the many tests we carried out. On this spacecraft we've completed more than 800 tests; and like I mentioned before, testing will continue right up until we're encapsulated into the launch vehicle. Moving forward, we also will be fully — we won't have to move the BlueBird ones beyond our own facility.
Caleb Henry
analystAll right. That's my final item. Regarding sending up the rest of the Block 1 satellites and moving past that, is there any schedule you've set for revealing further launch contracts? Or have you already locked in more launch capacity with SpaceX past those initial 5?
Scott Wisniewski
executiveScott speaking. I'll handle this. We hold a multi-launch agreement with SpaceX. Consequently, we made some prepayments toward an additional launch. So that has been completed, and it would potentially serve a second launch. On the components side, we've established suppliers for the first 5 satellites, and for the next generation past that, a lot of parts are under contract too. So our planning is in place. We aim to be strategic about long lead items and looking ahead, since clearly there are supply chain disruptions that everyone must handle. So we've been actively planning for the satellites that will follow the first 5. Yet right now, we won't reveal the timing, but those are ones we're clearly very focused on, and we want to build satellites as quickly as possible. But we've treated these first 5 satellites as a single launch, as Abel mentioned, sort of a hefty way to make a dent in the constellation, and that's what we're doing as the first move, but we intend to have satellites right behind that very closely.
Landon Park
analystGreat. Now regarding the BlueWalker 3 testing, Abel, could you discuss the primary problems you believe might come up during testing? What do you see as the largest obstacles to kind of get past? And what kind of disclosure ought we to anticipate across that 6-month testing process?
Abel Avellan
executiveOkay. Well, to respond to that, I think I'll need to break it into phases. So the initial test carried out happens once we've launched and reached orbit — we'll conduct an in-orbit test, which essentially is meant to confirm that every component and the satellites themselves show up correctly in that orbit and that all the parts work the way they should. That's phase one. And we expect that to occur within the first 2 weeks following launch. Afterward comes a phase in which we choose to deploy — essentially to unfurl the array. Basically, we had a phased array of roughly 8 meters by 8 meters that gets unfurled; we've got cameras; we've got potentially other satellites capturing images of that event, and where it's closed, that essentially confirms the mechanisms and the capability to open the satellite. The final event — we begin, basically, we had plenty of these planned in advance. And clearly, I concur with the network operators when we begin broadband direct to the cell phone with BlueWalker 3; so for that, we'll have several chances to test with leading operators the satellite alongside the Nokia and Rakuten equipment on the ground. And we'll basically — we'll be in a position to demonstrate broadband directly to the handset. That's sort of the last phase.
Landon Park
analystOut of all of these, which one strikes you as the toughest obstacle you'll need to get past?
Abel Avellan
executiveHonestly, it's hard to pick one. What I can tell you is that more than 12 months went into putting these states through tests and checks to confirm they'd behave the way we intended. So right now, where we stand on our — is — the timing of our launch comes down to the fact that we're all — we have the proof leading us to believe that each thing will work the way we intended — that the — and that is likewise the reason we broke it into stages: in-orbit testing, then deployment, and after that, delivering actual broadband to the cell phones.
Landon Park
analystCould you also jog my memory on the kind of throughput each device should get from BlueWalker 3?
Abel Avellan
executiveOur expectation is data rates for 5G and 4G. Naturally, this is a test satellite. Plus, alongside the operators, we'll be fine-tuning the network. Our belief is that we'll meet the FCC's 5G specifications for the 5G rural phone beginning already with BlueWalker 3. Naturally, when we launch — we sent up the extra satellites and made further enhancements to them — we anticipate that will grow.
Landon Park
analystAll right, then, just so I'm clear — when it comes to BlueWalker, the throughput for service is going to be capped closer to what we should expect? Is that a result of your testing happening across such a slim band, or...
Abel Avellan
executiveNo. What happened was — under our experimental license, we were given a 10 megahertz block for testing purposes. We've got facilities, sites in Texas where the test can be run, plus Hawaii. Those represent 10 megahertz of spectrum assigned to us. Our expectation is approximately 1.5 bits per hertz on the uplink side, and 2 to 3 bits per hertz on the downlink side. And that's — we do have spectrum in place. The FCC granted us approval to conduct this testing.
Landon Park
analystso I guess that amounts to ten megahertz in TDD.
Abel Avellan
executiveit's FDD, ten megahertz...
Landon Park
analystMy apologies — that's FDD, got it. Alright, then. So what I'm hearing is that data rates on the downlink are in the double-digit range.
Abel Avellan
executiveThat's right.
Landon Park
analystAll right. And regarding what you anticipate for BlueWalker 3 in terms of throughput per satellite, and then how that compares with the BlueBirds, has that been discussed?
Abel Avellan
executiveYeah. So capacity per satellite comes to roughly 1.9 million gigabytes each month for every satellite. That figure is going to grow; certain satellites of ours will let us bring MIMO into the network. Still, the rough capacity — or tonnage — we intend to handle using spacecraft of this kind sits at about that figure.
Landon Park
analystCould you break down that figure and explain the underlying assumptions regarding both gross throughput and usable throughput, or...?
Abel Avellan
executiveThe figure represents usable throughput delivered to handsets. It is billable.
Landon Park
analystYeah, got it. I'm simply trying to figure out what the underlying — what exactly is the — if we measure in gigabits per second, how much throughput does the satellite deliver?
Abel Avellan
executiveSo, roughly 9 to 13 gigabytes — gigabit per second of trunking capacity going back to ground is what we had, and we're able to bring that down across an area roughly 20,00 kilometers in diameter, which travels around through the air. Then, once you factor in that the satellite passes between regions containing phones and regions without any phones, plus all of that, that's essentially the way you can arrive at an estimate of how many gigabytes' worth of tonnage you're able to transmit to the handset.
Landon Park
analystSo I want to confirm I've got this right — you mentioned throughput of 9 to 13 gigs for each satellite?
Abel Avellan
executiveThat's correct. That's right.
Landon Park
analystAll right. And is that BlueWalker 3, or is that BlueBird — the first BlueBird?
Abel Avellan
executiveNo. BlueWalker 3 — apologies, those are the satellites we're producing; it's Bluebird.
Landon Park
analystPerfect. Great. That's all very helpful. And then Sean, just 1 question for you. Did you size the funding gap that you're expecting?
Sean Wallace
executiveWe don't disclose that as yet. What we have been doing is giving guidance on how we're funded for the next 12 months. And we've also given guidance on a 20-satellite configuration.
Landon Park
analystSo from what I'm hearing, your burn each quarter ought to stay under $50 million on average across the coming year. Is that the idea?
Sean Wallace
executiveOur expectation is roughly $30 million in cash operating expenses. CapEx may rise or fall, though it might land in that area, yes.
Scott Wisniewski
executiveAppreciate it, operator. What our company is doing is constructing a cellular broadband network based out in space, made to work with the handset already sitting in your pocket right now. To everyone holding shares with us who came onto this call, we want to express our thanks, along with our gratitude for the steady and robust backing you've given the AST SpaceMobile mission. Thanks so much.
Operator
operatorThanks. That brings us to the end of today's call. We appreciate everyone joining in. You're free to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AST SpaceMobile, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to AST SpaceMobile, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AST SpaceMobile, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.