Thanks, and good afternoon to all of you. I'd like to direct your attention to slide 2 in the deck, where you'll find our safe harbor disclaimer. On this call today, we might make some forward-looking statements. Those statements rest on what we currently expect and assume, which means they carry risks and uncertainties. A number of factors could lead actual events to come out materially different from the forward-looking statements made on this call. If you'd like more detail on those risks and uncertainties, take a look at the Risk Factors section in AST SpaceMobile's annual report on Form 10-K for the year that ended December 31, 2022, which was filed with the Securities and Exchange Commission, along with other documents AST SpaceMobile files with the SEC from time to time. We'd caution readers against placing undue reliance on forward-looking statements, and the company expressly disclaims any obligation to update the forward-looking statements that may come up during this call. Also, once our initial remarks wrap up, we'll kick off our Q&A section with questions our shareholders submitted in advance. Now, turning to slide 3, for anyone who may be new to our company and our mission, more than 5 billion mobile phones are in use around the globe today, yet plenty of us still run into coverage gaps as we go about living, working, and traveling. On top of that, billions of people lack cellular broadband and stay cut off from the global economy. The markets we're going after are enormous, and the problem we're tackling matters and affects just about all of us; against that backdrop, AST SpaceMobile is building the first and only global cellular broadband network in space that operates directly with everyday, unmodified mobile devices, backed by our extensive IP and patent portfolio. It's now my pleasure to hand things over to Chairman and CEO Abel Avellan, who will walk you through our activities since the last public update.

Abel Avellan

executive
#2

Thank you, Scott. I want to extend a welcome to everyone joining our Q3 2023 Earnings Call. If you'll turn to page four, I'd like to begin with the highlights and updates that matter most. Once again, we achieved something unprecedented in the connectivity field. BlueWalker 3 showed off the first and only 5G capabilities originating from space, along with data rates of 40 Mbps. That wraps up an incredibly successful test program spanning 2G, 4G, and 5G. Vodafone, AT&T, Rakuten, and Nokia all joined us as partners, and the effort validated AST SpaceMobile's satellite design, its patented technology, and its manufacturing strategy. On top of that, we are moving forward as quickly as possible toward putting the first five satellites into orbit in Q1 2024. In Midland, production is proceeding at full speed and going well. To help you appreciate the progress we've made: about 85% of the capital expenditure we planned for these satellites, including launch costs, has already been spent. Turning to what we spend, after we wrap up some one-time research and development projects along with the initial five satellites built for commercial use, we expect our adjusted operating expenses to come in at around $25 million to $30 million per quarter. That begins in Q1 2024. For comparison, the run rate historically has been about $37 million to $40 million each quarter. Last, our efforts to raise funds with several strategic partners continue to move ahead, and the schedule lines up with what we shared a few weeks ago in the press release for our interim business update. If you turn to page five, I can walk you through a little more about where things stand. With a number of strategic partners, we are making progress on definitive documentation as well as finishing diligence. This strategic investment effort is designed to attract fresh capital while establishing additional financial, commercial, and strategic ties throughout the wireless ecosystem. The new funding is intended to support building, deploying, and running further BlueBird satellites beyond the initial five commercial ones. Overall, we feel good about how this process is progressing and anticipate being able to say more sometime in November or December. Now let's return to our technology discussion on page six. For the third quarter in a row, we've achieved something no one in telecom has done before. In September, we accomplished another groundbreaking advance in cellular broadband delivered from space: we completed the world's first 5G voice and data call connecting a standard smartphone, with no modifications, to a satellite orbiting Earth. That call took place on September 8, using a Samsung Galaxy S22 that hadn't been altered in any way, located in Hana, Hawaii, within an area with no wireless coverage. The testing concluded together with our partners Vodafone, AT&T, and Nokia, all of whom are part of this shared achievement. In a different test, we broke the prior record for space-based cellular broadband data sessions, achieving a download speed of roughly 44 Mbps. I'd recommend taking a look at the video on our site showing the 5G connection along with other testing milestones tied to BlueWalker 3. Then, turning to page 7, you'll find that this achievement — delivering 5G cellular broadband directly from space, something never done before — comes at a moment when the United States is working to ensure 5G broadband connectivity is available to every American. Today, less than half of the country's geography has 5G coverage offering download speeds exceeding 7 Mbps. Built specifically for cellular broadband, the SpaceMobile network is the only space-based network of its kind, and we'll be positioned to serve the country's unconnected areas efficiently, bringing 5G connectivity to everyone. During the FCC's reopened comment period for the 5G Fund for Rural America rulemaking, we submitted our input. We had asked the commission to allow satellite networks to qualify for this program's funding, and we expect to follow what happens next in the rulemaking shortly; this clear need that we're tackling plays a key part in how we've been able to develop solid wireless operator partnerships over the years. Turning to page eight, I want to give a few examples of how our MNO partners have highlighted our collaboration. To start, here's a brief look at the way Vodafone is thinking about using our service to fill in gaps alongside their leading terrestrial network. They'll depend on us — the first and only space-based cellular broadband network — for voice calls, SMS texts, video calls, internet browsing, email, music streaming, and social media, no matter where a Vodafone subscriber happens to be. As for AT&T, for a second straight quarter, they've placed us right at the center, highlighting us as a major milestone in their history and during our earnings call. Here, they talk about their support for the world's first direct 5G voice call. That kind of prominent public endorsement shows how serious and how deep these relationships are. Of course, AT&T and Vodafone are important partners for us, but they aren't the only ones. If you go to page 89, you'll see we've got MOUs and an agreement in place with over 40 of the world's biggest mobile network operators — that adds up to over 2 billion subscribers who'll be able to reach us once our network is up and running. Among these MNOs are Vodafone, Rakuten, AT&T, Bell Canada, Africell, Etisalat, Globe, Indosat, Liberty Latin America, LTC, Maxis, Millicom, MTN, Muni, Nysat, Optus, Orange, Salam, Safran, Tech, Smart, Smile, Somtel, STC, Telecom Argentina, Telefónica, Telkomsel, Telstra, Uganda Telecom, Jazz, Zain, and more. Now, before I update you on where we stand with manufacturing, I'd like to briefly highlight just how strong our intellectual property is — that's on page 10. The size of our IP portfolio continues to grow — we've now got over 3,100 patents and claims that are patent pending. That includes 30-plus patent families, more than 25 US applications, and over 10 further patents internationally. From the day we were founded, our strategy has been to secure patents covering important pieces of the direct-to-device value chain from beginning to end, plus important elements of how we manufacture. If you'll go to page 11. We can share some great news about how far we've come in producing our initial five commercial satellites at our Midland, Texas facilities. We've made substantial headway on the crucial subsystems for these satellites, and we keep a large share of the overall work in-house. All of the primary components are now produced by us internally. At our Midland sites, we operate around the clock across three shifts, and we've grown to roughly 160 people working in manufacturing, more than 100 of whom appear in the photo above. So far, 85% of the capital expenditure we planned, launch costs included, has been spent. Let's move to page twelve. I'd like to walk you through where things stand on the first five commercial satellites we're producing, which are at an advanced stage in Midland, Texas. You should appreciate how much of the manufacturing we do ourselves. Doing so much in-house matters greatly to us, since it lets us hold onto the unmatched cost per unit we deliver on our satellites, along with the power and capability to send broadband straight to ordinary smartphones. Such capabilities are rare within the industry, and they'll let us operate at a manufacturing capacity of 6 satellites each month and 72 satellites each year. On this page, we lay out the main subsystems that make up our Microns, the fundamental element of our phased array. Every one of our Microns is built for mass production and they're all the same. Being able to mass produce them is crucial if we're to keep our satellites' cost as low as it is.

Abel Avellan

executive
#3

To make Microns at scale, we’ve brought the Micron’s power system, power storage, electronics, and antennas together under one roof. We had a solar panel production line in Midland, plus our own CIC lines, cover glass, and interconnect cells at a supplier, so we could cut costs, lengthen lifespan, and adjust how the solar panels perform so they can endure in space. We also run a battery pack production line in Midland, and those packs then get integrated into the Micron. For BlueWalker 3, both the solar panel and the batteries had been sourced externally, and afterward we moved them in-house. Our electronics are engineered to last 7 to 10 years while keeping costs low. For our first five satellites, we build our electronics using FPGAs, field-programmable gate arrays, and our own PA LNAs, so performance holds up in the harsh environment of space; for Block Two, the FPGA will be upgraded with our own ASICs. If you turn to the next page, our system consists of a very large phased array, which is constructed from the Microns I described on the previous page, and a central control and processing unit, which we refer to as our Control Sat, and we’ll give you an update on that here as well. The ControlSat is also manufactured in-house, including the structure that contains our avionics flight software and central processing beamformer, which is the unit that generates and creates the beam that turns into cellular—cell for handling direct connectivity to devices; this too is made in-house. The key component of this has been finished and is being integrated at our Midland, Texas facility. The flight computer is a vital part of our system and is where we host our attitude control system to manage the spacecraft’s position, and also where we run flight software, which communicates with every sensor and actuator on board to control our spacecraft. This is all produced in-house, including the wiring harness. The software and control system are architected and designed in our U.S. offices and get integrated and tested at our Midland facilities. In this picture, you can see the ControlSat component of the avionics stack, the harness, and all of the ground and flight software, which is needed to manage and control the satellites. It’s important to remind you that all these subsystems and this level of vertical integration are only possible because we have BlueWalker 3 operating successfully for over a year. That has given us all the learnings and all the required heritage so we can integrate effectively and cost-effectively all these parts of our new build of satellites; and with that, I’d like to hand over to Sean to provide a financial update.

Sean Wallace

executive
#4

Thanks, Abel, and good afternoon, everyone. It was a little more than 12 months ago that BlueWalker 3 headed into orbit in the night sky above Cape Canaveral. From that point on, AST has continued stacking up one achievement after another and has kept advancing toward the goal of constructing the AST SpaceMobile constellation; right now we are both propelling and shaping the satellite-to-device field, which is fast becoming one of the most exciting breakthroughs the mobile phone industry has witnessed in the past half-century. Since our last discussion of quarterly results, the AST SpaceMobile team wrapped up further trailblazing trials with BlueWalker 3, made substantial headway before the scheduled deployment of the five BB-1 satellites, and stayed focused on locking in financing for the AST SpaceMobile constellation. One exciting and tangible indicator of that momentum is watching our Midland assembly, integration, and testing facility start up manufacturing, staffed by dozens of technicians and engineers and outfitted with highly specialized processes — all of which helped produce five BB-1s for the launch aimed at next year. First, I want to recognize and thank our committed engineers, technicians, and suppliers, along with the support and validation from our partners — among the most sophisticated wireless companies in the world — including AT&T, Vodafone, Rakuten, and Nokia. Let me begin by walking through the key operating metrics for Q2, which you can see on slide 14. On the first chart, during 2023's third quarter our non-GAAP adjusted cash operating expenses totaled $37.3 million, versus $38.4 million in the second quarter. When we refer to non-GAAP adjusted operating expenses, we exclude certain non-cash operating costs — depreciation and amortization, along with stock-based compensation. Those costs amounted to $21.6 million in the third quarter and $19.6 million in the second quarter. On a sequential basis, our non-GAAP adjusted operating expenses fell $1.1 million in Q3. Research and development spending dropped during the quarter since we spent less on our ASIC chip design work, and that project continues to move closer to completion. For us, R&D is largely non-recurring development work, typically carried out by outside vendors, with payments linked to milestone achievement. Engineering services costs decreased, whereas general and administration expenses rose modestly in Q3. Now turning to chart number two. Q3 capex reached $71.7 million, versus $26.8 million in Q2. On the previous call, we informed you this figure would climb significantly, since our focus was on procuring parts, materials, and systems for the BB-1 satellites, and also on paying our launch services provider. As the third quarter closed, over 85% of the anticipated amounts for those satellites had been spent. Our present estimate is approximately $115 million for the five BB-1 satellites, above the $110 million we projected last time. That total includes roughly $150 million in commitments tied to the program. Now for some better news: a big chunk of that expense increase happened because a potential customer requested that we change the satellite constellation's orbital tilt, which would allow us to provide better coverage for the subscribers they serve, and relocating the orbit required us to make an added payment to our launch provider. On the final slide of the presentation, we ended the third quarter with about $135 million of cash on hand. As we stated in our 10-Q, we believe this cash, together with our ability to obtain financing through existing arrangements, will be sufficient to cover our spending needs for at least the next 12 months. Also, as we mentioned in our 10-Q, the structure of our costs and the way our capital plans are designed provides us with substantial flexibility. That allows us to scale spending up or down based on shifts in our build-out timeline and the capital we're able to secure. Given that flexibility, we have confidence in our ability to actively manage liquidity, although it hinges on the pace at which we bring in capital. Now on page 15, I'd like to provide guidance for the upcoming fiscal year regarding the operating expense levels and capital expenditures we expect. We've been financing the development of our two main satellite designs, Block One and Block Two, as well as our ASIC chip design and the build of five BB1 satellites. Completing the BB1 effort and a large portion of the BB2 and ASIC design work is expected to produce a significant reduction in our adjusted operating expenses and future capital expenditures; that lower cash spending will come without any material reduction in employee headcount, as most of these savings result from finishing up third-party work. In total, we anticipate our adjusted operating expenses will drop from $37 million to $40 million per quarter to approximately $25 million to $30 million per quarter, with the full effect beginning to be seen in the first quarter of 2024. Additionally, we intend to lower our capital expenditures as we finish the final investments for BB1 and the major investments for BB2. As I noted, the timing of these changes to our adjusted operating expenses and capital expenditures might be pushed back or might not occur at all due to a range of factors. That wraps up the presentation portion of our earnings call, and I'll hand it back to Scott.

Scott Wisniewski

executive
#5

Thanks, Sean. Prior to opening things up to the analyst queue, there are a handful of questions our investors sent in before the call that we want to address. Operator, would you mind kicking us off with question number one?

Abel Avellan

executive
#6

Thank you, Rolando. Excitement has been enormous regarding services that connect devices directly. During the last 12 months, we've watched competitors raise their hands with copycat products. Yet once you dig into what they actually offer, it's obvious those systems aren't broadband, can't scale, and won't work with the phones people carry today. Solving this is genuinely difficult, requiring many separate pieces to come together successfully, and since our company was founded in 2017 we have dedicated ourselves completely to building this system; more than $700 million has been poured into the effort so far, producing upwards of 3,100 claims tied to patents or pending patents plus manufacturing capacity we own end-to-end for our satellites. What sets AST SpaceMobile apart is simple: ours is the first and only architecture built to deliver 5G cellular broadband. We've demonstrated we can hit 5G data speeds, and 4G and 2G as well. Competing systems right now remain a long way from matching our results and mostly amount to narrowband text plus emergency connectivity. Our exceptionally big phased array antenna, paired with ASICs we developed ourselves, stands alone in this industry and matters greatly for delivering 5G straight to the everyday smartphones already in use, and for growing to meet demand from the 5 billion handsets worldwide alongside the biggest and leading MNO partners globally. Thanks, Tanner. Creating the ASIC took 4 years and cost more than $40 million; at this stage, that work largely sits behind us. The design is essentially finished. We anticipate receiving initial units roughly 3 to 4 months following tape out, meaning the stage when our foundry partner, TSMC, manufactures the design. Let me remind everybody that our first five commercial satellites will launch carrying the FPGAs we use now, which are basically the programmable form of the ASIC. With the ASIC, we anticipate a 10 x gain in processing bandwidth across 1 GHz-10 GHz of spectrum available per satellite, while cutting satellite power draw, consumption, and expense. In our view, this creates a substantial obstacle to entry for cellular broadband from space, together with our 2,400 sq ft phased array.

Scott Wisniewski

executive
#7

Thanks, Lydon. I'll handle that one. You might remember that with BlueWalker 3, we repeatedly had to relocate the satellite to another location. That covered vibration testing plus other kinds of testing. Just before we sent the satellite to Cape Canaveral, we actually needed to return to California to run tests, which naturally is not efficient and added additional time to our schedule. For our initial 5 commercial satellites, though, we'll be capable of performing all of our testing outside the factory internally at our Site Two facility in Midland, Texas; that testing covers component-level and satellite-level thermal vibration and RF testing. That's yet another excellent capability we've brought in-house alongside the vertical integration Abel mentioned earlier. Because of this, we anticipate considerably cutting our production times and boosting our control over our process relative to BlueWalker 3. As we mentioned earlier, we've kept expanding the list of MNOs with which we hold MOUs and agreements. We've now reached more than 40 operators globally, who together serve over 2 billion subscribers. Our intention is to sign a number of these agreements before launch, and in fact, we recently altered the inclination for our first 5 satellites in response to customer feedback. We're going to be at a 53-degree inclination, and this orbit lets our satellites cover any location on the globe, up to 59 degrees latitude for both the northern and southern hemispheres. With that, I want to thank our shareholders for sending in these questions. Operator, let's open up the call to analyst questions now.

Benjamin Black

analyst
#8

Hey there. I appreciate you taking my question. I've got a couple for you. First off, could you provide any additional details about the strategic investment process — specifically, what you're seeking and how you envision those partnerships taking shape? Thanks.

Scott Wisniewski

executive
#9

Hi, Ben. Thanks for asking. I'd say we've already included the bulk of the most recent details in this presentation. This represents a key stage for us, since it outlines not only the funding but also the commercial and strategic connections that matter to us. So we're feeling quite positive about where things stand at the moment, and we're eager to share further specifics in November and December.

Benjamin Black

analyst
#10

Understood. So with 5G connectivity now in place, what would you say is the next big testing goal you folks have in mind, if there is one?

Abel Avellan

executive
#11

Hey, Ben, how's it going? Right now our focus is shifting toward assembling the following 5 satellites. Testing with BlueWalker 3 is still ongoing, but every key milestone that BlueWalker 3 needed to hit has already been reached.

Benjamin Black

analyst
#12

All right, understood. And after that, could you provide any additional detail regarding the CapEx path ahead? I caught the remark that it may drop, but I'm curious how quickly and roughly how large that move would be? That's all from me. Appreciate it.

Scott Wisniewski

executive
#13

Clearly, during the quarter just ended, our CapEx rose quite sharply because of certain final payments tied to BB1 along with some additional BB2 outlays; going forward, we anticipate that figure will decrease substantially; while we don't offer guidance on it, it should land well below the level seen across the prior two quarters.

Griffin Boss

analyst
#14

Hi, and thanks for taking my questions. So, first off for me: is there anything more you've learned during the last three months that you can share about capacity and the capability to handle several calls at the same time within a given beam or cell?

Abel Avellan

executive
#15

We've already provided preliminary guidance on what the capacity per satellite is, and on the processing bandwidth we're able to support. For Block 1, using the FPGA-based system, it's roughly 1 GHz of processing bandwidth. With the ASIC, that's a tenfold increase, to 10 GHz of processing bandwidth; and our testing backs up these assumptions.

Griffin Boss

analyst
#16

Alright, understood. But when it comes to BlueWalker 3 specifically, have you run tests involving several calls happening simultaneously? I'm not sure I've come across any test results showing multiple calls at one time, or multiple video calls? Right.

Abel Avellan

executive
#17

Yes, we have carried out simultaneous, multiple sessions. Beyond that, we've opened up the pipes so that hundreds — in certain cases, thousands — of phones can latch on and connect to the system, which has likewise been confirmed throughout the testing.

Griffin Boss

analyst
#18

Okay, that's great. All right, thanks, Abel. I appreciate it. Then, backing up a bit, about that U.S. National Spectrum Security that came out yesterday, I'm just wondering whether anything in it stood out to you as noteworthy when it comes to supplemental coverage in space, or, you know, whether anything there hints to you that the FCC could now act more quickly to build out such a framework?

Abel Avellan

executive
#19

Yeah, well, as you're aware, direct-to-device was our invention. We were also the first to show it working at broadband, and ours is the only system that supports it. It's really encouraging to see a presidential notice whose first item is essentially a system replicating what we came up with. So yes, that got our attention; we're quite pleased. That makes us very encouraged. My sense is this will make it easier down the road for how our services get regulated, especially within the United States. The United States also serves as a benchmark for other nations. Alongside our strategic investors, our existing strategic investors, we've made meaningful headway worldwide in having this system regulated and usable, and we address a major problem. So yes, we take real pride in being referenced and in being included in presidential spectrum strategies, which amounts to unexpected usage backing a system we invented and where we're the sole provider able to deliver broadband connectivity straight to ordinary devices; so we're quite pleased, quite encouraged by that.

Griffin Boss

analyst
#20

Got it — that clears things up. I appreciate the perspective. If there's room, I'd like to add one last question. The topic of the competitive landscape came up before. I was wondering if you'd be open to sharing your view, assuming you have one, about the reasons behind Qualcomm's recent choice to step back from Iridium?

Abel Avellan

executive
#21

Sure. Well, you know, we're talking about 5 billion phones out there. At the time we introduced this system design, one condition had to be met: your device wouldn't require a specialized chip, a specialized frequency, or anything specialized at all. The second you go down that road, those five billion handsets already out there turn into a narrow niche. Anything needing a handset swap, or an SOS function, or a test — our view is that it stays small, and the opportunity is capped when you stack it against delivering broadband straight to the ordinary smartphone people carry in their pocket. So this doesn't catch us off guard, and I really do think — we really do think — that once solutions demanding a specialized device start arriving, once our satellites begin going up as soon as the coming quarter, in the coming year, every one of those approaches matters less and less. So it isn't a surprise to us. Actually, I'd say this only reinforces what we're aiming for: the system ought to work with whatever handset someone has, in any location, and it shouldn't need modifications, additional silicon, a dedicated ASIC, a unique chipset, or anything else tied specifically to that device. That way, it can reach each of the 5 billion phones currently in use.

Griffin Boss

analyst
#22

Understood. Fine, that's excellent. Thank you. I appreciate it, and best of luck.

Scott Wisniewski

executive
#23

Excellent. Thanks, operator. What our company is building is a cellular broadband network based in space, made to work with the phone already in your pocket. I'd like to thank all of you for being here, including the shareholders as well as the research analysts for their questions. Enjoy your evening.

Operator

operator
#24

That brings us to the end of today's call. At this point, you're welcome to hang up. We appreciate you taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AST SpaceMobile, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to AST SpaceMobile, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AST SpaceMobile, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.