Earnings Call Speaker Segments
Scott Wisniewski
executiveThanks so much, and good afternoon to all of you. I'd like to direct everyone to Page 2 of the deck, where you'll find our safe harbor disclaimer. On this call today, we might make some forward-looking statements. Those statements rest on our current expectations and assumptions, and because of that, they carry risks and uncertainties. A number of factors could lead actual events to diverge materially from what's said in the forward-looking statements on this call; if you want more detail on those risks and uncertainties, take a look at the Risk Factors section in AST SpaceMobile's annual report on Form 10-K covering the year that ended December 31, 2023, filed with the Securities and Exchange Commission, along with other documents AST SpaceMobile files with the SEC periodically. We'd remind listeners not to place excessive reliance on forward-looking statements, and the company expressly disclaims any duty to update the forward-looking statements that might come up during this call. Also, once our opening remarks wrap up, we'll kick off the Q&A portion with questions our shareholders sent us ahead of time. Now let's turn to Page 3. If you're just getting to know our company and what we're trying to do, consider that more than 5 billion mobile phones are in use across the globe today, yet plenty of us still run into gaps in coverage in the places we live, work, and travel. On top of that, billions of people lack cellular broadband and stay cut off from the worldwide digital economy. The markets we're going after are enormous, and the problem we're addressing matters and affects practically everyone. Against that background, AST SpaceMobile is constructing the first and only worldwide cellular broadband network in space that works directly with ordinary, unmodified mobile devices, backed by our broad IP and patent portfolio and built for commercial as well as government use; with that said, I'd like to bring in our Chairman and CEO, Abel Avellan.
Abel Avellan
executiveThanks, Scott. I want to extend a welcome to everyone joining our Q4 2023 business update call. The past few months have been extremely busy here at AST SpaceMobile, and today I'll take you through what's happening in our main areas of focus. To begin, early in the year we announced strategic investments from AT&T, Google and Vodafone — a sign of confidence in both our technology and our business model. Because of that, we now hold the funding required to carry out our near-term strategic plan: launching 5, 700 square foot Block 1 BlueBird satellites along with the first next-generation 2,400 square foot BlueBird, which will be bigger than Block 1 and become the largest phased array in Low Earth Orbit. We're also thrilled to keep moving forward with talks involving additional strategic partners, following the same blueprint of strategic investment combined with commercial payments. Another strong step for commercialization came through a new contract award announced with the United States government via a prime contractor, which we expect will create opportunities for dual use — commercial and government — applications of our satellites. Regarding regulation, we recently got excellent news in the form of new FCC rules, which give us a pathway to unlock over 200 megahertz of spectrum for direct-to-device, helping support rollout of our technology. On March 14, the FCC voted to approve supplemental coverage from space, which had been published in February. That should help AST SpaceMobile's FCC application to deliver commercial services in the U.S. It will streamline the overall application process by turning the standard rules into the framework covering the majority of AST SpaceMobile applications; we expect many regulatory bodies around the world to adopt the new U.S. regulatory regime when regulating our services. We're already beginning to see that in large countries such as Brazil. Turning to Manufacturing. Our 185,000 square foot Texas facility is fully operational, with production, assembly and testing underway. Sadly, production took a hit mainly from 2 suppliers, causing delays in integration and testing for the 5, 700 square foot Block 1 BlueBird, and we've also hit early difficulties manufacturing our new grade microns intended for Block 1 and Block 2; to speed up production of our upcoming satellites and lessen reliance on outside suppliers, we obtained a license to build one of the components ourselves and substitute the other supply with our own IP and design. Simultaneously, we're quickly stabilizing our micron production line. That matters because these are the same micron building blocks for our next satellite launch. Once the supplier issues are resolved, we'll be able to produce in-house and through our third parties, using our own IP, roughly 95% of all satellite subsystems for our next-generation Block 2 BlueBird satellites, further securing our supply chain. Then I can give you an update on our orbital launches, so you have a sense of the near-term schedule. Our 5,700-foot Block 1 BlueBird satellite is expected to move from the assembly facility to the launch site sometime between July and August 2024. Beyond that, we've locked in one more launch contract, this one for the first 2,400-square-foot next-generation Block 2 BlueBird satellite, with a contractual launch window running from December 2024 through March 2025. That satellite will overtake Block 1 as the biggest phased array in low Earth orbit. Also, as we told everyone last week, our custom ASIC has now entered tape-out, and it's designed to support a peak data rate of 120 megabits across 40-megahertz spectrum channels. We developed this novel costume and low-power architecture so each next-generation 2,400-square-foot Block 2 BlueBird satellite could achieve as much as a tenfold gain in processing bandwidth. Our custom ASIC design, with roughly 10,000 megahertz of processing bandwidth per satellite, combined with the phase — with a large phase array, is what enables true space-based cellular broadband using a comparatively small number of satellites. This work amounts to more than 4 years, which works out to an estimated 150 man-years of intensive effort, plus roughly $45 million spent on developing the ASIC by itself. And finally, on top of the strategic discussion mentioned earlier, we're thrilled to have gotten 3 non-binding letters of interest for non-dilutive quasi-governmental funding. So we've kicked off the process with those funding sources, and Sean will walk you through more of that. If you turn to page 5. The investments from AT&T, Google and Vodafone matter a great deal to us. Alongside the U.S. government, they rank among our biggest prospective customers; with Google especially, the product development collaboration agreement will greatly benefit our prospective MNO customers. We have agreements and understandings with more than 40 mobile network operators worldwide, and those operators have over 2 billion subscribers globally today. AT&T and Google have now joined Vodafone, Rakuten, American Tower and Bell Canada as investors. I couldn't be prouder to have these outstanding organizations with us as we execute our mission. And as we've said previously, we keep pushing discussions forward with other strategic partners, following the same blueprint of strategic investments paired with commercial payments. If you turn to page 6. A few weeks back, we announced a new contract award with the United States government via a prime contractor. Let me step back and explain what the opportunity is here. Our large phased array antenna technology in space can address a lot of potential opportunity for mission-critical capabilities in the government sector. The large aperture and high power we deliver to orbit at a low cost relative to historical benchmarks match the governmental model that's desired for capturing commercial networks with dual-use capabilities; and although we stay focused on the large commercial opportunity for our business, we're excited about the initiatives now underway with the U.S. government too. During Q1 2024, we started recording initial revenue tied to this contract. Additionally, other opportunities may come our way, such as further phases of this same contract that could be open to us during calendar year 2024. Moving on to Page 7. I'd like to spend a moment explaining why owning our own ASIC truly matters so much — it's essential for delivering True Broadband from space. Our innovative custom design, built for low power, was created to allow as much as a tenfold gain in processing bandwidth aboard each satellite. These satellites will weigh less, cost less to build, and need reduced mass to reach orbit. The tape-out is going to be finished with TSMC, the top foundry globally, after collaborating with semiconductor industry leaders in recent years; if you're unfamiliar with this technical term, tape-out refers to the point when we and our development partners finished designing the ASIC. Following 4 years of effort and $45 million invested, we have officially transferred those designs to TSMC so they can manufacture the chip for the first batch of ASICs, supporting the 2,400 square foot next-generation Block 2 BlueBirds, which we expect to get later this year. I feel tremendous pride in what the team has done to hit this vital milestone. Our ASIC, together with our Large Antenna, will support up to 120 megabits per second data rate per beam across 40 megahertz channels and 10,000 megahertz of processing bandwidth — paired with our large phased array, this is the crucial enabler for True Broadband from space directly to the phone already in your pocket. Now I'll hand things over to Scott for a quick regulatory update.
Scott Wisniewski
executiveThanks, Abel. Moving to Page 8, I want to walk everyone through a few key regulatory developments. As a quick refresher, our initial submissions to the SEC were made in 2020, and from quite early on we've been meeting with them on a consistent basis regarding direct-to-device through ordinary, unmodified cellphones. The key point is that the unanimous vote in March to approve the new rules clears the path for our FCC application to deliver commercial service across the U.S., since it designates more than 200 megahertz of low band spectrum specifically for direct-to-device operations; and right before that FCC vote took place, we submitted a revised application reflecting a licensing jurisdiction with the U.S. This signals a tighter strategic alignment between AST SpaceMobile's network construction and its future network operations within the United States. Turning to international markets, Brazil has introduced a preliminary regulatory framework for direct-to-device too. Under this framework, we're able to conduct testing in Brazil alongside TIM Brazil and Claro, which is a subsidiary of América Móvil. With that, I'll pass things over to Sean for the financial update.
Sean Wallace
executiveAppreciate that, Scott, and good afternoon to all of you. During this quarter, AST SpaceMobile kept moving forward: we raised a significant amount of capital in January, carried on with regulatory efforts, and saw a great deal of activity at our assembly, integration, and testing site in Midland, where the focus is on producing 5 BB1 satellites. I'd also note that the tape-out stage has now begun for our custom ASIC chip. That ASIC chip is going to deliver processing capacity gains that substantially expand the number of gigabytes available on satellites we plan for the future, which we can sell to end users via our MNO partners. Designing this ASIC has taken nearly 4 years and required a major investment, one that we think competing systems would struggle to match if they were starting from scratch. With production of our 5 Block 1 satellites nearing completion, I want to acknowledge and thank the dedicated engineers, technicians, and suppliers whose efforts are making this remarkable feat possible. Our approach of backward integration into satellite assembly, integration, and testing, we believe, lets us construct our constellation years sooner than an outsourcing approach would, and at a reduced cost. Now let me turn to reviewing the key operating metrics for the fourth quarter, shown on Slide 9. Looking at the first chart, in the fourth quarter of 2023, non-GAAP adjusted cash operating expenses came to $38.6 million, compared with $37.3 million during the third quarter. Certain noncash operating costs, such as depreciation and amortization plus stock-based compensation, are excluded from non-GAAP adjusted operating expenses. Compared with the third quarter, our fourth quarter non-GAAP adjusted operating expenses were up $1.3 million. Research and development expenses climbed $1.5 million this quarter, driven by higher spending on engineering models and prototypes tied to our manufacturing process. Mostly, our R&D expenses involve nonrecurring development work, for which we generally hire third-party vendors, with payments tied to hitting milestones. Engineering services expenses grew $0.5 million, while general administration expenses fell $0.6 million in the fourth quarter relative to the third quarter. Now to the second chart on this page. Capital expenditures totaled $33.9 million in the fourth quarter, against $71.7 million in the third quarter. That number comprised modest launch payments, capitalized direct materials for the Block 1 satellites, extra facility and production equipment for our assembly, integration, and test site in Midland, and commercial-grade software delivered by Nokia. By the close of the fourth quarter, we had spent more than 90% of the amounts expected for the 5 Block 1 satellites. We continue to project spending of roughly $115 million on the 5 BB1 satellites. Also, looking at the last slide, the first quarter closed with $210.8 million in cash. We're still looking at drawing down the rest of our senior credit facility, which would bring in capital in the low 40s. Raising strategic capital could take priority over that senior credit facility, and at a minimum, waiting has cut down somewhat on the negative carry we'd have taken on had we tapped the facility sooner. Like we said in our 10-K, we think this cash plus our capacity to raise capital via our current facilities is enough to fund our expenditures for no less than the next 12 months. As we've also covered in our 10-K, our cost positions and capital plans are highly modular, and those traits give us the flexibility to raise or lower how fast we spend depending on shifts in our build-out plans and how much capital is available; that flexibility makes us comfortable that we can handle our liquidity profile on a dynamic basis depending on how quickly we raise capital. Earlier in the year, we gave guidance on what we expected our operating expense levels to be. We've been backing the development work on our 2 critical satellite designs, Block 1 and Block 2, our ASIC chip design and building 5 BB1 satellites. Finishing this BB1 work along with a substantial share of the BB2 and ASIC design work should lead to a material drop in our adjusted operating expenses and future capital expenditures. That cut in cash expenditures will happen without a material drop in our employment head count, since most of these reductions tie to the completion of third-party work. On the whole, our adjusted operating expenses should fall from an average of $38.7 million per quarter during 2023 to an average of $30 million per quarter for 2024 as the Block 1 design wraps up and the Block 2 design nears completion. These figures will shift based on manufacturing activity in each period. This guidance leaves out the expected cost of roughly $15 million tied to the tape-out and initial production of our ASIC chips. Those ASIC related costs will be recognized as an R&D expense in later quarters in 2024 as the milestones are completed; we also intend to lower our outlook for capital expenditures as we hit the final investment for BB1. Over the next 3 quarters, we expect to spend in the aggregate approximately $50 million to $60 million in capital expenditures. Any rise past these levels will go along with the timing of deploying our Block 2 satellites, which might be either in late 2024 or the first quarter of 2025. Timing of the shifts in our adjusted operating expenditures and capital expenditures, as I've just described, could be pushed back or might not be realized because of a variety of factors. Before we wrap up, I want to give a bit more color on one more of the ways we're looking to raise money, and it works alongside the strategic round we just closed. For a long time, companies in satellite and other infrastructure have turned to government and quasi-government bodies — these are called export credit agencies — to obtain long-term debt funding for big projects at attractive costs. What makes these structures work is technology that's already proven, plus selling a substantial amount of capacity under long-term contracts to large entities with strong credit. We've started reaching out to these financing institutions, and that effort includes bringing on an adviser and putting together marketing materials. In early talks with a handful of these agencies, we've gotten letters showing they're open to reviewing this kind of financing with us; we're at a very early point in the process. As things move forward, I'll share updates on these possible financings. We can't guarantee we'll succeed in chasing this kind of financing and funding; and with that, the presentation part of our earnings call is done, and I'll hand it back to Scott.
Scott Wisniewski
executiveThanks, Sean. Prior to opening things up to the analyst queue, I want to take up a handful of the questions our investors sent in before the call. Operator, would you mind kicking us off with question number one?
Abel Avellan
executiveThanks for asking that, Trevor. Let me start by saying the facilities are completely constructed; every piece of test equipment needed for our build sits in-house. No stage of satellite assembly has to leave our own sites; we've got 185,000 square feet of production space. With the two suppliers that gave us trouble on Block 1 now added, we're reaching 95% vertical integration, covering everything from the ASIC through all the structures and every element needed to build and launch this space graph. So we don't expect any holdups tied to facility construction or manufacturing buildout. Another point: the very same building block we rely on for Block 1 — the one that needed this stretch of time to settle down and reach volume production — is what we'll use for Block 2 and satellites beyond that as we move forward. Naturally, our priority at this moment is getting the Block 1s into orbit. Once more, we figure we'll be on the launch path around June, July, or August, and we're already at work producing for the following launch, which falls in a window from December to March.
Sean Wallace
executiveI appreciate that. After consulting with our lenders, we concluded that the structure we selected for the offering was the optimal way to bring in extra capital alongside our strategic capital raise. In the end, the deal accomplished what we set out to do by delivering a meaningful amount of funding, allowing us to keep advancing our business plan. Going forward, we'll keep seeking capital from strategic partners in the wireless ecosystem, just as we did in January, and we're also working on securing long-term, low-cost debt financing through export credit agencies, which I covered in my presentation. I'd also note that the bulk of the senior management team holds the same stake as shareholders, since restricted shares and options make up most of their compensation.
Abel Avellan
executiveTo build on what Sean said about the reason behind that public equity deal: timing had to come first for us. The investment from AT&T, Google, and Vodafone needed to be matched so we could stay on schedule with our production plan, our build, and our launches. Meanwhile, we've kept going, and we're really enthusiastic about the extra strategic backing we'll keep receiving, plus the non-dilutive funding Sean and the team are pursuing to pair strategic financing with non-dilutive financing — and on that front, we've already started, having received a letter of interest. On top of that come prepayments from MNOs and government payments. Thank you, Danny, for asking. No, that isn't the answer. In fact, 5 Bluebird 1s are going up on the next launch. We can also fly on Falcon 9 and other providers, among them the one we'll use for our upcoming launch — beyond the Block 1 launch; that's why our satellite was designed to be entirely agnostic about which launch provider gets used. Naturally we're relying on Falcon 9, Ariane 6, ISRO, the emerging new launchers, the future New Glenn, and other providers with medium-to-large-size vehicles. So to your question, the answer is no — Starship is not required, and we aren't counting on it for our Block 2 launches. Leaden. I mean, look, our mission is bringing broadband to the whole world — wherever people live, wherever they work, and whatever phone they carry in their pocket; and the Broadband Commission had one single focus: making certain the 2.6 billion people still unconnected become connected; and I don't know of any other program with a global scope that can genuinely make a sizable dent in how many people get connected to broadband through their phones the way ours can. So this aligns with the Broadband Commission. In the Broadband Commission, we had wonderful participants such as Carlos Slim, who owns Telmex in Mexico; we have the Chairman of the FCC, we have the Chairman of Verizon. We had the Chairman of many within the large wireless ecosystem, along with very lively and full involvement from governments, regulators, and people whose central interest is ensuring that connectivity as a human right gets established worldwide. So we view this as something backing our mission. It's a program we're proud to be part of. Within the Broadband Commission, we have lots of new initiatives and tasks, such as low-cost phones for democratizing access to knowledge and information, a universal network available to everyone globally; so we believe this is supportive; it's part of our effort to ensure that everybody, wherever they live or work, can reach broadband on their phone.
Scott Wisniewski
executiveHaving said that, I want to express appreciation to those who hold shares in our company for sending in these inquiries. Operator, please begin taking questions from analysts at this point.
Chris Quilty
analystTo start, I want to ask about the microns and the move to produce them internally. Regarding the supply chain for building Microns, do you see any pieces that strike you as especially tricky, or where pricing could be a problem compared with a supplier that perhaps enjoyed greater scale on particular parts needed to make them?
Abel Avellan
executiveChris, I appreciate that question. As you're aware, the Micron component serves as the satellite's fundamental building block, and every part is either engineered or produced by us. Essentially, we build everything starting with the solar panel, right through to all the electronics, batteries, structures, and every item that goes inside them. At present, for this particular launch, FPGAs form the basis of the microns. That's the reason we procure those from a current supplier. The initial Block 1 will likewise use FPGA's; after that, going forward, subsequent launches will employ the ASIC through the AST5000 launch. So, to clarify, the 2 vendors that caused us a problem — we won't name them. They weren't involved in the microns; they belonged to the control subsystem.
Chris Quilty
analystGreat. For my next question, regarding the shift of our domicile to the U.S. for regulatory reasons, what effect does that have on your position in any regulatory submissions, if any?
Abel Avellan
executiveWe see no such effect at all. I believe we are discovering our chance with the American government, possible funding originating from the United States and the — given that the FCC now has a framework that we believe will guide the entire globe in regulating our product worldwide. We felt it was the appropriate moment and the appropriate procedure to truly relocate our satellites under a U.S. flag; so that makes us quite proud, and we view it as enabling us to speed up. We are collaborating very closely at present with the FCC, and we are clearly quite pleased with the fresh regulatory framework that we now begin to observe being copied in major nations via the approach of essentially reusing spectrum employed for terrestrial deployments, but from space, which is in fact the heart of our technology, reusing the current handset already sitting in everyone's pockets, utilizing it to connect no matter where the person is, no matter where their device is on a worldwide scale.
Mike Crawford
analystMy understanding is that five Block 1 BlueBirds will ride a Falcon 9 late in the summer. As for the launch you have targeted somewhere between December and March, what number of Block 2s is that able to carry? And from what I hear, that one involves a different launch provider rather than SpaceX?
Abel Avellan
executiveThat's right. The next one does not use SpaceX as its provider; it is a large rocket, a large vehicle. So far we have not disclosed who the provider is, yet a contract is already in place and the launch window is locked in, spanning December through March of '25 — a $100 million deal. A single satellite will fly on that mission; it also relies on FPGA technology, but it is the big Block 2 type of satellite measuring 2,400 square feet.
Mike Crawford
analystAll right. And you had said before that you intended to make initial service available in Japan during 2026. So what quantity of Block 2s must be operational before service can be introduced there?
Abel Avellan
executiveRoughly 45 satellites would allow that first service launch, somewhere between 45 and 60. We're putting in a lot of effort; and to clarify, the same Block 1 micron — the identical kind of microns we build at present — is what we keep building for Block 2. Stabilizing that line required longer than we'd anticipated. It's a fresh micron featuring a new complete capability, with all of it vertically integrated on our own. The encouraging part, though, is that this is behind us, and we intend to keep going, reaching a pace of 72 satellites each year once we stabilize and possess sufficient parts to manage it. Naturally, the earliest units are the hardest to send into orbit. They're likewise the ones where you first put into practice the modifications and improvements you make to them.
Mike Crawford
analystAll right, and one last thing. It's about Google, your new strategic partner. I realize your service functions with any handset folks already own, but could Google take certain steps — for instance, with the Android operating system — so those devices link up even more effectively with your network?
Abel Avellan
executiveYeah, you've got that exactly right. Our network and our technology are fully open — built for every kind of phone, 2G, 4G, 5G, and down the road 6G — so everything hinges on whoever makes the handset, or really the G inside that handset. That said, we have strong belief, and we're tremendously enthusiastic regarding this tie-up with Google. Google happens to be, as everyone knows, the biggest ecosystem supplier for cellular phones, spanning more than 3.5 billion devices worldwide; and we reached an agreement to work jointly on product development and on bringing features to life within the Google ecosystem, purely to the advantage of the MNO for our customers, and afterward the end users who rely on SpaceMobile. So this partnership has us very thrilled. For us it's hugely strategic, and its purpose is generating value across the Android ecosystem for our customers and end users.
Benjamin Soff
analystThe first thing I want to ask about is that government contract. Could you give us any more detail regarding what kind of service you'll be delivering? And more broadly, how are you sizing up the market chance for working alongside government agencies both inside the U.S. and internationally? Then I've got one more question after that.
Abel Avellan
executiveSure. What I'd say is that this government chance looks extremely large to us. Clearly, here's a technology capable of producing arrays — phased arrays — of this scale, at the power levels they put out. When you stack that against what comparable capability costs today for applications outside communications, the difference comes to several orders of magnitude in higher expense versus what we're able to achieve, even while we're actually doing it. Our facility spans 185,000 square-feet. Production is being scaled up right now, at this very moment. So the government has tremendous interest here; these chances aren't limited to the communications side, which is the plain application — linking any 3GPP device, any cellular device that government users rely on worldwide, or that defense users rely on worldwide. Beyond that, a multitude of uses exist for this same technology, requiring no significant modification to what we've built, applicable in the noncommunication space, which strikes us as a huge market and a huge opportunity. We also see this alongside the prepayments we anticipate continuing to receive from MNOs, payments from governments, and the non-dilutive funding that, in our view, represents the most efficient route to advance our network and keep building satellites under these agreements we're beginning to see; so the government opportunity has us very excited. And our sense is that we're at the very, very early innings of what's possible for our government with our technology.
Benjamin Soff
analystGreat. My second question concerns the Block 2 satellites. Clearly, quite a few things have shifted across the past 2 years, so I'd like to hear your most current view regarding the schedule and expenses for those Block 2 satellites? Also, has anything changed lately?
Abel Avellan
executiveYes. No, our cost guidance for Block 2 stays as it is. Like I mentioned, the components, the fundamentals remain identical. We're constructing for Block 1. Thus the line — our assembly line, our processes, they can keep up. At this point we manage roughly 95% of what it costs us to build our satellites, plus our supply chain, and that covers Block 2 as well. So regarding Block 2, we use these microns, which are identical between Block 1 and Block 2. They depend on the same solar system, same solar panels, same battery systems, structures and software to maintain them. So that work is finished; we're quite thrilled about where things stand there; and, and we've adopted a strategy of adding features to the satellite gradually. So with Block 2, we reused that, but they clearly are bigger. Each one measures 2,400 square feet, which is the — what enables reaching 120 megabits of data rate on a 10,000 megahertz of processing bandwidth, which truly is the sole means of delivering broadband directly to ordinary handsets.
Chris Schoell
analystExcellent. Regarding the Block 1 satellites, could you give us an update on your current thinking about the first applications and the revenue you expect to bring in while you wait for more continuous coverage? Then, after they're in orbit, would you also remind us of the schedule for testing and calibrating those satellites? And which key milestones must be achieved before commercial service can begin?
Abel Avellan
executiveYes. What I mean is the early — the noncommercial usage isn't constellation based. It's essentially usage on a per-satellite basis. So the revenue from that grows incrementally with each satellite we add. For the MNOs, what we'll do is integrate that into the core system right away, as we continue launching additional satellites; so there is — we've disclosed an initial payment from AT&T upon the launch of Block 1. There's a pre-agreement with Vodafone to begin using them in certain core markets; and we also start producing some revenue at the outset for non continued service while we build these satellites. But it's a mix of revenue for noncommercial. It scales satellite by satellite; and for commercial, it's for noncontinued service kinds of applications; we begin seeing early revenue from that. However, our plan is to ramp quickly, backed by government contracts, non-diluted revenue and prepayment revenues, to keep building into the Constellation. So we're proceeding region by region, and we're doing so by prioritizing the MNOs who are investors alongside us and who keep supporting the constellation's build.
Chris Schoell
analystThat's useful. And I realize talks with potential MNO customers are probably still happening, but could you share any fresh details about where things stand? And is there interest coming from outside the partners you've already announced?
Abel Avellan
executiveYes. Yes is the answer, no doubt about it. Roughly 48 operators — 48, give or take — are ones with whom we hold agreements or MOUs. Applying the very same approach we first used alongside AT&T and Vodafone, that's what we'll keep doing. Whether through prepayments or advanced payments, and at times paired with a strategic investment, or sometimes not. So an ecosystem that's very, very vibrant is what we've got. Already we now have AT&T, Vodafone, Google, Rakuten, Bell Canada and American Tower. But those 48 relationships are all ones where dialogue with us never stops. Seeing our constellation up as quickly as possible is something everybody is super interested in. Their regions and their customers being prioritized is what each of them wants, and we're capitalizing on that relationship, which is very symbiotic between the operators and us.
Scott Wisniewski
executiveAppreciate that, operator. What we're working on is a cellular broadband network based in space, built so it works with the phone already sitting in your pocket. To all of you who came on — both our shareholders and the analysts — thanks for bringing your questions. I hope each of you has a wonderful week. Thanks so much.
Operator
operatorThat wraps up the call for today. At this point you're free to hang up. Thanks for joining, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AST SpaceMobile, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to AST SpaceMobile, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AST SpaceMobile, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.