AtkinsRéalis Group Inc. (ATRL) Earnings Call Transcript & Summary

February 28, 2020

Toronto Stock Exchange CA Industrials Construction and Engineering earnings 73 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, and thank you for joining us for SNC-Lavalin’s earnings conference call for the fourth quarter of 2019. <<operator_script>> At this point, I’d like to hand the conference over to Denis Jasmin, Vice President, Investor Relations. Please go ahead.

Denis Jasmin

executive
#2

Thank you. Good morning, and thanks for being with us. We put out our earnings announcement earlier today, and the matching slide deck is now up in the Investors area of our site. A recording of this call and webcast will be posted on our website within 24 hours as well. Joining me are Ian Edwards, our President and Chief Executive Officer; Sylvain Girard, Executive Vice President and Chief Financial Officer; and Nigel White, Executive Vice President Project Oversight. Before we get started, I'd ask each of you to keep it to two or three questions so that every analyst gets a chance to take part. Feel free to rejoin the queue if you have follow-ups. I'd like to point you to Slide 2. Anything said on this call may include forward-looking information. By its very nature, that kind of information carries risk and uncertainty, so actual results could differ materially from the views expressed today. For more detail on these risks and uncertainties, please see the company's relevant filings on SEDAR. Those documents can also be found on our website. With that, I'll hand things over to Ian Edwards. Ian?

Ian Edwards

executive
#3

Thanks, Denis. Good morning, and I appreciate everyone joining us. If you could turn to Slide 4. Operationally, we had a very strong fourth quarter. Our results make clear that the new strategic direction we put in place in July — to derisk the business and produce consistent earnings and cash flow — is delivering. Among the key highlights for the fourth quarter, we generated more than $300 million in operating cash flow, our highest quarterly cash from operations since the fourth quarter 2017. Our adjusted net income from E&C came in at approximately $80 million, a significant reversal from the adjusted net loss from E&C in Q4 2018. We grew our cash position by over 87% year-over-year to $1.2 billion and significantly reduced our recourse and limited recourse debts. Our reduced net recourse debt to EBITDA ratio as calculated by our creditors was 2.1 at the end of Q4 2019, substantially lower than 3.4 at the end of Q3 2019. We saw consistent growth in SNCL Engineering Services, growing year-over-year revenue backlog and delivering strong segment EBIT and a double digit segment EBIT ratio. We continued to reduce our LSTK project backlog. This strong performance reaffirms that our strategic direction is delivering and positions us well for 2020.

Ian Edwards

executive
#4

When it comes to the coronavirus, we're still watching developments closely and adhering to guidance from the World Health Organization along with policies set by local governments. Our strong business resilience program was launched quickly in China, and it now makes sure that information and actions are coordinated across the countries affected. As examples of steps already taken to reduce risks while keeping business running as usual, there are company-wide bans on travel to Mainland China, designated majors for staff using technology to work remotely over an extended period, use of technology to cut down on international travel and essential trips, an emphasis on hygiene, and recognition of symptoms along with support for employees who are worried or looking for more information. Now let me take you through a more detailed update on our business lines. Beginning with Slide 5, SNCL Engineering Services, the high value portion of the business, posted a strong quarter across every segment, with some notable gains in EBIT and revenue. Quarter-over-quarter EDPM grew revenue and has strong EBIT margins above 9%. Nuclear revenue matched last year and delivered a strong EBIT margin above 18%, up from roughly 15% in Q4 2018. The biggest revenue growth came from infrastructure services, rising more than 20% versus last year thanks to the contribution from Linxon.

Ian Edwards

executive
#5

Broadly speaking, capital revenue came in lower because the dividend from Highway 407 ETR declined following the sale of part of our stake in Highway 407. SNCL Engineering Services keeps winning new contracts and high-quality work, lifting the backlog by roughly $900 million compared with a year earlier. That takes me to Slide 6 and the growth opportunities, beginning with EDPM. We are a market leader in the UK and Canada, and we also see a substantial chance to grow our presence in the U.S., with particular emphasis on capturing the potential of data and technology throughout our services. In the UK, for instance, we are engaged on High Speed 2, the new high-speed rail network and one of the most transformational projects ever undertaken in that country. As engineering delivery partner for Phase 1, we hold a major role, with another 1,500 employees having worked on this project since 2016. In the United States, especially in the Northeast and the Northwest, we have the opportunity to expand our footprint in transportation infrastructure and in program and project management. Globally, we see additional growth potential, given considerable investment in infrastructure spending over the next 10 years across our key geographies, with a high proportion of that directed to roads and rail infrastructure.

Ian Edwards

executive
#6

Now let's discuss the Nuclear segment, shown on Slide 7. Over the decades ahead, we anticipate substantial fresh investment in nuclear. That's because aging plants will either be upgraded or shut down, while brand-new builds are scheduled to begin operating in multiple countries around the world. Our position is ideal for seizing this chance. Since we lead this industry globally, our emphasis is especially on expanding our presence in the key markets of Canada, the UK and the U.S. We perceive considerable opportunity in delivering end-to-end service throughout the entire lifespan of nuclear facilities, drawing on our portfolio of hundreds of patents to craft additional value-added offerings for our clients. One standout item in Nuclear was the contract won by Atkins Nuclear Secured Holdings, through a JV led by AECOM, within the U.S. Department of Energy. That nuclear services award carries a value of $10 billion across 10 years and covers central plateau cleanup at the Hanford site close to Richland in Washington. Nuclear momentum carried into Q1 2020, as the company secured multiple new contracts globally. Shifting to infrastructure services on Slide 8. Our focus is on drawing upon our solid record of handling intricate projects and extending those services to clients.

Ian Edwards

executive
#7

We’re seeing plenty of chances across Canada and the U.S. tied to lower-risk projects, plus mandates for construction management and for operations and maintenance services. There are also meaningful openings in alliance-style contracts where we act as integrator on major programs, drawing on our end-to-end capabilities. Moving now to Slide 9, our SNCL projects business: results kept getting better in Q4 2019 and came in ahead of each of the prior four quarters. Our infrastructure EPC Project segment — which makes up the large bulk of our LSTK construction backlog — turned a profit in Q4, posting segment EBIT of $23 million versus $10 million in Q4 2018. Even so, the business line posted a loss for the quarter because of the Resources segment, and that loss stemmed from a mix of things. There was a favorable reforecast on certain resource LSTK construction projects, the midstream oil and gas facility, which is being shut down; and overhead costs that are being rightsized to match the reduced activity level in our resources business. All three of these factors are being tackled as part of the restructuring of the Resources segment, with the focus on running off our LSTK backlog. During Q4 we cut our resources backlog by 20% to $400 million, and the great majority of that will be wound down in 2020.

Ian Edwards

executive
#8

What's left in the LSTK project backlog sits within infrastructure Canadian light rail contracts, an area where our track record has historically been strong. We expect to run off most of that backlog by the end of 2021. At the close of the year, we also took the difficult but necessary step of closing Valerus, which produced a $72 million restructuring charge, $54 million of which was non-cash, driven primarily by the inventory write down and the impairment of property and equipment. Looking ahead, we remain actively engaged in pursuing every option for the remaining resources business, including potential divestitures and a transition to a services-based business. We'll provide an update as decisions get made. Finally, let's turn to Slide 10. In conclusion, I'm proud of the resilience our team demonstrated in 2019. 2019 was a challenging year, and during it we took several direct actions aimed at reducing uncertainty in the business and positioning the company for success in the future. Those actions included settling the federal charges stemming from the company's legacy activities in Libya; substantially lowering our leverage ratio; and embarking on a new strategic direction, which involves derisking the company by exiting the volatile LSTK construction business and ceasing to bid on new LSTK construction contracts.

Ian Edwards

executive
#9

Now that those challenges are behind us, we're heading into 2020 as a stronger company, and we're genuinely excited about what lies ahead. Later in this call, Sylvain will take you through the 2020 outlook we'll be giving for SNCL Engineering Services. With a fresh strategic direction, a robust balance sheet, and good momentum, SNC-Lavalin is entering a new phase — one where we're locking in the company's permanent transformation into a top-tier provider of professional engineering services and project management solutions. To make that transformation happen, we're making sure the right skills and expertise sit at the senior leadership level to deliver on this goal. As you may have noticed, we've set up several new roles, among them a Chief Transformation Officer, and we've appointed Jeff Bell as Chief Financial Officer. Jeff's background at a global energy and services firm fits the transformation objectives perfectly. He'll work closely with Sylvain to make sure the transition goes smoothly before he takes on his new role as CFO in April. I'd also like to pause and thank our current CFO, Sylvain, for his leadership and his extraordinary commitment to SNC-Lavalin across his four years as CFO.

Ian Edwards

executive
#10

Beyond guiding the business through a challenging stretch, Sylvain gave me enormous support in putting the new strategic direction into practice. So once more, Sylvain, thank you, and I wish you every success going forward. That said, I will now hand the call to Nigel White, our EVP of Project Oversight, who will give a status update on the LSTK backlog. Nigel?

Nigel White

executive
#11

Thank you, Ian. If we look at Slide 12, across the last two quarters I've kept up my review of the SNCL projects business, concentrating on winding down the LSTK backlog quickly and efficiently. For every project now sitting in that backlog, we keep carrying out sensitivity analysis so we can form a realistic picture of the best and worst case for each one. From those analyses, our confidence remains firm that the risks within our LSTK backlog can be managed. With that evidence based understanding of the LSTK backlog, and working alongside sector presidents and delivery teams, we've brought in a number of measures aimed at strengthening risk management and optimizing outcomes. We set up our Project Oversight team, made up of two senior executives, who will focus on resources and on infrastructure projects respectively. By reinforcing our Project Oversight teams, I've been able to review the projects business clearly — getting out to the sites, examining the projects more closely, and collaborating directly with teams and sector presidents to find solutions, proactively address potential issues and manage risk. We've also reinforced our commercial team on each of the large Canadian infrastructure projects, so that we secure fair compensation on our contractual entitlements.

Nigel White

executive
#12

We keep applying several stronger controls and strategies. Two examples are weekly project review meetings with senior leadership, which allow transparent reporting so that problems get flagged and acted on as fast as possible. Then there is work on tightening our cost management protocols so they line up better with our supply chain, giving greater certainty on projects. Slides 13, 14, and 15 give more detail on where the LSTK backlog currently stands. On Slide 13, most of the remaining $3 billion in LSTK contracts is infrastructure — roughly $2.6 billion, or 86%. The rest of the LSTK backlog, an estimated $400 million, sits in resources. Those projects are mainly in oil and gas, and most should be run off by the end of 2020. Still, it matters to keep in mind that these projects are highly complex and challenges will always come up. Even so, I believe the right measures are being put in place so those risks are properly managed. Along with the sector presidents and their teams, I stay firmly focused on winding down what remains of the backlog as quickly and effectively as we can. Thank you. I will now pass the call to Sylvain.

Sylvain Girard

executive
#13

Thanks, Nigel, and good morning, everyone. Turning to Slide 17, we reported an IFRS loss for Q4 of $293 million, which includes the net present value of the federal charges settlement of $257 million and restructuring costs of $100 million, mainly related to the closure of Valerus. Adjusted net income from E&C in Q4 2019 was $79 million, or $0.45 per diluted share, compared to a net loss of $284 million, or $1.62 per diluted share, for Q4 of 2018. That improvement was mainly attributable to a significant decrease in losses from the resources segment, as Q4 2018 included a significant loss in that segment, due to negative cost reforecast on a major mining LSTK project in Chile. In addition, the company incurred lower financial expenses in Q4 2019, compared to Q4 2018. Adjusted net income from capital in Q4 2019 was $19 million, or $0.11 per diluted share, compared to $54 million, $0.31 per diluted share, for Q4 2018, mainly due to the decrease in our stake in the Highway 407 ETR dividends, following the partial sale of our interest in the Highway 407 ETR in August 2019. Total revenues for Q4 2019 amounted to $2.4 billion. SNCL Engineering Services revenue totaled $1.6 billion, an increase of 1.9%, compared to Q4 2018, mainly due to a revenue increase of 21% in Infrastructure Services, reflecting the increased level of activity in Linxon.

Sylvain Girard

executive
#14

For Q4 2019, SNCL Projects revenues fell 16% to $826 million. The main reasons were the ongoing backlog run-off in our LSTK construction projects and in the resources within the Infrastructure EPC Projects segment, along with the absence of new bidding in that market. SNCL Engineering Services had another strong quarter, recording positive segment EBIT of $191 million — a 12% EBIT-to-revenue ratio, or 10% excluding capital. By contrast, SNCL Projects posted negative EBIT of $28 million in Q4 2019, though that was a $17 million improvement over Q3 2019. Total corporate SG&A came to $28 million in Q4 2019, with $21 million attributable to E&C only, in line with our expectations versus $55 million in Q4 2018. Keep in mind that corporate SG&A for Q4 2018 included a guaranteed minimum pension equalization expense — past service costs of $25 million. For 2020, we expect corporate SG&A expenses for E&C only to land between $80 and $90 million, while for capital I expect these expenses to be between $25 million and $35 million. The company's balance sheet remains strong. As of December 31, 2019, the company held $1.2 billion of cash, $1.2 billion of recourse debt and $400 million of limited recourse debt.

Sylvain Girard

executive
#15

We also had $2.4 billion of capacity that was unused under the company's committed revolving credit facility of $2.6 billion. Moving to Slide 18, cash flows from operating activities show significant improvement, reaching $312 million in the fourth quarter of 2019. If we look at cash flows generated solely by the SNCL Engineering Services business line, which will serve as the core of our business going forward. Year-to-date operating cash flows excluding capital generated $733 million, which represents a strong segment EBIT conversion ratio above 100%, mainly driven by strong working capital performance at year end and advanced payments in Linxon. The capital segment generated $197 million. On this slide we can also see that cash flows from SNCL Projects are the main cause of our negative $355 million operating cash flows for the year. We expect our operating cash flows to be consistent with prior periods, resulting in better operating cash flows in the second half of the year versus the first half. Slide 19 details the company's cash and debt position as at December 31, 2019. Outstanding recourse debt that the company has consists of three debentures for a total of $675 million and the $500 million term loan. The company also has a limited recourse loan of CDPQ with an outstanding balance of $400 million.

Sylvain Girard

executive
#16

The ratio of net recourse debt to EBITDA, as determined under the provisions of the company's credit agreement, dropped substantially — from 3.4 times as of the close of September to 2.1 times at December's end. On Slide 20, you'll see results broken out by segment. Our resources segment posted a loss of $51 million, driven by the three factors I mentioned earlier. Meanwhile, the Infrastructure EPC Project segment delivered EBIT of $23 million as we keep making headway on our key LRT projects. Every segment within SNCL Engineering Services turned in a solid quarter and stayed in line with the full-year segment EBIT margin, with the exception of Nuclear, which delivered an especially robust quarter. Let's turn to Slide 21. With consistency and predictability now brought back to the operations, we believe the time is right to share a little more detail regarding our 2020 outlook for SNCL Engineering Services, since this business represents the growth and the future of SNC-Lavalin. For 2020, we anticipate gross revenue at SNCL Engineering Services, excluding capital, will rise by a low single digit percentage. That projected revenue gain rests on the following growth assumptions: low single digit revenue growth in EDPM, mid single digit growth in Nuclear, and high single digit growth in Infrastructure Services.

Sylvain Girard

executive
#17

Additionally, we anticipate that segment EBITDA, measured as a percentage of gross revenue, from SNCL Engineering Services excluding capital, will land somewhere between 10% and 12%. For adjusted E&C, the effective tax rate should come in around the low to mid-20s. Please also be aware that our current expectation for cash tax payable on the Highway 407 ETR gain is now under $25 million. Finally, a reminder that the appendix of this presentation contains the 2019 segment EBITDA broken out by quarter. We think this data may prove helpful moving forward when assessing the company. This marks my final quarterly presentation for SNC-Lavalin, since Jeff Bell will be taking my place on the next call. I want to express my thanks to all of you. Interacting with so many of you over these past four years has been a real pleasure. The lines are now open for questions. Thank you.

Operator

operator
#18

Thanks. At this point we'll move into the question-and-answer portion. <<operator_script>> Yuri Lynk from Canaccord Genuity has our first question.

Yuri Lynk

analyst
#19

Morning. I have a single question regarding your 2020 guidance — it’s definitely useful to have it for the engineering business. Compared with some of your peers, I’d say the margin guidance range you’re providing is somewhat wide. Is that simply a conservative approach? Or are there certain variables that remain unresolved right now and could shift 2020 runway either way? Any additional detail on that would be helpful.

Ian Edwards

executive
#20

Ian, thanks for asking. There are probably a couple of points to make on that. First, as you noted, we do want to be conservative when we replace the guidance we've put on the table. And second, we have historically seen quarter-on-quarter variance within each of the business lines, and we expect that to continue. So the guidance really concerns the annual figure, with variance from quarter to quarter.

Yuri Lynk

analyst
#21

All right. Does any of this tie back to the fact that you report gross revenues rather than net? And there could be some fluctuation when converting gross revenue into net revenue, just to…

Ian Edwards

executive
#22

That does have some effect, since what we refer to as flow-through volume that arrives tends to fluctuate between quarters. So when you look more at how 2019 splits out, you will notice the margin range within the Engineering Services segment, and you will see variation there as you move from quarter to quarter. Much of that stems from flow through along with other seasonality.

Yuri Lynk

analyst
#23

Alright, that's my final question. For 2020, what ought we to anticipate regarding operating cash flow — particularly with respect to what you expect from lump-sum turnkey project performance during this year?

Ian Edwards

executive
#24

I’ll have Sylvain walk through the specifics on those figures. But it’s clear that within the lump-sum turnkey portion of our operations, our ongoing emphasis will be on better performance, and we’ll keep working through the resources sector backlog in 2020 as well as the infrastructure backlog in 2020 and 2021, and stay at it until we see that the remaining backlog has been cleared. Obviously, what matters most is getting through that work and delivering as much consistency as we can. That said, in the Infrastructure sector, there are milestones and receivables tied to closed jobs or jobs from the past that we still need to deliver on. So that introduces a degree of volatility into the year-on-year comparison. But Sylvain, perhaps you could speak to what we viewed as the endpoint of that?

Sylvain Girard

executive
#25

Sure. Perhaps I can give a bit of color beneath total operating cash flow, then add a few specifics. We aren't issuing explicit guidance for operating cash flow, since swings in cash coming in and going out on the LSTK can shift those figures. Still, across the full year, we expect OCF to be positive. Regarding the lump-sum turnkey project, we evaluate such projects across the entire runoff life. Right now, we view the full runoff as a positive cash event. That said, it probably won't be positive in 2020 for the lump-sum turnkey, largely owing to the timing of milestones and claim settlements. For Engineering Services, you should keep seeing strong EBIT to cash conversion. And I believe, as you could observe in the prior quarter and in this quarter, there is likely an estimated range for that. Then finally, as I noted in my remarks, the quarterly pattern will resemble 2019, with a stronger finish — a stronger second half compared with the first half.

Yuri Lynk

analyst
#26

All right, I appreciate the background. I'll hand things off now.

Operator

operator
#27

We'll now take a question from Benoit Poirier at Desjardins Capital Markets.

Benoît Poirier

analyst
#28

Yes. Morning. On the cash flow tied to that LSTK contract — since you’re roughly burning $1.4 billion of LSTK contract in 2020 — could you go over the moving pieces again and say whether you expect free cash flow overall from it to be positive? Or are there some variances, depending on the milestone, that could push part of it negative, Sylvain?

Sylvain Girard

executive
#29

Yes. So Benoit, what I was saying is that the first — the overall runoff, which, as you can see on the chart, is a multiyear runoff, we expect that to be a positive cash flow event. But in 2020, given when milestones fall, the cash advance we've received to date, and the outstanding claims on a few projects, as we discussed earlier, the timing of those items will put pressure on cash flows for 2020. And as things stand right now, we see it as unlikely that LSTK cash flows will be positive in 2020.

Benoît Poirier

analyst
#30

Alright. Sylvain, without needing to be exact, could you speak to the size of what you might achieve in 2020?

Sylvain Girard

executive
#31

Yeah. No, we won’t get that granular, since these items can shift. I mean, that’s just how it is — settlement timing can readily be brought forward or delayed. So regrettably, no. All I can say is what I mentioned: looking at the big picture, our view is that the big picture is going to be positive.

Benoît Poirier

analyst
#32

Alright, that's great. And looking at your net recourse debt to EBITDA, there's a significant sequential gain, coming in at 2.1. Could you take us through what you're aiming for down the road? And also, how should we anticipate that figure landing as we close out 2020?

Sylvain Girard

executive
#33

Well, I’d say the priority is still to keep improving that ratio. In the past we’ve mentioned a ratio of gross debt to EBITDA in the range of 1 to 1.5. So we haven’t reached that point yet. I think this will carry on into 2020. But we do see the ratio continuing to get better as we swap out a weak EBITDA quarter for stronger ones in 2020. And that’s essentially the priority at the moment.

Benoît Poirier

analyst
#34

All right, that's great. And Ian, would you be able to update us on where things stand with the LRT project as it relates to Eglinton, REM, and Trillium?

Ian Edwards

executive
#35

Yes. Let's start with Eglinton, then. There's been some coverage in the media about Eglinton, and obviously this project is over halfway done. So we're quite far along. Over the past three years, there have been problems related to working in an urban setting and tie communities, with permitting and community interface, and all those sorts of third-party issues that aren't uncommon. And those have affected the project. We're working very closely with the client to optimize the best completion date for that project, now expected in 2022, early 2022. And clearly all of these issues fall outside what was originally contemplated in the contract. We're also working closely with the client to resolve them from a commercial perspective. So we're actually really pleased with where the project is heading and how we're tackling the challenges together with the client. On REM, as you saw, we had various challenges together with the client. Some of them were attributable to the existing tunnel here, and some other issues that we again needed to face together with the client. Our business is about providing solutions to challenges, and our business is about overcoming those challenges with the client so that it's a win-win outcome.

Ian Edwards

executive
#36

And we got that done at the close of the year with the client on REM, and we put a commercial arrangement in place. That way we could really concentrate on driving the project's performance and getting it finished on schedule, so we're very pleased with how that turned out. On the Trillium project, once again, there's been a lot of media chatter about the bid. We're very happy with the bid we submitted. We've now been working on that project for more than a year. We got through the first construction season last year. In fact, I was out on the project last week. We're positioning ourselves for a busy construction season. We're ready for it. Things have gone well up to now. But it's still early days. On that project we're under 20% complete. Still, everything looks positive from that standpoint so far.

Benoît Poirier

analyst
#37

Alright, that's all from me, Ian. Could you discuss the strategic review and the timing for winding down Valerus? And for resources services, if you would, share the headline figures in terms of revenue and EBITDA contribution, plus when the review is expected?

Ian Edwards

executive
#38

Like we've stated plainly, the resources business is being reviewed as part of the new strategic direction. The aim of that review is to bring the business to profitability, to make it perform, and to make it generate cash. Beyond that — and we've been pretty open on this too — we're looking into possible divestitures inside the business, or of the business in its entirety, to genuinely figure out where it belongs over the long term. Does it stay with us? Or does it go to someone else? So along this path — if you will — of improving the business, we're sharply focused on clearing the LSTK backlog, which came up earlier. Within Valerus we had a midstream facility that was losing money, and we were either going to sell it or shut it down, and in the end we determined that, from a timing standpoint, shutting it down was the most efficient route for us — which we did, and that underpins part of the reporting we issued this time. Then the broader effort of turning this from an LSTK business into one built on services requires getting overhead to the right size, something we're actively doing — we did it last year and we'll be doing it this year as well.

Ian Edwards

executive
#39

On the numbers specifically, I'm not sure whether you'd like to go back over those, Sylvain, if you would.

Sylvain Girard

executive
#40

Yes. Just — I might need you to repeat the last part of your question. But regarding the Valerus closure, the timing is Q1; we'll essentially have finished working through the outstanding backlog by then. So we're quite far along with that. That will be done. And then over the course of Q2 we'll be wrapping up the liquidation of the remaining inventory, but all the charges were recorded in the Q4 results. And then, if you don't mind, Benoit, what was the end of your question?

Benoît Poirier

analyst
#41

What I’d like to get is the scale of the resources services business in terms of revenue and EBITDA, since at present it’s split approximately.

Sylvain Girard

executive
#42

Honestly, I think it really hinges on what conclusion the review reaches. The service portion of the business, as things stand, sits above $1 billion right now. That said, how the review turns out will determine whether we adjust that figure.

Ian Edwards

executive
#43

So I mean, where things stand right now with backlog — you can work that out from the SNCL projects, and the LSTK share of that comes to $3 billion.

Benoît Poirier

analyst
#44

Great, that’s ideal. I really appreciate you taking the time.

Ian Edwards

executive
#45

I appreciate that.

Operator

operator
#46

Mark Neville from Scotiabank has our next question.

Mark Neville

analyst
#47

Good morning. I'd like to pick up where we left off on the 2020 cash flow discussion. Once more, I realize you aren't attempting to nail down precise figures for the projects business where cash flow is concerned for this year. That said, you commented that the business, viewed on a consolidated basis, would be, in a manner of speaking, cash flow positive. Engineering services in 2019 generated, roughly speaking, $730 million in operating cash flow. So I'm simply — I suppose what I'm trying to get at is the remark regarding positive cash flow for the business, and whether we should be thinking in the range of hundreds of millions of dollars, that kind of magnitude, of a negative swing stemming from projects pressure this year — again, something around that size.

Sylvain Girard

executive
#48

Well, at this point I think I’ve already covered most of what we wanted to say, unfortunately. So yes—there isn’t much more I can add to that. You all saw the volatility at LSTK’s, which is concerning; I think we had a solid project forecast around that, but things can shift. On engineering services, we gave a data point at the end of Q3. You could see how it performed in Q4. And obviously the full-year performance is quite high. So I wouldn’t assume that a conversion ratio of EBIT in line with the full year of 2019 for that segment has to be something below 100%. You probably can—this segment will behave more like a typical service business. So I think you probably have figured that out. So that’s—I’m saying now that, as an overall company, it will be positive. So before you can…

Mark Neville

analyst
#49

Alright. Perhaps we could stick to just the EBIT segment ranges for a moment. Again, I suppose that 8% to 10% EDPM seems somewhat conservative. But is that, I guess, simply an attempt to account for the volatility from quarter to quarter, while for the full year, again, the 8% figure feels a little like it would come somewhat late? Is that roughly the correct way to look at it?

Sylvain Girard

executive
#50

Yes. That is exactly how you should be looking at it.

Ian Edwards

executive
#51

That's correct.

Mark Neville

analyst
#52

Perhaps to continue with the resource side too, I have a couple of questions. First, regarding that loss you reported in Q4, what portion was essentially related to the reforecast?

Sylvain Girard

executive
#53

Ian split it between those two components, so it isn't really comparable to last quarter — there was somewhat more reforecast as a percentage than in Q3. So roughly 40% to 50% was reforecast, and then the remainder was divided between Valerus and overhead.

Mark Neville

analyst
#54

Could you repeat that figure? I didn't catch the percentage, Sylvain.

Sylvain Girard

executive
#55

Somewhere in the range of 40% to 50%.

Mark Neville

analyst
#56

All right, perhaps just one final question. Regarding the services segment inside the resource unit — and please set me straight if I've got this wrong — my recollection is that you mentioned a backlog of $3 billion connected to that segment. Did I hear that correctly?

Ian Edwards

executive
#57

Not quite. My point was this — regarding the SNCL project, out of the backlog we disclosed, $3 billion tied to SNCL projects falls under LSTK, which means what's left over is resources services, correct.

Mark Neville

analyst
#58

Yeah. Okay. So, I suppose — again, as you're kind of going through, I guess, sort of options for the business. I guess the question, what I'd ask, is whether there's any — presumably it could be a solid business once it were all service and properly sized. Are there any synergies between this and the remainder of the business? Or any kind of rationale beyond just it being a good business to own? Or perhaps why it might not be better off in somebody else's hands.

Ian Edwards

executive
#59

So there are a few points I'd make, definitely. We do have operations sitting in the same regions as our resources division — the Middle East, North America, or Europe, for instance. Yet that forms an integral piece of the assessment we're carrying out, looking at how profitable this business can become and how significant the LSTK elements will be for it moving forward. So all of that is essentially being reviewed. What we're really aiming for is that it needs to be getting close to matching the profitability of the remainder of our SNCL engineering services business. That's the thing we're trying to establish prior to taking any further decisions. And it isn't — these choices aren't really all-or-nothing for the business as a whole. There could be business lines inside it where we need to take additional decisions or relocate them. Does that address your question?

Mark Neville

analyst
#60

Absolutely.

Operator

operator
#61

Jacob Bout from CIBC has the next question for us.

Jacob Bout

analyst
#62

Morning. I'd like to revisit the revenue guidance you provided. So I suppose you're pointing toward gross revenue growth in the low single digits, and I set that against your book-to-bill of 1.2x. To me, that guidance comes across as conservative. Could you kind of take us through some of the puts and takes, and perhaps as well how you're viewing this coronavirus? I know it's very difficult.

Sylvain Girard

executive
#63

I might make a couple of comments, and then Ian can chime in. One point worth keeping in mind is that EDPM, where your revenue growth range sits lower, ended 2019 on a fairly solid note. So I think that plays some part in the figure we're seeing for 2020. And as for your book-to-bill, you've got that right. Growth there was strong, and that's why we keep seeing robust growth in infrastructure services, which was a major contributor to that book-to-bill.

Ian Edwards

executive
#64

That's more of a high-level comment, I'd say. What I'd point out is that we're obviously operating under a new plan. That plan contains multiple elements, and one element is expansion in SNCL engineering services. Our concentration on those business lines—EDPM, nuclear, and infrastructure services—each carries a distinct growth potential and a distinct growth plan. And I think, given the guidance that was provided, we again want to be prudent right now, since we're working our way into this plan and we're six months into it. Clearly, our longer-term expectation goes beyond that. On the virus—just a question about the virus. Obviously, we're concerned exactly as every other company, country, and person is. We have a process in place that we've implemented globally, which gathers local data and local impact, and we gather that together and make decisions about how we need to protect our people and how we need to protect our business. Clearly, the most mature region, if you like, where the virus is present is China, and we have taken steps in our China business and our Hong Kong business to implement working from home and travel restrictions.

Ian Edwards

executive
#65

Right now, the effect from those businesses is not all that significant, honestly. In 2019, Hong Kong accounted for roughly 1.2% of our revenues, while China made up 0.4% of our revenues. But if you ask what the global impact on our business will be, I wouldn't be able to speculate at this time. We're putting plans in place to deal with it, just as we did in China and Hong Kong, but I really couldn't give you anything beyond that to speculate on the impact.

Jacob Bout

analyst
#66

Alright, that’s useful. Perhaps a question here specifically about the EBIT margins in nuclear, where you mentioned 13% to 15%. If we consider the decommissioning work alongside the can do work, how should we approach that from a margin standpoint? Are they comparable? Or does one category of work carry noticeably more weight than the other?

Ian Edwards

executive
#67

That breaks down into a couple of pieces. The first is the way it gets reported, and the second is the business's profitability in absolute terms. In terms of profitability within those two lines of business, I don't believe it's similar, but as for how it's reported — well, perhaps Sylvain can address that.

Sylvain Girard

executive
#68

Yeah. So quite a bit of that decommissioning activity is also going to happen in the U.S., and the U.S. portion is going to be carried out via our joint venture with CDI. And you'll see that flow through as an equity pickup. So that's included in the outlook figure we gave — the range we gave does take in that equity pickup from those projects.

Jacob Bout

analyst
#69

All right, I'll stop at that point. Thanks.

Ian Edwards

executive
#70

I appreciate that.

Operator

operator
#71

The following question is from Chris Murray at AltaCorp Capital.

Chris Murray

analyst
#72

Thank you. Good morning everyone. I’m just circling back on the question Jacob raised. As a matter of fact, I had a few questions myself regarding the nuclear business. So I suppose the first thing is, you’ve kind of guided toward mid single digit revenue growth. And again, going back to — maybe it’s a presentation matter, but could you simply take us through — you secured a lot of awards, you definitely have some decommissioning work coming in. So frankly I’m somewhat surprised that the growth rate is as low as it is heading into the year. So just — could you walk through some of the moving pieces behind your thinking? I think the other thing, if you would, please address it. How do you view this business across the next couple of years? Do you believe there are some further opportunities for additional decommissioning work, or that there are other projects you think exist out there?

Ian Edwards

executive
#73

Right, thanks, Chris. So at the moment, when we look at the business's main pieces, we have life extensions taking place in live projects in Canada. There's our waste remediation business, which sits mostly in the U.S., and the decommissioning business, which is in the U.S. right now. We have new build, which is supporting Hinkley construction in the UK. And then technologies, which are global in nature — we sell and promote those to the nuclear industry worldwide. So there's obvious room to grow across the three core geographies of the UK, the U.S. and Canada by doing more of those business lines in all three countries, so growth potential definitely exists as power plants come offline and waste needs remediating. On the long-term contracts — take the new waste contract we won, that one runs 10 years. And the decommissioning contracts start relatively slowly before they ramp up, since there's a great deal of pre-engineering and preparation work involved. So this is, without question, a really exciting business for us. And what you're probably seeing at this moment is what I'd describe as the beginning of the growth phase.

Nigel White

executive
#74

Yeah. Perhaps I could build on what Ian said, since it ties back somewhat to Jacob’s earlier question — take the revenues that will flow through the JV and CDI, for example: those won’t show up on the revenue line, right. So the percentage we provided there was essentially what you’ll see up here on the red line, meaning some growth will simply appear in the bottom line as equity pickup.

Chris Murray

analyst
#75

To that point, the absence of transparency can be somewhat difficult for us. So when we consider year-over-year growth, let's suppose—and perhaps this is reasonable—you mentioned margins of 15% to—13% to 15%, comparable to the remainder of the business. Is it reasonable to believe that when we see that equity pickup, working backward in that way gives us a clearer sense of the actual revenue or activity level regarding what you're doing,

Ian Edwards

executive
#76

Well, I think we give you enough detail that you can probably go ahead with the figures. Now, if you're attempting to separate what's equity pickup from what isn't — yes, you're right. You'll have a bit of difficulty doing that. That's one thing we'll be examining from a reporting perspective: how do we offer some color on the activities carried out through JV. So that's something, I suppose Jeff, will be looking into and see what's appropriate to do at that point.

Chris Murray

analyst
#77

Okay, that's fair. Now for my second question — I'm not sure how you'd like to tackle this one. You did mention it in the press release, the fact that the board committee's work on its special activities had been finished. But at the same time, I suppose the other thing that raised was whether that affects what you're considering doing with the resources business. I'm just curious whether you can reconcile the — perhaps the apparent disconnect there, because if you were going to pursue maybe bigger transactions or something along those lines, I would have thought you'd have kept that committee around?

Ian Edwards

executive
#78

So, I mean, first off, the committee was really helpful to me during the first half of last year, and in getting us to the point where we defined the new strategic direction. And it kept being helpful as we made some decisions and looked toward further decisions. But I think we've reached a point now where we've defined what the company's future is in terms of being a professional services and project management company — it's really about execution now. And it's really about building on that strategic plan to move the company forward successfully around those kinds of macro parameters, macro strategic goals. So that'll just be normal board support, normal board oversight, and normal board function. And I think that's really why we got to a point where we thought the special committee could be disbanded.

Chris Murray

analyst
#79

All right. So we shouldn't infer anything from your thinking about what you'll do with the resources business now that community is going away. You're still going to keep considering possibly divesting assets if that becomes necessary.

Ian Edwards

executive
#80

Certainly. Every possibility is on the table, without exception. And those choices will be made with the board providing oversight and giving its approval as needed, and we will communicate them, clearly.

Chris Murray

analyst
#81

Okay, thank you.

Operator

operator
#82

Devin Dodge from BMO Capital Markets has our next question.

Devin Dodge

analyst
#83

Okay, thank you. Morning, everyone.

Ian Edwards

executive
#84

Hello there, Devin.

Devin Dodge

analyst
#85

I’d like to try once more on the cash flow topic. Sylvain, is it your expectation that, across the whole business, free cash flow will be positive in 2020?

Sylvain Girard

executive
#86

I believe we laid everything out for you—we aimed to be straightforward here. And please don't read my response as either a no or a yes; rather, I think you need to work it through your model, and I believe we've given you enough to arrive at a reasonable OCF, and we also supplied guidance on CapEx. So I think you'll see what that works out to.

Devin Dodge

analyst
#87

All right, all right. So perhaps — look, if you folks keep up the profitability streak you've shown over the past couple of quarters, and our leverage ends up dropping to roughly the lower end of your target range by the second half of 2020, do you think you might be in a position to reengage on this small-scale M&A, or possibly even share buybacks, later in the year?

Ian Edwards

executive
#88

Appreciate the question. So first off, I think we don't want to get ahead of ourselves. What I mean is, the company's main drive and what we're trying to achieve at this moment is improved performance — working our way through the LSTK backlog, supporting our SNCL Engineering Services business, and all of that is, of course, to reach that point. We intend, through — with Jeff now on board. Jeff is going to look at the capital allocation strategy so that we can communicate that at a point in time. But certainly, right now the main focus is on continued performance and continued kind of generation of cash and continued improvement.

Devin Dodge

analyst
#89

All right, that’s clear. Perhaps just one final question, specifically about the concession portfolio: are there any assets that could be monetized during the next 12 months, whether through that partnership with BBGI or with another party?

Ian Edwards

executive
#90

Sorry, could you say that question again?

Nigel White

executive
#91

A concession asset that has been monetized.

Ian Edwards

executive
#92

Correct — that isn’t something we’re doing at present. At this time, it isn’t part of the plan.

Devin Dodge

analyst
#93

All right, that's fair. I'll stop there. Ian, get well soon, and Sylvain, best of luck in whatever comes next for you.

Sylvain Girard

executive
#94

I appreciate that a lot.

Operator

operator
#95

The following question is from Maxim Sytchev at National Bank Financial.

Maxim Sytchev

analyst
#96

Morning, hello. I have one brief question about infrastructure services. Would you be able to provide a little additional detail regarding those standardized EPC contracts, the $892 million figure? And if possible, could you also talk about what the risk profile looks like for those items?

Ian Edwards

executive
#97

Yes, so there are two things. First, there are the projects we carry out with ABB through Linxon. We refer to those as standardized projects, rather than really viewing them that way, because the business is primarily about supplying ABB products. Installation of those components makes up a major portion of it. And construction that supports that accounts for a very small element. Plus, these are highly repetitive standardized products. And we believe we can bring those to different customers together with ABB and build a successful, lower-risk kind of business from that. The other component is our district cooling business. In the Middle East, we are a leader in district cooling facilities. We have been doing this for well over a decade. We would go more districts cooling facilities in the Middle East than our peers. And it has been a successful business for a long time. And again, it is very, very similar in that these things are repeat "type of projects" that we build and install. So we don't see it as a high-risk business.

Maxim Sytchev

analyst
#98

All right, understood. Thanks for that. Then my question is probably for Sylvain, about working capital and the positive swing in Q4. Did Champlain play any part in that, or did the Q4 contribution come entirely from all the other projects?

Sylvain Girard

executive
#99

No. Nothing came in from Champlain — I would've liked that, but no. As for everything else, the working capital reduction contribution was fairly evenly distributed across — pretty much all the segments. So…

Maxim Sytchev

analyst
#100

All right. And then regarding how we attempt to picture this — I get it, once more, that nailing down the exact timing of milestones at this moment is somewhat difficult, since it's hard to say precisely how those items will unfold. But when you mention, roughly speaking, the lifespan of these projects until they become OCF positive — so should we then anticipate a meaningful reversal in, I'm not sure, 2021, 2022, when it comes to recovering working capital? I mean, simply in terms of how it will unfold from a cash flow standpoint, if that's possible?

Ian Edwards

executive
#101

Yes. So, taking what I mentioned, right, overall life positive for 2020 — unlikely to be positive. You began on a number of these projects, you start with a set of advanced payment or milestone payment that you're simply going to burn off, particularly you'll burn that off through the life. But then you also have some margin recognition through the life as well. So, as we blend the two together, that's basically how you end up with a net positive, which is something we've been tracking, and we'll continue to track, I guess, at different points in time. What's the balance between what I've already received versus what remains to be received on the project and the margin associated with that? And that gives rise to essentially your net margin at the end of the project. And then you compare to the cash flow position you have at the beginning of it and is that a positive event or not? So that's how we do it. I'm not sure that answered your question, but…

Maxim Sytchev

analyst
#102

No. And I suppose, directionally speaking, as that LSTK backlog comes down quite sharply across the coming two years — if we're thinking about it directionally, non-cash working capital ought to be reversing in roughly the opposite direction, is that right?

Ian Edwards

executive
#103

Yes, definitely. So at present, if I say the total length is going to be a positive thing, and I say that in 2020 it will be negative — well, that means 2021 is going to make up for that state of affairs. Well, in 2021 and 2022 and beyond, it will make up for that state of affairs, and hopefully that turns out to be a positive thing.

Maxim Sytchev

analyst
#104

All right. All right, that’s useful. Thanks a lot.

Ian Edwards

executive
#105

I appreciate that.

Operator

operator
#106

Michael Tupholme from TD Securities has the next question for us.

Michael Tupholme

analyst
#107

Thanks, and good morning. I’d like to return to the outlook and that guidance of a low-single-digit percentage. Just to clarify: in the prepared remarks, did you actually give more specific details about what you expect for each segment, if so? I think I missed that. Could you go over it again?

Ian Edwards

executive
#108

Yes, I did. So for EDPM, we're setting it at low-single digits, Nuclear at mid-single digits, and Infrastructure Services at high-single digits.

Michael Tupholme

analyst
#109

All right, thanks. Next, regarding the Resources segments, you gave us details on how the quarterly loss on an EBIT basis split among the overruns, Valerus, and the rightsizing. I'm curious, looking ahead to the Valerus shutdown, when do those loss components begin to disappear? So Valerus losses could carry into the first quarter and through the second quarter — and at what point were the rightsizing matters essentially resolved, so that losses from that angle, realizing the cost of runs, which may be somewhat harder to forecast — could you just speak briefly about how, as we progress through the year, those various loss features started to fade?

Sylvain Girard

executive
#110

Yes, so I’ll take the Valerus part first, and then Ian can provide a bit more detail on some of the broader actions. On Valerus, like I mentioned, our goal is to finish the rest of the backlog before the first quarter ends. By that point, the operating losses tied to those orders ought to have been fully absorbed. So we don’t expect much, if any, of that in Q2. Q2 will be more about wrapping up the inventory liquidation. We’re attempting to carry that out in a reasonably orderly way so as to get the most value, but the impairment itself was recorded in Q4.

Ian Edwards

executive
#111

Yeah, so just a kind of general comment on that. If you look at the LSTK and overhead as the remaining two pieces, clearly we've worked through 20% of the backlog, and as we move through this year, each quarter the backlog gets smaller, and as it gets smaller the risk gets smaller, and our — the risk period we're in comes to an end. So we'd expect to keep seeing improvement as we work through that LSTK backlog. Same thing with overhead: as we shift the business from LSTK to a services business, we're taking actions — we took significant action in the second half of 2019 on right-sizing and the overhead. And we have a plan to keep making those changes in Q1 and Q2 of this year. So I've given fairly precise guidance on that, that's how we see it; it's in the current situation.

Michael Tupholme

analyst
#112

Alright. Could you speak at all to how the runoff of the resources backlog on the LSTK side is paced — that $400 million across this year? Does it come weighted toward the front end, or is it spread evenly through the year? And on that same point, the graph on slide 15 gives the impression that the bulk of that resources work wraps up in 2020, yet the table on Slide 14 lists two projects running into 2021. So do those finish right at the very start of 2021?

Ian Edwards

executive
#113

I don’t believe there’s a big swing between quarters there. I don’t have the precise figures on hand, but I wouldn’t assume any quarter-over-quarter change is at play here. There’s a minor piece tied to one of the projects we posted in 2021, as you correctly noted. And I think the only other point we could make is that the 20% — the backlog you saw — came down.

Michael Tupholme

analyst
#114

Thank you. And to go a bit further on resources, and more broadly, I suppose across the entire LSTK backlog — since the whole team, and Nigel especially, has finished the work of monitoring these projects and providing project oversight — have you found any additional risks, whether during the fourth quarter or up through today, that you had not already identified back in Q3?

Ian Edwards

executive
#115

Are you asking about the risks on the projects?

Michael Tupholme

analyst
#116

That is right.

Ian Edwards

executive
#117

Well, these projects are always in a state of flux. What I mean is, some risks get closed out and others get realized — that's simply part of how construction goes. Honestly, it's hard to respond to that question by claiming there are no fresh risks, yet we're watching closely and a great deal of risk has been taken off the table. What I mean is, on every one of these projects we have quite detailed risk analysis schedules, and obviously the project management team, the entire push is to close those risks out as fast as possible, while also spotting what lies ahead as fast as possible. Nigel, I'm not sure whether you…

Nigel White

executive
#118

Yes. Maybe what I’d say is that we certainly believe at this point that we now have a heightened awareness of the investigation and interrogation, since the challenges are always present on the project. And we manage those risks dynamically as we move forward, and as a team we’re very focused on that. And let’s say we’ve strengthened our protocols to ensure we do that well. One thing we can say is that obviously, as we work through the backlog, we were looking closely at producing a diminishing risk perspective.

Michael Tupholme

analyst
#119

All right, that clears things up. Thanks. And finally, could you give us some clarity, or just let us know the timing for those two items — specifically, when the 407 tax payment is actually going to be paid, and when the initial payment related to the federal charges settlement will be made.

Sylvain Girard

executive
#120

The tax falls in Q1, and that settlement will wrap up somewhere between Q1 and Q2, since this is somewhat a matter of timing that might shift — it could land anywhere between Q1 and Q2.

Michael Tupholme

analyst
#121

Alright, thanks.

Operator

operator
#122

That wraps up the Q&A portion. I'll now hand the conference back to Mr. Denis Jasmin for any closing remarks he'd like to make.

Ian Edwards

executive
#123

I'd like to start by thanking everyone for putting up with me today. I'm dealing with a bit of a cough, so I apologize for how unsettling that may sound, and I really appreciate the questions you've brought today.

Denis Jasmin

executive
#124

Absolutely. I appreciate it, everyone. Should anything else come up, feel free to reach out to me again. Many thanks, and enjoy a wonderful day. Thanks.

Operator

operator
#125

That brings us to the end of today's conference call. You can now disconnect your lines. Thank you for joining us, and have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.