AtkinsRéalis Group Inc. (ATRL) Earnings Call Transcript & Summary
October 30, 2020
Earnings Call Speaker Segments
Denis Jasmin
executiveThanks, Ariel. Morning, everyone, and thanks for being on the call. I hope you and your families are safe and doing well. We appreciate that you're spending time listening in today. Our Q3 earnings announcement came out this morning, and a corresponding slide presentation has been posted in the Investors section of our website. A recording of today's call, along with its transcript, will be available on our website within 24 hours as well. Joining me today are Ian Edwards, President and Chief Executive Officer, and Jeff Bell, Executive Vice President and Chief Financial Officer. <<operator_script>> I'd like to point you to Slides 2 and 3. Comments on today's call may include forward-looking information. By its nature, this information carries risks and uncertainties, and as such, actual results could differ materially from the views expressed today; for more information about these risks and uncertainties, please see the company's relevant filings on SEDAR. Those documents are available on our website too. Also during the call, we may reference certain non-IFRS measures. These measures are defined and reconciled with comparable IFRS measures in our MD&A, which can be found on SEDAR and on our website. Management believes these non-IFRS measures offer additional insight into the company's financial results, and certain investors may use this information to evaluate the company's performance from period to period. And now I'll hand the call over to Ian Edwards. Ian?
Ian Edwards
executiveThanks, Denis, and I appreciate everyone being on the call. Let's go to Slide 5. We're still advancing along our strategic path, which includes expanding the pipeline and turning in steady results, and we stay focused on exiting LSTK as effectively as we can. First, SNCL Engineering Services has kept delivering strong results, consistent with what we expected. A diverse business mix, public sector work, and long-term contracts and relationships keep working in our favor. Second, the transformation of the Resources Service business is progressing as planned, and we've acted quickly to restructure and cut overhead while securing new services contracts. At SNCL Projects, infrastructure LSTKs are still being hurt by productivity losses stemming from COVID-19 along with some reforecasts. On the Current Resources LSTK side, results were solid, with just a small loss. That said, the total project loss was a letdown, and it stemmed from an adverse arbitration decision involving a finished LSTK legacy resources project. Finally, our financial footing remains robust. We hold $1.1 billion in cash, and in the quarter we completed a successful $300 million bond issuance. Moving to Slide 6 for the SNCL Engineering Services highlights: Engineering Services turned in another quarter of strong performance, which highlights the durability and resilience of that business, posting an adjusted EBIT margin of close to 10% along with $186 million of cash flow. Segment adjusted EBIT landed a bit higher than what we saw in Q2, and EDPM, Nuclear and Infrastructure Services have all delivered steady results over the last six months — which really demonstrates just how vital and long-lasting those Services contracts are to our Engineering Services business. Turning to Slide 7. EDPM continues to turn in a solid performance across its core markets — the U.K., Canada and the U.S. Transportation and defense revenue out of the U.K. and Europe was particularly robust, and we're still bringing in new work. Not long ago, we were picked as commercial delivery partner on the U.K.'s High Speed Rail 2 project. This is a cutting-edge high-speed line, and it's essential to the U.K.'s low carbon transport future. We keep securing business in the United States too — just recently we landed a number of advisory and design service contracts with the State Department of Transport. In the Middle East, a market that's currently slower, we're also bringing in new work and were recently given the master planning assignment for the new leisure park with Six Flags. All in all, Q3 backlog came in at a solid $2.8 billion, slightly higher than Q2 and consistent with Q3 2019. Our pipeline of prospects stays strong at $27 billion. Kindly turn to Slide 8. Nuclear continues to do well, with Q3 results exceeding Q2. A favorable blend of long-term contracts, field services and ongoing engineering benefited the segment, helping it produce improved EBIT. Nuclear has seen robust growth in the U.S. market. Two contracts with the Department of Energy are progressing, and both involve decommissioning and waste management at the Hanford Site in Washington State. A number of contract and industry awards also reflect strong recognition of our proprietary nuclear technology. Turning to Slide 9. Infrastructure Services delivered better results in Q3 compared with Q2, and revenue and margin both reached target. Because they were classified as essential, our operation and maintenance contracts ran at full service levels, and we continue to be active on health care and power service contracts. At Linxon — the substation joint venture we operate with ABB — revenue rose for the U.K. and Europe. Q3 brought a number of infra services awards, among them scopes tied to the ongoing pandemic and master service agreements in hydro. On Slide 10, the capital highlights: during Q3, Ontario province and the Greater Toronto area reopened in phases, and as a result the 407 ETR posted traffic improvement versus Q2. On September 3, SNC-Lavalin collected a dividend of $16.9 million from Highway 407. Every one of the concessions is performing strongly, with contracts structured on an availability model. Over on Slide 11, SNCL Projects: for infrastructure EPC projects we booked a loss of $25 million in segment adjusted EBIT, which reflects COVID-19's continuing effect on productivity along with certain reforecasts. We are still in discussions with our clients aimed at recouping those losses. Our view continues to be that over their full life these Canadian light rail projects will generate positive cash flow. We have now finished two quarters operating under COVID restrictions, and as October gets going the productivity effects are becoming clearer to us. Productivity effects across the industry now span 10% to 25%, differing from one project to another and depending on which activities are involved. The most severe effects tend to hit projects featuring a lot of activities — manual handling of materials, working at height, or confined spaces — where pandemic social distancing safeguards have dragged on productivity. At every site, additional hygiene breaks as well as travel restrictions to site have likewise taken a toll on productivity. Productivity may be down, yet we're still working through the LSTK backlog, and that stood at $1.9 billion when September ended. Turning to Slide 12 and the Resources projects: across Resources LSTK plus services, the loss totaled $75 million for the quarter, driven largely by an adverse arbitration decision involving a legacy LSTK job that's already finished. That outcome leaves me plainly disappointed, because it went against what both our internal and external specialists had concluded. While we believe our present approach to assessing litigation risk is suitable, we are conducting an additional examination of the remaining legacy LSTK litigation matters to provide extra assurance; more positively, the services segment outperformed forecasts, and the loss on active LSTK projects decreased to about $3 million. Services got better because of our ongoing work to right-size the business via divestments and cuts to overhead, along with winning work and improved execution. As previously stated, we remain on track to substantially complete the Resources LSTK backlog by year-end. Turning now to Slide 13. Starting with our June 2019 strategic choice to stop pursuing bids for that kind of contract, LSTK backlog has dropped considerably. You can likewise see that the Resources Services backlog, which now resides within this sector, has remained stable at about $1 billion. That makes us more confident about the Resources Services transformation. As you're aware, our goal is to leave LSTK behind, and our focus there continues. Moving to Slide 14 and the Resources business transformation we announced in Q2: as we noted, we achieved significant progress during Q3 as we work toward profitability in the second half of 2021. In Q3, we announced that we're selling the South African Resources business, we divested our European fertilizer business, we brought overhead and headcount down to roughly 10,000, and we bolstered the order backlog through renewals of key service contracts in core countries. We're still on track to break even by the first half of '21 and to turn a profit next year. With that, let's go to Slide 15, and I'll wrap up my remarks before Jeff takes you through more detail on the Q3 numbers. What we delivered this quarter again underscores the strength and resilience of the Engineering Services business and our ongoing closeout of legacy LSTK business. At present, our attention is on four priorities aimed at creating value for every stakeholder: first, bringing our LSTK business to a successful close; second, maintaining steady, reliable performance throughout Engineering Services' core markets and geographies; third, readying the company for a lasting future by pursuing organic growth through capability-sharing across those core markets—this includes identifying which capabilities let us help clients deliver sustainable infrastructure and clean energy, and using technology plus collaborative working to bring our major project know-how into new contract models that serve our clients and project outcomes well; and fourth, we are creating an organization that is connected and collaborative so our overall strategic direction gets delivered efficiently. I'm convinced our business is aimed at the correct markets and geographies, and that we're pursuing the proper path toward what lies ahead for us. On that note, thank you — I'll now hand things over to Jeff.
Jeffrey Bell
executiveThanks, Ian, and good morning, everyone. If you turn to Slide 17, you'll see that SNC-Lavalin's shareholders recorded an IFRS net loss attributable to them of $85 million in Q3 2020, which works out to $0.48 per diluted share, while the corresponding quarter of 2019 produced net income of $2.8 billion, or $15.70 per diluted share. Q3 2019 included a large gain from the divestiture of a 10.1% interest in Highway 407 ETR, totaling $2.6 billion, or $14.74 per diluted share. Worth noting is that the $45 million income tax expense in Q3 2020 included a $53 million write-down of deferred income tax assets, which came from a reassessment of the recoverability of U.S. loss carryforwards. Looking ahead, that will apply going forward. In contrast, Q3 2019's income tax expense of $309 million included $83 million in tax recoveries from capital losses linked to the capital gain on the Highway 407 ETR disposal proceeds. Q3 2020's net loss also reflected $33 million of pretax restructuring charges, largely associated with the Resources Services transformation. Year to date, $58 million has been recorded for the Resources segment transformation, in line with management's guidance of $50 million to $60 million for the full year. For the third quarter of 2020, adjusted net loss from PS&PM was $58 million, equivalent to $0.33 per diluted share. That compares with adjusted net income of $165 million, or $0.94 per diluted share, during the same period in 2019. The change was primarily attributable to lower segment adjusted EBIT in both Engineering Services and Projects, together with an unfavorable swing in income taxes. The company also remains in a strong financial position. At the close of September, cash on hand was $1.1 billion, and an additional $2 billion was available for drawing under the revolver credit facility. Now let's look at the segments in more detail. Turning to slide 18, SNCL Engineering Services delivered strong performance and proved resilient during COVID-19, posting quarterly revenue of $1.4 billion — level with the second quarter, though 3.6% below Q3 2019. Segment adjusted EBIT was $142 million, a 9.8% margin, in line with what we expected. At EDPM, revenue reached $899 million, a decline of 7.3% compared with Q3 2019, as gains in several sectors — including transportation and defense across the segment's core region of the United Kingdom and Europe — were more than outweighed by COVID-19's negative effects in certain other markets, particularly aviation and commercial property. In our EDPM segment, adjusted EBIT came in strong at $81 million, which is a 9% margin—right in line with the 8% to 10% range we target over the long term. Keep in mind that the 10.6% margin in Q3 2019 got a boost from some favorable project settlements. Turning to Nuclear, segment revenue increased 5.5% to $225 million, mainly reflecting higher volumes across the geographies. Segment adjusted EBIT was strong at $36 million, a 16.1% margin, which is above our long-term target range of 13% to 15%. Infrastructure Services saw revenue grow 1.6%, driven primarily by growth in Linxon's revenue across the U.K. and Europe region. For the segment, adjusted EBIT was $25 million, which gave us a 7.8% EBIT margin — that's also above the 5% to 7% long-term target range we've set. If you move to Slide 19, SNCL Engineering services backlog is still holding up well despite COVID-19, and it was $10.7 billion at the close of September, and that figure includes $1.2 billion in awards during the third quarter. EDPM had a notably strong quarter, finishing with backlog of $2.8 billion, which is 1.6% higher than at the end of Q2. We booked $943 million during the quarter, giving a booking-to-revenue ratio of 1.05, which matches the year-to-date ratio. Moving to Slide 20 and SNCL projects, in line with our strategy to exit LSTK work, Q3 2020 revenues kept falling. Infrastructure EPC Project revenues fell 18% to $237 million, mostly due to continued backlog runoff on our large LSTK construction projects. The Infrastructure EPC Projects segment posted negative segment adjusted EBIT of $25 million, versus a modest $2 million profit in Q3 2019. This quarter's loss was driven primarily by certain cost forecast adjustments and reduced productivity stemming from changed working conditions caused by COVID-19. Just a heads-up that in the quarter, we moved the Husky White Rose project backlog out of LSTK construction and into Reimbursable & Engineering Services, because contractual term changes have brought the risk down on that project. As Ian noted, the Resources segment posted negative segment adjusted EBIT of $75 million. Within that, the LSTK project business had a $61 million loss, and the main driver was the $58 million provision we booked for the unfavorable arbitration ruling. Meanwhile, the Resources Services business — which we're in the process of reshaping so it complements Engineering Services — recorded a loss of $14 million, a bit ahead of what management expected as nonprimary operations keep winding down. Let's go to Slide 21. Capital segment adjusted EBIT declined, largely because certain concessions contributed less and dividends from our Highway 407 ETR investment came in lower — we got $17 million in dividends in Q3 2020 versus $42 million in Q3 2019, reflecting our reduced ownership stake. Traffic volumes were still feeling the impact of the COVID-19 situation, though we view these as exceptional circumstances. With 78 years left on the concession, our confidence in the long-term value of this investment remains strong. Turning to Slide 22, net cash used for operating activities came to $136 million in Q3 2020, compared with $51 million in Q3 2019. That difference came primarily from timing: we paid $200 million for the first wave of claims in the pyrrhotite case, while the insurance coverage proceeds we expect in Q4 2020 — which should cover a substantial portion of that $200 million — had not yet arrived. SNCL Engineering Services generated $186 million in cash flow from operations, reflecting robust EBIT conversion and a solid working capital position, while SNCL Projects continues to use cash, with a cash outflow from operations of $73 million. SNCL Engineering Services should continue to show strong EBIT conversion into operating cash flow in Q4, but SNCL Projects will keep consuming cash, including the arbitration settlement payment. Add in some unwinding during Q4 of the temporary working capital benefits tied to COVID-19 government payment terms and sales tax deferrals that we outlined in our Q2 results earnings call, and net operating cash flow for Q4 is expected to come in slightly negative. In the quarter, we successfully issued $300 million of debentures due in 2024, and the proceeds went toward funding the repurchase of a portion of our Series 1 debentures and repaying certain outstanding indebtedness under our revolving credit facility. By the close of September, the net recourse debt-to-EBITDA ratio under the revolver credit facility — computed according to the provisions of the company's credit agreement — came in at 1.7x, comfortably under the 3.75x covenant threshold. Now, turning to Slide 23. Regarding the Q4 2020 outlook, provided nothing major changes in the current COVID-19 situation worldwide, SNCL Engineering Services revenue is expected to fall by a low to mid-single-digit percentage versus Q4 2019, and for that same period we have narrowed our guidance for segment adjusted EBIT as a percentage of revenue to a range of 8.5% to 9.5%. That wraps up my presentation, and we are ready to take questions on the line. Thank you.
Jacob Bout
analystFirst thing I want to ask: you're saying there's going to be an additional review of the LSTK legacy litigation matters that are still left. How many projects might fall into that?
Ian Edwards
executiveOkay. Yeah. Thanks, Jacob. Let me first take you through how these situations arise, and then I'll give some sense of what the number looks like overall. Clearly, wrapping up LSTK is a priority as we exit that business. The aim there is to finish every live project and bring anything legacy to a close. Typically, once we've completed the work, the accounts are settled fairly fast in relative terms. That's what we'd expect to achieve by engaging with our clients and negotiating them out. In certain cases, though, those do become disputes. Obviously, we don't make a habit of not being paid for work we've performed, and we're not going to leave money on the table. So where we believe recovery is achievable, we go after it through a dispute or litigation. That's a far smaller number of instances than the total. In this particular case, it dates back to the early part of last decade. So this is a long-outstanding project that has gone through an arbitration. As we work through those arbitrations, we assess what the outcome will be. And obviously, in this case, we're quite disappointed. So to answer your question: in the context of closing out all of LSTK, we're talking about a relatively small number of projects.
Jacob Bout
analystAll right. My next question concerns the EBITDA margin guidance you provided, the 8.5% to 9.5% range. From what I recall, that sits at the top end of the H2 guidance range you disclosed earlier. Is it simply a matter of mix, with somewhat more nuclear? Or what exactly is driving it?
Ian Edwards
executiveI'll hand that to Jeff. What I'd say is it's somewhat a case of a stronger fix as we wrap up the year. But Jeff?
Jeffrey Bell
executiveEarlier guidance stood at 8% to 9%. As mentioned in my script, we have narrowed it to 8.5% to 9.5%; you would be right to note that the midpoint of both ranges works out to essentially 9%. What I think makes the difference now, compared with where we stood at our Q2 earnings result, is that we have had one more quarter of the COVID backdrop affecting the business. That gives us, I believe, clearer visibility into the impact it is having and how the business is responding. So with 1 quarter remaining, we feel confident narrowing that range to 8.5% to 9.5% from 8% to 10%; that, I think, is where our guidance feels comfortable.
Jacob Bout
analystAlright. So looking ahead, if we ramp up the Nuclear work more, does that carry better margins for you?
Jeffrey Bell
executiveYeah. I think, as we've said in our guidance — you've seen this guide — we pointed to 13% to 15%. What I'd say now is that, clearly, this is a business with higher margins. It comes down to a few really distinctive capabilities we're able to bring to the market in that business, plus how much quality and effect the supply chain matters within the nuclear industry itself. Also, I think over time, several of our growth areas, especially in the U.S., will show up through joint venture net equity or income pickups, where we'd essentially be capturing revenue and margin in equal measure. So in theory, as time goes on, you could also see the reported margin percent rise, though that would stem as much from us capturing net income as from revenue.
Mark Neville
analystIf I may pick up on what Jacob asked about the litigation. Thank you for your remarks. I realize it concerns a limited set of extra projects; still, could you somehow put a figure on the possible exposures, or at least reassure us that this truly is a one-time occurrence?
Ian Edwards
executiveYes. Yes. Well, obviously, we are quite disappointed. That is the main thing I would say; this represents a $58 million gap versus where we had anticipated it would land, so disappointment is there; and I would likely explain — as I mentioned, this arbitration has been going on for more than a decade. And how we evaluate the result of such arbitrations and litigations is clearly through outside counsel, outside legal guidance and outside quantum analysis, and we apply our internal assessment process, our risk assessment process, to arrive at a position that we either make provision for and that we report on using all available information. And that is an ongoing process. As it moves through its hearings and as additional information comes in, that process gets updated, and we revise any provisions or any reporting against it as the case develops; now with this specific case, the hearing took place a while back and the actual award came in Q3; so we do believe, having received this, which was disappointing, that it matters to examine the handful of cases we hold and conduct a fresh review of them; we would expect only minor change from that, since the process we already have is fairly robust, but we will carry it out to give ourselves absolute extra assurance that nothing there requires updating.
Mark Neville
analystAll right. And with this specific situation, do you have a right to appeal? Or is it more of a...
Ian Edwards
executiveWell, that varies. I mean, it hinges on where the litigation stands, and it hinges on the process itself. Here, it's fairly limiting; so clearly, that's the reason we've recorded the loss.
Mark Neville
analystAll right. And just to shift topics a bit. Looking at the Projects backlog and Infrastructure, and I know you folks now have a clearer picture of where the inefficiencies are. But are there any remediation steps or actions you could take to get this to a breakeven kind of business in the current environment? Or do we just need more "normalized" working conditions before you can stop the losses there?
Ian Edwards
executiveWell, no, absolutely. I mean we're actively seeking to recover our COVID losses. I mean the contracts — I mean we're basically down to 3 contracts. We're down to Trillium, the REM project and Eglinton. And across all those contracts — they're each a bit different, and obviously, the clients differ. There are avenues for recovery through the contract, and we will pursue those. And frankly, we have yet to recover anything, but the discussions and the contractual case are being put forward based on the impacts as we see them. So in due course, we would expect to recover, certainly, the loss that's specific to COVID, and we will pursue that.
Mark Neville
analystOkay. Maybe one last thing for Jeff. Jeff, I just — I didn't really catch your comments on what we should expect for cash flow in Q4. There were — you listed several kind of separate items. I just didn't catch everything.
Jeffrey Bell
executiveYeah. No, that's okay. What I was essentially saying is that in Q4 we anticipate continuing to see solid EBIT conversion into EBITDA and operating cash flow. We'll continue to see cash being used in the SNCL Projects area. And like Ian mentioned, a few things play into that, among them SNC needing to recover from some of the productivity hit related to COVID-19. Another factor—I mentioned this back in Q2—is government assistance programs. We're seeing favorable quick-payment arrangements, and in the U.K., for example, deferrals of sales tax. These have all helped give us positive working capital, though they'll partially reverse as we close out this year and continue unwinding into 2021. Taking all of that together, our best assessment is that operating cash flow will come in slightly negative for Q4.
Mark Neville
analystAll right. Does that figure include the $58 million settlement too?
Jeffrey Bell
executiveYeah. Correct, it does. I believe I mentioned that in my prepared remarks as well, though clearly it plays a part too. And the other point worth noting is that nine months into the year, from an operating cash flow standpoint, we're essentially at breakeven. We're a little on the positive side, around $17 million, I think; so where we land in Q4 is really where we'll land for the full year too.
Sabahat Khan
analystIf we focus just on the Resources segment, and perhaps leave aside this arbitration ruling that went against you, I understand you have roughly 1 quarter plus a little more work remaining. What's your sense of the Resources LSTK work still ahead of you?
Ian Edwards
executiveYeah. I mean, we're — I mean, I believe the presentation indicates $0.2 billion of backlog left; that figure actually appeared in Q2. It isn't that nothing moved during the quarter, it's simply a rounding matter. We consumed roughly $60 million of backlog in the quarter. And as you can see, the loss from those projects is fairly minimal. And once we reach the end, then obviously, we're eager to have the entire Resources LSTK business behind us. Now I would — we've consistently said there's no — going forward it isn't zero risk, but I think we have a pretty solid grip on the rundown through to the end. And we should be on track to get this behind us, certainly, in the early part of next year; so I think it's a good quarter for progress and a good quarter for closing out.
Sabahat Khan
analystAll right, and then I noticed quite a few headlines coming out of the U.K. with the government's focus on nuclear. I think the Canada government is putting a little bit into some SMRs here. Could you maybe talk about the nuclear pipeline and sort of where you're involved or what some of those opportunities might be for you?
Ian Edwards
executiveAre you asking specifically about nuclear, or just generally?
Sabahat Khan
analystNuclear in particular, though honestly it applies everywhere too.
Ian Edwards
executiveYeah. Yeah. So I'd put it this way: our nuclear know-how covers a very broad spectrum, because it originates in several distinct areas. We bring decommissioning expertise; we bring skills in cleanup and nuclear waste remediation. We bring new build capabilities, which were put to use at the Hinkley Point power station in the U.K. Technology is the only thing we do; we have plenty of vendor support for existing CANDU reactors. And we run a technology business that's genuinely quite innovative when it comes to delivering technology solutions to the nuclear industry around the world. We're seeing a lot of opportunity in our main markets, especially the U.K., where there's a clear commitment to new nuclear build. Right now there's plenty of talk around Sizewell and whether that project will move forward. If it does, we'll be right there alongside the client, EDF, and our relationship with EDF is strong. Decommissioning also presents a major opportunity — I mean, all the plants in the U.S. and the U.K., and to some degree in Canada, are reaching the end of their operating lives. We take real pride in our know-how when it comes to shutting down and cleaning up existing power plants so the surrounding natural environment is restored, and we see that capability as a source of market expansion ahead. I could easily go on at length about this, since it's a genuinely exciting piece of what we do, but hopefully that offers a sense of it.
Sabahat Khan
analystThen, only one final question from me, perhaps regarding the infrastructure EPC area. You mentioned 3 major buckets, I believe REM, Trillium and the Eglinton project; and there have been some headlines about litigation that has begun on the Eglinton project. If we consider where you aim to obtain recoveries or certain cost offsets down the road, should we pay closer attention to one of them than the others? Or do your cost headwinds from COVID affect all 3 major ones equally?
Ian Edwards
executiveNo. I'd say the productivity problems we are dealing with are fairly uniform; and it hinges on the exact particular character of the work being done on the job. Tunneling, for instance, happens in a confined space, and social distancing there is extremely hard, so the impact is larger. Working at height on an elevated platform is hard since you can fit only 2 people on a platform, whereas ordinarily you would fit 20. That sort of factor is what causes the productivity loss. But we are definitely seeing it across all 3 jobs, and we are definitely chasing our recovery across all 3 jobs. And as you correctly point out, we concluded on Eglinton that the proper move, after trying to pursue this for a good while, was to file a claim in court. And on that job, we truly need to reach alignment with our client regarding the impact for many reasons, not only recovery, but time reasons as well, and I am sure we will definitely get there. But such matters take time, and they clearly take demonstration.
Yuri Lynk
analystI'd like to ask a follow-up about the 3 Canadian LRT projects, just so we're clear; as you pursue these — trying to recover these COVID losses, if you don't succeed in recouping those costs, should we expect a cost reforecast down the road because of that? Or are the numbers already built on the assumption that you won't get these recoveries?
Ian Edwards
executiveWhat I'd say is that we're making a prudent assessment of where we believe the outcome will land, because obviously we're in the business of exiting this business line; we don't want to carry risk forward into the future. So I think we're being prudent, and that's how I would answer that.
Jeffrey Bell
executiveYeah, this is Jeff. I believe that's correct. Obviously, we use our best estimate, as we did at the close of Q3 on that, wherever we're worried or see a situation where we feel it needs to be reflected in the financial statements we have. But as Ian mentioned before, we believe that across the various contracts, we're entitled to recover substantial portions of the COVID-19 impact.
Yuri Lynk
analystAlright. Coming back to the arbitration matter, can you put a number on how many projects may still be — that you remain in arbitration over? And my follow-up, I suppose, is this: if you want a sturdy process, why not simply book a loss and assume you'll lose these proceedings? That way there's nothing left to report, since it's already reflected in the numbers. And should you win, it could turn into a positive reforecast. I'm simply attempting to grasp what tail risk remains outstanding and whether any shift in your approach is called for.
Jeffrey Bell
executiveYeah. I mean — it's Jeff here. Perhaps I'll offer a perspective and address that. As you've heard from us, these are few in number. Typically we resolve them and negotiate commercially. But a handful of them carrying meaningful value sit in some type of litigation dating back many years, and this one falls into that category. As Ian mentioned, I mean we draw on expert advice, internal views, external views to try to arrive at the best assessments. Part of the reason is that in certain of these cases, you can end up with a fairly wide range that frequently winds up in litigation. One party requests a bigger figure, the other requests a smaller figure. So you have no option but to attempt your best estimate of what you believe the outcome will be, grounded in the best input available to you. We've clearly reviewed that as part of receiving this arbitration settlement; we believe our provisions, where necessary, are appropriate, but we will absolutely, essentially double check that and triple check regarding how we arrived at the best view on all of them; so we believe that's the right path forward, and that's the process we'll carry out here over the coming months.
Yuri Lynk
analystAll right, let me squeeze in one more for Jeff while I still have you.
Jeffrey Bell
executiveOf course.
Yuri Lynk
analystI think the way your net debt-to-EBITDA ratio is calculated has shifted, and it's been a while since we got any update on that. So could you tell us what the covenant is — is it still 3.75 — and where your current ratio sits against it?
Jeffrey Bell
executiveYes. I mean, the somewhat tricky piece, as always, is that the ratio calculated under the covenant for our revolver credit facility isn't simply net debt to EBITDA. Quite a few adjustments get made in there. Looking ahead—especially into the first half of next year—we're focused on making our forward thinking clear, given that LSTK projects have kept winding down further and we now have improved visibility into future cash flows along with a stronger ability to forecast them. Once you strip out a portion of the swings inherent in the LSTK projects, it should become simpler to tie net debt to EBITDA straight from the financial statements, if you will, rather than relying solely on the covenant ratio computation. Still, as what we were doing made clear, given the cash on hand and financial flexibility we possess, along with how we concentrate on cash flow and where our net debt sits, we remain comfortably inside that covenant ratio right now.
Benoît Poirier
analystFirst question: regarding the productivity lost around the pandemic, could you perhaps quantify how much has been lost so far and how much you potentially expect to recover from clients? And do you have any thoughts on opportunities related to the government subsidies?
Ian Edwards
executiveSo I think — as we've incurred these losses, as we incurred them through Q2 and Q3, I think we've been clear on what our assessment of that is. Now obviously, we're in somewhat of a discussion, negotiation and proof of loss with all the clients. So we don't actually want to get into the finite numerical details of that. But what I — just to — maybe, Jeff, if you could perhaps just add to that from what we posted in Q2 and Q3?
Jeffrey Bell
executiveRight, so in Q3 we saw roughly $22 million in benefit from that. You can find it in Note 16 of the notes accompanying our financial statements. I'd like to offer a couple of thoughts here. First, this applies on a global basis — it isn't limited to Canada, for example. In the U.K., for instance, there's a government program aimed at keeping furloughed employees on payroll. So what I'd point out is that this represents grants we've gotten from governments. In practice, though, that money sits there and has gone toward offsetting the higher costs we incurred either by keeping workers and maintaining employment levels we otherwise wouldn't have, or by bringing employees back from furlough or temporary leave. That's how we've applied it.
Benoît Poirier
analystOkay. Now, regarding the Resources Service business, can you talk about the restructuring currently taking place and whether you have more clarity and visibility now on what that business's margin profile could look like over the long term?
Ian Edwards
executiveThe first thing I would mention is that what we pledged to do in Q2 is progressing as planned. I believe we gave guidance for the Services business covering Q3 and Q4 and then into 2021, to bring it back to profit. And as a matter of fact, we have come in slightly better on loss than what we had stated. We came in somewhat ahead of the progress we had communicated for Q3, and naturally we're happy about that. Another encouraging point, in my view, is that making this business profitable boils down to two things: getting overhead to the right size and securing contracts. The overhead adjustment is definitely moving along well. Our headcount now stands at roughly 10,000 employees, a substantial reduction from 2019, when we had approximately 15,000 on staff. So we've continued driving forward with the restructuring and the resizing effort. On the contract front, we were very pleased to secure a framework agreement with BP during the quarter. This project fits our criteria perfectly—it's precisely the type of mandate we're after, since it provides the structure for us to deliver engineering services plus inspection work across a range of their assets. As we mentioned when we assembled this last quarter, serving IOCs and NOCs represents the path ahead for this business. And before we get ahead of ourselves, clearly we need to keep pushing to bring it into profitability during 2021, but what we're aiming at past that is lifting profitability to a level that complements our other Services businesses—and that's plainly the goal beyond '21.
Benoît Poirier
analystAlright, just a quick one from me — regarding the pyrrhotite case, could you give us some more detail on it, and perhaps share how confident you are that this payment gets reimbursed? Also any sense of the timeline for the pyrrhotite case?
Jeffrey Bell
executiveSure, it's Jeff. Ian, why don't I handle that one? So I think what you've seen, as I — and as we said in the presentation, the first wave of claims tied to pyrrhotite called for a payment, or at least our portion of it, of $200 million. And we now have clarity, having actually been through the Québec court system, that we'll be paid $140 million, and it should come this quarter, from the insurance group; and in fact there's a further $30 million on top of that. So of that $200 million, roughly $175 million is what we'd expect to get back; and as for the remainder, we had already provided and provisioned for it in prior periods, so from a P&L perspective we don't see any change as a result. Obviously, a second wave of claims is underway, but that first wave is settled out.
Devin Dodge
analystIn your Resources Services division, you've got several framework agreements with clients. I'm just curious — have you noticed, or has there been any shift toward revisiting the pricing terms in those agreements? On one side, the pandemic could have affected your cost performance, but on the other, I'd think clients may be feeling squeezed by lower commodity prices. Can you give us any color on that?
Ian Edwards
executiveNo. On the framework agreements we have in the Resources business, I'm not seeing that. I mean, the LSTK portion of the Resources business, which clearly we're going to exit, is probably getting more competitive as the market tightens, and oil price fluctuation has obviously been there; but no, I don't believe we're seeing that sort of pressure yet. With the level of profitability in the framework we won from BP, we're very comfortable, so no signs yet.
Devin Dodge
analystAlright. Alright, and then perhaps one question for Jeff, following up on an earlier one about leverage. What I'm wondering is what are you aiming for when it comes to financial leverage for the business? Does that shift as those LSTK projects wind down? And then at what stage would you be more at ease being more active with capital deployment, whether for additional buybacks or M&A?
Jeffrey Bell
executiveYeah. No, I believe that's a reasonable question. What I'd say is I think I'd begin with 2020, which in my view has roughly — has been roughly about creating financial flexibility and resilience. I think the initial catalyst for this was simply emerging from everything in 2019, but then clearly, COVID placed us in the same position; so consequently, we've been very focused on cash flow, converting earnings into cash flow, safeguarding cash flow and really getting the business intensely focused on that. I think looking ahead, the — and in particular, the LSTK portfolio, which generally introduces variability into how we deliver cash flow and how we forecast cash flow, and that's been visible across the last few quarters. But I think we've noted before, as we move into the first half of next year, we will have completed a substantial portion of the LSTK runoff. You saw on Ian's slide, we began back in — mid-2019 at roughly $3.4 billion across Infra Projects and Resources; we're now down to just over $2 billion. By year-end, we would forecast being just under $2 billion and having delivered quite a few of those projects; so I think as we move into the first half of next year, we have considerably better confidence in our capacity to project that; and I think our general posture at this point is to have a balance sheet consistent with investment-grade financial metrics, but we'll have to form a view on how quickly and how long it takes to return to that. And consequently, I would expect our gross debt, broadly speaking, to be at a similar or lower level than where it stands now. And I think simultaneously, that begins to give us some opportunity to consider in 2021 where we have positive cash flow, how we would deploy that appropriately, but we'll need to come back and provide more visibility on that as we get nearer to that point in the first half of next year.
Frédéric Bastien
analystCould you take us back to what you said regarding the Husky White Rose project being taken out of the LSTK backlog? What's the reason for that?
Ian Edwards
executiveYes. Well, to start with, that project has been postponed 2 times. When COVID hit, the client moved quickly to push the project back by a year. And as COVID has continued and drawn out, our current understanding is that the project won't restart until 2022, though I do believe that is being reviewed; on top of that, the contract wasn't really a traditional lump sum arrangement in any case; it includes some risk sharing. And earlier this year, we spent a period with the client essentially re-examining the contract and recasting it to the point where we wouldn't now classify it as an LSTK. The risk sharing doesn't fall under that profile; so if the project does return, and we aren't certain about that at the moment, but if it does, it will be a solid project for us with limited risk.
Frédéric Bastien
analystAll right, but was there any obligation from that choice to book a provision against the project this quarter? I'm simply wondering whether it carried a financial effect.
Ian Edwards
executiveNo. No. No, the client has in fact been quite fair in how it went about shutting the project down. I mean, we need to keep people on site to sort of preserve the project's status, so that it can be restarted. So we've coordinated closely with the client, and I believe we have a solid relationship there, where we've stayed flexible about what they need. And clearly, no loss has been incurred by us from it.
Frédéric Bastien
analystAll right. Could you give us an update on how things are progressing with the Trillium project?
Ian Edwards
executiveWell, it's — clearly, COVID has had some impact on it, but much like the other jobs, we're still at a fairly early stage when it comes to completion. Next year is the big one for the Trillium project. What I mean is, we're now heading into the winter period, when the work will be more limited until spring next year, but we have a major campaign lined up for next year, and that year is critical to the job's success. Beyond that, we're largely on track; though as I said, the real proof will come in next year's work.
Chris Murray
analystSo perhaps if we return to the EPC projects briefly and simply try to grasp how we ought to view the margin profile from here on. Let's suppose that — I believe in your remarks here, you said you're now figuring out how to operate within certain COVID restrictions; and let's suppose your talks with clients will keep happening, but how should we view the margin profile for the near term? Since I know you've mentioned something like free cash flow neutral, say, margins from history, but with the reforecast now finished, how should we view this for Q4 and going into '21?
Jeffrey Bell
executiveYes. Ian, perhaps I'll try to address that. Chris, I think — and you're completely right, we've said they'd be cash flow positive across their life. Consequently, we'd clearly regard them as profitable across their life. One reason for that remark, of course, especially regarding cash flow, is that those cash flows can be somewhat uneven, since, obviously, we often incur the cost in a fairly steady manner, while the cash payment profile inside the contracts can clearly be somewhat more uneven. As you heard Ian mention, we are where we're seeing cost impacts, absorbing those as we proceed; we do believe with — and so that may ultimately pull the margin down somewhat. But in the end, when it comes to COVID, we believe the costs themselves are mostly recoverable over time and through money within those contracts. So I think part of it is, it's early days. We've been handling this quarter by quarter. I mean it feels as though we've been living in COVID forever; but in reality, at least here in Canada regarding these projects, the impact has really only been in the last 2 quarters. So we've been trying to evaluate that quarter by quarter. The stance we've taken at the end of Q3 is the visibility we see, and I think that carries us into the winter. And then as we get into next year, we'll, we believe, have an opportunity to have worked through some of these issues with our clients and have a solid idea about what that means for the construction period next year.
Chris Murray
analystAll right, that helps. My second question relates to the Resources segment. We touched on it briefly. Some remarks, I believe, leaned more toward energy, but one item — or a few of the observations, and perhaps this is another angle if you're considering Oil & Gas, yet energy more broadly, part of the transition — and regarding the energy transition there's also been conversation about the mining business and the resource needs involved in constructing some of this new infrastructure. Could you speak a bit about how you view some of the funding, particularly from the Canadian government, aimed at creating this transition, and how you expect that might affect you over the coming year?
Ian Edwards
executiveDo you mean funding for energy and infrastructure, the entire market, Chris?
Chris Murray
analystYes, precisely.
Ian Edwards
executiveYeah. Yeah. I suppose the phrase that's commonly used in the market we mainly serve is shovel ready, shovel worthy, correct? And what shovel-worthy really refers to is infrastructure investment that delivers an economic return while also being sustainable by nature. And there are a number of announcements that, of course, you'll know about in Canada, but it's the same — pretty much the same picture, I think, in — certainly in the U.K. and to some degree, in certain states in the U.S. And for us that's an extremely large positive, because actually delivering sustainable infrastructure and actually — the way we think about that, plus both the kinds of capabilities we possess and how we bring those capabilities to bear, sit pretty much in our sweet spot of the capabilities we have. I mean if you consider clean energy, obviously, we have extensive capability around hydro and clean energy wind farms in the U.K; we have a nuclear capability which, in our view, is clean energy; we've just secured this mandate in the U.K. for the high-speed rail, which absolutely, because of the Net Zero 2050 legislation, has to consider its carbon footprint, and we've done considerable work examining the carbon footprint alongside the client there. So we see the whole industry shifting somewhat more toward an outcomes-based industry rather than simply thinking let's work on an LSTK basis and obtain the cheapest price we can. So I think where we're steering the company and the capabilities we hold play straight into this.
Denis Jasmin
executiveI appreciate everyone being here today. I realize a handful of analysts are still waiting in the queue, but time is running short for us, so please feel free to reach out to me. I would be glad to address whatever questions you may have. Many thanks to all of you, and enjoy a wonderful day. Goodbye.
Ian Edwards
executiveThank you.
Jeffrey Bell
executiveThank you.
Operator
operatorThat wraps up the conference call for today. You can go ahead and disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.