operatorAppreciation for holding. I'm the conference operator. Welcome to the SNC-Lavalin First Quarter 2021 Conference Call. Please note that everyone joined today is in listen-only mode, and this conference is being recorded. Following the presentation, an opportunity to ask questions will be provided. <<operator_script>> At this time, I'd like to hand the conference over to Denis Jasmin, Vice President, Investor Relations. Please go ahead.
Denis Jasmin
executiveGood morning, everyone, and thanks for being on the call. We put out our Q1 earnings announcement this morning, and a matching slide deck is now posted in the Investors section of our website. A recording of today's call, along with its transcript, will be up on our site within 24 hours as well. Joining me today are Ian Edwards, President and Chief Executive Officer, and Jeff Bell, Executive Vice President and Chief Financial Officer. Before we get started, I'd ask each of you to keep to one or two questions so that analysts have a chance to take part. Feel free to rejoin the queue for any follow-ups. I'd like to point you to slide two. Statements made on today's call may include forward-looking information. By its nature, such information carries risks and uncertainties. As a result, actual results could differ materially from the views expressed today. For more detail on these risks and uncertainties, please see the company's relevant filing on SEDAR. Those documents are also available on our website. In addition, during the call we may reference certain non-IFRS measures. These measures are defined and reconciled with comparable IFRS measures in our MD&A, which you can find on SEDAR and on our website.
Denis Jasmin
executiveIn management's view, these non-IFRS measures offer extra insight into the company's financial results, and certain investors may use this information to evaluate how the company performs from one period to the next. Now I'll hand the call over to Ian Edwards. Ian?
Ian Edwards
executiveThanks, Denis, and good afternoon, everyone. To begin on slide four, we got off to a strong start this year, with solid performance across all three engineering services segments. Engineering services brought in $1.5 billion in revenues, with a segment adjusted EBITDA margin of 8.8%. Revenue is basically level with Q1 2020, and margins have recovered to their customary levels. The backlog is also holding up well, with $1.7 billion of new bookings during the quarter. On SNCL projects, we're continuing to make solid headway, cutting the LSTK backlog and lowering total outstanding backlog to $1.6 billion. All in all, it was a very solid quarter. Moving to slide five and EDPM's Q1 results. EDPM delivered a strong quarter, producing $81 million in segment adjusted EBIT. Margins rose year-over-year to 8.6%. That strong performance stemmed from a mix of factors, including robust revenue growth in the UK across project management, transport, and defense; successful work to right size the business and cut costs in the Middle East; and recovery in certain markets hit by COVID in Q1 2020. The backlog is also growing at a really impressive pace. In Q1, EDPM added $1 billion in new wins, an increase of just over 10%.
Ian Edwards
executiveOn top of that, Q4 2020 delivered close to 9% growth, which lifts EDPM and backlog to a three-year peak of slightly below $3 billion. Among the new wins are rail, road and water schemes across our core markets of the U.K., Canada and the U.S. These take in engineering services for the Georgia Department of Transport in the U.S., plus a long-term renewal of a master services agreement with Intel covering project and program management. Going forward, the pipeline stayed robust at $27 billion. We also stay optimistic about our core markets, since governments are seeking infrastructure investment to serve the dual objectives of economic recovery and carbon Net Zero targets. Moving to slide six, the Nuclear Segment: Nuclear revenues came in broadly level with a year earlier, while EBIT matched expectations, though it was down year-on-year because Canadian refurbishment works contributed less. Demand remains healthy for reactor engineering, field service work, waste management, and for our proprietary tools and technologies, among them Robotics and Digital Trends. With our work on the first reactor at Darlington finished, we have now scaled up and are making solid progress on unit two.
Ian Edwards
executiveAs we head into 2021, we see a number of truly meaningful opportunities and growth catalysts ahead. Among them: sustained demand for reactor support and decommissioning work, stepped-up tendering from the U.S. Department of Energy for environmental management efforts at a range of nuclear sites, and continued momentum in the U.K. tied to the Hinkley Power Station and the proposed New Nuclear Science Point C Project. Turning to slide seven, infrastructure services posted a solid quarter, with a segment adjusted EBIT margin ratio of 5.8%, up versus Q1 2020, driven by better profitability and higher activity and health services. During the quarter, infrastructure services landed a number of new mandates, among them a first of its current contract to retrofit a 100 year old dam in Pennsylvania, along with three hydroelectric power stations to generate renewable energy. The segment also secured an additional five year renewal of a logistics and project management program in Canada. A backlog of just over $7 billion stayed strong, reflecting both the long-term and essential nature of infrastructure services. Looking forward, we see a number of opportunities in Canada and the U.S. across rail and transit and social infrastructure. Major projects will be a key focus as we pursue new collaborative liability kept contracting models such as the East West Rail Project in the U.K.
Ian Edwards
executiveThis one we won in February. We’re also seeing a solid pipeline of opportunities for Linxon, as well as in transportation and offshore wind. If you turn to slide eight, the capital segment—it kept feeling the effects of the Ontario lockdown, and that cut traffic volume on the Highway 407 ETR. Because of that, no dividend was paid this quarter. Our remaining concessions are still doing well. Going forward, we see an appealing pipeline of new Public- Private Partnership opportunities where we can bring our engineering and O&M strengths to bear. These include a number of PPPs in Canada and the U.K., in sewage and water treatment as well as hospitals. On slide nine, Infrastructure EBC projects—we’re still making solid headway, bringing the LSTK construction backlog down by more than $200 million this quarter. The LSTK backlog, made up of the three remaining Canadian LRT projects, stood at $1.5 billion at the end of March. This segment posted negative adjusted EBIT of $11 million for the quarter. Now slide 10, the Resources Segment. We’re still aiming to close the sale of our Oil & Gas business in Q2. Our M&M services business is doing well.
Ian Edwards
executiveRevenue and profitability are both expanding for us, and the real engine behind that is rising demand for the materials that go into clean energy storage, electric vehicles among them. If you turn to Slide 11 — as you might have noticed earlier today, we put out our ESG targets and commitments, and one of those is a pledge to hit carbon net zero by 2030. We have built a thorough plan for getting to that ambitious goal, and it threads a low carbon approach through everything we do, from how we handle travel and electric vehicle leasing to cutting energy use across our real estate footprint. To get there, annual targets are now in place, and third parties will verify them and they will be published to the carbon disclosure project. All told, we have pinpointed 12 ESG priority areas, and those include protecting and enhancing human rights, corporate integrity, and diversity and inclusion. On ED&I in particular, we have established clear targets aimed at raising the representation of women at every level of the company. And as our commitments make clear, ESG is, in our view, an integral part of the company's future growth and sustainability. With that, I'll hand the call over to Jeff now.
Jeff Bell
executiveThanks, Ian, and good afternoon, everyone. If we move to Slide 13, revenues on a total basis for the quarter came in at $1.8 billion, a bit below what we saw in the same quarter of 2020. SNCL Engineering Services revenue declined 1.3% and landed at the low end of the outlook range we had for the quarter, since the COVID-19 pandemic did not have a significant impact on Q1 2020. Segment adjusted EBIT for the quarter was $143 million, and that figure included $133 million of segment adjusted EBIT for SNCL Engineering Services, $19 million for capital, and negative $8 million for SNCL projects. That negative EBIT in the ladder was primarily attributable to the Infrastructure EPC Projects Segment, which saw a reduction in gross margin, because the first quarter of 2021 included costs and the closing out of certain projects nearing completion, along with the impacts of COVID-19, partially offset by lower overhead expenses. Corporate SG&A expenses were $16 million in Q1 2021, versus $37 million in the first quarter of 2020. This quarter included a revision to certain estimates and cost accruals that lowered the expense in the quarter, while Q1 2020 included a $10 million additional provision adjustment related to the Pyrrhotite litigation. Adjusted net income from PS&PM in Q1 2021 came to $83 million, or $0.48 per diluted share, which represents a 37% increase compared with Q1 2020.
Jeff Bell
executiveEach of those two quarters saw the benefit of an effective quarterly tax rate that came in below what we'd normally expect. In Q1 2021, that favorable rate largely came from reversing some provisions tied to tax liabilities, and that contributed $0.07 per share. At the close of the quarter, backlog stood at $13.9 billion, matching where it was a year earlier. The decline we saw was mostly attributable to the ongoing runoff in SNCL projects backlog tied to LSTK projects, which came down by $824 million. Meanwhile, SNCL Engineering Services backlog rose 1% over that same span, and was up 10% year-over-year, with EDPM at $2.9 billion. Over the past 12 months, Nuclear backlog fell 17%, driven mainly by the headway made on the company's big long-term refurbishment contracts in Canada. The business kept securing extensions on contracts already underway in Canada, along with other long-term contracts in the US and UK regions. When it comes to infrastructure services, backlog held steady at $7 billion, consistent with the end of March 2020, largely on the strength of contract wins during that 12-month stretch. Let's move to slide 14 now. For EDPM, days sales outstanding hit 61 days at quarter's end, which is a 12-day improvement versus Q1 2020.
Jeff Bell
executiveThe primary driver here is our ongoing emphasis on collecting cash, along with an early COVID-19-related government payment program. Looking at full year 2021, the robust operating cash flow characteristics of SNCL Engineering Services should be partly offset as we return to a more normalized DSO level later in the year. As of the end of March 2021, the company held $703 million in cash. Recourse debt fell by $175 million relative to December 2020, reflecting our full repayment of the Series 3 Debentures, which matured during the quarter. On the revolver credit facility, the company's net recourse debt to EBITDA ratio — calculated per the terms of the company's credit agreement — stood at 1.8 times, comfortably under the 3.75 times covenant requirement. Turning to slide 15. Net cash from operating activities was $6 million in Q1 2021, versus $23 million in the same period a year earlier. SNCL Engineering Services kept producing robust cash flow from operations, at $118 million for the quarter, driven by strong EBIT conversion and a low DSO in the EDPM segment, while capital contributed $21 million. Once cash taxes, interest and corporate items are accounted for, as you can see, we produced $97 million of operating cash flow in the quarter, which was offset by $124 million of cash usage from SNCL Projects.
Jeff Bell
executiveKeep in mind that cash flow from SNCL projects can swing quite unevenly across a given year, since it hinges on how far each project has advanced and which milestones are hit, whereas engineering services show a steadier pattern of quarterly cash generation. In addition, we do not view the cash consumed by SNCL projects in Q1 as indicative of what the rest of the year's quarters will look like. For 2021, our expectation remains that operating cash flow for the company will be roughly breakeven, reflecting a return by year-end to a more typical DSO profile and engineering services, together with cash usage and SNCL projects. And lastly, if we move to slide 16. The company is holding steady its outlook for SNCL Engineering Services revenue growth as well as the ratio of segment adjusted EBIT to revenue. We are likewise still aiming for the identical long term EBIT margin percentage in every segment. That brings my presentation to a close, and I'll turn it back over to you, Ian.
Ian Edwards
executiveThanks, Jeff. If you go to slide 18, I'd like to wrap up my comments with a handful of key points. The strong start we've had this year has been really encouraging to us. On our two main priorities — derisking the business and accelerating growth in engineering services — we keep making meaningful progress. Across every one of our core markets, we're seeing a robust pipeline of new business opportunities, as governments put money into new infrastructure and green initiatives. Through our Engineering Net Zero offering, which delivers a wide range of sustainable solutions across energy, transport and infrastructure, we're playing our part both as a company and as a partner to governments — governments and private clients. We regard this as an essential piece of our future growth. We're looking forward to sharing more detail on those growth opportunities at our Investor Day in September. Thank you. I'll now open the call to questions.
Operator
operatorThank you. At this point we'll move into the question-and-answer portion. <<operator_script>> Jacob Bout from CIBC has our first question. Please go ahead.
Jacob Bout
analystGood afternoon, everyone.
Ian Edwards
executiveHey there. Hello. Jacob, hey.
Jacob Bout
analystTurning to your engineering service segment and that outlook for low single-digit top-line expansion — since sales slipped only 1% during Q1, and I'd note you seem to have outperformed competitors on an organic basis, is some conservatism baked into that figure? And second, how much of this full-year guidance depends on the back half?
Ian Edwards
executiveWell, I don't believe we're factoring in any additional conservatism. I mean, obviously, we're being prudent, since we still observe that. Even though our book-to-bill was very strong in Q4 and Q1, we remain in the pandemic. So we're also seeing very, very strong signals of, sort of, future commitment. And we truly expect those to, sort of, land in revenues, probably more in 2022 than in 2021. So we didn't — we've examined it, obviously. I mean, we've considered this and we've reviewed the pipeline, and we felt that holding the guidance outlook unchanged was prudent at this time. But, obviously, we'll keep, sort of, watching that as we move through the year.
Jacob Bout
analystThen for my second question, regarding how quickly material costs have been climbing — is that shifting how clients are behaving at all, perhaps?
Ian Edwards
executiveYes. That is a fair question. Well, I would say the answer is no. I mean, the level of activity we're seeing across our core markets and in our, sort of, call it end markets, plus the different geographies, that commitment remains intact. And I mean, I think supply chain, material flows and demand could be a near-term matter, once things return to normal after COVID. But absolutely not — we aren't observing any downtime stemming from that.
Jacob Bout
analystAlright, those are the 2 from me. Thanks.
Ian Edwards
executiveI appreciate that.
Operator
operatorYuri Lynk from Canaccord Genuity has our next question. Go right ahead.
Yuri Lynk
analystNice quarter, everyone. Ian, I'm curious how you're feeling about shifting more toward growth, and when do you think SNC would be ready for that—particularly when it comes to possible acquisitions, the way a lot of your peers are doing?
Ian Edwards
executiveThanks, Yuri. What I mean is, we remain very conscious that there are two priorities for us. The LSTK backlog is still something we need to work through, and we're highly focused on doing that successfully. That said, over the past few months we've devoted a lot of time to a strategic plan, building on decisions already taken. You've seen the choices we've made concerning our core geographies, our focus, and our end markets. The geographies are the US, Canada and UK; the end markets are transport infrastructure, social infrastructure and nuclear. We're really focused on how we grow those. What are the growth drivers? Where do we direct our energy, both organically and inorganically? What does our capital allocation look like over a longer period of time? We're going to share all of that at the Investor Day in September — I mean, the exercise is still somewhat ongoing, but we'll be pretty fixed on it and give you quite a bit more detail then.
Yuri Lynk
analystAlright, and my second question goes to Jeff. If I were to find fault with the quarter, SG&A looks like it came in much lower than expected. That certainly didn't hurt the EBITDA. Could you walk us through in a bit more detail what was behind that? And then, is there anything that, that you can do to make that line item a little more predictable going forward, because it's, you have to admit it's kind of all over the place quarter-to-quarter?
Jeff Bell
executiveYeah, so my first thought is that there were a few items in there. Now, in fairness, it's especially the case with our digital transformation investment, which we're treating as a central cost. That way we can keep watching it and put it to use in the most suitable way. As you know, that gives us a quarterly run rate of roughly $25 million. So it doesn't take much in any single quarter — a few million, either direction — just where timing lands, or in the case of the first quarter this year, when we examined some of the provisions we had, there were some true-ups to that, which in the quarter came through as a credit. So it would — I wouldn't — it's more that it's essentially one-off; we wouldn't expect to repeat it — as part of that cleanup. But yes, you're right, it was about $7 million or $8 million, and therefore below what we believe the normal run rate would be for this year.
Yuri Lynk
analystI’ll turn it over now. Thank you.
Jeff Bell
executiveI appreciate that.
Operator
operatorChris Murray from ATB Capital Markets has our next question. Go ahead, please.
Chris Murray
analystThanks, everyone. Just a couple of quick questions. First, with the oil and gas sale now closed, is there anything we should expect that will change? I know you said we'll likely see some one-time gains in Q2 just to clean it all up, but any other color or update you can give would be great.
Ian Edwards
executiveOn the timing side, sure—our aim is to complete this during Q2. The buyer is very motivated, and so are we when it comes to closing. Naturally, these situations involve building consensus and securing approvals, and they hinge partly on outside parties. So a slip into Q3 isn't out of the question, though we see no warning signs—I'm referring simply to the financial side and how the transaction is structured. Jeff, would you like to address that.
Jeff Bell
executiveYes. I’d say there’s been no meaningful change whatsoever. We continue to anticipate a sizable non-cash revaluation, especially on the currency translation account. That said, as for the remaining portion of net assets in how we see the businesses, it’s mostly unchanged from a few months back.
Chris Murray
analystAll right, that's useful. Thanks. And then, I'm not sure — who'd like to field this one? But a question I keep hearing frequently is this: now that we're shifting away from building assets ourselves and becoming more of designers of assets, how should we think about Capital Group? I know you hold some strong assets there, and we've discussed the 407 Impasse as simply a solid deployment of capital. Still, the real question concerns creating further assets — I suppose, the non-407 capital business. Going forward, how do you see that fitting within the company?
Ian Edwards
executiveYeah, that's a great question, Chris, and I hope I can shed some light on it. I mean, we definitely view ourselves as partners with customers when it comes to delivering an asset. So to me, that involves designing the asset. It involves consulting and advising on what those assets ought to look like. It involves supervising the construction of an asset, and it also involves operating an asset. So all of those capabilities, as you're aware, have traditionally been very strong at SNC-Lavalin, and we're not going to stop doing those things. We no longer do lump sum construction, but we do all the remaining things to help our customers realize that they can aspire to deliver efficient assets. So, interestingly, the PPP market is shifting somewhat. What we're seeing in the middle portion of the construction element, in certain countries, is more collaborative contracts even. And if we see that, then certainly we're going to draw on our capital capability and invest in assets so that we can secure the design, project management, oversight, and operation work from it. Here in Canada, for instance, we're now partnering with construction companies so that we can serve as the designer and the operator, and we can hold part of the concession as an investor and obviously, once again, leverage all the capability that we've built over many years — we've actually been pretty good at financial engineering these things and delivering the whole project.
Ian Edwards
executiveSo a fair amount has come out of that since we exited our LSTK. That's a good question.
Chris Murray
analystAll right, I appreciate that. That is useful.
Ian Edwards
executiveI appreciate that.
Operator
operatorThe following question is from Benoit Poirier at Desjardins Capital Markets. You have the floor.
Benoît Poirier
analystYes. Thanks a lot, and it was a solid quarter. Turning to nuclear, there has been considerable conversation about nuclear power when it comes to the green transition. Would you speak to the pipeline of opportunities ahead of you across the main geographies?
Ian Edwards
executiveYes. Yes. Thank you, Benoit. I can. I think the first point I would make is that our nuclear strategy — new nuclear isn't really the central focus of it. I mean, if that happens, that's a bonus. And maybe I'll return to that. Because where we play, obviously, is in support to CANDU reactors around the world — that's an important part of the business. Extending the life of reactors, such as Darlington and Bruce, but also in decommissioning and waste cleanup and actually, where we see the biggest kind of short term growth — short term, three years is in actually the waste and environmental management, environmental cleanup of nuclear waste particularly in the US. The Department of Energy is really, you know, pumping a lot of funds into that with some very, very big programs to clean that up, but we're also seeing that particular in the UK, where decommissioning of the ageing fleet and waste cleanup put their Sellafield plant in the north of England is pretty big also. So, the real goal is plan that we've got, the biggest driver I would say is in naturally waste remediation and cleanup. Now, if and I think it's an issue as you said, the question marks out there, if nuclear becomes an acceptable form of clean energy in the global forum, then we will be absolutely there to sell our services and potentially even so we can do technology.
Ian Edwards
executiveStill, I'd say that isn't quite right just yet.
Benoît Poirier
analystAlright, alright, that's great. And on the LSTK project specifically, could you speak to whether there are particular key elements to keep an eye on, especially as the resource backlog runs down?
Ian Edwards
executiveNo, I mean, I think the jobs — the 3 jobs we've got; Eglinton, Trillium and REM. Those jobs are progressing well, but COVID is still having an impact. I mean, you know, we were looking at that — we're going to be out of COVID round about the summer. If you remember in the updates from previous quarters, we're still optimistic about that, you know what we're hoping the vaccines in Canada will bring us back to normality and we can get people to the projects and you know reduce social distancing and reduce the kind of number of outbreaks on the projects where we have to isolate part of the project. But certainly, what we're seeing so far in Q2, obviously the impact is ongoing. And but apart from that, we continue to negotiate with our customers to try and resolve the whole settlement around COVID, no real update there. It's going to take some time. No red flag, but it just take — these things take time that to kind of preserve.
Benoît Poirier
analystAll right, I really appreciate you giving me the time.
Ian Edwards
executiveI appreciate that.
Operator
operatorMichael Tupholme from TD Securities has the next question — go right ahead.
Michael Tupholme
analystThanks. Perhaps building on the previous question and answer about LSTK and the way you had planned for activity resuming in a manner more closely matching what you would historically have seen with regard to COVID — to what degree do you believe you'll then have to take further provisions should this end up being extended?
Ian Edwards
executiveSure — there are a handful of unknowns and some things still to unfold. First off, we really need to see how this summer plays out regarding productivity, and we factored that in as we headed into the summer. So right now there's no issue at all, but we do need to watch what the summer brings, I'd say from a productivity standpoint. Then there's the recovery of loss from our customers. As you're aware, we've adopted a very prudent stance on that recovery. We're fully confident we have the right to recover that loss. We recognize it takes time. This is fairly complex, and the proof of losses rests with us — the burden of proof is on us — so we have to make sure we pursue it and demonstrate the loss. So we don't expect it to take weeks; it's more of a month exercise, but if we begin to see some resolution there, that could be a positive. So there are a few moving parts, but no concerns at present.
Michael Tupholme
analystAlright, that's useful. Thanks. For my second question, I want to ask about the backlog in the EDPM segment — clearly the growth there is very strong, up 10% year over year. Could you discuss what makes up that backlog, and has its duration gotten longer, since that year-over-year growth is obviously quite strong? And bearing in mind that you're guiding to roughly low single-digit top line growth for EDPM this year, as well as for the other parts of SNCL Engineering Services, I'm just wondering how we ought to think about that backlog and its composition?
Ian Edwards
executiveYeah, I mean — so certainly, the UK is a robust market for us, with a number of wins, some solid wins. And the US is also a robust market, and we've had some solid wins there too. We — I think if you recall, we sort of revised our expectation about what we'd be able to win in the Middle East back in Q1 of last year. In fact, the Middle East is performing fairly well at present as well. But I think most of what you're seeing there is a very strong backlog. At this point it'll be the UK and the US. And this — the US business is up without the bias on investment, I mean it's up simply year-over-year in terms of volume in our particular end market. I mean, we're fairly focused on transport infrastructure in the US. And we view that as being quite strong. I think that — those, I mean, those are the key areas.
Michael Tupholme
analystRight, okay, perfect. And just to make sure I understand your answer there, Ian — the work you've been bringing in, does it extend across a longer stretch in terms of months of backlog compared with what you've perhaps seen historically? Are these bigger projects that will play out over longer periods?
Ian Edwards
executiveNot really. What I mean is, looking at the business mix, our EDPM business splits fairly evenly across consultancy, design, and project management of that kind. And most of those projects run under a year, and what we've observed has been fairly similar. I mean, not in a specific sense, no.
Michael Tupholme
analystAll right, that's everything. Thanks.
Ian Edwards
executiveI appreciate that.
Operator
operatorThe following question is from Sabahat Khan at RBC Capital Markets. You have the floor.
Sabahat Khan
analystHello, and thank you — good afternoon. Earlier you commented on, or were considering, ways to expand going forward, whether over quarters or years, in certain of your main markets versus the other geographies or end markets where you operate. I suppose my question is: what are your views on possibly looking at some end markets — the ones where you might lack a presence — through M&A, given that the approach has concentrated heavily on areas where you already hold a solid position? And is something like that part of the strategic plan, or is it more of a longer-term matter?
Ian Edwards
executiveOkay, so I can give you a sense of our thinking here instead of getting into a lot of specifics, though we'll share more detail in September. We've devoted considerable effort to making the business simpler and reducing our exposure to low-margin and, frankly, loss-making lines of work, and that has been a major area of emphasis for us across the last 18 months to two years. Where we sit today is mainly in three core geographies — the UK, Canada, and the US — with a strong focus on nuclear, social infrastructure, transport infrastructure, and government clients. We believe the choices that brought us down to those areas are the correct ones, since that's where we see growth coming from market size, as well as growth from SNCL level and market share. Take the US, for example — even there, our market share is fairly small, and we've put together a fairly detailed plan for how we'll grow our share in that market. If we think about Canada as well, this stretch during which we avoided taking on our LSTK work has slightly reduced our other services, so we have runway to return there.
Ian Edwards
executiveSo, regarding where we're putting our attention—I believe it's the right place. Do we require additional capacity via inorganic growth? Yes, and we are definitely examining that. But at this point, I'd say it's more about what we already have rather than exploring different markets and capabilities.
Sabahat Khan
analystThanks. Now for my second question: several competitors have discussed expectations for rising demand and the necessity of stepping up hiring, so I'd like to get a sense of how you're handling that area and what your intentions are for expanding headcount once demand strengthens?
Ian Edwards
executiveThat's a truly excellent question. In the strategic planning we're undertaking, the talent plan and the capacity plan are extremely, extremely important to the growth plan and to the strategy growth. So we think about it in three ways. And we think about it in terms of growing the talent. What talent do we need? How do we attract more talent? And obviously, we've done a lot of work on our culture, done a lot of work on our purpose and we've done a lot of work to improve the employee experience within the business and that's paid off for us both in not losing employees, but also being able to attract employees. But we also think about it in terms of building capacity through the move to digital tools and automated design and increasing our capacity from our digital transformation. So that's been an interesting journey over the last few years as well. And then lastly, we have been quite successful in building a very, very capable. Global Technology Centre out of India, which supports our businesses globally from a design and a 3D and a modeling perspective. So we think the answer is, not just more people we think that it's actually digital tools, offshoring, and doing things more efficient as well as more people.
Sabahat Khan
analystIf I could just slip one in quickly, and it follows up on what you said. In the ESG announcement this morning, I believe you mentioned that rationalizing buildings and facilities is part of the strategy. Is that a review that's underway right now and that we should expect an update on, or how far along are you with it?
Ian Edwards
executiveIs that real estate?
Sabahat Khan
analystRegarding real estate, yes.
Ian Edwards
executiveYeah, yeah, absolutely. Yeah, I mean, I mean we began prior to COVID. I mean, we were shifting toward a more flexible working setup and greater density in our offices before COVID. In fact, 2 of our largest UK offices have already made that move to more flexibility and more density. So like every company, I mean COVID sped up remote working, and we're going to keep raising density in our offices and aim to operate in offices with a greener footprint and to cut our running costs and the overall carbon footprint in the business.
Sabahat Khan
analystI appreciate that.
Operator
operatorDevin Dodge from BMO Capital Markets is up next with a question. Go right ahead.
Devin Dodge
analystOkay, thank you. So I have a few cash flow questions, perhaps directed at Jeff. To start, I understand there was a favorable resolution of a claim in the legacy oil and gas Division in Q1, and what I don't quite follow is whether SNC was able to keep that benefit, or whether that payment was passed along to the buyer as part of, let's say, the working capital adjustments at the time the transaction closes?
Ian Edwards
executiveRight. So that advantage remains ours as the — as essentially the present proprietor of that business. So it was encouraging to see. We did have — some ongoing true-ups in the remaining legacy oil and gas business partly counterbalanced that. But yes, you're correct, we received a positive settlement on that project, and that benefit is retained by us.
Devin Dodge
analystAlright. Alright. Glad to hear that. Alright. Now, moving on to another question. During the prior quarter, you mentioned a cash flow headwind of approximately $115 million stemming from DSOs and EDPM returning to normal levels, along with deferred tax payments, and I believe you noted that in Q1, DSOs dropped even further below their Q4 levels. How should we now view that cash flow headwind compared with the picture at the time you reported Q4?
Ian Edwards
executiveYeah, so I think we'd keep seeing things largely along the same lines as what we saw in Q4. You're right that we ended up in a good spot at Q1 — I'd say even a touch better than what we'd expected, and much of that keeps coming from the strong emphasis on cash flow and managing cash flow that we've been pushing into the business. But we'll see whether it's that reversal, which falls more in the remaining nine months of the year, along with the natural expectation of some of that DSO unwinding back, we do think it would land back roughly in the low-70s. So we think that headwind remains largely the same as it was at — that we discussed at the end of the year. Obviously, we'll need to watch how the quarters keep going forward and how governments react, but I think that's our view right now.
Devin Dodge
analystAlright, thank you. I'll hand things over now.
Ian Edwards
executiveI appreciate that.
Operator
operatorThe following question is from Mark Neville with Scotiabank. You have the floor.
Mark Neville
analystHello there, and good afternoon, everyone.
Ian Edwards
executiveYes. Mark, hello there.
Mark Neville
analystGood to see all the effort paying off. Turning to May — actually, I just have a handful of follow-up questions. Regarding the sale of the oil & gas business, I'd say timing matters less to me; what I'm really wondering is whether there are any major obstacles, risks, or milestones we should know about before that deal closes?
Jeff Bell
executiveNo. This is Jeff, and I might be able to give a little more detail there. Our stance on it is no. As Ian mentioned before, and also what we discussed back on February 9 — there are obviously several obstacles when it comes to regulatory matters and especially filings, plus the operational effort involved in separating the business, but in our view all of that is still on schedule. And although it's considerable work, we haven't encountered any specific warning sign or problem that we hadn't expected, so I think it mainly comes down to how much time it takes, and we're still aiming for the end of Q2, though as Ian said, some of those regulatory filings are not entirely within our control. So if, because of COVID or something else, it takes a bit longer, that could move, but we and the buyer are very focused on getting this done during the quarter.
Mark Neville
analystAll right. On the cash flow side, I understand there’s some lumpiness across projects, but is there a stretch of time during which these are cash uses, or will it just be this kind of quarter-to-quarter unevenness?
Jeff Bell
executiveYes, I believe it will stay somewhat uneven for a while — likely through 2021, certainly through that period. Obviously, as we work down the backlog further, the remaining work shrinks and keeps getting smaller, so naturally the quarter-to-quarter swings in variability should narrow too. In our view, Q1 was probably at the extreme edge of the lumpiness we'd typically expect, and going forward, even if it stays uneven, we wouldn't treat Q1 as representative of variability at that level. I'd say Q1 was somewhat unique.
Mark Neville
analystPerhaps regarding the real estate remarks in response to the question, I appreciate the flexible work arrangement aspect, but that point simply wasn’t clear to me. Do you believe there will be a chance to reduce your footprint substantially, or not?
Ian Edwards
executiveSo, yes — we do have a plan, and it's a clear one, for shifting our offices toward higher density. Our reference point for density, in fact, is the London office in Victoria, and, well, it's a genuinely strong office. There's flexible working there, and it follows that — how to put it — hot-desking, or the seat-based kind of approach, and it functions very well; staff are fond of it, since it's far more collaborative, considerably denser, and as a result cheaper to run than the offices we hold elsewhere across the globe. Now, as I mentioned, we've been working on this for a couple of years, so it came before COVID. And we've been carrying out that plan as leases have expired. And as we've sought to, well, renew leases and as we've sought to sort of swap out offices, that's when we aim to move to this model, with much greater density. And to some degree, COVID has sped that up. Now, obviously it will have a certain effect on the — on the SG&A, but within the broader picture, well, it isn't — it isn't what I'd call closely significant; I wouldn't describe it that way — Jeff, would you?
Jeff Bell
executiveApologies, my line was muted. No, I’d share that view. What I mean is, savings have already shown up, they’ll keep showing up during 2021, and we’d anticipate further savings ahead under the multi-year plan we have regarding our office footprint. So that represents a solid avenue for cost savings down the road, though as Ian put it, it isn’t — it isn’t earth shattering on the inside.
Ian Edwards
executiveWhat really matters here is how employees experience things. The feedback we've received from our people has been tremendously positive, and every one of us will be competing for talent. So these points genuinely matter.
Mark Neville
analystGreat. All right. Thank you, and congratulations once more.
Ian Edwards
executiveI appreciate it.
Jeff Bell
executiveAppreciate it.
Operator
operatorMaxim Sytchev from National Bank Financial has our next question. You have the floor.
Maxim Sytchev
analystHello, and good afternoon to you all.
Ian Edwards
executiveHello there, Maxim.
Maxim Sytchev
analystI just have a couple of quick clarifications, if I could. I'm not sure whether we've talked about the stopping before, but obviously peers report their revenue on both a gross and a net basis. I'm just wondering whether you guys have ever considered aligning with that kind of presentation at some point, so investors could actually see the implied clean EBITDA margin for the business, or maybe any thoughts on that front if that's possible?
Ian Edwards
executiveSure. Jeff, perhaps I'll pick that up. Max, we're — and this is something that we're conscious of, and it's something we're examining. We believe the EBITDA gross revenue metric we have is a solid one. One reason, not the least, is that we effectively assume both risk and profit risk on the project's gross cost, not merely the net cost and offence. That said, we're also reviewing the net revenue to EBITDA figure, and again might potentially return to it later today — around the Investor Day could be the right moment, as we begin thinking about multi-year financial metrics and targets, and how that might factor in.
Maxim Sytchev
analystAll right, okay. Since I figure that's clearly going to be useful, because everyone keeps bringing up figures like 15% or 16%, so it's a somewhat different range. And one quick thing about the free cash flow slide on page 15 — regarding the leases, are they included on a consolidated basis for cash flow, or do we need to make adjustments for them?
Ian Edwards
executiveYou see, in a way, the interest piece sits within operating cash flow. The principal part, effectively, isn't there — it belongs to financing cash flow, and that's where we'd keep it.
Maxim Sytchev
analystOkay, yeah, got it. So because it isn't adjusted, that means it doesn't apply to the second part, right?
Ian Edwards
executiveSure thing.
Maxim Sytchev
analystAll right, I'll leave it there. Thanks so much.
Ian Edwards
executiveI appreciate that.
Jeff Bell
executiveAppreciate it, Max.
Operator
operatorThat brings the Q&A portion to an end. Denis Jasmin, I'll hand the conference back to you for any closing remarks.
Denis Jasmin
executiveMuch appreciated, everyone, for being with us today. Should further questions come up, feel free to reach out to me. Have a good afternoon, and a really nice weekend as well — and stay safe, everybody. Thanks so much. Bye-bye.
Operator
operatorThat brings us to the end of today's conference call. You can go ahead and disconnect your lines now. Thanks for joining us, and have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.