Thank you for holding. I’m the conference operator. Good morning, and welcome to SNC-Lavalin’s conference call on the results for the third quarter of 2022. Please note that everyone attending is in listen-only mode, and this conference is being recorded. Following the presentation, there will be a chance to ask questions. If you’d like to join the question queue, press star then one on your phone’s keypad. If you require help at any point during this call, you can signal an operator by pressing star then zero. At this time, I’d like to hand the conference over to Denis Jasmin, Vice President, Investor Relations. Please go ahead.

Denis Jasmin

executive
#2

Thank you, Ariel. Good morning, everyone, and thanks for being on the call. We released our Q3 earnings announcement this morning, and a corresponding slide presentation has been posted in the Investors section of our website. A recording of today's call, along with its transcript, will be available on our website within 24 hours as well. Joining me today are Ian Edwards, President and Chief Executive Officer, and Jeff Bell, Executive Vice President and Chief Financial Officer. Before we get started, I'd like to ask everyone to keep themselves to one or two questions so that all analysts have a chance to participate. You're welcome to rejoin the queue for any follow-up questions. I'd like to direct your attention to slide 2. Comments made on today's call may contain forward-looking information. By its nature, this information is subject to risks and uncertainties, and as such, actual results may differ materially from the views expressed today. For more information on these risks and uncertainties, please consult the company's relevant filings on SEDAR. Those documents are also available on our website. Also, during the call, we may refer to certain non-IFRS measures and ratios. These measures and ratios are defined, calculated, and reconciled with comparable IFRS measures in our MD&A, which can be found on SEDAR and our website.

Denis Jasmin

executive
#3

Management thinks these non-IFRS measures give extra insight into the company's financial results, and some investors may use this information to assess how the company has performed from one period to the next. Now I'll hand the call over to Ian Edwards. Ian?

Ian Edwards

executive
#4

Thank you, Denis. Good morning, everyone, and thanks for being with us today. As I do each quarter, I'd like to begin by taking a moment to acknowledge the tireless work of our 33,000 employees around the world. I'd also like to formally welcome those who joined the company during the quarter. We're delighted to have you as part of the SNC-Lavalin family. Our core purpose is engineering a better future for our planet and its people, and we can only accomplish that thanks to the hard work and dedication of our people, whose contributions help us reach our long-term growth aspirations. I'm grateful for all that they do. With that, let's turn to slide 4. In the third quarter, we saw top-line performance continue to improve, with total revenues rising 4.5% year-over-year to CAD 1.9 billion, powered by the ongoing acceleration of our engineering services business. In the third quarter, backlog for our LSTK projects fell by a further CAD 164 million versus the second quarter, to CAD 664 million. As we move toward completing these projects — with the two Ontario projects on track to be largely physically complete by the end of the year — we remain confident in the financial risk estimates we laid out earlier this year.

Ian Edwards

executive
#5

SNCL Services brought in CAD 1.6 billion in revenue, an 8.2% gain versus Q3 of the prior year. If you strip out foreign currency effects, organic growth came in strong at 12.6%. Segment adjusted EBIT reached CAD 153 million, a 9.3% margin. We're particularly happy with how our engineering services business keeps delivering — it posted a record-high backlog for a second quarter in a row. These last two quarters make it even clearer that we can carry out our pivoting to growth strategy and push further into our core geographies, which keep showing resilient growth. Engineering services total backlog climbed to CAD 4.6 billion, up 20% year-over-year, with additional strong growth in the U.S. We've been deliberate about pivoting into particular core geographies and the markets we've chosen. This quarter's success further underscored the strengths of our pivoting to growth approach, and our growth opportunities are unfolding just as we planned. Our view remains that the strategy we've put in place is the best opportunity for SNC-Lavalin, and we expect to keep delivering on the goals we've stated. The macroeconomic environment is difficult and is expected to stay that way for the foreseeable future, but our business model remains resilient.

Ian Edwards

executive
#6

The public sector's emphasis on sustainable infrastructure and long-term energy solutions is what's driving this. Moving to slide 5. Our engineering services business kept up the momentum it has built over the past few quarters, turning in strong results in the third quarter. Business is still robust across our core geographies, as shown by organic revenue growth of 18.3% year over year, reaching roughly CAD 1.2 billion. Our steady quarter-over-quarter improvement underscores our capacity to capture market share and offers a clear roadmap for the growth prospects tied to sustainable infrastructure demand. Segment adjusted EBIT margin came in at 8.3%, and segment adjusted EBITDA over net revenue margin was 14.5%, both within our target ranges. In absolute terms, segment adjusted EBIT rose CAD 5 million year over year. Before I get into key wins, I want to say how proud I am of our teams for how quickly they responded to help the U.S. Emergency Relief Fund program, which FEMA set up to assist Floridians in need after Hurricane Ian. We send our best wishes to everyone still being affected by this disaster. In the third quarter, we continued to land significant wins across our core geographies: the U.S., the U.K., and Canada. We also saw demand rise in the Middle East, where we keep securing project wins in sustainable building development to support population growth in the region.

Ian Edwards

executive
#7

We saw a strong pickup in US backlog thanks to a number of government contract awards, particularly with the Department of Transportation for Infrastructure Development in Florida, Georgia, Colorado, and Texas. Those awards, along with others, pushed our backlog up to $4.6 billion — yet another record, and 20% above where we were as of September 30, 2021. As we look ahead, we're still optimistic about the long-term potential of our engineering services business. Our pipeline is still robust, and we're well-positioned to keep growing and to take market share as governments place more emphasis on sustainable infrastructure and renewable power alternatives. We also think the global energy transition now underway benefits SNCL — not just our nuclear and infrastructure sectors, but also mining and industrial, where demand for our services has risen significantly, including studies for new minerals extraction processes and engineering for new electric vehicle battery plants. Let me now turn to slide six and the results for our nuclear business. In the third quarter, nuclear revenues and segment-adjusted EBIT were comparable to the prior year, with slightly lower revenue offset by a slightly higher segment-adjusted EBIT margin. We're continuing to make progress on our Canadian refurbishment projects at Darlington and Bruce Power, and we're also seeing rising demand for life extension work on the CANDU reactor fleet worldwide.

Ian Edwards

executive
#8

With nations increasingly committing to net zero, we view that as a favorable driver for nuclear—a low-carbon means of generating electricity—and it signals a heightened emphasis on new build possibilities to supply base load power to a grid that is evolving and getting greener. We're also positioned well to take advantage of significant new build projects coming up along with small modular reactors, and there we're assigning more of our highly skilled engineers to billable work as we get our new build business ready for growth. We provide support for large reactor technology and keep working in partnership with Rolls-Royce on small modular reactor efforts. The chance to take part in nuclear projects is strong, including Sizewell C in the U.K. and the possibility of Cernavodă Units 3 and 4 in Romania. Going forward, the pipeline for potential growth in this area looks very robust. During the last three months, we have brought a substantial volume of fresh opportunities into the pipeline spanning every nuclear subsector—life extensions and refurbishment, decommissioning and waste management, and new builds. These top-quality prospects demonstrate the potential growth opportunity that lies ahead of us. Our technology and scale put us in position to lead the market in nuclear support and to enhance the long-term growth potential of SNC-Lavalin.

Ian Edwards

executive
#9

Turning to slide 7, in our O&M segment, revenue came in at CAD 124 million for the third quarter, with organic growth of 12.2% year-over-year. This business continued to post solid segment-adjusted EBIT of CAD 16 million — a 12.7% EBIT margin, which is well above our long-term target range of 5%-7%. Going forward, we've identified a number of opportunities in the U.K., the U.S., and Canada tied to building and road infrastructure improvements. As we make progress on our final LSTK project, we're also gearing up for O&M startup at the REM, Eglinton, and Trillium. We still see growth opportunities through our strategic partnership with key industry players, and by using our capital group to maximize bidding opportunities for future growth in core markets. Moving to slide 8, our Linxon business felt the impact of supply chain and manufacturing delays in the third quarter, with revenues falling to CAD 123 million — an organic revenue decline of 11.1% versus the third quarter of 2021. Segment-adjusted EBIT was CAD 2 million for the quarter. The Q3 and year-to-date margin sits below our long-term target of 4%-6%. So our main focus, beyond winning more profitable work, will be on performance improvement to make sure we hit our targets in 2023.

Ian Edwards

executive
#10

The opportunities pipeline continues to be strong, supported by substantial worldwide spending on grid infrastructure and renewable power. At the close of the second quarter, our backlog stood at CAD 764 million. That said, CAD 217 million in new orders have been added to backlog so far this year, and we expect more backlog growth in the fourth quarter, since we have landed several project wins after the quarter ended. If you turn to slide 9, in capital, third quarter revenues were up CAD 29 million and segment adjusted EBIT climbed to CAD 25 million, largely because of the dividend we received from Highway 407 ETR. That gain was partly offset by the earlier sale of our InPower BC investment, which took place in the first quarter of 2022. With COVID-19 restrictions in Ontario continuing to loosen, traffic trends on Highway 407 have been stronger, and traffic has now reached 88% of the pre-pandemic level. We collected a CAD 40 million dividend in the third quarter, and after the quarter closed, we collected a CAD 24 million dividend in October. Turning to slide 10 and the LSTK projects update: our backlog keeps falling at a solid pace, dropping year over year from CAD 1.2 billion to CAD 664 million, which is a 43% reduction.

Ian Edwards

executive
#11

In order, the backlog went down by 20% versus Q2. Segment adjusted EBIT is still being hit by the macroeconomic forces we have been dealing with for a number of quarters while we work to finish these projects — supply chain disruptions, elevated inflation, labor shortages, and the effect early in the quarter from an Ontario safety inspector strike. As we have said before, in our view these post-pandemic macroeconomic factors are largely recoverable under the contracts we hold with our customers, and negotiations to recover the losses are ongoing. We keep moving the majority of these projects toward completion at our cost, even though our customers have not paid for contractual issues where we hold a legal entitlement to compensation. Our cash flow shortfall this year has been significantly affected by not receiving those compensation payments, and we will keep actively pursuing claims for a timely recovery as we head into 2023. As you can see on slide 11, we have given, as in Q2, a more detailed update on the wind down of the LSTK projects. Two of the three Canadian projects, Eglinton and Trillium, are still on track to be largely physically complete by the end of the year.

Ian Edwards

executive
#12

REM is still advancing nicely and was more than 70% finished as of September 30, 2022. Through the year to date, we've recorded CAD 111 million in EBIT losses, and CAD 77 million of that ties to the CAD 300 million in overall financial risk needed to finish the LSTK projects, which you can see on the chart at the right side of the slide. The other CAD 34 million in losses comes mainly from overhead costs for managing those projects. As each quarter goes by, we get better visibility into what completion will cost for these projects, and we stay confident that any extra financial risk beyond what we've seen should stay inside the CAD 300 million envelope we first projected earlier this year. Before I hand things to Jeff, I wanted to call attention to our 2021 sustainability report, which came out on the 26th of September. Assisting customers in hitting their net zero carbon targets is a core part of what we do, and we aim to be seen as a global pioneer in sustainable infrastructure. We've demonstrated our capabilities via a varied track record spanning electrified light rail transportation and nuclear energy through to designing, building, financing, and maintaining projects aimed at transforming the built environment for a greener future.

Ian Edwards

executive
#13

We're putting money into digital innovation driven by data, which we think can create meaningful value for our clients — giving them more certainty about when projects will happen and what they'll cost, along with better operational efficiency and a smaller carbon footprint. By addressing worldwide demand for clean energy, cutting carbon from the built environment, lessening the effects of new infrastructure, and strengthening resilience against climate change impacts, we're helping to engineer a better future. Getting our customers to embrace clean power and renewable energy is an effort on a global scale that's expected to call for substantial investment over the next 30 years. None of this happens without the hard work and commitment of our people, and so far this year we've successfully brought in a net gain of 2,400 employees across the company, and we're investing further in their careers so they can advance through our global talent development program. It's an exciting moment to be part of SNC-Lavalin. With that, I'll hand things over to Jeff, who will go through the financial highlights.

Jeff Bell

executive
#14

Thanks, Ian, and good morning to everyone. If you’ll turn to slide 14, total revenues rose to CAD 1.9 billion for the quarter, driven by SNCL Services, which delivered its sixth straight quarter of positive year-over-year revenue growth, while LSTK project revenues kept declining as anticipated. Total segment adjusted EBIT came to CAD 134 million for the quarter, made up of CAD 153 million from SNCL Services, up 3% year over year, CAD 25 million from Capital, and CAD -44 million from LSTK projects. The adjusted EBIT margin at SNCL Services was 9.3%, within our 8%-10% target range. The negative EBIT for LSTK projects came from recognizing CAD 31 million in the quarter out of the CAD 300 million of potential financial risk we disclosed at our Q4 2021 results, plus CAD 13 million primarily from segment overhead costs required to support these projects. Corporate SG&A expenses from PS&PM were CAD 25 million for the quarter, consistent with our expectations and 43% lower than last year, since Q3 2021 included certain unfavorable estimate revisions. We still expect corporate SG&A expenses for PS&PM to be roughly CAD 100 million for full year 2022. Capital had CAD 7 million of corporate SG&A, consistent with last year and with our expectations.

Jeff Bell

executive
#15

For this quarter, IFRS net income from continuing operations came in at CAD 45 million, versus CAD 19 million in Q3 2021. That breaks down into CAD 30 million of net income from PS&PM and CAD 15 million from capital. Adjusted net income from PS&PM rose 29% net to CAD 52 million, or CAD 0.30 per diluted share, driven by lower corporate SG&A and higher segmented adjusted EBIT from SNCL Services, though this was partly offset by bigger losses on LSTK projects. Backlog stood at CAD 12.4 billion at quarter end, down from CAD 12.8 billion at the close of Q3 2021 — mainly reflecting a decline in LSTK projects as we keep executing our strategy of exiting LSTK construction contracts, partly offset by growth in SNCL Services. SNCL Services backlog grew to CAD 11.7 billion by the end of the quarter, and that included a 20% rise in the engineering services segment backlog even with a weaker British pound than in Q3 2021. This segment booked CAD 1.6 billion of work during the quarter, a very strong 1.4 book-to-bill ratio. Nuclear also delivered a solid quarter, posting a 1.2 book-to-bill ratio and finishing Q3 with CAD 859 million of backlog.

Jeff Bell

executive
#16

Moving to slide 15, at the close of September 2022, net limited recourse and recourse debt stood at CAD 1.5 billion, with the ratio of that debt to adjusted EBITDA at 3.3 times. That ratio sits above the 1.5 to 2 times target range we set for the end of 2024, but balance sheet strength and financial resilience rank among our core financial priorities, and we stay confident we will hit the target as the LSTK projects wrap up and we keep executing our growth strategy. Day sales outstanding for engineering services remains below the pre-pandemic level thanks to our ongoing cash collection efforts, and it was 65 days at quarter end. That said, it is above the level seen across the last four quarters, as client payment terms return to more normalized levels. Turning to slide 16 on free cash flow: net cash used for operating activities totaled CAD 159 million in the third quarter. SNCL Services kept generating positive cash flow from operations, at CAD 60 million for the quarter, while capital contributed CAD 19 million. Once you factor in cash taxes, interest, and corporate items — including payments for government fines, restructuring, and transformation costs, among others — the company used CAD 16 million of operating cash flows excluding LSTK, while LSTK projects used CAD 143 million.

Jeff Bell

executive
#17

For the year to date, SNCL Services produced CAD 213 million, and its operations brought in CAD 46 million of capital cash flow, whereas LSTK projects used CAD 369 million. Once cash taxes, interest, and corporate items are accounted for, net cash usage across the first nine months totaled CAD 421 million. As Ian mentioned, even though our clients have made no financial payment, we keep making solid progress on the LSTK projects that remain. Several external challenges keep affecting these projects, which forces us to fund the higher costs those events create. Our view remains that the clients bear responsibility for a large share of these added costs, and we are actively pursuing claims tied to the increased costs we have incurred. Talks with our LSTK project clients are still constructive and continue. Still, reaching a final resolution could take a while, and when it comes, the cash received in connection with it will add incrementally to the company's net cash from operating activities. In this year's final quarter, we anticipate that operating cash inflows from SNCL Services will be better than in Q3 and that operating cash outflows tied to LSTK projects will decline. With physical completion of two of these large infrastructure projects getting closer, we fully expect the cash outflows needed to finish them to drop substantially over the course of 2023, and as a result, cash flow to improve year over year.

Jeff Bell

executive
#18

Our targets over the longer term remain the same. We still anticipate that free cash flow conversion to adjusted net income will land in the 80% to 90% range by the close of 2024, consistent with what we have previously disclosed. Now if you'll turn with me to slide 17, my final slide, I'll discuss our 2022 outlook. With the year-end approaching, we are revising our 2022 outlook in three ways. First, consistent with my earlier comments regarding cash flow, we now anticipate net cash used in operating activities for the full year 2022 to be roughly CAD 300 million, while the fourth quarter should see positive net cash from operating activities. Second, because of our solid backlog and the strong results achieved so far this year in engineering services, we are increasing our outlook for SNCL Services organic revenue growth for full year 2022 compared with 2021 to a range of 5%-7%. Keep in mind that engineering services revenues in Q4 of last year benefited from a one-time favorable arbitration decision worth $93 million, which we do not expect to recur this year — absent that item, our 2022 revenue growth outlook would be even higher. Third, we are narrowing our outlook for the SNCL Services segment adjusted EBIT to segment revenue ratio for full year 2022 to a range of 8.5%-9%, consistent with the margin we have recorded year to date.

Jeff Bell

executive
#19

Every other financial outlook metric for the company for full year 2022 stays as it was. With that, I'll turn things back over to Ian.

Ian Edwards

executive
#20

Thanks, Jeff. Now on slide 19, I want to wrap up my comments by sharing a handful of main points. Things are going well in how we're running our core business, and we keep following through on the commitments we've made. We're posting solid financial results, with meaningful growth in backlog for engineering services in markets that hold strong potential, and we're reinforcing the pipeline of fresh business opportunities in nuclear positions as well as in our core markets. Our plan to exit the LSTK business is moving forward, and we're holding detailed discussions with customers to recover all the cash owed to us for work already finished. These recent results show once more how resilient our business is and how we can expand within today's macro environment. Our attention stays sharply fixed on carrying out our Pivot into Growth strategy while generating steady revenue and earnings that support SNC-Lavalin's long-term health. We sit in a strong position, with leading presence in our core markets of Canada, the U.S., and the U.K., and we bring global capabilities to local clients, providing distinctive end-to-end services over the entire life cycle of an asset, which makes us a partner of choice. Through the breadth and depth of what we can do, we generate value by reliably providing top-quality services and solutions to our customers.

Ian Edwards

executive
#21

There are substantial opportunities ahead of us. We can draw on our engineering services capability to help develop new infrastructure projects, and on our global nuclear expertise as public entities look for alternatives to support their energy security and net zero goals. We anticipate sharing more updates on how we are progressing in creating long-term value for all our stakeholders through our core growth drivers. Thank you. We will now open the call for questions.

Operator

operator
#22

Thanks. We're moving into the Q&A portion now. If you'd like to ask a question, just hit star followed by one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, lift the handset first before you press any keys. To pull your question, press star then two. We'll take a brief pause while callers get into the queue. Yuri Lynk from Canaccord Genuity has our first question. Go right ahead.

Yuri Lynk

analyst
#23

Morning to all of you.

Ian Edwards

executive
#24

Good morning, everyone.

Jeff Bell

executive
#25

Good morning, everyone.

Yuri Lynk

analyst
#26

Ian, I'd like to press a bit further on what you said regarding Eglinton and Trillium. You're still steering toward physical completion by year-end, yet those projects sit at 95% and 85% complete — identical figures to where they stood at the close of June. What's going on? At least on the percentage-of-completion figures, they don't appear to be advancing. Perhaps you could offer a little more detail on when these can actually finish up.

Ian Edwards

executive
#27

Yeah, sure. So actually, we brought in CAD 165 million of revenue during the quarter. Q3 is a solid period for getting physical work done. Obviously, it's late summer and the weather's favorable. So some extra work always tends to flow through too. That's likely why you don't see the net coming down. But the key thing with these two projects is completing the physical work. As we've mentioned previously, the risk assessments we've done and the risks we've been taking on throughout this year, and obviously in earlier periods, all center on finishing the physical work. So they're actually going well. I mean, both of these projects have moved along nicely. We'll be where we told you we'd be by year-end, and next year is entirely about bringing them into operation. Testing, commissioning, obviously, finishing the landscaping and that sort of thing once winter's over. By and large, these jobs are at the point we expected, and we feel good about where they stand. For sure, that CAD 300 million overall risk envelope we disclosed is definitely something we're confident we're inside of. You might have seen some media coverage about the opening date, and I'll speak to that as well.

Ian Edwards

executive
#28

Of course, when we actually open is going to hinge heavily on both our customers and our clients—specifically on when they feel confident that everything is in place to run these assets. We collaborate closely with them so that the handover into operation goes smoothly.

Yuri Lynk

analyst
#29

You keep bringing up physical completion.

Ian Edwards

executive
#30

Absolutely.

Yuri Lynk

analyst
#31

I'm going to assume this, so please correct me if I've got it wrong. As soon as physical completion has been achieved, the likelihood of significant unfavorable cost reforecasts going forward from that moment is very small—basically zero? How should we be thinking about the tail risk on these?

Ian Edwards

executive
#32

I'd say reduced — actually, I'd put it as substantially reduced, because completing these projects mostly involves the civil and building work tied to finishing the jobs. Once the physical work is largely done, the risk isn't zero, but it falls away considerably. What's left is mainly professional staff testing and commissioning the systems, bringing the systems online, getting the trains running, and bedding them in. The risk envelope looks quite different as we head into next year. That's the reason we keep emphasizing physical completion on those two jobs.

Yuri Lynk

analyst
#33

All right.

Ian Edwards

executive
#34

As we’ve noted in earlier quarters, clearly, the causes are hyperinflation, a shortage of labor, and the supply chain. All those risks, you know, have produced these cost overruns—and those overruns relate to carrying out the physical construction work, rather than to testing, commissioning, and bedding in the rail systems.

Yuri Lynk

analyst
#35

Understood. Second and final question, and it's a quick one for Jeff. Leverage rose by half a turn compared with the prior quarter. My sense is that if we see one more quarter like that, you'll be at or past your covenant. What I'm after is certainty about the cash you anticipate receiving in Q4, especially given what you said about clients failing to pay on those bigger contracts. Thank you.

Jeff Bell

executive
#36

Sure, no issue at all. From where we sit, our covenant ratios on the credit facilities leave us plenty of room, and we have a great deal of confidence about the direction we're taking in the fourth quarter. That confidence comes both from the cash the services business is generating and, as Ian mentioned, from the fact that as winter arrives and we get close to physical completion — especially on the two Ontario projects — we begin moving onto a glide path with reduced cash usage on those LSTK projects. I have no concern whatsoever about the state of our balance sheet or our cash flow projection going forward.

Ian Edwards

executive
#37

Ariel.

Operator

operator
#38

Jacob Bout from CIBC has our next question. Go right ahead.

Jacob Bout

analyst
#39

Morning, everyone.

Ian Edwards

executive
#40

Good morning, everyone.

Jeff Bell

executive
#41

Good morning, everyone.

Jacob Bout

analyst
#42

I’d like to return to what we discussed about the LSTK project and ask how much time you expect it will take to resolve those claim recoveries at Eglinton and Trillium. I realize you mentioned that talks are still underway, but how long do you figure it will take to get them worked out? What is really the bottleneck there?

Ian Edwards

executive
#43

Look, we're obviously disappointed that we haven't clawed back some of that loss in 2022, and that is the primary reason behind the revised outlook on operating cash that we've issued. Clearly, the ideal route to settle these compensation payments is negotiation. That isn't the sole option. Other paths exist — dispute resolution, arbitration, or even litigation — though those would ultimately take more time. Our efforts are going into negotiating with our customers. It's obviously complicated, and our customers mostly represent government, so they need to be confident that whatever compensation gets paid is justified and correct. While we're disappointed we didn't get that resolved in 2022, and obviously with 2 months remaining, we've had to reassess our ability to recover it. We're really focused on trying to get this done in 2023. Now, a negotiation always involves 2 people and 2 parties, so I can't give, you know, a guaranteed outcome, and I can't give you a guaranteed timeline, but we're working really hard to get that cash back. Because obviously every claim that gets settled is a cash upside. We want to get this company back to a normalized cash position as soon as we can.

Ian Edwards

executive
#44

Clearly, leaving LSTK in the past is a piece of that.

Jacob Bout

analyst
#45

So where's the biggest constraint at the moment?

Ian Edwards

executive
#46

It really comes down to how big the problem is. We're not talking about minor figures here. It's the intricacy of the data, plus the demand from government bodies that they be able to grasp and satisfy themselves that the choices they're making when settling these claims represent the correct judgments and the correct settlement judgments. While I do understand our customer's perspective, this is extremely frustrating on our side, because every bit of time required to settle these claims comes at our expense. We're finishing these jobs at our own cost, and we're not, you know, talking only about the losses that were incurred in 2022. We're also talking about losses that were incurred in earlier periods. It's a frustrating process, but we simply have to keep pushing, and hopefully we'll reach an amicable resolution with our Ontario customers.

Jacob Bout

analyst
#47

Alright. My next question concerns the engineering services sub-segment within SNCL Services. With a book-to-bill of 1.4 times in Q3, it appears you are building considerable momentum in the U.S. Could you discuss what is fueling that growth and whether you are seeing expansion into new areas across the U.S.?

Ian Edwards

executive
#48

Yes. I mean, clearly, we're very happy with the go-forward portion of this business. We safeguarded it across the recent years as we worked through that transformation, and we entered the pivot to growth strategy 12 months ago when we laid it out at our investor day. It's really gratifying that we're delivering on it. Sixth quarter in a row of year-over-year growth. You know, Q3 growth in engineering services of 18%. I mean, that is, you know, that's genuinely encouraging. The three core geographies where we've positioned this company are providing a highly sustainable pipeline of opportunities that fits our specific capabilities. We can win work because we're, you know, we're bringing those capabilities to our customers in a market with strong demand. I mean, as you mentioned, the U.S. is especially encouraging because we had this very defined land and expand strategy to not only keep succeeding in specific states, but also to carry that success into new states. That strategy is paying off. You know, a solid share of the growth that you've seen in the backlog in engineering services, with a record backlog at CAD 4.6 billion, has actually come out of the U.S.

Ian Edwards

executive
#49

as part of that approach.

Jacob Bout

analyst
#50

Excellent — I appreciate it.

Ian Edwards

executive
#51

I appreciate that.

Operator

operator
#52

Chris Murray from ATB Capital Markets has the next question. You're up.

Chris Murray

analyst
#53

Morning, everyone, and thanks — appreciate it.

Ian Edwards

executive
#54

Good morning, everyone.

Chris Murray

analyst
#55

Ian, thinking back to your Investor Day, you discussed future growth a little. And I appreciate that in your prepared remarks you touched on the pivot toward an organic growth strategy. But part of that was also about M&A, and maybe some balance sheet caution is how I'd put it — perhaps you being hesitant on M&A. But is there a point where you could likely become more active on M&A, and is it still, as you set out at the Investor Day, still aiming to pursue either the land-and-expand approach in the U.S. or tuck-ins in the U.S.? Or is something shifting in how you view M&A growth?

Ian Edwards

executive
#56

No, no. I really don’t believe there’s been any fundamental shift in how we allocate capital. Especially when it comes to the point you raised about land and expand in the U.S. I mean, obviously, until we generate free cash flow, we’re still just in the preparation stage, and we’re actually devoting a fair amount of effort to that preparation stage. You know, those efforts require substantial pre-work and pre-analysis to figure out which targets are available and which will be the most accretive for us, so that we can use them as a base to build upon. Obviously, at this moment, we don’t have the free cash flow to deploy. Maybe, Jeff, you could just restate our capital allocation priorities.

Jeff Bell

executive
#57

Right. So, I think, as you've heard from us, the balance sheet takes top priority as we get back to generating positive free cash flow later on. At the same time, we'd be seeking chances to put capital to work to speed up the strategy and growth even more. Alongside that, we'll be examining what that means regarding shareholder returns — both in terms of whether we truly have acquisitions compelling enough, but I think also, clearly, it depends on where the share price sits and whether we see a meaningful discount to the company's intrinsic value. We'll obviously be considering both of those when we reach the stage of putting capital to work past the balance sheet.

Chris Murray

analyst
#58

Okay. Is it reasonable to believe that you're holding off until the LSTK is behind you—or at least until there's some resolution on the Ontario projects—before that's a fair thing to consider? Or would it be driven purely by the numbers on the cash flow statement?

Ian Edwards

executive
#59

Chris, what's the situation on M&A?

Chris Murray

analyst
#60

Yeah—or, well, essentially, that's right.

Ian Edwards

executive
#61

Yeah. I mean, no, I believe there is a certain amount of overlap in this case. I mean, clearly a fairly sizable portion of the company's people are dedicated to LSTK execution and to recovering LSTK costs via the claims, and that group is extremely focused on it. You have another set of people whose focus is, you know, expanding the company going forward and moving the company ahead, plus an M&A group and a group, especially within the U.S., that are examining how that will look down the road and getting ready for it. There is a bit of overlap in that respect, but without question, we're approaching everything in what you could call a step-by-step manner.

Chris Murray

analyst
#62

Okay, that's fair. My other question is this—if you wouldn't mind going into a bit more detail on Linxon. When I consider some of the regions where they operate, I'm mainly thinking about Europe, but if you think about a part of the world that likely requires energy infrastructure assistance urgently, that region certainly comes to mind. Could you perhaps explain what you'll be capable of doing in the near term to improve those margins? Any longer-term thinking regarding some of the—maybe it's the war in Ukraine and some other problems there—and Europe and its energy challenges, how does that factor into all of this?

Ian Edwards

executive
#63

The way I'd put it is that the market out there is much bigger than what we're able to serve. The market is really strong, and it's strong around the world. North America, Europe, the Middle East, and Asia too — the market is strong because nearly everyone is trying to upgrade their transmission and distribution, and Linxon, of course, sells substation-type services into that upgrade. We don't think we have a problem winning work and growing the business. As you rightly point out, we're disappointed with the margin profile. We've set an EBIT range that we believe is achievable, 4%-6%, and that is actually a good EBIT range given how much flow-through work runs through this business, but we need to reach it. Our focus is going to be on winning profitable work, mainly in Europe and North America, so it fits with the overall strategy of asset development and lifting those margins and improving how the business performs. In fact, we've got a real drive on that with the team right now.

Jeff Bell

executive
#64

I think maybe Ian could add to that — this relates to the second part of your question, Chris — which is that when we consider Europe more broadly along with energy security, that really ties in strongly with the nuclear business and the nuclear capabilities we have there. That applies both from a potential new build standpoint — whether that means assisting EDF with the next project or being a key member of EDF's team on the next new build in the U.K. — or indeed our CANDU reactor technology, which currently has two stations in Romania, with the potential for two more, and on which we've seen a lot of good progress. As Ian says, we think there's a great deal of market opportunity there.

Chris Murray

analyst
#65

Okay, that helps. Thanks.

Ian Edwards

executive
#66

I appreciate that.

Operator

operator
#67

We'll take our next question from Devin Dodge at BMO Capital Markets. Go right ahead.

Devin Dodge

analyst
#68

Thanks. Good morning. Could you help us get a clearer picture of why the operating cash flow guidance has come down in steps since the update you gave us back in August? I'm having a little difficulty squaring that extra CAD 200 million of cash flow usage this year with what I'd call a fairly modest bump in that CAD 300 million maximum downside bucket.

Jeff Bell

executive
#69

Sure, Devin — let me take that one. There are really a couple of pieces to it. You can think of part of it as tied to claims we haven't been able to negotiate with our customers. As Ian mentioned, we saw success on that front in prior years. We've had good, constructive discussions with clients, but we simply haven't reached resolution within the year the way we expected earlier on, back in August. The second piece is that we're seeing higher costs. Beyond the absolute losses we see on the projects themselves, costs have come in a bit above that, and we believe we can recover some of that, so we book it as revenue. As a result, costs are running higher too. It's partly one thing and partly the other that has really driven us to that CAD 200 million.

Devin Dodge

analyst
#70

All right, thank you for that. Perhaps staying on cash flow for a moment — looking at slide 16 in the deck, it appears SNCL Services is using a fairly significant amount of working capital. In fact, it's nearly comparable to, you know, the drag coming from LSTK, both in Q3 and on a year-to-date basis. Could you discuss what's driving that, and whether you expect part of it to reverse in the quarters ahead?

Jeff Bell

executive
#71

Yes. That pattern has been building across the past several quarters. The main reason for it, Devin, is that DSO has been climbing from what we'd view as an unusually low point during COVID. It's moving back toward a more typical figure — closer to 70 days outstanding, instead of the high 50s to 60s we'd been posting in earlier quarters. Another factor behind it is honestly the very substantial growth rate in the services business, especially engineering services. When revenue speeds up like that, you inevitably get a working capital drag, since it accumulates in WIP and receivables before being billed and converted to cash. So that's why we've guided to expecting stronger cash flow in Q4, services included, as some of that normalizes and the cash starts coming in. Thanks for that. I'll turn it over.

Ian Edwards

executive
#72

Appreciate it.

Operator

operator
#73

The following question is from Benoit Poirier at Desjardins Capital Markets. You may proceed.

Michael Kypreos

analyst
#74

Morning, everyone.

Ian Edwards

executive
#75

Good morning, everyone.

Michael Kypreos

analyst
#76

With regard to the Florida situation and Hurricane Ian, since you have a couple of joint ventures along with exposure on FEMA work appraisals, is it reasonable for us to anticipate a positive contribution of some kind in the quarter ahead?

Ian Edwards

executive
#77

Yeah, I mean, I think part of the increase in the U.S. in Q3 came from the FEMA work we won. Obviously, with this disaster relief work, we need to deploy people fast, and we have to locate people throughout the business to support FEMA. We did that. Obviously, that work is still going on. It'll likely continue through Q4 and perhaps even into next year. Yeah, I think that's a reasonable assessment.

Michael Kypreos

analyst
#78

Perfect, and thanks for the added detail. On free cash flow specifically, as we look ahead to 2023, would you say a complete turnaround is plausible, or is it more reasonable to anticipate a steadier, step-by-step recovery, since the timing of when governments might sit down at the negotiating table remains unknown?

Jeff Bell

executive
#79

Yes. Jeff, as Ian mentioned and as you’ve heard, it’s difficult for us to say precisely when we’ll be able to settle these various claims with the government or the client. We remain hopeful that we can resolve them through negotiation and do so in 2023, but we’ll have to see. Regardless, as we move into 2023, as I said in the presentation, the two Ontario projects will be largely physically complete this year and will move mostly into testing and commissioning next year. By definition, that will lower the costs and the quarter-over-quarter cash flow usage they require. So because of that fact alone, as the projects complete and ultimately go into service, we do expect a clear improvement in cash flow over the course of 2023.

Michael Kypreos

analyst
#80

That’s great. Thanks. I’m grateful for the time.

Jeff Bell

executive
#81

I appreciate it.

Ian Edwards

executive
#82

I appreciate that.

Operator

operator
#83

Frederic Bastien with Raymond James has our next question — the floor is yours.

Frédéric Bastien

analyst
#84

Morning, everyone. As we're all aware, central banks have lifted rates quite forcefully of late, and that has produced a marked shift in the interest costs you incurred this quarter. Could you remind us what portion of your debt carries a fixed rate as opposed to a floating one, and broadly what the terms look like on that? Thanks.

Jeff Bell

executive
#85

Yes, Jeff. Over the course of this year, we've taken some steps to convert debt that was largely floating rate—some of it—into fixed rate debt. I'd say right now it's roughly two-thirds floating and one-third fixed, 75 to 25, somewhere in that neighborhood. As for every 1% increase in interest rates, we provide some disclosure, as we did at the end of the year in our financial statements. With CAD 1 billion of floating rate debt, economically, 1% would be about CAD 10 million pre-tax.

Frédéric Bastien

analyst
#86

All right, Jeff, that clears things up. I don’t have anything else. Thanks.

Ian Edwards

executive
#87

Appreciate it.

Operator

operator
#88

Maxim Sytchev from National Bank Financial has the next question — go right ahead.

Maxim Sytchev

analyst
#89

Hello there, and good morning to you both.

Ian Edwards

executive
#90

Morning, everyone.

Maxim Sytchev

analyst
#91

I have a quick question about engineering services, since it seems to me that EBIT margins have compressed compared with a year ago. I'd like to understand the various moving pieces involved—perhaps you could say something about wage inflation and similar factors. Yes, thank you.

Jeff Bell

executive
#92

Yeah, Max, I believe what you were mainly asking about was engineering services. There are a few pieces to that, and then maybe I'll hand things over to Ian so he can say a bit about wage inflation. First, we did have an arbitration settlement last year, and that gave the margins a boost, you know, last year. I think roughly 8.9% last year versus 8.3% this year. Some of that was in there. Second, the decline in the pound has been mostly offset by, you know, how strong the U.S. dollar has been year-over-year, but not completely. There's a little bit in there where we're seeing some drag from FX. Those two things account for most of that gap in the year-over-year comparison, kind of. It, you know

Ian Edwards

executive
#93

Right. Wage inflation by itself, especially within engineering services, really has no effect on profitability or margin levels. The explanation is that, for the most part, the engineering services business runs on a short cycle. On average, the backlog gets used up across nine months. So you're continuously rebidding work and continuously winning work. A fairly high share of that work is also reimbursable, and obviously the inflation around wages gets passed through there. Even earlier, in other periods of high inflation that we've witnessed, we've generally not observed margins deteriorating. I think it's really those other aspects that Jeff has spoken to.

Maxim Sytchev

analyst
#94

Okay, so how should we be thinking about this in a directional sense? I mean, clearly you've brought the guidance down relative to what some had been expecting for 2022. When it comes to 2023 and beyond that, with some of the cost initiatives and optimizations, how should we be thinking about those going forward?

Jeff Bell

executive
#95

Yes. So Max, as is our usual practice, we'll return at Q4 to lay out guidance for 2023 — similar, I'd expect, to what we did here in 2022. We'll give probably a better perspective at that point. What I'd say is that we do have cost transformation programs underway. We're pushing those, especially in this environment, given the amount of inflation we're seeing. There's a lot of focus on how we manage the cost base, obviously, particularly from an overhead perspective. We'll keep aspiring to drive margins higher up in our range. We'll come back and give better perspective on that in 2023 at Q4.

Ian Edwards

executive
#96

Right. As we've mentioned a few times, consistency is really our core focus. We want to stay consistent, of course. We always aim for the top end of our ranges, but growth matters most, and our attention is on expanding these businesses.

Maxim Sytchev

analyst
#97

Okay, one final question to fit in about operating cash flow and the way it rises and falls, particularly looking at next year. So do you feel we're shifting free cash flow generation out to 2024, and that there's essentially no possibility of it occurring next year, again because of that uncertainty over when payment from the government will come? Or what's your thinking at this stage of the year? Thanks.

Jeff Bell

executive
#98

Right. Maxim, as I mentioned before, the legacy projects will be mostly physically finished by the end of this year or early next year. We do expect cash flow usage to begin improving clearly as those projects complete through, certainly, the first half or so of next year. If you look at slide 16 in the presentation, as we get to quarters where there's little or no drag from the LSTK projects, particularly later next year, the rest of the business is a consistent free operating cash flow generating business. I think it really is tied to—ignoring when we get amounts back from government—it's really about, as we complete those projects, we would start to believe we're entering a period of seeing free cash flow generation. I don't think we necessarily see that as being in 2024 or having to wait that long, but we'll continue on this path in 2023.

Maxim Sytchev

analyst
#99

Okay, so on REM — no worries at all when it comes to the payment terms, right?

Jeff Bell

executive
#100

Actually, the way that contract is structured is such that—

Ian Edwards

executive
#101

No

Jeff Bell

executive
#102

You know, we haven’t really encountered the same problems in that respect.

Ian Edwards

executive
#103

Our projects are moving along quite nicely, in fact.

Maxim Sytchev

analyst
#104

Alright. Alright, that's excellent. Many thanks. I'm finished.

Ian Edwards

executive
#105

I appreciate it.

Operator

operator
#106

The next person to ask something is Michael Tupholme from TD Securities. Go right ahead.

Michael Tupholme

analyst
#107

Thanks. Morning, everyone.

Ian Edwards

executive
#108

Good morning, everyone.

Jeff Bell

executive
#109

Good morning, everyone.

Michael Tupholme

analyst
#110

Jeff, could you speak to what we should expect for non-cash working capital changes in Q4? You know, a seasonal reversal frequently occurs, but I'm not certain whether all the things you've described regarding the LSTK projects and their timing have a bearing on that this year and in some way change it. Your thinking on that would be useful.

Jeff Bell

executive
#111

Honestly, I'm not certain we'll see a major shift in non-cash working capital, or in that pattern from an LSTK standpoint. As Ian mentioned, we keep funding the cost of these projects. We'd anticipate that pattern persisting absent reimbursement, or additional reimbursement, from the client. I doubt that pattern will change. On your services point, historically we do usually see non-cash working capital come down as we reach the latter portion of the year. I can't recall who posed the question, but with revenue rising quickly, especially in engineering services, that produces roughly a quarter's lag in turning that extra revenue into actual cash. We'd expect that to begin normalizing in Q4 and into the early part of next year. For that reason, all else being equal, I'd expect non-cash working capital to improve.

Michael Tupholme

analyst
#112

All right. Taking everything into account for Q4, do you have a perspective on whether, on a net basis overall, you'd come out positive — or is that not something you can say?

Jeff Bell

executive
#113

Right. Like I mentioned during the presentation, given where we stand at nine months, our expectation is that we'll be operating cash flow positive in the fourth quarter, even with LSTK, when you consider our guidance of an overall usage of CAD 300 million.

Michael Tupholme

analyst
#114

All right. Could you then discuss how you expect leverage and the leverage ratio to develop going forward — I suppose toward the close of this year, but also, more specifically, as we head into next year? And any targets you've set, along with the timing for reaching them.

Frédéric Bastien

analyst
#115

Is it still intact, or has anything shifted?

Jeff Bell

executive
#116

No, I really don't believe we're seeing any meaningful change on that front. Like I mentioned, there's still a very clear route for us to land inside the 1.5 to 2 times target range in 2024. It does move around somewhat from one quarter to the next and from period to period. You can see that if you look back at the end of last year, for example. Over time, I'd certainly expect that ratio to get better, and we'll see where things stand at year-end. As I said, we still have a great deal of confidence in our balance sheet and in our ratio right now. The real effect is simply from the LSTK losses that we're experiencing as we work to wrap up those projects, especially when it comes to physical completion.

Michael Tupholme

analyst
#117

All right, that's excellent. Thanks very much.

Operator

operator
#118

Sabahat Khan from RBC Capital has our next question. You have the floor.

Sabahat Khan

analyst
#119

Hello there. This is really more of a question about the operating environment. Could you perhaps say a few words regarding the U.K.? From what I understand, the government there is also carrying out a capital review, so I'd welcome your thoughts.

Ian Edwards

executive
#120

Yes, absolutely. So we are certainly keeping a close eye on the U.K., and we're working to track how the situation develops. That said, we believe our particular business is in fact fairly resilient, in our view, to whatever austerity measures might emerge. The explanation is that we operate a highly diversified business throughout the U.K. There are many different services we provide to a range of end markets. Among the markets we serve, nuclear and transportation are two of the largest areas. We also have a presence in water, defense, buildings, and places. Much of that skews toward government, though not everything sits in capital projects. Our view is that it's likely the bigger capital projects that could be pushed back — probably not scrapped, but possibly delayed. Since we provide a substantial volume of services, from consultancy, or we provide a substantial volume of services tied to running assets like water, rail, and road, clearly the operation and maintenance of those assets must carry on, and the funding for that must carry on as well. Another encouraging factor, I'd say, is the dedication to the energy transition, and especially the shift toward nuclear in the energy transition.

Ian Edwards

executive
#121

We’ve got a substantial number of people working at the Hinkley Point nuclear power station, and we remain very hopeful that Sizewell will be announced before long. A large position at Sizewell has already been pre-negotiated by us, and that is going to drive our business forward in a very meaningful way. Overall, I think we need to watch that situation really carefully. As you’ll have noticed earlier in the year, we brought Baroness Ruby McGregor-Smith onto the board as a board member. That gives us genuinely valuable insight into the market. We believe we can take a resilient sort of approach to whatever headwinds we encounter in the U.K.

Sabahat Khan

analyst
#122

All right, that’s excellent — thank you so much for that.

Ian Edwards

executive
#123

I appreciate it.

Operator

operator
#124

That wraps up the question and answer portion. Now I'd like to hand the conference back to Denis Jasmin, who may have some closing remarks.

Denis Jasmin

executive
#125

Thanks a lot, everyone, for being with us on this call today. Should anything else come to mind, feel free to reach out to me. Enjoy the rest of your day and a wonderful weekend. Many thanks.

Jeff Bell

executive
#126

I appreciate that.

Ian Edwards

executive
#127

I appreciate that.

Operator

operator
#128

That brings us to the end of today's conference call. Your lines can now be disconnected. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.