Good morning, and thanks for joining the AtkinsRéalis Fourth Quarter 2023 Results Conference Call. Just a reminder that everyone is in listen-only mode and that this conference is being recorded. Following the presentation, you'll have a chance to ask questions. <<operator_script>> At this point, I'd like to hand the conference over to Denis Jasmin, Vice President, Investor Relations. Please go ahead.

Denis Jasmin

executive
#2

Thanks, Aria. Morning, everyone, and thanks for being with us today. If you're on the phone, we'd encourage you to pull up the slide deck we've posted in the Investors section of our website — we'll be referencing it throughout this call. There's also a webcast of today's call. Joining me are Ian Edwards, Chief Executive Officer, and Jeff Bell, Chief Financial Officer. Before we get started, I'd ask each of you to keep it to one or two questions so that all the analysts get a chance to participate. Feel free to rejoin the queue for any follow-ups. I'd like to point you to Slide 2. Anything said on today's call may include forward-looking information. By its nature, that information rests on assumptions, risks and uncertainties, so actual results could differ materially from the views expressed today. For more detail on those assumptions, risks and uncertainties, please see the company's relevant filings on SEDAR+. Those documents are also available on our website. In addition, during the call we may reference certain non-IFRS financial measures. Reconciliations of these amounts to the corresponding IFRS financial measures appear in our earnings release and MD&A, which you can find on SEDAR+ and our website.

Denis Jasmin

executive
#3

At this point, I'll hand things over to Ian Edwards. Ian?

Ian Edwards

executive
#4

Thanks, Denis. Morning, everyone, and I appreciate you being with us today. At AtkinsRéalis, 2023 proved to be an outstanding year and marked a turning point as we repositioned the company. The new brand we unveiled last year stands for a dynamic organization focused on cultivating a strong culture and delivering excellence to our clients. We finished the year with solid Q4 results, which underscored considerable demand worldwide for our engineering, project management and nuclear expertise. We kept reducing the company's risk and substantially increased our revenues. AtkinsRéalis Services posted revenue growth of 20%, with organic revenue growth of 18%. The ratio of segment adjusted EBIT to segment revenue came in at roughly 9%, propelled by strong top-line performance throughout our businesses. Backlog at year-end stood at about $14 billion, another record high for the company. We also kept successfully bringing in high-quality talent during 2023, which reflects our core purpose and values. Our total headcount grew by 4,200, excluding the impact of the sale of the Scandinavian Engineering business. If you turn to Slide 4, we're proud of last year's results, since we met or exceeded every one of our most recent guidance targets.

Ian Edwards

executive
#5

One thing that stood out was how we managed to produce positive cash flow in the latter half of the year. That went beyond what we had anticipated. The outcomes we saw in the third and fourth quarters give a signal of what our business can do in terms of generating cash in 2024 and beyond. When it comes to our people, we remain sharply focused on further cultivating a best-in-class culture at AtkinsRéalis. That effort is bearing fruit, since one gauge of employee engagement rose 300 basis points, reaching 87% by the close of 2023. We also earned recognition in a number of publications, among them top 50 employers in the UK for gender equality. In the fall, we published our 2022 Sustainability Report, which spotlighted many achievements tied to our core purpose of delivering a better future for the planet and its people. Those include elevating our TCFD framework reporting and announcing the Global Parity Alliance, an initiative centered on advancing equality, diversity and inclusion. Looking back on 2023, none of what we accomplished would have been possible without the hard work and dedication of our employees. Leading such an amazing group of talented professionals makes me very proud and humbled. Last, we are putting forward our 2024 full year financial outlook, and Jeff will go through it in more detail shortly.

Ian Edwards

executive
#6

We expect 2024 to be another solid year, with revenue continuing to grow and profitability remaining strong—plus positive cash flow generation that is both stronger and more consistent. Moving to Slide 5, I'd like to highlight a few points from our fourth quarter. Revenues at our AtkinsRéalis Services business hit a quarterly record of $2.2 billion. Organic revenue growth rose by 25%, and segment adjusted EBIT was up 29%. We set another record for backlog this quarter, which came to $13.7 billion at year-end—evidence of the demand for our services and of our capacity to keep securing high-quality wins in our core end markets and geographies. Net operating cash flow was strong at $273 million in the fourth quarter, thanks to continued growth across our AtkinsRéalis Services businesses and solid working capital management. We closed the year at 1.8x net debt-to-EBITDA, inside our target range of 1.5x to 2x, and we reached that result a year ahead of what we forecasted when we launched our pivoting to growth strategy. It's been a little over two years since we introduced this strategy, and the results of this past prove it is working. It has driven substantial growth across our businesses and puts us in a good position for further long-term value creation.

Ian Edwards

executive
#7

We’ve been taking careful, deliberate steps toward becoming a top-tier, fully integrated professional services and project management firm. This year’s accomplishments make me very proud, and I’m eager to demonstrate our strategy and bring you up to date on it during the Investor Day in June. Slide 6 shows how our backlog has grown throughout AtkinsRéalis Services. The 16% increase in the fourth quarter compared with the fourth quarter of last year came from major wins in our core Engineering Services and Nuclear operations. We keep securing such major wins throughout many of the end markets where we do business, such as CANDU life extension nuclear work in Romania, airport runway safety work in the U.S., transportation work in the UK, social buildings in Canada, and our recent selection to plan the world’s largest modern downtown in Riyadh, Saudi Arabia. These projects make up only a modest portion of the enormous opportunity pipeline for AtkinsRéalis in the end markets where we operate. On Slide 7, you can see that our Engineering Services business keeps generating strong organic revenue growth, with a 27% rise year-over-year in the fourth quarter. That revenue growth came from our continued capacity to land new wins throughout our geographic scope.

Ian Edwards

executive
#8

For the quarter, segment adjusted EBIT margin came in at 9.6%, while segment adjusted EBITDA over net revenue margin was 16%. Our backlog keeps growing and is now roughly $5.4 billion, which is 16% higher than what it was on December 31, 2022. Slide 8 gives you more detail on how Engineering Services is growing in each of our core geographies — the UK, the U.S. and Canada — along with our other targeted geographies. Demand for what we do remains strong, driven by the need to replace aging infrastructure and to deliver clean, affordable and secure energy solutions. In the UK and Europe, we keep landing key wins by drawing on our end-to-end capabilities, supporting defense and growth through infrastructure and water facility development. The pipeline for contracts in transportation, digital and technology projects, plus a number of design and project management projects, is still robust. Our position in the market, particularly our leading edge in the UK, puts us in a good spot to win bigger, higher revenue projects as our capabilities gain recognition across the geography. In the U.S., we're seeing a high volume of work orders as major metropolitan areas look for design and project management services. The pipeline of transportation infrastructure projects especially remains strong.

Ian Edwards

executive
#9

A big push is underway to put money into water infrastructure and renewable energy via the IIJA and IRA government spending programs, and that has worked in our favor as well. On top of that, we see powerful tailwinds in the minerals and metals market, and where we sit gives us an edge over competitors, positioning us to bring in more revenue from that sector. In Canada this quarter, we built up our backlog with better-quality wins and renewables master service agreements involving clients we've worked with for a long time. To execute on that larger backlog, our focus has been on drawing in and keeping strong talent. The culture we're building continues to be a valuable draw for candidates, and that has led to growth in our employee base in Canada. Energy transition remains overrepresented in both our existing client base and our prospect pipeline, and our solid track record of delivery in the power and industrial end markets keeps helping us land new mandates. Let me turn now to Slide 9 and walk through the results of our Nuclear business. We're still showing robust growth, with organic revenue up 22% last quarter versus the fourth quarter of 2022. Our Nuclear backlog stands at $1.9 billion, a 98% increase compared with our backlog as of December 31, 2022.

Ian Edwards

executive
#10

The new build and refurbishment contract we signed this year is what's behind this, and it really underscores the significant long-term growth potential for our Nuclear business. In the quarter, operating margin came in at 15%, which is at the top end of the 13% to 15% range we target. On Slide 10, we're highlighting what we've achieved in each of the nuclear services we offer. During 2023, we made exceptional progress in winning new build contracts. Public sector entities around the world that are focused on a cleaner energy future keep recognizing our capabilities. Back in November, we made a major announcement to the world when we unveiled our newest reactor design, the 1,000 megawatt CANDU MONARK reactor. We did that at the World Nuclear Exhibition in Paris. Large scale nuclear reactors are increasingly in demand to decarbonize power grids, generate stable baseload power and strengthen energy security. MONARK represents the evolution of proven CANDU technology, which delivers affordable, reliable, carbon free power and has a decades long global track record of consistent delivery and operational effectiveness. As a follow-up to introducing MONARK, last week we announced an agreement with ACL to collaborate for the purposes of successfully deploying CANDU reactors in Canada and internationally. Looking across our core markets, we see a continued increase in the pipeline of opportunities for large and small nuclear renewables, both domestically and internationally.

Ian Edwards

executive
#11

To give you an example, in January the UK government said it would put an extra $1.7 billion toward continuing early-stage work on the Sizewell C nuclear plant — one more sign of their plan to spend on a more sustainable energy future. The life extension work we have underway now, along with the opportunities in the pipeline, is still very robust. In Ontario, we remain actively engaged on the CANDU life extensions at Darlington and Bruce Power. And over in Europe, we are involved in engineering, tooling and procurement for the CANDU retube and refurbishment program at Serban Voda in Romania. A strong pipeline of opportunities for CANDU reactor life extensions, both at home and abroad, is still what we see. Turning to waste management and decommissioning, we are making more progress on projects in the UK and the UAE. And in the U.S., we have a solid pipeline of prospects together with National Security Administration. For AtkinsRéalis, the growth opportunity in nuclear is significant over both the near term and the long term, and demand for our services keeps rising year-over-year. Across the globe we are continually drawing on our capabilities so we can be a trusted partner to public entities as they pursue net zero goals. Now let's move to Slide 11 and our O&M and Linxon businesses.

Ian Edwards

executive
#12

In the fourth quarter, revenue from our O&M segment came to $130 million, which was roughly consistent with the fourth quarter of 2022, since greater revenues from the start of a portion of the REM project were offset by a contract completed in 2023. The segment's adjusted EBIT margin stood at 9.5%, and it remains above the long range target of 5% to 7%. Lower costs and improved efficiencies across several of our contracts drove EBIT growth. In the fourth quarter, our Linxon segments posted 29% year-over-year organic revenue growth, and full year revenues finished 1% above 2022. Backlog at the end of the quarter totaled $1.4 billion, 63% higher than the fourth quarter of last year. This quarter's results, especially the backlog improvement, highlight the current and long-term growth potential of this business across many of its geographies. Our strategic review of Linxon is now complete, done together with our joint venture partner Hitachi Energy. It remains our view that the market for supplying and installing electrical substation equipment is attractive and growing, as countries look to decarbonize and electrify. Linxon is one of only a handful of global suppliers and is well-positioned to win work, as evidenced by the success in '22 in growing both the amount and quality of its backlog.

Ian Edwards

executive
#13

But the fixed-price installation project approach at Linxon is no longer aligned with the strategy for the go-forward business at AtkinsRéalis. So we've reached agreement with our partner Hitachi Energy that we'll seek to exit our shareholding in Linxon by looking at sales to third parties — someone who can take advantage of the value creation opportunity that Linxon's position in the market represents. We're actively working on this exit with our partner's support, though it's too early to say how long a successful exit will take. In the meantime, we'll keep working to strengthen operational delivery, resilience and capabilities at this business. Turning to Slide 12 and our LSTK projects and capital business. Commissioning and testing at our Ontario LSTK projects is proceeding as planned. Our backlog fell this year by roughly 50% to $365 million, mainly reflecting the REM project, which is still progressing well. As we complete the LSTK projects for our clients, we're continuing to pursue claims we believe are owed to us, and those discussions with our clients are ongoing. On our capital business, fourth quarter EBIT rose by $10 million, or 22%, largely because of higher dividends received from our ownership of Highway 407.

Ian Edwards

executive
#14

As we've demonstrated, 2023 marked a turning point for AtkinsRéalis. We anticipate another robust year of expansion in 2024. In this concluding year of our strategy to pivot toward growth, we're likewise expecting solid delivery of operating cash flow and earnings. And so that our worldwide capabilities can be deployed more effectively on a local basis for our clients, we've put a new operational structure in place. Within this structure, the segment previously known as Engineering Services and O&M will be combined and overseen through four regions: Canada, United States and Latin America, United Kingdom and Ireland, and Asia, Middle East and Australia. Beyond that, we've established a permanent COO office, which Phil Hoare, former Head of Engineering Services, will lead. I'm truly excited to have Phil serving in this role so that our operating model can be successfully optimized throughout the company. This is going to assist us in fully harnessing our capabilities and in driving operational excellence as we work toward margin expansion. With that said, I'll now hand things over to Jeff for a discussion of our financial results.

Jeff Bell

executive
#15

Thanks, Ian, and good morning to all of you. If you'll turn with me to Slide 15, revenues on a total basis rose 20% for the quarter, reaching $2.3 billion, versus Q4 2022. At AtkinsRéalis Services, revenue came in at $2.2 billion — that's 24% above the same quarter in 2022, or 25% when measured on an organic revenue growth basis. Total segment adjusted EBIT for the quarter stood at $232 million, a figure well ahead of Q4 2022, made up of $201 million from AtkinsRéalis Services, $55 million from capital, and negative $24 million from LSTK projects. The adjusted EBIT margin at AtkinsRéalis Services was 9.4%, an improvement of nearly 40 basis points over Q4 2022 and right within our target range of 8% to 10%. Corporate SG&A expenses from PS&PM climbed to $35 million this quarter from $24 million, driven largely by costs tied to the company's rebranding, as we flagged on our last earnings call. Our expectation remains that the final one-third of the $30 million total rebranding spend will be incurred during the first half of 2024. Consequently, we expect corporate SG&A expenses from PS&PM to land at roughly $110 million for the full year 2024. IFRS net income from continuing operations for this quarter was $90 million, compared with a loss of $54 million in Q4 2022.

Jeff Bell

executive
#16

That figure broke down into $46 million of net income from PS&PM along with $44 million of net income from capital. For the quarter, adjusted EPS from PS&PM came in at $0.45 per diluted share, versus negative $0.31 in the fourth quarter of 2022. Turning to Slide 16, you'll find selected financial metrics for the full year. Revenues on a total basis rose 14% to $8.6 billion for the year, up against 2022. AtkinsRéalis Services revenue came to $8 billion, which is 20% above the prior year, or 18% when measured on an organic revenue growth basis — surpassing the top end of our most recent outlook. For the year, total segment adjusted EBIT climbed 85% to $766 million, made up of $712 million from AtkinsRéalis Services, $113 million from capital, and negative $59 million from LSTK projects. Restructuring and transformation costs fell to $49 million for the year, compared with $83 million in the prior year. In 2024, we expect those costs to keep coming down. Net financial expenses totaled $186 million for the year, driven mainly by higher interest rates. We anticipate lower expenses in 2024, largely reflecting forecasted debt levels that are lower over the coming year. IFRS net income from continuing operations came in at $287 million, significantly higher than in 2022.

Jeff Bell

executive
#17

Adjusted net income from PS&PM came in at $274 million, equivalent to $1.56 per diluted share. For 2023, our income tax rate on adjusted PS&PM net income stood at roughly 19%. We anticipate that rate rising in 2024, moving nearer to the Canadian statutory income tax rate of 2020, which is 26%, pushed by several changes — among them, the expectation that we will fall under the Pillar 2 global minimum tax rules starting January 1, 2024. Backlog closed out the year at $14.1 billion, up 13% versus the end of 2022, and we saw strong book-to-bill ratios across Engineering Services, Nuclear and Linxon. Turning now to Slide 17 and free cash flow: net cash from operating activities was robust this quarter, amounting to $273 million, which delivered positive cash generation for the second half of 2023, in line with what we expected. That quarterly cash flow let us bring debt down by $311 million relative to the position at September 30, 2023. The main drivers were strong services EBITDA delivery along with working capital management. In 2023, AtkinsRéalis Services produced operating cash flows of $804 million. Once you factor in cash taxes, interest, corporate items and capital, we generated $477 million of operating cash flow for the year, and $66 million after the cash used by LSTK projects.

Jeff Bell

executive
#18

So if you add back the federal and provincial charges, then strip out capital expenditures and lease liability payments, our free cash flow for 2023 came in at negative $28 million. On top of that, we brought in $179 million from proceeds on sales of businesses and investments within our Engineering services and Capital segments, mainly thanks to the divestiture of our Scandinavian business. As we look ahead, we expect continued revenue and EBITDA growth in 2024 from the services businesses, along with significantly lower cash outflows from the LSTK projects, and on that basis we anticipate net cash generated from operating activities for the company should exceed $400 million for the full year 2024. Keep in mind that we expect cash generation to be weighted much more heavily toward the second half of the year. We're also anticipating a higher level of CapEx for 2024, in the range of $140 million to $160 million, since we believe we'll be investing in development of the CANDU MONARK nuclear reactor. Our view is that this investment will lay the foundation for future growth in nuclear revenue, as demand for low carbon, reliable power generation remains a high priority for many governments around the world. With the expectation that the company's operating cash flow profile will keep improving in 2024, we remain committed to achieving investment grade financial metrics, and we also see the ability in 2024 to begin deploying free cash flow for the benefit of our strategy and our shareholders, as outlined in our pivoting to growth capital allocation framework.

Jeff Bell

executive
#19

Now if we go to Slide 18 and look at the balance sheet — gross debt stayed steady while EBITDA rose considerably in 2023, so leverage came down to 1.8x, inside our target band of 1.5x to 2x, which is a year ahead of the 2022 to 2024 guidance we originally gave. Thanks to ongoing work on collecting cash, days sales outstanding for engineering services remain solid, at 52 days when the quarter closed. Let me move to my last slide, Slide 19, and give a summary of the 2024 outlook. With a healthy backlog and a solid pipeline of opportunities, organic revenue growth is expected to land between 8% and 10% for the Engineering Services region and between 12% and 15% for our Nuclear business, each measured against 2023. In addition, we expect the Engineering services region segment adjusted EBITDA to net revenue margins to fall between 15% and 17%, and the Nuclear segment adjusted EBIT margin should stay within 13% to 15%. Also, much as in 2023, we do expect cash flow and profitability to carry more weight in the second half of the year. That said, I'll pass the presentation back to Ian.

Ian Edwards

executive
#20

Thanks, Jeff. I feel a great deal of pride in what we achieved during 2023. It was an excellent year, with important wins throughout our businesses in every one of our main regions. Our backlog, which set a record, underscores the considerable runway we have for expansion and the strong appetite for what we offer. As public entities pursue change through energy that is clean and secure and swap out infrastructure that has aged, they will keep looking to AtkinsRéalis as the partner they can trust. Above all, we have a workforce that is strong, committed and expanding, and that workforce helps us reach our targets. Every day I am grateful for their dedication and hard work, which bring the world AtkinsRéalis's broad capabilities. And with our new organizational structure, we will be able to deliver all of those global capabilities locally to our clients, while our new brand reflects our fresh identity as a dynamic, transformed organization. We are eager to share further specifics of the long-term outlook with you at our Investor Day in Toronto in June, and we hope you can be there with us. With that said, let's begin taking questions. Thank you.

Operator

operator
#21

The opening question is from Michael Doumet at Scotiabank.

Michael Doumet

analyst
#22

Honestly, across all of these results, really well executed. I thought maybe I'd begin with the LSTK just to clear up a few points. Perhaps you could just speak to why the loss came in somewhat higher there this quarter? What's driving the backlog increase? And finally, should we be thinking that the losses there will mostly be wrapped up in 2024?

Ian Edwards

executive
#23

Sure. In Q4, the loss came in a bit above the run rate we'd maintained across the year. Even so, nothing much has actually shifted. What we told you at the close of 2022 still holds: the Ontario projects had reached physical completion, and what remained on those two difficult jobs was largely Engineering Services plus administrative-style work. And what we discovered — our way of putting it — as we reached the end of 2023 is that the opening dates for both railways have in fact slipped. That slippage stems from many factors, a good number of them being decisions made by the customers. Whether they enter operation isn't ours to determine, yet we still must close out every aspect of the job, covering all the paperwork, testing and commissioning. The extra loss recorded in Q4 reflects our forecast of when those projects will now enter service, along with a forecast of every cost required to finish those jobs. Our attention is now firmly fixed — and will stay fixed — on recovering what we lost. We've consistently maintained that the problems we encountered during COVID, and other non-contractual obligations we had to deal with as challenges, represent losses that can be recovered.

Ian Edwards

executive
#24

Those are things we'll keep going after. As for the outlook, we stated that an overhead expense will be incurred through '24 at roughly $10 million per quarter. That's our view of it. Still, by and large, what we laid out a year back has unfolded the way we anticipated. The REM project remains with us, and it has consistently moved forward very well, and nearly all of the backlog you're seeing at present is in fact rent based rather than tied to the Ontario projects. As it happens, I spent a day at each of those projects a couple of weeks ago, and they are fantastic projects. I mean, every station is finished, the trains are operating. I actually rode the train from one end to the other on the Trillium project, and it will be a magnificent asset in Ottawa, as will the Eglinton project in Toronto.

Michael Doumet

analyst
#25

Moving on now to those extra disclosures we got on Slide 24. By my calculation, you can plainly see EBIT margins in Canada more than doubled in the second half compared with the first half. I'm just curious: of the total 100 basis points of margin improvement you're guiding to in Engineering Services for 2024, how much comes from Canada versus some of the broader operational excellence initiatives you have underway?

Ian Edwards

executive
#26

That is a great question, and it really lets me walk through our thinking here. First, expanding margins matters enormously for making this business as strong as it can be down the road, and that is exactly where our attention sits. We are in the middle of a journey of improvement. The places we need to improve are quite specific, both by geography and by business line. A lot of this business runs at really strong margin levels. Nuclear, for instance, leads the industry. But certain parts of our business—and Canada is one you mentioned—sit within an improvement program. That program is sharply targeted at the particular things we know must change, whether that is profitability, whether that is win rates, whether that is clients, or whether that is strengthening our capability within a given sector, and we are concentrated on exactly that. One more point I would likely make: where we see a business that cannot be placed on an improvement program and brought to where we want it, we will take decisions about it. You saw that happen with the Scandinavian business, and now you have seen it with the Linxon business.

Ian Edwards

executive
#27

Our attention is squarely on reaching the correct position.

Operator

operator
#28

Jacob Bout from CIBC has our next question.

Jacob Bout

analyst
#29

I had a few questions about the organic revenue growth guidance you gave. First, for Engineering Services, you're referring to 8% to 10% for '24. The fourth quarter was nearly three times that. I'm just trying to get a sense of how much of this reflects conservatism. Is it simply harder comparisons in '24? A little more detail there would be useful. And then perhaps you could comment on how you expect the shaping to look across the year, with the margin profile declining as we move through the year?

Ian Edwards

executive
#30

And clearly, we've issued guidance of 8% to 10% for the Engineering Services business, and we're much more bullish on the Nuclear business, at 12% to 15%. We had an absolutely exceptional year in 2023 — we're very pleased and very proud of it. But we really have to ask whether that is sustainable over the long term. And obviously, we're looking very closely at our markets, at the backlog, and at win rates. And I think the way we see our markets, they're being fueled by the energy transition, where we're seeing a big commitment toward expanding the electrical energy grid, particularly with clean energy and affordable energy. We're looking at an energy transition, decarbonizing buildings and transport, which is also fueling that infrastructure replacement in the U.S., funded by IIJA, and resilience work for weather events and flooding and disaster relief. So those three things are really driving our markets. But as we see those things driving our markets, we're also seeing — and we have seen in the UK — a bit of a change of focus in government policies, in terms of moving away perhaps from transport to an easy transition as they refocus their investment and their funds and their budgeting.

Ian Edwards

executive
#31

What we're doing here is genuinely weighing every one of those aspects and examining what we can definitely deliver through the outlooks we've laid out there. And I think we feel good that those ranges are very achievable, and obviously we'd be aiming to perform at the top end of those ranges.

Jacob Bout

analyst
#32

Now regarding the shaping question, as the year progresses: the first half comes in somewhat stronger than the second.

Jeff Bell

executive
#33

From a revenue standpoint, I think what we'd expect is solid growth during the first half, with that carrying over into the second half. As Ian mentioned, once you look much further out in the year, your visibility into precisely how projects will take shape gets thinner. We've taken that into account in how we're viewing revenue. Then on profitability and cash flow, the pattern we see looks a lot like what we've had over the last year or two, with the weighting toward the back half of the year, and we anticipate the same in 2024.

Jacob Bout

analyst
#34

And then, perhaps to follow up on that, just in terms of geographic mix, what level of variability do you anticipate in '24 when we look at, say, the U.K., Europe, the U.S., and Canada?

Ian Edwards

executive
#35

I mean, honestly, the forces at work differ from one of those markets to another, yet we are seeing fairly robust potential for growth in all of them, perhaps for separate reasons. Take the UK: solid water, solid defense, solid nuclear energy transition. In the U.S., solid on resilience, solid on transportation, still replacing aging infrastructure. And in Canada, energy for certain, building the ecosystem around clean energy materials such as EV batteries, and then transport. So it varies somewhat by geography, but we have a very targeted approach in our strategies and our tactics so that we keep growing in each. So no real difference among them.

Operator

operator
#36

Yuri Lynk from Canaccord Genuity has our next question.

Yuri Lynk

analyst
#37

Solid quarter. I’ll follow up with one more question about the guidance. For services, your EBIT margin goal for 2022 to 2024 is 8% to 10%. I’m just wondering whether what you’ve laid out for 2024 suggests a shift beyond that range.

Jeff Bell

executive
#38

It's Jeff, and I'll take that one. As I think you could tell from our guidance, we're starting to shift that guidance toward EBITDA to net revenue. Regarding the Engineering Services regions, we've raised that from the initial Engineering Services guidance you'll recall, which was 14% to 16%, up to 15% to 17%. So as Ian mentioned, we clearly see a chance to keep pushing margin improvement. And in fact, if you look at some of the detail on Slide 24 that the earlier caller brought up, you can see that a number of our regions are at, or a bit above, the top end of that range on an EBIT to gross revenue basis. I think we'll keep seeing that during 2024, with certain regions performing at that level. Others, as Ian has noted, are on an improvement plan, and obviously, on the whole, we'd expect the weighted average to keep getting better.

Ian Edwards

executive
#39

What I'd add is that we have a very granular understanding of precisely where improvement is needed. We've examined customers, geographies, and end markets in depth to pinpoint where different actions are required so we can reach the position we're aiming for. And to bring that into the business, creating this Chief Operating Officer's office was essential, giving us a horizontal lens and a set of KPIs to drive those improvements. Those metrics span the cost base, productivity, win rates — all sorts of measures at a fairly detailed level that Phil will lead horizontally. And obviously, vertical accountability and the geographies still sit with our presidents. But we know what needs doing and we have a plan for doing it — that's the message I'd give.

Yuri Lynk

analyst
#40

I was just trying to make things simpler for myself with that question about the consolidated EBIT margin, since you're folding in the O&M segment together with Engineering Services, or else blending net and gross revenues. Still, it does appear that the margin guidance for Engineering Services has been raised—though correct me if I'm mistaken, O&M is more of a business with a 10% EBITDA margin that you're combining with Engineering Services, right? And what you end up with on the other side is an even higher margin?

Ian Edwards

executive
#41

That's our view too. The O&M business has been doing well since we've shifted it toward being driven by engineering rather than facilities management. At this point it's nearly all engineering led. So it genuinely fits within the Engineering Services business, at comparable margin levels. So you're absolutely right.

Yuri Lynk

analyst
#42

And for the final question, I'd like your perspective on the MONARK news. I believe we can all agree nuclear is a sector that progresses at a very slow pace. It's definitely one where catching up has been shown to be rather challenging. And I think that's exactly the position you're in at present with this design. I mean, it's new. Rivals are already out there in the market. How does shifting from the conception stage to actually securing licensing for this thing, with all its safety certifications and so forth, match up with the most probable purchasers of it, who are located in Ontario?

Ian Edwards

executive
#43

Right. So the big edge CANDU technology gives us is that the Canadian government has put investment into it across seven decades. And as you're aware, we acquired the rights to the product in 2012, along with sole rights to the IP, though Canada still holds ownership of it. The MONARK really represents a coming-together of the investments made prior to our acquiring the product rights. So there was a gigawatt reactor. It had gone through multiple phases of development and investment. We're reviving that. We're adding the safety features that are required today. We're digitizing it, and we're pulling it all together. In fact, the investment needed, in terms of what we foresee to bring that to market and get it licensed, is comparatively modest versus beginning from a blank piece of paper. It's almost a no brainer to do this. We've conducted extensive research into what we believe is the most competitive scale for a large nuclear reactor, and we believe it's a gigawatt. I think beyond that, to speak about the domestic market, we know what our customers want there, and we need to be ready to deploy it when they need it, and that's what's driving this investment.

Ian Edwards

executive
#44

Still, as you can see, developing this doesn't call for a large amount of investment on a year-over-year basis. Our timeline — and it will hinge to some degree on securing domestic orders — is roughly 3 or 4 years to carry this through to licensing. Even so, we would expect to be booking orders and bringing in revenues before the license is granted.

Yuri Lynk

analyst
#45

Is that three-to-four-year estimate contingent on regulators treating this as an evolutionary design? And if instead they see it as a completely new design, what then — wouldn't that scenario stretch out much longer?

Ian Edwards

executive
#46

No. The regulator is absolutely involved throughout this process. Products aren’t simply handed over to the regulator and then reviewed by them. This is a parallel effort. We collaborate alongside them in parallel to reach the licensing stage. As a matter of fact, that’s already underway.

Operator

operator
#47

Devin Dodge with BMO Capital Markets has our next question.

Devin Dodge

analyst
#48

Ian, to build a little on that previous question: during your prepared remarks, you mentioned the agreement with AECL. Could you give us some background on the reasons that agreement was required and the benefits it ought to deliver for AtkinsRéalis?

Ian Edwards

executive
#49

Absolutely. To begin with, the intellectual property rights belong to us, and we had to be completely certain that those rights—and the manner in which the agreement is structured—stay with AtkinsRéalis permanently and continue to be available and exclusive to us. We simply wanted to go back over the agreement because, with any agreement, there are always enhancements that can be made. Before we began putting money into the project and the MONARK, we wanted to ensure we made those enhancements and achieved full alignment with AECL on the strategy for moving CANDU technology forward. And we have accomplished that. What I mean is, I view AECL as a genuine asset for developing the product and marketing it around the world and internationally, and so is the Canadian government, which in the end holds ownership of the technology. So that was the purpose behind it. As you observed, we issued a solid announcement. We received backing in that announcement from the federal government. We are all essentially in agreement on what needs to be done here.

Devin Dodge

analyst
#50

And then last night, the DOE handed a big cleanup contract to a competitor of yours. I believe Atkins is part of one of the expiring contracts. Look, we understand this kind of work gets done through a consortium, and it's understood to be paid off of JV income. But can you quantify how much earnings came from that expiring — I guess, the Hanford tank operations contract? And just was that — how did the wind down of that contract factor into the margin guidance for nuclear in '24?

Ian Edwards

executive
#51

Yeah. So no — look, we remain quite confident in our outlook and quite confident about growth in nuclear, whether or not that contract comes through. Obviously, we're disappointed. I mean, it's a solid contract, and winning it would have been nice. But remember, we doubled our backlog in 2023 in the nuclear business, which makes us really happy and gives us that strong sense of confidence for the 2024 outlook. And when you miss out on these jobs — these are Tier 1 jobs, whether it goes straight to the DOE — but when you miss the Tier 1 piece, the secondary market opens up around supporting that Tier 1 contract. So we'll shift focus now to what we call Tier 2 work, which means supporting the DOE and the winner, actually. So overall, no material impact across the year, though of course it's disappointing.

Operator

operator
#52

Chris Murray from ATB Capital Markets has our next question.

Chris Murray

analyst
#53

Let me return to a few points about free cash flow and some of the moving pieces here. First, you mentioned briefly the possible sale of Linxon and the exit from the JV. Just to confirm, Jeff, that $400 million in available cash flow you're referring to — it doesn't assume any proceeds from the JV, correct? And on that same topic, regarding the timing of cash flow, could you speak a bit about your ability to deploy capital and what the timeline would look like for an M&A?

Jeff Bell

executive
#54

Yes, so to address the first part of what you asked: no, we aren't assuming any proceeds from a possible lease sale or anything along those lines. That would come on top of the guidance we've provided. And our thinking is that, having gotten to the balance sheet and leverage metrics we reached at the close of 2023 — which, as I mentioned, is clearly within the target range we'd originally projected we wouldn't hit until the end of 2024 — we expect the business's natural cash flow generation in 2024 to keep us at or below that 2.0 leverage ratio. So because of that, we believe it opens up the possibility of small tuck-in or bolt-in acquisitions, or returns to shareholders as well. We therefore see an opportunity to pursue that across 2024, whenever the right opportunities come along.

Chris Murray

analyst
#55

Along those same lines, what I'm also trying to get at is this: when it comes to initial tuck-ins, could you say a bit about where the pipeline of possible opportunities stands at the moment? I know that in some cases you've mentioned it might not involve buying a company — it could simply be opening a new office. You've noted, for example, that there's plenty of white space in the U.S. to work on. Could you just describe where you see the opportunity set? And for instance, if you had extra capital — say you could recycle it out of something like Linxon — does that mean that instead of perhaps waiting during the second half, you could speed up some of those opportunities, maybe bringing them earlier into the year?

Ian Edwards

executive
#56

I mean it's very much a core element of the land and expand approach in the U.S., and that approach always required both organic and inorganic growth. And to address your point about M&A, we're already concentrating on pinpointing potential targets for U.S. M&A. Now, that's not tuck-in acquisitions at the outset. We expect to be able to convert one or two of those this year. It's likely to be the second half of the year. What's good about the U.S. market is that it's very much centered on individual states. There's a range of sizes of companies that perform the work we do. And our intent is to build a foothold in additional states and then connect all of that with our broader team, where we're operating at Tier 1 and land and expand. I mean, ultimately, our aim is to be a top five player in the U.S. with a coast-to-coast business operating in the Engineering Services space. Once we've gotten onto this cycle of M&A and building capability and making sure we can integrate successfully, we'll keep doing that at an increasing amount of scale. But we really do want to take a step-by-step approach to it, though we actually want to get on with it this year with the funds that are now forecasted to be available.

Chris Murray

analyst
#57

Then for my second question, digging into the MD&A detail on the breakdown: I think, going back to an earlier question, Canada really stands out because Engineering Services margins there are considerably below the other regions, right? I suppose there are a couple of parts to this. First, was there anything unusual — say a one-off item or a specific project that caused you trouble in Canada that we perhaps missed given how the reporting was structured? And then, maybe to expand a bit more on what you said about working to fix things within the office of the COO: what exactly do you believe has to happen in Canada to bring that up to what you'd consider a peer-type margin, or even a margin profile roughly similar to the rest of the business?

Ian Edwards

executive
#58

There are several factors at play. I couldn't point to any single major issue in Canada that required correction. Several items come to mind. Let me mention a couple. Your cost structure always matters, and we've restructured the operation. As you can see, we now have a dedicated President overseeing the entire Canadian business under Stephanie Vaillancourt. Regarding the kind of work and the customers, we were taking on many very small jobs with low profitability, and shifting from that toward focusing on bigger opportunities we identify in the market takes some time, because you have to burn off the existing backlog, which consists of low-margin work, and swap it for higher-quality backlog. We're well along in that effort, and the plan is progressing very, very well. On productivity, I mean bringing the business up to the same productivity levels as our other operations, ensuring that staff and people have the right capabilities and support. So not any one thing, but we're confident we'll get where we need to be.

Operator

operator
#59

Michael Tupholme from TD Securities has our next question.

Michael Tupholme

analyst
#60

To follow up a bit on that final question regarding the expected margin gain, Ian, you mentioned productivity. Could you describe where you stand on headcount as you work through that quite substantial backlog? Are you continuing to hire at this point? Or do you believe you largely have the talent required and that there’s really a chance to capitalize on productivity improvements?

Ian Edwards

executive
#61

Honestly, talent and our people mean everything to us. Ours is a people business, and there's no way to generate organic growth unless we can draw in the best talent. Starting four, five years back, we concentrated on our culture and the value proposition we offer employees. I believe we've built a world-class employee experience. Elements such as our purpose, our values, and how we handle ED&I genuinely set us apart for younger people. That lets us bring aboard the talent required to propel the business. Achieving headcount growth of 4,200 people in 2023, I mean, comes from a mix of bringing our turnover rate down — it keeps falling — plus having that value proposition for employees and cultivating a culture that makes them want to join us. So we'll keep expanding headcount organically, and that is absolutely essential for the company's growth. Fortunately, how we accomplish this combines early careers people — 2,000 people from graduates and universities joined us in 2023. We can get them working very quickly and profitably, and they bring in revenues for us. On top of that, we add capable and experienced people who also generate revenues for us very quickly.

Ian Edwards

executive
#62

I'd say that plays a pretty key role in the overall narrative we're telling.

Jeff Bell

executive
#63

There's another point I'd tack on there, Ian — we keep an eye on utilization as well as productivity, and we align the folks we hire quite closely to region, subregion, and customer end markets. That way, the growth — which, as you mentioned, has been quite successful and was necessary for delivering that backlog — fits well within each of the various regions and geographies. So we avoid adding staff in places where there's less work, and instead concentrate on the areas where we have the greatest amount of work to get done.

Michael Tupholme

analyst
#64

Moving to my second question, I want to return to the LSTK projects segment. I believe you addressed this before, but I'm not certain I caught the response. Regarding the sequential rise in backlog, does that connect as well to what you described about delays on certain of these projects? Could you help clarify precisely what caused it? My other question, or the follow-up, would be how do you expect that backlog to develop through 2024 as the year progresses?

Jeff Bell

executive
#65

Jeff here — let me handle that one. We did observe somewhat of a rise in backlog. And as Ian mentioned, that really stems from our clients reforecasting completions, especially regarding the two Ontario projects in 2024 and REM. As part of that, there's simply a perception that additional work remains compared with what would have existed at the close of the prior quarter. Not a material amount of work. As Ian noted, it doesn't materially extend the timeline. But that's a significant factor behind what produced the modest backlog uptick at year-end. Yet it's largely ramped because, I believe, that's heading toward final testing and commissioning documentation, training drivers. That carries a comparatively small share of the overall total. I think there was a second portion to that question, Michael. Did I address the second part?

Michael Tupholme

analyst
#66

Not precisely. That latter piece simply concerned our view of how things develop as the year unfolds.

Jeff Bell

executive
#67

My expectation is that we'd aim to have most of that backlog finished by year-end. We anticipate handing over both Trillium and Eglinton to the clients during this year. And as REM has said itself, I believe they also expect to be substantially construction complete by the end of this year.

Michael Tupholme

analyst
#68

So does that mean, then, regarding the $10 million loss per quarter that you mentioned earlier during 2024, when we look ahead to 2025, we should basically take it that this loss isn't happening whatsoever anymore in 2024?

Jeff Bell

executive
#69

As I mentioned when answering earlier, a significant portion of that relates to overhead costs tied to pursuing recoveries and claims and similar items, along with backing the jobs still underway. That figure is going to come down. I wouldn't claim it will reach zero in '25, but it will be lower, since we'll be left with essentially just working to recover the loss. I'd still hope that at some point we can negotiate this and see that come in.

Operator

operator
#70

Maxim Sytchev from National Bank Financial has our next question.

Maxim Sytchev

analyst
#71

It seems nearly all the questions have already come up, so we just have a few cleanups left. Ian, would you be willing to spend a moment on the Middle East business, now that it has topped $1 billion in gross revenue? I'm curious how you view the risk profile for that portion of the business. Any color you could offer there would be helpful.

Ian Edwards

executive
#72

Absolutely. The Middle East, honestly, is booming. Demand for services from firms such as ours — both through expansion in the Kingdom of Saudi Arabia and now through reinvestment in the United Arab Emirates — is genuinely, genuinely driving the market. So what we've done is really concentrate on projects where we believe there's a sustainable future. Those would be the iconic ones, very heavily committed to efforts like Neom, the downtown area of Riyadh, and the greening and redevelopment of Riyadh City. So we've secured some very good contracts in that kind of work. But we're also now, instead of continuing to focus somewhat on one area, since we're seeing good opportunities emerging from the Emirates now, we're looking at the Emirates too. And we're up to more than 10% of our business now. It's in the Middle East, but that's roughly where we want to be — around about 10%. We don't want to outgrow the Middle East relative to the rest. We're keeping it at a level that's positive and supports our customers there, but we will keep that at a proportionate level, more or less.

Maxim Sytchev

analyst
#73

And just two quick things to tidy up, if I can. On the subject of, sort of, free cash flow conversion — consolidated net income turning into free cash flow, around 80% to 90% — I mean, that remains, sort of, the plan, correct?

Jeff Bell

executive
#74

Yes, you have that right.

Maxim Sytchev

analyst
#75

Could you give us a little more detail on the timing, or tell us how we ought to think about it?

Jeff Bell

executive
#76

Yes. I mean, as I mentioned, Max, in terms of timing, that reflects our full-year guidance. Like I noted in my remarks, it's going to be weighted toward the second half of the year. So we would expect to see less in the first half and more in the second half. But clearly, on a year-on-year basis, a genuine step forward in both halves, frankly.

Maxim Sytchev

analyst
#77

And finally, regarding the 407 and considering possible congestion charges as pricing has risen, could you perhaps give us some color on how we ought to think about that, if at all?

Ian Edwards

executive
#78

Yes. On that point, Max, I think the broad answer is to point you toward what the 407 itself has stated. Their position is clear: although some payments may be congested, the value involved and the need to account for the absence of any price increase over more than four years were plainly what motivated the pricing change they put into effect at the start of February. So at this stage I doubt I'd have anything further to add.

Maxim Sytchev

analyst
#79

But on a net basis, obviously, shouldn't there be some positive effect when you look at it from an EBITDA standpoint?

Ian Edwards

executive
#80

Absolutely.

Operator

operator
#81

That brings the Q&A portion to an end. I'll now hand the conference back to Denis Jasmin for any closing remarks.

Denis Jasmin

executive
#82

Thanks a lot, everyone. Should anything else come up, feel free to reach out to me personally. Many thanks — enjoy a wonderful day and weekend. Thanks. Goodbye.

Operator

operator
#83

That brings us to the end of today's conference call. You're welcome to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.