AtkinsRéalis Group Inc. (ATRL) Earnings Call Transcript & Summary

November 14, 2024

Toronto Stock Exchange CA Industrials Construction and Engineering earnings 70 min

Earnings Call Speaker Segments

Operator

operator
#1

Thank you for staying connected. Speaking is the conference operator. Good morning, and welcome to the AtkinsRéalis third quarter 2024 results conference call. Please note that everyone attending is in listen-only mode, and this conference is being recorded. Following the presentation, attendees will have a chance to ask questions. To enter the question queue, simply press star then one on your telephone keypad. If you require assistance at any point during the call, you can signal an operator by pressing star then zero. At this time, I'd like to hand the conference over to Denis Jasmin, Vice President, Investor Relations. Please proceed.

Denis Jasmin

executive
#2

Thank you, Drew. Bonjour tout le monde. Good morning, everyone, and thank you for joining us today. For those dialing in, we invite you to view the slide presentation that we have posted in the investor section of our website, which we will refer to today during this call. Today's call is also webcast. With me are Ian Edwards, Chief Executive Officer, and Jeff Bell, Chief Financial Officer. Before we begin, I would like to ask everyone to limit themselves to one or two questions to ensure that all attendees have an opportunity to participate. You are welcome to return to the queue for any follow-up questions. I would like to draw your attention to slide two. Comments made on today's call may contain forward-looking information. This information, by its nature, is subject to assumptions, risks, and uncertainties, and as such, actual results may differ materially from the views expressed today. For further information on these assumptions, risks, and uncertainties, please consult the company's relevant filings on SEDAR+. These documents are also available on our website. Also, during the call, we may refer to certain non-IFRS financial measures. Reconciliation of these amounts to the corresponding IFRS financial measures is reflected in our earnings release and in MD&A, which can be found on SEDAR+ and our website.

Denis Jasmin

executive
#3

Ahead of handing things over to Ian, I want to take a moment to recognize Jacob Bout, Managing Director of Equity Research at CIBC, who is on his final quarterly call with us today as he retires. Jacob, thank you for every bit of help, advice, and support you've given us through the years. We wish you the very best in your retirement, and now I'll turn the call over to Ian Edwards. Ian.

Ian Edwards

executive
#4

Thank you, Denis. Good morning, everyone, and thanks for being with us today. I'll start this call by giving you an overview of how we performed in the third quarter, along with our backlog that keeps on expanding and the successes and opportunities we're currently seeing across our four engineering services regions and our nuclear businesses. After that, I'll hand things over to Jeff, who will walk you through our financial results in more detail, and then we'll open the line for Q&A. So let's begin on slide three. We're heading into the last months of 2024 carrying continued momentum after yet another quarter of strong results. The success we delivered this past quarter underscores even more the rising demand for our services as the energy transition and aging global infrastructure are addressed. We're encouraged by the steady, profitable growth in our services and our nuclear businesses across most of the geographies and markets where we operate. Organic growth in AtkinsRéalis' services revenue came in at 14%, and segment-adjusted EBIT rose 27% to roughly CAD 239 million. Revenue from our engineering services regions grew organically by 8%, reaching CAD 1.8 billion, while nuclear revenue organically climbed 35% to CAD 369 million. At the close of the third quarter of 2024, backlog stood at approximately CAD 16.8 billion, up 35% year-over-year — yet another record high for AtkinsRéalis.

Ian Edwards

executive
#5

The results we've posted so far this year show our strategy—built deliberately around moving into geographies and markets that deliver high total returns—is working. Our know-how in nuclear remains a real edge in the marketplace, as we locked in important wins during this quarter and can see clearly toward meaningful revenue in the near term, and we produced more than CAD 200 million of operating cash flow in this quarter. We assist both public and private organizations in meeting their net zero targets and tackling the energy trilemma, delivering energy solutions that are clean, affordable, and secure. Thanks to our track record over the years, we are the partner of choice for these efforts, and it's a source of pride to help build a better future for the planet and the people on it. Turning to slide four, you'll see our backlog across AtkinsRéalis' services continuing to grow. The 35% increase in the third quarter compared with last year came from key wins in our core engineering services and nuclear businesses. Within nuclear, we landed a life extension contract for the Qinshan Nuclear Generating Station. As we covered in detail at our June Investor Day, we're among the few public companies able to service a nuclear asset across its entire life cycle, from design through decommissioning.

Ian Edwards

executive
#6

This latest deal is just a single illustration of how demand for our nuclear expertise spans the globe. Across the U.K. and Ireland, we keep backing the government's significant capital spending on transportation—such as the newest technology screening services that we're rolling out at Heathrow. Because our engineering services capabilities cover the full scope from start to finish, we're able to prevail in the marketplace, including at one of the busiest airports anywhere in the world. Moving to slide five, our engineering services business delivered strong organic top-line growth, posting an 8% year-over-year rise in the third quarter. That revenue performance came from our continued success in landing new wins throughout the geographic areas where we operate. Segment-adjusted EBITDA over net revenue margin reached 16.9% for the quarter, an increase of 160 basis points relative to Q3 2023. We kept growing our backlog, which now sits at CAD 12 billion—a 17% gain versus our backlog as of September 30, 2023. Starting on slide six, we'll walk through each of our four regions and how they performed in Q3. In Canada, organic revenue fell 8% year-over-year, while segment-adjusted EBITDA came to CAD 35 million, a margin of roughly 15%. Gross revenue dropped because a project with a large share of flow-through revenue came to an end, yet as you can see, underlying net revenue rose 12% year-over-year to CAD 226 million, and our Canadian business keeps getting stronger.

Ian Edwards

executive
#7

Our backlog rose 23% compared with a year earlier. We keep securing significant awards in transportation, buildings and places, and power and renewables, while expanding our footprint in Ontario and Western Canada. In Toronto, we won a major rail project, and in Quebec, we signed an agreement to expand a sterile injectable facility in Montreal. Since our June Investor Day, we have been carrying out our Canada strategy, and we are achieving meaningful headway on our margin enhancement mandate as we focus on a profitable pipeline. Across the U.K. and Ireland, we keep winning notable contracts that draw on our end-to-end capabilities, especially in defense, water, aviation, and power and renewables. Our agile and focused approach has established a strong base for our regional presence and is driving our performance. Organic revenue increased 6% against the third quarter of 2023, and segment-adjusted EBITDA climbed to CAD 93 million. This past quarter brought a record-high EBITDA margin of 18.5%, helped by a gain from closing out a major project. Backlog continued to grow in the third quarter, reaching roughly CAD 1.7 billion, mainly because of new work orders in the water and rail signaling businesses.

Ian Edwards

executive
#8

We keep showing that we're the partner of choice alongside Network Rail, having landed a key contract to upgrade and digitize the U.K.'s signaling over the next 10 years. We also signed an agreement to renew and enhance infrastructure across 6,000 mi of track in the East of England. On top of that, we've advanced further in widening our access to the growing U.K. water market, with several major framework wins tied to the AMP8 program. As things stand, announced plans show the water sector intends to boost its investment substantially, to GBP 96 billion by March 2030, which is close to double current levels. That gives AtkinsRéalis plenty of opportunity to win additional water projects connected to this U.K. investment. Our long-standing position in the U.K. also aligns with key public sector commitments to build a cleaner future. We're making meaningful headway on opportunities in transnational renewable projects and on plans to upgrade the U.K. grid. We're also trusted advisors across defense, where capacity and spend are expanding under the AUKUS trilateral security partnership. Moving to slide eight, in the U.S. and Latin America, we saw a continued growth trajectory across many high-growth customer end markets.

Ian Edwards

executive
#9

Organic revenue was up 11% compared with a year earlier, and segment-adjusted EBITDA rose to CAD 51 million. We keep drawing on our transportation know-how, with important wins in Georgia and Florida during the quarter. Our hearts go out to everyone affected by the devastation caused by hurricanes Helene and Milton. Together with FEMA, we are supporting recovery work in the communities hit hardest. Q3 backlog was 7% higher than a year earlier, as we keep moving forward with our land and expand strategy, put priority on our key clients, and capitalize on what sets us apart. The roster of prospects for additional contract wins keeps growing across geographies in the U.S., and we see it as representing strong opportunities for sustainable growth. We will stay resolute in how we go about speeding up our foothold throughout the U.S. so that we capture our share of possible new contracts, and we also think potential M&A opportunities exist to broaden our presence in the regions and end markets where we can see a clear path to high growth potential. In EMEA, revenue rose 33% on an organic basis compared with the third quarter of 2023, driven by higher volume for buildings and places projects in the Middle East. That work also produced a segment-adjusted EBITDA of CAD 39 million, a 17% margin over net revenue.

Ian Edwards

executive
#10

Over the past 18 months, the Middle East portion of our operations has expanded substantially, and that's a level we feel good about, so we anticipate it will be more moderate in the quarters ahead. EMEA total backlog rose 16% during the third quarter. Over in Asia, we successfully re-won the Formula One work that we've been providing for the past 10 years, which strengthens an already solid relationship. In South Korea, we landed design, engineering, and procurement services for a new bioprocessing center. We've added capacity and capabilities in Australia, since the pipeline of prospects is accelerating there in the power and renewables and defense markets. This region has a bright future, with exciting long-term opportunities ahead for our end-to-end capabilities. I'd like to turn now to slide 10 and the results of our nuclear business. We keep showing significant growth, with organic revenue up 35% this quarter versus the third quarter of 2023. Our nuclear backlog stands at CAD 3.2 billion, representing more than a 200% increase versus our backlog as of September 30, 2023, driven mainly by life extension bookings in the CANDU fleet. Segment-adjusted EBIT rose 18% to CAD 46 million.

Ian Edwards

executive
#11

Segment-adjusted EBIT came in at 12% of segment revenue for the quarter. Slide 11 lays out what we achieved across our nuclear CANDU and services portfolios. This quarter once again showed how strong demand is for our nuclear expertise — we signed key wins and kept making headway on projects in every region we serve. In Canada, public and private sector backing keeps growing, and we brought on more key stakeholders for our Canadians for CANDU campaign. Within our CANDU business, progress has been excellent, especially on our CANDU life extension projects. On the services side, AtkinsRéalis was chosen in the U.S. to develop the pre-concept design for Type One Energy's fusion pilot plant in Tennessee. We're also seeing more opportunities to partner with other technologies or providers on SMR development. In the U.K., we signed an agreement with GE Hitachi to support delivery of its small modular reactor technology, and we continue providing new build support at Hinkley Point C and Sizewell C along with decommissioning services at Sellafield. Third parties are taking note of our success. As the slide shows, we've picked up a number of awards in the U.S. recently.

Ian Edwards

executive
#12

And in the U.K. — now if we move to slide 12, I'd like to draw more attention to the CANDU revenue opportunities, both near-term and long-term, that sit inside our nuclear business. As you can see, thanks to the backlog growth and the contract wins we've had over the last couple of years, our customers keep recognizing the nuclear expertise we bring. That's showing up in revenues we're booking right now, and at the same time it's building a solid backlog of strong future revenues for AtkinsRéalis. As I said earlier, we landed a 30-year life extension contract covering two CANDU reactors at the Qinshan Nuclear Generating Station. On top of that, we're still making solid progress in negotiations for new build contracts for C3 and C4 at Cernavodă in Romania. Once it's signed, that will signal CANDU reactors coming back to the global nuclear market, and talks are ongoing regarding the next phase of our Cernavodă C1 life extension project. What we've achieved so far in Canada and Romania really underscores the opportunities that exist worldwide today for CANDU support and life extensions. We're also in the process right now of building the technology for our Monarch nuclear reactor. Alongside that, we're holding discussions with public entities about constructing new reactors to help meet Net Zero goals. These prospective contracts amount to a huge opportunity for our business and could bring substantial growth across the next 10 years and beyond.

Ian Edwards

executive
#13

Only a handful of publicly traded firms possess the know-how and capacity to support a nuclear asset through its whole life cycle, and that lets us accumulate a backlog that expands with time and delivers recurring revenue for decades ahead. The projects shown on this slide represent wins we have secured recently, yet they also hint at what this business could achieve going forward. The growth we are posting and the major contracts we have landed demonstrate both the appetite for and the promise of our nuclear capabilities around the world. Turning now to slide 13, covering our Linxon LSTK and capital operations. In the third quarter, our Linxon segment delivered organic revenue growth of 32% versus a year earlier, carrying forward the solid volume momentum built in the first half, and achieved EBIT margin expansion of 310 basis points. Backlog stood at CAD 1.6 billion when the third quarter closed, which is 32% above the level in the third quarter of last year. Demand for our transmission and distribution services continues to be strong. Regarding LSTK projects, commissioning and testing at our two Ontario projects are proceeding according to plan. In fact, trial running of the Trillium Line has just been carried out, it produced a successful result, and we anticipate substantial completion of this project very soon.

Ian Edwards

executive
#14

Backlog overall came down 38%, landing at CAD 190 million as of the close of the third quarter, and the main driver there is the REM project, which is moving along nicely. While we wrap up the LSTK projects for our clients, we're still chasing the claim recoveries we feel are owed, and those conversations with our clients are continuing. Turning to capital: we picked up CAD 15 million in dividends from Highway 407 during Q3, with traffic trends still improving on a year-over-year basis. After the quarter closed, we brought in another CAD 47 million of dividends in the fourth quarter. There's also nothing new to share regarding our planned disposition of our stake in Linxon and Highway 407. Once we have further details down the road, we'll pass them along. With that, I'll hand things over to Jeff for the financial highlights.

Jeff Bell

executive
#15

Thank you, Ian, and good morning to everyone. If you'll turn to slide 15, revenues on a total basis rose 11% versus a year earlier, coming in at CAD 2.5 billion for the quarter. Professional services and project management revenues were up 12%, and within that, our services business saw revenue climb 15% while LSTK projects fell 42%. As Ian noted, organic revenue in the engineering services region grew 8% this quarter relative to Q3 2023, which lifts year-to-date organic growth to 12.6%. In forecasting fourth-quarter revenue we've taken a prudent approach, since a couple of major projects wrapped up recently and Q4 2023 was especially strong, so organic growth in Q4 could be relatively flat. Our confidence remains in the 8%-10% revenue growth outlook for the full year, and in our capacity to hit the greater than 8% annual organic growth target we laid out at our June investor day. Segment-adjusted EBIT totaled CAD 246 million for the quarter, up 25% from last year, made up of CAD 239 million from AtkinsRéalis Services, CAD 25 million from capital, and negative CAD 18 million from LSTK projects. Corporate SG&A expenses from PS&PM came to CAD 27 million this quarter, versus CAD 47 million a year ago, as Q3 last year carried a higher expense tied to revised estimates on long-term employee incentives along with the company's rebranding costs.

Jeff Bell

executive
#16

We still expect PS&PM's corporate SG&A costs to come in at roughly CAD 130 million for the whole of 2024, though they might land about CAD 10 million to CAD 15 million above that if the sizable rise in our share price that has occurred lately persists until year-end, which would affect our long-term compensation expenses. Net financial expenses came to CAD 41 million for the quarter, below Q3 2023, thanks to a reduced level of recourse debt and lower interest rates on our variable rate debts. For Q4, we would anticipate a comparable expense figure. The effective income tax rate from PS&PM stood at approximately 29% this quarter, above the Canadian statutory tax rate, largely because of the geographic mix of earnings and other non-recurring items. Our year-to-date income tax rate on adjusted PS&PM net income was, as expected, above last year's, and we still believe full year 2024 ought to be near the Canadian statutory rate of 26%. IFRS net income for this quarter was CAD 104 million versus CAD 105 million in Q3 2023, yet it is worth noting that Q3 of last year contained a CAD 46 million gain on the disposal of the company's Scandinavian Engineering Services business.

Jeff Bell

executive
#17

Leaving that gain aside, net income for the company rose by 76%. For the quarter, adjusted EPS from PS&PM came to CAD 0.63 per diluted share, up 66% from CAD 0.38 in Q3 of last year. Backlog closed the quarter at a record high of CAD 17 billion — 21% above where it stood at the end of last year and 33% above the end of September — with engineering services, nuclear, and Linxon all showing strong gains. Turning now to slide 16 and free cash flow: net cash from operating activities totaled CAD 267 million in the third quarter. As we expected, our services businesses produced robust cash flows, with the year-over-year improvement driven by higher EBITDA and better capital and working capital positions, and it included a sizable advance on a nuclear refurbishment contract. The slight positive cash inflow from LSTK projects this quarter came mainly from anticipated cash advances as those projects move toward full completion. For the full year, we expect net cash from operating activities for the company to be slightly above CAD 400 million. Following CapEx and lease liability payments, free cash flow was CAD 226 million for the quarter.

Jeff Bell

executive
#18

Capital spending, which takes in development expenses for the CANDU Monarch nuclear reactor, came to CAD 37 million for the quarter, matching what we had expected. Our projection for the whole year's capital expenditure stays at a range of CAD 140 million to CAD 160 million, since Monarch development keeps accelerating in the fourth quarter. On that note, I'll return the presentation to Ian now.

Ian Edwards

executive
#19

Thanks, Jeff. Revenue is on the rise. Our backlog keeps building. Margins are getting better, and we're producing positive operating cash flow. Momentum continues to build through key wins across all four of our engineering services regions and in our nuclear business, which is lifting backlog and giving us visibility into revenues that can be sustained for years ahead. Market conditions remain solid for both engineering services and nuclear, as we keep helping public and private entities meet their changing power needs and their Net Zero goals. Our strategic positioning in high-growth geographies and end markets is enabling us to capture our share in these healthy markets, and through the work of our COO office we are harnessing operational efficiencies throughout the company. All of this rests on the need to address the energy trilemma and aging infrastructure, and the scale of our longer-term opportunities emerging from these megatrends genuinely excites us. Delivering excellence and driving growth, our new strategy, is built on optimizing the business to drive profitable growth, accelerating our footprint in growing end markets and regions, and exploring untapped opportunities across the organization. We'll keep doing this by using our positive free cash flow to invest organically and inorganically, strengthening our position in high-growth geographies and end markets.

Ian Edwards

executive
#20

With that said, we can now take your questions.

Operator

operator
#21

Our question-and-answer portion is starting now. If you'd like to enter the question queue, press star followed by one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, lift the handset before hitting any keys. To take your question back out, press star then two. We'll hold briefly while callers line up. Jacob Bout of CIBC has the first question. Go right ahead.

Jacob Bout

analyst
#22

Morning, and thanks for the nice remarks about my upcoming retirement. I'll start with a question about margins. If you look at engineering services, that's at the top of the 24 targets. Nuclear, as I recall, sat at the bottom end. Could you perhaps weigh in on margins — what margin levels are currently built into backlog, and how confident you are in your three-year outlook regarding the 25 to 27 margin targets?

Ian Edwards

executive
#23

Yeah, thanks, and congratulations. So yeah, I mean, obviously, looking at the quarter itself, we're really pleased with the EBITDA net revenue margin of 6.9%, which is 160 basis points up on a year ago. That's great. Our objective, as we said at the investor day, is to build through the Chief Operating Officer's Office a sustainable approach to improvement of margins across the engineering services business. That will take us on a year-to-year journey to those margins that we committed to by 2027 of 17%-18%. The reason I say it like that is because you will see some quarter-to-quarter variance through the year, as this is, it's not going to be a quarter-to-quarter linear process. It's going to be a year-to-year linear process. The reason for that is that there are some fundamental business improvements that we've got to build in to our engineering services business. Those are obviously winning the right work, and that's very much in progress. We are, particularly in Canada, got a whole better quality of backlog than we would have had two years ago. We've done really well in the Middle East, but we are conscious that that is high-quality work, and we're going to maintain that level in the Middle East.

Ian Edwards

executive
#24

Both the U.K. and the U.S. are performing very well when it comes to their margin journeys. So it's about winning the right work. Next comes overhead — the business overhead cost — and being as optimal as we can in making that overhead cost as efficient as possible. The utilization of our resource. A key overhead cost for us is extracting the best utilization from our people around the world, and we achieve that by linking the organization together across geographies. We have this culture of collaboration, and we have this culture of sharing throughout the company that will lift our utilization rates. And finally, it's the technology center, 4,500 very capable people in India, where obviously there's a significant arbitrage from the wage perspective. So betting that into the business, all of those things will deliver the 18%, 17%-18% that we've committed to. Now, what you will see, obviously, in Q4 is the target that we will identify for 2025. We've done well this year, and I think we've got a good incremental improvement this year, and we'll continue to do so. On the nuclear side, we've committed to a 12%-14% range. We believe that's the right range for nuclear.

Ian Edwards

executive
#25

And obviously, nuclear is really about serving the market as this incredible renaissance arrives, and our focus there is on growth, though not at margin's expense. That margin is going to stay in the 12%-14% range. So that was a somewhat lengthy response, but I hope it's useful.

Jacob Bout

analyst
#26

That's useful. Perhaps a little more detail on the nuclear front. You just announced a $2 billion operations and maintenance contract with the U.S. Department of Energy. Compared with some of the rebuild work you're doing, how should we think about margins on contracts of that kind?

Ian Edwards

executive
#27

Jeff, would you like to take that one?

Jeff Bell

executive
#28

Yeah, Jacob, this is Jeff. So those kinds of contracts, we're in a joint venture on them, and basically we receive an equity pickup for our portion of the net profit that comes from those contracts. So that helps the margins, and we're really happy about that contract and about winning it. Waste decommissioning in the U.S. is a strong area for us. It gives the nuclear group a very stable, long-term financial contribution. And on that contract, we've been part of it since 2016, and it's great to see we'll be involved for another 10 years.

Jacob Bout

analyst
#29

Alright, that's useful. Appreciate it.

Ian Edwards

executive
#30

Appreciate it.

Jeff Bell

executive
#31

I appreciate that.

Operator

operator
#32

Sabahat Khan of RBC Capital Markets has the next question. You may proceed.

Sabahat Khan

analyst
#33

All right, thanks. Could you give us a quick update on your approach in the U.S. market? You’ve offered some detail around the guidance, but this was a key topic at the investor day, both regarding organic growth and M&A. Maybe you could touch on some of the early positive signs you’ve observed there, and I believe growth in that region has been quite robust. How are you thinking about lapping that as we move into 2025 and beyond? Some specifics on that would be helpful. Thank you.

Ian Edwards

executive
#34

Yes. Yes, of course. So, as you're aware, this is what we call our land and expand strategy. And we have a quite deliberate plan aimed at making us a top 10 player in the U.S. Right now, we're very strong in the southeast, and we've opened offices in the northeast, and we've opened offices on the west coast. But really, it was very much an organic land and expand strategy until roughly a year ago. And around a year ago, we began examining M&A, and we began examining how we could complement those white space areas, so to speak, out west and in the northeast. And clearly, we're seeking quality companies that can add value and add connectivity and add capability into our existing kind of business in the U.S. Nothing to announce today on the M&A front, but it's very, very key to securing some acquisitions to complement the organic growth drive. Now, beyond that, when we think about end markets in the U.S., our business is really heavy on the Department of Transportation state by state, and we would want to keep growing that geographically. There is a good water program in the U.S., which we certainly are, I would say, in an evolving space, but we see great opportunity from the water market as water infrastructure needs to be upgraded.

Ian Edwards

executive
#35

That's an end market play we need to add. Overall, we have a clear plan in place. We're executing against it. We're pleased with where we are. As you saw, we posted 11% double-digit growth in Q3. And as I said, we're committed to getting into the top 10.

Sabahat Khan

analyst
#36

Thanks. Maybe turning to the margin part of the story — I know you gave some detail on that earlier. Could you give us a bit of an update on the initiatives you laid out at Investor Day, the ones that drive margin improvement through the guidance period, and where you stand on that journey?

Ian Edwards

executive
#37

Right. Like I mentioned in response to the previous question, there are four highly specific ways we're going to improve margins: by securing the right work, by cutting overhead, by getting better utilization, and by bringing in the GTC. Our COO, Phil Hoare, has embraced the task of collaborating with the presidents to embed those gains across the engineering services businesses on a regional basis. We've got a really clear plan, with really clear targets and KPIs that we track quarter by quarter and month by month. It's progressing well. I suppose you'll see real evidence of it when we issue a 2025 target in Q4, and you'll already have observed improvement in 2024. So that path takes us to the range we set out for 2027, which is 17%-18%, and we're confident we can get there. Jeff, I don't know whether you'd like to add anything.

Jeff Bell

executive
#38

Yeah, that sounds right to me. In a way, it's still early days, but then again, the team and the business have been progressing well, and we're already beginning to see a few of those first efforts and initiatives show up in our figures for the back half of the year.

Ian Edwards

executive
#39

To me, getting more out of the business we already have matters just as much as expanding it. Both things have to happen.

Sabahat Khan

analyst
#40

And then only one final quick item. Clearly, there are plenty of questions out there about what the new administration could do for just kind of the base organic business. But if you view it through sort of the M&A lens and your engagement with potential targets in the U.S., do you think it's possible folks adopt a bit of a wait-and-see stance? Potential sellers, do you think people might want to sell more quickly? Or just some of your perspectives on how that operating backdrop or just kind of the shifting climate might affect seller willingness to engage?

Ian Edwards

executive
#41

Yeah, yeah. I mean, I think the industry is largely in agreement that the impact on engineering services companies is fairly neutral. Obviously, we have our own perspective, and our view is that it's neutral. And there are a few main factors behind how we see it and why we believe it comes out neutral. First, infrastructure throughout the United States is getting older, and it has to be upgraded, maintained, and replaced — especially when it comes to transport infrastructure, and especially water infrastructure. On top of that, energy security is going to be a top priority. Perhaps the path to net zero less so, but energy security definitely. And energy security, particularly to meet the demands of the future — when you consider AI, when you consider electric vehicles, when you consider the growth in manufacturing — is going to call for more electricity generation. That means grid upgrades. That means additional power plants, more nuclear. So from our standpoint, we view all of that as positive. But on the engineering services side in particular, I think it's fairly neutral. I don't see the IIJA being impacted. The IRA could potentially return in a somewhat different form, but it's a very strong market, very buoyant.

Sabahat Khan

analyst
#42

I appreciate that.

Operator

operator
#43

We’ll take the next question from Chris Murray at ATB Capital Markets. Go ahead, please.

Chris Murray

analyst
#44

Morning. Let me circle back, if I could, to nuclear and that set of opportunities you mentioned. You just announced a pretty sizable contract, I realize, and there's clearly solid year-over-year growth along with backlog. Could you give us a bit more detail on the timing of certain projects? When do you expect to be able to book them? And on the longer-tail items especially — we touched on this at investor day, I know — my recollection is the indication was much of that would land heavily toward the back end for the newer pieces. Still, any color on when backlog growth comes through would help.

Ian Edwards

executive
#45

Yes, and that's precisely why we added the extra bell chart slide to today's deck—to help provide some context. What exactly does the CAD 3.2 billion of backlog we had at Q3 represent? And what opportunities lie beyond it, both near-term and perhaps longer-term? Referring to that slide, we're showing what's secured with respect to Darlington and Bruce, which we've been working on for quite a while, along with what we've locked in on the first phase of Cernavodă and the first phase of Qinshan and retubing. Beyond that, additional phases are coming on Cernavodă 1 and on Qinshan. Negotiations are also underway regarding plans to retube Wolsong in South Korea. We're very near to wrapping up the Cernavodă 3 and 4 negotiations, which is a game-changing new build—the first new build contract we will have won in 20 years. All of that revenue and backlog is still to come. Pickering. There are clearly ongoing negotiations to retube Pickering, which involves a considerable number of units. Obviously, we can't discuss specific revenues and dates since many of these matters are under negotiation, but we've tried to be indicative on this slide about when those will come in.

Ian Edwards

executive
#46

When it comes to the hard targets we've laid out, meaning revenue of CAD 1.8 billion to CAD 2 billion by 2027, we have a lot of confidence we'll hit those. Beyond that, there are clearly new builds, which don't even appear on this slide, in Canada and abroad. Lots of discussions, lots of opportunities. We have to land something internationally. We have to land something in the domestic market. We'd probably see something secured maybe in 2025, though revenue from it will start slowly and then build toward the end of the decade, just to give you a sense of it. But I think where we're fortunate and where we stand apart in our nuclear business is that retubing is already generating real revenue for the business today, yet we share the same opportunity other nuclear OEMs have, since this market lies ahead of us for tomorrow.

Chris Murray

analyst
#47

All right, that helps—thanks. My next question concerns Trillium, and I believe you described substantial completion as being imminent, to use your wording. I did see in the subsequent event that you appear to be shifting some financing around. Could you perhaps take us through what we ought to expect if you truly think substantial completion will arrive, say, by year-end? How would that look regarding its effect on operating costs or anything else in there? And how should we view that feeding into cash flows into 2025?

Ian Edwards

executive
#48

Yeah. Jeff, could you sort of handle the cash flow side of things? Regarding the asset itself, I mean, like we mentioned, much of the cost, much of the spending, and the difficulty we faced was largely pre-2023, since they're in the construction phase. But then there's a considerable amount of commissioning work, plus a lot of documentation work, which has been underway during 2023 and 2024. The wrapping up of all that is a trial running period spanning a certain length of time at a certain reliability level. We've gotten through that. For a railway, that's a pretty significant milestone, because it's quite intricate, yet we've gotten through it. So that naturally brings about a completion process — substantial completion, as we term it. So we'd anticipate getting that during this year, and at that point, more or less, the asset gets handed over to the client. It's more or less finished.

Jeff Bell

executive
#49

Yeah. And from a cash flow standpoint, Chris, I think we'd anticipate posting that, the final accounts, holdbacks, and supply chain, over the course of Q4. A portion of it could carry over into Q1, but that would be the last of it.

Chris Murray

analyst
#50

Okay, that helps. And Jeff, just quickly, going back to what you said about your script: so for stock-based comp, your expectation is roughly an extra CAD 10 million to CAD 15 million in Q4, on top of the CAD 130 million year-to-date figure, sort of as a guide. If the share price holds where it is now, is that the correct way to look at it?

Jeff Bell

executive
#51

Yes. Yes. That is precisely correct. I mean, given how quickly the share price has climbed over roughly the last six weeks, if the year had ended at those kinds of elevated levels, then we would face that kind of exposure. But you have described it accurately.

Chris Murray

analyst
#52

Alright, sounds good. Thanks a lot.

Operator

operator
#53

Devin Dodge from BMO Capital Markets has the next question. You may proceed.

Devin Dodge

analyst
#54

Yeah, thanks, and good morning. I'd like to begin with the nuclear side of things. There was an announcement not long ago that AtkinsRéalis is collaborating with the Canadian nuclear regulator on getting the Monarch approved. I was just wondering whether you could give us some background on that, and what the benefit ought to be for the business.

Ian Edwards

executive
#55

Could you repeat that name? My apologies—I simply didn’t catch it.

Devin Dodge

analyst
#56

Regarding the Monarch's approval, that came from the nuclear regulator.

Ian Edwards

executive
#57

Okay, yes, absolutely, Jeff. Let me step back and talk about Monarch. What happened is that 18 months back, based on research and conversations with clients, we concluded that a gigawatt reactor would be the ideal size for the new Renaissance as well as for the worldwide market moving forward. We currently hold a fully licensed EC6 reactor, and that unit is a 600 MW reactor. That's referred to as a Gen III+. It includes every one of the newest safety features. You could deploy it right now. What we're developing, though, is an improved version of it. The fascinating part about Monarch is that it genuinely is an upgrade. Certain components of this reactor were previously constructed. What we're doing is improving it so it produces additional power and becomes more marketable. We're additionally introducing some modularization so the build is efficient. We're also digitizing it and, clearly, adding all the newest safety controls along with passive safety systems. So at the moment we're moving through a process that, in our view, will require until the end of 2026 to bring it before the regulator, finish the design, and reach a stage where it can be deployed.

Ian Edwards

executive
#58

And that's proceeding right on timetable. Things are moving along nicely, I'd say. Roughly 250 people are engaged on it. We've been transparent regarding what it costs. And in our view, it will be an extremely differentiated offering for the market. Just to remind everyone, our particular technology relies on natural uranium, which removes a lot of obstacles for a lot of countries. As a byproduct, it also generates medical isotopes — a really major differentiator, since that gives you revenue beyond electricity, which matters a great deal as demand for medical isotopes rises worldwide. So it's progressing well. Clearly, we haven't sold any as yet, but we're pushing hard on marketing. Having it ready around 2027 lines up very well, because any customers, countries or utilities that want to build this must go through their own regulatory and permitting steps for any site in any case. So we believe we're highly competitive worldwide.

Devin Dodge

analyst
#59

All right, thank you for that. All right, so perhaps remaining on the topic of nuclear new builds: if we peer beyond 5 years and take it that the interest you are seeing right now in new builds has become genuine opportunities, do you perceive a danger that the industry might face capacity limits — whether in the supply chain, in labor, or when it comes to financial backing? And how would you get the business ready in advance to get past those possible constraints?

Ian Edwards

executive
#60

Sure. That's the first thing on our minds. I mean, we've brought more than 1,000 people into our nuclear business over roughly the past year. Now, we accomplish that in a lot of different ways. We do it by hiring at the entry level, through graduates, and by partnering with universities and schools. We do it by retraining engineers who work in our engineering services business. We do it by retraining project managers from our ES business, but we also do it by being a genuinely good employer and recruiting nuclear professionals from all over the world. That's progressing well, and we're confident we can build the capacity that's required for, for instance, what you see on slide 12. On the supply chain, we've had a campaign running called Canadians for CANDU to bring the supply chain along on our journey so they're also equipped, particularly in Canada, for the very strong domestic market and the export market from Canada to the projects we're doing overseas. And I think that program is going really well. A lot of suppliers have joined up. We now have a group that we chair and meet with so that we can communicate what's necessary to build capacity.

Ian Edwards

executive
#61

In the end, stronger relationships may need to be built on a global scale. We do have connections to highly capable international firms that could assist. Still, for the near term, our attention is squarely on Canada and on strengthening our position there.

Devin Dodge

analyst
#62

All right, thank you for that. I'll hand things over now.

Ian Edwards

executive
#63

I appreciate it.

Operator

operator
#64

Michael Tupholme from TD Cowen has the next question. Go ahead, please.

Michael Tupholme

analyst
#65

Thank you. Good morning. I'd like to circle back to that really sharp sequential rise in nuclear backlog at year-end, and versus a year ago. I appreciate the slide you flagged earlier that lays out all the different nuclear opportunities. And I know you issued a press release on the Qinshan award, which I believe would have helped backlog during the quarter. But could you perhaps elaborate on which other factors drove that very strong growth apart from Qinshan?

Ian Edwards

executive
#66

I went over that slide during an earlier question and discussed CANDU. It might be useful to take a step back and consider the nuclear business in its entirety, since CANDU is genuinely significant — it's the main thing fueling our backlog growth at the moment, though it isn't the sole factor. What we have is a global nuclear business offering full service, and we're witnessing a supercycle in nuclear around the world. Clearly, that's being propelled by the necessity of replacing the 85% of electrical generation from fossil fuels that exists worldwide, and beyond that, we'll need to expand the grid roughly 3x. That goal keeps shifting. Consider AI and the data centers required to run it — they're placing enormous pressure on the electrical grid. The new generation units are well over a gigawatt each. So the market is robust. Extremely, extremely robust. And looking at our own operations, we provide support for SMRs. As you can see, we support GE Hitachi. We support Rolls-Royce. We support waste remediation throughout the U.S. and the U.K.

Ian Edwards

executive
#67

And Sellafield, plus the project we just secured, is also generating additional work. We actually back fusion initiatives too. Within the U.K., we support fusion work, and in the U.S. it comes right out of wind. These are lengthy research efforts, but they demand resources, and they require people on top of that. So all of that combined across our full-service operation, and let's not forget backing other technologies like EDF in the U.K. for Hinkley and Sizewell C, which are fairly substantial projects for us. Hinkley remains at quite a high level, and Sizewell is gradually ramping up. Adding everything together along with the CANDU life extension work, that is what feeds our backlog now. Looking ahead, it will be largely more of the same, particularly with Pickering, Wolsong, the second phases at Qinshan, and Cernavodă on the retube side. Then, naturally, there's this EC6, which would represent the first new CANDU nuclear order in 20 years. On the global nuclear stage, that is truly meaningful for AtkinsRéalis, and it matters for Canada as well. It will put us in a really strong position worldwide. We would hope to make an announcement on that imminently.

Michael Tupholme

analyst
#68

Alright, that's useful — thanks. Turning to how cash flow came in, clearly quite strong this quarter. And Jeff, I believe you restated the guidance of more than CAD 400 million in operating cash flow for the whole of 2024. As we head toward Q4, which is usually a robust quarter for cash generation as well, could you walk us through any factors we ought to keep in mind, especially with the LSTK projects wrapping up soon? And following on from that, help us frame what your capital allocation priorities look like now, given the improved cash flows and the deleveraging that happened this quarter. In what ways have those priorities shifted from a capital allocation standpoint?

Jeff Bell

executive
#69

Yes, absolutely — glad to. As you mentioned, we’re entering the fourth quarter from a solid position. Nuclear advance gave us a lift in the third quarter as well, but we have strong confidence in the CAD 400 million, and turning to capital allocation, as your question does, I believe that illustrates both our present leverage and our projection through year-end, which, all else being equal, would keep enhancing our leverage and our balance sheet. Financially, that leaves us very well positioned to carry out, for example, our land and expand inorganic strategy in the U.S., and spotting and eventually completing bolt-on acquisitions is plainly a component of our strategy, and I think our background leaves us really well set up for this.

Michael Tupholme

analyst
#70

To add to that point, though, we've noticed you repurchasing some shares now that all these factors are lining up the way they are, with cash flow and leverage both declining. At this stage, where do buybacks rank on your priority list?

Jeff Bell

executive
#71

Yes. As you observed, under the framework we use for capital allocation, our aim was to be actively using every component of it. We have been paying down debt. We have been giving some capital back to shareholders. And we would also like to get M&A done. So in that sense, I think we will keep doing this, with one difference: going forward, our clear intention would be that we can eventually announce something on the M&A front as well.

Michael Tupholme

analyst
#72

That's great. I'll stop at that point. Thanks.

Jeff Bell

executive
#73

I appreciate that.

Operator

operator
#74

Benoit Poirier from Desjardins Capital Markets has the next question. Go right ahead.

Benoît Poirier

analyst
#75

Yes, sir. Thanks a lot, and good morning to everyone. Congratulations on the results, and I'd also like to thank you for the improved disclosure and the prepared remarks. First question: when we look at USLA's strong organic growth, margins were down roughly 50 basis points year-over-year because of lower income from emergency work, but also due to a change in business mix. So could you maybe give us more color on the mix, and also on the contribution from emergency work in Q4 last year, just trying to gauge what we should expect from a margin standpoint, especially given the impact with Milton recently?

Jeff Bell

executive
#76

Sure, Jeff, let me handle that one. You're completely right, Benoit. We'd been doing less of that emergency work through FEMA that we've handled previously, and that definitely factored into part of the business mix. A couple of projects were wrapping up at lower margins, so that contributed too. But honestly, we view both of those as fairly temporary headwinds. As you'd expect, given the hurricanes recently, we anticipate that emergency work. And in fact, we're securing contracts right now to deliver the valuable skill set we bring, along with others, to assist those hard-hit areas. We'd anticipate that getting better through Q4 and then into next year. So I believe that will help from a margin standpoint. And the underlying business itself, apart from a few projects, continues to have strong margins, and we'd expect that to normalize over Q4 and into next year.

Benoît Poirier

analyst
#77

All right. Jeff, earlier in this call you provided some detail regarding organic growth for the fourth quarter—noting it might be flat due to the completion of a couple of large projects and a tougher year-over-year comparison. So could there be a risk that this project timeline situation carries over into 2025 and affects organic growth across the next couple of quarters, or is it really just a one-quarter matter?

Ian Edwards

executive
#78

There are a couple of particular items in Q4 — a pair of headwinds, really. I mean, Q4 2023 was an incredible quarter for us, truly exceptional. And then there are projects up in Canada where the second phase went to someone else. So a few things are quite specific. Looking ahead, though — the market, how confident we feel about our businesses across the four regions, our positioning — we're genuinely pleased with the wins coming in, with the marketplace, and with our capacity to keep landing those wins. We have confidence in the growth range we laid out for year-over-year, 2025, 2026, 2027. What happened in Q4 is somewhat of a blip, which we'd anticipated. So naturally, we're aiming to be prudent by factoring that in.

Benoît Poirier

analyst
#79

Alright. Turning to free cash flow, you've restated your target of over CAD 400 million for cash from operations. You also made some strong points about how the advance from nuclear projects in Q3 boosted free cash flow generation. So I'm curious about Q4 — could you give us more detail on some of the working capital movements? And with the substantial growth we're expecting over the next few years, are there any working capital movements we should factor in for 2025, whether favorable or unfavorable?

Jeff Bell

executive
#80

Sure. I’ll speak to the fourth quarter first. Then, Benoit, I’ll likely save most of what I have to say about 2025 for when we discuss how cash flow is shaping up against our Q4 results, which is what we usually do. As we move into Q4, that tends to be a solid quarter for us when it comes to working capital. Our expectation is that we’ll keep seeing that again this quarter. The business also continues to perform well, obviously. At the same time, we’ve successfully rolled out the next phase of our ERP implementation system across roughly 40% or 50% of the business here in the fourth quarter. That always carries the potential to shift our working capital around somewhat as well. We don’t believe at this point that it would be material, but we’re clearly working hard on it. So with all of that in mind, we remain confident in our ability to deliver that guidance of greater than CAD 400 million. But there’s a lot of heavy lifting still to be done through the quarter at this point. And we’ll come back and talk about 2025 in March.

Benoît Poirier

analyst
#81

Okay, and perhaps just one final quick question from my side. Your leverage clearly showed a solid improvement this quarter, falling to 1.4x. So could you give us a bit of detail on the latest conversations with the rating agencies, the timeline for reaching investment grade, and whether the 407 is still needed for the credit protection?

Jeff Bell

executive
#82

Yeah. I mean, we speak with the rating agencies on a regular basis. At the end of the day, whether they keep the rating where it is or change it is their call. So I don't have any further visibility into that. We'll see how things develop. From where we sit, certainly, our Q3 results once again drive home the point that we believe we are very much an investment-grade company and organization. But they have their own work to do to get there as well over time. Sorry, what was the second 407? Sorry. Yeah. Nothing to obviously announce on the 407. We think fundamentally that the business risk, as both we would look at it and we think as rating agencies would look at it, the fundamental business itself, with the type of leverage ratios we've put out there, is very much consistent with being investment-grade. But obviously, we'll kind of work that through with the rating agencies over time.

Benoît Poirier

analyst
#83

I appreciate you gentlemen giving us your time.

Jeff Bell

executive
#84

Alright.

Operator

operator
#85

Our following question is from Maxim Sytchev at National Bank Financial. You have the floor.

Maxim Sytchev

analyst
#86

Hello, and good morning to you all.

Ian Edwards

executive
#87

Good morning, everyone.

Jeff Bell

executive
#88

Good morning there, Maxim.

Maxim Sytchev

analyst
#89

Since most questions have already been covered, I'll limit myself to just one if that's alright. Looking at M&A multiples, particularly in the U.S., there appear to be some fairly significant read-throughs at the moment. I'm curious how you're approaching the accretion algorithm and related items. Perhaps Ian and Jeff could refresh that for us. Thanks very much.

Ian Edwards

executive
#90

Yes. Let's both take that one. We have specific metrics we're aiming at, clearly. And the main point I'd make is that we also know quite well how a fit with strategy should look and what quality should look like. Of course, nothing has been announced, but we've been at this for a while now, since what matters is the quality of the assets we bring into the business. We won't rush into anything that doesn't fit our strategy, our culture, and our capacity to deliver our land-and-expand effort and our margin expansion program. Those are the big-picture requirements. The wonderful thing about the U.S. is that so many businesses are state-by-state employee-owned operations that are available. PE is active, yes, but these businesses don't always make it their first choice to join. We believe we can acquire what we need for our purposes, in line with our strategy and our metrics. We're confident we can deliver on that. So Jeff, I don't know whether you'd like to add anything specifically about the metric side.

Jeff Bell

executive
#91

Yeah, the one thing I would tack onto that is this: within the small tuck-in range, we're seeing a great deal of opportunity at, honestly, attractive multiples, Max — deals where we could generate substantial value. Naturally, when it comes to bigger, high-quality regional-type platforms, the price you pay is higher. But honestly, with our land and expand strategy, an opportunity of that kind, we believe we could drive a tremendous amount of value through by making that sort of acquisition, even if it winds up requiring a higher multiple. So on both fronts, we see strong opportunity over time to bring in high-quality businesses that will be very value-accreting for us. And the other thing to keep in mind here is that we're underweight in the U.S. So we have more white space than you might see from our peer set. That means we can build on that white space through M&A.

Maxim Sytchev

analyst
#92

All right, that's excellent. I really appreciate it.

Jeff Bell

executive
#93

I appreciate that.

Ian Edwards

executive
#94

Appreciate it, buddy.

Operator

operator
#95

That wraps up our question-and-answer session. Denis Jasmin, I'd like to hand the conference back to you for any closing remarks.

Denis Jasmin

executive
#96

Thanks so much, everybody, for being with us today. Should you have any additional questions, feel free to reach out to me. Many thanks, and enjoy the rest of your day. Bye-bye. That concludes today's conference call. You can now disconnect your lines. We appreciate your participation, and have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.