Hello, and thanks for holding. I'd like to welcome everyone to the AtkinsRéalis conference call on our results for the 4th quarter of 2024. Right now, everyone attending is in a listen-only mode. Once the speaker finishes presenting, we'll open things up for a question-and-answer session. If you'd like to ask something during that session, just press star 11 on your phone. Please note that this call is being recorded. I'll now hand things over to your host for today, Denis Jasmin, Vice President of Investor Relations. Denis, please go ahead.

Denis Jasmin

executive
#2

Much appreciated, Lydia, and thanks very much. Good morning, everyone. <<foreign_lang>>. We're glad you could be with us. If you've just joined, you're encouraged to pull up the slide deck that's been placed in the investor area of our site, since we'll be referencing it throughout today's session. This call is being webcast as well. Joining me now. Chance for you to take part. Feel free to come back to the Q&A afterward with any follow-up questions. I'd like to point everyone to slide two. Anything we say on this call could include forward-looking information. By its very nature, such information rests on assumptions, risks, and uncertainties, so actual results might differ materially from the views we express today. To learn more about those assumptions, risks, and uncertainties, please review the company-relevant filings on SEDAR+. Those documents can also be accessed through our website. In addition, we may reference certain non-IFRS financial measures during this call. A reconciliation of those amounts to the corresponding IFRS financial measures appears in our earnings release and MD&A, both of which are available on SEDAR+ and our website. At this point, I'll hand things over to Ian Edwards. Ian.

Ian Edwards

executive
#3

Thank you, Denis. Good morning, everyone, and thank you for being with us today. Before we dive deep into what was a great 2024, I want to take a moment to recap a few announcements. First, I am really pleased with the agreement signed earlier this morning for the sale of our interest in Highway 407. As outlined at our Investor Day, this is an important step in our strategic journey to simplify the business, create value for shareholders, and become a focused, world-class engineering services and nuclear company. Jeff will provide more details on the transaction in a few minutes. Second, we have announced a number of organizational changes. To begin with, Phil Hoare is stepping down as Chief Operating Officer to join Balfour Beatty as their new Chief Executive Officer. He will stay on until the summer to allow for a smooth transition with his replacement. During that time, Phil will continue instituting measures across the business that will yield sustainable margin improvement. I want to thank Phil for his contributions to the organization, but also to me personally, and we wish him all the best in his new role. We also announced personnel changes to strengthen our engineering services businesses in the U.K.

Ian Edwards

executive
#4

We also strengthened operations in Ireland and the EMEA region. Within our nuclear division, we've bolstered our operational capacity so we can successfully deliver the growing backlog. Those adjustments will help us keep delivering excellence and generating growth for many years ahead. Let's turn to slide three now and talk about our successful 2024. It was a memorable year, one in which we completed our pivot to a growth strategy. The past year's success underscores even more the rising demand for what we offer as the energy transition proceeds and global infrastructure ages. Our diversified portfolio lets us perform consistently through the economic cycle across our main business segments and regions. This year, AtkinsRéalis Services produced record-high revenue of $9.3 billion, which means over 15% organic growth and a segment-adjusted EBIT to segment revenue ratio above 9%. We posted a record backlog for AtkinsRéalis Services totaling over $17 billion at year-end. That's an increase of over 25% compared with the close of 2023. The 2024 results show our purpose-built strategy of growing into geographies and markets offering high total returns. They also deepen our confidence in the margin expansion plan we laid out at our June Investor Day.

Ian Edwards

executive
#5

For 2024, our performance was strong in every area, and we either hit or surpassed the outlook targets we set out at the start of the year. Net cash from operating activities came in above $500 million, which underscores how AtkinsRéalis generates cash. We secured a number of significant nuclear contracts, made considerable operational improvements at our Linxon joint venture, and brought our Trillium Line LSTK project to substantial completion. Finally, we added 1,350 new employees organically to headcount, all while keeping an employee engagement score that leads the industry. As I said a moment ago, we have now formally wrapped up the 2022 to 2024 strategy centered on pivoting to growth. On slide five you can see that every target set during the 2021 Investor Day was met or exceeded. What we delivered over that three-year period demonstrates how focused our leadership team is on honoring commitments, and we are confident we can drive additional revenue growth along with margin expansion in our engineering services and nuclear portfolios, as set out in our new delivering excellence and driving growth strategy. We are optimizing the business, speeding up value creation, and probing the untapped potential in the end markets and geographies we have chosen. Turning now to slide six and the quarterly results: revenue at AtkinsRéalis Services grew 11% organically, and segment-adjusted EBIT rose 21% to $243 million.

Ian Edwards

executive
#6

Revenue in our engineering services regions fell 3% organically, to $1.7 billion, while nuclear revenue rose 64% organically, to $464 million, which is a record high. Linxon revenue was up 70% organically. Together, these produced more than $300 million of operating cash flow this quarter and a balance sheet whose leverage ratio stands at a strong 1.1, at the low end of our target range. Slide seven shows how our backlog keeps growing across AtkinsRéalis Services. The 25% growth in 2024 came from key wins in our core engineering services, nuclear, and Linxon businesses. In nuclear, we landed a contract to build the C3 and C4 reactors at the Cernavodă nuclear generating station in Romania. We're very excited to support the next phase of work at Cernavodă using our CANDU expertise, since these units will let Romania nearly double its output of low-carbon, reliable, and affordable electricity. In Ireland, we secured key engineering and design contracts for water and rail projects, and in the U.S., we strengthened our already solid relationship with the Florida Department of Transport by winning a contract for phased design build on a major interstate. On slide eight, our engineering services business posted robust organic top-line growth in 2024, with an 8% year-over-year increase to a record high of $7 billion.

Ian Edwards

executive
#7

The revenue we brought in came from our ongoing success in landing new contracts throughout the regions where we operate. During our third quarter earnings call, we noted that net organic revenue growth for the fourth quarter, on a year over year basis, was expected to come in below what earlier quarters had delivered. The reason was exceptionally strong fourth quarter growth in 2023, combined with the wrap-up of a few significant projects. Consequently, revenue in the fourth quarter declined 3% on an organic basis. Segment-adjusted EBITDA over net revenue margin came in at almost 16% for 2024 and 16.3% for the fourth quarter, which reflects gains of 90 basis points and 20 basis points, respectively, compared with the prior year period. Our backlog kept growing and now sits at roughly $12 billion, which marks 14% growth relative to our backlog as at December 31st, 2023. Starting on slide nine, we give an overview of all four of our regions along with how each performed in the fourth quarter and the full year 2024. In Canada, organic revenue growth was flat across the year yet shrank 11% in the fourth quarter, largely because a project wrapped up earlier in 2024 that carried a high percentage of flow-through costs.

Ian Edwards

executive
#8

Segment-adjusted EBITDA came in at $31 million for the fourth quarter and $111 million for the full year. We closed out 2024 with a margin of nearly 13%. Our backlog was up 23% compared with the prior year. We keep winning key awards across transportation, buildings and places, and power and renewables end markets, and we're delighted to have been chosen recently for the Alto high-speed rail project, which could reshape Canadian mobility linking Ontario and Quebec. As we begin the first year of our delivering excellence and driving growth strategy, we're focused on delivering margin improvement, growing our footprint in Ontario and Western Canada, and strengthening our standing in several high-growth end markets. In the U.K. and Ireland, this year's performance shows the strong position we've built in high-growth markets including water, aviation, defense, and power and renewables. Organic revenue growth for the quarter was flat against the fourth quarter of 2023, largely because of temporary uncertainty around the U.K. government's project pipeline, which has caused some award deferrals in the transportation, education, and health markets. In January, the U.K. government set out its comprehensive 10-year infrastructure strategy. Further details are expected later this year, but the strategy is meant to support long-term planning that is essential for housing, low-cost carbon, energy, net-zero targets, and improving public services.

Ian Edwards

executive
#9

They’re likewise dedicated to putting capital into the nuclear and defense industries. AtkinsRéalis stands out across every one of those fields, and the strong position we’ve held in the market for a long time means we’re well placed to win a reasonable portion of the work involved here. Looking at the full year, organic revenue rose 4%, reaching almost $2.5 billion. Segment-adjusted EBITDA climbed to $95 million for the quarter, and for the entire year segment-adjusted EBITDA came in at $343 million. The EBITDA margin hit 19.6% during the most recent quarter — a record high — driven largely by how well we’re able to make project delivery more efficient. Backlog kept expanding through the fourth quarter, reaching roughly $1.7 billion, helped partly by fresh work orders coming from the water business. Moving to slide 11, we’re still seeing solid headway on our US land and expand strategy — we acquired David Evans Enterprises, secured new projects with the Jersey Department of Transport, and deepened our footprint in California and the Mid-Atlantic. In the fourth quarter, organic revenue was up 4% compared with a year earlier, since gains in the underlying transportation engineering sector were partly cancelled out by a decline in our global minerals and mining sector. Across the full year, organic revenue increased 10% to $1.7 billion. Segment-adjusted EBITDA took a hit from extra remediation costs tied to wrapping up a couple of projects that have now been completed.

Ian Edwards

executive
#10

Segment-adjusted EBITDA finished the year at $182 million, which was a touch under what we delivered in 2023. Our backlog grew 2% year over year, reaching roughly $1.6 billion, and that reflects how we kept prioritizing key clients and making the most of our distinctive capabilities. Throughout the U.S., we secured important wins in water, rail, and transportation infrastructure — the markets where we're known for our expertise around the globe. Looking forward, the pipeline of new work and revenue opportunities we see in the U.S. is as robust as it has ever been. We recently signed a definitive agreement to buy a 70% stake in David Evans Enterprises, which is an engineering and staff augmentation services firm based in Portland, Oregon. David Evans fits our land and expand strategy in the US really well strategically, giving us a West Coast regional platform with a high-quality employee base and substantial potential to leverage our combined capabilities. This deal is a strong illustration of how we're delivering against the M&A criteria we laid out at our 2024 Investor Day. First, it's consistent with our strategy of acquiring companies that have long-standing, deep local customer relationships in a market where our footprint is smaller. It lets us bring our distinctive technical capabilities into more regionally focused, high-growth end markets, including transportation, water, and power and renewables.

Ian Edwards

executive
#11

Combining our strengths gives us the size and scale needed to handle large, complex projects, which moves us further up the value chain and expands the project pipeline we can pursue together. Last but not least, David Evans enjoys a strong industry reputation and places real emphasis on people. Its dedication to clients and its corporate values line up perfectly with those of us at AtkinsRéalis. We are genuinely thrilled to bring David Evans into the company. Within EMEA, revenue on an organic basis fell 8% compared with the fourth quarter of 2023, while segment-adjusted EBITDA rose by $34 million, a 17% margin over net revenue. Across the full year, revenue came to $1.3 billion, which is 28% organic growth against 2023. Segment-adjusted EBITDA reached $150 million, roughly an 18% margin. Our Middle East business has expanded substantially over the past two years, and that is a level we feel comfortable with. As a result, we anticipate more moderate growth in the years ahead, since we will stay selective and partner with high-quality clients seeking best-in-class engineering capability to help get projects delivered. In Asia, we are observing greater government investment tied to infrastructure and transportation. Our demonstrated capacity to support defense work around the world, together with our deep power expertise, puts us in position to capture potential Australian government investment in defense as well as power and renewables.

Ian Edwards

executive
#12

Now let's turn to slide 14, where we'll go over how the nuclear business performed. We're still seeing substantial expansion — organic revenue for the quarter rose 64% against the fourth quarter of 2023. Across the full year, revenue came in at roughly $1.5 billion, a record high, reflecting organic growth of 41% compared with 2023. Nuclear backlog stands at $3.2 billion, over 70% above where it sat on December 31st, 2023, and the main driver was life extension bookings within the CANDU fleet in Canada, Europe, and Asia. Segment-adjusted EBIT rose 36% to $56 million in the fourth quarter, and for the full year it was up 27% to $184 million. Measured against segment revenue, segment-adjusted EBIT came to 12% in the quarter and 12.4% for the full year. Moving to slide 15, we're showing what's been accomplished across our nuclear, CANDU, and services portfolios. Within CANDU, things are going very well on both life extension projects and new builds. We're especially happy about the agreement reached with the government of Canada, which is set to supply long-term financing of as much as $304 million so we can keep advancing the proven CANDU technology, the Monarch included.

Ian Edwards

executive
#13

This shows our complete dedication to backing the indigenous CANDU technology both in Canada and abroad. In Romania, as I mentioned earlier, the work we've done at the Cernavodă nuclear generating station over the past several years led to the contract for building two additional CANDU reactors. That's a significant milestone, since it marks the first new-build CANDU reactor contract win anywhere in the world since 2007. On top of that, we were given the contract to carry out the retube and the life extension at Cernavodă C1. With that award, the total contract value for AtkinsRéalis's work on Cernavodă unit one now comes to nearly $1.9 billion. Separately, we finished the refurbishment of the Darlington reactor one. That came in five months ahead of schedule, which shows our capacity to deliver major nuclear projects on time and ahead of schedule. Finally, in January this year, we signed a multi-billion dollar contract for CANDU life extensions at the Pickering nuclear generating station. In our services business, AtkinsRéalis was chosen to support new fissile design with Rolls-Royce submarines as part of their plans to double the size of their site in England. Alongside this work, we're seeing further opportunities for SMR development in the U.S. and services in the U.K.

Ian Edwards

executive
#14

In Washington state, we're backing a project together with Energy Northwest. Meanwhile, in the U.K., we're applying our new-build know-how at Hinkley Point C and Sizewell C, as well as providing decommissioning services at Sellafield. On top of that, in the U.S., we won a significant award from the Department of Energy to operate and maintain the depleted uranium hexafluoride conversion facilities located in Kentucky and Ohio. If we move to slide 16, I'd like to draw more attention to the near-term and long-term CANDU revenue opportunities inside our nuclear business. As you can see, thanks to our ongoing backlog growth and the contract wins we've had over the past couple of years, our customers keep recognizing our nuclear expertise. That is turning into revenues we're booking right now, and at the same time it's building a solid backlog of strong future revenues for AtkinsRéalis. The potential contracts shown on this slide amount to a massive opportunity for AtkinsRéalis and could deliver significant growth for the foreseeable future. These are profitable contracts, and they show that we have genuine backlog with genuine teams in place delivering work each and every day on these projects. Now let's go to slide 17 and our Linxon LSTK and capital businesses. In the Linxon segment, revenue grew organically 70% quarter over quarter and 42% for the year, which shows strong volume momentum through 2024.

Ian Edwards

executive
#15

On a realized basis, we saw 760 basis points of EBIT margin expansion during the fourth quarter, along with 350 basis points for the full year, as the operational improvements we put in place earlier this year have started to take hold. Our backlog rose 48%, reaching a record high of $2.1 billion at year-end. We secured a number of awards throughout the Americas, Europe, and the Middle East, which produced strong results compared with prior years and brought us to $1.5 billion in bookings for the calendar year. Turning to the LSTK projects, we booked negative adjustment EBIT this quarter because of difficulties on two projects. The first involved elevated commissioning costs tied to reaching substantial completion on the Trillium Line project, which went into operation in January this year. The second was on the Eglinton project, where we added provisions for future delays in putting that project into operation. On that project, we anticipate our responsibilities will be largely finished by the summer. Regarding capital, we received $47 million in dividends from Highway 407 in Q4, with traffic patterns continuing to improve year over year. With that, I'll now hand things over to Jeff to go through our financial results and the 2025 outlook.

Jeff Bell

executive
#16

Thanks, Ian, and good morning, everyone. If you’ll turn to slide 19, total revenues for the quarter rose 14% year over year, coming in at $2.6 billion. Revenues from our professional services and project management business were up by 14%, which included a 15% revenue increase for our services business and a 24% decrease in LSTK projects as we complete the remaining projects. Total segment-adjusted EBIT for the quarter was $217 million, made up of $243 million for AtkinsRéalis services, $58 million for capital, and negative EBIT of $84 million for LSTK projects. Corporate ST&A expenses from PSMPM came to $49 million in the quarter, higher than last year as expected, mainly because of the strong appreciation of our share price in 2024 and how that affected our long-term employee incentives expense. We expect corporate ST&A from PSMPM to land between $120-$130 million for full year 2025. IFRS net income this quarter was $52 million, versus $90 million in Q4 2023. Adjusted EPS from PSMPM for the quarter was $0.26 per diluted share, compared with $0.45 in the fourth quarter last year. On slide 20, you can see the selected financial metrics for the full year.

Jeff Bell

executive
#17

For the year, total revenues rose 12% to $9.7 billion versus 2023. PSMPM revenues grew 12%, and within that, our services business saw a 16% revenue increase while LSTK projects declined 51%. Segment-adjusted EBIT in total for the year was up 10% to $845 million, made up of $872 million from AtkinsRéalis services, $107 million from capital, and negative $134 million from LSTK projects. For 2025, we would anticipate the quarterly EBIT loss on LSTK projects to fall within a $10-$20 million range, which represents overhead costs, the cost to pursue outstanding claims, and reflects the higher commissioning costs we experienced in 2024. Net financial expenses came to $163 million for the year, down from $186 million in 2023, driven mainly by a lower level of recourse debt and lower interest rates. IFRS net income from continuing operations was $284 million, in line with 2023, and that included a $46 million net gain on the disposal of our Scandinavian engineering services business. Adjusted net income from PSMPM was up 15% to $315 million, or $1.79 per diluted share. For 2025, we expect a tax rate on our adjusted PSMPM net income in the high 20%.

Jeff Bell

executive
#18

We closed the year with backlog at an all-time high of $17.5 billion, which is 24% above where it stood at the close of 2023, and we saw robust book-to-bill ratios across engineering services, nuclear, and Linxon. Turning now to slide 21 and free cash flow: net cash from operating activities came in at $526 million for 2024, versus $66 million in 2023, reflecting better cash generation in AtkinsRéalis services and a substantial reduction in cash outflows on LSTK projects. The year-over-year gain in AtkinsRéalis services was fueled by higher EBITDA and stronger working capital positions, including sizable advances of roughly $100 million on nuclear refurbishment contracts. Since those advances are largely expected to be used up during 2025, we expect net cash from operating activities for the company to come in below 2024's level in 2025, because forecast cash flow growth from higher EBITDA won't be enough to offset this working capital effect. For the full year 2025, we anticipate operating cash flow above $300 million. Keep in mind that we expect cash generation to lean more toward the second half, following a pattern similar to 2024. After CapEx of $160 million—which included $48 million for Monarch's development in 2024—and lease liability payments of $81 million, our free cash flow came to $327 million for the year.

Jeff Bell

executive
#19

I'd point out that the $43 million in provincial and federal charges are the last payments required under those arrangements. For 2025, we anticipate a higher level of CapEx, somewhere in the range of $150-$200 million, since we're continuing to put money into developing the CANDU Monarch nuclear reactor. Our view is that this investment will establish the groundwork for nuclear revenue growth down the road, given that demand for reliable, low-carbon power generation stays a priority across the globe. Our leverage ratio kept improving in Q4, and at year-end, net recourse and non-recourse debt to adjusted EBITDA stood at 1.1, which is at the lower end of our one to two times target range. Turning to slide 22, as you've seen, we've signed three agreements to sell our whole 6.76% interest in our Highway 407 investment. Just over 5% goes to Ferrovial, with 3.3% sold under a share purchase agreement payable at closing, and the remaining 1.76% under a put-and-call option agreement exercisable during the 18 months post-closing. We'll also sell 1.7% to CPP Investments under a share purchase agreement, and we would expect payment shortly after the Ferrovial sales close.

Jeff Bell

executive
#20

The put-and-call option involving Ferrovial, along with the share purchase agreement with CPP Investments, will each be adjusted according to a formula both parties agreed upon, factoring in the timing of exercise or payment. Roughly $2.8 billion is the total price. A portion of those proceeds will go toward repaying the associated limited recourse debt of $400 million. On the net gain from this transaction, we anticipate paying a cash tax in the mid to high single-digit percentage range, made possible by applying available non-capital losses. After that, the net proceeds will be allocated consistent with the capital allocation priorities the company laid out at our 2024 Investor Day, and in line with what management and the board of directors consider to be in the company's best interest and most accretive to shareholder value over time. That would involve reducing indebtedness, possibly funding additional growth via small and mid-size acquisitions, and returning capital to shareholders, with share buybacks being our preferred method to do so. Closing of the transaction is expected in the second quarter of 2025. Lastly, moving to slide 23, I'd like to address the outlook, which I will summarize. With our high-level backlog and a strong pipeline of opportunities, for the engineering services regions we anticipate organic revenue growth compared to 2024 of between 7 to 9%, with a segment-adjusted EBITDA to net revenue margin expected to land between 16 to 17%.

Jeff Bell

executive
#21

Keep in mind that we anticipate organic growth will lean more heavily toward the latter portion of 2025, since the factors behind the weaker growth in Q4 carry over into the early part of 2025 before they fall away. Regarding the nuclear segment, we anticipate that revenues for the entire year 2025 will keep rising and land between $1.6-$1.7 billion, with an adjusted EBIT to gross revenue margin falling in the 12%-14% range. With that said, I'll now return the presentation to Ian.

Ian Edwards

executive
#22

Thanks, Jeff. 2024 proved to be a remarkable year, and I want to recognize the efforts of our over 38,000 staff members, whose commitment and hard work produced record results for our engineering services and nuclear segments. With our pivoting to growth strategy now complete, I take pride in everything we achieved across the last three years. It's clear that our strategic, geographic, and market positioning is delivering a favorable effect on the company. Revenue is on the rise, backlog keeps expanding, margins continue to strengthen, and we are producing positive operating cash flows. We've demonstrated that we can meet our goals and honor our commitments. As we embark on our delivering excellence and driving growth strategy, our capacity to operate more efficiently and produce bottom-line gains will become evident in the coming few years. This strategy rests on optimizing the business to generate profitable growth, speeding up our footprint in expanding end markets and regions, and seeking out untapped opportunities throughout the organization. We assist public and private entities in reaching their net zero objectives and tackling the energy trilemma, delivering low-carbon, affordable, and secure energy solutions. Given our historical execution track record, we are the partner of choice for these efforts, and we take pride in helping build a better future for our planet and its people.

Ian Edwards

executive
#23

The opportunities ahead of us have us genuinely enthusiastic, and we intend to seize them during 2025 and afterward. With that said, let's begin taking questions.

Operator

operator
#24

Thanks. Just a quick reminder that if you'd like to ask a question, you'll need to press star one one on your phone and then wait for your name to be announced. If you want to withdraw your question, just press star one one once more. Please hold while we put together the Q&A roster. Our first question is coming from Sabahat Khan at RBC Capital Markets. Your line is now open.

Sabahat Khan

analyst
#25

Thanks, and good morning. I suppose regarding this morning's transaction on the 407, just where the proceeds are going — you mentioned share buybacks, and it appears you've announced an NCIB. Might there be any possibility of something beyond, say, share buybacks, or would those buybacks simply hinge on the share price and how you see it? The second thing is, given your M&A activity, might there be a chance to speed that up thanks to the balance sheet capacity, or do you simply expect to carry on with it, with the balance sheet just a little cleaner next time?

Ian Edwards

executive
#26

Yeah, thanks for the question. Look, obviously we're very happy to have reached this deal to sell the 407. I mean, we did talk about it at the Investor Day. It's squarely in line with our strategy of pursuing value creation for the company under an engineering services and nuclear business. You'll recall that we laid out a really clear capital allocation plan around reducing debt, small to medium-sized M&A, and returns to shareholders. I'll let Jeff come back on the returns to shareholders in a moment. I do want to say one thing here and be clear about it. We've completed our first acquisition, and we're proud of that. We have a methodical plan, and we need to stick with the plan that we have for M&A, which is basically filling geographical white space and filling capability white space in small to medium-sized acquisitions. Until we have been through that methodical process and developed the capabilities and the confidence that we can integrate successfully and that we can fill those white spaces successfully, that's where we're going to stay. That's the M&A program that we're going to stay with. As for the returns to shareholders, Jeff, I don't know if you want to kind of come in on that point about the potential share buyback.

Jeff Bell

executive
#27

Yes. Sabahat, as you mentioned, you'd have noticed the NCIB we filed this morning, and it's at a higher level than last year's. That really reflects the balanced capital allocation framework Ian discussed and that I brought up in my script — we'd expect some of it to be deployed over time through a share buyback. We'll keep reviewing that balance with the board on an ongoing basis, looking at what creates the most value, and evolve it as we go.

Sabahat Khan

analyst
#28

Alright, thanks. Maybe just one question about the engineering side—I suppose, for your 7%-9% organic growth guidance in 2025. You gave us some color on that already, but perhaps you could go a bit deeper into the bigger contributors there, and in particular maybe explore your view of your US business, given some of the headlines we're seeing out there.

Ian Edwards

executive
#29

Thank you. Yeah. So obviously we were happy with the 8.4% growth in the engineering services business in 2024. There was a bit of a slowdown toward the end of the year, and that will probably carry into Q1 of this year. As we move through the year, every metric we track tells us the markets are strong. Take our backlog, which is a genuinely forward-looking measure — it's clearly up 25%. We're quite confident, and 14% in engineering services. We're quite confident about the markets. I mean, the markets are still — no matter the geopolitical turmoil — the markets are still supported by the need to replace aging infrastructure and to boost electrical generation and energy transmission. Those are central priorities for investment, especially in the U.S., Canada, and the U.K. We're obviously comfortable with the range we've issued. Our long-range figure is above 8%. We remain comfortable with that. If there are questions about specifics for particular regions, I'm happy to answer those.

Sabahat Khan

analyst
#30

Much appreciated. I’ll share that with the team. Thank you.

Operator

operator
#31

The next caller is Yuri Lynk from Canaccord. Your line is open now.

Yuri Lynk

analyst
#32

Morning, everyone.

Ian Edwards

executive
#33

Good morning, everyone.

Operator

operator
#34

Good morning, everyone.

Yuri Lynk

analyst
#35

Turning to margins in Canada and the US specifically — I mean, 2024 brought solid growth, particularly in the US, yet margins declined in both regions. So I'm just wondering whether we should expect Canada and the US to carry most of the weight on the margin side in reaching your 2025 margin improvement target?

Ian Edwards

executive
#36

Absolutely, and that's a fair question. As you're aware, we've laid out a very specific roadmap for expanding margins. That roadmap has to hit — and it will hit — the long-term target we've described for 2027: an enhancement of 200 to 300 basis points, taking EBITDA to net revenue to 17%-18%. Twenty twenty-five marked the inaugural year of this initiative, and over the course of it we gained 90 basis points. I view that as encouraging — the initiative is delivering and we're essentially where we should be. We've provided guidance of 16%-17% for 2025, and we're confident we'll get there. I did mention that it won't progress evenly across every region. What I mean is, we moved to regional reporting so you can observe which regions are doing well and which ones require more work — that's about being transparent. Honestly, they're each at a different point. Take the U.K. — that's our most established operation. It delivers our strongest margin, and that's what you'd anticipate. In the Middle East we've been extremely intentional about pursuing premium-quality work, and we intend to keep doing so. That's precisely why it's a high-margin operation. Canada is trending upward, it started from a low base, it keeps getting better, and we'll see additional gains in 2025.

Ian Edwards

executive
#37

The US is a growth region for us, so to speak. There, we take a land-and-expand approach, and we're weighing margin expansion against growth. Overall, we're pleased with how far we've come. There are quite specific initiatives spanning the entire business to get us there. We're confident about reaching that 16, 17, in 2025.

Jeff Bell

executive
#38

There's another point I'd like to tack on there, Ian, and it relates specifically to what you're asking about — the US, for example. As Ian said before, we had a few projects during 2024 that carried extra remediation costs, and we don't anticipate those coming back in 2025. So that's another factor that will support the year-over-year gain we anticipate seeing as we head into 2025 in the US, for instance.

Yuri Lynk

analyst
#39

All right, final question — just seeking some clarity regarding Monarch. Looking at slide 16, which addresses the new-build opportunities in Canada, the slide lists Monarch followed by a slash and then CANDU. Does that suggest the existing CANDU technology might be selected for a new build in Canada? I'm merely attempting to interpret what you're —

Ian Edwards

executive
#40

Right. No, no — absolutely, yes. I mean, this is technology that already exists, and it's being put to use at Stone and Boulder on units three and four. So what's being built there is what we refer to as the existing EC6. Of course, that 600-megawatt reactor has been upgraded so that, from both a safety and a regulatory standpoint, it's the latest generation. It remains highly relevant as a reactor that's current today. As for the customers we're engaged with — and since we're in a competitive situation, nothing is guaranteed. The customers we're pursuing in Canada genuinely want this Monarch gigawatt-scale reactor. That's precisely why we embarked on its development, and we think it's the ideal size in terms of cost and efficiency, delivering the lowest cost of electricity. That's the reason we're developing it for both the global market and the domestic one. It's quite possible that certain provinces will opt for the existing technology. I mean, all of this is still a work in progress. We're quite excited about two customers in Ontario, and we're quite excited about a customer in Alberta. Naturally, there are no confirmed orders to announce today. Things are looking pretty good going forward, including international interest in Europe and Asia as well, Asia-Pacific. It could be either one. That's a fair question.

Yuri Lynk

analyst
#41

Alright. Is the Monarch able to accept enriched uranium, or is natural uranium also an option for it? That's my final question.

Ian Edwards

executive
#42

No. No. Every characteristic of the Monarch matches what you find in the CANDU technology we already have. CANDU offers three genuinely distinct benefits compared with any other technology available anywhere in the world. First, it runs on natural uranium, and natural uranium exists in plentiful supply. Enriched uranium is really scarce at the moment, since 47% of it comes out of Russia. Second is the medical isotope. Byproducts from a CANDU reactor are able to produce medical isotopes, and that too is unique. The third — and this is becoming truly significant — is that every component of a CANDU reactor can be manufactured in Canada. It's among the few technologies that doesn't have to look overseas for enormous forged metal components.

Yuri Lynk

analyst
#43

I appreciate that.

Operator

operator
#44

I appreciate that.

Ian Edwards

executive
#45

The next question is from Chris Murray at ATB Capital Markets. Your line is open now.

Chris Murray

analyst
#46

Yes, thanks, everyone, and good morning. So if we look at the nuclear side of things and try to place 2025 within the larger three-year plan — 2024 was a fairly outstanding year in terms of growth, but my sense is that perhaps we won't necessarily see a material slowdown, though things may just level off somewhat as we head into 2025. Could you give us a bit of color on how we ought to be framing what you'll be focused on across 2025? I recall that at some point we discussed margins drifting toward the bottom end of the range last year. Given where the revenue stack stood at the outset, how should we think about margin progression over the course of this year?

Ian Edwards

executive
#47

Yeah. Yeah. Good question. So obviously, we issued a revenue range for this year of $1.6-$1.7 billion. From that you can see that the kind of almost exponential growth we saw in 2024 doesn't continue into 2025. What I think matters is that backlog has gone up significantly. The revenues we're going to see in 2025, 2026, 2027 are almost all in backlog, because these projects get released in phases, as you can see on slide 16, and not all of those phases are in backlog yet. These projects ramp up. Even the life extension project will begin with engineering, and then it moves into physical work, and revenues build through that. It's almost like what you see on the page there in terms of getting to 2027, $1.8 billion-$2 billion. We are almost there. We're very, very confident in doing that. Now, what's the potential for revenues and projects and backlog on top of that? That's what we try to articulate on this slide as well. It's obviously a long process for customers to make a commitment to what will be tens of billions of dollars of nuclear commitment.

Ian Edwards

executive
#48

So at this point, the government seems to be committing to that, especially in certain Canadian provinces and in a few nations globally. We're putting a lot of effort into promoting the CANDU, selling the Monarch along with the existing reactor, and competing globally against really just four players: the French, the Koreans, American technology, and our own. Should orders start coming in — and my guess is new nuclear probably won't happen this year, perhaps next year — those revenues would let us keep going well past 2027 with dependable revenue and a solid order book. That's sort of how everything fits together. Chris, I'm not sure whether that responds to your question, but that's our perspective.

Chris Murray

analyst
#49

Yeah, given how the mix is going to look in 2025, do you have any thoughts on whether the margin profile would land closer to the bottom or the top of that range?

Ian Edwards

executive
#50

Absolutely. Jeff, would you like to take that one?

Jeff Bell

executive
#51

Yeah. I think our view would be that it'll fall in the range, probably comparable to what we saw in 2024. Though, Chris, as we've discussed, the factor that could potentially cause us to shift it around a bit is how much procurement we're doing for customers for materials as these life extensions get going. That can move around somewhat quarter by quarter. Now, I'd say at present, it's looking in the first half of the year, like a few of our customers have a strong desire to get ahead of some of that procurement. I think what you'll see is that flowing through into additional whole dollar EBIT and revenue, but that may pull down operating margins a bit in the first half of the year in particular.

Chris Murray

analyst
#52

All right, that's fair. My second question concerns how the 407 sale is structured mechanically. Perhaps you could take us through that a bit so I can follow it. A few components are closing — namely the two share purchase agreements. Could you give us somewhat more detail on what is expected there? As I understand it, the sale to CPP Investments carries conditions; maybe you could explain how that works. What was the reasoning behind including the put-call agreement in the deal?

Jeff Bell

executive
#53

You're absolutely right. If we break down the deal, roughly half of it — the 3.3% with Ferrovial — is payable and will close at the end of the period between signing and closing. We'd expect that to happen in Q2. Both Ferrovial and CPP Investments wanted a deferral option of up to 18 months, given how they're deploying capital overall. In effect, the second portion of the transaction comes in two tranches — one of about $725 million and another of $700 million with CPPIB. That extra $1.4 billion would apply if they waited the entire 18 months. What we agreed with them is that both sides hold options, but should they exercise the call option at the front end of that 18-month window, an adjustment and a discount for the time value of money would apply.

Chris Murray

analyst
#54

Okay, all right. At this point, though, aside from being within that 18-month window, we don't really have clarity on precisely when a number of those transactions are going to take place.

Jeff Bell

executive
#55

Right, so at present, our thinking is that we'd definitely anticipate the CPPIB investment could get called fairly soon after the closing period wraps up. Both they and Ferrovial do hold an option regarding that. Okay. Alright, I'll stop there.

Chris Murray

analyst
#56

I appreciate it.

Jeff Bell

executive
#57

Thanks, everyone, and welcome.

Operator

operator
#58

Thanks. We move now to a question from Benoit Poirier at Desjardins — Benoit, your line is open.

Benoît Poirier

analyst
#59

Hi there. Good morning, everybody. And congratulations on this morning's 407 announcement. Regarding cash flow from operating, that's an area where I'd really like to get more detail. You're expecting to bring in more than $300 million this year once the advance payment on nuclear is factored in. Right now that appears to be well off what the street is expecting. Could you expand a bit on what's behind those figures, the various components, and how they relate to the $526 million achieved in 2024? How much was the advance payment you received on nuclear projects? I'm just trying to reconcile the components and to see whether you're being conservative with that $300 million figure. Thank you.

Jeff Bell

executive
#60

Yes, absolutely — you're right about that. On the nuclear progress payments, as I mentioned during my presentation, it's roughly $100 million, slightly above that, which we essentially collected and hadn't burned off in 2024; however, we'd anticipate burning it off during 2025. Basically, Ben, that gives you a year-over-year swing of about $200 million. Another thing, clearly, that we're looking at over the longer term is getting to that 80%-90% conversion of free cash flow into net income, and that figure came very much without the cash flow boost from the LSTK projects. As I said, we're going to see that come through across 2025. Setting those two items aside, the remainder of the business — the underlying business — is turning net income into cash flow, or producing operating cash flow, consistent with the 80%-90% target we set out at our investor day.

Benoît Poirier

analyst
#61

Alright. Alright. That's excellent, Caller. Regarding margin — EBITDA margin by region — clearly you provided certain specifics on the US, and how remediation costs affected it, which essentially account for the margin drop this year. I'd be interested to know whether you could quantify those remediation costs. As we look toward 2025, are any regions more susceptible to possible remediation costs?

Jeff Bell

executive
#62

Yeah, absolutely. As far as the US goes, we'd definitely be looking at a bit more than 100 basis points there. That should obviously deliver an improvement as we head into 2025. And when it comes to the other regions, broadly speaking, across all projects, a number of them beat their forecast and their initial selling margin. A few fall a little short of that. It's simply that we had a couple in the US that were bigger in scale and nature than what we'd typically see. We made certain to take the charges required against that. That provides us with a clear run-through into 2025.

Ian Edwards

executive
#63

I think the long-range improvement of 2 to 300 basis points toward the 17%-18% in 2027 — we're confident we can reach that. Obviously, the 90 basis points of improvement in 2025 pleases us. We've committed to going further than that, to 16%-17% in 2025. We have very specific pieces of the margin improvement plan: using technology, AI, and digital tools; broadly cutting overhead; making sure the backlog margin is strong where we bid; greater use of the GTC; and then collaboration globally across the company to raise utilization rates. Those are somewhat global initiatives, and different parts of the business are at different stages with them. The plan is that over a period of time we'll bring them all to the same place. Naturally, there's always the occasional one-off that you'll see now that we report regionally, such as the US, where we have a quarter issue. What I'm pleased about, and what I'm confident about, is the destination, because the plans are working, and we're going to get where we need to be across the business.

Benoît Poirier

analyst
#64

Thanks, Caller. This will probably be my final question. Clearly, the David Evans acquisition has been announced, and we're very happy about that news. Could you perhaps share some detail on how David Evans has grown organically in the past? And maybe tell us what's currently in the bidding funnel for M&E Fort Hawkins?

Ian Edwards

executive
#65

Yes. As I mentioned before, whether or not the 407 is sold, a plan exists on our side. That plan centers on expanding geographically and on developing capabilities in end markets that are already established. Now, as you're aware, we lack a full coast-to-coast operation in the US. This acquisition is an excellent one for growing our West. From a geographic standpoint, we'll continue going after other regions of the US, and potentially other geographies too, where our presence is currently low, where we think the markets are robust and suit our capabilities. We'll also aim to add capabilities. Take, for instance, the power renewables market worldwide, which everyone knows is highly active. We'll be actively seeking capability enhancement through that, as one example. Now, the key to all of this is that we are genuinely rigorous about finding quality targets and quality customers who share our culture, who have a track record of performance and business track record and relationships. David Evans fits right into that. Culturally, performance-wise, and what we see in this particular acquisition, which we intend to repeat, is really significant revenue synergies. When we put our global capability with their local presence, we can up the level of bidding at projects immediately.

Ian Edwards

executive
#66

Combining those two really does give you 1 plus 1 equals 3. That's the outcome we're aiming to reproduce, and it's what we intend to pursue in a methodical way, no matter how much money has flowed out of 407. On David Evans's track record specifically, Jeff, perhaps you could address that.

Jeff Bell

executive
#67

Right. The expansion David Evans has been building on their own closely mirrors what we've managed to deliver over the past two years. As Ian mentioned, it fits really nicely into the US business — quite comparable in terms of organic revenue growth rate, plus those extra opportunities in the pipeline, bringing together our global capabilities with their local customer relationships.

Benoît Poirier

analyst
#68

I appreciate you giving me a few minutes here.

Ian Edwards

executive
#69

I appreciate that.

Operator

operator
#70

Thanks. The next question we have is from Maxim Sytchev at NBF, and your line is open now.

Maxim Sytchev

analyst
#71

Hello there, and good morning to you all.

Ian Edwards

executive
#72

Good morning, everyone.

Maxim Sytchev

analyst
#73

Good morning. A lot of the questions have already been covered, but I've got a couple of quick ones myself. I just want to confirm the thinking on M&A — it's really focused on medium-sized tech and something like the Nothing transformation that's currently being considered. Is that right?

Ian Edwards

executive
#74

It is. It is. We've obviously been putting in a lot of effort across roughly the past year, building out a pipeline and growing the market. David Evans Enterprises is the first example of that kind of approach. That's the sort of typical deal you'd expect to see — or perhaps even smaller — over the coming 18 months or so. And what happens after that? Naturally, we'll be building capability, adding capacity, and producing cash flows. Later on, we might go beyond that into something bigger, but right now that isn't the plan.

Maxim Sytchev

analyst
#75

All right, that's quite useful, thanks. I'd like to see whether we can get some additional detail on Linxon. Obviously, we can see the figures — revenue generation rose — but what precisely was behind that increase? And is there any news on your plans for this asset specifically?

Ian Edwards

executive
#76

Thanks. Yeah. I mean, the improvement plan is something I feel good about. Revenue has risen 70%. And we've generated a margin of $31 million from it in 2024. We're genuinely pleased. It really comes down to governance. We hold 51% of this asset — or this company. There's a governance structure in place over it. We've put in hard work alongside the teams inside the business to concentrate on high-growth markets, high-margin clients, clients who pay well. The overall market for energy companies of this kind is strong. We're pleased with the position we've reached. We'll be seeking further improvement as we head into 2025. Divestment is still underway. There's nothing to announce, nothing to announce imminently, so to speak. At the end of the day, the aim is to divest this business. It contains an element of lump sum work. As you know, we no longer do that. At the end of the day, it doesn't really fit with the family of businesses and the portfolio we want to carry forward.

Maxim Sytchev

analyst
#77

All right, that's fair. That one's on me. Thanks a lot.

Operator

operator
#78

Thanks. Our following question is from Michael Tupholme at TD Cowen.

Michael Tupholme

analyst
#79

Appreciate it, and good morning, everyone.

Ian Edwards

executive
#80

Morning, everyone.

Michael Tupholme

analyst
#81

You mentioned nuclear earlier and also touched on Monarch compared with the EC6. I was just wondering whether you could give us an update on where things currently stand regarding how far Monarch's development has progressed, what has been achieved so far, and what remains to be done on that development work.

Ian Edwards

executive
#82

Right, absolutely. We've moved beyond what we refer to as the initial development phase — and this whole effort is really about genuine engineering, working out the engineering specifics so the product can be deployed and built and can satisfy the regulatory framework. That first phase is behind us, and it represented a milestone. We hit it in line with expectations on both cost and schedule. The progress the team is making pleases me. I'm also very pleased by the federal government's backing for the loan covering both CANDU and Monarch development. To me, that demonstrates meaningful support for deploying this indigenous Canadian technology at home and abroad. Honestly, that signal that the government has faith in this technology matters almost more than the loan itself. Development of the Monarch will carry on. It'll be 2027. Put plainly, it will be ready when our domestic customers require it. Because even if we started an order today, certain project permitting requirements would stretch beyond the point where our development of this asset is finished.

Ian Edwards

executive
#83

That’s the schedule we’ve built the entire effort around. When customers require it, we have to be prepared.

Michael Tupholme

analyst
#84

All right, understood. That’s clear. Thanks. Perhaps just a few questions for Jeff regarding LSTK and cash flow. I may have missed this, but I believe you said the LSTK loss for the quarter was tied partly to Eglinton, or was it entirely? I’m not certain. Could you clarify precisely what caused it in terms of which project? Also, from a cash standpoint, what was the real effect of LSTK on cash flow during the quarter and for the full year 2024, if you’re able to address that?

Ian Edwards

executive
#85

I’ll hand it over to Jeff for cash flow. I just want to say—obviously, we’re disappointed. We ran into two issues on top of the usual overhead run rate we’ve been carrying for the last two years. The first of those two was getting Trillium into operation. There were costs tied to wrapping up commissioning, wrapping up defects, and wrapping up the paperwork so that permits and the regulatory environment would allow the asset to go into service. The good news, if you can call it that, on that issue is the railway is now operating and performing really well. That’s one down. Another one down, with almost two still to go, so to speak. The second is that, based on that experience, we added some extra provisions against Eglinton because we believe our obligations there and our work will be completed in summer. We simply want to have it provided for whatever is needed to get it there by summer. The ram, as you know, has always gone well for us. We are almost at the end of this permanently. On the cash flow side, Jeff?

Jeff Bell

executive
#86

Sure. What I'd say is that, as always, the charge we recorded this quarter — that $84 million — reflects both costs actually incurred during the quarter and forward-looking estimates of what it will take to finish the project. In this quarter, I'd say it was roughly an even split between actual cash during the quarter and cash outflow that will come through the first half of this year.

Michael Tupholme

analyst
#87

All right, that's great. Now, looking specifically at 2025, did I hear you correctly that LSTK is anticipated to post an EBIT loss of $10-$20 million each quarter across all of 2025?

Jeff Bell

executive
#88

You're right about that. All right.

Michael Tupholme

analyst
#89

If we sort of combine that with your earlier point that half of the $84 million in the fourth quarter is actually cash for 2025, does that roughly represent the full cash impact from LSTK in 2025? Or should we be expecting more beyond half of that $84 million?

Jeff Bell

executive
#90

Right. So what I mentioned during my remarks is that, from an LSTK standpoint, we'd anticipate 2025 being largely comparable to how 2024 turned out. One of the slides in my presentation shows that for the full year, it came to roughly $130 million. Along those lines, it might come in somewhat lower or somewhat higher, but approximately in that same kind of range.

Michael Tupholme

analyst
#91

All right. That’s great. I’ll stop here. Thanks.

Operator

operator
#92

Frederic Bastien from Raymond James is next, and your line is now open.

Frédéric Bastien

analyst
#93

Morning. I have just a brief question. I'd like to return to the David Evans deals and ask whether you could walk through the reasoning for buying just 70% of that business, and when do you anticipate raising that stake to 100%?

Ian Edwards

executive
#94

Thank you. Yeah. So this is our first acquisition, I believe, in a while — that's probably the first point to make. It's a highly, highly established brand and a highly established company located on the West Coast, out west in the US. Right now our footprint in the west isn't especially strong. We thought an approach involving a stretch of time in which we more or less back something close to a joint venture and grow the revenue synergy would be beneficial from an integration standpoint. Naturally, after a stretch of time, we'll pick up the remaining stake and bring it fully in. That's the thinking. There is, of course, a fixed endpoint to that window that lets us make the acquisition. My expectation is this happens sooner rather than later, since everyone will recognize the upside of collaborating. Honestly, that's already beginning to occur. Is that okay?

Frédéric Bastien

analyst
#95

Absolutely. Appreciate it.

Ian Edwards

executive
#96

Yes. All right, thanks.

Operator

operator
#97

We'll now take a question from Jonathan Goldman at Scotiabank — Jonathan, your line is open.

Jonathan Goldman

analyst
#98

Hello there, and good morning. I appreciate you taking the time for my questions. A lot of them have already been covered, but I’ve got perhaps just two quick ones. Regarding the guidance that organic growth in engineering services will recover halfway back to this year’s level, is that primarily a matter of comparables?

Jeff Bell

executive
#99

Yes, Jeff, you've got it exactly right. Those are the comp issues we discussed in Q4 and noted would carry over into Q1. Once we move into Q2 and beyond, those comp issues drop away, and the organic revenue growth we're naturally generating underneath will emerge.

Ian Edwards

executive
#100

There are a couple of significant moving pieces regarding the Middle East contract. Phase two has slipped. Also, a large battery factory that had been slated for Q4 2023 and Q1 2024 is dropping out. Still, we have no worries about the growth underneath.

Jonathan Goldman

analyst
#101

Alright, understood. Regarding the second question on LSTK, you provided some guidance about the quarterly loss run rates for 2025. Do you believe anything might carry over into 2026 beyond that?

Ian Edwards

executive
#102

Sure, what’s happening with Eglinton is that whether the asset goes into service isn’t for us to decide. That decision clearly belongs to the government. We have a very clear picture of what remains for us to finish and close out our work. We’re quite confident. Yeah. Quite confident that our work will be closed out this year. That entire LSTK chapter is now behind us.

Jonathan Goldman

analyst
#103

Is it reasonable to think the size of those losses or cash flows would likely land in the range you're anticipating, though the timing might move around based on the factors you just listed?

Ian Edwards

executive
#104

Right, and Quantum's position seems appropriate. On the cash flow timing front, Jeff?

Jeff Bell

executive
#105

Right. It might shift around somewhat. You would anticipate a bit more, especially as we get closer to wrapping up our work, which, as we mentioned, happens mid-year, in summer. Likely it would begin to come down during the second half of the year. We still have the supply chain to settle up and final accounts to close out.

Ian Edwards

executive
#106

The quantum cash flow, definitely, though likely somewhat weighted toward the first half rather than the second half.

Jonathan Goldman

analyst
#107

All right, that’s clear. Appreciate you answering my questions.

Operator

operator
#108

Thanks. I see there are no more questions. At this point, I'll hand the call back to Denis Jasmin, who will offer some closing remarks.

Denis Jasmin

executive
#109

I appreciate everyone being here with us right now. Should anything else come to mind, feel free to reach out to me at any point during today or tomorrow. Many thanks, and I hope today treats you wonderfully. Thanks so much.

Operator

operator
#110

That brings us to the end of today's conference call. We appreciate everyone for joining in. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete AtkinsRéalis Group Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to AtkinsRéalis Group Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in AtkinsRéalis Group Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.