All right, good morning everyone, and once more, thank you for joining us so we can walk through and explain the quarter's results. As we had already anticipated, this quarter was a very important one for us, and now we are going through it. Even with weaker production that had been projected beforehand, we still generated cash flows. We are making significant progress on the projects I'm going to share with you. Starting with the results and production itself, as we released in early July, output for this quarter came in at close to 48, 48.5 thousand gold equivalent ounces, which is below the first quarter, mainly due to EPP, where we assessed lower grades during the last quarter. That had been projected since the start of the year; we knew this quarter would be weaker at EPP and that we would be reaching higher grades in Q3 and Q4, significantly higher grades. I'm going to show you that this is exactly what happened in 2021 and 2022. In 2023, we should likewise have a strong Q3 and an even stronger Q4, not only from higher grades at EPP but also because we expect commercial production to start at Almas very soon, plus a gradual increase in Honduras and stable production at Arantzazu. We are maintaining guidance for EPP despite this weaker quarter, since it was already planned. Again, for those who are invested in Aura, now, recently, mining gold is different from other things, from iron ore, for example, because sometimes you reach higher grades and sometimes lower grades. The grades are not spread out very evenly across the site, so sometimes you will have higher and lower grades; this is very common among gold companies, and of course, the more assets you have, the more this gets smoothed out, and we are growing our number of assets and producers, so we should see this movement smooth out over the coming years. At San Andres, we had, we continue to increase production, we continue to improve productivity at the site. If I remind everybody, in the last quarter of last year, we produced close to 12,000 ounces. In the first quarter of this year, we produced 14,000 ounces, and this quarter, slightly over 16,000 ounces. We are gradually improving, and we should keep doing so, moving to 18,000 to 20,000 ounces of production now in Q3 and also Q4. However, since we had a more challenging start to the year at San Andres, this ramp-up is in line with our expectation, but we began at the lower range. In the end, this will affect our production guidance for the year. We are changing the year's guidance for San Andres by around 10,000 ounces. Now the guidance is to be close to 62,000 to 69,000 ounces for the year. Understanding that we will continue to improve, and Q3 and Q4 will be higher production, should be higher production than Q1 and also Q2. Where EBITDA is concerned, Cleber will get into more detail; we hit $26.6 million, which is below the prior quarter, largely due to EPP, where we cut production by grades. At San Andres we raised output, and at Arantzazu we are now quite stable as well; on all-in sustaining cash costs, several different variables had an effect. First, the reduced production hurt our all-in sustaining cash costs, pushing our guidance up by 3% within the middle of the range, reflecting the lower output anticipated for the year at San Andres. On the other side, the dollar's valuation against chiefly the Mexican peso and the Brazilian real. In Honduras it is tied more closely to the dollar. There was no meaningful devaluation; in Mexico and likewise in Brazil, the dollar did devalue, which also touches our costs, and it went up, impacted by the full-year projection, by 6%. We are revisiting guidance for our all-in sustaining cash costs at the middle of the range by 9%, with 3% stemming from lower production at San Andres and 6% from the exchange rate. Since the metal should respond, once you have it on the top line, if we push costs higher in U.S. dollars owing to the dollar's valuation, then again gold and copper prices have appreciated as well relative to what we had forecast at the start of the year. Ultimately, both gold and copper serve to protect against the dollar's valuation and inflation too. Despite this weak production that we projected for the quarter, when you look at the results, we still generate robust cash flows from operations, and that allowed us to honor our commitment to shareholders by paying dividends, and we paid $10 million in June as a dividend to our shareholders. Now, based on the Q3 and Q4 results, we ought to pay another dividend by year-end, since we are now committed to paying our dividends to shareholders twice each year. Moving a bit away from the quarter's results, and looking now at what is happening with the projects or development, with the value creation we are delivering to our shareholders during the quarter, this was very significant. First, in Q1 we completed construction of Almas on budget and on time, you know, at a moment when the whole world faced shortages of products and labor, and many projects were delayed, we managed to meet our commitment to be on time and on budget. Beyond that, the ramp-up has been very satisfactory, and we are already running above nominal capacity in only under 4 to 5 months, when we ought to be declaring commercial production for Almas very soon. We're already running at full capacity, and on top of that, gold recoveries have consistently come in above 90%, at 92% and occasionally 93%, so we feel quite confident about declaring commercial production very soon. Almas is progressing and advancing as we anticipated, and we expect to deliver those results along with commercial production shortly, and it will be included in the EBITDA results for the second semester. Second, Borborema is likewise advancing in line with what we expected. We're just about finishing up the figures for that project's feasibility study, and an announcement should come soon. Beyond that, we've already begun some land works to get the site ready for the investments. Also, we're finalizing the funding very soon so construction can begin. Turning to the market as we continue moving ahead with exploration across all our projects. Before I turn to the numbers, on safety, which is very important, we again had zero lost time injuries in Q2, just as we did in Q1. At both Almas and EPP, it has now been one year without any lost time injury as well.

Rodrigo Barbosa

executive
#2

When it comes to how stable the structures are, each month an external review is done on our geotechnical structures, and a third party audits every one of those geotechnical structures, and they have remained at a satisfactory level across all of our structures. Looking at the left side of this slide, on production, we had 49,000 gold equivalent ounces in Q2. As you can see, in Q4 2021 and Q3 2022, Q4 2022, once we get to higher grades, we will be raising production by Q3 and then Q4. We should expect the lowest point now, over the last 12 months, and then we begin climbing in the quarters ahead. On the right side, as I mentioned before, you can see the drop from Q1 output — gold equivalent ounces fell from 53,000 to 49,000 — and that came mostly, in fact entirely, from EPP, where we encountered lower grades. At EPP it dropped from 13,000 to 7,000, and from there we expect to move into higher grades. For the coming quarters, they should anticipate 20,000 to 25,000 ounces of gold production, possibly more; over at Arantzazu, output is holding very steady, and even though gold and copper price movements worked against us, production actually rose somewhat, which helped partly offset those weaker output levels. Where Arantzazu's production is concerned, we're quite consistent. It ought to remain quite steady; at San Andres, once more, we started from 12,000 ounces produced each quarter, then 14 in last quarter and the first quarter of this year, and now 16, with that figure expected to hit 18,000 to 20,000 gold equivalent ounces in the quarters ahead. Regarding all-in sustaining cash costs, Q2 showed an increase versus Q1, driven by two factors. First, output at EPP was lower, at 7,000 ounces as we saw, and that will come down as grades improve through Q3 and Q4. The other factor is the weaker dollar, which affected our all-in sustaining cash costs too—mainly EPP, and then the dollar's valuation..; regarding guidance, we provided plenty of detail. Rather than walking through every figure now, please feel free to pull up the presentation, which will be posted on the website. The key takeaway: we're revisiting this year's consolidated production guidance, largely due to the difficulties we faced at San Andres early in the year. The ramp-up is currently at the lower end—it began with reduced production—but it's now progressing in line with our plans, and we should keep increasing. For the year, we're revising guidance by just 5%, even with the difficulties we faced in Honduras. That reduced output in Honduras has affected our cash cost. We put significant measures in place to bring cash cost down and partly offset the higher cost resulting from lower production. Holding the exchange rate constant and comparing purely on that basis, our all-in sustaining cash cost goes up by only 3%, despite production coming in 5% lower. On top of that, there's the currency effect, in both Brazil and Mexico. As I said earlier, that added another 6% to our all-in sustaining cash costs. Right now we're projecting cash cost guidance of $897-$973, and all-in of $1,162-$1,261. Bear in mind that Almas, Borborema and Matupá all carry an all-in sustaining cash cost below the average we have today. We should see these new projects come online and bring those all-in sustaining cash costs down at the lower production level; these figures already place us in the second quartile. We'd prefer to push it lower still, but costs across the whole industry are climbing, and we've kept our cash costs controlled well enough that the company stays in the second quartile. On CapEx, we previously guided to $80 million and $93 million; the range is now $85 million to $95 million. Some expansion at Almas is already in the works, along with additional mine development work there, so that number has risen somewhat. We expect to raise production at Almas in the near future. As I mentioned, we take real pride in the results we've been achieving at Almas. Our workforce there already exceeds 1,000 employees. 55% come from the immediate area, and 80% from the state and the regional states. We've put substantial investment into training the local team. Additionally, a few of our managers were dispatched to EPP for training, and upon returning they are operating this facility in a highly satisfactory manner and adding substantially to the achievement of this ramp-up. Let me stress once more that at the very end we reuse all of the water, sending it back into production. From time to time, owing to evaporation, we take water from the river, though that will not go beyond ten percent of our overall water consumption. The ramp-up got underway in April. Sixteen months — well, it was actually fourteen, since we held off during the initial two months because of the intense rainfall, and at this point we are finished, which places it among the quickest plants ever constructed at a mine anywhere on the globe. Up to this point, we've exceeded what the theoretical curve predicted for ramp-up, and we're also establishing fresh market benchmarks, because commercial production ought to be declared within the next few weeks. The figures shown on the left-hand side are the plant's weekly output numbers. Since June, the pace of our ramp-up has been quite rapid. By late June we had already gone past 20,000 tons, after which we improved steadily, and in July we're now above 25,000 tons — 26 — while last month came in at 24.7. Nominal capacity shifts slightly from one month to another, though it lands at approximately 25,000 tons weekly. Measured in tons per hour, nominal capacity is approximately 160 tons per hour. On the right side, as you can see, over the last six weeks — one, two, three, four, five, six — we're already running above that nominal capacity in tons per hour. We began raising the grades to watch how recoveries responded, and at this point recoveries are coming in at 90, 92, 93%. That's very much in line with our expectations. It leaves us comfortable holding here and watching closely over the next two weeks, and if things stay very stable, we'll declare commercial production at that point. Cleber, over to you.

Kleber Cardoso

executive
#3

Can everyone hear me okay? Great — thanks. Good morning, all. Next we'll go through a summary of the key financial results. On this page you'll see the main financial KPIs that the company tracks. We have the figures for the current quarter, for the past several quarters, and for the trailing 12 months accumulated as of the close of each reporting period. As Rodrigo mentioned, the departure was softer on the production side, largely due to mine sequencing at EPP. You can see that in this quarter's results, with revenues of $85 million and adjusted EBITDA of $27 million in the second quarter. Even with that challenge, we still delivered positive net income of $11 million in Q2. Turning to cash and net debt, we closed the quarter in a solid cash position of $110 million. That came after paying $10 million in dividends in June and putting $21 million into expansion during the second quarter. Net debt stood at $114 million at quarter-end, and we want to flag again that this is likely the peak we'll see in the ratio of net debt to adjusted EBITDA. And with Almas very near to declaring commercial production, that will bring added cash and EBITDA to the company. Additionally, as grades improve at EPP over the coming quarters, that trend ought to reverse—net debt should come down and EBITDA should get better. We've included here a breakdown of the key line items bridging adjusted EBITDA to net income for Q2. Adjusted EBITDA, as we noted earlier, came in at $27 million. In the second quarter, we'd again point to Arantzazu's performance—consistently solid across output, cash cost, and EBITDA alike—and it posted the quarter's top EBITDA figure at $18 million. On a further positive note for San Andres, EBITDA was quite low across the past two quarters owing to the production ramp-up. We're now back at $11 million, and while it hasn't hit its full potential yet, that's still a positive note. For EPP, we saw $3 million in EBITDA, even with lower production caused by mine sequencing. Turning to the other items, amortization and depletion expenses were $11 million, and financial results came in at $3 million, both in line with our expectations and really consistent with the past few quarters. On other results, the company is recording a positive gain of $3.4 million in the second quarter, which is tied to a promissory note Aura holds in its favor. The promissory note carries an outstanding balance of $12 million when you combine principal and accrued interest, and we anticipate collecting that amount during August. Aura had earlier reflected $8.6 million on its balance sheet tied to the receivable expected from this promissory note. Since collection now looks very near, we are booking the extra $3.4 million. So, to repeat, apart from the accounting treatment, what is encouraging is that this $12 million non-recurring inflow will land in the company's cash during the third quarter. Net income tax expenses came to $2 million, consistent with the results, which brings net income up to $11 million as of the end of the quarter. And finally, as we do every quarter, we're presenting a detailed breakdown showing how the company's cash and equivalents moved across the whole quarter; at the far left of the page, the opening cash position for the quarter stands at $103 million. On that left side of the page is what we refer to as adjusted free cash flow to Firm, meaning the free cash flow to Firm produced by the three mines in commercial production, excluding investments in business expansions. That part of the business, even with a weaker quarter on the production side, generated $50 million for us; then in the middle of the chart, under investments for growth, we put $7 million into exploration. Just to remind everyone, 2023 is the year when we're putting the most money into exploration—to grow our reserves and resources as well as the company's mine life—and we're seeing sizeable investments each quarter. Expansion CapEx came to $21 million, mostly tied to the final construction phase at Almas and to capitalizing ramp-up costs. For Almas, that number should drop considerably beginning in Q3. Moving further to the right of the page, among the financial items, there were debt proceeds of $30 million related to the company's ongoing liability management, plus dividends paid at the end of June of $10 million, which bring the cash position to $110 million at quarter close.

Rodrigo Barbosa

executive
#4

With this, we end our presentation, open to questions. Thank you.

Edgard Souza

analyst
#5

Hi, everyone, and thanks for taking the question. First off, I'd like to ask about Borborema. I understand the feasibility study is still in progress, but some qualitative details on the project would be helpful for us. Have you already begun pre-construction activities on site? When do you anticipate construction getting underway, and what duration do you foresee for it? Staying with Borborema, could you please shed some light on the expected timeline for the project's CapEx? How should we go about modeling the CapEx for this project? In other words, what % of total CapEx should be disbursed in 2023 and what % in 2024? My second question concerns Honduras. Congratulations on getting production stabilized there. I look at this as a major step forward for that operation. My question is really more of a medium-term one. Going forward, at what levels do you expect San Andres production to settle? That's everything from me. Thanks.

Rodrigo Barbosa

executive
#6

All right. No, thank you. Thanks, Edgard. I'll begin with Borborema. We can't disclose the exact figures at this point. The feasibility study is being finalized. It's expected in the coming couple of weeks; once that's done, we'll put out all the financials for this project, and afterward we'll file the complete report on 43 to 101. The key thing I want to emphasize—and it matters a lot—is this: first, as you asked about, we've already begun the land works, getting the site prepared, and we're continuing that land work to make the site ready for the investment. We've also placed the order for the mill, since delivery of the mill was the bottleneck. That's the piece that would have been a struggle had we not ordered it. The mill is due to arrive by the end of 2024. Production begins at the end of 2024, but mostly now in 2025; on that front... I'll also add, since I noticed Rona had a question about the CapEx: we're facing inflationary pressures, correct? We can observe a portion of these shifts, inflationary forces, and foreign-exchange effects on capital spending. Just as we handled Almas, we're putting substantial effort into refining CapEx so we can hold steady—or even lower—what the Big River project previously required. We're now moving along those lines. The mine plan has already been updated, so all elements are aligning as anticipated. We'll issue the feasibility study alongside the preliminary economic assessment for extending output. That feasibility study is being prepared for two million tons annually. As I mentioned publicly, this project already contains close to 900,000 ounces in reserves—and that number might increase twofold if we shift a single road a short distance and obtain extra water access. We're carrying out a feasibility study using 2 million tons and 900,000 ounces of reserves, even though combined resources and reserves surpass 2 million ounces. Per our projections, by the third or fourth year—and we're already undertaking every step required to apply for and secure additional water access and to relocate the road—we expect this to be finished within three years. By year three and year four, the PEA will hit roughly 3.5 million tons of production, and that will also give a significant lift to our gold output in that year. This is coming together and, once again, progressing very satisfactorily. Edgar, we'll be sharing the exact figures with the market over the coming couple of weeks. I'd encourage you to stay tuned, and we'll also be hosting a call with the analysts to walk through this project in more detail, which matters a great deal for our growth path, as you know. On your question about San Andres — at San Andres, we should continue increasing output to between 18,000 and 20,000 gold equivalent ounces each quarter. Relative to 2021, our average grades are a bit lower at present, so absent an expansion of capacity, that level shouldn't be anticipated on running rates. At the current capacity, we've already reached production of 80,000 to 90,000 ounces. On the running rate, we shouldn't be sitting where we are today. Somewhere in the range of 70 to 75, 65, 75 thousand ounces of gold is where we should be. We're now starting exploration in other areas to grasp the potential for accessing higher grades and also to grasp the potential for expanding the plant's capacity, which would allow us to raise production as well. At these running rates and with the capacity we have now, that will be in that range.

Kleber Cardoso

executive
#7

Okay, thank you. Thank you very much, Rodrigo and Kleber.

Victor Shen

analyst
#8

Hello, Rodrigo. Hello, Kleber. Can you hear me, I'm not sure?

Rodrigo Barbosa

executive
#9

Yeah. Yeah.

Victor Shen

analyst
#10

All right, great. I don't know whether the camera is on, but I'll just proceed anyway. Thanks for fielding my question, Rodrigo and Kleber. My question concerns Almas. Hello, Rodrigo, Kleber.

Rodrigo Barbosa

executive
#11

Yes.

Victor Shen

analyst
#12

I have a question about Almas. I ran into a few technical problems, so apologies if this has already been asked. Almas is nearly at commercial production, and I'd like to understand how the ramp-up is going. Is everything proceeding as expected? You gave the production contribution for Almas for 2023, and I was hoping you could share what we should expect for annualized production at Almas, if that's possible to disclose. My second question concerns Borborema. In the release, you mentioned that delivery times for a ball mill have been longer than expected, which is pushing Borborema's startup into the beginning of 2025. I'd like a bit more detail on that, since it appears this wasn't your fault — it was down to external factors — so I just wanted you to touch on that. Regarding the withdrawal of the 2024 production guidance, was the Borborema delay the only factor, or were there other factors behind that decision to withdraw the 2024 production guidance? Thank you.

Rodrigo Barbosa

executive
#13

Okay. First, Almas. Yes, the ramp-up is actually above our expectations, in terms of the last three to four weeks, both in production and in our recoveries. That gives us real comfort in thinking about commercial production very soon. In fact, we had expected to get there by Q3, as we projected — the end of Q3; now we can push to do this in August instead. The production at Almas, on the project and the feasibility, leads us to an annualized production of 50,000 ounces of gold per year. We are... As I said earlier, we could see, we have already seen some opportunities to increase production, so we are now investing so that we can see what a higher production might look like next year. But still, 50,000 is the annual annualized production for Almas in the first three to four years. After expansion, though, that can increase. You mentioned Borborema. Yes, the sole reason production is pushed to very, very early 2025 is the delivery time for the mill. It should be delivered by the end of 2024, and then you need to install it and run some preliminary tests so that we can begin operation and the ramp-up in 2025. The, the, the, the single reason we withdrew the projections for 2024 is exactly this. It is only because Borborema is delayed by two or three months, and we had been projecting to start production by late 2024. Now it's early 2025; that's the only thing that affects it; also, we are getting close to the 2024 guidance; we are now at the end of 2023, and once we finish the Q4 result, then we will give the guidance for 2024, as we do on an annual, annual basis. The sole reason we pulled back was the lead time on the mill at Borborema.

Victor Shen

analyst
#14

Great, thank you Rodrigo, and thank you Kleber.

Operator

operator
#15

Thanks very much. Roman Rossi has sent us a question through the webcast. Good morning, and thanks for taking my questions. If I may, I have a couple. On Borborema, you said an investment decision is expected shortly. Do you anticipate having the financing secured in the course of 2023? Could you offer additional guidance regarding CapEx, or on how it stacks up against the current technical report, especially given FX and inflationary pressures?

Rodrigo Barbosa

executive
#16

Thanks, Roman. The figures can't be disclosed just yet; we're in the final stages. As I said, there has been a certain amount of inflationary pressure. The exchange rate has had some effect as well. On CapEx, we did find optimization opportunities, the same way we did at Almas. Compared with the latest number Big River has put out, we don't see meaningful differences on the CapEx side. The mine plan is out now as well. We looked at additional optimization options too. Most importantly, we could also see — and we'll get this plant ready, just like we did with Almas — a great deal of flexibility at 2 million tons, then a step up to 3.5 and beyond in years three and four. He asked a second question that I've lost track of here. Could you — did I cover everything?

Kleber Cardoso

executive
#17

On the hedging front — isn't that right?

Rodrigo Barbosa

executive
#18

Roman, our approach is the same one we took with Almas: we like to lock in the payback of the projects. With Almas, the equity payback came within one year, and the payback on the whole project, debt included, came within two years. That's why we hedged the first two years of production — to make sure our equity investment earns its return and the debt gets paid. We ought to use the same reasoning for Borborema so that the project’s payback is assured at sensible gold price levels; typically we structure hedges as zero-cost collars, and that is the approach we are already looking into for Borborema. Regarding funding for Borborema, yes, we should announce construction alongside the funding, secured so that we can move forward with the project. That will be a complete package we are putting together with the feasibility studies funding, as well as the project’s returns.

Rodrigo Barbosa

executive
#19

We... The inflationary pressure we experienced was mostly during 2021, 2022, and 2023, and it appears to be more. The impact on our costs came largely from the devaluation of the dollar, and we report the numbers in dollars, while some of our costs are in Brazilian reais in Brazil and some are in Mexican pesos. We are not seeing very high inflationary pressures at present, throughout the year of 2023. Kleber, is there anything you would like to add?

Kleber Cardoso

executive
#20

Yeah, I’m with you on that. My view is that the pressure we saw in 2021 and 2022 came largely from the initiatives we put in place to counter inflation. What we’re seeing now is less inflation and more of a currency-effect impact—the Brazilian real and the Mexican peso appreciating, which, on the other side, is partly the result of our weaker dollar, and that’s also adding to higher metal prices. Beyond that, I’d say no, no, no significant inflationary pressures.

Rodrigo Barbosa

executive
#21

Kleber.

Kleber Cardoso

executive
#22

Yes. So it's our — we partner with local banks, and with quite a few different banks, in every jurisdiction. In the past, a big chunk of our maturities sat in the short term, and that has actually been getting better over the last three or four years. Each year, through liability management with the local banks, we've managed to extend the debt somewhat. What we're doing at this very moment — we did some of it in Q2. I showed that we raised $30 million for the liability management. We'll continue running that same program, working with the local banks in every jurisdiction, so we can capture the benefits of both the capital liability and the tax shields, and by doing liability management in each term where we do it, we extend the debt somewhat. That doesn't worry us.

Rodrigo Barbosa

executive
#23

All right, thanks everyone for joining the earnings call. Even with weaker production, which we had anticipated for this quarter, we strengthened our position — operations generated healthy cash flow, giving us room to keep investing and to keep paying dividends. As I've said before, our approach ever since the IPO we completed in Brazil has been to create value for shareholders in three ways. First, by growing production and carrying out greenfield projects. Second, by boosting resources and reserves across every mine we run. Third, while still paying dividends. Production has been rising. The project is being delivered. Almas is up and running; the ramp-up began on time and on budget, and we expect to declare commercial production very soon. Next, we're advancing the Borborema project. Figures should be arriving and made public very soon. Meanwhile, we keep developing Matupá. That's our long-term project, and even with the 5% review on guidance, the company's long-term outlook remains very consistent, and we reaffirm guidance of reaching 450,000 ounces of gold equivalent production, annualized, by the end of 2025. Thank you all, and I'd invite you to stay aware and stay tuned. We hope to bring you news in the coming weeks. Important news, since we've been asked here several times about Borborema and about Almas as well. Thank you.

Operator

operator
#24

Thank you; we now conclude the Aura Minerals' conference call. Have a nice day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aura Minerals Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Aura Minerals Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aura Minerals Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.