executiveHello everyone, and thanks for joining us today. We're going to walk through the third quarter results, plus give some commentary on the guidance we released just yesterday. Q3 mattered a great deal to us because it marked a pivot point. As you're about to see, we'll lay it all out for you. Output has gone up, and we'll keep raising it over the coming quarters; so we reversed the slight downward trend in production that had been in place across the prior 12 months. Now we're bouncing back and growing once more, getting back on track. On top of that, this quarter delivered a really notable rise in the gold price — driven not only by geopolitics, but also because the market is beginning to wake up to currency debasement, fiat money losing value, and money flowing toward hard assets like gold and other commodities. I'd also urge everyone to examine how central banks have placed themselves and are now buying new gold reserves at record-breaking levels, aiming to protect their value and gain a few other options rather than only propping up the dollar. China, for instance, is offloading U.S. Treasuries while acquiring gold, and that's been happening throughout the last 12 months, and it ought to keep going over the years ahead. With all that said, I want to invite every one of you to come to Aura Days; it's set for early December, and there we'll provide you with additional details, aiming to bring in some experts and also walk through our operations more thoroughly, just as we've done over the past couple of years. Now, back to the quarter itself. This quarter posted a substantial jump in gold output. We hit close to 65 gold equivalent ounces, which comes in 34% above Q2, and every one of our operations improved. EPP rose by 62%, Aranzazu went up by 11%, and San Andrés climbed 7%; and crucially, we began selling gold from the Almas project that we brought online during the first semester. We ramped it to a record level, and production there started in September and October. That's the operational side — the gains we saw in output. We also lifted EBITDA, which came in at $30 million versus $26.5 million in the previous quarter; that EBITDA was also dragged down by a one-time high cash cost at Apoena that we drew on, and I'll go into more detail on the upcoming slides — we tapped a stockpile with low grade and high cash costs during the quarter, and that material has already moved through the plant. We did generate cash, but costs ran above what we saw in other quarters. We wrapped up the quarter on Q3 already with a low cash cost on the inventory, and at this point we're evaluating, even though it's a bit behind schedule, we're now evaluating the Ernesto pit at a higher grade. And the all-in sustaining cash costs, because of this elevated cash cost that originated from Apoena, Brazil, along with some one-time investment in Honduras, came to $1,437 all-in sustaining cash costs dollars per gold equivalent ounces. And as we're going to see, for the year, we expect an average of somewhere between $1,260-$1,330 on the all-in sustaining cash costs. That means that in the fourth quarter, we've laid the groundwork to have a considerably lower cash cost throughout every operation. Worth emphasizing in the quarter are the two items I brought up. The first is Almas — we ramped up Almas at record levels in only less than 5 months, hitting levels that had never been achieved, or were only very occasionally achieved previously. That's a mix of a strategy of keeping things simple plus a great deal of management attention. And then, the Borborema project, where we released a new feasibility study with a strongly accretive internal rate of return, approaching 52% internal rate of return, leveraged at a gold price of $1,900, not counting the expansion we're already planning regarding resource and reserves once the road gets moved, and we'll get into more details. We released a new feasibility study. We also locked in $100 million on leverage to build the project. We acquired an additional 20% participation that previously belonged to Dundee. And at this point we're finalizing — we've just finalized the hedging program that also brings in $14.5 million dollars in cash to assist us on the equity. And at this point we're finalizing the royalty agreements so we can complete the funding package for the project. And also, while we keep moving forward with the construction. A very remarkable achievement that we accomplished during this quarter, and I take great pride in what the team has been working hard to reach at those levels. We now stand at a zero lost time injury across the whole year in 2023. In fact, in our operation, it's been 12 months that we've had zero Lost Time Injury in operation; that's a significant achievement that the entire team has been working toward for several years; and now, naturally, the challenge is to maintain this, this position. But we're working hard to ensure that everyone who works with us has a very safe environment and can return to their homes the same way they arrive. That's the top priority we have throughout all our operations. When it comes to stability of the structures, we keep monitoring. Independent consultants produce reports for us, and each quarter when they arrive, every one of the structures — geotechnical ones, whether it's a tailings dam, the leach pads, or underground structures — meets satisfactory standards, and third parties keep monitoring them continuously, and our own internal team does as well. So like I said, this marks a turning point; looking at the chart, on the left-hand side the bars represent quarterly gold output, while the line shows accumulated production over the trailing 12 months. So what we observed was a slight quarter-over-quarter decline in output, caused by some difficulties we faced in Honduras too. And at this point, with operations and production recovering, along with commercial production from Almas, we're seeing that curve begin to climb once more, and it ought to keep climbing as we progress through upcoming quarters, now with Almas output included. On the right-hand side, regarding output, the chart shows gains at Aranzazu, gains at EPP, gains at San Andrés, and now we see this one — the light blue bar — which makes me very proud: the Almas project producing. At Aranzazu, we managed to boost productivity and raise output. At EPP, we also lifted it considerably, though it fell short of what we expected because of unforeseen heavy rainfall this quarter. The situation is that at Ernesto pit, we will reach the bottom of the pit by the end of the high grade.
Rodrigo Barbosa
executiveWhen you get substantial rainfall, water builds up at the pit's lowest point, and that puts a great deal of the mine's development and output at risk. So the work we needed to carry out while preparing for the high grade at EPP got held up. That's now running into the third quarter, and in the fourth quarter as well, and it's also going to slip into early 2024. That's the primary factor behind our review of guidance: the ounces we had planned for this year — part of them have now moved into 2024. Since we couldn't reach the high grades the way we anticipated at Ernesto, we drew on the low-grade stockpile to meet the plan; output fell as a result, because low grade is standing in for high grade. Beyond that, the low grade carried a high cash cost as a stockpile, so that fed into the results too and drove up the cost, particularly at EPP; and as we can — we'll see, the cost tied to the stockpile at the start of the quarter was near $1,000, and now we've — we closed out the quarter with the stockpile cost, meaning the inventory, near $600 and just under $600; on all-in sustaining cash costs, that figure is likewise hurt by the elevated cash cost stemming from the low-grade stockpile inventory at EPP. We recorded a modest rise relative to Q2, but I'd point to the right-hand side under EPP, where, as you can see, we opened the quarter with the stockpile, with ore inventory sitting right in front of the plant, at $1,000 an ounce. We processed a great deal of that low grade into gold, and we ended the quarter at $569 per ounce on the stockpile; that will additionally be blended with the high grade arriving from Ernesto; we anticipate a notable drop in all-in sustaining cash cost for the fourth quarter, since we now project all-in sustaining cash costs across the full year of 2023 in the vicinity of $1,260-$1,330 per ounce. So, given that unanticipated rain and the holdup at the Ernesto pit chiefly, plus some holdup at Almas that I'll go into later; we are revisiting the guidance we had set at 273, ranging from 273 gold equivalent ounces to 245. It ought now to be 231 and 253. The upper end remains inside the low, the earlier range, yet we judged it worthwhile now to be more cautious and ensure we hit this guidance through year-end. And the weaker output is also mirrored in the cash cost per ounce within the all-in sustaining cash costs. The all-in sustaining cash costs, previously projected at $1,162-$1,261, are now $1,225-$1,324. On the right side, we have the CapEx guidance. I want to point out that our earlier guidance did not factor in the Borborema project. Since we gave the green light to Borborema and construction got underway there in Q3, that project is now part of this guidance; that accounts for the bulk of the difference in the new project and expansion line; meanwhile, exploration and sustaining keep the same guidance as before. Turning back to production guidance, as I said earlier, there was a delay in reaching high grade at Ernesto, plus somewhat lower output expected from Almas. That's mostly because of the situation at Almas right now — we completed the ramp-up very efficiently. The plant is running above its nominal capacity; at this point we're moving into the hard, let's say, fresh rock, which is the hard rock. So a transition is occurring from very soft rock to hard rock. Usually that isn't a big problem, but you have to adapt how you mine and the procedures you follow in mining. And since it's a new mine with a new contractor, we're currently adjusting every procedure required for mining hard rock; these are management decisions, and they're being put in place right now to ensure we can hit the production target next year, 2024, and maybe even exceed what we had projected, since we made implementation changes to boost capacity across the whole system. So all of those decisions are being made and settled to restore productivity now with the fresh and hard rock, so we get strong production next year. As for the Almas project, we take real pride in having built it on time and on budget, through the pandemic and through heavy inflationary pressure. Beyond that, we also completed the ramp-up there in under 5 months. Typically, if you look at the chart in the bottom right, the dotted line shows the theoretical ramp-up curve, where most companies get above 80% within six or seven months and approach 100% over 12 to 18 months of ramp-up. The other lines belong to major companies like Newmont and others that have ramped up. Anglo ramped up over the last five years, while at Almas we managed to ramp up to 100% of capacity in five months, setting new benchmarks. That's quite an accomplishment for the team, and it comes from very hard work, strong integration between the group running the plant and the group that built it, and also from our strategy of keeping projects simple — easy to build, easy to operate. Borborema: the very team that built Almas has now shifted over to Borborema. The Borborema project, even though its scale is larger than Almas, is likewise simple to build and simple to operate. Turning to Borborema, like I said, it was an extremely active quarter spent putting together the entire financing plan for Borborema, releasing an updated feasibility study, and kicking off construction. EPCM is already engaged. Back in the second quarter, Q2, we placed the order for the mill, which arrives by the close of 2024. So things are tracking right where we want them, with Borborema set to come online in early 2025. The feasibility study numbers are striking: payback comes in at 3.2 years, and the internal rate of return is 52% on a leveraged basis at a gold price of $1,900. Once more I'd like to — and I've done this myself — extend an invitation to every analyst, and to investors as well, to examine this project we're launching, which holds 814,000 ounces of reserves, though there's room to grow as high as 2 million ounces once the road gets moved. Ounces that aren't available for mining... available to be mined could not be counted, and still cannot. That's why the feasibility study deals solely with 814,000 ounces. Yet the project could potentially be scaled up, with no fresh trials and no major additional studies, to as much as two million ounces of production.
Rodrigo Barbosa
executiveTherefore, we anticipate that Borborema will deliver a notably greater return than what appeared in the feasibility study we released. Naturally, this is going to require some time. Regarding relocating the road, the necessary steps are already underway, and completion could take multiple years—as many as 3 or 4. So at this point I'll hand things over to Kleber, who will walk through the results in more detail, and afterward I'll return for Q&A.
Kleber Cardoso
executiveAll right, thank you, Rodrigo. Good morning to everybody. Good morning, all; on this slide, like we do every time, we're giving you a recap of the key financial KPIs for the company during the quarter just reported, the prior several quarters, and cumulative over 12 months at the close of each reporting period. Despite a few headwinds covered in Rodrigo's remarks, mostly in the EPP operations. What we're seeing is gains across nearly every financial KPI this quarter. Revenues above $100 million, once more, hitting $111 million as this quarter closed. And then trailing 12-month revenues came in near $400 million once again. Turning to adjusted EBITDA, there's a $10 million step-up in EBITDA for this quarter, moving from $27 million to $30 million as Q3 ended, and we anticipate a further rise in the fourth quarter since we expect production to grow alongside a decrease in cash costs. For the time being at least, Q4's average gold price is above Q3's. Looking at the trailing 12-month figure, there's yet another gain. We move from $116 million cumulated in the prior quarter up to $129 million in the quarter just ended. Moving on to net income. Net income, we're seeing a decline this quarter, from $11 million to $8 million. The main reason is that in the earlier quarter we booked certain non-cash gains tied to appreciation of the Brazilian real in that period, and those did not recur in the third quarter. And when we look at the trailing 12 months, there's another gain, with net income hitting $50 million across the last 12 months; and lastly, on cash and net debt, we're likewise seeing an improvement in net debt, finishing the quarter at $112 million, plus an improvement in our cash and cash equivalents, up to nearly $180 million as this quarter ended. That's largely a result of the debt we raised to fund the Borborema project during the quarter. Here we have a slide laying out the key items bridging our adjusted EBITDA and net income for the quarter. As we noted earlier, adjusted EBITDA of $30 million, with Aranzazu again the strongest, reportedly the strongest results. EBITDA of roughly $19 million at Aranzazu. San Andrés, we know, remains below its potential, yet it keeps displaying signs of recovery, posting EBITDA of $7 million. Almas, we'd flag it as a strong quarter, given just two months of production. In only two months, Almas produced close to $7 million in EBITDA. EPP, among the business units that are producing, had the lowest EBITDA this quarter, $2 million. That's mainly due to the accounting impact, for the reason Rodrigo described, the high-cost inventories, and now we begin Q4 with lower inventories, so we likewise expect EPP's EBITDA to climb in the coming quarter. Amortization and depletion, $13 million, in line with what we expected. On the finance side, we had $5 million in expenses, and this quarter that figure includes certain impacts, among them a non-cash loss, since — different from what happened the quarter before — during the third quarter the Brazilian real depreciated, and that produced some FX losses for us. So finance expenses come in negative at $5 million. During this quarter, we booked a $5 million other gain tied to buying the 20% stake in the Borborema project, a transaction we closed within the quarter. That $5 million is an accounting gain. It gets computed by taking the fair value of the estimated worth of the 20% company stake acquired, less the estimated fair value of the royalties handed over as consideration for that acquisition. And it's clear this was an excellent deal for the company; and then income tax expenses of $8 million, mostly taxes stemming from results at Aranzazu, plus some deferred tax expenses of $4 million. That is a non- — again, a non-cash loss we booked this quarter, once more because of the Brazilian real's depreciation, which leaves net income at $8 million by the close of the quarter. And then last, on this page, we present the in-depth analysis, the manager review, covering how cash and the company's cash positions moved across the quarter. On the first side — the left side of the page — in red, we show that we entered the quarter with $110 million. Then, on this left side of the page, what we refer to as adjusted free cash flow for, meaning the cash produced by the four mines now in production, excluding investments into growing our business. So we can see that portion of the business produced $14 million during the quarter. Then, in the chart's middle section, what we refer to as investment for growth, the bulk of that $11 million went toward our exploration program. We put $7 million into exploration. Expansion CapEx declined this quarter because Almas reached its commercial production declaration, at only $4 million. We do anticipate this figure rising in upcoming quarters, now that the program is under construction. Moving to the right side, we see the financial items, mainly calling out the net proceeds from debts, which came to close to $70 million, principally the $100 million term loan we raised in order to develop the Borborema project. And also, minus the payments of the first installment of the inventories by our Almas, which brings our cash position to close to $180 million by the end of the quarter. That concludes our presentation, and I'm open to questions. Thank you.
Caio Greiner
analystYes, good morning, everyone, and thank you. I've got two questions to ask. First, regarding the Almas startup. Rodrigo, apologies if you've already covered this — I was having some connectivity problems at the start — but the downgrade to Almas guidance had me especially concerned. I'd like to grasp a bit better how that affects your input plan, particularly as we head into 2024 and then 2025. In other words, ought we to view this as something that will drag on? Should we still anticipate a material effect on output and shipments during the first half of 2024, and even the second half of 2024? Or is it your view that things will already be resolved within a short window? My second question concerns the Altamira acquisition you announced earlier today. I'd like to grasp a bit better the reasoning behind that step. What I mean is, you're buying a minority stake in a different business as an investment — that's not exactly standard practice. So I wanted to hear a bit more about what drew your attention to this business, and why not pursue a full takeover? Do you hold any instruments allowing you to lift your stake up to 100%? Was that negotiated beforehand? I just wanted to grasp a bit more. Thank you.
Rodrigo Barbosa
executiveNo, many thanks, Caio, and thanks for joining us; so to your first question about Almas. We view it as a transitionary challenge of short duration that we're facing. As I said, what occurred is that our ramp-up happened very quickly. The plant is performing very well, actually exceeding our nominal capacity. Yeah, what occurred is, when we began mining, and typically the start of a mine involves soft rocks, which are simpler to mine and to process. When we get to the shift from softer rock into hard rock, which is how we operate at EPP, and how we operate at the other mines, that threw off the productivity of our contractor along with our own mine team. So this amounts to purely managerial decisions that threw off this contractor. They're learning how to run mines. They're starting to operate mines too; so we're teaching them plenty, how to boost efficiency. Plenty of team members are heading there to restore efficiency at the mine. So our expectation is that this won't drag into 2024, and also that it won't affect the results or the projection we have for 2024, 2025, relative to what we had in the base case. In fact, as we recently published, we made a small investment aimed at raising capacity. So we're boosting Almas capacity so it can produce above the feasibility study production compare in 2024; we expect these managerial decisions and better efficiency to unfold over this fourth quarter. That's the reason we tweaked the guidance somewhat, though we don't anticipate any meaningful effect in 2024. Maybe during the first part of January and February, but after that we speed up, and productivity comes back quickly. Now, moving to the second question about Altamira. We looked at Altamira. This is an early-stage business. No reserves exist yet; what they have are inferred resources; even so, we have strong belief in what it could become. It sits in the Alta Floresta area. It's near our Matupá project, though not near enough for meaningful G&A and synergies, since the distance is over 200 kilometers, yet it's a trend we find appealing. We perceive substantial upside in the project for considerably growing resource and reserves; so our approach there is this: the market currently offers scarce capital for new companies that must raise equities. These junior miners are desperate for capital, and share prices have fallen dramatically around the globe. Junior miners are finding it hard to raise money amid these low prices; but we identified a project that is solid, with plenty of upside, so we recognized a chance to commit a modest sum of capital, and let them work and watch them enhance the results. As a result, we hold warrants allowing us to raise our stake to approximately 18%. We have no options to exceed that; nonetheless, we consider it natural that after you're in and they begin producing successful drilling results, we could step by step boost our involvement in the project in line with the interests of both sides. So, why aren't we handling this ourselves? We could conduct exploration. We aren't an early-stage company. Our focus is operating with one; we are not early stage, so our focus is building and operating, plus growing resource and reserves inside the mines we run. We lack the team and the technical expertise to operate at early stage, which is why our approach is to invest in businesses that specialize in early stage, that have management, a full-time CEO along with all the senior management, the technical team, working full-time on exploration so we aren't distracted from our plan. So we are planting seeds that let us raise production and raise our participation in those projects over the coming four or five years. Those, once more, are early stage projects requiring several years to mature, but we will track closely the advancements at those companies; and the price available today to join and enter those companies is quite attractive.
Kleber Cardoso
executiveOkay, thanks a lot.
Edgard Souza
analystHello, Rodrigo. Hello, Kleber. I appreciate the questions. My initial inquiry concerns EPP. From what I gathered, the primary effect on output came from those intense downpours during the period. So what level of production can we anticipate for EPP on a normalized annual basis, perhaps considering the coming year and 2025? Then, fellas, my next question relates to Matupá. Is there anything new, any developments regarding these projects? At what point must construction begin so that you can meet that target of 450,000 ounces each year by 2025? Thanks, everyone.
Rodrigo Barbosa
executiveFine. Thanks, Edgar. So your inquiry concerns EPP's anticipated output, and afterward what has to be done at Matupá so we can reach the analyzed production by the 25th, the close of 2025; regarding EPP, we're currently reviewing the budget for the upcoming year. But we still lack the figures to provide you. Even so, as you, I'd suggest you examine what we generated previously absent Ernesto's high grade. Though early in the coming year, we ought to have some high grade from Ernesto, throughout the year, we should return to typical grade levels ranging between 1 gram, 0.9 to 1.1 grams per ton. Thus we don't anticipate having those extremely elevated levels experienced across the last two years because of Ernesto. We'll publish the fresh guidance for 2024 once we conclude the budget talks and afterward report the Q4 production. Regarding Matupá, we're pushing forward with the entire permitting process so that construction on this project can begin in the second quarter of the coming year. That's what, that's our aim for meeting the 2025 guidance, since those projects, Matupá, can be constructed within 12 months, 14 months, and afterward you can ramp up quite quickly, just as we did with Almas. The second quarter of the coming year is our goal for commencing Matupá's construction.
Edgard Souza
analystAlright, many thanks.
Román Rossi
analystMorning, everyone. Appreciate you taking my questions, and congratulations on the progress at Borborema. So I wanted to follow up on what Edgar asked about EPP. You said the grades ought to come in lower than those we saw in Q4 of last year; but what's the normalized figure, and given that you're shutting down the Ernesto pit, what mine life do you anticipate? Since you're putting substantial money into exploration there too. And on top of that, you reported 11,000 ounces produced, yet you sold only about 9,600, correct? So was that tied to the heavy rains too, and is this inventory you've built up going to be sold at better prices, or had the pricing already been locked in? ...
Rodrigo Barbosa
executiveRoman, I'm not certain I caught that final question. I think the line was cutting out. I missed part of it.
Román Rossi
analystMm-hmm. Oh, the second item concerns the gap between the ounces that EPP turned out and the ounces that were sold. There are roughly 1,500 ounces in that gap, so given the higher prices we're seeing at present, should that be taken into account, or had the pricing already been locked in?
Rodrigo Barbosa
executiveKleber, would you like to—
Kleber Cardoso
executiveHello, everybody. Now, regarding what you asked second. Right, the sole discrepancy when it came to shipments, between when the gold was produced and our ability to sell it all by the close of the quarter — that gold had already been sold during Q4 at Q4 pricing, meaning we did not lock in those ounces within the target for the quarter's end.
Román Rossi
analystAll right, great. And the initial question about EPP concerned the grades you anticipate for Q4 and Q1 of 2024, especially given the inventory, the stockpile that you're accumulating.
Rodrigo Barbosa
executiveSo for Q4, grades will keep improving since we're now reaching the Ernesto pit. Even though it was delayed, high grade will arrive in Q4, plus a few high grades in January and February of next year. Thus, the guidance we provided reflects those grade levels, which will be Ernesto and not entirely Ernesto, but Ernesto blended with our other mines, the Nosde or a stockpile. Over the years ahead, as I mentioned, we shouldn't anticipate seeing Ernesto's higher grade return to our plans once we exhaust that mine early next year. Our projection had been to exhaust the mine by the close of this year in Q3 and Q4, and the delay pushed a portion of those high grades into early next year; after that, we revert to the standard grade levels we operated at in 2018, 2019, 2017, meaning 0.9 to 1.1, 1.2 grams per ton, depending on your location within the mine. You also inquired about the life of mine, and indeed, we've invested heavily in extending the life of mine, especially at EPP, where our life of mine is shorter. The results have proven quite interesting and positive, particularly in linking some pits we already operate. Therefore, we should see, we expect an increase in life of mine in the upcoming AISC, and perhaps we can even disclose something ahead of that, demonstrating to the market this growth in life of mine and the potential for further growth at EPP. Again, at EPP, as expected, we began operating this mine with a three-year life of mine back in 2016. We've already run it for seven years, and today we hold more than three years of life of mine. And only during the past two years did we begin boosting exploration investment; so we should keep witnessing a steady extension of EPP's life of mine as we advance toward production. So, the results have been quite interesting in revealing this trend of ours to progressively extend the life of mine across operations.
Román Rossi
analystGreat. One final thing, building on what Caio brought up about the Altamira purchase — that minority position. I was just curious whether some particular project stood out to you and shaped the choice to invest?
Rodrigo Barbosa
executiveSure, there are a number of them, though Cajueiro is likely the strongest candidate. There's also a copper-gold asset at an earlier phase that could potentially deliver a porphyry find. Once more, this is a company at an early stage, and consolidating the resource and reserves will require multiple years, yet our outlook is quite favorable. What drew our interest was the broader trend across that region, which we understand well and see as promising. That project spans 190,000 hectares within a zone that has previously yielded somewhere between 7 to 10 million ounces of gold; and, the bulk of that output came from artisanal work, and at present they're conducting professional drilling so as to consolidate a larger resource and reserve, and afterward move into production. G Mining, for instance, at Tocantinzinho, runs comparable structures, and they'll be capable of producing beyond 100,000 ounces, 150,000 to 160,000 ounces each year within that sort of geo-exploration and geology.
Román Rossi
analystGreat. Thanks a lot.
Rabi Nizami
analystHello, Rodrigo. Hello, Kleber. I appreciate your time on this call. Many of my EPP questions have already been addressed, though I'll just piggyback. You said you'd picked up that land package next to it, next to the Japanese pit, which carried some intriguing exploration potential. Might you say a little about how things are shaping up there thus far? And then, my second question, regarding San Andrés, could you give us more detail on a few of those one-time maintenance items, plus your expectations for 2024, costs for that asset.
Rodrigo Barbosa
executive..; so, you brought up Japonês Oeste. Japonês is the land package we purchased a year ago; right now we're exploring that zone, drilling. We observed the Japonês trend continuing across that zone. So at this point we're tightening things up and making certain we can release the resource and reserves in the upcoming AIF or during next year; therefore quite a bit of drilling has already happened there. Certain drillings verified the extension on the step out. Certain drillings, naturally, you don't get 100% of a hit rate on those drillings; yet we're quite hopeful we'll manage to expand those bits and grow the resources and reserves of EPP along the strike of Japonês Oeste, and fresh results ought to arrive before the AIF that gets published next year. Then your question concerning Minosa. What was the size of the one-time investment? We did more than two-
Rabi Nizami
analystYeah.
Rodrigo Barbosa
executiveThe figures are $2 million, then $2.3 million, and that's a one-time outlay for boosting productivity — improving the belts, upgrading the entire system — so the plant can raise its output and bring back the production levels we saw previously. Therefore, as far as this $2.3 million goes, we don't anticipate that non-recurring item occurring before this year is over.
Rabi Nizami
analystCorrect, Rodrigo. Also, your financials included a remark that recovery at that mine is somewhat lower right now, depending on the type of ore you're in. How long do you expect that to last? Could you share some details on 2024 production and cost for Honduras?
Rodrigo Barbosa
executiveYes, so the ore we're currently processing, which is in the pit we're operating, contains other contaminants, and that has brought recoveries down somewhat. A portion of this has been dealt with, so recoveries ought to rise. However, it appears that this zone won't achieve the recovery we previously had of 76%-78%; in those ores we're now at 68%-70% recovery, rather than 75 to 78. And we'll likely see results of that kind next year.
Rabi Nizami
analystOkay. I appreciate you taking my questions. Thank you.
Rodrigo Barbosa
executiveThe guidance for 2024 is going to be disclosed on January 24. So I can't get into much more detail about what the cost would be. But what I can tell you is that Q3 is not the levels we'll be operating at, because what happened is we used an inventory of low-grade ore that was located very near the plant. When you mine over the last 2 or 3 years, what we do is we prioritize higher grades, and then we feed the plant with the highest grade we can, and the lower grade that comes from the mine, we stock it, we place it in a stockpile closer to the plant to use in situations like we had this quarter, when we had a delay in the mine. So we used a low grade with a high cash cost that had been accumulated near the plant over the last couple of years; and we won't have this situation next year, when we'll be mining, uh, fresh ore, uh, at a lower grade, but not as low as what, uh, we put through the plant. So I think, uh, a good, good guidance would be to look at Q1, Q2 or, uh, a few years back, plus some impact from the inflation we had. Uh, in Altamira, uh, they are conducting, uh, several, uh, new drills; this is why they raised the capital. Uh, the drill campaign can last 6 months, 1 year. Uh, so and, and that — those early-stage projects are a gradual information process, so we should expect new drilling results coming in early next year. But the consolidation of our resource and reserves, the consolidation, uh, of the, the, the view we'll have about the potential, uh, with, uh, confirmed resource and reserves, will take several years. Uh, it might take 3, 4 years, depending on the results they get, uh, over the next, uh, 1 or 2 years.
Rodrigo Barbosa
executiveOkay, thanks everyone for joining us once more. It was regrettable that we had to disclose our guidance for the year. The primary reason was Apoena, owing to a minor issue at Almas that we addressed. Even so, it proved to be a highly notable quarter, since we recorded zero lost time incidents. In addition, we reached the milestone of bringing Almas into production and raised output across every operation we run. Consequently, the declining trend seen over the past 12 months has now reversed, and we ought to keep observing greater production at all our operations. We enhanced margins in Q4, not just through decreased cash costs, especially at Minosa and Apoena—which won't repeat that one-time item at Minosa—but also because of the elevated cash costs on stockpile, combined with a stronger gold price. Thus Q4 should bring greater output, reduced cash costs, and a better price should gold stay around this level. Alongside all of that, during Q3 we also set the stage for fulfilling our growth pledge of 450,000 ounces, with substantial progress at Almas, which is already producing, and then Borborema, with its new feasibility study, funding package, and construction now underway, proceeding in line with our plan. So I appreciate everyone, and I'd like to invite you once more to join us at Aura Day. There we'll examine each operation in greater depth, along with the detailed finance strategy, and also discuss the company's strategy a bit further, plus hear from experts on the gold price and some figures I'd encourage everyone to review—especially right now, when we witness a strong conviction about fiat currency debasement driven by large fiscal deficits and plenty of U.S. dollars being printed, on top of geopolitical troubles. So thank you all.
Operator
operatorThat wraps up our call, and we appreciate everyone for joining in — have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aura Minerals Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Aura Minerals Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aura Minerals Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.