Aura Minerals Inc. (AUGO) Earnings Call Transcript & Summary
February 21, 2024
Earnings Call Speaker Segments
Rodrigo Barbosa
executiveThank you. <<foreign_lang>> Good morning, everyone; we're gathered to discuss how Q4 went along with the close of 2023, and to also provide our outlook for 2024. To begin with, 2023 mattered not just because we delivered strong financial performance, but also because we did so while meeting the strictest ESG criteria. Above all else, throughout 2023 we recorded zero lost time incidents across every operation. Today we run four operations. Construction at Almas wrapped up, work on Borborema got underway, and we managed to deliver meaningful outcomes by avoiding any lost time incidents and by ensuring that safety first — one of our greatest values — means looking after every person working with us, including not just our own staff but also the third parties visiting our sites. We put them through extensive training so these objectives can be met. This is a long-term target that we've pursued throughout the operations for 3, 4, 5 years, working hard on it every single day, which is what made zero lost time incidents possible for the year; our goal is to keep it that way. It isn't easy, but we intend to hold at zero lost time. As of today, we remain at zero lost time. Additionally, by coincidence, we're aiming to accomplish the same thing during 2024. Still on ESG, we also pioneered efforts designed to assist and deliver a fresh income stream to Honduras. The region of Honduras where we run our operations closely resembles an area of São Paulo that turns out premium wines; we enlisted some specialists, and we were then able to examine the soil and climate conditions at the mine we operate in Honduras to determine whether the people living near that area might also gain an opportunity to make premium wines. That's what we did. Through these efforts, as we'll demonstrate, we planted those grapes on land we had already mined. So rather than putting in trees, we're now planting — we will plant — grapes and observe whether that might turn into a fresh income stream for nearby communities. They already grow coffee, so shifting toward wine could matter a great deal to them; regarding output in Q4 as well as our results, we hit our largest quarterly production figure at 69,200 gold equivalent ounces for the quarter; that's 7% above Q3 of last year. Our expectation was that the final quarter would be the biggest, and indeed it was; for the full year, that produced $88 million in recurring free cash flow. With ongoing operations for the year, we reached 235,000 gold equivalent ounces. As we'll see looking at 2024, our aim is to keep expanding and reach greater production, which we'll detail in our guidance. Since Minosa is now running at a steady rate following the last quarter. We've already put measures in place to boost output at Apoena. Aranzazu remained consistent. With Almas now contributing for a full year, we ought to keep growing through 2024. During the quarter, Aranzazu performed exactly as we had anticipated and was highly consistent. Mine planning will cause output to dip slightly, though this shift won't be significant in any meaningful way. Aranzazu keeps delivering exceptionally robust results. Regarding costs at Aranzazu for 2024, we anticipate a certain rise driven mainly by three separate factors. First comes the exchange rate: the Mexican peso has been strengthening against the dollar, which drove our costs upward. Second, there is inflation. We are working to counter it, yet a portion of it flows into our costs. Mine sequencing ranks third, though its impact won't be substantial. At Minosa, we produced 17,900 to 18,000 ounces during the quarter, which represents a 2% gain over Q3. Keep in mind that we entered the year at Minosa facing serious difficulties. Comparing the final quarter of 2022 with the final quarter of 2024, that amounts to a 47 to 50% rise. Thus throughout 2023, as we kept telling the market, we steadily enhanced the operations, repairing the drop in productivity. Each quarter we managed to lift output; at this point I think we have settled into a sustainable pace, and we have kicked off 2024 from a very solid position at the pace Minosa is meant to run at. Turning to Apoena, we once again anticipated higher output from moving into Ernesto Pit, and indeed we climbed to 15,000 ounces of gold produced; that is 36% above Q4 2023, yet it also marks a decline versus Q4 2022, largely since in the fourth quarter of 2022 we enjoyed a complete quarter of very high-grade Ernesto material. This time we only partially accessed that high grade at Ernesto because heavy rains during the third quarter delayed our entry into the Ernesto pit. Consequently, part of that high grade got deferred into the first quarter, which we are now extracting in 2024. At Almas, we hit nearly 10,000 ounces of gold output. That represents the first complete quarter of production, bearing in mind that Q3 was only partial once we declared commercial production mid-quarter. At Almas, as we explained on Aura Day, output was extremely high during Q3. After we hit fresh rock, which is harder, productivity dropped, and that also weighed on fourth-quarter output, which, while up from Q3, fell short of expectations and the running rate. I want to point out that this productivity decline in Q4 has already been resolved, and we closed December having surpassed 1 million tons at the mine. So we stand in a very solid position at the running rate we are meant to achieve. We therefore begin 2024 in a very strong place in line with our plan. On sustaining cash cost, we recorded a cash cost of $1,311. We saw a 9% drop from Q3, which matched what we had predicted and was pretty much aligned with the guidance we provided to the market. This decline is due to elevated output at Apoena, along with strong productivity at Minosa. After that, we anticipate 2024 will closely resemble 2023, maybe slightly under or slightly over depending on how circumstances unfold across the operations throughout the year. On adjusted EBITDA, we recorded $41 million, the highest EBITDA of the year, since we had been expecting a stronger fourth-quarter EBITDA. That represents a 37% rise from Q3. This stems from greater production at our operations, as I noted, plus better gold prices and reduced cash cost; regarding growth, I'd point out that the company kept solidifying our route toward producing 450,000 ounces of gold equivalent; and as we've said, that originates from advancing three projects: Almas, Borborema, and Matupá. Almas was the first greenfield project we completed on time and within budget. Construction wrapped up in 2023. We ramped up over five months.
Rodrigo Barbosa
executiveWe completed construction in 16 months, which set a new standard for the market relative to the other mines that have been built; we did it within budget, on schedule, and full production is already underway. At Borborema, we provided an update during the year through a feasibility study. That feasibility study was published. We secured the funding for Borborema, construction has already begun, and 18% of the entire construction is already finished, very much aligned with what we expected so far regarding deadlines and the budget as well. So we keep clearing the path to keep expanding through 2024, 2025, and 2026. Once more, when it comes to safety, that is something we take great pride in. It is an accomplishment that belongs to the entire team working every day to reach those figures. At Almas, we reached this in June 2023, at Apoena in July, at Aranzazu in September, and then at Minosa in October. We now have 4 operations with 0 lost time incidents over a year, because we closed out the year and we remain at 0 lost time incidents up to now. Regarding stability and the structures, as we tell our board, as we tell our employees, and as we tell our investors, we have robust management of every geotechnical structure, which an outside party, a consultant, reviews each month. An online monitoring system is now in place throughout all our operations. We work with Geoconsultoria, one of the best-known consulting companies for verifying the stability of our geotechnical structures. We are at a satisfactory level across all our geotechnical structures, meaning the tailings dam, the leach pads, the pits, and underground developments too. As I also said, we received considerable coverage from the national press in Honduras concerning these new efforts to deliver high-quality wines, which ultimately is about creating a new income stream for the communities near us so they rely less on the mines and can pursue other initiatives to gain other sources of earnings. We understand that with mining and gold mines, a day will come when mining there ends. We will replant 100% of the areas. And rather than leaving them with trees alone, we would prefer to also leave them with a new income source they can benefit from through these new initiatives. Naturally, this is a 3 to 4-year test that we must determine whether it will succeed, but we are quite optimistic that this can help substantially not only that area, but it can lift the entire country, Honduras, and other nations near Honduras. That picture we saw in the corner, right, this area that was mined previously. Alright, so this area is now being used to plant grapes, and we're testing whether they might yield high-quality wines. On production, I'll get into some specifics—on that chart to the left, what I'd point out on the bars is quarterly output. The line represents production over the trailing 12 months. So for the quarter, we posted the strongest quarter of the year, even stronger than Q4 of 2022, now that Almas is producing. But the key point is that from Q2 to Q3, we reversed the trend of declining production on a trailing-12-month basis caused by the difficulties we faced in Honduras early in the year, and then the rain at Apoena. Now, though, we've resumed growing output, with 65 gold equivalent ounces in Q3 and 69 in Q4. So at the low point of 2023, 228 gold equivalent ounces were produced on a trailing-12-month basis in Q2 2023, and that rose to 234, then 236; and it's quite intuitive to expect this to keep rising through 2024, since we're entering 2024 with solid production across all our operations. On top of that, Almas is now adding to the production increase during the year. I'd also encourage you to look two years out, if you'd like; in 2025, we'll see Borborema's output also coming online during the year. So we should keep growing through 2025 as well. The next one, I've already covered. Yeah. So on Cash Cost, in Q2 we saw an increase versus Q1. Then in Q3, another increase, mainly because, as we explained, we processed low grade and stockpile at Apoena. Even though we generated cash doing that, Cash Cost went up. And now we've begun to see a higher grade at Apoena again. We don't anticipate having that low grade we had in Q3. We no longer have it in the stockpile; so in Q4, it's mostly Apoena that allowed us to bring our cost down and somewhat at Minosa to $1,311, which is what we expected to show the market. On guidance, we saw 2023 production of 236 gold equivalent ounces. Now we're projecting to the market 244 to 292; we're entering the year with Minosa at the running rate. At Apoena, we'll also make some improvements to the plant. We'll reach hard rock ore that affects plant productivity; and to offset that, we're expanding the plant a bit so we can achieve higher production than we had in 2023. Aranzazu remains very stable. Almas is ramping up as the year gets going, so we expect to reach full production during the year at Almas, which kicked off the year pretty much right where we thought it would, at the run rate anticipated for closing out 2023; on cash costs, essentially matching 2023. The mines differ from one another. As I said, Minosa will see a reduction. Almas also comes down. Aranzazu goes up because of FX and a bit of inflation. All of those sustaining cash costs likewise align closely with 2023. And when we look ahead to CapEx for 2024, sustaining comes in essentially flat versus 2023, though we now have to layer in Almas, which must also carry out its own sustaining CapEx and operations. Exploration lands a touch under 2023; then, looking at new projects and expansion, we are now bringing in Borborema, which is being built, and that explains the jump from $56 to $144-$169 million. The bulk of Borborema's CapEx falls within 2024, with a portion left for 2025; regarding project development, once again, not only did we complete Almas on schedule and within budget, we did so while establishing a fresh benchmark for the industry. We are currently a bit above 17%-18% complete at Borborema, and we anticipate beginning the ramp-up in Q1 2025.
Rodrigo Barbosa
executiveThe bulk of the land preparation is finished, and civil construction has now begun. Over 350 individuals are currently on site; and just as we did with Almas, our hiring strategy centers on recruiting from the local area. Roughly 70% of the workers at the site come from the neighboring city, Currais Novos, which sits closest to where we operate; another key point is that as the project advances — even though it's 18%, 17% built — we've already secured agreements or hold solid details regarding the full CapEx, with more than 61% of total CapEx now under contract. So we remain very much aligned with our projections. There's no variance so far, and we're still delivering on schedule and within budget for this project. With luck, we'll kick off the ramp-up in early 2025; meanwhile, I want to stress something very important for investors: this project launches with reserves of approximately 815,000 ounces, yet we hold in excess of 2,000,000 ounces of resources. You can't claim reserves for those areas until they're fully licensed. Since a road runs near the pit, the feasibility study limits us to just 850,000 gold equivalent ounces of reserves; however, once that road is relocated, those reserves could more than double, potentially approaching 1,000,000, 2,000,000 ounces after we obtain the license to move it. The entire relocation process, which is already governed by law, is underway; it takes time, but we've already started all discussions with DNIT, the National Department for Roads, to make the change. It isn't a major change, but we'll need some time to get there; that's the summary. I'll return for the Q&A, and now I'll hand things over to Kleber, who will share and highlight more of the financial results.
Kleber Cardoso
executiveThanks, Rodrigo. Morning, everyone. We'll begin by walking through a slide covering the key financial metrics we're disclosing to the market. First, looking at net revenues: for Q4, we brought in $124 million. That mirrors the pattern Rodrigo described for production — it marks our third consecutive quarter of growth, and it climbed at a quicker pace than output thanks to better gold pricing in Q4. Over the full year, revenue came in above $415 million, which is a 6% gain versus 2022. Turning to adjusted EBITDA, the story is much the same. Q4 delivered our best EBITDA for the year, coming in at $41 million, and we're also noticing adjusted EBITDA getting better across the past two quarters. That comes from a mix, as Rodrigo showed, of higher output, better gold pricing, and lower cash costs during the most recent quarter. Moving into Q4, our report is roughly unchanged — possibly matching what we posted in the same quarter a year ago, $41 million. On a full-year basis too, we're finishing level with 2022, at $134 million. On the net income line, for this quarter we posted a $6 million loss. That mostly comes from a non-recurring, non-cash item tied to mark-to-market adjustments on Borborema Almas project gold collars, which totaled $28 million. Later, at the close of my presentation, I'll walk through more specifics on that figure, but to repeat: it's non-cash, and we don't anticipate it becoming an actual cash loss down the road. Strip out that effect, and net income for the quarter would have landed at a positive $22 million. That also would have made it the best result of the year. And on cash and net debt, we finished the year in a strong position. A key improvement in our net debt situation: it went from $112 million when Q3 wrapped up down to $85 million by year-end. That happened even though we distributed $80 million in dividends during December. We also closed out the year sitting on a solid cash balance of $237 million. Let me walk through the biggest factors bridging adjusted EBITDA and net income for the quarter. As shown on the prior slide, adjusted EBITDA came in at $41 million, and Aranzazu was again our top-performing business unit, posting $80 million of EBITDA in Q4. I'd also call out the gains we made at Minosa and Apoena. Minosa, for a fourth straight quarter we've seen output rise, and in particular during the most recent quarter there was a major drop in cash costs, which drove an EBITDA gain that came in above $10 million for that period. Apoena likewise posted meaningful EBITDA gains versus the prior quarter, reaching $9.4 million now. At Almas, even with the difficulties faced, EBITDA came to $5 million — positive for the quarter. On amortization and depletion, the figure has held steady across quarters at $11 million. Finance expenses came to $37 million in total. As noted earlier, $20 million out of that amount is non-cash and relates to the gold collars at Borborema and Almas, and I'll go into more detail on that soon. Taking a look at our results for the quarter, there's a $4 million gain on income taxes. The main factor there is that during this period we recognized a $7 million deferred tax asset at Almas. What happened is that before Almas reached commercial production, it went a couple of years with no revenues, so losses piled up. Those losses in Brazil generated income tax assets. We weren't able to put them on our balance sheet until Almas hit commercial production and became profitable. So we see that as another piece of good news, booking this $7 million, which will turn into cash savings later on. On top of that, there are other items totaling $3 million in expenses, which leaves us with a net loss of $6 million for the quarter. But once again, on a pro forma basis, stripping out those mark-to-market items, it would be positive at 2022. Moving to this page, we provide a detailed breakdown of how the company's cash and equivalent positions changed across the fourth quarter of the year. On the far left of the page, you can see we entered the quarter with $179 million in cash. Then, further along on the left side of the page, is what we refer to as adjusted free cash flow to firm, which represents the free cash flow to firm produced by the four mines in production. That excludes the investments we make to expand our operations and exploration. All right, so that quarter was clearly a solid one. From the operating mines, we brought in $38 million, and as we've already highlighted, EBITDA was stronger, plus we generated positive working capital during that period. Then you've got the middle section of the chart, which we refer to as investment for growth — basically what we're spending, like buying Altamira's shares, along with exploration that's still pending and expansion CapEx. For the quarter, that added up to $9 million, and that number is going to climb a lot in upcoming quarters as Borborema moves further along in construction this year. Turning to the financial side on the right, I want to highlight the $21 million that came in at Borborema from royalties, plus the $18 million dividend we paid in December, which left us with $237 in cash at quarter's end. Now, taking that same approach I walked through for the quarter and applying it across the full year — this page lays out all of 2023. You can see that adjusted free cash flow to firm from our operating mines came to $88 million, which comfortably exceeded what the company invested in growth. We directed $74 million toward growing the business. Of that, $25 million went to exploration, which will boost our mineral reserves and mineral resources and extend the life of mine of the company. So wrapping up with the last stage of Almas's build-out and its ramp-up, and then over on the right-hand side, once more, the line items, the free cash flow coming out of financing activities. Mostly calling out the proceeds that we raised in order to construct Borborema, largely during this year. Plus the $28 million cash outflow for dividends, which got paid out in June and December. So to wrap up, this is the walk-through regarding the more detailed explanation of the $28 million in non-cash finance expenses that we booked during the quarter. To get your head around it, I'll begin the explanation at the top of the page, with what took place in the business. As of September, the company carried roughly 175,000 ounces in gold collars on its books. Largely tied to the Almas gold collar risk management program, which we entered a few years back. During the first phase of the Borborema hedging program. By December, those 175,000 ounces had grown to 298,000 ounces; meaning a 70% increase. That's because we finished the Borborema gold hedging program, going from about 80,000 ounces of gold collars up to 215,000 ounces. Simultaneously, over the fourth quarter, gold prices climbed sharply, which is excellent for our business. Gold prices gained over $200 from one quarter-end to the next; so combining a larger quantity of gold collars on our books with higher gold prices at closing produced a differing effect on our balance sheets and P&Ls. On our P&L. Looking at our balance sheet, you can see the impact of a $14.5 million cash gain — that's revenue — which was the premium banks paid for participating in the Borborema hedging program. From that $14.5 million, we've already received $4 million during 2023, and the remaining $10.4 million will come in by June 2024. On the other side, as IFRS standards require, at the end of each quarter we had to record a mark-to-market adjustment on the balance sheet for every outstanding position. With gold prices having gone up, the mark-to-market on those open derivatives resulted in a $43 million liability at year-end. We see this — and expect it to remain — as a non-cash liability, for two reasons. First, every open position on our books, the strike prices on these gold collars, the call strike prices sit well above spot prices. So spot is roughly 2,000 to 2,030 at present. And the ceiling prices on these derivatives exceed 2,400. And second, we intend to carry all these positions through to maturity, meaning that if market conditions remain where they are, this liability will unwind over time with no cash impact to Aura. And with that, we finish our presentation and open the floor to questions. Thank you.
Rodrigo Barbosa
executiveAll right, then — a handful of points to wrap up. As you’re able to see, this was a hugely significant year for Aura. To begin with, we brought in $88 million in recurring free cash flow to firm. That exceeded what was needed to finance the growth. Yet we could also use leverage to finance that growth and still distribute the dividends. And we accomplished all of this while maintaining the top ESG performance with zero lost time incidents, doing what’s right under the ESG standards. And just as crucial as the results themselves, we established the benchmarks in the fourth quarter. We raised output at Minosa, at Apoena, at Almas. And we set the benchmarks so we could begin 2024 extremely strongly, closely matching what we expected; and now with Almas fully in production. And after that, constructing Borborema so the ramp-up begins in early 2025. So it was a hugely significant year, in which we delivered meaningful results and laid out the route to 450 gold equivalent ounces annualized by the close of 2025.
Ricardo Monegaglia
analystHello, good morning. Can you hear me?
Rodrigo Barbosa
executiveYes.
Ricardo Monegaglia
analystAll right. Regarding EPP, I have a few questions. Should we anticipate higher volumes out of Ernesto during Q1 compared with Q4? Also, could you share the schedule for the capacity expansion at the plants that the press release referenced? It would be helpful to hear a rough budget figure for that expansion too. My second question concerns Borborema. My understanding is the project is on time and on budget, but I'd like a sense of which key milestones in executing the project would signal whether it stays on time and on budget. And finally, a quick one. Is there any legislation being discussed in Brazil that might impact any of your exploration works? That's all. Thanks, everyone.
Rodrigo Barbosa
executiveThanks, Ricardo. Starting with Apoena: some ore remains at Ernesto, and we're mining it now in Q1. It won't necessarily exceed what we mined during Q4 of last year. After that, we'll shift more toward Pau-a-Pique. The rock at Pau-a-Pique is harder, which has somewhat reduced productivity at the plant, but we're making an investment to upgrade the plant and boost capacity, so we can reach even higher production than 2023 across the year of 2024. On Borborema, I'm not certain I grasped the question. Could you repeat it, please?
Ricardo Monegaglia
analystYeah, sure. So which milestones matter most for executing or constructing the project that you foresee in 2024? What determines whether the project stays on schedule and within budget? Which deliveries are critical for 2024?
Rodrigo Barbosa
executiveYeah, deliveries happen daily, though I'd say completing landwork comes first. That's now done, so we're moving into civil works. Later, in the second semester, we'll also begin building and assembling the plant. A significant milestone involves the mill's delivery, slated for Q4 of 2024, enabling us to kick off commissioning and ramp up throughout 2025; thus all civil works plus beginning assembly of civil works this semester, beginning assembly in the second semester, then wrapping up assembly once the mill arrives in Q4 of the year. Our team already went to see the supplier in China. Really impressed by how diligent they are regarding schedule, regarding program. They're prepared. The mill is likewise being constructed on time, within budget; no delays are anticipated so far. Then you asked regarding regulation as it might impact our exploration. I don't know of any regulation that could impact our near-mine exploration program. Most areas where we mine or explore sit on a farm, not near a regional zone, not near highly protected forest areas; hence we don't anticipate regulation interfering with our exploration program in Brazil.
Ricardo Monegaglia
analystThanks.
Román Rossi
analystMorning, everyone. So, a few questions from my side. About Borborema, Rodrigo, you said that after relocating the road, the resource base doubles. Any idea what that might translate to in MPV terms?
Rodrigo Barbosa
executiveRight, the feasibility study is being updated. Once that's done, we'll publish it. We still can't make every disclosure, but I'd encourage you to think it through and run a simulation using two approaches, okay? The first: if we expand the reserve—and that's possible before the road gets moved—we can grow reserves simply by securing the permit. Naturally, you could only bring that into production as we relocate; however, we don't want those additional reserves tacked on at the mine's end of life. That's precisely why we're constructing a plant with enough flexibility to boost capacity once that permit for the road relocation is in hand, letting us push those reserves into output during year 4, 5, or 6 at Borborema. Again, 3 years, 3, 4 years for relocating the road, and after that you can begin considering a production increase at the project, moving from 2 million tons up to 3.4 million tons by the year following 4 years.
Román Rossi
analystAlright, that's great. Now, the second item concerns the hedging, and I believe it's directed at Kleber. There are 10,000 ounces you've hedged at EPP, with ceiling prices of $2,100. The expiration window runs from March 2023 through December 2025, so I was hoping to understand how these derivatives roll off, since, for instance, in 2025 my target price for gold sits above that ceiling, correct? So I'd just like to grasp what the possible effect might be should gold prices climb beyond $2,100.
Rodrigo Barbosa
executiveYes; from this point until maturity, Roman, the expirations follow a roughly straight line. They aren't clustered into 2024 or 2025. It happens quarterly. They're essentially dispersed.
Román Rossi
analystAlright. Great. Great. Then last, on the topic of dividends, given the policy you have in place right now, it looks as though no dividend payments would be made by you in 2024. So what's your outlook for the year?
Rodrigo Barbosa
executiveNo, we aren't bound by any policy of that kind that would restrict our dividend payments in 2024. The policy we follow is 20% of debt minus recurring CapEx; and we ought to stick with it, unless an M&A opportunity comes along that needs more cash than what we're projecting. So yes, we keep projecting dividend payments for 2024. In line with our policy, which comes to 20% of the EBITDA minus recurring CapEx.
Román Rossi
analystAll right, that's great. Thanks, everyone.
Rodrigo Barbosa
executiveNo, there's been no delay. At Matupá, the licensing process is now in its final stage. We're anticipating receiving that license so that construction can begin before this semester ends — by June or July of this year — allowing us to kick off building immediately afterward. Following that, production should begin before 2025 is over. So we remain on track, with Matupá in production and Borborema at full capacity, annualized, by the close of 2025, which gets us to 450,000 gold equivalent ounces of output. And once more, as you saw, the construction CapEx for Matupá was not included in our guidance, since licensing is still pending and board approval is required before construction can start. As a result, we'll be updating the CapEx guidance. But right now, we're pushing the process forward to hit those milestones.
Rodrigo Barbosa
executiveI think if he's making the question, he's on mute.
Guilherme Nippes
analystHello. Guilherme Nippes here, calling in from XP. I've got a single question for you. Considering the contractor problems you ran into over the last quarter, what are your expectations for Almas operations? Just so I'm clear on this, should we anticipate that operations will be back to normal in the first quarter of 2024, meaning you begin the year with normalized operation and remain on track to hit the production guidance ramp-up for 2024?
Rodrigo Barbosa
executiveThanks for asking, Guilherme. That's right. We closed out the year with the movement at the mine running at the pace it ought to; therefore, we had already begun January in Q1 of 2024 at the anticipated production speed in Almas; we feel quite at ease about achieving the full year of the production of the year 2024 in line with our guidance.
Guilherme Nippes
analystThanks.
Rodrigo Barbosa
executiveThanks, everyone. Like I said, this was a really significant year. Key milestones — no lost time accidents at all, $88 million in recurring cash flow, $28 million in dividends paid, which worked out to a 6% dividend yield for the year, and that marked the third consecutive year we hit our highest dividend ever, one of the top dividend yields anywhere in the sector globally. We wrapped up construction at Almas on schedule, within budget. Ramp-up happened on schedule, within budget too, establishing new global benchmarks for greenfield project development; we kicked off construction at Borborema, which was already fully funded by the time Q3 ended; and we accomplished all of this with zero lost time accidents, truly. The team's achievements make me very proud. Sure, we ran into some production difficulties. I'd point out that we closed out the fourth quarter free of those difficulties. Operations at Minosa are fixed. Almas is already running at full capacity. Apoena has a solid plan in place to boost output over the course of 2024. The rest are quite steady going into 2024 as well. So we keep advancing Borborema. During 2025, Borborema's production will come online progressively across the year. We'll keep demonstrating quarter-over-quarter growth from this point until the Matupá project is finished. I appreciate everyone's participation this quarter, and I'd also encourage you to check our resources and reserves update in the AIF. We'll also keep the market informed about milestones as Borborema gets built; so thanks once more. And don't hesitate — if anything else comes up, just reach out to our investor relations team and we'll be happy to answer your questions. Thank you.
Operator
operatorThat wraps up Aura's conference. We appreciate everyone for joining in, and we hope the rest of your day goes well.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Aura Minerals Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Aura Minerals Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aura Minerals Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.