Alright, good morning everyone. Bom dia a todos. Buenos dias. We feel a great deal of pride being here. Thanks for joining us to look at the first quarter results for 2024; we're very proud to put out the numbers we released yesterday for a few key reasons, and after that we'll move into the presentation. First, this marks the fifth consecutive quarter with zero lost time injuries across our operations, which means we're among the top companies when it comes to workplace accidents. And it's; it's fascinating to note that usually, and I'd encourage investors to check this, safety and accidents go hand in hand with strong production, solid cost efficiency, and good results. Second, during this quarter, we also raised, versus the first quarter of last year, production by 28%. We lifted EBITDA by forty-five percent, and that's still not fully reflecting the recent surge in gold and copper prices. Compared with the first quarter of last year, our gold price is near 9.8%, while copper price has actually fallen by 6%. So, had you factored in the full prices for gold and copper, you'd expect our result to have been even stronger versus the first quarter of last year. So Natasha, let's go to the first slides now. As usual, I'll give the summary of the results, some key milestones reached in the quarter, and then Kleber will come in and get more specific about the results. So again, very proud to have another quarter with no lost time injuries, and that's, I want to thank the entire team and all the leadership in our operations; that is. That stems from hard work over a long period. We've spent years working on raising our safety standards, and what we have now is 15 months with no lost-time incidents; on the production side, we raised output by 28%, hitting 68,000 gold equivalent ounces. Quite similar to the last quarter of last year, much higher versus the first quarter of last year. That mostly comes from higher and recovery production — recovered production at Minosa, which is now stabilizing; and also Almas, which wasn't producing in the first semester last year, now running at full capacity, generating 12,000 ounces of gold in the quarter. So we also keep pursuing cost efficiency across all operations, the productivity gain at Minosa, along with gains in recoveries. That comes from hard work by the team as well to bring down our cash cost on average, though for Almas, for instance, we still have some room to keep reducing. All-in Sustaining Cash Costs, the outcome of this cost efficiency and productivity gain, we brought All-in Sustaining Cash Costs to $1,287, which is under the guidance, even though we think we'll stay within the guidance for the year. So, solid output, with a modest rise in gold prices, which will become more efficient over the course of Q2, and reduced cash costs are going to give our EBITDA a substantial boost. And we ought to anticipate that EBITDA continuing to climb, given that gold and copper prices have gone up considerably since we closed out the previous quarter. Another extremely significant milestone is the Borborema project. Just as we delivered Almas on schedule and within budget, Borborema is progressing toward those same targets, reaching production on the timeline we anticipate — Q1 of next year — and staying inside our budget; at this point we are 25% of the way through the project. Every bit of the land work is already finished. We are now beginning the civil works and also procuring some of the components so we can start assembling the parts inside the plant. We have also kicked off the process to relocate the road at Borborema, recognizing that the existing feasibility study and the figures we published — NPV, internal rate of return — cover only 814,000 ounces of gold and reserves. But we can more than double that once the road is moved, and that relocation process has already begun, and we anticipate the license being granted within 1 year. After that, another 2 years will be needed for all the construction work on the process; so we think we can begin growing our resource, our reserves, during this year, but production will only be added in 3 and 4 years; we also, in the quarter, refreshed our mineral resources and our mineral reserves, adding 2.4 million ounces of gold equivalent ounces in measured and indicated, plus 0.9 in proven and probable, which is a huge milestone and stems from the exploration spending we are carrying out across our operations, where we are now beginning to reap the first results. I would note that, for instance, some very important milestones we will be sharing with the market, Apoena, where we had, and still have, a shorter life of mine relative to the other operations; we shut down this mine in 2016, with only three years of life of mine. We have already run it for six years, and now we have extended it to five years of life of mine. So we are extending the life of mining operations as we go along, going forward. As a subsequent event, two items: First, we have the buyback program in place, approved by the board and also by the regulator, which we were unable to start during the blackout period, so we should begin this process once the blackout period has ended, which is immediately after the results are released, a few days later. Also, Kleber will then provide a bit more information. Since the gold price has climbed past what we had projected, we now have substantial gains on puts and calls that will eliminate any margin call requirements across these programs, freeing up all the cash inside our operations so we can take advantage of the gold price upside, which in our view can keep rising in the near term. Next slide. Again, as I said earlier, we take great pride in the safety standards we are reaching — a milestone of real significance, one never seen before at Aura, which is now 5 quarters with zero lost time incidents. And second, through monthly monitoring conducted by independent consultants, we apply the most rigorous procedures and technologies, and every one of our structures, our geotechnical structures, sits within the standards at a highly satisfactory level. So we keep watching this and keep improving all the structures, whenever it's needed. Next slide; so I'd like to direct the attention of investors and analysts to the slides on the left-hand side. On the bars, you can see quarterly production. On the line above those bars, you can see production for the trailing 12 months. As we said, following Q2 and through Q3, we turned things around last year, we bent the curve, after Almas began producing and also once we tackled the productivity loss at Minosa, we were able to begin raising the trailing twelve months output, and we'll keep doing so through the coming quarter too. As you can see, we already have 3 quarters at 60,000 to 70,000 ounces of production, while the most recent one starts from 49.

Rodrigo Barbosa

executive
#2

As we look ahead to the next quarter, a sensible assumption is that matching what we delivered in Q1 2024 would add 20,000 ounces over the trailing twelve months, which puts us at a run rate of 270,000 ounces of gold equivalent production. This is hugely significant, because it lines up with a combination of better gold prices, better copper prices, and stable cash costs. Now on the right side of the slide, where the two bars show production per unit by quarter, we can see a slight drop at Aranzazu. That's very much in line with how we've sequenced the mine. As I've mentioned previously and have already gone over with investors and analysts, the nature of it isn't homogeneous. Grades shift and the ore body's characteristics shift; so we anticipated a lower, somewhat lower output at Aranzazu this quarter, which remains a significantly stable operation for us. Second, Apoena, as we also anticipated, is no longer a meaningful portion of the Ernesto high-grade pit, so production there has dropped to 15,000 from 12,000. And Minosa — this marks the fifth quarter in a row that we've raised output at Minosa, beginning last year at 12,000, then 14,000, 16,000, 18,000, and now 19,000, reaching a very stable level of production at Minosa. Maybe we'll keep going, but we keep looking at opportunities to gain efficiency as well as cut costs; at Almas, we produced — we had a below-expectation output in last year's final quarter because of poor productivity from the contractor. We fixed that productivity, yet we fixed it at a higher cost. But now we hit 12,000 ounces of gold for the quarter. We're now concentrated on bringing down that operation's cash cost. So many initiatives are already underway, among them switching to a contractor with a more efficient level so we can now lower the cost while keeping production in ounces. Next slide. Turning to All-in Sustaining Cash Costs — for a second quarter now, we've brought those down. The improvement comes partly from initiatives we've launched internally to trim costs, and partly from better efficiency, mostly over at Minosa. That's our current read on it, and we'll continue pushing to reduce All-in Sustaining Cash Costs further, even though I'd say they're sitting at fairly sensible levels at this point. What this shows is that Aura has the ability to keep costs in check and to operate more efficiently, and that's something we're very focused on. The trouble we ran into before came from concentrating so hard on reducing cash costs. We brought in different contractors, we suffered, we suffered a loss of efficiency, then we put in the work and got that efficiency back, and after that we were able to restore cash costs or perhaps do even better than before. While inflation has been rising, we've managed to bring our cash costs down. Next slide. When it comes to how we're tracking against guidance, we restated our full-year guidance. Our first quarter came in nicely at 68,000 equivalent ounces, and we're holding our guidance at 244 to 292. Naturally, given those solid results, should we keep delivering strongly throughout the year, we ought to land nearer the upper end of the guidance on the production side; on cash costs, we sit comfortably inside the guidance, a touch above the bottom portion of the guidance, and for All-in Sustaining Cash Costs, we're actually beneath the lowest portion of the All-in Sustaining Cash Costs. That said, for the full year, we anticipate staying inside the guidance on All-in Sustaining Cash Costs. Naturally, should production shift toward the upper end of the guidance, All-in Sustaining Cash Costs would then potentially sit at the bottom portion of the guidance. On CapEx, while the charts may suggest we won't hit the CapEx guidance for the year, that ignores the fact that the bulk of Borborema's expenses land in the second semester, when we'll be assembling the parts and completing construction of the project. Again, I believe that underscores how important this Borborema project is. If you look at the images on your left, those show that every bit of land-related work is done, and we've started getting all the ground ready for civil works. As a matter of fact, the entire base has been constructed, and at 25%, we're right where we expected to be. When it comes to CapEx, 80% has either been paid out or agreed upon, so we foresee no unexpected issues regarding the project's CapEx, and none regarding hitting the timeline we told the market about, which means production begins ramping up in Q1 of next year. Now, on to the following slide. I really want to make sure investors understand how significant this project is for Aura. It matters a great deal, it's substantial in scale, and the margins and returns it offers are quite compelling — and that's true even before we account for the possibility of more than doubling the reserves, something we believe is entirely achievable once the licensing comes through and the road is relocated. With that in mind, we kicked off the feasibility work, and the study came out last year, ahead of us starting to build the project. The numbers showed 812,000 ounces in reserves, an NPV of just $182 million, an internal rate of return of 22, and a leveraged internal rate of return of 40%. All of that was based on gold sitting at $1,712. If you plug today's gold price into that same study from last year, the numbers climb further—to $2,300—which means the NPV would rise by 143%, bringing it to roughly $440 million for this project. On a leveraged basis, that's a 74% yearly return in US dollars across the mine's entire life, while the unleveraged payback comes in at 2.4 years. And keep in mind, all of this covers just 812,000 ounces of reserves from that study. Moving the road could more than double the result, because the gold is right there—already measured, already analyzed—and it looks very much like a continuation of the Ore Body. There's nothing concealed here. The mine plan is fully engineered at this point. All that remains is permitting and subsequently getting to it; therefore, I'd ask each of you to consider what could occur with this project's NPV should we put greater than twice the reserves into the cash flows. On to the following slide. So, these results make me quite proud. At this point, I'll hand things over to Kleber, who will discuss the results further, particularly the specifics, and after that, we return for the Q&A. Thank you.

Kleber Cardoso

executive
#3

Thank you, Rodrigo. Good morning, everybody. So I'll walk through the primary financial results for the quarter. As shown on this page, the key financial KPIs for the period mirror, particularly regarding net revenues and EBITDA, what Rodrigo covered on the operations side of the business. As you can see, our net revenues rose for a third consecutive quarter now. We're posting $132 million in net revenues for this quarter, and we now already surpass $450 million across the trailing 12 months in net revenues. Regarding adjusted EBITDA, likewise the third consecutive quarterly increase, we're posting $53 million in EBITDA, which stems from a mix of holding production at the same levels reported in the prior quarter, more favorable gold prices and reduced cash costs, as Rodrigo laid out. And it's key to note, once more, that gold prices in the first quarter, average gold metal prices broadly, are considerably lower than where they stand, they are now. Average gold prices during the first quarter were $2,070, and copper prices at three, just three dollars and eighty-six cents. Copper now has climbed past four dollars forty cents per pound. Turning to net income, the picture differs, which is largely accounted for by non-cash losses tied to the requirement, under accounting rules, to mark to market the outstanding gold derivatives on our books. This mirrors what we saw in the prior quarter. So, in the fourth quarter, as you may recall, we booked a $20 million non-cash loss since gold prices went from below $1,900 at the close of Q3 to above $2,000 at the close of Q4; now, in the first quarter, gold prices shifted as well. We finished the quarter at $2,000, so we recorded a further $20 million in non-cash losses. Combined across the last two quarters that totals $40 million, which again, matters to understand this isn't anticipated to turn into cash losses down the road. Of that $40 million, assuming current metal prices, we'd expect those to convert into only roughly $2.3-$3 million in cash losses over the coming few years. And then moving to cash and net debt, we see we closed the quarter once more with a solid cash position, $214 million at quarter end. Net debt rose modestly during the quarter to $105 million, which came in as anticipated, primarily due to investments in the Corcorinha projects and also non-recurring working capital usage during the quarter, which I'll cover over the next few pages. I think we're good. Yeah. Now on this page, we show the primary items explaining the gap between adjusted EBITDA and net income for the quarter. When it comes to EBITDA, the thing I want to point out is that among the $53 million we posted, there's a nice even split across our four business units. Aranzazu was the biggest single contributor this quarter, posting $18.5 million in EBITDA, but Minosa, Apoena, and Almas each came in above $10 million in EBITDA for the quarter. So it was a well-balanced quarter, and a solid one, not just for Aura overall but for every one of the operating units individually. Turning to depreciation and amortization, we're booking $16 million of expense this quarter. In prior years, up until last year, our amortization expense ran somewhere between $12 million and $13 million each quarter. Going forward from this year, that figure ought to climb. It should land closer to what we're showing this quarter. The reason is essentially that Almas is now producing, and we've begun depreciating its fixed assets. Financial expenses come to $34 million, mainly, and the explanation is mostly what I covered on the earlier page. It ties to the non-cash losses on the gold derivatives; on top of that, we booked $3 million of FX expenses this quarter from the Brazilian real strengthening. Income tax expense of $11 million landed pretty much in line with expectations, given how strongly all the business units performed. Then there are some minor other expenses that take our result to a net loss of $90 million, which, again, would have been a positive figure — $12 million positive — had we stripped out the non-cash losses tied to the gold derivatives. On to the next page. Here, as we do every time, we've got a detailed breakdown walking through how cash and cash equivalents moved during the quarter. Over on the far left of the page, you can see our opening cash position of $237 million at the start of the year. That left-hand side of the page shows what we call adjusted free cash flow from, meaning the free cash flow our four producing mines generate, excluding what we're putting into growing the company; that part of the business throws off solid cash, $19 million this quarter, even with a non-recurring working capital increase. We used $13 million during the quarter. One reason for that, for instance, is the Easter holiday and Good Friday in Mexico, which kept us from shipping our concentrates. So of that $13 million, a sizable chunk should come back to us over the coming quarters this year. Also, the first quarter is when we pay the bulk of our taxes. We paid $9 million in cash for taxes, and half of that was for special mining duties in Mexico, which we only pay once a year. Alright, moving ahead, on one hand, we'd anticipate cash flows rising as metal prices become more favorable; during Q1 we had certain one-time cash outflows that ought not to recur over the coming quarters. Growth investment — that's the money we're allocating to boost reserves and resources and to grow, grow our business. We put $23 million in during the quarter. The bulk of that, the investments for Borborema, came to $17 million. That pattern looks set to persist through the remainder of the year, and even, even step up what we're directing to Borborema over the next few quarters; then over on the right-hand side of the page, we've got the financial items. The biggest one there is interest paid on debt, which used up $11 million of our cash this quarter, and that ran higher than our recurring interest payments. Essentially, that's because in every January, we make interest payments for Almas, the ventures in Brazil; so come Q2, that figure ought to come down somewhat compared with what we've observed across the prior few quarters. On that basis, we closed the quarter holding $214 million in cash and equivalents. Last, we also reported subsequent events, as had been expected; during April we held negotiations with the banks that hold our gold hedging programs. The removal of what are known as the credit support agreements — essentially the banks' ability to call margins; so as far as we're concerned, the banks consented to take out that portion of the agreements. No matter where prices head down the road, there will be no margin calls made against Aura; that's why we flag this as a significant achievement and it demonstrates how we're strengthening on the credit front with the leading financial institutions. That brings our presentation to a close. Ready for questions. Thank you.

Edgard Souza

analyst
#4

Hello, hello, Rodrigo. Hello, Kleber. Congratulations on the steady results. My first question is about Borborema; it looks like the talks about relocating the road are moving forward. So I'd like to grasp how long — how should we think about the CapEx for this expansion once the road is moved? How much time will relocating the road require? And once it's moved, how can we think about the CapEx for this expansion versus the greenfields you're currently doing? And how long do you figure it will be before you begin producing at the expansion? That would be great. Then my second question might concern your growth projects. If you could share any news about the investment in Matupá — whether you're moving ahead with the project's financing, and when you expect construction to start, if it's on track and on budget? And also on your other growth projects, any news on discoveries at Serra da Estrela, for instance, would be great. Thank you very much.

Rodrigo Barbosa

executive
#5

Thank you, Edgar. So first, Borborema — we've already begun the initial talks to obtain the license for relocating the road. We expect to hold that license in, I'd say, one year. Once the license is in hand, you still need to complete the final drawings, engineering, purchase the land or expropriate it, and then construct the road. I believe that will require another two years before it's done. As soon as we secure the licensing to move it, we can already treat measured and indicated as reserves. Naturally, you then must draw and figure out what — how many ounces will come out of the pit and so forth, but then we will publish — I will publish a further update to the feasibility study, incorporating those ounces. The CapEx for relocating the road — we don't have the final figures yet, Edgar, but it won't be significant next to the CapEx we have today, won't be meaningful next to the cash we generate afterward. What we'll need to invest then is — we're building the plant for 2,000,000 tons per year. Flexible, as we did with Almas, to raise capacity by 50% or more, as we move the road. So the plant is already flexible and designed to handle the higher production, but once the license is obtained, you then need to invest more to raise production. Because we don't want only to extend the life of mine at Borborema. Once you have this increase in reserves, we want to raise production. And to raise production, we'll have to invest. And that — but we can begin doing that after the licensing. So everything that we believe we can raise production in year 4, 3 or 4, ahead of the, as we stand today; then, your question about Matupá. Matupá — we are now in the final stage of licensing. Every one of the requirements has been satisfied already. Our submission has gone to the environmental agency. The preliminary license should come through in June or July, and right after that point we would make the call to begin building the core project, so things remain very much on the timeline we anticipated. Meanwhile, we keep up exploration at Serrinhas, exploration with X1, and exploration quite close to mine X1, which we think could potentially bring in additional resources and reserves. We haven't yet released anything on that, since we are pulling together information before disclosing it. Beyond that, we are reviewing options in case the vessels stay, whether Almas and Matupá end up as smaller plants, given that the deposits, the many deposits, are able to feed the plant. So we are in fact examining options for adding new deposits to X1, which would either secure a longer life of mine for Matupá or lift output. That means we are also studying options for bringing in more gold from other deposits located very near the mine. You also raised the question of the new project for continued growth. At present we keep hunting actively for M&A. We hold a list, and we are aware of targets we are pursuing. We know what we are after. Naturally, we must also match what you want with what is on offer, yet a great deal of effort inside our company goes toward finding new options for continued growth and clearing the path for it to exceed 500,000 ounces of gold equivalent production over the coming two or three years.

Edgard Souza

analyst
#6

All right, thanks, Rodrigo. One more thing regarding what I asked earlier. Any sense of the CapEx efficiency we'll gain, since this is a brownfield project, versus constructing a brand-new plant capable of 1.5 million tons, say, in Borborema? In other words, how much cost efficiency, how much CapEx efficiency, should we assume you'll capture, given that this is merely an expansion of an existing plant rather than a fresh project?

Rodrigo Barbosa

executive
#7

For Borborema, this isn't a fresh project. It's, it's simply a brownfield expansion.

Edgard Souza

analyst
#8

Yes.

Rodrigo Barbosa

executive
#9

The foundation's already in place, and all the supporting infrastructure—transmission lines, water supply, plus a portion of the structures—will already exist. So, that means... It's a CapEx figure you can't just ignore. It's going to be substantial, yet it won't match what we're currently spending on $280. What we should anticipate is a good deal less, $288 million. You gain a great deal of efficiency by simply doing this—adding to the existing power and plant capacity rather than constructing an entirely new facility. It certainly won't carry the CapEx tag of putting up a brand-new plant; it's simply a brownfield expansion at the plant we already have.

Edgard Souza

analyst
#10

All right, thanks.

Guilherme Nippes

analyst
#11

Hey, everyone. Am I coming through?

Rodrigo Barbosa

executive
#12

We hear you perfectly.

Guilherme Nippes

analyst
#13

Yeah. Okay. Thank you, Rodrigo, Kleber, and Natasha, for this chance, and well done on the numbers; I've got a couple of questions. On EPP, what stood out most from our perspective was costs, and you've already kicked off output at the Lavrinha and Nosde pits. So might you share any update regarding the output and costs you're currently witnessing at those two new pits? My second one concerns Almas operations. So, at what point do you anticipate the cost decreases will settle back to normal, so that the company stays on track to hit the cost guidance for 2024? So when might we expect the problems the contractor ran into in Q3 and Q4 to affect costs? Those are my two questions. Thank you.

Rodrigo Barbosa

executive
#14

I'll take the second one first, then hand over to Kleber for the first. Regarding Almas, at this very moment, we are switching out a contractor, this month, so we'll be in a transitional phase; no meaningful cost decrease is anticipated from us during the current quarter, though for Q3 and Q4, yes, we anticipate that productivity gain. We also have, maybe, some improvement in rates and additionally improvement in cost efficiency. So Q3, Q2, likely the same cash cost at Almas for this year; we could even see somewhat reduced output owing to the transitioning, you'll lose some productivity, but then everything is being set up for really strong results in Q3 and Q4; so Kleber, if you'd like to say a few words about Apoena. As you know, you can see Kleber is far taller than me, so we'll need to adjust the camera a bit.

Kleber Cardoso

executive
#15

Okay, so what we're looking for across Apoena and our other business units is essentially to hit the guidance we've given for this cash cost increase. We're aware that as of the end of last year, and into this first quarter, we still had some ounces left over from the Ernesto pit — that's high-grade material, which typically leads to a lower cash cost, so we did anticipate a positive effect this quarter. For the remainder of the year, the new pits won't offer that same type of material, so what you should be expecting, until we get to the point where we're inside the guidance, applies to both cash costs and AISC.

Guilherme Nippes

analyst
#16

Thanks.

Flávio Bica

analyst
#17

Hey, everyone. How's it going? I appreciate you letting me ask. Two things from my end. The first: are the projected NPV gains at Borborema tied to the rise in gold prices, and is that figure already adjusted for losses on the collar hedge co-hedge? My second one concerns tax reform. Do you anticipate any major shifts, or have you run any numbers on it? Those are my two. Thanks.

Rodrigo Barbosa

executive
#18

Yes. Regarding Borborema, keep in mind that what we recorded was an accounting loss, not a cash cost loss. That happens because you must mark-to-market the options — the calls we sold in order to purchase the puts. Since those calls carry a strike price of 2,400 and above, and because our simulation assumed a gold price of 2,300, there is zero loss, and any gold price up to 2,400 is completely reflected and can be entirely absorbed by Borborema's NPV. Beyond that point, during the initial years, we're committed on the bulk of output at 2,400. So there's still space for gold prices to climb and deliver gains on returns and on the project up to 2,400; therefore, no loss whatsoever exists up to a $2,400 gold price at Borborema. In fact, should it exceed that level, it isn't a case of us losing — rather, we simply won't capture the upside on the majority of Borborema's output. We will capture upside from our other operations; and then your other question concerned the tax, the tax referendum. At this point we lack any information suggesting a material effect on our output and our taxes. Some effect may exist, but as of now, we don't foresee any meaningful tax changes for operations in Brazil.

Flávio Bica

analyst
#19

Thanks.

Ricardo Monegaglia

analyst
#20

I've got two things to ask. Can you hear me? All right. Hey, everyone. There are two questions I have. First, regarding production. What would you say are the biggest risks that could keep you from hitting the top end of the 2024 production guidance? And also, perhaps you could tell us, now that the first quarter numbers are behind us and we're partway through the second quarter, do you feel more confident about getting to the high end of that guidance than you did when the year started, or when the guidance was first put out? My second question concerns the liquidity of the shares. It would be interesting if you could give us some detail on the most recent efforts to boost how liquid our shares are. Thanks, everyone.

Rodrigo Barbosa

executive
#21

Thanks, Ricardo. So the biggest risk of failing to hit the guidance always ties back to production instability, which arises from a handful of causes; it could stem from contractor issues, meaning we saw a drop in performance at the mine, or extreme weather worse than what we budget for. We already budget for heavy rainy seasons and dry seasons, and for rainfall above average and rainfall below average. That's all built in. But should a 5% scenario of too much rain hit some of the operations, that too could affect and slow down what we produce; and likewise, contractor troubles, even though we're prepared and every contract is aligned; the one currently being swapped at Almas is the same one we run at Apoena. We're very familiar with it and we know how to handle it, and in fact, the mines at Apoena are harder to run than Almas, so we don't anticipate any meaningful drop in productivity. Maybe for one month there's likely to be some loss during the transition, and after that strong quarters in the Q3 and Q4. And you brought up where we stand with this quarter underway, you know, do you think you'll land inside the guidance and where the guidance sits, the first quarter came in below what we expected. So, placing that in context, yes, we think we will land inside the guidance, but right now we're trending toward the high end of the guidance when it comes to production and the low end of the guidance when it comes to sustaining all-in cash costs. As I said, if you swap the second quarter production for the production we anticipate, if we hold the production of Q1 through Q2, you're adding 20,000 ounces over the last twelve months. So we're adding, if you swap the Q2 with the Q1 production of this year, we're already at 270 and above of production, which places us more toward the upper level of the guidance and consequently a lower level on the all-in sustaining cash cost and also cash costs.

Ricardo Monegaglia

analyst
#22

Thanks, Rodrigo. I just have a single additional point regarding that initial question. Could you tell us which operations or which mines, in your view, carry greater risk of hitting, perhaps, the upper bound of the guidance on a mine-by-mine basis? I'm just trying to get a clearer picture. And I realize the dangers of falling short came through very clearly, but which operations do you believe might face the risk of operational problems, or perhaps still rely on certain factors in order to improve-

Rodrigo Barbosa

executive
#23

Well-

Ricardo Monegaglia

analyst
#24

Like, operational efficiency needs to get better, so you can hit the high end?

Rodrigo Barbosa

executive
#25

Let's take it mine by mine. Right? Aranzazu has held steady across many quarters in a row — actually, years, right? We ramped that mine up back in 2019; we raised capacity, and since then we've run it very steadily, very much in line. Apoena is the one where we get ups and downs, depending on where you're entering, but that variation is known; so that's already being factored into our projection. Almas, that's probably where we're transitioning contractors, which I'd say carries some risk, because a new contractor is coming in, and we have to make sure they'll perform the way we expect. And Honduras, with the fifth quarter in a row of improvement, so very stable, now hitting very good production levels. We — that's, that was the last mine where we rolled out Aura 360°, which is how we make decisions to centralize a great deal of connection among the employees and communication. This team has been rebuilt since we replaced the general manager, the director of operations, we opened there. They've consolidated a very strong team that we believe will be able to keep this production stability for the upcoming one. One, one operation that I would, the first one, that would get more, would get more attention is this contractor transition at Almas; at Apoena, there's always some variability shifting from one pit to another one, so we need to make sure we'll also keep good stability in that operation.

Rabi Nizami

analyst
#26

Right. I want to put this to the team. A solid first quarter is good to see. Compared with the past 2 years, I observed that it makes up a sizeable share of the guidance. So that's really what my first question concerns. Could you share a bit more about your aims to reach output and expenses that are steadier and easier to predict? And thinking in particular about Apoena, can you provide some direction on how you see quarterly results unfolding across the year at that operation.

Rodrigo Barbosa

executive
#27

I'm not certain I followed the question. So we anticipate keeping things stable when it comes to production and cost, and what do you expect for the second half, correct?

Rabi Nizami

analyst
#28

Yes. So essentially, when it comes to Apoena, its output record has been uneven, and we're considering your yearly guidance, and Q1 appears strong. Could you share some detail on which elements will influence, you know, Q1 compared with Q2, Q3, Q4? Just the fluctuations that will even out so the whole year is achieved.

Rodrigo Barbosa

executive
#29

Yeah. Apoena, that's quite consistent with the guidance we provided at the start. In the first quarter, we still had certain elevated grades coming from Ernesto; we don't anticipate that occurring in the second quarter; after that, Q3, Q4, you'll move into Nosde. So we'll see some offsets between one quarter and another, yet still, quite consistent with what we shared, at the start of the year. On a consolidated basis overall, we anticipate Q2 will be, will be quite comparable, a bit under, a bit over, Q1, no major shifts. And ideally, as we've observed at Aura, over the past three years, though not with that, dramatic a shift, we ought to expect certain gains in Q3 and Q4 when it comes to output. So, that's the reason we're already operating at a rate of 270,000 ounces. If we swap Q2 of last year for the Q1 of this year, then we can reach 270 and beyond in terms of output; but yeah, we're at the start of the year, as you said... things shift, weather shifts, so we're being quite cautious in keeping the same guidance we provided in the early, early part of this year.

Rabi Nizami

analyst
#30

Thank you, Rodrigo. Alright, since we're taking it as a given that Ernesto has been depleted, and it appears certain stockpile FX have diminished as well, should we anticipate that longer-term grades will move nearer to reserves? Or, to put it more simply, are stockpiles going to remain a meaningful share of the feed during this year?

Rodrigo Barbosa

executive
#31

That's possible. Sure, stockpile could be part of it, but on grades, we ought to expect a return to what the company produced prior to Ernesto. Likewise, the strip ratio, which was elevated on a net basis, is now also coming back to where we stood two or three years back, before we began moving toward Ernesto. So yes, lower grades, lower strip ratio, each one partly offsets the other, but as we move toward the guidance, we should see — we're currently turning out roughly 60,000 to 65,000 ounces of gold. We shouldn't expect to see that again in the near term; it reverts to the level we forecast earlier this year.

Rabi Nizami

analyst
#32

Thank you, Rodrigo. And if I could follow up with one more question, regarding the gold, the hedges, and the credit support agreement that you recently resolved, could you provide some context on this? Did that agreement relate only to the Borborema collars, or was it determined by credit thresholds across Aura as a whole?

Rodrigo Barbosa

executive
#33

Across the whole company. Entirely our—

Rabi Nizami

analyst
#34

That's all.

Rodrigo Barbosa

executive
#35

Correct — when it comes to our hedge program, there is no longer any requirement for margin calls at all.

Rabi Nizami

analyst
#36

Understood — so this modification doesn't affect any covenants or the ability to take on debt going forward. Is that correct?

Rodrigo Barbosa

executive
#37

Nothing has changed.

Rabi Nizami

analyst
#38

No. That's great. All right, thank you so much; and, regarding, regarding the hedges, might you provide us with some detail on, over the coming 12 months, some indication of how the hedge balances are distributed when it comes to the, the ceilings and the amounts that apply during the next 12 months? And, yes.

Kleber Cardoso

executive
#39

Yes; so the majority of our hedges tie to either the Almas program or the Borborema program. Within our financials, we separate the two programs. So regarding Almas, we ought to see every one of the collars; they're already reaching expiration each month. Every collar is set to lapse by the middle of 2025, by June 2025, and come July 2025, we begin to have the maturity of the Borborema gold hedges, which will mature from the middle of 2025 through June 2028. So that's going to span three years. For Borborema and Almas, we hedge at 80% of the projected production. Borborema has only a single strike price for the ceiling, which is $2,400. And as for Almas, which is expiring, it will expire over the next 12 months, the average ceiling prices come to roughly $2,450, ranging between $2,300-$2,800. Most, though, though I'd say most at, at this point, by far, most of the program is, is, is for the Borborema hedges, which begin maturing around the middle of 2025 until 2028, and every one of them carries a strike price of $2,400.

Rabi Nizami

analyst
#40

Great. Thanks a lot for making room in your schedule. We're grateful for it.

Stephen Sanga

analyst
#41

Are you able to hear me?

Rodrigo Barbosa

executive
#42

Yes. Right now, yes.

Stephen Sanga

analyst
#43

Yeah, yeah, yeah. Thanks. Yeah, I've been a shareholder for quite a while, so I have several questions. You guys have been performing really well. First off, with the TSX, the company isn't really getting credit for its accomplishments. Have you thought about listing somewhere more international, like the Chicago Board Exchange, where it's on seven exchanges and value gets reflected better? With the TSX, I notice there's some shorting going on, and it's very liquid, and the share price doesn't capture the value you have; so that's my, that's my first question. Next, as someone who has held shares for a long time, I wanted to ask about Rio Novo — the Almas pit mine is pretty big, and that pile pit at the very bottom that we were never able to drill in the beginning could extend the life of the mine, the extension of it, plus there are substantial resources at Almas. Then my final question: since you're turning into a mid-tier producer, do you figure there's a chance a major company comes along and acquires you? I appreciate your time.

Rodrigo Barbosa

executive
#44

Thank you, Stephen. It means a lot that you've stuck with us as an investor all these years. So, to start with your question regarding liquidity and the TSX. Yeah, we definitely feel the sting of TSX liquidity being weaker than we'd like. Part of that stems from us being a fresh narrative. In the past, Aura didn't have much success on the TSX, so remnants of that perception linger. On top of that, we've managed to secure funding within Brazil and beyond. In Mexico, gold is far less expensive compared to any nation raising money in Canada, which is why we're steering clear of Canadian debt and equity markets — we've found better rates elsewhere. Right now, we're bringing in capital at $ +8, $ +7.5, for 3, 4, 5 years more. The term, whereas plenty of companies our size are dealing with double-digit levels. On the equity capital market side, we aren't forced to rely on that route — we completed a Brazil IPO worth CAD 200 million, even as up in Canada on the TSX, folks were cheering over deals of CAD 30 million to CAD 50 million. That's why we've managed to secure funding at lower cost from other places, which also explains part of the reason we aren't gaining much traction in the Canadian market. That being said, we rolled out a number of initiatives aimed at boosting liquidity in Canada, among them stepping up spending on investor relations. Even so, I'd have to say the outcome falls short of our expectations, which means we have no choice but to look at alternative listing options. When you look at Aura, this is a business that's going to deliver really robust cash generation, expansion, and a dividend story, right? And it's hard to find anyone else in this space—maybe nobody at all—who can match the kind of growth we're putting up, all while still returning cash to shareholders and keeping our leverage low. On top of that, Canadian investors tend to favor exploration and novelty—maybe a brand-new acquisition, or a fresh hole you're planning to drill in order to grow resources and reserves. So as you mentioned yourself, perhaps our story resonates more with audiences in the U.S. or Europe. Then you raised Almas, is that right? That explains why we aren't putting major exploration money into extending the mine's lifespan at the pit we're currently working. And you're absolutely right—that pit is fully open. We're aware that drilling deeper or to the sides would let us grow reserves quite easily. Even so, Almas already gives us 15 years, or 16 years, of mining life. There's no need for us to extend Almas's mining life. Instead, our focus is on exploration in places where we can subsequently feed—boost the feed going into the plant, right? You don't boost the plant's feed by growing reserves at depth, but you can boost the plant's feed by exploring satellites, satellite deposits, which is what we've been doing, and the results we've been getting are quite interesting.

Stephen Sanga

analyst
#45

Alright, thanks, and no — I appreciate you taking that question. That's clear to me. Around Veracruz, as I understand it, there are plenty of deposits you could bring in. What about the Tolda Fria project in Colombia? Is it simply paused, or is it an asset we're going to keep for the long term? And thanks for your time.

Rodrigo Barbosa

executive
#46

At Tolda Fria, what we're doing is quite basic exploration, checking whether the resources and reserves can be grown; on top of that, there's still a permitting license that has to be renewed, and that's under discussion with both local and federal government. So that's — that's more of something we don't discuss. My view is it's more of a long shot. Right now we keep watching it, we keep working there, but it remains a longer shot. I believe we can, without much difficulty, and we will, bring Borborema into production next year. Matupá can also be put into production without much difficulty, and construction can begin very soon. Exploration at Serrinhas, which came up earlier, is turning out to be very interesting, and we're assembling and compiling the numbers so we can share them with the market. So the company currently has other priorities, and we're waiting for this licensing process in Colombia to wrap up, after which we can then step by step begin raising our investments there.

Stephen Sanga

analyst
#47

Okay. Thanks, I appreciate your answer.

Rodrigo Barbosa

executive
#48

Given how much time we have, there may be space for perhaps one or two additional questions.

Rodrigo Barbosa

executive
#49

Regarding Almas, the primary thing we're doing is swapping out the contractor, since that contractor failed to meet what we expected in the final quarter of last year, at the point when we hit the hard rock. As a result, our productivity dropped. We had the option to restore output by adding more machines and spending more money, which would compensate for their lack of efficiency; so at this point we're replacing that contractor, meaning we won't have to bring in all that extra equipment and put capital in just to make them efficient. If you take the efficiency level they've got at Apoena and apply it to Almas in practice, running it becomes even simpler. And now, it's clear to us that we can push that cash cost down quite a bit more as we move toward Q3 and Q4 of this year. There was another question, which was-

Rodrigo Barbosa

executive
#50

Just wait, because I won't remember. Let's go-

Rodrigo Barbosa

executive
#51

Let's move on, since we're watching the clock.

Rodrigo Barbosa

executive
#52

Aranzazu was the first one, right. Yeah, I'll return to the plan. Yeah, so, regarding Aranzazu.

Kleber Cardoso

executive
#53

Additionally, we did anticipate a rise in cash costs and all-in costs for this year relative to the prior one. That has been incorporated into our guidance, and we expect to meet that guidance. There are 2 macroeconomic factors at play, and the first involves the effects Román mentioned. Beyond that, when you look at gold equivalents, a conversion takes place. Gold prices shift more rapidly than copper does. So once that conversion is done, cash costs appear elevated, though this is purely a conversion issue. Ideally, then, comparing at constant metal prices would be preferable. It matters to keep in mind that across our operations for this year in total, we anticipate an increase versus the prior year, mainly since certain significant agreements are being renegotiated during this year that had not absorbed the full inflation impact over the last 2, 3 years, given they were long-term deals at fixed prices; naturally, upon renewal, some effects show up. So that largely accounts, along with a stronger Mexican peso and metal prices, for the higher cash cost this year versus the one before.

Rodrigo Barbosa

executive
#54

Our projection is that output and recovery will align quite closely with what the feasibility study set out. The shift stems largely from the order in which we're mining, since we saw productivity drop off at the close of last year, so we anticipate the grades as well as the recoveries will match up closely; there's no significant departure from the feasibility study. It has more to do with the sequencing at the mine.

Rodrigo Barbosa

executive
#55

Our projection is that capital expenditures will fall right within what we guided. Like I said, at Borborema we're now picking up the pace. Initially comes the site preparation work, and that's where the expense is lowest; therefore a steady climb should appear, along with a bigger, more back-loaded rise, in Q3 and Q4 of this year when it comes to CapEx; so the bulk of Borborema's CapEx gets paid out and put to work over this year's second semester.

Rodrigo Barbosa

executive
#56

Thanks, everyone, for joining us. Q1 delivered a really strong result, but I'd like to ask the analyst — and ask the investors — to look forward and see what this company becomes when you combine Almas running at full production for the entire year, a lower cash cost, and a higher gold price, right? The first quarter is simply an indication of what we're capable of across the year. In Q1, again, we did perform — the gold price was $2,070. Today we're operating at $2,300. Just imagine, if we keep growing with that gold price; then, next year, we will keep growing. It doesn't halt this year; this year, we've already lifted production by 28%. The year is already heading toward 207,000 ounces of production or more, as we've calculated together here. And next year, another project that matters for everyone. It's close to 90,000 ounces of yearly gold production across the first four years, and we'll begin ramping up in Q1 next year; and a mine that isn't just big, but also carries a lower cash cost than our own. So we ought to keep growing through this year, with high gold prices, spot controlled, and next year, bringing online a project with 90,000 ounces of production at a lower cash cost than where we stand right now. So next year, you can expect at least — if you compare 90,000 ounces to the 270,000 on average that we might achieve this year — an additional 30% increase in production, combined with higher gold prices and lower cash costs. And we'll do all of that again while we keep going, and we maintain our guidance on dividends, our policy, 20% of miner's recurring CapEx, and we can keep paying dividends, keep leverage low, and build the projects; so thank you all, and we'll see you next quarter.

Operator

operator
#57

That wraps up the Aura call. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aura Minerals Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Aura Minerals Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aura Minerals Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.