Good afternoon, everyone, and welcome to the 9 months 2026 Results Conference Call for Avio. Joining me are Mr. Giulio Ranzo, Avio's Chief Executive Officer, and Mr. Roberto Carassai, Chief Financial Officer. Shortly, we will walk through the presentation that we have uploaded on our website; and afterward, we would more than welcome your questions. At this point, I hand the conversation over to Giulio. Please go ahead.

Giulio Ranzo

executive
#2

Thanks, Nevio. Hello everyone, and welcome to the results presentation. I hope the presentation is in front of you. I'll turn to Page 4 for the highlights. So again, in this quarter as well, we keep up our double-digit growth trajectory across revenue, profits and so forth. As you're aware, we've now successfully wrapped up our final legacy mission with Sentinel-3C and FLEX; plus one more, Ariane 6 lifted off successfully carrying MTG-I2. So launch activity is moving forward as planned. We've made fresh headway on our U.S. project, in that construction of the plant has begun. Our groundbreaking ceremony took place not long ago, and construction is now underway. In addition, we signed a binding strategic cooperation agreement—essentially a framework agreement—with Lockheed Martin that covers long-term future production of ER GMLRS and PrSM missiles, or rocket motors. That represents a very significant achievement. We have also booked further orders from MBDA for ASTER-30, and as I anticipated, more will likely follow; orders continue to come in on a regular basis, and while we cannot forecast them with much precision, come in regularly they do. Our backlog, as a result, is again around a couple of billion euros, and it's converting into revenue fairly fast, since revenue is growing at about 20%; so clearly, on one hand, we're adding to the backlog while on the other hand, we're working through what we already have. EBITDA is also increasing in the high teens range; so I'd call that in line with what we expected. Given all of this, we reaffirm the 2026 guidance. Moving to Page 5. That latest Vega C launch was very significant for us. It was near the maximum of our performance, placing 2 satellites into orbit together, Sentinel-3C and FLEX, so using the rocket's full capacity. The image shows the fairing was fully packed. Placing those 2 satellites into orbit was also a highly intricate part of the mission, so we're very happy it went off without a hitch and the customers were completely satisfied. Saying that this is the heart of what we have to deliver to keep the customer happy is never a small thing; in this instance, I'd say we did an excellent job. Also worth pointing out is that Ariane 6, on Page 6, successfully launched MTG-I2. Ariane 6 continues to ramp up at a very rapid pace—almost surprisingly so, I'd say. The payload was a Meteosat third-generation imaging satellite, which is the type of work Ariane has traditionally performed. What strikes me, though, is how quickly they're pulling off an increase in launch tempo. They're projecting eight launches this year. Perhaps they'll manage seven rather than eight—I can't say for certain. If they fall short, though, another launch would follow shortly into next year. They really are speeding up fast, and that matters enormously for our booster manufacturing output. Indeed, as I noted regarding Page 7, the launch schedule has become crowded. Over on the Vega program, a third flight is scheduled ahead of Christmas. That's our target. The customer payloads are somewhat behind schedule. So we're awaiting the final few to arrive. It's a fascinating mission—six separate satellites. They’re coming in a bit behind schedule. That leaves us right up against Christmas, but okay—we’ll do the best we can there, and the rocket is being assembled at the pad. There’s a further Ariane launch in November, maybe another in December; we’ll see how their timetable develops, though the year looks quite successful overall; on Page 8, this picture is from the ceremony marking the start of construction at our U.S. plant; it was a fascinating occasion since it attracted fairly robust attendance from highly pertinent American institutions, including Virginia’s Governor and the U.S. Secretary of— Because of the contracts we signed not long ago, the Navy plus important personnel from our main customers, Lockheed Martin and Raytheon, will basically take in nearly all the capacity we have; so our expectations are high, and I believe we performed very well. I should mention that having every one of those parties present at the groundbreaking was meaningful, since each voiced appreciation for our work in the U.S. and their dependence on it. The Secretary of the Navy stated plainly that what we are doing is greatly needed by the U.S. Navy, and that they depend on our project and so forth, and Raytheon and Lockheed said the same. The Governor also gave us quite encouraging remarks. As you might remember, he's supporting us with as much as $97 million in state money to offset costs—via tax incentives and similar mechanisms. So we truly have a strong team in place to succeed. Sure, we have to deliver, but the broader picture is unfolding largely in line with what we anticipated. What's new—and this is on Page 10, something we shared with the market a few days back—is that the business plan we presented to the market a year ago, particularly regarding the U.S. business, is now getting filled in with fresh, pertinent details. Specifically, during the stretch from August through October, our core customers—Lockheed Martin, Raytheon, and the U.S. Army—finalized their own agreements with the U.S. government and with customers, meaning the U.S. Army, the Navy, and the government broadly; these deals concern precisely the products we're tied into, that is PrSM and ER GMLRS for Lockheed Martin, SM-6, SM-3, and Tomahawk for Raytheon, along with multiple programs for the U.S. Army. The implication here is that our customers—the prime contractors—currently hold sufficient business that they're able to hand work down to us going forward. So it follows pretty logically that Lockheed Martin has put pen to paper with us, in effect booking plant capacity across the full run of those programs. We'll likely strike a similar arrangement with Raytheon before long, covering the Mk 104 as well as the Tomahawk missile. The U.S. Army fits the same picture — it already has a few programs with us in production. On the whole, this development made us see that these customers probably represent more business than we'd expected. As a result, volumes could come in above what we baked into the original business plan. We can't really put a number on how much, but it's pretty clear to us that an upside opportunity now exists that could extend past the 6 programs shown on this page — 2 with Lockheed, 2 with Raytheon, 2 with U.S. Army. Additional programs could come from each of those customers, and volumes for each of these programs could exceed what was anticipated. So on the whole, we conveyed the message in a document posted on the website a few days ago that we now expect volumes might be higher than we had anticipated. On Page 11 as well, regarding the European space business — the Space and Defense business — we're seeing clear signs that the system is ready to shift to another scale. The European Space Agency is considering asking its member states in Europe to back a sizable rise in Ariane 6 and Vega C launch rates, reaching as many as 15 Ariane 6 annually and as many as 9 Vega C launches annually, according to what the European Space Agency Director for Space Transportation communicated. In Defense, similarly, MBDA is continuously issuing new orders, as their press releases show, driven by greater internal demand from European customers and additional supplies heading to Ukraine via the refinancing of Ukraine support. So, overall, as I mentioned a few minutes ago, the way to read this is that across our entire business plan, upside potential seems larger than what we had built into the plan. That isn't sufficiently firm yet for us to say we must update our business plan or anything of that kind. Still, we need to make clear that additional gains look likely, and we will keep tracking developments for any further clear indications that this upside is in fact showing up in practice. With that said, I will now hand things over to Roberto, who will walk you through the financials.

Roberto Carassai

executive
#3

All right. Good afternoon, everyone. Turning to Slide 13, we can talk about the backlog. As Giulio mentioned, we still sit at roughly EUR 2 billion in backlog, even after a fairly significant rise on the revenue side, which we'll get to shortly. Over the 9 months, we booked EUR 240 million in orders, split 50% in the Space domain and 50% in the Defense business segment. Looking at how the backlog breaks down, you can see that the production portion has reached 70% of total backlog, versus the development part, which naturally accounts for 30%. Moving to the next slide, Slide 14, we'll say a bit about revenue growth; we delivered EUR 410 million during the 9 months period, up 17% versus last year. And it's worth noting that all 3 business segments contributed to that growth. So the launch system, space propulsion and defense propulsion too. The defense share of revenue has now reached 70% of total revenue. Naturally, the biggest chunk of revenues is still tied to the launch system business segment, at more than 60%. On the revenue mix, again similar to what we said about backlog, you can see the production share of our revenue climbing versus last year, hitting 67% in the 9 months 2026. Moving to Slide 15, here are the main figures, the key economic and financial numbers for the company. Overall, I think you can see the figures improving versus last year across all the lines, and in particular I'd note that revenue growth has stayed at a double-digit pace for the third consecutive 9 months period, and likewise on the EBITDA side quarters, yes. On EBITDA, we reached almost EUR 18 million; and on reported EBIT, we have a positive result of EUR 1.7 million versus almost nil last year. The net financial position. Net financial position is quite significantly high, above EUR 600 million, at EUR 614 million. You should bear in mind that this amount benefits from the capital increase subscribed by Advent late in September. So net of that capital increase, the company saw a cash absorption of almost EUR 80 million during the period, driven by CapEx acquisition in the period and a slowdown in advance payments to sub-co that were previously, let's say, collected. Moving to Slide 16. Here you can see the quarterly evolution of EBITDA. I think you can see there is this steady growth across the first 9 months. Then, as usual for this company, with the seasonality that's typical of our business, we should expect more significant growth in the last quarter of the year. We've already covered the net financial position. All right, let's move to the final slide of the deck, which essentially reaffirms the guidance for year-end as things stand right now. Thanks so much for your time today.

Nevio Quattrin

executive
#4

Thank you, Giulio. Thank you, Roberto. We can now open up the Q&A session.

Alessandro Pozzi

analyst
#5

The first item concerns what you said at the start regarding U.S. volumes possibly coming in above expectations. I've also come across some press remarks implying that Lockheed Martin's volumes support half of the new plants' volume, with most of the remainder coming from RTX and then a small amount of volume perhaps left over, though not much. I was wondering, since you're also building the new plant, when is the best moment to decide how to size it, whether to go for 700 tons per year or to add another mixer to the plant? That's my first question. And the second one is that you also mentioned — we're all aware there's a big push from ESA to raise the number of launches. How should we think about Avio's production volumes from now through 2030? Will it be a linear, steady increase next year, '28, '29? Or is it more of a step change as you move toward ESA's ambitions?

Giulio Ranzo

executive
#6

Thank you very much. So let's begin with the U.S. volumes; when is a good moment to decide on the plant size? First of all, you know that together with our engineering firm we have been designing a scalable plant that can be installed with a capacity of up to 3x the baseline capacity. So anywhere from 700 tons of capacity all the way up to 2,100 tons of capacity. Now, on when it's a good moment to make that decision, that is one end of a question, because I presume it will be during 2027, since at the end of the day you would want to wait a little longer to see whether these upside volumes really materialize. But at the same time, you cannot let construction of the company — of the factory drag on for 6 or 7 years. So at some point we need to force the customers to be a bit more specific about their volume expectations, so that we can more properly concentrate production over a certain period and make sure it doesn't take too long if we defer decisions on a potential plant size growth. In fact, the dilemma here is the following. If you invest more for a bigger plant, you end up with a better return because you don't spend much more, but you get more volumes and more profit. So it will definitely increase the return; but you're not yet completely sure about the upside. So to answer your question, we'll have to make a decision during 2027. On the ESA volume growth side, the way things stand at the moment, growth in boosters for Ariane is pretty much linear, and it has been quite rapid up to now, since compared with what we delivered last year — or this year versus last year — we raised boosters delivered by 50%. In the coming year, we'll raise boosters delivered by a further 50%, right? At that point we'd be very near capacity; we'd be at 90% of capacity. As for growth in Vega launches, we ought to climb to 4 and after that to 5 as fast as we can, provided customers hold to their deadlines, because even with this most recent flight the customer was somewhat late. So we wind up slipping roughly 1 month, and that isn't due to our production capability, but rather because we had to accommodate a customer need; so even on Vega, I'd say, growing by 1 launch per year is like growing 25% to 30% per year, which on the launch service side isn't a trivial exercise. On the solid rocket motor side, in the European part, we're probably growing around 35%, 40% a year in volume steadily, and we'll have to keep doing that. Unlike the U.S., for instance, with ASTER-30, we're very well covered by orders all the way to 2034. So it's more a matter of execution than a matter of market. So it's a growth type that's more plannable.

Alessandro Pozzi

analyst
#7

Okay, and if we return to the U.S. for a moment, the midterm results are in. Do you expect that will shift how the defense budget gets calculated from here on, and how munitions funding is allocated within defense?

Giulio Ranzo

executive
#8

Actually, there's a page we put up on the website. I think it's the one we pulled from a third party, with estimates of funding for different programs at the government level, covering Tomahawk, covering SM-3, SM-6, and so forth. And in that chart, if you revisit our website, you can see the funding levels for fiscal year '25, fiscal year '26, and fiscal year '27. That's as far as the U.S. government's congressionally approved budget extends, correct? You clearly notice in fiscal year '27 a really sharp jump in budget allocation. So we don't yet know if that will also occur in '28, '29, '30, and so on, since the U.S. Congress hasn't approved that yet. But the tendency is clear — not linear growth, but a vertical step change in volumes as well. Now, will this trend keep going? Will it shift because of the change in Congress that has already taken place? Honestly, we don't know. But one thing is certain: the U.S. inventory for solid rocket motors has fallen to the minimum, okay? So regardless of whether Congress is Democrat or Republican, or whether they believe in this or not, there's an obvious need to ramp up production volume very substantially.

Martino De Ambroggi

analyst
#9

First off, I'd like to ask about the timing of the announcement — that's my initial question. I completely understand that the call on whether to double or maybe triple production won't be made until next year. That said, could we treat the Tomahawk signature — the Tomahawk order getting formalized, and so on — as the milestone that makes it completely obvious an upward revision is required? Second, is it right for me to assume that if doubling capacity in the U.S. becomes necessary, your financial structure is able to self-finance that investment, which I estimate at roughly EUR 150-plus million for the doubling of capacity alone? And third, about the additional programs you're in negotiations over right now — I fully understand it's confidential, so you're unable to disclose them. Could they be smaller, or about the same size, as a possible upside relative to what you've already announced?

Giulio Ranzo

executive
#10

The Tomahawk announcement on its own is a very strong signal, but we don't have exact volumes for the Tomahawk yet; wherever you look right now, considering the scale of orders Raytheon has gotten for the Tomahawk, that comes to more than EUR 24 billion — EUR 23 billion in orders they've received, if I remember correctly; so in principle, there's plenty of volume there. What portion of production they'd want to give us is not known yet, and discussing that will take some time. I wouldn't say there's any single key milestone that determines whether the plan succeeds or fails with respect to building a larger plant, since this whole thing happens gradually, right? So we could begin with two mixers. We could put in one more mixer to get to three, and then at a later point we could bring in the fourth. So there isn't a make-or-break decision point where you must choose whether to double capacity. You're able to move forward step by step, correct? But what I mentioned earlier is that you can't break this into a separate decision each month, because otherwise — I mean, or each year, because otherwise getting the plant commissioned would stretch out over ten years, right? What I'd say is that we begin from the baseline assumption. Then, during '27, if we have enough justification and visibility to be confident we can do more, perhaps we'll add one mixer. And then we'll see; clearly, each time you add a mixer to boost capacity, it costs a few tens of millions of dollars, and we don't have that money at present. So for this purpose specifically — and not only for this one — we've asked the U.S. government for extra funds, structured as a soft loan and, we hope, partly as a small grant. And we’ll find out whether we’re granted extra funds at a capital cost that ought to be below the equity cost of capital we face now. If that works out, then clearly the choice becomes far simpler to pursue a somewhat bigger plant or perhaps even double it. So somehow we need to run all of this decision-making in parallel. In fact, just yesterday I was talking with the team about how we must track where customers are in terms of their capacity to pass orders through to us. We need to verify where the government is on providing financing to us. And then we have to see where we are on building the plant, and we’ll attempt to bring those dates into alignment. Of course, it would be great if every decision came to us upfront and our only job were to carry out the plan. But sadly, life isn’t perfect.

Martino De Ambroggi

analyst
#11

Yeah. And regarding the negotiations currently underway for new programs, I just want to get a sense of whether they're comparable?

Giulio Ranzo

executive
#12

I believe there's a full discussion taking place on a different program for Raytheon. There ought to be another discussion involving a different product with Lockheed. Honestly, I can't say how long these things will take; take Tomahawk, for instance — that discussion has moved far quicker than I ever expected, while the one on Mk 104 has dragged on for quite a while. Each product carries its own history; and on top of that, we lack full visibility into how simple or how hard it is for the customer to secure the matching funding from their own customer. As a supplier, then, our visibility into their contracts with their government is limited. So — but I'd say on a couple of programs, the discussion has wrapped up. Let's see where things stand; but my hope is that over the coming couple of quarters, we'll be in a position to say something about it.

Gabriele Gambarova

analyst
#13

My first question is about soft loans again. From your October presentation, I gathered that you might be able to request as much as a couple of hundred million dollars. Is that understanding right? That's question number one. Question two concerns the cost level tied to the U.S. initiative of EUR 4.8 million in the 9 months 2026. I was wondering what the level might be for the whole of 2026 and for the years ahead, and whether anything has changed? My third question is about inflation. Do you foresee any disruption or any impact, given that the cost of gas has risen significantly.

Giulio Ranzo

executive
#14

So, Gabriele, I'll take the first question and then ask Roberto to handle the ones that follow. On soft loans, we don't know what will be approved. Yes, we can request a few hundred millions. Asking is not so hard. You can ask for as much as you like, even billions. What matters is the feedback. Our discussion is very constructive, because I believe the concurrent need from our customer, which became evident at the groundbreaking ceremony when the U.S. Navy spoke very highly of what we are doing and so on, is building enough consensus within the government that what we are doing as a merit, soft loan will be a soft loan. So it ought to be cheap. I don't know precisely what conditions will accompany that type of funding; so we will see. Talks are ongoing, and we will keep you posted as soon as we have more quantitative details about what we can obtain. Roberto?

Roberto Carassai

executive
#15

All right. Regarding your second question, Gabriele, across the 9 months we've taken on costs of nearly EUR 5 million, and that tracks with the budgeted profile we set, and we anticipate finishing the year at somewhere between EUR 8 million and EUR 9 million, as expected.

Michael Filatov

analyst
#16

Sorry if I covered this already. I realize it's occasionally been difficult to catch. Just briefly on order intake: to hit that guidance of yours, Q4 requires roughly EUR 200 million. Beyond the EUR 55 million ASTER order, what else is in the pipeline? And could you perhaps give us some sense of how that splits across the rest of the year? My second question concerns the timing of the agreements with Lockheed and Raytheon. From the slides, it now appears Raytheon may be partnering on the SM-2, SM-3, SM-6 and Tomahawk. So what's the path and the timing toward a binding agreement, and something resembling what you announced with Lockheed? I'll stop there and perhaps follow up later.

Giulio Ranzo

executive
#17

Well, first, regarding order intake this year, a few things to consider; first, from now until year-end, we ought to bring in additional orders on the space side. There are a few space launch services we will contractualize between now and year-end, plus a few orders from the European Space Agency; so Q4 will lean more toward space new orders than defense orders, all right? Bear in mind that given how our business operates, we tend to receive more orders on the Vega side — I mean, on an ongoing basis, since we sell new launch services and such and sign contracts with ESA — and similarly in defense, we get an order from time to time. By contrast, for what we call space propulsion — meaning the boosters we deliver to Ariane — we don't receive an order each quarter. We receive an order perhaps every 3 years, since we obtain a large batch and then work through that batch, right? So right now we'll be consuming that batch with Ariane Group; and at some point it will reach 0. And before it reaches 0, we'll receive another large batch, all right? So — but answering your question, from now until year-end, order intake will mostly be space related. Then you asked about the agreement with Raytheon. It is in the making; discussions are under way. I hope we can complete it by end of the year; it would resemble the Lockheed one, not identical, but most likely similar. And its effect would be pretty much the same. So that would be another important piece of the puzzle, so to speak.

Michael Filatov

analyst
#18

Got it. And just a quick follow-up on the guidance, right? Because if I simply apply the 9-month seasonality, that suggests we'd land above the top end of the revenue guidance. So I suppose my question is why an increase isn't being considered; and earlier you mentioned that the business plan over the mid- to long term might be due for revision since things are looking good, which is a positive. What signals would you need to see before feeling confident about that, perhaps around the end of the year results, or whenever you'd feel comfortable?

Giulio Ranzo

executive
#19

Well, on the revenue side, as usual, we aren't especially worried about missing the number or potentially landing in the upper portion of the guidance. On profit, it's somewhat more complicated, since as you know from our Chart #16, which shows the quarterly progression of profits, the bulk of the profit—meaning half of it—builds up during the fourth quarter. So it's somewhat of a gamble to know what we'll do between now and year-end in recognizing every cost and thus accruing what kind of profit we can deliver within the year and so on. That's why our ability to forecast revenues exceeds our ability to forecast profits right up until the very last day of the year. So overall, I'd say we believe we can hit the guidance. On certain lines of the guidance, we might sit in the upper portion. On others, we might sit at the midpoint. As of today, it's hard to tell, given this concentration of activity in the fourth quarter, which isn't anything new for 2026—it in fact occurs annually.

Giulio Ranzo

executive
#20

Thanks to all of you for being here.

Andrea Bonfà

analyst
#21

No.

Andrea Bonfà

analyst
#22

All right. Are you able to hear me at this point?

Giulio Ranzo

executive
#23

Yes, Andrea.

Andrea Bonfà

analyst
#24

Just a quick question, and I'm curious about one thing: when are we really going to see a strong uptick in defense sales? Is that going to come next year? Because in '26, we're still, I'd say, looking at fairly modest growth in defense sales relative to the enormous potential we assume will arrive eventually; so I'm wondering when we'll see defense sales rise by 50% or even 100%; and the second thing is, your business plan sort of assumed at the time, used to assume, that a European Union Defense business wouldn't be far off from the U.S. one. But judging by what we're observing, the U.S. market is far bigger right now. Is there anything taking place in Europe that would help us grasp the true scale of the potential European defense business? Or how are you thinking about that?

Giulio Ranzo

executive
#25

Well, to begin with, regarding growth in defense revenues, my sincere hope is that we'll witness something more substantial in 2027, correct? At the moment, what limits us is execution rather than orders, since we have such a large backlog for defense in Europe — I mean, for the federal side — that it comes down to how much we can produce. I mean, how quickly we grow defense revenues hinges solely on our manufacturing capacity, and that capacity isn't just Avio's ability to build in Colleferro; it also depends on whether suppliers can deliver components on schedule. Because if you consider it, for instance, during these 9 months, our defense revenue growth came in at roughly — let me work this out for you in absolute terms — 22%, year-on-year. This figure represents production value rather than sales—specifically, the worth of the goods we produce. It rose 22%. Could we potentially reach a growth rate of 30% or 35%? Likely yes. We'll give it a try. The operation has become an industrial complex, since we're no longer producing just one or two programs as before—namely ASTER and CAMM-ER. Today we're running 14 distinct programs simultaneously, spanning both production and development efforts, so complexity has clearly increased. Still, I believe that in 2027 we will see—we should see—considerable growth, because our expansion will coincide with that of the U.S. We're working through Colleferro processing programs, ASTER expansion, CAMM-ER growth, and so forth. That means 2027 should bring quicker revenue gains. On European defense growth in general, what can I say? We're seeing lots of signals — demand indicators pointing to sustained expansion. As I mentioned, we're a supplier, so we lack complete visibility into exactly when a given order arrives and when it doesn't, all right? We're watching multiple indicators — for example, military delegations are visiting our plant more frequently these days. MBDA gives us confidence; and across Europe broadly, there's a need to close the gap toward a larger defense share of GDP. What governments really have in front of them, though, is that several are approaching the conclusion of their mandates. As is plain to see in Italy, they struggle to finalize the budget and have to reserve funds for other needs. So the honest answer is, I don’t know, Andrea, since over the longer run the direction of travel is upward. The pace at which they move and the timing of that movement stays rather uncertain to me. Still, every second month, another ASTER order shows up—EUR 55 million, EUR 60 million, EUR 70 million. And that continues piling onto an order backlog that already exceeds what we require, how should I phrase this? Honestly, things don’t get much better than where we are right now, since the number of orders coming in no longer holds us back. What matters instead is how fast we can scale up output while avoiding quality slip-ups, alright? Sure, you could try to make twice as many products year over year, but doing so carries a big chance of manufacturing mistakes.

Giulio Ranzo

executive
#26

Thanks, everyone, for joining, and goodbye.

Operator

operator
#27

Ladies and gentlemen, thank you for joining. You may disconnect your devices.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Avio S.p.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Avio S.p.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Avio S.p.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.