Thanks. Morning, everyone, and thanks for joining us on Avista's call covering results for the fourth quarter and fiscal year 2021. We put out our earnings along with our 2021 Form 10-K before the market opened today. You can find both on our website. With me today are Dennis Vermillion, Avista Corp.'s President and CEO; Mark Thies, our Executive Vice President, Treasurer and CFO; Kevin Christie, Senior Vice President, External Affairs and Chief Customer Officer; and Ryan Krasselt, Vice President, Controller and Principal Accounting Officer. A number of the remarks we'll make today are forward-looking, involving assumptions, risks and uncertainties, all of which are subject to change. To see the various factors that might cause actual results to differ materially from what we discuss on today's call, please look at our 10-K for 2021, which you can access on our website. I'll start by going over the financial results from today's press release. Consolidated earnings for the fourth quarter of 2021 came to $0.71 per diluted share, versus $0.85 in the fourth quarter of 2020; on a full year basis, consolidated earnings for 2021 were $2.10 per diluted share, compared with $1.90 last year; at this point I'll hand the discussion to Dennis.

Dennis Vermillion

executive
#2

Okay, thank you, Stacey, and good morning to all of you. I believe everyone here would agree that 2021 was definitely a year worth remembering; it's difficult to accept that we've now spent close to 2 years dealing with this pandemic. And at this point, we are noticing certain indications that a new normal is starting to take shape, which has us quite enthusiastic, though we clearly aren't past all the difficulties just yet. Thinking back on these tough times, I'd like to pause for a moment and give credit to our team members, since they made it possible for us to reach everything we did during 2021. They truly performed well. When it comes to the numbers, our 2021 earnings landed in the upper half of our guidance range, largely because of sizable improvements in our other businesses. Mark will cover a few of those specifics a bit later on. I want to spend some time on what we achieved operationally. During 2021, we completed the rollout of every smart electric meter and natural gas module throughout Washington State. At this point, our customers can get more real-time information, allowing them to handle their energy consumption more effectively; we offer proactive high bill alerts, or high-energy alerts, that let customers know when they might go over the energy budgets they've set, which naturally assists them in avoiding surprises once the bill shows up. Data from smart meters also gives us greater visibility into our system, helping us operate a more dependable and efficient power grid, identify and bring back power outages faster and deliver a better level of service to customers. Advantages for customers such as these allowed us to obtain — to receive full cost recovery on one of the biggest capital projects in the history of our company. Regarding clean energy, we submitted our clean energy implementation plan in Washington, which establishes the framework for reaching our clean energy objectives. Additionally, during 2021, we established a new aspirational natural gas target of achieving carbon neutrality by 2045, alongside a 30% cut in greenhouse gas emissions by 2030. We entered into 2 new power purchase agreements with Chelan County Public Utility District in 2021, and beginning in 2024, we'll incorporate additional renewable hydropower into our electric generating portfolio. And naturally, this will help us get closer to reaching our clean electricity objectives. We also put out a request for proposals looking for power generation and demand management proposals in order to fulfill our clean energy objectives. More recently, we published Avista's 2021 corporate responsibility report on our Avista Corp. website. Through that report, we offer a comprehensive view of our operations and the ways we're honoring our commitments to our people, our customers, communities and our shareholders. The website additionally offers links to Avista's reporting on a set of environmental, social and government's disclosures, or ESG disclosures. What we've shared illustrates Avista's long-standing dedication to corporate responsibility, and I encourage you to take a look; we've done a nice job with them. Avista has a brand-new unregulated arm called Avista Edge, and it's launching a broadband internet pilot over in Cheney, Washington — roughly 20 miles from Spokane. Through patented technology, Avista Edge provides a turnkey, dependable, safe, high-speed internet device that is simple and economical to install. Through partnerships with additional utilities and internet service providers to get this solution out there, our hope is that it closes the gap in a growing digital divide present in lots of communities around the globe that wrestle with high-speed internet access and connectivity, which matters so much in everyday life — something we witnessed more than ever amid the pandemic. Avista Edge is built on Avista's deep legacy of innovation. On the regulatory side, we submitted multiyear general rate cases in Washington in January; in October of 2021, a general rate case went to filing in Oregon, and we anticipate rate recovery during the second half of 2022. In these jurisdictions, the regulatory process is still something we're waiting on. In Idaho, a two-year rate case took effect around September 1 of 2021, and we anticipate submitting a further rate case during the first quarter of 2023. Going forward, our attention stays on continuing to invest capital prudently so we can maintain and upgrade our infrastructure and deliver dependable energy service to our customers. Our 2022 and 2023 earnings guidance is being confirmed, with consolidated ranges of $1.93 to $2.13 in 2022 and $2.42 to $2.62 in 2023. That positions us to earn our allowed return in 2023. Finally, earlier this month, the Board raised our dividend by 4.1%, bringing it to an annual dividend of $1.76 per share. This dividend increase, approved by the Board of Directors, represents the 20th consecutive year the Board has raised the dividend for our shareholders, and in my view it shows the Board's dedication to maximizing shareholder value; so with that, at this point, I'll hand this presentation over to Mark.

Mark Thies

executive
#3

Thanks, Dennis, and good morning to all of you. I appreciate you being with us today. So, if you spot me either in person or on video, you'll notice I've gotten rid of my playoff beard, since the odds are extremely thin that the Blackhawks can still reach the playoffs this year. That makes me sad. But that's fine. During 2021, Avista Utilities delivered $1.79 per diluted share, versus $1.83 during 2020. That came in where we anticipated, despite landing a bit under the guidance range for the utility. The main reason our earnings were down comes down to increased operating expenses and depreciation. Those operating expenses were really driven by more spending on insurance, on IT, and on labor and benefits. Then there's the depreciation increase, which mostly reflects — as Dennis mentioned — the ongoing money we're investing in our system, specifically plant additions made during the period. We've seen the economy recover, and that led to greater loads for non-decoupled customers — really greater loads across the board, though it's the non-decoupled customers whose loads influence earnings. Beyond that, we've also had to contend with higher power supply costs. During the prior year, we faced reduced hydropower availability along with dry spells, plus an extended stretch of elevated temperatures and rises in gas and power prices. Those factors drove a $7.7 million pretax cost in our Washington ERM, versus a $6.2 million gain in 2020 — a substantial year-over-year reversal. Thanks to stronger-than-anticipated results from our remaining operations, as Dennis mentioned, our overall earnings came in on target and finished within the top half of our forecast range. Those operations contributed $0.21 per share in 2021, versus a $0.05 per-share loss in 2020. Investment gains were baked into our earnings outlook, and we ended up with larger gains across a range of our holdings in those operations. As we move forward, we anticipate—consistent with what we've communicated recently—that these operations will generate profit; we're putting money into them, and profitability is our expectation. Our projection is that they'll contribute somewhere between $0.04 and $0.06 per share; we're not anticipating a steady $0.21 per share. What we foresee is closer to $0.05 per share in earnings across the coming two years. That figure incorporates the spending tied to the pilot Dennis brought up, since that pilot will carry certain expenses that we've factored into our outlook. Regarding anticipated capital expenditures, our plan is roughly $445 million for 2022 and the same for 2023, along with Avista Utilities. For AEL&P, our projection is $14 million across 2022, followed by $13 million in 2023. On the other side, our other businesses should see $15 million of investment in 2022 and $14 million in 2023, so those continue to be areas where we're putting money to work. Now, on liquidity: as of December 31, we had $82 million available through our committed line of credit. During 2021, we brought $140 million of long-term debt to market, along with roughly $90 million in common stock. As we look toward the first quarter of 2022, the plan is to take $400 million in long-term debt to market, given that a $250 million maturity is scheduled to come due on April 1. Across 2022, we also anticipate issuing $120 million of stock, and for 2023 — offering a bit of guidance there — we foresee issuing $110 million in long-term debt. There's a modest maturity, plus $110 million of common equity, to support our expenditures. Turning to guidance, as Dennis noted, we are reaffirming the consolidated ranges for 2022 and 2023: $1.93 to $2.13 for 2022 and $2.42 to $2.62 for 2023. That guidance presumes timely, appropriate rate relief in every jurisdiction where we've filed cases, which Dennis just described a few minutes ago. The relief we anticipate receiving from the general rate cases in Washington and Oregon during the latter half of the year has already been factored into those 2022 and 2023 ranges. In Washington's situation, the process takes 11 months, meaning December would come around before any effect becomes visible. For Idaho, we're looking at the second half of 2023 — really following nine one for 2023 — before rates there can go into effect. That, as you pointed out, is a rate case spanning two years. In addition to rate relief, the guidance range reflects improved customer growth of approximately 1% to 1.5% annually. Previously we had been tracking at about 0.5% to 1%, so this represents a modest increase in customer growth, together with the inflationary pressures we are seeing. Looking at 2022, we're seeing cost increases of a little more than 5% in certain areas, and we expect inflation to come back to a more normal level in 2023, which means we'll need to manage our costs to reach that point — and we believe we can do it. From Avista Utilities, our expectation is a contribution of $1.81 to $1.97 per share for 2022, and $2.30 to $2.46 a share for 2023. At the midpoint of our guidance range, there's no expense or benefit under the energy recovery mechanism. As for the ERM, we anticipate a negative expense position that falls within the 50% customer and 50% company sharing band, and that should reduce earnings by about 7% in 2022. As part of the regulatory process, we anticipate that the authorized power supply cost for the ERM will be reset in 2023 and will end up near actual power supply costs. For both 2022 and 2023, AEL&P ought to deliver between $0.08 and $0.10 a share, and in 2022 and 2023 as well, our remaining businesses ought to add $0.04 to $0.06 per share. Broadly, our guidance addresses only normal operating conditions and excludes unusual or nonrecurring items until their impacts are known and certain; for Avista Utilities and AEL&P, we additionally build in normal precipitation and hydroelectric generation for the year. With that, I'll give the call back to Stacey.

Stacey Wenz

executive
#4

Thank you. We are open for questions.

Kody Clark

analyst
#5

Kody Clark here, filling in for Julien. Morning to you.

Dennis Vermillion

executive
#6

Morning, Kody.

Mark Thies

executive
#7

Hello, Kody.

Kody Clark

analyst
#8

To begin, I simply wanted to verify something: when you talk about achieving your authorized ROE during 2023, less structural lag, does that presume you get the entire request approved in the Washington rate case along with the others? Is that right? Or within that 23% figure, are you factoring in some portion of the ask? Then, a second piece to that. Looking only at the ROE sought in the Washington rate case, we have observed approvals landing between 9.4% and 9.5%, even for a few of the multiyear rate plans that have been pursued up to now; so I am curious what makes you feel at ease with that 10.25% request.

Kevin Christie

executive
#9

Yes, great. Thanks, Kody. Speaking is Kevin Christie. Good morning. The first thing you raised was what gives us comfort with...

Mark Thies

executive
#10

I think the percentages of our total ask.

Kevin Christie

executive
#11

Regarding what share of the overall request that represents — thanks, Mark. Our usual pattern is to submit our filing and then end up either settling or going to litigation somewhere between 60% and 65%. So receiving the entire amount we asked for isn't something we need, nor is it necessary for achieving our authorized return. That figure is the standard one, and during year one under the rate plan I'd anticipate landing within that band. Year two should come in somewhat higher, given the way rate plans currently function in Washington. To reach our authorized return in that second year, we'll need something nearer to the mid-70s.

Kody Clark

analyst
#12

Understood. All right, then that range of $2.42 to $2.62 presumes roughly 60% to 65% of the overall request sits in there for...

Kevin Christie

executive
#13

Yeah, that is what we said previously, and I'd say the same holds for this instance.

Kody Clark

analyst
#14

Understood. Alright. Then when considering how we move from 2022 into the 2023 guidance, are there other factors besides rate relief that bring us to that consolidated figure of $2.42 to $2.62? Or does rate relief account for all of it?

Mark Thies

executive
#15

There are several items. Kevin covered the Washington case a moment ago. We also anticipate entering 2023 — we'll submit, or attempt to submit, during the first quarter or possibly late in the second quarter, in Idaho, since our existing Idaho case expires on September 1 of 2023. As we keep investing capital to serve our customers and face growing rate risk, we would expect to submit a filing in Idaho, plus we have an Oregon case too. So Washington isn't the only one. Washington isn't the sole item. We still must submit in Idaho, and we must finish the Oregon case too; for Avista Utilities, we'll submit in Alaska. I mean that's already factored in there for the Alaska case we'll submit in August; beyond that, we also have customer growth. We also face certain inflation pressures. Those offset one another, since customer growth benefits earnings and assists us, whereas inflationary pressures hurt. And we'll need to apply some cost management depending on how elevated inflation becomes, yet we anticipate controlling our costs to keep a sensible cost level for our customers that we included in our rate case.

Kody Clark

analyst
#16

All right, understood.

Mark Thies

executive
#17

So rate relief isn't the only factor here. A few other things are working in our favor too.

Kody Clark

analyst
#18

Right. Okay. Okay. Then, if I may, just one final thing. I'm simply wondering: suppose an order arrived and your pending rate cases reached a resolution. Within that multiyear rate plan, are there any levers available that would let you hit your authorized return? Say, for instance, you ended up with somewhat under your roughly 60% to 65% assumption — could anything be done to return to that authorized ROE? Or should we instead figure the next opportunity comes when you submit the following multiyear rate plan?

Mark Thies

executive
#19

Once more, you're focused only on Washington. Other jurisdictions exist for us — should every jurisdiction land a bit lower, we'd need to examine that. Could we examine controlling our expenses? We attempt that on a routine basis in any case; it isn't something new on our end. We attempt to keep our expenses at sensible levels at all times. Yet we could examine that as one possibility; and beyond that, additional opportunities will emerge as we proceed. We anticipate entering the energy and balance market during this year's first quarter, and as that progresses, we've observed other parties; within our rates there's a sum embedded that we must recover on behalf of our customers or deliver as a benefit to them. Beyond that sum, though — provided we succeed, it can flow through power supply costs and through the ERM, which can benefit earnings and customers, depending on the sharing level we have. So additional measures exist that we can take to manage things, yet cost management makes up the bulk of it. We do so year in and year out; it isn't something new on our end. But should an order come in lower — if it came in substantially lower, then no, we'd simply need to report the challenges we face, since we didn't receive fair recovery of our costs. That's not something we expect whatsoever; we expect — and past orders we've received have shown — and we believe our commissions have given us fair orders most recently, as recently as last fall in Washington.

Kody Clark

analyst
#20

Understood — appreciate that. Thank you for the time. I'll get back in line.

Dennis Vermillion

executive
#21

Thank you, Kody.

Brian Russo

analyst
#22

Hi. Good morning.

Dennis Vermillion

executive
#23

Hi, Brian.

Mark Thies

executive
#24

Hello, Brian.

Brian Russo

analyst
#25

Hey, regarding the ERM specifically — what's out there in the market at the moment that you would flag as that $0.07 of expense, or the 50/50 sharing? Is the cause simply elevated gas prices, or is it conditions below what's typical?

Mark Thies

executive
#26

Brian, the relationship between gas prices and power prices follows a complex formula. Specifics aren't something I'm able to provide. Broadly speaking, though, it's higher gas prices. On hydroelectric generation, we've observed a modest decrease, though it isn't significant. Snowpack sits in the mid-90s for us, so claiming that the outcome will differ isn't really possible right now; we simply don't have that knowledge. As you'll recall, having tracked us for quite a while, everything hinges on how the melt occurs, correct? That won't be clear to us until spring is further along. Still, our snowpack looks reasonable, so the main driver is gas prices alongside power prices — that spark spread differential.

Brian Russo

analyst
#27

Got it. Just so we're clear, the rate increase you're asking for — together with those multiyear rate hikes you want in Washington — those don't include any power cost changes, correct? Since that's an entirely separate docket? Or do the two sort of get bundled and combined?

Kevin Christie

executive
#28

Yes. Brian, let me come in on that. Kevin here. Appreciate the question. When we file our rate cases, we include a power supply update alongside the case. And the norm in Washington is that 60 days before the new rates take effect, we perform a reset using what we know at that point about power supply costs; and in this case, what we've requested, since our first multiyear following the legislation, is the ability to reset ahead of the rate plan's second year if we're beyond a 10% range. That's something we've proposed to the commission. Whether they'll accept it, we don't know, but given the uncertainty around power supply costs, that's what we've asked for here.

Brian Russo

analyst
#29

Understood. Also, refresh my memory on this: can customers claim money back because of earlier years when the ERM worked in their favor? Or was all of that already resolved, paid back, and squared away, if you will?

Kevin Christie

executive
#30

Correct. We keep running the numbers on a regular basis, and right now, with the circumstances Mark laid out, my understanding is that the money runs in our direction from customers, which means the books show a deferral, and that amount will be returned through rates going forward.

Brian Russo

analyst
#31

All right. And this is only a technicality in an industry case, yet it appears that separate approval from the commission is required for you to authorize using the credits to offset customer bills, and Avista cash flows plus credit metrics would likewise be taken into account by the commission in that decision. Is that merely a formality like in some of the last rate case? Yes.

Kevin Christie

executive
#32

It's quite similar. At their discretion, the commission can use those tax credits that we've made available for customers. And if we settle the case, for instance, we would expect to make a recommendation through the parties that settle with us on how to best use those tax credits to hopefully help lower the impact of the case to our customers; and if we are unable to settle and it goes through a litigated case, they would do similar to what they did last time is make a decision. And they are very well informed on how those decisions could impact our credit metrics, et cetera.

Brian Russo

analyst
#33

All right. Then, moving quickly to the 2023 guidance around $0.20 — clearly that's a pretty wide band, given the possible scenarios and results from the rate case. But should we think of it this way: your full request sits at the top end, your midpoint lands somewhere in that 60% to 65% zone, and something closer to peers or a current ROE near 9.4%?

Mark Thies

executive
#34

No, that's not how I'd frame it at all. What really drives our band is how much power supply varies within the ERM, and the ERM can move both up and down, plus how we manage earnings. That said, at the midpoint, we do expect a fair recovery. Kevin put up on the slide, or set out, that 60% to 65%. It might land anywhere, possibly above that. We've seen outcomes in a 70% range as well, and that's fine; our band accounts for that. But I wouldn't describe the top end as the ask and the bottom end as what happens if we receive a bad order. That's not it — the guidance is really centered on the midpoint, with some swing tied to the ERM and some swing tied to recovering our costs in the rate case. Even so, we can offset part of that through managing our costs. One more thing I want to be sure I mention: those tax customer credits. Our view is that they won't take everything we proposed for tax customer credits. It doesn't harm — we don't think it harms our cash flows enough to shift our rating agency metrics in any way. We think our credit metrics remain strong; this is simply a chance to offset part of the impact during an interim period for the — over a short stretch for customer bills; and we think that even if the commission accepted 100% of what we put forward, our credit metrics would still be fine.

Kevin Christie

executive
#35

Brian...

Brian Russo

analyst
#36

Yes, and one...

Kevin Christie

executive
#37

My apologies, Brian — I have to cut in for a moment and fix an error in what I stated earlier. Within the ERM, our position remains a net liability one. Earlier I noted that money is owed to us by customers, however what's true is that we sit in a net liability position. I simply wanted to ensure that point comes across clearly.

Brian Russo

analyst
#38

All right, thanks for that. Previously, if I recall correctly, you had roughly guided to an earnings-per-share expansion of 4% to 6%, based on whatever 2023 earnings power ends up being, and that aligns with your rate base compound annual growth rate of 5%. Does that remain the right lens for longer-term growth?

Kevin Christie

executive
#39

That wasn't explicitly included, but yes; we would anticipate that carrying on.

Mark Thies

executive
#40

As soon as we move beyond that point — as soon as we reach the stage where we're generating our permitted return, provided those chances to put capital to work that we've identified remain available, and right now we see nothing suggesting that won't hold true. From 2024 onward, we'd anticipate expanding those earnings at that 4% to 6% rate.

Brian Russo

analyst
#41

Understood, and I appreciate it a lot.

Sophie Karp

analyst
#42

Hello there, and good morning to everyone. I'm grateful that you're taking the question I have.

Mark Thies

executive
#43

Good morning to you, Sophie.

Sophie Karp

analyst
#44

I have two questions. Is it correct that the CapEx guidance you gave last year is still the same for the next few years? With inflation having picked up as much as it has, could you talk about how confident you feel about that figure? And what would cause it to rise or fall — what should we anticipate if inflation keeps running at today's pace?

Mark Thies

executive
#45

From the CapEx side, where inflation is concerned, we've experienced some increases in steel and in certain other materials. The effect is that we'd aim to hit our CapEx target, to spend that amount, though we might complete slightly fewer projects. Add in the supply chain challenges, and these would remain projects we think are sensible for our customers and that deliver value to them overall. So a bit less work could get done because of some of the inflation, and on the supply chain side, honestly it hasn't stopped us — it has simply meant we plan further ahead or request materials with a much longer lead time. As a result, we haven't actually found ourselves unable to carry out projects. So I'd characterize our confidence as fairly strong that we can complete the capital projects at a sensible level, in line with the dollar expectations we've provided.

Sophie Karp

analyst
#46

So, if I'm understanding correctly, you're telling me you'll stick to that figure, and should it become necessary to cut back on your plans so they fit within it, that's the approach you'd take?

Mark Thies

executive
#47

Yes, that's what we'd expect. That said, we need to be certain that the projects still make sense for the customer even when the cost basis comes in higher. So a given project might get evaluated and then dropped if its cost was excessive — if it wasn't economic for the customers; however, by and large, that hasn't really been something we've encountered. So my expectation is that it won't become a problem.

Sophie Karp

analyst
#48

All right, thanks. My next item concerned the ERM framework you examine, I believe, in order to reset things, correct? Plus you've entered the energy imbalance market, and simultaneously — assuming I've understood your remarks properly — you anticipate gaining from that within the current ERM structure, yes? So perhaps you could help us square those two things? What sort of advantage ought we — what should you realistically count on from participation in the ERM?

Mark Thies

executive
#49

That market is only just getting underway for us; thus, what we've observed is that our regulatory authorization contains an embedded benefit allowing us to participate in the ERM, and through that process we must deliver a benefit to our customers; that's essentially the objective we're aiming for. None of that really affects earnings. Should we fall short, it might turn negative, which would flow through the ERM. Yet we've watched other companies in our area enter that market and manage to show some benefit; it's quite an efficient market, and we believe an opportunity exists there. That's entirely separate from resetting the ERM, as Kevin explained — whenever we perform our power supply update during a general rate case, we reset our power supply cost. Alongside that, going forward, we'll review a track record of what we've accomplished in the energy imbalance market, and the commission might revise that periodically. We haven't begun at all; our start date isn't until March of this year. Therefore I can't truly forecast, or we can't forecast, whether we'll see any greater benefit or not regarding the ERM. So that remains unknown. Sophie, I'm unable to give you any impact figure there, but we'll — it will form part of our process as we proceed.

Sophie Karp

analyst
#50

Understood. That's quite useful. If I could squeeze in one more. Given that a rate case spanning multiple years is now moving forward in one of your biggest jurisdictions, would you at some point — say you get that outcome either by settlement or through litigation — would you at some point consider offering guidance that stretches past a three-year outlook? I suppose a few of your peers have provided longer-range forecasts, looking five years ahead and so on. Do you think that's something you'd be in a position to do if there's greater stability around the rate?

Mark Thies

executive
#51

Well, what I'd say is that our preference is to begin by reaching the point where we earn our allowed return. It's been something of a journey to arrive there, and we're focused on making certain we do arrive. On top of that, as Kevin said, this marks our initial objective under the new legislation covering multiyear rate cases. So if we're able to work through these proceedings in a sensible way, and we gain a bit more certainty, then we could think about exploring additional guidance. Right now, the only thing we've stated is that after we reach the point of earning our allowed return, our expectation would be to grow within roughly that 4% to 6% range, though we haven't provided specific guidance — but we have offered a growth expectation past 2023.

Sophie Karp

analyst
#52

Sophie, thank you very much.

Mark Thies

executive
#53

Okay, so we will simply need to observe how we are able to navigate those processes.

Sophie Karp

analyst
#54

Absolutely.

Stacey Wenz

executive
#55

Thanks so much. Thanks to everyone for being here with us today — we're grateful for your interest in Avista. Enjoy the rest of your day.

Operator

operator
#56

Thanks so much, everyone, for joining us on today's call. That brings the program to a close. You're welcome to hang up at this point. Have a great rest of your day, everybody.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Avista Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Avista Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Avista Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.