Aya Gold & Silver Inc. (AYA) Earnings Call Transcript & Summary

August 14, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 55 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning. At this point I'll hand things over to Elizabeth Hamaue, who serves as Director of Corporate and Financial Communication at Aya Gold & Silver. You have the floor.

Elizabeth Hamaue

executive
#2

Thanks, operator, and welcome, everyone, to the second quarter 2025 earnings conference call for Aya Gold & Silver. Joining me today are Benoit La Salle, our President and CEO; Ugo Landry-Tolszczuk, Chief Financial Officer; Elias Elias, Chief Legal and Sustainability Officer; Raphaël Beaudoin, Vice President, Operations; and David Lalonde, Vice President, Exploration. On this call we'll be referencing a presentation, which you can access through the webcast and which is also posted on our website. During the call we will be making forward-looking statements. Please refer to the cautionary notes included in the presentation, news release, and MD&A as well as the risk factors included in our annual information form. Technical information in this presentation has been reviewed and approved by Raphaël Beaudoin, Aya's Vice President of Operations, and David Lalonde, Aya's Vice President of Exploration, both of whom are Aya's qualified persons as defined under National Instrument 43 to 101 Standards of Disclosure for Mineral Projects. I would also like to remind everyone that our presentation will be followed by a Q&A session. With that, I will turn the call over to Benoit La Salle. Benoit?

Benoit La Salle

executive
#3

Thanks, Elizabeth. Hello, everyone, and welcome to the earnings call for Q2 2025. Before I begin the presentation, I want to share some news with you: last week we hit 10 million oz of silver production since we took over as management in April of 2020. Over the last five years, we have now produced more than 10 million oz of pure native silver. I figured that was worth a mention. There's a presentation you can follow along with as I speak. The forward-looking statement is on pages 2 and 3, and we'll begin on page 4. The Q2 highlights — it's been a very strong quarter, a very good quarter. We've delivered across every key pillar of our strategy. First, production: 1,042,000 oz in Q2, very similar to Q1. Gold and silver, but for us, it's silver revenue of $38.6 million. We report in U.S. dollars. Cash flow from operations in Q2 was $8 million. I'd like to note that we're now at $15 million in cash flow from operations after Q1 and Q2. Keep in mind that this is a ramp-up period. We commissioned the plant at the end of December last year. We began the ramp-up in January of 2025.

Benoit La Salle

executive
#4

We're finishing up the ramp-up now, as you'll see when we go through our KPIs at the close of Q2. Over the ramp-up's first six months, we generated $15 million in cash flow from operations. Our balance sheet at quarter end is strong. We're holding $114 million in cash at the bank. We have a $25 million line of credit, and our working capital position is very strong. Looking at some key production milestones, it's been a very good quarter, with solid operational KPIs that I'll walk you through, and we did hit 1 million oz of production. On the exploration side, drilling programs remain on track. We have many rigs starting up, at both Zgounder and Boumadine, and we keep delivering positive results to you. We've also been picking up new permits at Zgounder and at Boumadine, which fits our strategy. We truly capitalize on being first in country, and we add a lot of ground each quarter at Zgounder and at Boumadine. As for developing our second asset, Boumadine, the work behind the upcoming Boumadine PEA is progressing extremely well and is on plan.

Benoit La Salle

executive
#5

Turning to ESG, during the quarter we released our 2024 sustainability report. Health and safety remains a constant priority for us, and Q2 2025 was a clean quarter — zero incidents, nothing at all. Community engagement is something we continually deepen. In Q2, we accepted 26 new initiatives that local communities brought forward to us. They actually put forward 80 initiatives. Of those, we chose 26 during Q2 that we will be putting into action. Bolstering how we engage with communities sits among our core values. On the financing side, cash from operations, as I noted, came to $8 million, and $15 million after two quarters. We're extremely happy with that figure. In June we closed an equity raise of CAD 140 million — roughly $100 million — which leaves us with a very, very strong balance sheet. Moving to slide number five, we'll walk through the KPIs. As you'll recall, I always note that during ramp-up there are five KPIs we must manage. The first three are ore processing and milling rate. As you can see, in Q1 2025 we stood at 2,800 tonnes per day. By Q2 2025, that reached 3,000 tonnes per day. We're climbing steadily. Keep in mind that the nameplate capacity at the time we built the plant was 2,700 tonnes per day.

Benoit La Salle

executive
#6

By the close of Q1, we stood at 2,800. At the end of Q2, the figure was 3,000. And for Q3, we're now closing in on 3,500 tonnes per day. That KPI is handled well, kept firmly in check, and sits more than 20% above nameplate capacity. The recovery rate has always been a very delicate matter. We're aware that metallurgy matters greatly for a good mine. In Q2, the average came in at 86.5%. During June, we achieved 92% recovery. You'll remember that early in the ramp-up, the oxygen plant was the chief source of trouble. That problem has been fixed and is running as planned. We're now past 90% recovery, which is superior to what the feasibility study showed. Plant availability is another key KPI. For Q2 2025, it came in at 98%. We noted that this exceeds the industry standard. I've spent over 30 years in this business, and I've seldom seen plant availability above 95%, occasionally 96%. Here, we're at 98%. These operational KPIs can be sustained into H2. We anticipate the ramp-up is close to finishing. We'll be at cruising speed of 3,500 tonnes a day, with solid recovery and solid availability. Turning to slide number six, the Zgounder ramp-up phase at our mine.

Benoit La Salle

executive
#7

If you look at the ore mine, the tonnage exists. During Q1 we moved 195,000 tonnes, equivalent to 2,100 tonnes per day. As you'll remember, we began at 900 tonnes a day back when we ran the two smaller plants. We're aiming for 3,500 tonnes a day. Q1 had us at 2,100. Right now in Q2 we're at 2,600. That figure keeps climbing as we ramp up the open pit during Q3. Throughout Q2 we were getting the open pit ready. We carried out a great deal of stripping. We'll keep at that through Q3 so we can hit our target of 3,500, which brings things level. Mining output will match processing. That's another KPI showing green — one we handle very well and that's tracking to plan. The sole KPI we flagged last quarter as still being worked on, and which needs improvement, is the average grade. The problem during this ramp-up, as we go from 900 tonnes a day to 3,000 tonnes a day and then 3,500 tonnes a day, isn't metallurgical and isn't about the metal. It's not a metal problem. The metal is present. What has to be tackled is dilution.

Benoit La Salle

executive
#8

The way we extract it — both underground and from the open pit — that's what matters. In the past, we did a great deal of selective mining, and time was on our side because we started at 200 tonnes a day, moved to 500 tonnes a day, then 900 tonnes a day. Dilution wasn't a major issue back then. Today, given how fast we're executing, dilution has turned into our biggest adversary. We're aware of this. All of us are concentrated on bettering — or should I say lowering — the dilution. Mining selectivity is being improved. Operational control is being improved. We've brought on additional staff. We've brought on additional senior underground managers. Of the five KPIs we must tackle during ramp-up, the final one is really the dilution of grade coming from mining. At the open pit, we need to track blast movement more effectively, since we can see where the grade sits. We blast it, it shifts, and then we dilute it far too much once again. Underground is certainly even harder. All of this, we recognize, is our top priority at present. We must stabilize the mining rate, cut the dilution, control the ore, and deliver every bit of ore to the plant and every bit of waste to the waste dump.

Benoit La Salle

executive
#9

Moving on to slide seven, the financial highlights. On the revenue side, this is of course a record quarter—$38.6 million in revenue—clearly fueled by the ramp-up as well as the higher silver price. We went from $33 million in Q1 to $38 million in Q2. The average selling price is excellent, and it's actually improving further now in Q3. On the left-hand side of the slide, you can see the average net realized silver price. Comparing that with the cash cost, just to illustrate the margin, we currently have a $12 margin. In Q1 we also had a $12 margin. We anticipate that margin will grow over the coming quarters, since the selling price is higher than it is at present. Really, as we finish the ramp-up phase and as we enhance the grade or lower the dilution of the grade, you can expect costs to decline, the selling price to rise, and the margin consequently to expand. Slide eight demonstrates that we have a very strong balance sheet, which is something extremely important as we are really ramping up the Boumadine development now. This quarter, as we discussed, we generated $8 million of cash from operations, $15 million after two quarters.

Benoit La Salle

executive
#10

Capital expenditures and exploration are consistent with the $13 million budget we set. On exploration, we're allocating roughly $3.5 million to $4 million each quarter. As you're aware, we've got two sizable drill programs running. Our cash position matters a great deal at $114 million, since we intend to ramp up drilling at Boumadine and truly move toward a more detailed feasibility study in the coming year. That cash balance is crucial. Back in June when we raised the funds, it was plainly stated that the proceeds were earmarked for Boumadine development. Cash flow is strong, and CapEx is fully in hand. On a recent item, some of you may have noticed, a week and a half ago — two weeks ago now — we received an $8 million payment as compensation for the EPC contractual breach. You'll remember that last October, the plant arrived to us late. You'll remember we had a fixed date for delivery of the plant. Under the EPC contract we had secured certain contractual obligations, and a breach occurred. Owing to that breach, we were in a position to receive, and have now received, $8 million in compensation. Naturally, that isn't reflected in the cash position at present, because it arrived following the quarter end. It simply confirms for us now that we have completed construction of this new plant at Zgounder.

Benoit La Salle

executive
#11

We got it done. It had been on budget already, and now it sits $8 million under budget. Delivery came in late on timing. As you remember, we went through that in Q3 of last year. Commissioning went very fast—far faster than we had anticipated. Commissioning took us three weeks. Commercial production was declared in December, which matched the plan. To wrap up the balance sheet section: a strong balance sheet, with sufficient strength to genuinely advance Boumadine and to keep exploring at Zgounder and at Boumadine. On page nine, we included a few photos. I know lots of you have visited the site. It's gorgeous. The snow is gone from the mountain tops now. Last week, it was 48 degrees. Slightly warmer than Canada, though not by much. All those pictures are there for you to look at. Now, on to exploration, since as you're aware, we are a producer. We have a gorgeous, pure silver mine at Zgounder. The exploration side of Aya matters a great deal. Exploration at Zgounder at the mine, plus exploration at Zgounder regional. At Zgounder at the mine, we have drilled 4,700 m. That drill sits in the structure.

Benoit La Salle

executive
#12

As you know, our structure measures 1.4 km in length, roughly 700 m in depth, and 20 m in thickness. Drilling has taken place at the lower-left portion of the structure. Actually, we've drilled across the whole thing. At the bottom left, the results from drilling define a substantial extension down plunge, which we presented to you in a press release featuring strong thickness and really good grade. That confirmed the high-grade mineralization continues past the boundary of the current resource. This matters a great deal, since it is a major system. It is very well understood. We are observing extension toward the west at depth. We have likewise observed extension toward the east within the open pit, as we have shown you new open-pit results over time. The Zgounder main zone continues to grow. Regarding Zgounder regional — I'll show you a slide on that in a minute — we have drilled 1,000 m there. That is more exploration-focused drilling. There is an area known as Far East permits that we acquired and where we completed work during Q2. We have identified numerous highly interesting targets using geochemistry, satellite imaging, and spectral imaging. Some of those targets are being drilled right now. The drills are turning. We're drilling some of those targets. As I mentioned, detailed geology work is under way, and it is being carried out at Touchkal and at Zgounder Far East.

Benoit La Salle

executive
#13

You'll see this on the slide that follows. That next slide shows the location of the mine — the permit sits right in the center. Then you've got the 10 km, 20 km, and 30 km marks. Our focus is on discovering a new structure at a distance we can haul by truck to the plant, either to boost plant capacity or, depending on what we find, possibly to use. We operate three plants: a small leaching plant, a flotation plant, and the larger plant we recently finished. We're examining various things. We've identified structures that carry gold. We've identified structures with silver-copper. We're working hard to locate that additional structure, which we think is out there. We're applying AI as well. Likely in the next quarter, we'll be able to share what a massive AI program has accomplished in reviewing all our data — every bit of it: geophysics, geochemistry, satellites, spectral, stream sediment. AI is now doing work that would take many, many geos a number of years, and it's getting done in a couple of months. The next project, as everyone knows, is Boumadine.

Benoit La Salle

executive
#14

Boumadine is our tier one asset. During Q2, we finished 33,000 m of drilling. For most companies, 33,000 m is more than they would drill in an entire year. That is what we achieved in a single quarter. After two quarters, we stand at 79,000 m, and additional drilling is on the way. More is coming because we keep discovering new structures. This time around, we drilled extensively on the main trend, on the Tizi trend, and on the Imariren trend, all of which run parallel. Those are the structures parallel to the main trend. We have confirmed both continuity and extension. The PEA covers only these three structures: the Tizi, Imariren, and the main trend. Anything else we are examining will not be part of the PEA. It will come in a second step as we develop other satellite deposits at Boumadine. The main trend, Tizi, and Imariren hold enough ore quantity and grade to become a tier one producing asset. Beyond the surface work, we have identified a new zone called Asirem, which you will hear about over the coming couple of weeks and months — a permit we knew of because we had conducted the geophysics that let us acquire it.

Benoit La Salle

executive
#15

Like I mentioned, we're securing permits each quarter. David and his crew are adding more ground as new information comes in. We've gotten this permit. It contains a 9 km traceable structure where we found gold and copper. The gold is at 3 g per ton, and the copper is at 4%. We can observe it across 9 km. This is the—you can see the color. You can see the anomaly. This is what shows up at the northwest corner. You see that elongated structure. We're covering it over 9 km. We're also acquiring more ground to the north. That's a geochem and geophysics anomaly, and we're quite optimistic about the grab sample, about what we're seeing. We'll be drilling that within the next few weeks. Boumadine is, once again, a world-class asset. You've seen that slide many times. We've done considerable work on the main trend and on the parallel trend. We're now working on the west structure. In the next few quarters, we'll also be doing work to the south on these very long geochem and geophysics anomalies. That wraps up the geology. David will be on the call with us if you have questions.

Benoit La Salle

executive
#16

Now, regarding the outlook, we're reaffirming what we've previously communicated. We're highly driven to achieve all of this guidance. The production guidance ranges from 5 million to 5.3 million oz. We are dedicated to hitting that production figure. To summarize, and before we move into the Q&A session, the catalysts for 2025 were and continue to be launching the drill program. Naturally, we've accomplished that. We've started and are well along in 140,000 m of drilling at Boumadine and 25,000 m, 30,000 m of drilling at Zgounder. Our second catalyst involved starting the Boumadine PEA. That was slated for 2025. We're far along with this Boumadine PEA. As mentioned, we anticipate it will come out in Q4 of 2025. We aimed to hit 3,000 tonnes per day of processing at the new plant. That formed part of the ramp-up strategy. We achieved that during the Q2 quarter. We're already 15% above that in Q3. The ramp-up is maintaining a steady state at the plant. I'd say the ramp-up is finished. On the infrastructure side, it's done. The sole KPI remaining, and we're completely mindful of it, is the mine's dilution.

Benoit La Salle

executive
#17

We're on that. Let me give you an update on Boumadine metallurgy and the PEA. Metallurgy is the main focus, since that has been something of an open question for a lot of shareholders. A full metallurgy update is coming. The studies are wrapping up. You'll get a complete update from us in Q4 of 2025. On publishing the updated Zgounder technical report — we're working on it. What's great is that we keep finding beautiful structures, beautiful grade, and new extensions. We're on it right now and want it finished before year-end, or in Q4 of 2025. That wraps up the official presentation. We're open for business and for questions. That brings my formal remarks to a close. I'd now like to hand the call back to the operators for a Q&A session. Thank you.

Operator

operator
#18

If you would like to pose a question right now, simply press star 11 on your phone and hold until your name is called. Should you wish to pull your question, just press star 11 once more. Kindly remain on the line as we put together the Q&A roster. Bryce Adams from Desjardins is our first questioner.

Bryce Adams

analyst
#19

Thanks, Benoit — and I appreciate the presentation. A couple of weeks back, you released production figures for July month-to-date. If we extrapolate those data points across the whole month of July, it comes out to more than 400,000 oz produced. Could you speak to those July results and whether they cleared that 400,000 level, perhaps getting closer to 450,000?

Benoit La Salle

executive
#20

Thanks, Bryce. We provided 2/3 of July’s figures. Yes, for July we’ve gone past 400,000. As we said, we’ll stop reporting monthly production numbers, because that can create some turbulence at times while you’re in the ramp-up. The ramp-up is basically finished now. You saw the plant at steady state. Yes, July is above 400,000. It’s really in line with our aim of moving toward 500,000. We had a solid July. The grade was better. Throughput was excellent. July was a good month.

Bryce Adams

analyst
#21

Right, that does seem to be the case. I’ll note it as more than 400,000. Regarding the second half’s overall result for the open pit, which factors matter most in controlling the grade there? The open pit grade appears to be a bigger issue than underground. When we visited the site a few months back, the upper benches were somewhat restricted and had limited room. That may be typical while you’re developing the larger pit, but operational flexibility perhaps wasn’t especially strong a few months ago. In what ways has that gotten better? Is that the main factor in steering the open pit grade profile for the remainder of the year?

Benoit La Salle

executive
#22

Okay, so look, you're absolutely right. I mean, you know, there's no grade issue at Zgounder. Let's be very clear about this. There's no grade issue. There's a mining learning curve, and the mining learning curve was slower than what we had anticipated. At the beginning, we were in kind of a honeymoon with the open pit. We were hitting all the structures. That was pretty straightforward. It was lower tonnage, and the open pit was quite steady. The underground, as we were really pushing up the underground, created dilution that we didn't expect. We changed the focus. We pushed more the open pit. We reduced the underground. By doing that, we did not solve the dilution of the underground, but we kind of got that under control a bit more and are getting good grades from the underground. The open pit, then we realized we need a bigger open pit. We started doing some stripping, moving some of the infrastructure that you saw, the ventilation, and getting our contractor to bring in more trucks in order to prepare for the better structure. That was part, that was Q2. The open pit execution in Q2 was excellent. The dilution was not, and we therefore had lower grade than expected in the open pit.

Benoit La Salle

executive
#23

We're aware that things are improving in Q3. You're correct that the preparation of the open pit for moving to a considerably larger pit is certainly the reason the grade came in somewhat lower. We anticipate that will right itself during Q3 and certainly improve further in Q4.

Bryce Adams

analyst
#24

All right, having a bigger footprint provides you with added flexibility.

Benoit La Salle

executive
#25

That's right. Yes, it does.

Bryce Adams

analyst
#26

My final question, Benoit, concerns exploration. The most recent drill results for Zgounder that you posted in your newsroom and on your website date from June. Might we anticipate another set of drilling results soon? What have assay lab turnaround times been like? Does that play a part in when drilling updates come out?

Benoit La Salle

executive
#27

You're definitely right that the exploration results have fallen a bit behind. The reason is that we prioritized development drilling and drilling at the mine site. At the lab, capacity is plentiful, and we told the lab we want priority given to all samples coming from production, because with better definition we get better grade and less dilution. That's what we prioritized. Now, the team is back — August is the holiday month in Africa and mainly in Morocco as well. We're operating at full capacity, and David will have press releases out on both Zgounder and Boumadine, I'd say, right at the very start of September, as we are drilling. You can see the meters we've completed. We did almost 45,000 m in Q2. Yes, more results will be coming. The reason we're slightly behind is that we prioritized the production samples over the exploration samples.

Bryce Adams

analyst
#28

All right, understood. Thank you very much for all of that. I'll return to the queue.

Benoit La Salle

executive
#29

We appreciate your questions, and we’re very grateful for your support.

Operator

operator
#30

Justin Chan from SCP Resource Finance has our next question.

Justin Chan

analyst
#31

Hello, Benoit, and hello, team. Nice work on the quarter's progress. I was wondering if we could perhaps hear an update on where the plant stands at the moment, since it had been improving at a steady pace, and thank you to Alex and the team for having us a couple of months back. I'm just curious about the status of the oxygen plant — is it at nameplate capacity now? And I believe recoveries had been trending upward alongside stronger oxygen performance. As you said, tonnes were climbing past 3,000. Could you give us a snapshot of how the plant is performing right now?

Benoit La Salle

executive
#32

Thanks, Justin. Raphaël traveled back to Montreal from the plant for this call. He's here and still has his work boots on. He can give you a really up-to-date picture of where things stand at the moment.

Raphaël Beaudoin

executive
#33

Back in July, we took a two-day shutdown and used it to make some improvements. For the past two months, recovery has been above 90%, and it's holding at roughly 92%. Throughput is running around 3,400, and some days we go higher than that. On average, we're at about 3,400. Availability looks good, and we keep pushing to test the limit. That's where things stand right now.

Benoit La Salle

executive
#34

Regarding the oxygen plant — is that situation now back to normal?

Raphaël Beaudoin

executive
#35

Right, so recovery is no longer capped by the oxygen plant. The necessary repairs have been made. Some fine-tuning remains, but it isn't holding recovery back anymore. That's been true for 3 months at this point. As I mentioned, we're at roughly 92% recovery, and our reactors have more oxygen than they need.

Justin Chan

analyst
#36

All right, that's great. It seems like really strong headway has been made in that area. I realize you're sitting on a solid inventory, though I'd imagine that creates some strain on the mining side. I'm just wondering where you expect mining rates to land in Q3 and Q4 of this year. Do you figure you'll be able to keep pace with processing rates, or is that going to still be ramping up during that stretch?

Raphaël Beaudoin

executive
#37

Our mining ramp-up plan extends across the year. As we touched on a bit earlier during this call, additional room needs to be created in the open pit, and that is underway. The super pit progress is a project performing well. We'll keep ramping this up throughout the year. Naturally, in the end, the goal is for the mining rate to match the milling rate.

Justin Chan

analyst
#38

Understood, thanks. Perhaps just the final point, Raph — while we were at the site, you brought up enhancements to blast monitoring as part of the open pit upgrades. I'm just wondering what the timeline looks like for that, and whether that also begins showing up in the figures this year.

Raphaël Beaudoin

executive
#39

A team is being put in place by us. The software is there. The procedure is there. What we're putting in place for the second half of the year is going to be a continuous improvement journey. Q3, I would say, is the implementation, and by Q4 we'll be in place, and good results from that are what we expect to see.

Justin Chan

analyst
#40

All right, thanks very much, everyone. I’ll hand the line over to others and come back in should anything else come up. Many thanks.

Benoit La Salle

executive
#41

Appreciate that, Justin.

Operator

operator
#42

Don DeMarco of National Bank has our next question.

Don DeMarco

analyst
#43

Thanks, operator, and good morning to Benoit and the team. Congrats on the gains you've made in recoveries and throughput from one quarter to the next. Perhaps I'll come back to grades just to see whether I can get a bit more detail. Where do you see the greatest opportunity, in open pit or underground, both when it comes to tackling dilution and when it comes to mine sequencing? Do you have any higher grades that you might be set up for in the second half of the year?

Benoit La Salle

executive
#44

Thanks, Don. Your question is definitely on point. This is a matter we oversee closely—in fact, we go through it with the team each week. While preparing for the review, I checked the initial budget we had approved, and in that original plan our average grade during ramp-up for Q1 and Q2 was 155 g per ton. That was the budget we started with. We had a very clear picture of what had to be done. Ultimately, the average grade for H1—or rather Q1 and Q2—came in at 151. Yes, that's somewhat below target, but as you know, since last year we were aware that dilution was an issue requiring management. Now, looking at what we'll be mining in Q3 and Q4, the range is 180 to 200 g per ton. That's what the mine plan shows. We're confident it's there. We're also aware that a dilution problem remains—concerning blast control at the open pit and cutting down dilution—and we're working on that. New software is now in use. We've brought on new personnel because we recognized the need for additional bench strength; our learning curve simply moved more slowly than we had hoped.

Benoit La Salle

executive
#45

We've brought in additional bench strength. Our headcount is higher. During Q3 and Q4 we're mining at 180 to 200 grams per ton. July had already improved. That much we know. As you're aware, given how the deposit behaves, it's possible to move into a high-grade zone. That ties to your question about sequencing. Our sequencing does give us better grade than Q1 and Q2. Q1 and Q2, we understood, were a ramp-up. Again, when you look at your own numbers, you can see that even in the ramp-up, we still generated $15 million of cash flow across Q1 and Q2. We're aiming for better grade in Q3 and Q4. Better grade is where we're heading, yet we also clearly must cut the dilution. That will come in the open pit through improved blast control. Underground, it's simply a matter of better geological control; in the open pit we have three-by-three drill spacing. That isn't possible underground, but we're making improvements. We're making improvements — not yet where we'd like to be, but improving. Of the five KPIs we're tracking through the ramp-up, that's the final one. In the mine plan, we're mining 180 to 200 during the Q3, Q4 period.

Benoit La Salle

executive
#46

To hit our guidance, we simply have to land in the mid-160 range. Our guidance feels very comfortable to us, since 160 is all that's required. Mining will be running at 180 to 200. We're quite at ease with that.

Don DeMarco

analyst
#47

Alright, thanks a lot. That's useful. Later this year we have a catalyst coming with the Boumadine PEA. I realize you've looked at a variety of processing alternatives. When it comes to the PEA, have you more or less reached a decision? I recall you mentioned a roaster at some stage. Is that the approach you'll take in the PEA? And will there possibly be alternatives laid out showing how the economics could look if you simply sold the concentrate without roasting it?

Benoit La Salle

executive
#48

Yes, that's right. Precisely so. Our project will consist of two phases: phase one involves the concentrate, and phase two involves the roaster. As we said last year, the roaster was further along than the others, and that is clearly proving to be the case. Raphaël and his team are on it. In fact, this very week we began work on the organizational chart — how many hires we'll need in order to accelerate this project. That's the current status. What we're seeing at the moment makes us very pleased. Something will be ready in Q4, but you are entirely correct. Phase one: produce a concentrate. Examine the economics of that first phase — significantly less CapEx, reduced or, as you know, straightforward OpEx, simple to construct. It's largely a matter of logistics. Phase two: the roaster, which, as we've consistently stated, would be carried out with a partner, you know, in conjunction with the state. That is turning into a highly significant project for the country. It remains a phase-two item. Yes, it will form part of the PEA.

Don DeMarco

analyst
#49

All right, that's great, and thanks for that. That's everything from my side. Thanks once more, and best of luck for the remainder of the quarter.

Benoit La Salle

executive
#50

Thanks, Don. I appreciate it.

Operator

operator
#51

Charles Ehidiamhen from Scotiabank has our next question.

Charles Ehidiamhen

analyst
#52

Thanks for taking my question. I'm asking on behalf of Obi. Perhaps I could begin with Boumadine. I just wanted to get clarity on the PEA timing. The expectation is that the PEA will be released in Q4 of this year.

Benoit La Salle

executive
#53

Absolutely. If you're asking about PEA in Q4 of this year, then yes, it's definitely Q4 of this year.

Charles Ehidiamhen

analyst
#54

All right, thanks. So I suppose what I want to ask about next is simply the grades at the mine. I believe the outlook includes a remark referring to targeted initiatives. Could you say something about those? Apologies if I've already missed that.

Benoit La Salle

executive
#55

Apologies — I didn’t catch that question clearly. Could you tell me again what you’re asking?

Charles Ehidiamhen

analyst
#56

In the press release's outlook portion, you mentioned focused efforts aimed at improving mine grades while operations hold at a steady state. My question was whether you could address that specifically.

Benoit La Salle

executive
#57

Yes, yes, yes. You're asking what kind of initiatives we have? Absolutely. Initiative number one was stronger bench strength. That was the top priority — bringing in additional people with open pit or underground expertise, and simply adding senior management capable of backing up the operating team. We've completed that. Second, at the open pit we're applying software for blast control. We're applying improved definition. We have a contractor we collaborate with closely. Equipment has changed too. That contractor has bought new trucks with larger capacity, and more trucks. All of this is for preparing the open pit so we can reach better benches. That work is underway right now. Underground is comparable — strengthening the mining bench, improved definition, additional geologists, and more mine production geologists, so we plan better what is actually there and then measure that against execution. We were already doing this, but now we intend to boost bench strength in underground mining. I don't know, Raphaël, is there anything from what I just described that you would add to make us better at open pit and underground?

Raphaël Beaudoin

executive
#58

We're also carrying on with underground development, and we're looking at the ramp, which is going to open up access to new levels — always new levels. When it comes to the open pit, blast movement — we're aware that blast movement plays a major part in dilution, and that's something we're addressing directly. As we move deeper into the pit, we're also sharpening how well we understand the deposit, and that will help us out too. In short, I'd say blast movement for the open pit, and underground, as we open new levels, we take lessons from the levels above, and we've got a bit more manpower, particularly in geology for underground mapping.

Charles Ehidiamhen

analyst
#59

Okay, thanks. On exploration — when might results from the regional exploration project come in? I know you mentioned that Zgounder and Boumadine exploration results would be arriving soon, but for the regional portions, what's the expected timing for those results?

Benoit La Salle

executive
#60

Yeah, thanks for asking. Exploration results—particularly the regional ones—really hinge on what we hit. Much of it is greenfield. At the moment, as Benoit mentioned earlier, we're prioritizing what was near the mine for Zgounder specifically, what was near the mine and what's development. Regional really depends. On Boumadine, as Benoit mentioned, there are some nice, there are some interesting things that we've seen. I would think results from that come more in the back half of the year.

Charles Ehidiamhen

analyst
#61

Okay.

Benoit La Salle

executive
#62

We're going to be releasing drilling results in September and October, on a regular cadence, since we have a lot of drilling underway, and, you know, we'll make sure you stay informed.

Charles Ehidiamhen

analyst
#63

I appreciate that.

Operator

operator
#64

Just a quick note before we continue: to ask a question right now, you'll want to hit star 11 on your touchtone keypad. Up next, we have Justin Chan from SCP Resource Finance on the line.

Justin Chan

analyst
#65

Hey everyone, thanks. This is a minor question, perhaps directed at Ugo, but it concerns the income taxes that have accumulated on your payables. I'm just wondering whether you can offer any guidance regarding the timetable for tax payments during this year.

Ugo Landry-Tolszczuk

executive
#66

Right. Tax payments in Morocco work somewhat differently from how they do in Canada. We don’t have provisional accounts, and the taxes we owe are calculated solely from last year’s figures. There’s no requirement to prepare provisional accounts based on expectations the way there would be in Canada, for instance. A significant portion of our taxes payable comes from unrealized foreign exchange gains, since our local company’s debts are denominated in USD and the functional currency there is the Moroccan Dirham. The Moroccan Dirham has risen considerably against the USD. We’ll see how things look at year-end, and then a determination or a calculation will be made at the end of the year. If taxes are payable, we have to pay them around the end of March to early April timeframe.

Justin Chan

analyst
#67

All right, understood. For the remainder of this year, I suppose we should simply model it as taxes being accrued without being paid, or perhaps model them as matching what has been accrued?

Ugo Landry-Tolszczuk

executive
#68

Our provisional payments are made according to what we paid last year. Taxes are paid by us each quarter, calculated from the prior year's results. Should any extra income tax arise, at present we accrue it on the balance sheet and present it as a liability.

Justin Chan

analyst
#69

Understood, noted. Fine. Thank you, Ugo. I appreciate that. Yes, that's what I wanted to ask about on this one. Many thanks, everyone.

Operator

operator
#70

That wraps up the Q&A portion for today. I'll now hand things back to Benoit La Salle, who has some closing remarks.

Benoit La Salle

executive
#71

Thanks, operators. Thanks to all of you for joining today's call. I appreciate all the questions. To wrap up, I want to return to the point that over the past five years, Zgounder has already yielded 10 million oz of silver for us. A great deal more is on the way, since we'll be presenting the new mine plan before the year is out. I'd also like to note that because our balance sheet is strong, we're able to be highly selective about how we sell the silver. We're never in a hurry to sell. This week, we managed to sell 100,000 oz at $38.50 and held back 130,000 for a better price. We also have 100,000 oz being delivered next Monday in Geneva. Our selling strategy is very smart, and it pays off. We always secure a very good selling price. We did mention new hires, but let me tell you that Aya is a very good name in country. It's now a very well-recognized name. We're bringing in some new senior managers at the mine level, which will complement the existing team and will allow us to fix that last KPI that has been an issue.

Benoit La Salle

executive
#72

The Zgounder ramp-up has been going for six months. As Raphaël mentioned, it's running at the plant, consistently in the 3,400 to 3,500 range, with a few small peaks even higher. Given that level of throughput, along with better grades and solid recoveries, you should look for a very strong second half ahead. Our attention is entirely on underground and open pit operations. That's the final KPI, and we track it every single day. Our production guidance has our full commitment. On the Boumadine PEA, there were two questions. That PEA is transformational. As everyone knows, it's a multi-million ounce silver equivalent or gold equivalent. It's a tier one asset, and it's set up for substantial expansion of our production profile, plus growth in the other structures within this portfolio at Boumadine, where, as you're aware, we now hold more than 700 sq km of land. From here, we're moving into a really exciting period for exploration and resource growth. We keep having success at Zgounder — you can see the results. We're also continuing to succeed at Boumadine on the main structure. Drilling will carry on, and we'll have a very extensive drill program. We're also planning a bigger drill program at Boumadine next year than this year's, since we'll be moving into resource conversion from inferred to M&I and on to reserves.

Benoit La Salle

executive
#73

A very sizable drill campaign is on tap for next year. Boumadine is a project on a district scale, and we'll also run regional drilling there, since Boumadine holds some exceptionally strong anomalies that still need to be drilled. At Zgounder and Boumadine, we'll keep expanding our ground position. Being the first one in — what people call first mover advantage — is absolutely accurate. We continue to add ground at Zgounder and at Boumadine. Next year promises to be a very exciting period for exploration. Cash flow keeps coming. For H2, we anticipate stronger cash flow. Naturally, the silver price is not something we control, but if we assume it stays constant, we expect a very strong cash flow position through the remainder of the year. We are cash flow positive at present, and that will remain the case over the coming quarters. Margins are expanding, as you know, throughput is steady, and recovery is strong. As for our strategic positioning in Morocco, we remain focused exclusively on Morocco. We're examining additional ground along the fault. Certain families hold good assets and good projects that are dormant. We'll keep reviewing those on an ongoing basis and bringing them in under the Aya name and within the Aya portfolio.

Benoit La Salle

executive
#74

To wrap up on cost — and we did mention grade, since grade directly impacts cost — we examined that extremely carefully. I also want to note that when we reviewed the team here and how they run the Zgounder mine, and when we reviewed cost per ounce, it comes to a certain amount, but our management approach is cost per ton, meaning the cost of every ton we move. In our budget, for open pit and underground, we had $50, $56 a ton. The actual figure for the first two quarters is $46. That puts us nearly 20% under our budgeted cost. On processing, the budget was $31.5 million. The actual is $32 million. The gap comes from additional cyanide that was required. As you can see, costs are managed very well. The plant is performing extremely well. There's one element: we need to reduce dilution. By reducing dilution, we will bring down cash costs, we will bring down ASIC, we will strengthen cash flow, and we will return to where we want this project to be, so that we can focus on developing and building Boumadine over the next few years. Thank you very much for your time. Thank you for being there and for supporting us.

Benoit La Salle

executive
#75

We'll be speaking with you during the months ahead, and we'll get together in November for the Q3 conference call. Many thanks.

Operator

operator
#76

That wraps up the conference call for today. Thanks for joining us. You’re free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Aya Gold & Silver Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Aya Gold & Silver Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Aya Gold & Silver Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.