operatorGood afternoon, everyone. Thanks for joining us for B2Gold's conference call on first quarter 2020 earnings. At this point I'll hand things over to our President and CEO, Mr. Clive Johnson. Mr. Johnson, the floor is yours.
Clive Johnson
executiveThank you, Operator. As the operator mentioned, welcome everyone to today's conference call to go over B2Gold's first quarter 2020 financial results. I'll make just a few opening remarks, then hand things over, and Mike Cinnamond will take you through the results — the financial results. Bill Lytle, our SVP of Operations, will join us and give an update on what's happening on the operational side. Tom Garagan will come on and tell you a bit about what we're doing on exploration. As an overview, we've had another excellent, very strong quarter, with record gold production, gold revenue, cash flows, and record low cash operating costs of $367 an ounce. We're very pleased with the quarter, and obviously these are challenging times with the worldwide impact of the COVID-19 virus. We've kept operating extremely well throughout this period, and I do like to think that's partly because we jumped on the seriousness of the virus very early in Vancouver and at our sites. I'd also like to think it's thanks to the experience of our team and our great teams at the mines, who have many years of experience managing through both good times and bad.
Clive Johnson
executiveWe've performed quite well, and that's part of the reason we're keeping our 2020 guidance unchanged. As for strategy moving forward, it will remain largely the same. Above all else, the health and safety of our people is our foremost concern and has always been our highest priority. Beyond that, we aim to keep maximizing profitable gold output while also examining our pipeline for growth opportunities. Today you'll hear from Bill a little about the Fekola Mill expansion and the new fleet, which is coming along very successfully, and we remain on schedule to complete the mill expansion by the third quarter of this year. Looking at our pipeline, the opportunities include Gramalote, which we'll discuss, and getting that back on track. We're drilling as part of a feasibility study, and we now expect a final feasibility study in the first quarter of 2021. Also in the pipeline, of course, are things such as exploration, which Tom will touch on briefly, looking 20 km north of both Fekola — the Anaconda area — and the Cardinal area, which sits fairly close to the deposit itself, the Fekola deposit. That's really where we stand strategically, and we have sufficient confidence in our guidance and in our tremendous financial strength, as we see our debt reduction continuing.
Clive Johnson
executiveOur financial position gives us sufficient confidence to raise the dividend by two times, which we also just announced yesterday. So with that, I'll hand things over to Mike Cinnamond, and as I mentioned, he'll provide you with an update. And once all of that is finished, we'll open the floor for questions. Mike, over to you.
Mike Cinnamond
executiveThanks, Clive. Before I go on, is the audio coming through clearly on your end?
Clive Johnson
executiveYes, I’m able to do that.
Mike Cinnamond
executiveAll right, then. Clive already touched on this, and I'd agree — a really strong opening quarter, with several records worth highlighting. Starting with revenue: we brought in $380 million for the quarter. That marks a quarterly record, achieved on sales of 239,000 oz. The average price we realized came in at just under $1,590 an ounce — clearly well above the $1,350 we had originally budgeted. Another factor lifting us above budget was that we sold roughly 5% more ounces during the period than we had expected. Turning to production: continuing operations delivered 251,000 oz, which came in 17,000 oz above budget, driven largely by Fekola. Adding our 34% attributable share of Calibre's Nicaraguan output, which was 14,000 oz, total gold production reached 265,000 oz — another quarterly production record for the company. A note on Calibre's figure: when we initially published the production release, we had put Calibre's output at an estimated 12,000 oz, but they've since reported their production results, so the actual number was 14,000 oz. That's 2,000 oz more than the total production figure we released roughly three weeks ago. Just to touch on a few of the individual components behind that — Fekola led the way.
Mike Cinnamond
executiveAt Fekola, we produced 164,000 oz, beating the budget by 14,000 oz. Several factors contributed to that, though the main one was the higher grade we mined from phase IV of the pit compared with what the budget assumed. We also had part of the expansion fleet arrive on-site early in the quarter, got it commissioned ahead of schedule, and benefited from that. As everyone knows, this is the year we're carrying out the expansion plan, which involved optimizing the pit designs in the mine plan and, more broadly, targeting a higher-grade area than the original feasibility study contemplated. Another point worth noting, I think, is that in light of what was happening around the globe and the COVID-related risks being experienced worldwide, we chose to mine higher-grade areas in phase IV of the Fekola pit on a temporary basis. The aim was to add to the ore stockpiles there in case we ever ended up in a stockpile-only scenario. The good news is that we kept running very well at Fekola and, in fact, at all the other sites throughout the quarter and throughout the first effects of the pandemic. I think Bill will go into that in a bit more detail later, following the financial update.
Mike Cinnamond
executiveNow turning to Masbate. Masbate produced 45,000 oz, which was still 1,000 oz above budget, so essentially in line with budget. We achieved that despite mill throughput coming in below budget and mining activity being lower than planned. Process grade and recovery both came in above budget. That really comes down to the timing of when we got into the Montana pit. We had planned to be in Montana from the very beginning of the year, but as it turned out, we didn't get there until early February 2020. As a result, we concentrated more on Main vein, and the ore grade, oxide ore tonnage and total ore tonnage from Main vein all came in better than modeled, which delivered grade and recovery above budget. Otjikoto came in at 42,000 oz, 2,000 oz above budget. A solid quarter overall. At Otjikoto, we're up compared with last year, and that reflects our being in high-grade ore from the Wolfshag pit during the first quarter of 2020. We didn't reach Wolfshag last year until the second half. In total, 251,000 oz came from our three operating mines, and 265,000 oz overall, which, as I mentioned, is a record for the company. Let's spend a moment on costs now.
Mike Cinnamond
executiveWhen you look at everything together, our all-in cost across every operation—counting our stake in Calibre—comes to $389 per ounce. And if you focus just on the cash cost at the three mines we operate ourselves, it's $367 an ounce, which marks the lowest consolidated cash cost per ounce produced in this company's history. Measured per ounce sold, the figure was $382 an ounce. Breaking that down, Fekola drove the result. Fekola set a quarterly record low for that operation at $251 per ounce produced, or 286 per ounce sold, coming in roughly $40 an ounce under budget. The main reason at Fekola was stronger gold output, and that same overall cost base produced a lower cost per ounce. Perhaps I should add a single remark about fuel at Fekola. We've clearly watched global fuel prices come down. At Fekola we didn't see overall fuel price declines, though they are beginning to fall now and somewhat track the broader crude price drops. Just so you understand the reason, in Mali the government fixes the fuel price once a month in advance. And in West Africa as well, there's a certain fixed-price element to fuel.
Mike Cinnamond
executiveThere are a couple of pieces to the cross-border cost picture. Another practice of ours is that we usually hold two to almost three months of fuel inventory at the site and in stock. We accumulated those fuel stocks in the fourth quarter of 2019, when prices ran somewhat higher, and during Q1 we've been reducing those costs as we consumed that fuel. On the whole, we did not see a decline in fuel costs in Mali during the quarter. They came in slightly above budget, though we are beginning to observe those fuel costs coming down going forward. At Masbate, cost per ounce was $722 an ounce, which again is well below budget by a little more than $60 an ounce. The favorable variances to budget resulted from cost savings due to lower mine tonnage from Montana, along with reduced waste stripping activity. They also stemmed from the temporary suspension of mining activities late in March, when we had to halt operations for about a week because of fuel supply disruptions caused by COVID-19. As we announced, we had the fleet operating again very quickly. I should note that when we shut down, we did not stop milling operations—only mining activity—and we brought it back up and running very quickly, and the mine is operating again now.
Mike Cinnamond
executiveWe additionally observed at Masbate that actual unit fuel prices came in below what we had budgeted. Those savings reach that operation more rapidly. At Otjikoto, we recorded $441 an ounce, which is again $64 beneath budget. The reduced costs essentially stemmed from cheaper fuel — both diesel and HFO — along with lower reagent expenses and a Namibian dollar that proved weaker than planned. In March we witnessed the rand drop sharply, and the Namibian dollar tracked it. Thanks to that currency decline, we likely saved roughly $2 million in foreign exchange in the latter part of March alone. Turning to all-in sustaining costs, consolidated they came to $721 an ounce, $695 from our three operating mines, or $721 when our estimated share of Calibre's costs is included. From where we sit, our operating mines ran $110 an ounce below budget. That reflects a cash cost per ounce that was roughly $50 lower. The remaining piece really relates to the timing of capital expenditures. At a number of the sites we did record meaningful capital expenditure underages, and exploration costs came in slightly under expectations as well, owing to how accessible certain sites were later in March. Over the full year, we anticipate those will reverse. Broadly, on CapEx for the year, we are still budgeting the entire amount of capital expenditure we have projected for the total year.
Mike Cinnamond
executiveOur guidance and the budgeted figure for that remain unchanged. Let me speak to guidance in general, and production guidance. For the year, we had guided milling to 955 on a consolidated basis, and that figure includes our attributable portion of Calibre of between 45,000 oz and 50,000 oz. Late in March, Calibre announced that operations in Nicaragua had been suspended so they could proactively manage any COVID-19 related issues there. At this point, it isn't clear when the Nicaragua ops might resume and be running again. That said, since we're 14,000 oz ahead, or 17,000 oz ahead from our own mines after already in Q1, we've kept our consolidated production guidance as it is. We believe we can cover any shortfall that might arise if Calibre isn't able to get its operations up and running in the near term. On cash costs and all-in sustaining costs, just a reminder, we're maintaining the same guidance, $415 to 455 per ounce cash costs, and $780 to 820 all-in sustaining costs. A couple of comments perhaps on the operations overall. Fekola, the expansion's going well, Bill, I think after this segment, Bill's going to give you a bit more detail on that, I'll leave that to him to give you the overall picture.
Mike Cinnamond
executiveOn Fekola Solar as well, we did make it known that the solar work was being slowed. Activity at that site was put on hold for a period so we could be better positioned for any COVID-linked roster adjustments and workforce management at Fekola. It's paused for now, though we anticipate that when we restart, we'll get it operational and finished inside 6 months from the restart. For Otjikoto, a quick reminder that the board gave the go-ahead for Wolfshag Underground development, with portal development anticipated in Q3 2020. On Gramalote, Bill will walk you through where things stand, but a brief note that we were required to sole fund $13.9 million so we could earn our way back to a 50/50 position in the joint venture and keep our role as manager. As of the close of quarter one, we had sole funded $12.7 million, so we're nearly there. By quarter end, we've nearly reached that $13.9 million sole funding figure. Perhaps a broader point on fuel hedging as well. There have been a handful of questions about it. On fuel hedging, a fuel hedge has always been in place. Well, at least over the last few years, a fuel hedging program has been something we've had.
Mike Cinnamond
executiveTypically, what we aim for is to hedge out 50% of a single year's usage, and then have 25% of the next 12 months covered through hedges. When the quarter closed, roughly 40% of our one-year total was hedged, with 20% in the following 12 months. Since the quarter ended, we've actually added more positions, and at this point we've reached our target of 50% for one and 25% for the next. 50% for the first year and 25% of the next. We did place a bunch of hedges. Obviously we began the year with some already in place. On the income statement you'll notice an unrealized mark-to-market loss of $14 million. Most of that relates to fuel, since some of those hedges we put on in earlier periods were hit by the decline in fuel prices. Overall, given that our hedging goal is to never be more than 50%, we never overexpose ourselves to not benefiting from fuel price declines. Okay, just a couple of comments maybe on the income statement. You'll see interest and financing expense significantly lower this year than last, and that's a function of us having paid down $200 million in debt last year and continuing to do so this year.
Mike Cinnamond
executiveBack in early April, we announced that we had drawn down $250 million on our revolver as a precautionary step. That cash was taken purely as a safeguard. We don't require those funds to run our operations, and we have no other purpose intended for them at present. It was simply a precaution, given the kind of economic conditions we observed worldwide, and that we continue to observe. Those funds were simply put back to work and are sitting there now. Broadly, our aim — as we'll point out over the course of the year — is to keep watching that cash position, and we anticipate being in a net cash positive position probably at some point later in this quarter. We certainly will have the capacity at some stage during the year to repay that debt, should the economic climate have calmed somewhat and goods and services be moving more freely around the globe. A few remarks as well on current income taxes: $63 million, a fairly large increase versus the prior year quarter's $25 million. That reflects more profitable operations, particularly at Fekola, along with considerably higher gold prices. Those are the main factors behind it. Within that total, $47 million related to Fekola — $37 million of which is current income taxes, with the remaining $10 million being the priority dividend.
Mike Cinnamond
executiveThat covers the initial 10% stake held by Mali's government in the Fekola operations, and just as a reminder, it shows up as a tax. Perhaps a word on EPS as well. Bringing all the results together and looking at where we landed on a GAAP basis, EPS came in at $0.07 per share, and adjusted EPS — after stripping out some of the big non-cash items — reached $0.10 per share. On cash flow, another quarterly record worth flagging: $216 million in operating cash flows from operations. That figure also captures any working capital movements. It works out to $0.21 per share in operating cash flow. Record operating cash flows. I should also mention what we saw certainly later in the third month, or the final month of the quarter in March, as individual countries were hit by changes to airline schedules or international flights being canceled or banned. Shipping gold from sites certainly became more difficult. At every one of our sites we managed to keep doing so successfully, using our own charters or shared ones with other companies where needed. We've kept shipping gold without interruption.
Mike Cinnamond
executiveAnd our refiners — the ones operating the refinery in South Africa and Metalor in Switzerland — have also kept running without interruption. So overall, we've had no problems when it comes to shipping gold, refining our product, and getting it ready to sell. We've been in a position to benefit from these elevated gold prices. One more point regarding operating cash flow: our guidance for the year assumed gold at $1,500 for the full year. We figured operating cash flows would land at roughly $700 million. Should gold remain at its present level — about $1,700 per ounce — through the rest of the year, we'd expect operating cash flows to come in north of $800 million for the year. A few additional notes on certain cash flow items. We paid down $25 million on the revolver. That stems from the preemptive $250 million draw we made in early April. As I mentioned, our intention all along was to retire that $200 million of outstanding revolver debt during this year. At present, $425 is drawn following that preemptive draw. And again, as I said, we do anticipate generating sufficient cash flow to be in cash positive territory by the close of the current quarter.
Mike Cinnamond
executiveOf course, what we'd want to do is keep an eye on that and ideally retire the full balance of that debt afterward in the year. To start with dividends, just a quick remark. We paid our second quarterly dividend at $0.01 per share. B2Gold's inaugural quarterly dividend was paid in the final quarter of 2019, at $0.01 per share. We repeated that in the first quarter, at a cost of $10 million. As Clive mentioned, we've announced that we are doubling the quarterly dividend from $0.01 to 0.02 per share US, and we expect to declare that first $0.02 dividend later in June. On cash flow from investing activities, we spent $112 million on investing activity. As I said when discussing all-in cost per share and sustaining cost per share, we've had some CapEx timing differences. Some CapEx wasn't incurred at sites, mainly increases to mobile equipment and some pre-strip development. For example, in Namibia, the NamPower connection. We didn't complete those things in Q1 as originally budgeted, but we expect they will happen later in the year. Really, those CapEx items are just timing differences. Also worth commenting that, as we mentioned in our news release, we entered into a deal with West African Resources to sell our interest in the Toega deposit post period end, for total proceeds to us over time of $45 million, plus a small royalty.
Mike Cinnamond
executiveSo with that, I believe we closed out the period holding a bit less than $208 million in cash. As I mentioned, we're in a very solid position when it comes to cash flow and liquidity, and we're looking forward to operations staying strong through the rest of the year. I think that wraps it up. Those are the primary items I had intended to discuss.
Clive Johnson
executiveAll right, thanks, Mike. Bill, could you walk us through briefly what’s going on in operations?
Bill Lytle
executiveYeah. Can you hear me okay, Clive? Mike kept cutting in and out while he was speaking.
Clive Johnson
executiveMike's audio had some interference earlier, and we're still getting a little of it. Please go ahead. From where I'm listening, you come through quite clearly.
Bill Lytle
executiveAll right, real quick on operations—Mike already went over much of this, so I'll keep my remarks fairly brief. The main points I'd like to make are these: first, we are still holding to guidance at every one of our operating mines, as well as our company-wide guidance for the year, as Mike mentioned. It has significantly affected our operations. It hasn't significantly affected any of our operations. B2Gold moved ahead of the pandemic very early on. Back in February, we decided to stop all non-essential travel and put a stay-at-home order in place. That decision has helped us succeed in carrying out our operational requirements. Turning to the operation at Fekola, in Mali: Mali has had a restriction on the country since the beginning of April. We've managed to keep operating, and we've managed to keep receiving. We have accelerated mining in phase 4. Right now we hold a very large stockpile that will carry us through not only the second quarter but also the second half of the year. We are still holding our guidance of 600,000 to 620,000 oz for the year. As for the expansion, it breaks down into roughly three parts.
Bill Lytle
executiveThis is a comprehensive enterprise-wide build-out. Regarding mining, we placed the order for that fleet back in June 2019. Then, at the start of Q1 2020, before the pandemic hit, that fleet began operating. As I mentioned earlier, we have increased the mining rate and built a very substantial stockpile, which supports going from 6 million to 7.5 million tons per annum. That expansion remains on track to be finished and commissioned by the end of Q3 2020. Beyond that, we discussed completing a double tailings lift before the 2020 rainy season. That work is nearly done — over 90% complete at this point — and we expect it ahead of the 2020 season. This will provide capacity through 2023, giving us a couple of years to design and develop the following lift. Also, as Mike noted, the solar plant was paused. That solar expansion wasn't needed to support the mill expansion. Its purpose was cost reduction. As Mike said, once we restart the solar plant — which we expect within six months — we anticipate it being finished and operational. At Masbate in the Philippines, we are holding guidance of 200,000 oz-210,000 oz for this year.
Bill Lytle
executiveCOVID-19 struck the Philippines severely, with over 9,000 operations closed, international travel halted, and the whole population placed under a stay-at-home directive. That restriction has since been eased or partially lifted. At this point, they are working to restore the economy. On the island of Masbate, no COVID-19 cases have appeared at all; workers are being released from self-quarantine and operations are returning to full strength. Under our current plan, we are mining at full strength in both the Main Vein and the Montana pit. Guidance for this year remains unchanged there as well. At Otjikoto, the country was isolated early on because of worries about residents of informal settlements lacking electricity and water. A quarantine was imposed for the city of Windhoek in that region, along with the entire coastal region where most people live. That approach has worked very well. As of today, fewer than 20 cases have been reported in Namibia. Because of this, last month, in April, the government chose to begin easing some restrictions and quarantines. The Otjikoto mine is now ramping back up toward full production on the mining side.
Bill Lytle
executiveOn that front, we’re once again keeping our guidance for the year in place, and as of right now we don’t anticipate any enduring complications tied to COVID-19. The exception is Gramalote. Regarding Gramalote, when the pandemic hit, we said that after consulting with the community and the government, even though we had permission to keep operating, we chose to pause exploration for the time being. The way things stand there: we had been expected to finish a feasibility study by the end of 2020, and after that to make a call in early 2021 together with AngloGold. We stated publicly that completion of the feasibility study would slip to the end of Q1 2021. That stems from our having halted the drilling. In the interim, work on the feasibility study has carried on. Metallurgical testing has continued throughout. We’re preparing to do some work with our feasibility engineer, or our mill engineer. Mining design work has also been proceeding. On the engineering side, we remain on schedule, and we expect that within six months of getting back to full speed, we’ll be in a position to hand resource over to the engineering group. Possibly at some point in the first quarter, possibly a little earlier.
Bill Lytle
executiveWe are looking at how the timetable will look after drilling is underway. As I mentioned, from my side, what I’m saying is somewhat inconsistent since I’m able to pick up quite a lot of noise in the background.
Clive Johnson
executiveBill, I believe you've caught the main point. Your audio was fading in and out somewhat. Have you finished?
Bill Lytle
executiveRight, I'm finished. I was only checking whether there was anything you needed from me.
Clive Johnson
executiveAlright. No, I think that's fine, though. Thank you, Bill. There's just one point I wanted to add that I should have brought up at the beginning. I believe a key factor—one of the reasons we've succeeded in handling COVID-19 and kept our operations running so smoothly—is the relationships we have with our employees and with governments. As everyone knows, we take pride in our culture of fairness, respect, and transparency in how we treat people. In times like these, the mutual trust we've built and earned with our employees and the governments in the places where we operate really steps to the front. Cooperation has been excellent. Our employees have been outstanding. They were eager to work. The unions and our employees wanted to continue working if they could do so safely, and the governments in the countries where we're present wanted us to keep operating if safety could be assured. In the past, critics have talked about political risk in the regions of the world where we are, and we understand that. I think it's worth noting that there are positive aspects to being in countries that want you there—they want the tax revenue, and they want the good jobs, provided safety is maintained, the environment is taken care of, you're socially responsible, you do the right things, and you deliver on the commitments you make.
Clive Johnson
executiveOn the other side, political risk can mean operating in nations where your company plays a substantial economic role and matters socially and environmentally to what is going on — and I believe that applies to B2Gold. Much of what we achieve in ordinary periods, I think, stems from that, while our ability to handle crises and manage through them derives from many years of extensive experience doing this across the globe. It also derives from the connections we maintain with people. The governments in the places where we operate, locally and federally, have confidence in us. A trusting relationship has been established in both directions with them, and our employees trust us strongly that their interests are being protected. Those, I think, are among the main reasons we succeed. I would like now to have Tom provide a brief update on exploration activity. We keep exploring effectively around our mines and are pursuing major discoveries. The least expensive ounces are invariably those you discover yourself, and we have accomplished plenty of that, which is ongoing. Tom, the floor is yours.
Tom Garagan
executiveThanks, Clive. Is my voice coming through clearly for everyone?
Clive Johnson
executiveYour audio is coming through clearly on my end.
Tom Garagan
executiveAll right, good afternoon or good morning, everyone. At the mine sites in Mali, Masbate, and Otjikoto, B2Gold has kept up exploration during this period. Because of constraints brought about by COVID, much of our grassroots exploration has been reduced to minimal field work, or none whatsoever. Later in the summer, we’re hoping to resume work in a number of those areas. Regarding exploration at Masbate, to date we have drilled 7,000 m of a 25,000-m program. Drilling near the base of the pits has been the program’s focus, since we believe those pits hold strong potential to grow larger with higher gold prices, or if higher gold prices persist. We are concentrating on the bottom of those pit areas. At Otjikoto, we have drilled 4,000 m of the 14,000-m budget. The emphasis at Otjikoto has been on drilling down plant on Wolfshag. With underground development moving into the area, we want to see how it looks going down. So far we have had success in extending the mineralization, and now we want a better handle on grade through tighter-spaced drilling. We are also carrying out some grassroots drilling near the mine site on several other parallel structures that we see as having potential.
Tom Garagan
executiveExploration at Fekola has kept going right through this period. During the year to date, we have put down roughly 10,000 m of diamond drilling and more than 24,000 meters of RC drilling in the Fekola area. Our attention has centred largely on two zones: Mamba, up to the north, and the related parallel structures at Anaconda and Adder. We have begun concentrating considerably more on the Cardinal area. Some of our exploration effort — our focus — is moving to Cardinal. That area sits only slightly west of the Fekola pit, no more than 500 m away from it. Originally, we had earmarked this ground for a waste area. Results there have been quite good, and we are beginning to outline a resource. Drilling in that zone is being re-focused, with infill holes and work to test where its boundaries lie, so we can learn how large it may become. That work will carry on for the remainder of the year. At least one or two rigs will also stay active in the Mamba area. In addition, we intend to begin some met testing on ore from Cardinal before long. That is all I have to discuss. Clive, over to you.
Clive Johnson
executiveAppreciate it, Tom. All right, I believe the operator will now open the line for questions.
Operator
operatorThanks. Just a quick reminder — if you'd like to ask a question, press star one on your phone.
Ian MacLean
executiveAll right, at the moment we've got Ovais Habib, Geordie Mark, Kris Thompson, Josh Wolfson, Carey MacRury, and Lawson Winder on the line.
Clive Johnson
executiveWho is this speaking? You've reached the main line. Ian, you are connected to the main line. Hello?
Ian MacLean
executiveIs anyone on the line?
Clive Johnson
executiveHello, and at this point we'd like to begin taking questions for B2Gold.
Operator
operatorOvais Habib has the first question.
Ovais Habib
analystHello, Clive — is my voice coming through okay?
Clive Johnson
executiveAbsolutely, Ovais. Hi there, Ovais — how are things going?
Ovais Habib
analystAlright. Hello, everyone. Once more, I'd like to offer congratulations on a solid quarter, and likewise for keeping your guidance intact amid these extraordinary circumstances. Clive, my first question concerns Fekola. Clive, how ought we to view Fekola across the second half where output and costs are concerned? The mill expansion starts up in Q3, or at the close of Q3. Do you anticipate that the elevated grade now coming out of phase four will carry on through the second half too?
Clive Johnson
executiveNope, that's not something I see. Bill, I'll hand things to you.
Bill Lytle
executiveNo, not really. The basic idea is that we moved ounces ahead so we'd be certain of having those ounces for Q3 and Q4. Right now, we don't feel comfortable stating that we'll keep up that grade through Q3 and Q4; what we'd prefer to say is that we'll hit guidance at this point until we find out what happens with the mill extension.
Ovais Habib
analystAlright, so what I'm getting at, Bill, is whether you have some lower-grade material stockpiled at the site that could be blended through during Q3 and Q4. Or is the plan just to keep working through phase IV and then move on into phase V?
Bill Lytle
executiveYeah, quite a bit of that lower-grade stockpile is sitting there on site.
Ovais Habib
analystAll right, let's turn to Masbate, Bill. Clearly, regarding the oxides there, I believe we've discussed before that they were meant to wrap up in 2017, yet your team has kept mining those oxides through this quarter. Are these transition ounces that became oxides, or that weren't tested as oxides, and then do you anticipate those oxides carrying on into the second half?
Clive Johnson
executiveBill, over to you.
Bill Lytle
executiveYeah. That's the big question today. The answer is yes—a few transition oxides have converted into oxide, but much of it comes from us mining through surface dumps and certain stock works from the old underground, which were backfilled with material now essentially treated as ore. I can't give you an answer on that going forward. It's something we keep examining. What I can say is that part of it does arrive as a surprise, as upside, and we continue to hold our guidance.
Ovais Habib
analystUnderstood. Alright. Alright, everyone, I'll stop at this point and hand things over to the others. Thanks once more.
Clive Johnson
executiveThanks, Ovais — that's great.
Operator
operatorThe following question is from Geordie Mark.
Geordie Mark
analystGood day, everyone. Ovais here. Yeah, perhaps we could start with a few questions for Tom. Regarding Cardinal, could you refresh our memory—you mentioned on Friday that it was separate from the Just, in terms of the kind of mineralization present there and how its morphology looks to you at this point?
Clive Johnson
executiveAlright. Tom, your audio is cutting in and out a bit there, Geordie, though I believe I caught the main point regarding Cardinal — the question about Cardinal. Tom, would you like to say something on that?
Tom Garagan
executiveGeordie, I couldn’t catch what you said very clearly. Broadly speaking, Cardinal differs somewhat from Fekola. It sits within a mix of diorites and what I suppose you’d describe as black shales, which are mudstones. There are several zones tied to really strong alteration, sulfides spread throughout, a small amount of copper, and at times some gold you can see. These are certainly zones of another style. They relate more to shear zones. Drilling has been fairly extensive across it up to now. We’re continuing to learn about it. Was that what you were asking, Geordie? I wasn’t able to hear you well.
Geordie Mark
analystYeah, that was — thanks. I might just pick up where Bill left off regarding the Fekola mining fleet and the fleet capacity you currently have. Any thoughts on how that fleet capacity might change, with the gold price where it is, effective strip ratios shifting, and stockpiling strategies, given the mining capacity you've put in place?
Bill Lytle
executiveThat question didn’t come through clearly to me.
Operator
operatorMy apologies.
Geordie Mark
analystThat's fine.
Bill Lytle
executiveThe question I had was regarding…
Geordie Mark
analystPerhaps I should simply put those down in writing, and we can discuss them separately afterward.
Clive Johnson
executiveYes, that probably makes the most sense. The audio from your side is cutting out really badly. Thanks. Operator?
Operator
operatorThe following question is from Kris Thompson.
Kris Thompson
analystHello there, and good morning, everyone. Congrats on a truly outstanding quarter. Like Ovais mentioned, it's genuinely encouraging that you're maintaining guidance through a difficult stretch. I just have a single question. I believe it concerns the Snake deposits, which are clearly close to Fekola. Could you help us understand where things stand regarding the testing of the economics of those deposits?
Clive Johnson
executiveOkay, Kris, I suppose my answer would be that the saprolite is what we’re focused on. That resource holds 800,000 oz, with a little over a gram in the saprolite, which now appears to have grown considerably larger. It’s getting bigger. As you know, we’ve also been getting some very good hits lower down, beneath, on the sulfide belts at Mamba and Anaconda. To be frank, at this point we’re waiting to find out how large it becomes. I think what we’d need to determine is whether this is additional feed for Fekola at some stage in the mill. As you know, it’s 20 km away. Is this a standalone scenario? What we’re really giving Tom here is the ability, or the time, to drill these multiple targets aggressively that we’ve now seen in the sulfides and establish, first, how big the saprolite gets, and second, whether we’re looking at a potentially significant deposit in the sulfide, or deposits in the sulfides as well. My sense is that as we move through the end of the year and into next year, we’ll probably begin to get a somewhat better handle on that. Would you say that’s fair, Tom?
Tom Garagan
executiveYes, Clive, that's fairly accurate. If I may build on it, we've encountered numerous intercepts within the sulfides, and at Mamba specifically, we've now identified at least 2 continuous mineralized zones that look quite promising and have a shallow plunge. We're attempting to interpret those zones, and through the drilling we're conducting on saprolite, we keep discovering additional areas of saprolite mineralization. I'd characterize it as still early stage, and as Clive mentioned, they've provided us with the opportunity to try to determine where it's heading and how large it might become before we transfer the resource to the engineers.
Kris Thompson
analystThanks, guys. One more quick question, if I could, and it's about Masbate. Could you help us understand, at steady state, how the runway breaks down between Main Vein and Montana?
Clive Johnson
executiveBill, over to you?
Bill Lytle
executiveSteady state? Well, we're in the process of altering that as we speak, since at first the projection had us entering Main, or entering Montana, in February, and we've now gotten in there, so we're taking a close look at it at this moment. I wouldn't want to state outright what I believe the steady state split will look like for the remainder of the year until our revised mine plan is up and running.
Kris Thompson
analystOkay, everybody. Many thanks.
Clive Johnson
executiveAlright, thanks a lot, Kris. Appreciate it.
Operator
operatorJosh Wolfson has the next question.
Josh Wolfson
analystThanks. I’ve just got one brief question.
Clive Johnson
executiveAre you Josh? Yes. Is my voice coming through? You dropped out for a moment. Try that again. All right. It looks like Josh is no longer with us.
Ian MacLean
executiveYes, hi everybody. This is Ian MacLean speaking. As you can tell, we're clearly struggling with the phone connection. Should any of you have questions that weren't able to get through, just send them straight to my email, and I'll steer you toward the appropriate folks who can provide an answer.
Clive Johnson
executiveAre there any further questions, operators?
Operator
operatorCarey MacRury has the next question.
Carey MacRury
analystHello there, is my audio coming through clearly for everyone?
Clive Johnson
executiveYes, Carey, I’m able to hear you.
Carey MacRury
analystPerhaps one more thing for Bill regarding Fekola — you know, $251 during the quarter. Is there anything out of the ordinary in that period that we ought to expect to reverse in subsequent quarters? And second, any detail on the cost side, mining versus milling, and so on, in terms of where you're seeing productivity?
Bill Lytle
executiveI'll pass on that.
Carey MacRury
analystWhen it comes to comparing mining costs with milling costs?
Bill Lytle
executiveWell, no. As far as production goes, we certainly aren't seeing anything. Basically, we moved a bit quicker on phase four and a bit slower on phase five. Some of the capital expenditures that were deferred in Q1 — we will see those pushed out. I think Mike already commented on that; basically, we are not adjusting our capital costs down for the year. We're going to stay on budget for that.
Carey MacRury
analystAll right. Perhaps what Geordie meant to ask was this: regarding the mining fleet for the expansion, has it now been fully deployed and is it up and running?
Bill Lytle
executiveI’m sorry, but I didn’t understand what the question was.
Clive Johnson
executiveThe question concerns our mining fleet. Has the new mining fleet now reached full operational status?
Bill Lytle
executiveOh, okay. No. Sorry—the connection is making it really hard to hear anything. The answer is no. Phase I of the mining fleet is up and running. Phase II is arriving at site right now. In fact, just within the past week, we've literally been receiving the next batch of 6040s and 789 trucks.
Clive Johnson
executiveCarey, is there anything more to add?
Operator
operatorAt this point, I'd like to return the conference to Clive Johnson.
Clive Johnson
executiveAll right, thank you all. Ian, perhaps you could reach out to whoever arranged this call and find out whether we can make it better next time, or else use a different provider. If we're capable of sending people to the moon, surely we ought to manage a simple conference call. All right, I appreciate everyone joining. Stay safe. Have a good day.
Operator
operatorThat brings us to the end of today's conference call. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete B2Gold Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to B2Gold Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in B2Gold Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.